# Boeing Service Bulletin 777-24-0077: Revision 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0544; AD 2014-16-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin 777-24-0077](https://openairdocs.org/service-documents/boeing/sb-777-24-0077.md)
- Title as filed: U.S. DOT/FAA - SB-777-24-0077-R04
- Pages: 51
- PDF: https://openairdocs.org/files/sha256/cd/e7/cde70e573fbf0162b311e99e9a23f10791fd249d2325a1cac3ab874e689368de
- Page: https://openairdocs.org/service-documents/boeing/sb-777-24-0077/file/cde70e573fbf

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
Number: 777-24-0077
Original Issue: August 21, 2003
Revision 4: October 17, 2012
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2003 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
1 of 51
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
2 of 51
BOEING SERVICE BULLETIN 777-24-0077
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 2
B. Concurrent Requirements ...................................... 1 2
C. Reason ................................................ 1 4
D. Description .............................................. 1 5
E. Compliance .............................................. 1 6
F. Approval ............................................... 1 7
G. Manpower .............................................. 1 7
H. Weight and Balance Changes .................................... 1 8
I. Electrical Load Data ......................................... 1 8
J. References .............................................. 1 9
1. Existing Data: ......................................... 1 9
2. Data Supplied with this Service Bulletin: ........................... 1 9
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 0
K. Publications Affected ........................................ 2 0
L. Interchangeability and Intermixability of Parts ........................... 2 0
M. Software Accomplishment Summary ................................ 2 0
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 1
C. Parts Necessary for Each Airplane ................................. 2 1
1. Kits/Parts: ........................................... 2 1
2. Parts and Materials Supplied by the Operator: ........................ 2 3
3. Parts Modified and Reidentified: ............................... 2 4
4. Parts Removed and Not Replaced: .............................. 2 5
D. Parts Necessary to Change Spares ................................. 2 5
E. Special Tooling - Price and Availability ............................... 2 5
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 7
A. GENERAL INFORMATION ..................................... 2 7
B. WORK INSTRUCTIONS ....................................... 2 7
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1 [Group 1, Configuration 1] ........ 4 0
FIGURE 2: FLIGHT DECK - AIRPLANE WIRE ROUTING [Group 1, Configuration 1] ......... 4 4
FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING [Group 1, Configuration 1] . 46
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
3 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
4 of 51
BOEING SERVICE BULLETIN 777-24-0077
BLANK PAGE

### Page 5

Commercial 
Airplanes
777
Service Bulletin
Revision Transmittal SheetNumber: 777-24-0077Original Issue: August 21, 2003
Revision 4: October 17, 2012
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on the airplanes changed in accordance with Revision 3 of this service bulletin.
REASON FOR REVISION
This revision is sent to tell operators that GE Aviation Service Bulletin 4000ELM-24-435 has been revised, and
to give data to change an Electrical Power Control Panel, part number 233W3202-9 to the new part number
233W3202-18.
These sections were changed:
1. In Paragraph 1.B., Concurrent Requirements, changed the GE Aviation service bulletin data.
2. In Summary, Background, Summary Manpower, Paragraph 1.C., Reason, Paragraph 1.G., Manpower
and Paragraph 1.J.1., Existing Data, added BAE Systems SB 233W3202-24-03 reference.
3. In Paragraph 1.K., Publications Affected, changed the publications data.
4. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator:
a. Added an Electrical Power Control Panel part number.
b. Added a note.
5. In Paragraph 2.C.3., Parts Modified and Reidentified, added a table.
6. In Paragraph 3.B., Work Instructions:
a. Step 3, added a note.
b. Step 5, changed the GE Aviation service bulletin data.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
5 of 51

### Page 6

REVISION HISTORY
August 21, 2003Original Issue:
May 24, 2007Revision 1:
December 17, 2009Revision 2:
December 06, 2011Revision 3:
October 17, 2012Revision 4:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
6 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 7

Commercial 
Airplanes
777
Service Bulletin
SummaryNumber: 777-24-0077Original Issue: August 21, 2003
Revision 4: October 17, 2012
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
The change described in this service bulletin will provide new switches on the flight deck that can remove power
from the cabin systems if smoke or flames occur.
We have received numerous reports of smoke or flames in the passenger cabin related to the wiring for the
passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not easy to remove the
electrical power to these systems to stop the smoke or flames.
Two switches can be installed to remove power from some of the passenger cabin electrical systems. When
selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the IFE (in-flight
entertainment) system and the passenger seats (seat motor power, personal computer power outlets and
telephones).
When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground service bus
(except the main and APU battery chargers and left forward fuel pump), the utility busses, the gasper air fan,
the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch is off, the night lights, the
supplemental night lights, the reading lights, the attendant work lights and some of the galley and crew rest
lights will be turned on.
Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.
BAE Systems SB 233W3202-24-03 Original Issue and BAE Systems SB 233W3202-24-04 Revision 2 are related
to this service bulletin.
ACTION (PRR 61887)
Group 1, Configuration 1:
On the P5 panel, replace the electrical power control panel. Install eight new wires and remove two wires between
the P5 panel and the P61 overhead panel. Install 13 new wires between the P110 panel and the P210 panel.
Remove one wire between the P210 panel and the P101 panel. Install four new wires between the P210 panel
and the P320 panel. Make the changes to the P110, P210 and P320 panels in accordance with the Smiths/GE
Aviation service bulletins. Do a test of the passenger cabin systems, including the IFE/PASS SEATS switch.
Do a test of the CABIN UTILITY switch.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
7 of 51

### Page 8

Group 1, Configuration 2:
More work is necessary. In the flight compartment, get access to the electrical power control panel. Do an
inspection on the electrical power control panel for the part number. If the electrical power control panel has the
part number 233W3202-18, and does have lockwire provisions on the switch guards at switches S6 and S10,
then change the part number to 233W3202-19. If the electrical power control panel has the part number
233W3202-19, and does not have lockwire provisions on the switch guards at switches S6 and S10, then change
the part number to 233W3202-18.
EFFECTIVITY
777-200 Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive (AD) related to this
service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service
bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done 60 months after the Revision 1 date
of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Group 1, Configuration 1:
Elapsed HoursTotal Task HoursAirplanes
13.5027.00777-200
Group 1, Configuration 1:
The time to make the change to the P110, P210 and P320 panels in accordance with the Smiths/GE Aviation
Service Bulletins is not included.
Group 1, Configuration 1:
This estimate does not include the task hour data given in the Boeing service bulletins in Paragraph 1.B.,
Concurrent Requirements.
Group 1, Configuration 1:
The time to make the change to the electrical power control panel in accordance with the BAE Systems SB
233W3202-24-03 Original Issue and/or BAE Systems SB 233W3202-24-04 Revision 2 is not included.
Group 1, Configuration 2:
Elapsed HoursTotal Task HoursAirplanes
1.001.00More Work
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
8 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 9 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
SEE
• SEE D
MAIN EQUIPMENT CENTER
ACCESS DOOR, 117AL
CHANGE THE P210 RIGHT  ROUTE FOUR NEW WIRES
POWER MANAGEMENT PANEL  FROM THE P210 PANEL TO
HARDWARE AND SOFTWARE  THE P320 PANEL
E1/E2 RACK
ROUTE 13 NEW WIRES
FROM THE P110 PANEL
TO THE P210 PANEL
CHANGE THE P320 GROUND
SERVICE HANDLING POWER
PANEL HARDWARE AND  CHANGE THE P110 LEFT
SOFTWARE  POWER MANAGEMENT PANEL
FWD *  HARDWARE AND SOFTWARE
MAIN EQUIPMENT CENTER
W27991
Original Issue: August 21, 2003
Revision 4: October 17, 2012  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-24-0077
Work - See page 1 for details.  9 of 51

### Page 10 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
DO A TEST OF THE
SEE D  IFE/PASS SEATS AND
CABIN UTILITY SWITCHES
SEE (C  ELECTRICAL
BATTERY  APU
ON
IFE/PASS  CABIN  ON  OFF  START
SEATS  UTILITY
OFF
ON
OFF  OFF  APU GEN
ON  FAULT
OFF
BUS TIE  BUS 1IE
AUTO  AUTO
FWD  ISLN  SECONDARY  PRIMARY  ISLN
EXT PWR  EXT PWR
OVERHEAD PANEL, P5  ON
FLIGHT  COMPARTMENT  AVAIL  AVAIL
GEN  GEN
CTRL  CTRL
BACKUP GEN
OFF  ON  ON  OFF
OFF  OFF
DRIVE
DRIVE DISC
REPLACE THE
ELECTRICAL POWER
CONTROL PANEL
INSTALL 8 NEW
WIRES AND REMOVE 2
WIRES BETWEEN THE P5
PANEL AND THE P61
OVERHEAD PANEL
•FWD
W27984
Original Issue: August 21, 2003
Revision 4: October 17, 2012  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-24-0077
Work - See page 1 for details.  10 of 51

### Page 11

Commercial 
Airplanes
777
Service Bulletin
Number: 777-24-0077
Original Issue: August 21, 2003
Revision 4: October 17, 2012
ATA System: 2400
SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power
Isolation Switches
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-24W001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 61887 for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
777-200 Airplanes with classic core IFE interface.-1
777-200 Airplanes that have not accomplished BAE Systems Service
Bulletin 233W3202-24-04 Original Issue or Revision 1.
1
777-200 Airplanes that have accomplished BAE Systems Service
Bulletin 233W3202-24-04 Original Issue or Revision 1.
2
Airplane Models:
777-200
GroupVariable Number
1WA002 - WA017
1WA076 - WA080
1WA086 - WA093
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
11 of 51

### Page 12

GroupVariable Number
1WA196 - WA198
1WA206 - WA209
1WA261 - WA266
1WB001 - WB015
1WB051 - WB082
1WB101 - WB104
1WB121 - WB125
1WB131 - WB132
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
B. Concurrent Requirements
Group 1, Configuration 1:
The service bulletins listed below must be done before or at the same time as this service bulletin:
Group 1, Configuration 1:
DescriptionService BulletinCompany
Installs new OPS in the Cabin Area Control Panel
(CACP) to change the operation of the cabin
lighting system when the CABIN/UTILITY switch
is installed.
777-23-0176 Original Issue thru
Revision 2.
Boeing
Changes the ELMS OPS and OPC software to
decrease the number of ELMS P110 Panel, ELMS
P210 Panel and ELMS P310 Panel EICAS status
messages. (a)
777-24-0087 Original Issue thru
Revision 2.
Boeing
(a) The changes in accordance with Boeing Service Bulletin 777-24-0087 can only be done at the same
time as the changes in accordance with this service bulletin.
Group 1, Configuration 1:
The Smiths/GE Aviation Service Bulletins listed below must be done to complete the changes in
accordance with this service bulletin.
Group 1, Configuration 1:
Description
(Power Panel)
Service BulletinCompany
P3204000ELM-24-435 Revision 8, Dated March 26, 2012GE Aviation
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
12 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 13

Group 1, Configuration 1:
Description
(Power Panel)
Service BulletinCompany
P3204000ELM-24-556 Revision 1, Dated December 21, 2009GE Aviation
P3204000ELM-24-619 Original Issue, Dated May 9, 2003Smiths
P3204000ELM-24-625 Original Issue, Dated May 9, 2003Smiths
P1105000ELM-24-450 Original Issue, Dated April 11, 2003Smiths
P1105000ELM-24-454 Original Issue, Dated April 11, 2003Smiths
P1105000ELM-24-554 Original Issue, Dated April 15, 2003Smiths
P1105000ELM-24-559 Revision 2, Dated August 12, 2005Smiths
P1105000ELM-24-560 Revision 2, Dated April 10, 2006GE Aviation
P1105000ELM-24-562 Revision 1, Dated March 3, 2005Smiths
P1105000ELM-24-565 Revision 2, Dated December 14, 2009GE Aviation
P1105000ELM-24-617 Original Issue, Dated May 9, 2003Smiths
P1105000ELM-24-451 Original Issue, Dated April 22, 2003GE Aviation
P1105000ELM-24-514 Revision 2, Dated December 12, 2005GE Aviation
P1105200ELM-24-566 Original Issue, Dated April 24, 2003Smiths
P2106000ELM-24-461 Revision 1, Dated June 12, 2006GE Aviation
P2106000ELM-24-555 Original Issue, Dated April 15, 2003Smiths
P2106000ELM-24-571 Revision 6, Dated December 14, 2009GE Aviation
P2106000ELM-24-572 Revision 3, Dated July 03, 2008GE Aviation
P2106000ELM-24-573 Revision 1, Dated December 12, 2005GE Aviation
P2106000ELM-24-575 Original Issue, Dated April 29, 2003Smiths
P2106000ELM-24-588 Revision 1, Dated June 12, 2006GE Aviation
P2106000ELM-24-590 Original Issue, Dated April 16, 2003Smiths
P2106000ELM-24-597 Revision 1, Dated December 14, 2009GE Aviation
P2106000ELM-24-601 Original Issue, Dated May 1, 2003Smiths
P2106000ELM-24-604 Revision 1, Dated June 14, 2005Smiths
P2106000ELM-24-614 Revision 1, Dated November 9, 2009GE Aviation
P2106000ELM-24-618 Original Issue, Dated May 9, 2003Smiths
P2106000ELM-24-624 Revision 5, Dated December 14, 2009GE Aviation
P2106053ELM1-24-613 Original Issue, Dated July 8, 2003Smiths
P2106060ELM1-24-587 Revision 1, Dated May 24, 2010GE Aviation
P2106064ELM1-24-576 Original Issue, Dated May 6, 2003Smiths
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
13 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 14

Group 1, Configuration 1:
Description
(Power Panel)
Service BulletinCompany
P2106064ELM1-24-603 Original Issue, Dated May 1, 2003Smiths
P2106087ELM1-24-615 Original Issue, Dated July 8, 2003Smiths
P2106000ELM-24-440 Revision 1, Dated December 21, 2005GE Aviation
P2106000ELM-24-456 Revision 1, Dated February 17, 2005Smiths
P2106000ELM-24-457 Original Issue, Dated April 11, 2003Smiths
P2106000ELM-24-460 Revision 3, Dated December 2, 2009GE Aviation
P2106000ELM-24-545 Revision 3, Dated December 22, 2005GE Aviation
P2106200ELM-24-581 Revision 1, Dated March 5, 2010GE Aviation
P2106200ELM-24-616 Revision 1, Dated March 5, 2010GE Aviation
P2106205ELM6-24-605 Original Issue, Dated May 2, 2003Smiths
P2106087ELM1-24-703 Original Issue, Dated January 26, 2009GE Aviation
The Smiths/GE Aviation service bulletins listed below are for reference and give the specific service
bulletins applicable for each airplane.
Group 1, Configuration 1:
NotesRevision and DateSmiths/GE Aviation Service
Bulletins
Reference OnlyRevision 2, Dated January 20, 2006ELMS-24-ANA
Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-BAB
Reference OnlyRevision 1, Dated January 16, 2004ELMS-24-EAD
Reference OnlyRevision 1, Dated March 1, 2004ELMS-24-GUN
Reference OnlyRevision 1, Dated March 1, 2004ELMS-24-JAL
Reference OnlyRevision 3, Dated May 23, 2004ELMS-24-JAS
Reference OnlyRevision 3, Dated December 14, 2009ELMS-24-KAL
Reference OnlyRevision 1, Dated March 1, 2004ELMS-24-TII
Reference OnlyRevision 2, Dated February 16, 2009ELMS-24-UAL
Group 1, Configuration 2:
None.
C. Reason
The change described in this service bulletin will provide new switches on the flight deck that can
remove power from the cabin systems if smoke or flames occur.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
14 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 15

We have received numerous reports of smoke or flames in the passenger cabin related to the wiring
for the passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not
easy to remove the electrical power to these systems to stop the smoke or flames.
Two switches can be installed to remove power from some of the passenger cabin electrical systems.
When selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the
IFE (in-flight entertainment) system and the passenger seats (seat motor power, personal computer
power outlets and telephones).
When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground
service bus (except the main and APU battery chargers and left forward fuel pump), the utility busses,
the gasper air fan, the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch
is off, the night lights, the supplemental night lights, the reading lights, the attendant work lights and
some of the galley and crew rest lights will be turned on.
Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.
BAE Systems SB 233W3202-24-03 Original Issue and BAE Systems SB 233W3202-24-04 Revision
2 are related to this service bulletin.
Revision 1 was sent to add three new wires to the wire changes in Figure 1. Reference to
6000ELM1-24-461 were revised to 6000ELM-24-461 due to typographical error. References to Smiths
service bulletin 6000ELM-24-459, 6000ELM-24-567, 5600ELM-24-558, 5000ELM-24-477, and
5000ELM-24-564 were removed because they are not applicable to airplanes with classic core IFE.
Revision 2 was sent to include reference to GE Aviation Service Bulletin 6087ELM1-24-703 in the
service bulletin. GE Aviation Service Bulletin 6087ELM1-24-703 gives instructions to change the wiring
in the Electrical Load Management System (ELMS) P210 panel for airplanes WA261-WA266. Also,
GE Aviation Service Bulletin ELMS-24-UAL which gives airplane applicability data, has been revised
to add reference to GE Aviation Service Bulletin 6087ELM1-24-703.
Revision 3 was sent to tell operators that the wire kit 280W5110-101 included in the top kit 005W3206-1
contains a wire 280W5110-101W of incorrect length. A new supplemental kit 280W5110-105W is added
to this service bulletin which contains an equivalent wire with the correct length. Also, this revision is
sent to tell operators that BAE Systems Service Bulletin 233W3202-24-04, and some GE Aviation
service bulletins have been revised.
The data given in Information Notice 777-24-0077 IN01 and 777-24-0077 IN02 is included in this
revision.
Revision 4 is sent to tell operators that GE Aviation Service Bulletin 4000ELM-24-435 has been revised,
and to give data to change an Electrical Power Control Panel, part number 233W3202-9 to the new
part number 233W3202-18.
D. Description
Group 1, Configuration 1:
On the P5 panel, replace the electrical power control panel. Install eight new wires and remove two
wires between the P5 panel and the P61 overhead panel. Install 13 new wires between the P110 panel
and the P210 panel. Remove one wire between the P210 panel and the P101 panel. Install four new
wires between the P210 panel and the P320 panel. Make the changes to the P110, P210 and P320
panels in accordance with the Smiths/GE Aviation service bulletins. Do a test of the passenger cabin
systems, including the IFE/PASS SEATS switch. Do a test of the CABIN UTILITY switch.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
15 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 16

Group 1, Configuration 2:
More work is necessary. In the flight compartment, get access to the electrical power control panel.
Do an inspection on the electrical power control panel for the part number. If the electrical power control
panel has the part number 233W3202-18, and does have lockwire provisions on the switch guards at
switches S6 and S10, then change the part number to 233W3202-19. If the electrical power control
panel has the part number 233W3202-19, and does not have lockwire provisions on the switch guards
at switches S6 and S10, then change the part number to 233W3202-18.
Revision 1 - More work may be necessary on airplanes changed as shown in the Original Issue of this
service bulletin. Operators can install the three new wires W6220-0071-20, W6220-072-20 and
W6220-073-20 as shown in Figure 1.
Revision 2 - More work is necessary on airplanes WA261-WA266 changed in accordance with the
Original Issue or Revision 1 of this service bulletin. For airplanes WA261-WA266 do GE Aviation Service
Bulletin 6087ELM1-24-703 Original Issue to change the wiring in the ELMS P210 panel.
Revision 3 - More work is necessary on the airplanes changed in accordance with BAE Systems Service
Bulletin 233W3202-24-04 Original Issue or Revision 1. The electrical power control panels 233W3202-12
and 233W3202-13 were incorrectly identified. The correct part number for the changed 233W3202-12
panel is 233W3202-18, and for the changed 233W3202-13 panel is 233W3202-19.
Revision 3 - More work is necessary on the airplanes changed in accordance with GE Aviation Service
Bulletin 6000ELM-24-614 Original Issue or GE Aviation SB 6200ELM-24-616 Original Issue. Do GE
Aviation SB 6000ELM-24-614 Revision 1 or GE Aviation SB 6200ELM-24-616 Revision 1 to put back
the P210 power panel to the correct standard.
Revision 4 - No more work is necessary on the airplanes changed in accordance with Revision 3 of
this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
117, 118777-200
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive (AD) related
to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in
this service bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done 60 months after the Revision
1 date of this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
16 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 17

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools
Group 1, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.751.52Open Access
8.0016.02Change
0.751.52Close Access
4.008.02Test
13.5027.00TOTAL FOR EACH AIRPLANE
Group 1, Configuration 1:
The time to make the change to the P110, P210 and P320 panels in accordance with the Smiths/GE
Aviation Service Bulletins is not included.
Group 1, Configuration 1:
This estimate does not include the task hour data given in the Boeing service bulletins in Paragraph
1.B., Concurrent Requirements.
Group 1, Configuration 1:
The time to make the change to the electrical power control panel in accordance with the BAE Systems
SB 233W3202-24-03 Original Issue and/or BAE Systems SB 233W3202-24-04 Revision 2 is not
included.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
17 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 18

Group 1, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
0.250.251Open Access
0.250.251Inspect
0.250.251Change
0.250.251Close Access
1.001.00TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Group 1, Configuration 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+951.6+2.6777-200
Group 1, Configuration 2:
None.
I. Electrical Load Data
Group 1, Configuration 1:
The electrical loads for these circuit breakers do not change. These circuit breakers change electrical
busses as shown in the last two columns of the following table. The actual electrical loads for these
circuit breakers can be found in the current copy of the electrical load analysis for the airplane. Some
airplanes will not have all of these circuit breakers. Change the electrical buss data only for the circuit
breakers installed on the airplane.
Group 1, Configuration 1:
Post S/B Bus LocationPre S/B Bus LocationNomenclatureCircuit Breaker
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase ALandscape CameraC23423
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase ACTUC23430
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase BUHF RC23432
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase CUHF LC23434
R Utility, Phase BR Utility, Phase CM1/M2 Galley HandsetsC23450
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase ACabin File ServerC23454
R Utility, Phase BR Utility, Phase CFax MachineC23455
R Utility, Phase BR Utility, Phase ACabin Unit/HolsterC23460
R Utility, Phase BR Utility, Phase APhones F/CC23468
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase BBCC PrinterC23473
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
18 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 19

Group 1, Configuration 1:
Post S/B Bus LocationPre S/B Bus LocationNomenclatureCircuit Breaker
L MAIN AC Sec 2, Phase AL MAIN AC Sec 1, Phase BCrew Rest Powered SeatsC25429
Group 1, Configuration 2:
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 61887
b. Boeing Service Bulletin 777-23-0125, 777-23-0176, 777-24-0087
c. Boeing Service Related Problem (SRP) 777-SRP-24-0091
d. Standard Overhaul Practices Manual (SOPM) 20-50-10
e. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19, 20-30-11, 20-30-12,
20-30-16, 20-61-11, 20-74-11
f. 777 Aircraft Maintenance Manual (AMM) 12-11-01, 23-18-00, 23-18-05, 23-32-00, 24-22-00,
24-22-01, 24-31-02, 24-31-06, 33-13-00, 33-16-00, 33-21-00, 33-31-00, 33-44-00
g. 777 Wiring Diagram Manual (WDM) 23-32-02, 23-93-21, 24-51-24, 24-51-41, 46-01-11
h. BAE Systems Service Bulletin 233W3202-24-03, 233W3202-24-04
NOTE: These Service Bulletins were previously issued by Boeing.
i. GE Aviation Service Bulletin 4000ELM-24-435, 5000ELM-24-451, 5000ELM-24-514,
5000ELM-24-560, 5000ELM-24-565, 5200ELM-24-566, 6000ELM-24-440, 6000ELM-24-460,
6000ELM-24-461, 6000ELM-24-545, 6000ELM-24-571, 6000ELM-24-572, 6000ELM-24-573,
6000ELM-24-588, 6000ELM-24-597, 6000ELM-24-614, 6000ELM-24-624, 6060ELM1-24-587,
6087ELM1-24-703, ELMS-24-UAL
j. Smiths Service Bulletin 4000ELM-24-556, 4000ELM-24-619, 4000ELM-24-625,
5000ELM-24-450, 5000ELM-24-454, 5000ELM-24-554, 5000ELM-24-559, 5000ELM-24-562,
5000ELM-24-617, 6000ELM-24-456, 6000ELM-24-457, 6000ELM-24-555, 6000ELM-24-575,
6000ELM-24-590, 6000ELM-24-601, 6000ELM-24-604, 6000ELM-24-618, 6053ELM1-24-613,
6064ELM1-24-576, 6064ELM1-24-603, 6087ELM1-24-615, 6200ELM-24-581,
6200ELM-24-616, 6205ELM6-24-605, ELMS-24-ANA, ELMS-24-BAB, ELMS-24-EAD,
ELMS-24-GUN, ELMS-24-JAL, ELMS-24-JAS, ELMS-24-KAL, ELMS-24-TII
NOTE: The supplier was told to send copies of the service bulletin to each operator.
2. Data Supplied with this Service Bulletin:
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
19 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 20

3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Wire Bundle Installation - Bulkhead (STA 332.5)288W4106
Wire Bundle Installation - L.S. Passenger Floor (STA 379-469)288W4111
Wire Bundle Installation - L.S. Cab Floor and Forward Passenger
Floor (STA 209.5-379.0)
288W4115
Wire Bundle Installation - R.S. Cab Floor and Forward Passenger
Floor (STA 209.5-379.0)
288W4116
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
1.21, 6.10, 6.20, 6.30, NNC.6777 Operations Manual
23-32777 Maintenance Manual
Equipment List, 23-32, 23-93, 24-51, 46-01777 Wiring Diagram Manual
23-32, 23-93, 24-51777 Schematic Diagram Manual
24-11, 24-21, 24-31, 24-41, 31-12, 33-13777 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
20 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Group 1, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 3 date of this
Service Bulletin (US
Dollars)
ROLT as of Revision
3 date of this Service
Bulletin (Calendar
Days)
NameKit Number
1,346.00182TOP KIT - CABIN POWER ISOLATION
SWITCH INSTALLATION
005W3206-1
90.00 (a)149WIRE280W5110-105W
(a) Wire 280W5110-105W is a supplemental kit to the top kit 005W3206-1.
Group 1, Configuration 2:
None.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
Group 1, Configuration 1:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Group 1, Configuration 1:
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
21 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 22

Group 1, Configuration 1:
Kit 005W3206
NotesExisting Part
Number
NameQTYNew Part Number
-1
(a)Top Kit-005W3206-1
Wire Kit1280W5110-1
Strap45BACS38K1
Strap70BACS38K1B
Strap25BACS38K1E
Strap10BACS38K2B
(a) There are more parts than are necessary.
Group 1, Configuration 1:
Kit 280W5110
NotesExisting Part
Number
NameQTYNew Part Number
-1-101-102-103-104-201
(a)Wire Kit-.....280W5110-1
Kit (W4236)1-....280W5110-101
Wire.1....280W5110-101W
Tie Wrap.1....280W5110-10101
Kit (W1052)1.-...280W5110-102
Wire..1...280W5110-102W
Tie Wrap..1...280W5110-10201
Identification Tape..1...280W5110-10202
Identification Tape..1...280W5110-10203
Kit (W6120)1..-..280W5110-103
Wire...1..280W5110-103W
Tie Wrap...1..280W5110-10301
Identification Tape...1..280W5110-10302
Kit (W6220)1...-.280W5110-104
Wire....1.280W5110-104W
Tie Wrap....1.280W5110-10401
Identification Tape....1.280W5110-10402
Identification Tape....1.280W5110-10403
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
22 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 23

Group 1, Configuration 1:
Kit 280W5110
NotesExisting Part
Number
NameQTYNew Part Number
-1-101-102-103-104-201
Identification Tape....1.280W5110-10404
Identification Tape....1.280W5110-10405
Kit (Spares)1....-280W5110-201
Contact, Socket...6122BACC47CN1S
Contact, Pin....31BACC47CN2A
Contact, Socket..8...BACC47CP1S
Splice...112BACT12C12
Contact, Socket..6...CTA0165 (CTA-
0165)
Sleeve...112D436-39
Contact, Pin..2...M39029-1-101
(M39029/1-101)
End Cap....11324485
(a) There are more parts than are necessary.
Group 1, Configuration 1:
Kit 280W5110
NotesExisting Part Num-
ber
NameQTYNew Part Number
-105W
(a)Wire1280W5110-105W
(a) Wire 280W5110-105W is a replacement for wire 280W5110-101W of incorrect length. Wire 280W5110-
101W is included in the wire kit 280W5110-101.
Group 1, Configuration 2:
None.
2. Parts and Materials Supplied by the Operator:
Group 1, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specifica-
tion
(c) (e)233W3202-9Electrical Power Control Panel1233W3202-18 (a)
(c) (d)233W3202-12Electrical Power Control Panel1233W3202-18 (a)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
23 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 24

Group 1, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specifica-
tion
(c) (d)233W3202-13Electrical Power Control Panel1233W3202-19 (a)
(c) (d)233W3202-11Electrical Power Control Panel1233W3202-22 (b)
(f)-Contact, Pin2BACC47CN2A
(a) This part is used in production.
(b) This part is not used in production.
(c) You cannot use the existing part to replace the new or changed part.
(d) The existing part number can be changed to the new part number in accordance with BAE Systems SB
233W3202-24-04 Revision 2.
(e) The existing part number can be changed to the new part number in two steps. The part number
233W3202-9 can be changed to part number 233W3202-12 in accordance with BAE Systems SB
233W3202-24-03 Original Issue, and then to the new part number in accordance with BAE Systems SB
233W3202-24-04 Revision 2.
(f) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
Group 1, Configuration 2:
None.
3. Parts Modified and Reidentified:
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
Group 1, Configuration 1:
NotesNew Part NumberNameQTYExisting Part Number
(b)233W3202-18Electrical Power Control Panel1233W3202-9
(a)233W3202-18Electrical Power Control Panel1233W3202-12
(a)233W3202-19Electrical Power Control Panel1233W3202-13
(a)233W3202-22Electrical Power Control Panel1233W3202-11
(a) Make the change in accordance with BAE Systems SB 233W3202-24-04 Revision 2.
(b) Make the change in two steps. The part number 233W3202-9 is changed to part number 233W3202-12
in accordance with BAE Systems SB 233W3202-24-03 Original Issue, and then to the new part number
in accordance with BAE Systems SB 233W3202-24-04 Revision 2.
Group 1, Configuration 2:
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
24 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 25

4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
25 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 26

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
26 of 51
BOEING SERVICE BULLETIN 777-24-0077
BLANK PAGE

### Page 27

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Refer to the Boeing Standard Wiring Practices Manuals SWPM 20-10-11, SWPM
20-10-12, SWPM 20-30-11, SWPM 20-30-12, SWPM 20-30-16 and SWPM 20-61-11
for the wire installation procedures. Refer to SWPM 20-10-19 for the wire separation
requirements.
4. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
5. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
6. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
7. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
B. WORK INSTRUCTIONS
Group 1, Configuration 1:
1. Remove the electrical power from the airplane. Refer to 777 AMM 24-22-00, Remove Electrical
Power, as an accepted procedure.
2. Remove the electrical power control panel. Refer to 777 AMM 24-22-01, Electrical Module Assembly
Removal, as an accepted procedure.
3. Install a new electrical power control panel 233W3202-18, 233W3202-19 or 233W3202-22. Refer
to 777 AMM 24-22-01, Electrical Module Assembly Installation, as an accepted procedure.
NOTE: The removed electrical power control panel, part number 233W3202-11, 233W3202-12
or 233W3202-13, can be changed to the new part number in accordance with BAE
Systems SB 233W3202-24-04 Revision 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
27 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 28

NOTE: The removed electrical power control panel, part number 233W3202-9 can be changed
to the new part number in two steps. The part number 233W3202-9 can be changed to
part number 233W3202-12 in accordance with BAE Systems SB 233W3202-24-03 Original
Issue, and then to the new part number in accordance with BAE Systems SB
233W3202-24-04 Revision 2.
4. Make a change to the airplane wiring in accordance with FIGURE 1, FIGURE 2 and FIGURE 3.
5. Make the changes to the ELMS panels P110, P210 and P320 in accordance with the Smiths/GE
Aviation Service Bulletins that follow:
Description
(Power Panel)
Service BulletinCompany
P3204000ELM-24-435 Revision 8, Dated March 26, 2012GE Aviation
P3204000ELM-24-556 Revision 1, Dated December 21, 2009GE Aviation
P3204000ELM-24-619 Original Issue, Dated May 9, 2003Smiths
P3204000ELM-24-625 Original Issue, Dated May 9, 2003Smiths
P1105000ELM-24-450 Original Issue, Dated April 11, 2003Smiths
P1105000ELM-24-454 Original Issue, Dated April 11, 2003Smiths
P1105000ELM-24-554 Original Issue, Dated April 15, 2003Smiths
P1105000ELM-24-559 Revision 2, Dated August 12, 2005Smiths
P1105000ELM-24-560 Revision 2, Dated April 10, 2006GE Aviation
P1105000ELM-24-562 Revision 1, Dated March 3, 2005Smiths
P1105000ELM-24-565 Revision 2, Dated December 14, 2009GE Aviation
P1105000ELM-24-617 Original Issue, Dated May 9, 2003Smiths
P1105000ELM-24-451 Original Issue, Dated April 22, 2003GE Aviation
P1105000ELM-24-514 Revision 2, Dated December 12, 2005GE Aviation
P1105200ELM-24-566 Original Issue, Dated April 24, 2003Smiths
P2106000ELM-24-461 Revision 1, Dated June 12, 2006GE Aviation
P2106000ELM-24-555 Original Issue, Dated April 15, 2003Smiths
P2106000ELM-24-571 Revision 6, Dated December 14, 2009GE Aviation
P2106000ELM-24-572 Revision 3, Dated July 03, 2008GE Aviation
P2106000ELM-24-573 Revision 1, Dated December 12, 2005GE Aviation
P2106000ELM-24-575 Original Issue, Dated April 29, 2003Smiths
P2106000ELM-24-588 Revision 1, Dated June 12, 2006GE Aviation
P2106000ELM-24-590 Original Issue, Dated April 16, 2003Smiths
P2106000ELM-24-597 Revision 1, Dated December 14, 2009GE Aviation
P2106000ELM-24-601 Original Issue, Dated May 1, 2003Smiths
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
28 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 29

Description
(Power Panel)
Service BulletinCompany
P2106000ELM-24-604 Revision 1, Dated June 14, 2005Smiths
P2106000ELM-24-614 Revision 1, Dated November 9, 2009GE Aviation
P2106000ELM-24-618 Original Issue, Dated May 9, 2003Smiths
P2106000ELM-24-624 Revision 5, Dated December 14, 2009GE Aviation
P2106053ELM1-24-613 Original Issue, Dated July 8, 2003Smiths
P2106060ELM1-24-587 Revision 1, Dated May 24, 2010GE Aviation
P2106064ELM1-24-576 Original Issue, Dated May 6, 2003Smiths
P2106064ELM1-24-603 Original Issue, Dated May 1, 2003Smiths
P2106087ELM1-24-615 Original Issue, Dated July 8, 2003Smiths
P2106000ELM-24-440 Revision 1, Dated December 21, 2005GE Aviation
P2106000ELM-24-456 Revision 1, Dated February 17, 2005Smiths
P2106000ELM-24-457 Original Issue, Dated April 11, 2003Smiths
P2106000ELM-24-460 Revision 3, Dated December 2, 2009GE Aviation
P2106000ELM-24-545 Revision 3, Dated December 22, 2005GE Aviation
P2106200ELM-24-581 Revision 1, Dated March 5, 2010GE Aviation
P2106200ELM-24-616 Revision 1, Dated March 5, 2010GE Aviation
P2106205ELM6-24-605 Original Issue, Dated May 2, 2003Smiths
P2106087ELM1-24-703 Original Issue, Dated January 26, 2009GE Aviation
The Smiths/GE Aviation service bulletins that follow are for reference and give the specific service
bulletins applicable for each airplane.
NotesRevision and DateSmiths/GE Aviation Service
Bulletins
Reference OnlyRevision 2, Dated January 20, 2006ELMS-24-ANA
Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-BAB
Reference OnlyRevision 1, Dated January 16, 2004ELMS-24-EAD
Reference OnlyRevision 1, Dated March 1, 2004ELMS-24-GUN
Reference OnlyRevision 1, Dated March 1, 2004ELMS-24-JAL
Reference OnlyRevision 3, Dated May 23, 2004ELMS-24-JAS
Reference OnlyRevision 3, Dated December 14, 2009ELMS-24-KAL
Reference OnlyRevision 1, Dated March 1, 2004ELMS-24-TII
Reference OnlyRevision 2, Dated February 16, 2009ELMS-24-UAL
6. Do this continuity check:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
29 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 30

AirplanesResultPanelPinConnectorPanelPinConnector
ToFrom
AllContinuityP21024D21037PP2106D21021P
AllContinuity26
AllContinuity28
AllContinuity29
AllContinuity30
AllContinuity31
AllContinuityP11019D11037PP2106D21021P
AllContinuityP1107D11037PP11019D11037P
AllContinuity11
AllContinuity15
AllContinuity18
WA261-WA266, WB051-WB082ContinuityP3209D32012PP21042D21021P
Continuity1028D21027P
Continuity1129D21027P
Continuity1230D21027P
AllContinuityP61A2DM23217GP546DM24023B
AllContinuityA347DM24023B
AllContinuityA148DM24023B
AllContinuityA1949DM24023B
AllContinuityA2050DM24023B
AllContinuityA1851DM24023B
AllContinuityGround45DM24023B
AllContinuityGround52DM24023B
7. Supply the electrical power to the airplane. Refer to 777 AMM 24-22-00, Supply Electrical Power,
as an accepted procedure.
8. Do the Master Dim and Test - Operational Test, and the Integral Panel Lights - Operational Test
for the electrical power control panel. Refer to 777 AMM 33-16-00 for the Master Dim and Test -
Operational Test, and 777 AMM 33-13-00 for the Integral Panel Lights - Operational Test, as
accepted procedures.
9. Do this test of the passenger cabin systems:
a. Prepare for the test.
(1) Make sure that the circuit breakers that follow on the P210 panel are closed:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
30 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 31

NOTE: This list is all inclusive. Operators should compare this list to the Wiring Diagram
Manual Equipment List (ELI) to find the circuit breakers installed on a specific
airplane.
NotesNumber, Location, Name
C21608, G2, R LAV/GLY FAN CTRL
C23302, D13, CTU
C23303, A2, SVU ZONE 1 L-C-R
C23309, A5, SVU ZONE 3 R-C
WA002-WA017 if Boeing Service
Bulletin 777-23-0125 has been done.
C23309, A5, BUFFER BOX 2
C23310, B2, SVU ZONE 3 L-C
WA002-WA017 if Boeing Service
Bulletin 777-23-0125 has been done.
C23310, B2, BUFFER BOX 3
C23354, C27, NATS PWR
C23403, C1, VIDEO PGMS & CTRL
C23404, D14, VIDEO PGMS & CTRL 2
C23405, C13, CABIN PRINTER
C23410, D3, VIDEO DISTR 1
C23411, C14, VIDEO DISTR 2
C23412, E6, VIDEO DISTR 3
C23413, E8, VIDEO DISTR 4
C23430, C6, CABIN TELECOMMUNICATION UNIT
C23432, D3, UHF - R
C23434, E5, UHF - L
C23448, C2, ZNC/ZNTU
C23450, D23, M1/M2 GALLEY HANDSETS
C23452, D22, FAX/F5 GALLEY HANDSET
C23454, E7, CABIN FILE SERVER
C23455, D23, FAX MACHINE
C23460, A23, CABIN UNIT/HOLSTER
C23461, D22, TFTS MPU & XMTR/RCRV
C23462 , C7 , VIDEO DISTR 1A
C23616, H8, ENTMT CTRL R
C23644, H7, PASSENGER TELEPHONE 2
C23650, J10, CTM/HOLSTER
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
31 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 32

NotesNumber, Location, Name
C23658, G12, IFE MASTER CTRL
C24451, B19, FLT DK SW PWR DISTR 1
C24452, D14, FLT DK SW PWR DISTR 2
C24688, G13, IFE SEATS DECK SW
C25312, F10, PAX SEAT R
C25314, F13, PAX SEAR C
C25315, F7, PAX SEAT 2R
C25316, F4, PAX SEAR 2C
C25320, A21, IN-SEAT POWER OUTLETS ZONE 1
(2) Make sure that the circuit breakers that follow on the P110 panel are closed:
NOTE: This list is all inclusive. Operators should compare this list to the Wiring Diagram
Manual Equipment List (ELI) to find the circuit breakers installed on a specific
airplane.
NotesNumber, Location, Name
C23305, A24, SVU ZONE 2 R-C
C23307, A27, SVU ZONE 2 L-C
WA002-WA017 if Boeing Service
Bulletin 777-23-0125 has been done.
C23307, A27, BUFFER BOX 1
C23401, D27, MULTP AUDIO ENTMT CTRL
C23407, F28, VIDEO DISTR 1
C23408, E23, VIDEO DISTR 2
C23409, C21, VIDEO DISTR 3
C23641, G23, ENTMT CTRL L
C23643, H15, PASSENGER TELEPHONE 1
C25311, F16, PAX SEAT L
C25317, F19, PAX SEAT 2L
(3) Make sure that the circuit breaker that follows on the P320 panel is closed:
NOTE: This list is all inclusive. Operators should compare this list to the Wiring Diagram
Manual Equipment List (ELI) to find the circuit breakers installed on a specific
airplane.
NotesNumber, Location, Name
C23475, K6, VEP AC
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
32 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 33

(4) On the P5 panel, select the IFE/PASS SEATS switch to the ON position.
(5) On the CSCP, select these menu items, Cabin Controls, Seat Control and Audio Monitor,
Seat/Audio Player Power Control, Seat Power "ON", Audio Entertainment Player "ON".
b. Do this test of the IFE electrical power.
(1) For airplanes WA002-WA017, WA076-WA080, WA086-WA093, WA116-WA119,
WA196-WA198, WA206-WA209, WB001-WB015, WB101-WB104, WB121-WB125 and
WB131-WB132, on the seat rows aft of door 1, see that the passenger control units (PCU)
are powered (LEDs are on). This step does a check that circuit breaker C23303 is
connected to the electrical power.
NOTE: For airplanes WA002-WA017, circuit breaker C23303 is collared if Boeing Service
Bulletin 777-23-0125 has been done. If the circuit breaker is collared, it is not
necessary to do this step.
(2) For airplanes WA002-WA017, WA076-WA080, WA196-WA198, WA207-WA209,
WB001-WB015, WB101-WB104 and WB121-WB125, on the seat rows aft of door 2, see
that the passenger control units (PCU) are powered (LEDs are on). This step does a
check that circuit breakers C23305 and C23307 are connected to the electrical power.
NOTE: For airplanes WA002-WA017, if Boeing Service Bulletin 777-23-0125 has been
done, check to see that buffer box 1 is powered (C23307).
(3) For airplanes WA002-WA017, WA076-WA080, WA196-WA198, WA207-WA209,
WB001-WB015, WB101-WB104 and WB121-WB125, on the seat rows aft of door 3, see
that the passenger control units (PCU) are powered (LEDs are on). This step does a
check that circuit breakers C23309 and C23310 are connected to the electrical power.
NOTE: For airplanes WA002-WA017, if Boeing Service Bulletin 777-23-0125 has been
done, check to see that buffer box 2 (C23309) and buffer box 3 (C23310) are
powered.
(4) See that the video entertainment player 1 (in the purser work station/video control center)
has power (LED is on). For all airplanes except WB074-WB082, this step does a check
that circuit breaker C23403 is connected to the electrical power. For all airplanes
WB074-WB082, this step does a check that circuit breaker C23475 is connected to the
electrical power.
(5) On the E2-4 shelf, see that the Audio Entertainment Player(s) are powered (at least one
LED is on). This step does a check that circuit breaker C23401 is connected to the
electrical power.
(6) For all airplanes except WA002-WA017, WB068-WB082 and WB121-WB125, turn on
the passenger video entertainment system. Refer to 777 AMM 23-32-00, Power On the
Video Entertainment System, as an accepted procedure. See that all the projectors and
monitors are on. This step checks that circuit breakers C23462, C23407, C23408, C23409,
C234010, C23411, C23412, C23413, C23421 and C23422, if applicable, are connected
to the electrical power.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
33 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 34

c. For airplanes WA002-WA017, WA076-WA080, WA196-WA198, WA206-WA209,
WB001-WB015, WB051-WB082, WB101-WB104, WB121-WB125 and WB 131-WB132, do
this passenger seat power test.
(1) On the seat rows aft of door 1 left, use the seat switches to see that the seats are powered.
This step checks that circuit breaker C25311 is connected to electrical power.
NOTE: Airplanes WB051-WB082 have this circuit breaker installed. If the circuit breaker
has a collar installed, it is not necessary to do this step.
(2) On the center seat rows aft of door 1, use the seat switches to see that the seats are
powered. This step checks that circuit breaker C25314 is connected to electrical power.
NOTE: Airplanes WB051-WB082 have this circuit breaker installed. If the circuit breaker
has a collar installed, it is not necessary to do this step.
(3) On the seat rows aft of door 1 right, use the seat switches to see that the seats are
powered. This step checks that circuit breaker C25312 is connected to electrical power.
NOTE: Airplanes WB051-WB082 have this circuit breaker installed. If the circuit breaker
has a collar installed, it is not necessary to do this step.
d. For airplanes WA261-WA266 do this test of the in seat power outlets.
(1) On the seat rows aft of door 1, see that the PC power outlets have electrical power. See
that LED is illuminated. This step checks that the circuit breaker C25320 is connected to
electrical power.
e. For all airplanes except WA131-WA137, WA171-WA175, WA206-WA209, WA261-WA266
and WB051-WB082 do this test of the passenger telephones.
(1) Try to make a phone call from either a wall mount telephone or an in-seat telephone.
Refer to 777 AMM 23-18-00 as an accepted procedure. If a call can be made, or a busy
signal is heard, the system is serviceable. This step checks that circuit breaker C23430
is connected to electrical power. Circuit breaker C23430 powers the cabin
telecommunications unit.
NOTE: Airplanes WB051-WB082 have this circuit breaker installed. The circuit breaker
is for provisions only and has a collar and an INOP label installed.
f. Do this test of the IFE/PASS SEATS switch.
(1) On the P5 panel, select the IFE/PASS SEATS switch to OFF.
(2) Make sure that all the IFE equipment in the purser work station or video control center
no longer has electrical power. Some components may have battery backup units. For
these components it may take several minutes before the electrical power is removed.
(3) Make sure that the overhead video system is off (no video signal, monitor may still be
powered).
(4) Make sure that all the passenger control units on the passenger seats are off (electrical
power is removed).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
34 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 35

(5) For all airplanes with PC power outlets, make sure that all the PC power outlets do not
have electrical power. See that LEDs are not illuminated.
(6) For airplanes with powered seats, make sure the powered seats do not operate (electrical
power is removed).
(7) For airplanes with wall mounted telephones, make sure that the telephone does not
operate. Swipe a valid credit card through the card reader. Make sure that no dial tone
can be heard.
(8) On the P5 panel, select the IFE/PASS SEATS switch to ON.
g. Do this test of the passenger seat/audio player power control system.
(1) See that the overhead video system is on. Refer to 777 AMM 23-32-00, Power On the
Video Entertainment System, as an accepted procedure to get the recommended
instructions.
(2) On the CSCP, select these menu items, Cabin Controls, Seat Control and Audio Monitor,
Seat/Audio Player Power Control, Seat Power "OFF", Audio Entertainment Player "OFF".
(3) See that the overhead video system is on.
(4) Make sure that all the passenger control units on the passenger seats are off (electrical
power is removed).
(5) For all airplanes with PC power outlets, make sure that all the PC power outlets have
electrical power. See that LEDs are illuminated.
(6) For airplanes with powered seats, make sure the powered seats operate (electrical power
is available).
(7) For airplanes with wall mounted telephones, make sure that the telephones operate.
Swipe a valid credit card through the card reader. Make sure that a dial tone can be
heard.
(8) For airplanes WB037-WB044, see that these switches are serviceable (the switch is
illuminated).
— PC/SEAT POWER ISOLATION SWITCH MCU 1
— PC/SEAT POWER ISOLATION SWITCH MCU 2
— PC/SEAT POWER ISOLATION
— SEAT/PC PWR FAULT
(9) Select the IFE master power switch to the ON position.
10. Do this test of the CABIN/UTIL switch:
a. Make sure that the circuit breakers that follow on the P110 panel are closed:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
35 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 36

NotesNumber, Location, Name
C21444, A07, L DR 1 HTR
C21446, B07, L DR 2 HTR
C21448, C07, L DR 3 HTR
C21450, C08, L DR 4 HTR
C28307, E05, L FWD FUEL BOOST PUMP
b. Make sure that the circuit breakers that follow on the P210 panel are closed:
NotesNumber, Location, Name
C21445, A25, R DR 1 HTR
C21447, A24, R DR 2 HTR
C21449, D28, R DR 3 HTR
C21451, B25, R DR 4 HTR
C33486, E09, RED ANTI-COLL LTS
C33636, M11, RED ANTI-COLL LTS CTRL
c. Make sure that the circuit breakers that follow on the P310 panel are closed:
NotesNumber, Location, Name
C24620, M02, MN BAT CHARGER
d. Make sure that the circuit breakers that follow on the P320 panel are closed:
NotesNumber, Location, Name
C24300, K09, MN BAT CHARGER PWR
C24301, K12, APU BAT CHARGER PWR
C33416, G02, CABIN LTS FWD R
C28301, G09, L FWD FUEL BOOST PUMP GND SVCE
C33417, L02, CABIN LTS FWD L
C33418, H04, CABIN LTS MID FWD R
C33419, L06, CABIN LTS MID FWD L
C33420, H09, CABIN LTS MID AFT R
C33421, L10, CABIN LTS MID AFT L
C33422, G03, CABIN LTS AFT R
C33423, L07, CABIN LTS AFT L
C33518, J12, E/E EQUIP CTR LTS
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
36 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 37

e. Make sure that the circuit breakers that follow on the P49 panel are closed:
NotesNumber, Location, Name
C24622, A01, APU BAT CHARGER
f. On the P5 panel, see that the CABIN/UTIL switch is selected to the ON position.
g. For airplanes with an airborne fax machine, see that the fax machine has electrical power.
Refer to 777 AMM 23-18-05 as an accepted procedure to get more data about the location
of the fax machine.
h. Do a test of the sidewall lights and indirect ceiling lights. Refer to 777 AMM 33-21-00,
Passenger Compartment Illumination - Operational Test, as an accepted procedure. This step
makes sure that all phases of the ground service bus, sections 1 and 2, have electrical power.
It is not necessary to do the test for the night lights.
i. Do a test of the forward equipment center lights. Refer to 777 AMM 33-31-00, Service and
Cargo Loading Lights - Operational Test of the Forward and Main Equipment Center Lights,
as an accepted procedure. This step makes sure the 28V AC ground service bus has electrical
power.
j. Do a test of the red anti-collision lights on the upper and lower body. Refer to 777 AMM
33-44-00, Anti-Collision Lights - Operational Test, as an accepted procedure. It is only
necessary to do a test of the upper and lower anti-collision lights. This step makes sure there
is electrical power on the right main AC bus.
k. On the P5 panel, select the CABIN/UTIL switch to the OFF position.
l. For airplanes with an airborne fax machine, see that the fax machine does not have electrical
power.
m. Do a test of the sidewall lights and indirect ceiling lights. Refer to 777 AMM 33-21-00,
Passenger Compartment Illumination - Operational Test, as an accepted procedure. The lights
should not come on. This step makes sure that all phases of the ground service bus, sections
1 and 2, do not have electrical power. It is not necessary to do the test for the night lights.
n. See that the passenger seat reading lights, attendant work lights, night lights and supplemental
night lights are all on. This step does a check of the new cabin management system (CMS)
database (refer to Boeing Service Bulletin 777-23-0176).
o. Do a test of the forward equipment center lights. Refer to 777 AMM 33-31-00, Service and
Cargo Loading Lights - Operational Test of the Forward and Main Equipment Center Lights,
as an accepted procedure. The lights should not come on. This step makes sure the 28V AC
ground service bus does not have electrical power.
p. Do a test of the red anti-collision lights on the upper and lower body. Refer to 777 AMM
33-44-00, Anti-Collision Lights - Operational Test, as an accepted procedure. It is only
necessary to do a test of the upper and lower anti-collision lights. The lights should not come
on. This step makes sure there is no electrical power on the right main AC bus.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
37 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 38

q. Do a test of the main battery charger operation. Refer to 777 AMM 24-31-02, Main Battery
Charger Installation Test, as an accepted procedure.
r. Do a test of the APU battery charger operation. Refer to 777 AMM 24-31-06, APU Battery
Charger Installation Test, as an accepted procedure.
s. Do this test of the left forward fuel boost pump operation:
WARNING: DO NOT OPERATE ANY FUEL PUMP IF THE AMBER PRESS LIGHT COMES
ON AND STAYS ON. FUEL VAPORS IN THE TANK MAY IGNITE AND CAUSE
A FIRE OR EXPLOSION.
(1) To operate any of the fuel pumps, you must be in the flight compartment to continuously
monitor the fuel quantity and the low pressure indication in the applicable tank.
Immediately set the applicable fuel pump switch-light to OFF if the amber PRESS light
comes on and stays on.
(2) Make sure there is a minimum of 6,000 LB (2,700 KGS) in the left main fuel tank.
NOTE: This fuel quantity is necessary to prevent dry operation of the fuel pump.
If it necessary to refuel the fuel tanks, refer to the 777 AMM 12-11-01 as an accepted
procedure.
(3) On the P5 panel, push the L FWD PUMP switch-light to the ON position.
(4) On the P5 panel, make sure the left forward fuel boost pump PRESS light goes off. The
PRESS light can take up to 20 seconds to go off.
(5) On the EICAS display, see that the FUEL PUMP L FWD message is not displayed.
(6) On the P5 panel, push the L FWD PUMP switch-light to the OFF position.
(7) On the P5 panel, make sure the left forward fuel boost pump PRESS light comes on. The
PRESS light can take up to 20 seconds to come on.
t. On the P5 panel, see that the CABIN/UTIL switch is selected to the ON position.
11. Put the airplane back to a serviceable condition.
Group 1, Configuration 2:
CONDITION: MORE WORK IS NECESSARY - ELECTRICAL POWER CONTROL PANEL
INSPECTION
1. In the flight compartment, get access to the electrical power control panel. Refer to 777 AMM
24-22-01 as an accepted procedure.
2. Do an inspection on the electrical power control panel for the part number.
3. If the electrical power control panel does not have the part number 233W3202-18 or 233W3202-19,
then no change is necessary.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
38 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 39

4. If the electrical power control panel has the part number 233W3202-18, and does not have lockwire
provisions on the switch guards at switches S6 and S10, then no change is necessary.
5. If the electrical power control panel has the part number 233W3202-18, and does have lockwire
provisions on the switch guards at switches S6 and S10, then change the part number to
233W3202-19. Refer to SOPM 20-50-10 as an accepted procedure.
6. If the electrical power control panel has the part number 233W3202-19, and does have lockwire
provisions on the switch guards at switches S6 and S10, then no change is necessary.
7. If the electrical power control panel has the part number 233W3202-19, and does not have lockwire
provisions on the switch guards at switches S6 and S10, then change the part number to
233W3202-18. Refer to SOPM 20-50-10 as an accepted procedure.
8. Put back the electrical power control panel. Refer to 777 AMM 24-22-01 as an accepted procedure.
9. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4: October 17, 2012
39 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 40 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
This Figure applies only to: Group 1, Configuration 1.
(8 LOCATIONS)  (6 LOCATIONS) 2
46  W1052-0146-24  A2
48  W1052-0148-24  A1
47  W1052-0147-24  АЗ
45  W1052-0145-24  _||' GB502-DC
49  W1052-0149-24  A19
51  W1052-0151-24  A18
50  W1052-0150-24  A20
52  W1052-0152-24  LI|' GB502-DC
DM24023B
M24023 ELECTRICAL  + W1052-0933-24 +//A A1
PANEL
P5 OVERHEAD PANEL
+/ W1052-0938-24 +11/A18
7A20
DM23217G
M23217 RIGHT OPCF
P61 MAINTENANCE PANEL
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING  W24279
REFERENCE: 777 WDM 23-93-21, 777 WDM 24-51-24, 777 WDM 24-51-41
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 1 OF 4)
Original Issue: August 21, 2003
Revision 4 October 17, 2012  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  777-24-0077
Work - See page 1 for details.  40 of 51

### Page 41 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
(4 LOCATIONS)
W6120-0023-20
15  W6120-0013-20  SP245  - W4236-0507-20-  SP396 ---- W6220
11  W6120-0024-20
18  W6120-0006-20
19  W6120-0007-20
D11037P
(J37)
P110 PWR MGMT
PNL-LEFT
- ADDED WIRE OR NEW ROUTING  W24309
REFERENCE: 777 WDM 23-32-02
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 2 OF 4)
Original Issue: August 21, 2003
Revision 4 October 17, 2012  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  777-24-0077  41 of 51

### Page 42 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
(4 LOCATIONS)
10
11
12
J  D32012P
(J12)  AP1462
P320  PWR PNL-
- W6220-8997-14-  35
GROUND SERVICE/
HANDLING  (3 LOCATIONS)  D1100P J
30  W6220-0073-20
29  - W6220-0072-20
28  W6220-0071-20
D21027P
42  - W6220-0009-20
AP0461
++ W6220-0049-20+
- W6220-0120-20
D1306P
(J21)  J  D21021P  P101 DIS INTG
PNL-DOOR 1
• (6 LOCATIONS)
30  W6220-0121-20-
24  - W6220-0122-20-
31  - W6220-0123-20-  SP396  - W4236
28  W6220-0124-20-
26  - W6220-0125-20-
29  W6220-0126-20-
D21037P
(J37)
- ADDED WIRE OR NEW ROUTING
P210  PWR
MGMT PNL-RIGHT  + DELETED WIRE OR FORMER ROUTING  W24365
- EXISTING WIRE
REFERENCE: 777 WDM 23-32-02, 777 WDM 46-01-11
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 3 OF 4)
Original Issue: August 21, 2003
Revision 4 October 17, 2012  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  777-24-0077
Work - See page 1 for details.  42 of 51

### Page 43

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTESQTYPART NUMBERNAMEFLAG
NOTE
8BACC47CP1SContact, Socket1
Refer to SWPM 20-74-11 as an
accepted procedure.
6CTA0165 (CTA-0165)Contact, Socket2
2M39029-1-101
(M39029/1-101)
Contact, Pin3
15BACC47CN1SContact, Socket4
2BACT12C12Splice5
2D436-39Sleeve
Airplanes WA261-WA266, WB051-WB082.6
1324485End Cap7
5BACC47CN2AContact, Pin8
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10202Identification Tape9
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10203Identification Tape10
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10302Identification Tape11
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10404Identification Tape12
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10405Identification Tape13
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10403Identification Tape14
Refer to SWPM 20-10-11 as an
accepted procedure.
1280W5110-10402Identification Tape15
FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4 October 17, 2012
43 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 44 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
This Figure applies only to: Group 1, Configuration 1.
- SEE A
FLIGHT COMPARTMENT
1) W1052
P61 MAINTENANCE
PANEL
DM23217G
GB502-DC
P5 OVERHEAD PANEL
UP
FWD
DM24023B  W24385
FIGURE 2: FLIGHT DECK - AIRPLANE WIRE ROUTING
(SHEET 1 OF 2)
Original Issue: August 21, 2003
Revision 4 October 17, 2012  Export Controlled ECCN: 9E991 - BOEING  777-24-0077
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  44 of 51

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
NOTESQTYPART NUMBERNAMETASKSTEP
Make the changes to wire bundle W1052
in accordance with FIGURE 1. Use the
straps as necessary. Wire bundle
W1052 has a separation code RM2 and
a tie color brown. Refer to SWPM 20-10-
19 as an accepted procedure.
1280W5110-102WWiresInstall1
-BACS38K1BStrapUse:
-BACS38K2BStrap
FIGURE 2: FLIGHT DECK - AIRPLANE WIRE ROUTING
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4 October 17, 2012
45 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 46

This Figure applies only to: Group 1, Configuration 1.
FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING
(SHEET 1 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4 October 17, 2012
46 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 47 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
W42361  B
STA  STA  STA  STA  STA
309  332  345  359  379
BL 0
RBL 11
RBL 22
RBL 33
3 W6220
- RBL 63
SPLICE AREA
(SP396)
RBL 104
UP
W6220  W24520
FWD •
FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING
(SHEET 2 OF 6)
Original Issue: August 21, 2003
Revision 4 October 17, 2012  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-24-0077
Work - See page 1 for details.  47 of 51

### Page 48 (OCR)

BOEING SERVICE BULLETIN 777-24-0077
STA
334.9
STA  RBL
329.4  99.9
(3) W6220
D21021P
POS J21
D21027P
POS J27
D21037P
POS J37
UP  FWD
W24521
FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING
(SHEET 3 OF 6)
Original Issue: August 21, 2003
Revision 4 October 17, 2012  Export Controlled ECCN: 9E991 - BOEING  777-24-0077
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  48 of 51

### Page 49

FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING
(SHEET 4 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4 October 17, 2012
49 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 50

FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4 October 17, 2012
50 of 51
BOEING SERVICE BULLETIN 777-24-0077

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
NOTESQTYPART NUMBERNAMETASKSTEP
Make the changes to wire bundle
W4236 in accordance with FIGURE 1.
Use the straps as necessary. Wire
bundle W4236 has a separation code
NN2 and a tie color white. Refer to
SWPM 20-10-19 as an accepted pro-
cedure.
1280W5110-105WWiresInstall1
-BACS38K1StrapUse:
Make the changes to wire bundle
W6120 in accordance with FIGURE 1.
Use the straps as necessary. Wire
bundle W6120 has a separation code
LM2 and a tie color yellow. Refer to
SWPM 20-10-19 as an accepted pro-
cedure.
1280W5110-103WWiresInstall2
-BACS38K1EStrapUse:
Make the changes to wire bundle
W6220 in accordance with FIGURE 1.
Use the straps as necessary. Wire
bundle W6220 has a separation code
RM1 and a tie color brown. Refer to
SWPM 20-10-19 as an accepted pro-
cedure.
1280W5110-104WWiresInstall3
-BACS38K1BStrapUse:
-BACS38K2BStrap
FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 21, 2003
777-24-0077Revision 4 October 17, 2012
51 of 51
BOEING SERVICE BULLETIN 777-24-0077

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
