# Boeing Special Attention Service Bulletin 777-25-0621: Revision 2

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2020-0586; AD 2020-22-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 777-25-0621](https://openairdocs.org/service-documents/boeing/sb-777-25-0621.md)
- Title as filed: SB-777-25-0621-02--
- Pages: 88
- PDF: https://openairdocs.org/files/sha256/2b/a5/2ba58f20cc9ea3e202160488ab0bd2f4e75be3ed063e2c7932243e96cad51e40
- Page: https://openairdocs.org/service-documents/boeing/sb-777-25-0621/file/2ba58f20cc9e

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
Number: 777-25-0621
Original Issue: December 10, 2014
Revision 2: February 28, 2020
ATA System: 2510 2581
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment - Overhead Panel Support Structure
BMS 8-39 Urethane Foam Insulation Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
1 of 88
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
2 of 88
BOEING SERVICE BULLETIN 777-25-0621
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 23
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 27
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 28
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
FIGURE 1: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS [Group 1, Configuration 1]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
FIGURE 2: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE, BMS 8-39
URETHANE FOAM INSULATION REPLACEMENT [Group 1, Configuration 1] . . . . . . 50
FIGURE 3: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS [Group 1, Configuration
1-2, 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
FIGURE 4: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE - REMOVAL [Group
1, Configuration 1-2, 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
FIGURE 5: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE - INSTALLATION
[Group 1, Configuration 1-2, 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
3 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 4

FIGURE 6: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS [Group 1, Configuration 2,
4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
FIGURE 7: FLIGHT COMPARTMENT - DRIPSHIELD, BMS 8-39 URETHANE FOAM INSULATION -
GENERAL VISUAL INSPECTION [Group 1, Configuration 1-2] . . . . . . . . . . . . . . . 67
FIGURE 8: FLIGHT COMPARTMENT - DRIPSHIELD, BMS 8-39 URETHANE FOAM INSULATION -
REPLACEMENT [Group 1, Configuration 1-2] . . . . . . . . . . . . . . . . . . . . . . . . 69
FIGURE 9: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS [Group 1, Configuration
2, 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
FIGURE 10: FLIGHT COMPARTMENT - OVERHEAD PANEL - MORE ACCESS [Group 1, Configuration 2,
4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
FIGURE 11: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE, BMS 8-39
URETHANE FOAM INSULATION DETAILED INSPECTION [Group 1, Configuration 2, 4] . 77
FIGURE 12: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE, BMS 8-39
URETHANE FOAM INSULATION REPLACEMENT [Group 1, Configuration 2, 4] . . . . . 79
APPENDIX A: PART DEMAND INTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
APPENDIX B: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE: TABLE 1: OVERHEAD PANEL
SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM INSULATION REPLACEMENT AND
GENERAL VISUAL INSPECTION OF THE DRIPSHIELD [Group 1, Configuration 1] . . . 83
APPENDIX C: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE: TABLE 2: DETAILED INSPECTION
OF THE OVERHEAD PANEL SUPPORT STRUCTURE AND GENERAL VISUAL INSPECTION
OF THE DRIPSHIELD FOR BMS 8-39 URETHANE FOAM INSULATION [Group 1, Configuration
2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
APPENDIX D: TYPICAL INSTALLATIONS OF BMS 8-39 URETHANE FOAM INSULATION INSTALLED ON
THE DRIPSHIELD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
APPENDIX E: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE: TABLE 3: DETAILED INSPECTION
OF THE OVERHEAD PANEL SUPPORT STRUCTURE FOR BMS 8-39 URETHANE FOAM
INSULATION [Group 1, Configuration 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
4 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 5

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
Revision Transmittal SheetNumber: 777-25-0621Original Issue: December 10, 2014
Revision 2: February 28, 2020
ATA System: 2510 2581
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment - Overhead Panel Support Structure
BMS 8-39 Urethane Foam Insulation Replacement
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2018-14-02 is related to this service bulletin.
Effects of this Revision on airplanes on which the Original Issue or Revision 1 was previously done:
ActionConditionGroup
1. Do a Detailed Inspection
for BMS 8-39 urethane
foam on the overhead
panel support structure.
2. Do a General Visual In-
spection (GVI) for BMS 8-
39 urethane foam on the
dripshield.
3. Replace any BMS 8-39
urethane foam found with
BMS 8-371 foam.
4. Do functional tests.
Airplanes that have accomplished
the Original Issue of this service
bulletin only.
1, Configuration 2
1. None.Airplanes that have accomplished
Revision 1 of this service bulletin
only.
1, Configuration 3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
5 of 88

### Page 6

ActionConditionGroup
1. Do a Detailed Inspection
for BMS 8-39 urethane
foam on the overhead
panel support structure.
2. Replace any BMS 8-39
urethane foam found with
BMS 8-371 foam.
3. Do functional tests.
Airplanes that have accomplished
both the Original Issue and Revision
1 of this service bulletin.
1, Configuration 4
See Paragraph 1.D., Description for more information.
REASON FOR REVISION
This revision is sent to:
1. Provide alternative materials and quantities.
2. Include instructions to remove ducting to access the BMS 8-39 urethane foam on the overhead panel
support structure.
3. Provide additional work requirements for airplanes that have accomplished the Original Issue of this
service bulletin and may not have removed BMS 8-39 urethane foam insulation completely from the
overhead panel support structure.
4. Provide additional tests to verify the functionality of equipment affected by the removal of the overhead
panel support structure.
These sections were changed:
1. Summary, Background: Changed information.
2. Summary, Action: Added group/configuration applicability.
3. Summary, Compliance: Added FAA AD information.
4. Summary, Illustration: Added group/configuration applicability.
5. Paragraph 1.A., Effectivity: Added group/configuration applicability.
6. Paragraph 1.C., Reason: Background: Added reason for revision statement.
7. Paragraph 1.D., Description: Added group/configuration applicability.
8. Paragraph 1.E., Compliance: Added FAA AD information and new compliance tables.
9. Paragraph 1.F., Approval: Added AMOC paragraph.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
6 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 7

10. Paragraph 1.G., Manpower: Updated manpower information.
11. Paragraph 1.J., References: Updated references.
12. Paragraph 2.A., Material - Price and Availability: Updated footnotes.
13. Paragraph 2.C.1., Kits/Parts: Changed existing part number for self-locking nut.
14. Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Added material dimensions and added
group/configuration applicability.
15. Paragraph 3.A., General Information: Added notes for Detailed Inspection and temporary protection.
16. Paragraph 3.B., Work Instructions: Updated instructions for Group 1, Configuration 1 and 2. Created
new instructions for Group 1, Configuration 3 and 4.
17. Figure 1 through 9: Added applicability.
18. Figure 1 and 3: Changed AMM reference in step 4.
19. Figure 2: Changed service bulletin number in step 4.
20. Created new Figure 10.
21. Appendix B and C: Updated information.
22. Created new Appendix E.
The data given in Information Notice 777-25-0621 IN 01 is included in this revision.
The data given in Information Notice 777-25-0621 IN 02 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
REVISION HISTORY
December 10, 2014Original Issue:
August 04, 2017Revision 1:
February 28, 2020Revision 2:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
7 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
8 of 88
BOEING SERVICE BULLETIN 777-25-0621
BLANK PAGE

### Page 9

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 777-25-0621Original Issue: December 10, 2014
Revision 2: February 28, 2020
ATA System: 2510 2581
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment - Overhead Panel Support Structure
BMS 8-39 Urethane Foam Insulation Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will make sure that the risk of fire in the flight compartment from aging
BMS 8-39 urethane foam insulation is decreased. Degraded BMS 8-39 urethane foam insulation on the overhead
panel support structure can be an unacceptable fuel source for a fire if exposed to an ignition source. If this
service bulletin is not done, degraded BMS 8-39 urethane foam insulation could result in an increased risk of a
fire.
BMS 8-39 flexible urethane foam insulation has self-extinguishing and physical properties that degrade with age
and large parts fabricated from this material present an unacceptable fuel source. BMS 8-39 urethane foam
insulation fire retardants are mixed into, but are not chemically connected with, the remaining components of
the foam insulation. This condition will cause the fire retardant properties to have decreased effectiveness. The
concern is hidden areas where fire cannot easily be detected and suppressed.
BMS 8-39 urethane foam insulation in the flight compartment and other areas of the airplanes was replaced in
production from line number 507 and Boeing Service Bulletin 777-25-0362 was released to instruct foam insulation
replacement for in-service airplanes. However, Boeing has recently found some additional BMS 8-39 urethane
foam insulation on the overhead panel support structure in the flight compartment, that was not included in
Boeing Service Bulletin 777-25-0362.
Since the release of the Original Issue of this service bulletin, BMS 8-39 urethane foam insulation was found
on the dripshield above the overhead panel. All BMS 8-39 urethane foam insulation on the overhead panel and
if installed on the dripshield, must be removed and replaced with BMS 8-371 polyvinylidene fluoride foam
insulation. This service bulletin gives instructions to remove BMS 8-39 urethane foam insulation and install BMS
8-371 polyvinylidene fluoride foam insulation on the overhead panel support structure in the flight compartment.
BMS 8-371 polyvinylidene fluoride foam insulation has better fire retardant properties that stay effective with
age.
Boeing Service Related Problem (SRP) 777-SRP-25-0346 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 777 FTD 25-14003 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
9 of 88

### Page 10

As a part of a service bulletin validation program, this change was completed on airplane WB509 by Service
Bulletin 777-25-0621 Original Issue before the release of Revision 1 of this service bulletin. The change completed
on airplane WB509 is equivalent to accomplishing Revision 1 of this service bulletin. Airplane WB509 has the
configuration of a Group 1, Configuration 3 airplane.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., ComplianceYesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected
(Flight Crew Operations Manual and/or
FAA Approved Airplane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Group 1, Configuration 1:
Remove the overhead panel support structure and replace the BMS 8-39 urethane foam with BMS 8-371 foam.
Inspect for BMS 8-39 urethane foam on the dripshield and replace any found with BMS 8-371 foam. Reinstall
the overhead panel support structure and do functional tests.
Group 1, Configuration 2:
Inspect for BMS 8-39 urethane foam on the overhead panel support structure and the dripshield. If any BMS
8-39 urethane foam is found, remove the overhead panel support structure. Replace any BMS 8-39 urethane
foam found on the overhead panel support structure or the dripshield with BMS 8-371 foam. Reinstall the
overhead panel support structure and do functional tests.
Group 1, Configuration 3:
Do functional tests.
Group 1, Configuration 4:
Inspect for BMS 8-39 urethane foam on the overhead panel support structure. If any BMS 8-39 urethane foam
is found, remove the overhead panel support structure. Replace any BMS 8-39 urethane foam found on the
overhead panel support structure with BMS 8-371 foam. Reinstall the overhead panel support structure and do
functional tests.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
10 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 11

EFFECTIVITY
777-200/200LR/300/300ER Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2018-14-02 is related to this service bulletin.
The effective date of the AD 2018-14-02 is August 13, 2018.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX A of this service bulletin to help Boeing
predict the quantity and timing of the Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
11 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 12 (OCR)

BOEING SERVICE BULLETIN 777-25-0621
GROUP 1, CONFIGURATION 1:
REMOVE THE OVERHEAD PANEL SUPPORT STRUCTURE AND
REPLACE THE BMS 8-39 URETHANE FOAM WITH BMS 8-371
FOAM. INSPECT FOR BMS 8-39 URETHANE FOAM ON THE
DRIPSHIELD AND REPLACE ANY FOUND WITH BMS 8-371 FOAM.
REINSTALL THE OVERHEAD PANEL SUPPORT STRUCTURE AND
DO FUNCTIONAL TESTS.
GROUP 1, CONFIGURATION 2:
INSPECT FOR BMS 8-39 FOAM ON THE OVERHEAD PANEL
SUPPORT STRUCTURE AND THE DRIPSHIELD. IF ANY BMS 8-39
FOAM IS FOUND, REMOVE THE OVERHEAD PANEL SUPPORT
STRUCTURE. REPLACE ANY BMS 8-39 FOAM FOUND ON THE
OVERHEAD PANEL SUPPORT STRUCTURE OR THE DRIPSHIELD
WITH BMS 8-371 FOAM. REINSTALL THE OVERHEAD PANEL
SUPPORT STRUCTURE AND DO FUNCTIONAL TESTS.
FLIGHT COMPARTMENT  GROUP 1, CONFIGURATION 3:  DO FUNCTIONAL TESTS.
GROUP 1, CONFIGURATION 4:
INSPECT FOR BMS 8-39 FOAM ON THE OVERHEAD PANEL
SUPPORT STRUCTURE. IF ANY BMS 8-39 FOAM IS FOUND,
REMOVE THE OVERHEAD PANEL SUPPORT STRUCTURE.
REPLACE ANY BMS 8-39 FOAM FOUND ON THE OVERHEAD
PANEL SUPPORT STRUCTURE WITH BMS 8-371 FOAM
REINSTALL THE OVERHEAD PANEL SUPPORT STRUCTURE AND
DO FUNCTIONAL TESTS.
OVERHEAD PANEL SUPPORT STRUCTURE  2376182
(WIRE BUNDLES AND MODULES NOT SHOWN)
Original Issue: December 10, 2014
Revision 2: February 28, 2020  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  777-25-0621
Work - See page 1 for details.  12 of 88

### Page 13

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
Number: 777-25-0621
Original Issue: December 10, 2014
Revision 2: February 28, 2020
ATA System: 2510 2581
SUBJECT: EQUIPMENT/FURNISHINGS - Flight Compartment - Overhead Panel Support Structure
BMS 8-39 Urethane Foam Insulation Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This bulletin is applicable to 777-200, 777-200LR, 777-300, 777-300ER Airplane(s), line number(s)
1-506 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers, the
airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers
1 through 9 inclusive.
Refer to Service Bulletin Index D624W001 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is applicable to 777-200/200LR/300/300ER Airplanes, line numbers 1-506,
in 1 Group. The Variable Numbers and Group Information for the applicable airplanes is given
below. An equivalent change is on subsequent production airplanes. Refer to PRR 62777-37S for
data about this change.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
13 of 88

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
777-200/-200LR/-300/-300ER Airplanes that have BMS 8-39 urethane
foam insulation installed on the overhead support structure and the
dripshield in the flight compartment.
-1
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue of this service
bulletin only.
2
Airplanes that have accomplished Revision 1 of this service bulletin
only.
3
Airplanes that have accomplished the Original Issue and Revision 1
of this service bulletin.
4
Airplane Models:
777-200, 777-200LR, 777-300, 777-300ER
GroupVariable Number
1WA001 - WA017
1WA076 - WA080
1WA086 - WA093
1WA101 - WA104
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
1WA196 - WA198
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281
1WA301 - WA302
1WB001 - WB021
1WB031 - WB046
1WB051 - WB088
GroupVariable Number
1WB101 - WB106
1WB121 - WB125
1WB131 - WB139
1WB151 - WB155
1WB161 - WB177
1WB181 - WB194
1WB201 - WB215
1WB231 - WB247
1WB271 - WB273
1WB276 - WB286
1WB291 - WB302
1WB306 - WB307
1WB311 - WB337
1WB341 - WB342
1WB366 - WB367
1WB371 - WB388
1WB406
1WB411 - WB413
GroupVariable Number
1WB416 - WB437
1WB446 - WB453
1WB476
1WB481 - WB484
1WB501 - WB510
1WB531 - WB537
1WB551 - WB554
1WB591 - WB597
1WB601 - WB606
1WB611 - WB621
1WB631 - WB638
1WB646 - WB649
1WC051 - WC073
1WC101 - WC104
1WC111 - WC115
1WC241 - WC243
1WC281 - WC290
1WC301 - WC306
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
14 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 15

GroupVariable Number
1WC361 - WC362
1WC371 - WC374
1WC381 - WC390
1WC441
GroupVariable Number
1WC446 - WC448
1WC456
1WD001
1WD501 - WD502
GroupVariable Number
1WD521 - WD529
1WD561
1WD621
--
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of this service bulletin will make sure that the risk of fire in the flight compartment from
aging BMS 8-39 urethane foam insulation is decreased. Degraded BMS 8-39 urethane foam insulation
on the overhead panel support structure can be an unacceptable fuel source for a fire if exposed to an
ignition source. If this service bulletin is not done, degraded BMS 8-39 urethane foam insulation could
result in an increased risk of a fire.
BMS 8-39 flexible urethane foam insulation has self-extinguishing and physical properties that degrade
with age and large parts fabricated from this material present an unacceptable fuel source. BMS 8-39
urethane foam insulation fire retardants are mixed into, but are not chemically connected with, the
remaining components of the foam insulation. This condition will cause the fire retardant properties to
have decreased effectiveness. The concern is hidden areas where fire cannot easily be detected and
suppressed.
BMS 8-39 urethane foam insulation in the flight compartment and other areas of the airplanes was
replaced in production from line number 507 and Boeing Service Bulletin 777-25-0362 was released
to instruct foam insulation replacement for in-service airplanes. However, Boeing has recently found
some additional BMS 8-39 urethane foam insulation on the overhead panel support structure in the
flight compartment, that was not included in Boeing Service Bulletin 777-25-0362.
Since the release of the Original Issue of this service bulletin, BMS 8-39 urethane foam insulation was
found on the dripshield above the overhead panel. All BMS 8-39 urethane foam insulation on the
overhead panel and if installed on the dripshield, must be removed and replaced with BMS 8-371
polyvinylidene fluoride foam insulation. This service bulletin gives instructions to remove BMS 8-39
urethane foam insulation and install BMS 8-371 polyvinylidene fluoride foam insulation on the overhead
panel support structure in the flight compartment. BMS 8-371 polyvinylidene fluoride foam insulation
has better fire retardant properties that stay effective with age.
Boeing Service Related Problem (SRP) 777-SRP-25-0346 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 777 FTD 25-14003 is related to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane WB509 by
Service Bulletin 777-25-0621 Original Issue before the release of Revision 1 of this service bulletin.
The change completed on airplane WB509 is equivalent to accomplishing Revision 1 of this service
bulletin. Airplane WB509 has the configuration of a Group 1, Configuration 3 airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
15 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 16

Revision 1 was sent to incorporate results from the service bulletin validation. The validation found that
foam insulation replacement could not be done without the removal of the overhead panel support
structure from the flight compartment ceiling. Removal and installation instructions were added to this
service bulletin. This revision also added work instructions which included tests of modules and a
General Visual Inspection (GVI) of the dripshield for BMS 8-39 urethane foam insulation.
Revision 2 is sent to:
1. Provide alternative materials and quantities.
2. Include instructions to remove ducting to access the BMS 8-39 urethane foam on the overhead
panel support structure.
3. Provide additional work requirements for airplanes that have accomplished the Original Issue of
this service bulletin and may not have removed BMS 8-39 urethane foam completely from the
overhead panel support structure.
4. Provide additional tests necessary to verify the functionality of equipment affected by the removal
of the overhead panel support structure.
D. Description
Group 1, Configuration 1:
Remove the overhead panel support structure and replace the BMS 8-39 urethane foam with BMS
8-371 foam. Inspect for BMS 8-39 urethane foam on the dripshield and replace any found with BMS
8-371 foam. Reinstall the overhead panel support structure and do functional tests.
Group 1, Configuration 2:
Inspect for BMS 8-39 urethane foam on the overhead panel support structure and the dripshield. If any
BMS 8-39 urethane foam is found, remove the overhead panel support structure. Replace any BMS
8-39 urethane foam found on the overhead panel support structure or the dripshield with BMS 8-371
foam. Reinstall the overhead panel support structure and do functional tests.
Group 1, Configuration 3:
Do functional tests.
Group 1, Configuration 4:
Inspect for BMS 8-39 urethane foam on the overhead panel support structure. If any BMS 8-39 urethane
foam is found, remove the overhead panel support structure. Replace any BMS 8-39 urethane foam
found on the overhead panel support structure with BMS 8-371 foam. Reinstall the overhead panel
support structure and do functional tests.
Effects of this Revision on airplanes on which the Original Issue or Revision 1 was previously done:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
16 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 17

ActionConditionGroup
1. Do a Detailed Inspection
for BMS 8-39 urethane
foam on the overhead
panel support structure.
2. Do a General Visual In-
spection (GVI) for BMS 8-
39 urethane foam on the
dripshield.
3. Replace any BMS 8-39
urethane foam found with
BMS 8-371 foam.
4. Do functional tests.
Airplanes that have accomplished
the Original Issue of this service
bulletin only.
1, Configuration 2
1. None.Airplanes that have accomplished
Revision 1 of this service bulletin
only.
1, Configuration 3
1. Do a Detailed Inspection
for BMS 8-39 urethane
foam on the overhead
panel support structure.
2. Replace any BMS 8-39
urethane foam found with
BMS 8-371 foam.
3. Do functional tests.
Airplanes that have accomplished
both the Original Issue and Revision
1 of this service bulletin.
1, Configuration 4
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
211, 212777-200, 777-200LR, 777-300,
777-300ER
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2018-14-02 is related to this service
bulletin. The effective date of the AD 2018-14-02 is August 13, 2018.
Accomplish the required action(s), based on the applicable condition(s) in Table(s) 1-3, in accordance
with Paragraph 3. Accomplishment Instructions.
A logic diagram showing compliance tasks and compliance times is included as an aid in APPENDIX
B, APPENDIX C and APPENDIX E.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
17 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 18

Group 1, Configuration 1:
Table 1: OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM INSULATION
REPLACEMENT AND GENERAL VISUAL INSPECTION OF THE DRIPSHIELD
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 72 months
after the effective
date of AD 2018-
14-02.
Do PART 1: OVERHEAD
PANEL SUPPORT
STRUCTURE BMS 8-39
URETHANE FOAM INSU-
LATION REPLACEMENT
All airplanes
Do PART 2: GENERAL
VISUAL INSPECTION
OF THE DRIPSHIELD
--No further action re-
quired.
CONDITION 1: BMS 8-39
URETHANE FOAM INSU-
LATION IS NOT FOUND
DURING PART 2 INSPEC-
TION
-Before further
flight.
Do PART 3: DRIP-
SHIELD BMS 8-39 URE-
THANE FOAM INSULA-
TION REPLACEMENT
CONDITION 2: BMS 8-39
URETHANE FOAM INSU-
LATION IS FOUND DUR-
ING PART 2 INSPECTION
Group 1, Configuration 2:
Table 2: DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE AND
GENERAL VISUAL INSPECTION OF THE DRIPSHIELD FOR BMS 8-39 URETHANE FOAM INSULA-
TION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 72 months
after the Revision
2 date of this ser-
vice bulletin.
Do PART 2: GENERAL
VISUAL INSPECTION
OF THE DRIPSHIELD
All airplanes
Do PART 5: DETAILED
INSPECTION OF THE
OVERHEAD PANEL
SUPPORT STRUCTURE
--No further action re-
quired.
CONDITION 3: BMS 8-39
URETHANE FOAM INSU-
LATION IS NOT FOUND
DURING PART 2 AND
PART 5 INSPECTION
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
18 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 19

Group 1, Configuration 2:
Table 2: DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE AND
GENERAL VISUAL INSPECTION OF THE DRIPSHIELD FOR BMS 8-39 URETHANE FOAM INSULA-
TION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further
flight.
Do PART 1: OVERHEAD
PANEL SUPPORT
STRUCTURE BMS 8-39
URETHANE FOAM INSU-
LATION REPLACEMENT
CONDITION 4: BMS 8-39
URETHANE FOAM INSU-
LATION IS FOUND DUR-
ING PART 5 INSPECTION
(a)
Before further
flight.
Do PART 3: DRIP-
SHIELD BMS 8-39 URE-
THANE FOAM INSULA-
TION REPLACEMENT
CONDITION 5: BMS 8-39
URETHANE FOAM INSU-
LATION IS FOUND DUR-
ING PART 2 INSPECTION
(a)
(a) Multiple conditions can apply.
Group 1, Configuration 4:
Table 3: DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE FOR BMS
8-39 URETHANE FOAM INSULATION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 72 months
after the Revision
2 date of this ser-
vice bulletin.
Do PART 5: DETAILED
INSPECTION OF THE
OVERHEAD PANEL
SUPPORT STRUCTURE
All airplanes
--No further action re-
quired.
CONDITION 6: BMS 8-39
URETHANE FOAM INSU-
LATION IS NOT FOUND
DURING PART 5 INSPEC-
TION
-Before further
flight.
Do PART 1: OVERHEAD
PANEL SUPPORT
STRUCTURE BMS 8-39
URETHANE FOAM INSU-
LATION REPLACEMENT
CONDITION 7: BMS 8-39
URETHANE FOAM INSU-
LATION IS FOUND DUR-
ING PART 5 INSPECTION
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
19 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 20

If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
The manager of the FAA Seattle ACO Branch approves the accomplishment of the change defined in
this SB revision as an alternative method of compliance (AMOC) to accomplishing SB 777-25-0621,
Revision 1, for paragraph (g) of AD 2018-14-02.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools.
Group 1, Configuration 1:
OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM INSULATION REPLACE-
MENT AND GENERAL VISUAL INSPECTION OF THE DRIPSHIELD
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
1.853.702FIGURE 1
0.622.504FIGURE 4
3.757.502FIGURE 2
0.250.251FIGURE 7
1.503.002FIGURE 8(a)
0.622.54FIGURE 5
3.156.302FIGURE 3
2.304.602Test
(PART 4)
62.65(b)62.651Test
(PART 6 and 7)(a)
1.002.002Close Access
14.5531.35TOTAL FOR EACH AIRPLANE
(a) Add the hours of this task to the total for each airplane based on the results of inspection
for BMS 8-39 urethane foam.
(b) Elapsed hours may vary depending on number of persons assigned to do the tests.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
20 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 21

Group 1, Configuration 2:
DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE AND GENERAL
VISUAL INSPECTION OF THE DRIPSHIELD FOR BMS 8-39 URETHANE FOAM INSULATION
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
1.501.501FIGURE 6
0.250.251FIGURE 7
3.757.502FIGURE 11
1.501.501FIGURE 9(a)
1.853.702FIGURE 10(a)
0.622.504FIGURE 4(a)
3.757.502FIGURE 12(a)
1.503.002FIGURE 8(a)
0.622.504FIGURE 5(a)
3.156.302FIGURE 3(a)
2.304.602Test
(PART 4)
62.65(b)62.651Test
(PART 6 and 7)(a)
1.002.002Close Access
9.8017.85TOTAL FOR EACH AIRPLANE
(a) Add the hours of this task to the total for each airplane based on the results of inspection
for BMS 8-39 urethane foam.
(b) Elapsed hours may vary depending on number of persons assigned to do the tests.
Group 1, Configuration 3:
FUNCTIONAL TESTS AFTER RE-INSTALLATION OF OVERHEAD PANEL SUPPORT STRUCTURE
Elapsed HoursTask HoursNumber of PersonsTask
62.65(a)62.651Test
(PART 6 and 7)
62.6562.65TOTAL FOR EACH AIRPLANE
(a) Elapsed hours may vary depending on number of persons assigned to do the tests.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
21 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 22

Group 1, Configuration 4:
DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE FOR BMS 8-39
URETHANE FOAM INSULATION
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
1.501.501FIGURE 6
3.757.502FIGURE 11
1.501.501FIGURE 9(a)
1.853.702FIGURE 10(a)
0.622.504FIGURE 4(a)
3.757.502FIGURE 12(a)
0.622.504FIGURE 5(a)
3.156.302FIGURE 3(a)
2.304.602Test
(PART 4)
62.65(b)62.651Test
(PART 6 and 7)(a)
1.002.002Close Access
9.5517.60TOTAL FOR EACH AIRPLANE
(a) Add the hours of this task to the total for each airplane based on the results of inspection
for BMS 8-39 urethane foam.
(b) Elapsed hours may vary depending on number of persons assigned to do the tests.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Boeing Service Bulletin 777-25-0362
b. Boeing Service Related Problem (SRP) 777-SRP-25-0346
c. Engineering Change Memo PRR 62777-37S
d. Engineering Change Memo MRR 725014-013S
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
22 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 23

e. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2018-14-02
f. Service Bulletin Index D624W001
g. Standard Overhaul Practices Manual (SOPM) 20-11-03, 20-30-03, 20-50-10
h. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19
i. 777 Aircraft Maintenance Manual (AMM) 21-31-03, 21-44-09, 21-60-01, 21-61-04, 22-11-01,
22-11-02, 22-31-00, 23-11-05, 23-12-01, 23-21-01, 23-24-00, 23-24-03, 23-51-04, 23-71-00,
23-71-02, 23-71-04, 23-93-00, 23-93-01, 23-93-02, 24-09-00, 24-22-00, 24-22-01, 24-30-00,
25-15-06, 26-11-00, 26-16-00, 26-21-00, 26-22-00, 26-22-03, 26-22-04, 26-23-00, 27-02-02,
27-02-03, 27-02-32, 28-22-00, 28-22-17, 29-11-00, 29-11-01, 29-11-02, 29-11-10, 29-11-80,
29-21-00, 30-11-00, 30-21-00, 30-41-00, 30-41-02, 30-41-12, 30-42-00, 31-25-01, 31-51-00,
31-51-02, 32-09-00, 32-31-00, 32-31-01, 32-44-00, 33-11-00, 33-13-00, 33-14-00, 33-16-00,
33-42-00, 33-51-00, 34-13-00, 34-24-01, 34-24-02, 34-43-00, 34-45-00, 34-51-00, 34-53-00,
34-55-00, 34-57-00, 35-22-00, 36-11-10, 36-11-20, 45-10-01, 45-11-05, 46-11-02, 46-11-04,
46-11-07, 46-13-01, 49-11-00, 52-51-00, 71-00-00, 73-00-00, 73-21-00, 76-11-00
j. 777 Fleet Team Digest (FTD) 25-14003
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
SUPPORT INSTL-OVERHEAD PANEL233W3300
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
21-22, 25-10, 33-11777 Illustrated Parts Catalog
53-17777 Aircraft Maintenance Manual - Prac-
tices and Procedures
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
23 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 24

L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
24 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits/parts shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits/parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Group 1, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 2
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 2 date of
this Service Bul-
letin (Calendar
Days)
QTYDateNameKit/Part Num-
ber
$5,840.001291July 24, 2014TOP KIT, RETROFIT -
BMS 8-39 FOAM IN
FLIGHT DECK OVER-
HEAD - REPLACE-
MENT
005W0025-1(b)
25February 17, 2015
24March 17, 2015
25April 14, 2015
$0.43---NUT, SELF-LOCKINGBACN11AG4
(a)
(a) It is necessary to remove and replace the self-locking nuts in accordance with FIGURE 4 and FIGURE 5.
(b) This kit contains shelf life items. Boeing recommends that operators consider the shelf life of the kit when
planning for service bulletin incorporation and kit ordering.
Operators are encouraged to complete the survey provided in APPENDIX A of this service bulletin to
help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
25 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 26

NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane. The Top Kit is divided into Figure kits for
each installation figure shown in the table below.
Group 1, Configuration 1:
Figure Kit
2Top Kit
1005W0025-1
Group 1, Configuration 1:
KIT 005W0025-1
Notes
Existing Part
NumberName
Figure
New Part Number
2
Qty
(a)(b)233W3307-1INSULATION1233W3307-27
(a)(b)233W3307-2INSULATION1233W3307-28
(a)(b)233W3307-11INSULATION1233W3307-29
(a)(b)233W3307-8INSULATION1233W3307-30
(a)(b)233W3307-4INSULATION1233W3307-31
(a)(b)233W3307-4INSULATION1233W3307-32
(a)(b)233W3307-6INSULATION1233W3307-33
(a)(b)233W3307-6INSULATION1233W3307-34
(a)(b)233W3307-3INSULATION1233W3307-35
(a)(b)233W3307-3INSULATION1233W3307-36
(a)(b)233W3307-5INSULATION1233W3307-37
(a)(b)233W3307-5INSULATION1233W3307-38
(a)(b)233W3307-7INSULATION1233W3307-39
(a)(b)233W3307-7INSULATION1233W3307-40
(a)(b)233W3307-9INSULATION1233W3307-41
(a) Discard the existing part.
(b) You cannot use the existing part to replace the new or changed part.
Parts
NotesExisting Part
Number
NameQTYNew Part Number
(a)BACN11AG4NUT, SELF-LOCKING2BACN11AG4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
26 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 27

Parts
NotesExisting Part
Number
NameQTYNew Part Number
(a) Discard the existing part.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
Group 1, Configuration 1-2:
NotesNameQTYPart Number / Specification
(a)Tape1 RollBMS 5-157, Type I, Class 1, Grade A, Form 1,
Composition MPVF
(a)(b)(c)Polyvinylidene Fluoride
Foam Insulation
1 SheetBMS 8-371, Type 1A, Class 1, Grade 2, 0.25"
thick, 36"x36"
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
(b) Minimum quantity given. More material may be necessary.
(c) BMS 8-371, Type 1, Class 1, Grade 2 Foam Insulation with BMS 5-123 Type 1 or BMS 5-30
Type 1 Adhesive is an acceptable alternative.
Group 1, Configuration 2, 4:
NotesNameQTYPart Number / Specification
(a)(b)(c)Polyvinylidene Fluoride
Foam Insulation
As requiredBMS 8-371, Type 1A, Class 1, Grade 2, 0.25"
thick
(a)(b)(c)Polyvinylidene Fluoride
Foam Insulation
As requiredBMS 8-371, Type 1A, Class 1, Grade 2, 0.125"
thick
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
(b) This material is required if any BMS 8-39 urethane foam is found during PART 5 inspection.
The amount of material necessary depends on the amount of BMS 8-39 urethane foam that
is found and removed. Refer to Figure 12.
(c) BMS 8-371, Type 1, Class 1, Grade 2 Foam Insulation with BMS 5-123 Type 1 or BMS 5-30
Type 1 Adhesive is an acceptable alternative.
3. Parts Modified and Reidentified
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
27 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 28

NotesNew Part NumberNameQTYExisting Part Number
(a)(b)-OVERHEAD ASSY1233W3311-1, -2, -3, -4, -14,
-16 or -17
(a) Make the change in accordance with this service bulletin.
(b) There is no equivalent Boeing part number for the changed part.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
28 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 29

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF
METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE
BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES
CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
CAUTION
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 777 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 777
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
4. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. The necessary conditions for selection of clamp type and size are included in SWPM
20-10-12. If any wire bundle support clamp specified in this service bulletin does not
make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted
procedure to select a clamp that fits correctly.
7. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
29 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 30

8. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation or assembly to detect damage, failure or irregularity. This could include
tactile assessment in which a component or assembly can be checked for
tightness/security. Available lighting is normally supplemented with a direct source
of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors
and magnifying lenses may be necessary. Surface cleaning and elaborate access
procedures may be required.
9. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
10. Refer to APPENDIX B, APPENDIX C and APPENDIX E for logic diagram(s). Logic
diagrams are provided as an aid only. Information contained in Paragraph 1.E.,
Compliance is the primary source for compliance times. Information in Paragraph
3.B., Work Instructions is the primary source for tasks required for compliance.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
13. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
14. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
15. Some steps in the Work Instructions are labeled as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as "RC", including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. If a step or sub-step is labeled
"RC Exempt" then the RC requirement is removed from that step or sub-step. An
Alternative Method of Compliance (AMOC) is required for any deviations to RC steps,
including sub-steps and identified figures. Steps not labeled as RC may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC. This is provided that
the RC steps, including sub-steps and identified figures, can still be done as specified,
and the airplane can be put back in an airworthy condition.
16. Use a temporary protective sheet when removing BMS 8-39 urethane foam from the
overhead panel support structure to prevent BMS 8-39 urethane foam particles falling
into the electrical equipment below.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
30 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 31

B. WORK INSTRUCTIONS
Group 1, Configuration 1:
OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM INSULATION
REPLACEMENT AND GENERAL VISUAL INSPECTION OF THE DRIPSHIELD
1. Remove electrical power from the airplane. Refer to 777 AMM 24-22-00 as an acceptable procedure.
2. Get access to the flight compartment.
3. Remove the overhead linings.
a. Remove and keep the left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
b. Remove and keep the overhead lining panel aft of the overhead panel support structure to
get additional access.
4. Remove and keep modules from the overhead panel to get access to the overhead panel support
structure in accordance with FIGURE 1.
5. Remove and keep the overhead panel support structure in accordance with FIGURE 4.
a. After removal, remove and keep any ducts on the overhead panel support structure necessary
to gain access to the BMS 8-39 urethane foam.
6. RC - Do PART 1: OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM
INSULATION REPLACEMENT
7. RC - Do PART 2: GENERAL VISUAL INSPECTION OF THE DRIPSHIELD for any BMS 8-39
urethane foam.
a. CONDITION 1: BMS 8-39 URETHANE FOAM INSULATION IS NOT FOUND DURING PART
2 INSPECTION
(1) No further action required.
b. CONDITION 2: BMS 8-39 URETHANE FOAM INSULATION IS FOUND DURING PART 2
INSPECTION
(1) Do PART 3: DRIPSHIELD BMS 8-39 URETHANE FOAM INSULATION REPLACEMENT
8. Install the kept overhead panel support structure in accordance with FIGURE 5.
a. Before installation, re-install kept ducts on the overhead panel support structure that were
removed to gain access to the BMS 8-39 urethane foam.
9. Close access in accordance with FIGURE 3.
10. Install the overhead linings.
a. Install the kept left and right overhead lining. Refer to 777 AMM 25-15-06 as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
31 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 32

b. Install the kept overhead lining aft of the overhead panel support structure.
11. Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an acceptable procedure.
12. Do the tests in accordance with PART 4: OPERATIONAL TESTS OF THE OVERHEAD PANEL
MODULES.
13. Do the tests in accordance with PART 6: ADDITIONAL OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
14. Do the tests in accordance with PART 7: TESTS OF THE EQUIPMENT AFFECTED BY THE
REMOVAL OF THE OVERHEAD PANEL SUPPORT STRUCTURE.
15. Put the airplane back to a serviceable condition.
Group 1, Configuration 2:
DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE AND GENERAL
VISUAL INSPECTION OF THE DRIPSHIELD FOR BMS 8-39 URETHANE FOAM INSULATION
1. Remove electrical power from the airplane. Refer to 777 AMM 24-22-00 as an acceptable procedure.
2. Get access to the flight compartment.
3. Remove and keep modules from the overhead panel to get access to see the dripshield and the
overhead panel support structure in accordance with FIGURE 6.
4. Remove the overhead linings.
a. Remove and keep the left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
b. Remove and keep the overhead lining panel aft of the overhead panel support structure to
get additional access.
5. RC - Do PART 2: GENERAL VISUAL INSPECTION OF THE DRIPSHIELD and do PART 5:
DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE for any BMS
8-39 urethane foam.
a. CONDITION 3: BMS 8-39 URETHANE FOAM INSULATION IS NOT FOUND DURING PART
2 AND PART 5 INSPECTION
(1) No further action required.
(2) RC Exempt - Close access in accordance with FIGURE 9.
(3) RC Exempt - Install the overhead linings.
(a) Install the kept left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
(b) Install the kept overhead lining aft of the overhead panel support structure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
32 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 33

(4) RC Exempt - Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an
acceptable procedure.
(5) RC Exempt - Do the tests in accordance with PART 4: OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
b. CONDITION 4: BMS 8-39 URETHANE FOAM INSULATION IS FOUND DURING PART 5
INSPECTION
NOTE: Multiple conditions can apply.
(1) RC Exempt - Remove and keep modules from the overhead panel to get access to the
overhead panel support structure in accordance with FIGURE 10.
(2) RC Exempt - Remove and keep the overhead panel support structure in accordance with
FIGURE 4.
(a) After removal, remove and keep any ducts on the overhead panel support structure
necessary to gain access to the BMS 8-39 urethane foam.
(3) Do PART 1: OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM
INSULATION REPLACEMENT
(4) RC Exempt - Install the kept overhead panel support structure in accordance with FIGURE
5.
(a) Before installation, re-install kept ducts on the overhead panel support structure that
were removed to gain access to the BMS 8-39 urethane foam.
(5) RC Exempt - Close access in accordance with FIGURE 3.
(6) RC Exempt - Install the overhead linings.
(a) Install the kept left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
(b) Install the kept overhead lining aft of the overhead panel support structure.
(7) RC Exempt - Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an
acceptable procedure.
(8) RC Exempt - Do the tests in accordance with PART 4: OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
(9) RC Exempt - Do the tests in accordance with PART 6: ADDITIONAL OPERATIONAL
TESTS OF THE OVERHEAD PANEL MODULES.
(10) RC Exempt - Do the tests in accordance with PART 7: TESTS OF THE EQUIPMENT
AFFECTED BY THE REMOVAL OF THE OVERHEAD PANEL SUPPORT STRUCTURE.
c. CONDITION 5: BMS 8-39 URETHANE FOAM INSULATION IS FOUND DURING PART 2
INSPECTION
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
33 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 34

NOTE: Multiple conditions can apply.
(1) RC Exempt - Remove and keep modules from the overhead panel to get access to the
overhead panel support structure in accordance with FIGURE 10.
(2) RC Exempt - Remove and keep the overhead panel support structure in accordance with
FIGURE 4.
(3) Do PART 3: DRIPSHIELD BMS 8-39 URETHANE FOAM INSULATION REPLACEMENT
(4) RC Exempt - Install the kept overhead panel support structure in accordance with FIGURE
5.
(5) RC Exempt - Close access in accordance with FIGURE 3.
(6) RC Exempt - Install the overhead linings.
(a) Install the kept left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
(b) Install the kept overhead lining aft of the overhead panel support structure.
(7) RC Exempt - Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an
acceptable procedure.
(8) RC Exempt - Do the tests in accordance with PART 4: OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
(9) RC Exempt - Do the tests in accordance with PART 6: ADDITIONAL OPERATIONAL
TESTS OF THE OVERHEAD PANEL MODULES.
(10) RC Exempt - Do the tests in accordance with PART 7: TESTS OF THE EQUIPMENT
AFFECTED BY THE REMOVAL OF THE OVERHEAD PANEL SUPPORT STRUCTURE.
6. Put the airplane back to a serviceable condition.
Group 1, Configuration 3:
FUNCTIONAL TESTS AFTER RE-INSTALLATION OF OVERHEAD PANEL SUPPORT STRUCTURE
1. Get access to the flight compartment.
2. Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an acceptable procedure.
3. Do the tests in accordance with PART 6: ADDITIONAL OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
4. Do the tests in accordance with PART 7: TESTS OF THE EQUIPMENT AFFECTED BY THE
REMOVAL OF THE OVERHEAD PANEL SUPPORT STRUCTURE.
5. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
34 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 35

Group 1, Configuration 4:
DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE FOR BMS 8-39
URETHANE FOAM INSULATION
1. Remove electrical power from the airplane. Refer to 777 AMM 24-22-00 as an acceptable procedure.
2. Get access to the flight compartment.
3. Remove and keep modules from the overhead panel to get access to see the overhead panel
support structure in accordance with FIGURE 6.
4. Remove the overhead linings.
a. Remove and keep the left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
b. Remove and keep the overhead lining panel aft of the overhead panel support structure to
get additional access.
5. RC - Do PART 5: DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE
for any BMS 8-39 urethane foam.
a. CONDITION 6: BMS 8-39 URETHANE FOAM INSULATION IS NOT FOUND DURING PART
5 INSPECTION
(1) No further action required.
(2) RC Exempt - Close access in accordance with FIGURE 9.
(3) RC Exempt - Install the overhead linings.
(a) Install the kept left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
(b) Install the kept overhead lining aft of the overhead panel support structure.
(4) RC Exempt - Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an
acceptable procedure.
(5) RC Exempt - Do the tests in accordance with PART 4: OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
b. CONDITION 7: BMS 8-39 URETHANE FOAM INSULATION IS FOUND DURING PART 5
INSPECTION
(1) RC Exempt - Remove and keep modules from the overhead panel to get access to the
overhead panel support structure in accordance with FIGURE 10.
(2) RC Exempt - Remove and keep the overhead panel support structure in accordance with
FIGURE 4.
(a) After removal, remove and keep any ducts on the overhead panel support structure
necessary to gain access to the BMS 8-39 urethane foam.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
35 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 36

(3) Do PART 1: OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM
INSULATION REPLACEMENT
(4) RC Exempt - Install the kept overhead panel support structure in accordance with FIGURE
5.
(a) Before installation, re-install kept ducts on the overhead panel support structure that
were removed to gain access to the BMS 8-39 urethane foam.
(5) RC Exempt - Close access in accordance with FIGURE 3.
(6) RC Exempt - Install the overhead linings.
(a) Install the kept left and right overhead lining. Refer to 777 AMM 25-15-06 as an
accepted procedure.
(b) Install the kept overhead lining aft of the overhead panel support structure.
(7) RC Exempt - Supply electrical power to the airplane. Refer to 777 AMM 24-22-00 as an
acceptable procedure.
(8) RC Exempt - Do the tests in accordance with PART 4: OPERATIONAL TESTS OF THE
OVERHEAD PANEL MODULES.
(9) RC Exempt - Do the tests in accordance with PART 6: ADDITIONAL OPERATIONAL
TESTS OF THE OVERHEAD PANEL MODULES.
(10) RC Exempt - Do the tests in accordance with PART 7: TESTS OF THE EQUIPMENT
AFFECTED BY THE REMOVAL OF THE OVERHEAD PANEL SUPPORT STRUCTURE.
6. Put the airplane back to a serviceable condition.
Group 1, Configuration 1-2, 4:
PART 1: OVERHEAD PANEL SUPPORT STRUCTURE BMS 8-39 URETHANE FOAM INSULATION
REPLACEMENT
1. Group 1, Configuration 1:
Replace BMS 8-39 urethane foam on the overhead panel support structure in accordance with
FIGURE 2.
2. Group 1, Configuration 2, 4:
Replace any BMS 8-39 urethane foam found on the overhead panel support structure in accordance
with FIGURE 12.
Group 1, Configuration 1-2:
PART 2: GENERAL VISUAL INSPECTION OF THE DRIPSHIELD
1. Do a General Visual Inspection of the dripshield, above the overhead panel support structure, for
BMS 8-39 urethane foam insulation in accordance with FIGURE 7.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
36 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 37

Group 1, Configuration 1-2:
PART 3: DRIPSHIELD BMS 8-39 URETHANE FOAM INSULATION REPLACEMENT
1. Replace all BMS 8-39 urethane foam insulation found on the dripshield in accordance with FIGURE
8.
Group 1, Configuration 1-2, 4:
PART 4: OPERATIONAL TESTS OF THE OVERHEAD PANEL MODULES
1. Do a related test of the modules that were removed and installed in the overhead panel support
structure. If a test fails, do the corrective action and repeat the test until the test is passed.
a. Flight Control Hydraulic Valve Power Module:
(1) Do the Hydraulic Shutoff Valves Test. Refer to 777 AMM 27-02-32 as an accepted
procedure.
b. Auxiliary Power Unit (APU) Maintenance / Electronic Engine Control (EEC) Maintenance
Module:
(1) Do the APU Bite Test. Refer to 777 AMM 49-11-00 as an accepted procedures.
(2) For airplanes with PW 4000 series engines, do the Electronic Engine Control (EEC)
System Static Test. Refer to 777 AMM 73-21-00 as an accepted procedure.
(3) For airplanes with Trent 800 series engines, do the Electronic Engine Control (EEC)
NORM/ALTN Mode Lights Inoperative test. Refer to 777 AMM 73-00-00 as an accepted
procedure.
(4) For airplanes with GE90 series engines, do the Engine Electronic Engine Control (EEC)
Test (MAT Initiated Test). Refer to 777 AMM 71-00-00 as an accepted procedure.
c. Ground Test Module:
(1) Do the Lower Cargo Compartment Smoke Detection MAT Test. Refer to 777 AMM
26-16-00 as an accepted procedure.
d. Left and Right Wiper Modules:
(1) Do the Windshield Wiper System - Operation Test. Refer to 777 AMM 30-42-00 as an
accepted procedure.
e. Pass Signs Module:
(1) Do the Cockpit Voice Recorder Microphone Installation Test. Refer to 777 AMM 23-71-04
as an accepted procedure.
(2) Do the Flight Compartment Illumination - Operational Test. Refer to 777 AMM 33-11-00
as an accepted procedure.
(3) Do the Landing, Runway Turnoff and Taxi Lights - Operational Test. Refer to 777 AMM
33-42-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
37 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 38

f. Anti-Ice Module:
(1) Do the Wing Anti-Ice - System Test. Refer to 777 AMM 30-11-00 as an accepted
procedure.
(2) Do the Engine Anti-Ice - System Test. Refer to 777 AMM 30-21-00 as an accepted
procedure.
g. APU Fire Switch Panel:
(1) Do the APU Fire Switch Installation Test. Refer to 777 AMM 26-22-03 as an accepted
procedure.
Group 1, Configuration 2, 4:
PART 5: DETAILED INSPECTION OF THE OVERHEAD PANEL SUPPORT STRUCTURE
1. Do a Detailed Inspection of the overhead panel support structure, for BMS 8-39 urethane foam in
accordance with FIGURE 11.
PART 6: ADDITIONAL OPERATIONAL TESTS OF THE OVERHEAD PANEL MODULES
1. Do related tests of the additional modules that were removed and installed in the overhead panel
support structure. If a test fails, do the corrective action and repeat the test until the test is passed.
a. Cargo Temp Select Module:
(1) Do the Cargo Temp Select Module Installation Test. Refer to 777 AMM 21-44-09 as an
accepted procedure.
b. A/C Module:
(1) Do the Air Conditioning Module Installation Test. Refer to 777 AMM 21-60-01 as an
accepted procedure.
c. Emergency Locator Transmitter (ELT) Module:
(1) Do the Emergency Locator Transmitter (ELT) System - System Test. Refer to 777 AMM
23-24-00 as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
d. Cockpit Voice Recorder Module:
(1) Do the Cockpit Voice Recorder System - Operational Test. Refer to 777 AMM 23-71-00
as an accepted procedure.
e. Overhead Panel Card File (OPCF):
(1) Do the Overhead Panel Card File (OPCF) Installation Test. Refer to 777 AMM 23-93-02
as an accepted procedure.
f. Electrical Syst Control Module:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
38 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 39

(1) Do the AC Generation and Bus Control - Operational Test. Refer to 777 AMM 24-22-00
as an accepted procedure.
g. Cargo Fire/Engine Control Module:
(1) Do the Cargo Fire/Engine Control Module Installation Test. Refer to 777 AMM 26-22-04
as an accepted procedure.
h. Primary Flight Computers/ADIRU Module:
(1) Do the Primary Flight Computers/ADIRU Module Operational Test. Refer to 777 AMM
27-02-03 as an accepted procedure.
i. Fuel System Module:
(1) Do the Fuel System Module Assembly Installation Test. Refer to 777 AMM 28-22-17 as
an accepted procedure.
j. Hydraulic/Ram Air Turbine Module:
(1) Do the Hydraulic/Ram Air Turbine Module - Operational Test. Refer to 777 AMM 29-11-80
as an accepted procedure.
k. Window Heat Backup Module:
(1) Do the Window Heat Control System - Operational Test. Refer to 777 AMM 30-41-00 as
an accepted procedure.
l. Window Heat/Emergency Lights Module:
(1) Do the Emergency Lights - Functional Test. Refer to 777 AMM 33-51-00 as an accepted
procedure.
m. Bleed Air/Pressurization Module:
(1) Do the Bleed Air/Pressurization Module Installation Test. Refer to 777 AMM 36-11-10 as
an accepted procedure.
PART 7: TESTS OF THE EQUIPMENT AFFECTED BY THE REMOVAL OF THE OVERHEAD PANEL
SUPPORT STRUCTURE
1. Do related tests of the equipment affected by the removal of the overhead panel support structure.
If a test fails, do the corrective action and repeat the test until the test is passed.
a. Do the Outflow Valve Assembly Installation Test. Refer to 777 AMM 21-31-03 as an accepted
procedure.
b. Do the Zone Air Temperature Sensor Installation Test. Refer to 777 AMM 21-61-04 as an
accepted procedure.
c. Do the Autopilot Flight Director Computer Installation Test. Refer to 777 AMM 22-11-01 as
an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
39 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 40

d. Do the Mode Control Panel Installation Test. Refer to 777 AMM 22-11-02 as an accepted
procedure.
e. Do the Left TMCF - Autothrottle Servo Loop - System Test. Refer to 777 AMM 22-31-00 as
an accepted procedure.
f. Do the Right TMCF - Autothrottle Servo Loop - System Test. Refer to 777 AMM 22-31-00 as
an accepted procedure.
g. Do the HF Communication Transceiver Installation Test. Refer to 777 AMM 23-11-05 as an
accepted procedure.
h. Do the VHF Communication Transceiver Installation Test. Refer to 777 AMM 23-12-01 as an
accepted procedure.
i. Do the SELCAL Decoder Installation Test. Refer to 777 AMM 23-21-01 as an accepted
procedure.
j. Do the Audio Management Unit (AMU) Installation Test. Refer to 777 AMM 23-51-04 as an
accepted procedure.
k. Do the Panel Data Concentrator Unit - System Test. Refer to 777 AMM 23-93-00 as an
accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
l. Do the Overhead Panel ARINC 629 System - Operational Test. Refer to 777 AMM 23-93-00
as an accepted procedure.
m. Do the Left Overhead Panel Bus Controller (OPBC) Installation test. Refer to 777 AMM
23-93-01 as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
n. Do the Right Overhead Panel Bus Controller (OPBC) Installation Test. Refer to 777 AMM
23-93-01 as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
o. Do the Signal Interface Unit - Exchange Check. Refer to 777 AMM 24-09-00 as an accepted
procedure.
p. Do the DC/Standby Power System - Operational Test. Refer to 777 AMM 24-30-00 as an
accepted procedure.
q. Do the Engine Fire Detection Operational Test. Refer to 777 AMM 26-11-00 as an accepted
procedure.
r. Do the Engine Fire Switch Test. Refer to 777 AMM 26-21-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
40 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 41

s. Do the EDP Depressurization Valve Check. Refer to 777 AMM 26-21-00 as an accepted
procedure.
t. Do the APU Generator Field Trip Check. Refer to 777 AMM 26-22-00 as an accepted
procedure.
u. Do the APU Fire Extinguishing Bottle Squib MAT Test. Refer to 777 AMM 26-22-00 as an
accepted procedure.
v. Do the Lower Cargo Fire Extinguishing Electrical System Test. Refer to 777 AMM 26-23-00
as an accepted procedure.
w. Do the Nozzle Distribution Tubing Pressure Test. Refer to 777 AMM 26-23-00 as an accepted
procedure.
x. Do the Actuator Control Electronics (ACE) Monitor Test. Refer to 777 AMM 27-02-02 as an
accepted procedure.
y. Do the Engine Fuel Spar Valve - Electrical Control and Indication Test. Refer to 777 AMM
28-22-00 as an accepted procedure.
z. Do the Fuel Shutoff Valve Battery - Test. Refer to 777 AMM 28-22-00 as an accepted
procedure.
aa. Do the Engine-Driven Pump (EDP) Supply Shutoff Valve - System Test. Refer to 777 AMM
29-11-00 as an accepted procedure.
ab. Do the Left and Right System Alternating Current Motor Pump (ACMP) Installation Test. Refer
to 777 AMM 29-11-01 as an accepted procedure.
ac. Do the Center System Alternating Current Motor Pump (ACMP) Installation Test. Refer to 777
AMM 29-11-02 as an accepted procedure.
ad. Do the Air-Driven Pump (ADP) Assembly Installation Test. Refer to 777 AMM 29-11-10 as an
accepted procedure.
ae. Do the Ram Air Turbine (RAT) Manual Deployment System - System Test. Refer to 777 AMM
29-21-00 as an accepted procedure.
af. Do the Clock Installation Test. Refer to 777 AMM 31-25-01 as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
ag. Do the Warning Electronic System - System Test. Refer to 777 AMM 31-51-00 as an accepted
procedure.
ah. Do the Warning speaker Installation Test. Refer to 777 AMM 31-51-02 as an accepted
procedure.
ai. Do the Air/Ground Mode Simulation. Refer to 777 AMM 32-09-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
41 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 42

aj. Do the Landing Gear Control System - Functional Test (Airplane on the Ground). Refer to
777 AMM 32-31-00 as an accepted procedure.
ak. Do the Landing Gear Control Lever Module Installation Test. Refer to 777 AMM 32-31-01 as
an accepted procedure.
al. Do the Parking Brake System - Operational Test. Refer to 777 AMM 32-44-00 as an accepted
procedure.
am. Do the Integral Panel Lights - Operational Test. Refer to 777 AMM 33-13-00 as an accepted
procedure.
an. Do the Flight Compartment Miscellaneous Lights - Operational Test. Refer to 777 AMM
33-14-00 as an accepted procedure.
ao. Do the Master Dim and Test - Operational Test. Refer to 777 AMM 33-16-00 as an accepted
procedure.
ap. Do the Air Data Standby Instruments - System Test. Refer to 777 AMM 34-13-00 as an
accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
aq. Do the Standby Attitude Display Installation Test. Refer to 777 AMM 34-24-01 as an accepted
procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
ar. Do the Integrated Standby Flight Display - Operational Test. Refer to 777 AMM 34-24-02 as
an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
as. Do the Weather Radar System - Operational Test. Refer to 777 AMM 34-43-00 as an accepted
procedure.
at. Do the Traffic Alert and Collision Avoidance System - Operational Test. Refer to 777 AMM
34-45-00 as an accepted procedure.
au. Do the Ground Proximity Warning System - Operational Test. Refer to 777 AMM 34-46-00 as
an accepted procedure.
av. Do the VOR System - Operational Test. Refer to 777 AMM 34-51-00 as an accepted procedure.
aw. Do the Air Traffic Control/Mode S Transponder System - Operational Test. Refer to 777 AMM
34-53-00 as an accepted procedure.
ax. Do the Distance Measuring Equipment System - Operational Test. Refer to 777 AMM 34-55-00
as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
42 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 43

ay. Do the Automatic Direction Finder System - Operational Test. Refer to 777 AMM 34-57-00
as an accepted procedure.
az. Do the Passenger Therapeutic Oxygen Operational Test. Refer to 777 AMM 35-22-00 as an
accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
ba. Do the ASCPC Installation Test. Refer to 777 AMM 36-11-20 as an accepted procedure.
bb. Do the Ground Test Switch Module Installation Test. Refer to 777 AMM 45-10-01 as an
accepted procedure.
bc. Do the MAT Installation Test. Refer to 777 AMM 45-11-05 as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
bd. Do the Display Unit Installation Tests. Refer to 777 AMM 46-11-02 as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
be. Do the Terminal Wireless LAN Unit (TWLU) Installation Test. Refer to 777 AMM 46-11-04 as
an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
bf. Do the Wireless WAN Unit - Installation test. Refer to 777 AMM 46-11-07 as an accepted
procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
bg. Do the Network File Server Operational Test. Refer to 777 AMM 46-13-01 as an accepted
procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
bh. Do the Flight Compartment Security Door Access System Test. Refer to 777 AMM 52-51-00
as an accepted procedure.
NOTE: This test may or may not be required and is dependent on airplane delivery
configuration.
bi. For airplanes with PW 4000 series engines, do the Test No. 20 - MAT Initiated Reverse Thrust
Lever Interlock Actuator Test. Refer to 777 AMM 71-00-00 as an accepted procedure.
bj. For airplanes with GE90 series engines, do the Test No. 17 - Engine Ignition System Test
(MAT Initiated Test). Refer to 777 AMM 71-00-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
43 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 44

bk. For airplanes with Trent 800 series engines, do the Test No. 23 - Engine Reverse Thrust
Lever Interlock Test (MAT Initiated Test). Refer to 777 AMM 71-00-00 as an accepted
procedure.
bl. For airplanes with GE90 series engines, do the Fuel Control Switches (in the Fuel Control
Module) Test Step D. Refer to 777 AMM 76-11-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2: February 28, 2020
44 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 45 (OCR)

BOEING SERVICE BULLETIN 777-25-0621
This Figure applies only to: Group 1, Configuration 1.
FLIGHT COMPARTMENT
(18
OVERHEAD PANEL
(TYPICAL)
FIGURE 1: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS
(SHEET 1 OF 5)
Original Issue: December 10, 2014
Revision 2 February 28, 2020  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-25-0621
Work - See page 1 for details.  45 of 88

### Page 46

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one airplane.
More DataQtyIdentificationNameTaskStep
Disengage the quar-
ter-turn fasteners to
remove the blank
panels.
2-BLANK PANELRemove / Keep1
Refer to 777 AMM
30-41-12 as an ac-
cepted procedure.
1-WINDOW HEAT
BACKUP MODULE
Remove / Keep2
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-FLT CONTROL HYD
VALVE POWER MOD-
ULE
Remove / Keep
Disengage the quar-
ter-turn fasteners to
remove the blank
panels.
1-BLANK PANELRemove / Keep
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-APU MAINT / EEC
MAINT MODULE
Remove / Keep3
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-GND TEST MODULERemove / Keep
Refer to 777 AMM
21-44-09 as an ac-
cepted procedure.
1-CARGO TEMP SE-
LECT MODULE
Remove / Keep
Refer to 777 AMM
23-71-02 as an ac-
cepted procedure.
1-COCKPIT VOICE
RECORDER MODULE
Remove / Keep
FIGURE 1: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS
(SHEET 2 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
46 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 47

More DataQtyIdentificationNameTaskStep
Refer to 777 AMM
23-93-02 as an ac-
cepted procedure.
2-OVERHEAD PANEL
CARD FILE
Remove / Keep4
-2-P11 CIRCUIT BREAK-
ER PANEL
Open5
Disconnect electrical
connectors from dis-
connect panels
AF0201 and
AF0202.
--ELECTRICAL CON-
NECTORS
Disconnect
Disconnect wiring
from terminal
block(s). Identify the
location of wire to
help put them back
in the same location
during installation.
--WIRINGDisconnect
Refer to 777 AMM
23-24-03 as an ac-
cepted procedure.
(a)
1-ELT MODULERemove / Keep6
Disengage the quar-
ter-turn fasteners to
remove the blank
panels. (b)
1-BLANK PANELRemove / Keep7
Refer to 777 AMM
30-41-02 as an ac-
cepted procedure.
1-WINDOW HEAT/EMER
LIGHTS MODULE
Remove / Keep8
Refer to 777 AMM
27-02-03 as an ac-
cepted procedure.
1-PRIMARY FLIGHT
COMPUTER/ADIRU
MODULE
Remove / Keep9
Refer to 777 AMM
29-11-80 as an ac-
cepted procedure.
1-HYDRAULIC/RAM AIR
TURBINE MODULE
Remove / Keep10
Refer to 777 AMM
24-22-01 as an ac-
cepted procedure.
1-ELECTRICAL SYST
CONTROL PANEL
Remove / Keep11
FIGURE 1: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS
(SHEET 3 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
47 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 48

More DataQtyIdentificationNameTaskStep
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-L WIPER MODULERemove / Keep12
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-R WIPER MODULERemove / Keep
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-PASS SIGNS MODULERemove / Keep13
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
module.
1-ANTI-ICE MODULERemove / Keep14
Refer to 777 AMM
36-11-10 as an ac-
cepted procedure.
1-BLEED AIR/PRESSUR-
IZATION MODULE
Remove / Keep15
Refer to 777 AMM
28-22-17 as an ac-
cepted procedure.
1-FUEL SYST MODULERemove / Keep16
Disengage the quar-
ter-turn fasteners to
remove the blank
panels.
1-BLANK PANELRemove / Keep17
Refer to 777 AMM
21-60-01 as an ac-
cepted procedure.
1-A/C MODULERemove / Keep
FIGURE 1: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
48 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 49

More DataQtyIdentificationNameTaskStep
Refer to 777 AMM
26-22-04 as an ac-
cepted procedure.
1-CARGO FIRE/ENGINE
CONTROL MODULE
Remove / Keep18
Disengage the quar-
ter-turn fasteners to
pull out the module,
then disconnect the
electrical connectors
at the back of the
panel.
1-APU FIRE SWITCH
PANEL
Remove / Keep
(a) Some airplanes have a blank panel on the upper half and an Emergency Locator Transmitter (ELT)
Module on the lower half of this location. Both the blank panel and ELT Module can be removed and kept
for these airplanes.
(b) Some airplanes have a blank panel on the upper half and a Broadband System Module on the lower half
of this location. Both the blank panel and Broadband System Module can be removed and kept for these
airplanes.
FIGURE 1: FLIGHT COMPARTMENT - OVERHEAD PANEL - OPEN ACCESS
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
49 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 50

This Figure applies only to: Group 1, Configuration 1.
FIGURE 2: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE, BMS 8-39 URETHANE
FOAM INSULATION REPLACEMENT
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
50 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 51 (OCR)

BOEING SERVICE BULLETIN 777-25-0621
(10 26)
A-A  10 26  025
B-B
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one airplane.
Step  Task  Name  Identification  Qty  More Data
1  Remove  INSULATION  233W3307-5  2
2  Remove  INSULATION  233W3307-9  1
Remove  INSULATION  233W3307-8  1
4  Remove  INSULATION  233W3307-7  2
5  Remove  INSULATION  233W3307-4  2
6  Remove  INSULATION  233W3307-3  2
7  Remove  INSULATION  233W3307-6  2
8  Remove  INSULATION  233W3307-1  1
9  Remove  INSULATION  233W3307-2  1
10  Remove  INSULATION  233W3307-11
11|  Clean  PANEL SUPPORT  (a)
STRUCTURE
12  Install (New)  INSULATION  233W3307-37  1  (b)
FIGURE 2: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE, BMS 8-39 URETHANE
FOAM INSULATION REPLACEMENT
(SHEET 2 OF 3)
Original Issue: December 10, 2014
Revision 2 February 28, 2020  Export Controlled ECCN: 9E991 - BOEING  777-25-0621
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  51 of 88

### Page 52

More DataQtyIdentificationNameTaskStep
(b)1233W3307-38INSULATIONInstall (New)13
(b)1233W3307-41INSULATIONInstall (New)14
(b)1233W3307-30INSULATIONInstall (New)15
(b)1233W3307-39INSULATIONInstall (New)16
(b)1233W3307-40INSULATIONInstall (New)17
(b)1233W3307-31INSULATIONInstall (New)18
(b)1233W3307-32INSULATIONInstall (New)19
(b)1233W3307-35INSULATIONInstall (New)20
(b)1233W3307-36INSULATIONInstall (New)21
(b)1233W3307-33INSULATIONInstall (New)22
(b)1233W3307-34INSULATIONInstall (New)23
(b)1233W3307-27INSULATIONInstall (New)24
(b)1233W3307-28INSULATIONInstall (New)25
(b)1233W3307-29INSULATIONInstall (New)26
(c)--SERVICE BULLETIN
NUMBER
Apply27
(a) Clean to prepare the surfaces for bonding BMS 8-371 foam insulation. Remove debris after cleaning and
do a general clean again. Refer to SOPM 20-30-03 as an accepted procedure.
(b) To bond foam insulation on the structure, make sure the side of the foam insulation that has the adhesive
faces the structure. To bond foam insulation in position, it is acceptable to use BMS 5-157, Type I, Class
1, Grade A, Form 1, Composition MPVF tape. Align holes in the foam insulation and structure. Cut foam
insulation to let it fit around ducts and brackets.
(c) Identify the overhead panel support structure with this service bulletin number to show that it is changed.
Refer to SOPM 20-50-10 as an accepted procedure.
FIGURE 2: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE, BMS 8-39 URETHANE
FOAM INSULATION REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
52 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 53 (OCR)

BOEING SERVICE BULLETIN 777-25-0621
This Figure applies only to: Group 1, Configuration 1-2, 4.
FLIGHT COMPARTMENT
13)
OVERHEAD PANEL
(TYPICAL)
FIGURE 3: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS
(SHEET 1 OF 5)
Original Issue: December 10, 2014
Revision 2 February 28, 2020  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-25-0621
Work - See page 1 for details.  53 of 88

### Page 54

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one airplane.
More DataQtyIdentificationNameTaskStep
With the blank panel
in its position, en-
gage the quarter-
turn fasteners at all
fastener locations.
2-BLANK PANELInstall (Kept)1
Refer to 777 AMM
30-41-12 as an ac-
cepted procedure.
1-WINDOW HEAT
BACKUP MODULE
Install (Kept)2
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-FLT CONTROL HYD
VALVE POWER MOD-
ULE
Install (Kept)
With the blank panel
in its position, en-
gage the quarter-
turn fasteners at all
fastener locations.
1-BLANK PANELInstall (Kept)
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-APU MAINT / EEC
MAINT MODULE
Install (Kept)3
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-GND TEST MODULEInstall (Kept)
Refer to 777 AMM
21-44-09 as an ac-
cepted procedure.
1-CARGO TEMP SE-
LECT MODULE
Install (Kept)
Refer to 777 AMM
23-71-02 as an ac-
cepted procedure.
1-COCKPIT VOICE
RECORDER MODULE
Install (Kept)
FIGURE 3: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS
(SHEET 2 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
54 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 55

More DataQtyIdentificationNameTaskStep
Refer to 777 AMM
23-93-02 as an ac-
cepted procedure.
2-OVERHEAD PANEL
CARD FILE
Install (Kept)4
Connect wiring back
in to terminal
block(s), in the same
locations they were
removed from.
--WIRINGConnect5
Connect electrical
connector back on
to disconnect panels
AF0201 and
AF0202.
--ELECTRICAL CON-
NECTORS
Connect
-2-P11 CIRCUIT BREAK-
ER PANEL
Close
Refer to 777 AMM
23-24-03 as an ac-
cepted procedure.
(a)
1-ELT MODULEInstall (Kept)6
With the blank panel
in its position, en-
gage the quarter-
turn fasteners at all
fastener locations.
(b)
1-BLANK PANELInstall (Kept)7
Refer to 777 AMM
30-41-02 as an ac-
cepted procedure.
1-WINDOW HEAT/EMER
LIGHTS MODULE
Install (Kept)8
Refer to 777 AMM
27-02-03 as an ac-
cepted procedure.
1-PRIMARY FLIGHT
COMPUTER/ADIRU
MODULE
Install (Kept)9
Refer to 777 AMM
29-11-80 as an ac-
cepted procedure.
1-HYDRAULIC/RAM AIR
TURBINE MODULE
Install (Kept)10
Refer to 777 AMM
24-22-01 as an ac-
cepted procedure.
1-ELECTRICAL SYST
CONTROL PANEL
Install (Kept)11
FIGURE 3: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS
(SHEET 3 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
55 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 56

More DataQtyIdentificationNameTaskStep
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-L WIPER MODULEInstall (Kept)12
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-R WIPER MODULEInstall (Kept)
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-PASS SIGNS MODULEInstall (Kept)13
Connect the electri-
cal connectors, then
with the module in
its position, engage
the quarter-turn fas-
teners at all fastener
locations.
1-ANTI-ICE MODULEInstall (Kept)14
Refer to 777 AMM
36-11-10 as an ac-
cepted procedure.
1-BLEED AIR/PRESSUR-
IZATION MODULE
Install (Kept)15
Refer to 777 AMM
28-22-17 as an ac-
cepted procedure.
1-FUEL SYST MODULEInstall (Kept)16
With the blank panel
in its position, en-
gage the quarter-
turn fasteners at all
fastener locations.
1-BLANK PANELInstall (Kept)17
Refer to 777 AMM
21-60-01 as an ac-
cepted procedure.
1-A/C MODULEInstall (Kept)
FIGURE 3: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
56 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 57

More DataQtyIdentificationNameTaskStep
Refer to 777 AMM
26-22-04 as an ac-
cepted procedure.
1-CARGO FIRE/ENGINE
CONTROL MODULE
Install (Kept)18
Connect the electri-
cal connectors, then
with the panel in its
position, engage the
quarter-turn fasten-
ers at all fastener lo-
cations.
1-APU FIRE SWITCH
PANEL
Install (Kept)
(a) If a blank panel was also removed at this location, install it by positioning the blank panel in its original
location then engaging the quarter-turn fasteners at all fastener locations.
(b) If a Broadband System Module was also removed at this location, connect the electrical connectors, then
with the module in its position, engage the quarter-turn fasteners at all fastener locations.
FIGURE 3: FLIGHT COMPARTMENT - OVERHEAD PANEL - CLOSE ACCESS
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
57 of 88
BOEING SERVICE BULLETIN 777-25-0621

### Page 58 (OCR)

BOEING SERVICE BULLETIN 777-25-0621
This Figure applies only to: Group 1, Configuration 1-2, 4.
STA
228.44
FWD
STA
166.53
2489045
FIGURE 4: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE - REMOVAL
(SHEET 1 OF 3)
Original Issue: December 10, 2014
Revision 2 February 28, 2020  Export Controlled ECCN: 9E991 - BOEING  777-25-0621
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  58 of 88

### Page 59 (OCR)

BOEING SERVICE BULLETIN 777-25-0621
(4 4 LOCATIONS
(2) 4 LOCATIONS
FWD
TYPICAL  TYPICAL
(2 LOCATIONS)  (2 LOCATIONS)
LBL
1.39
RBL  (3) 4 LOCATIONS
1.63
5) 4 LOCATIONS
FWD
TYPICAL
(2 LOCATIONS)
A-A  2489053
FIGURE 4: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE - REMOVAL
(SHEET 2 OF 3)
Original Issue: December 10, 2014
Revision 2 February 28, 2020  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-25-0621
Work - See page 1 for details.  59 of 88

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
2BACN11AG4NUT, SELF-LOCKINGRemove1
2NAS1149D0416HWASHERRemove / Keep
2BACJ40K7A7A22BONDING JUMPERDisconnect
8BACB30LT4-9BOLTRemove / Keep2
8NAS1149F0432PWASHERRemove / Keep
8BACB30LT3-9BOLTRemove / Keep3
8NAS1149F0332PWASHERRemove / Keep
8BACB30LT4-9BOLTRemove / Keep4
8NAS1149F0432PWASHERRemove / Keep
4BACB30LT3-9BOLTRemove / Keep5
4NAS1149F0332PWASHERRemove / Keep
Disconnect ducts as
necessary.
--DUCT ASSEMBLIESDisconnect6
1233W3311-( )OVERHEAD ASSYRemove / Keep
FIGURE 4: FLIGHT COMPARTMENT - OVERHEAD PANEL SUPPORT STRUCTURE - REMOVAL
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: December 10, 2014
777-25-0621Revision 2 February 28, 2020
60 of 88
BOEING SERVICE BULLETIN 777-25-0621

The text continues at https://openairdocs.org/service-documents/boeing/sb-777-25-0621/file/2ba58f20cc9e.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
