# Boeing Special Attention Service Bulletin 777-54-0035: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-2459; AD 2016-06-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Service Bulletin 777-54-0035](https://openairdocs.org/service-documents/boeing/sb-777-54-0035.md)
- Title as filed: SB-777-54-0035-00
- Pages: 31
- PDF: https://openairdocs.org/files/sha256/4f/c8/4fc89ca5edddcce5ee2b311ef4afea2e9dbcf80cc8be738a00b93146feba0727
- Page: https://openairdocs.org/service-documents/boeing/sb-777-54-0035/file/4fc89ca5eddd

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
Number: 777-54-0035
Original Issue: October 30, 2014
ATA System: 5451
SUBJECT: NACELLES/PYLONS - Nacelle Strut - Flammable Fluid Drain Path Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: October 30, 2014
777-54-0035
1 of 31
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
2 of 31
BOEING SERVICE BULLETIN 777-54-0035
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 4
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 5
E. Compliance .............................................. 1 5
F. Approval ............................................... 1 6
G. Manpower .............................................. 1 6
H. Weight and Balance Changes .................................... 1 6
I. Electrical Load Data ......................................... 1 6
J. References .............................................. 1 6
1. Existing Data: ......................................... 1 6
2. Data Supplied with this Service Bulletin: ........................... 1 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 7
K. Publications Affected ........................................ 1 7
L. Interchangeability and Intermixability of Parts ........................... 1 7
M. Software Accomplishment Summary ................................ 1 7
2. MATERIAL INFORMATION ........................................ 1 9
A. Material - Price and Availability ................................... 1 9
B. Industry Support Information .................................... 1 9
C. Parts Necessary for Each Airplane ................................. 1 9
1. Kits/Parts ............................................ 1 9
2. Parts and Materials Supplied by the Operator ........................ 1 9
3. Parts Modified and Reidentified ................................ 1 9
4. Parts Removed and Not Replaced .............................. 1 9
D. Parts Necessary to Change Spares ................................. 1 9
E. Special Tooling - Price and Availability ............................... 1 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 0
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1
A. GENERAL INFORMATION ..................................... 2 1
B. WORK INSTRUCTIONS ....................................... 2 2
FIGURE 1: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - LEFT
SIDE .............................................. 2 4
FIGURE 2: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - RIGHT
SIDE .............................................. 2 7
APPENDIX A: GAP BETWEEN LOWER WING PANELS ADJACENT TO STRUT AFT VAPOR BARRIER . 30
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
3 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
4 of 31
BOEING SERVICE BULLETIN 777-54-0035
BLANK PAGE

### Page 5

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
SummaryNumber: 777-54-0035Original Issue: October 30, 2014
ATA System: 5451
SUBJECT: NACELLES/PYLONS - Nacelle Strut - Flammable Fluid Drain Path Change
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will prevent fire and smoke in the pylon area in the event of a fuel leak.
The existing drainage provisions in the wing leading edge flammable fluid leakage zone above the strut may
allow leaked flammable fluid (fuel) to come in contact with an ignition source (aft strut heat shield). When the
flammable fluid comes in contact with an ignition source, there is a risk of fire in the pylon area, including
uncontrolled fire in the upper strut inside the pylon and personal injury during ground operations.
Boeing has received two in-service events that reported fire and smoke from the aft pylon area after landing
and engine shutdown. Subsequent investigation found that there was a fuel leak caused by a damaged o-ring
in the fuel coupling attached to the wing front spar. The fuel was captured by the fuel coupling rubber boot and
was discharged into the strut-to-wing cavity flammable fluid leakage zone as intended. The fuel did not follow
its intended drain paths into the aft strut and lower wing panel drains, but instead followed an unintended drain
path through an unsealed gap between the lower wing panels above the strut aft vapor barrier. The leaking fuel
then followed gaps and seams in the aft fairing structure and eventually ignited after contact with the hot engine
exhaust heat shield causing the fires.
Boeing has done factory testing to analyze and verify the flammable fluid drainage path in the strut-to-wing
cavity. The test results showed that the interface between the strut aft vapor barrier and the lower wing panel
had an unsealed gap that allowed the fuel to drain down and eventually contact the engine exhaust heat shield,
which is an ignition source. Subsequent to the factory testing and analysis, Boeing has developed a sealing
method to better control the flammable fluid drain path and prevent fire and smoke in the aft pylon area in the
event of a fuel leak.
This service bulletin is sent to provide a wing panel gap sealing method to prevent flammable fluids from taking
the unintended path and reaching a possible ignition source.
Boeing Fleet Team Digest (FTD) 777 FTD 54-13004 is related to this service bulletin.
Boeing Service Related Problem (SRP) 777-54-0146 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
5 of 31

### Page 6

ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 62777-94S)
Get access to the inboard side of the strut-to-wing front spar area by removing fairing and access panels. Apply
sealant to fill the gap between the lower wing panels adjacent to the strut aft vapor barrier. Close access.
EFFECTIVITY
777-200, 777-200LR, 777-300, 777-300ER, and 777F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the
list of affected airplane(s).
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends that the change given in this service bulletin be done within 1,875 days after the original
issue date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of February 28, 2013. Please refer to
Paragraph 2.B., Industry Support Information. The warranty remedies will expire eight years from the original
issue date of this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
2.702.70Group 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
6 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 7 (OCR)

BOEING SERVICE BULLETIN 777-54-0035
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
GET ACCESS TO THE
INBOARD SIDE OF THE
STRUT TO WING FRONT
SPAR AREA. APPLY
SEALANT TO FILL THE GAP
BETWEEN THE LOWER
WING PANELS. PUT THE
AIRPLANE BACK TO A
SERVICEABLE CONDITION.
LEADING
EDGE
PANELS
VAPOR
LEFT STRUT SHOWN  BARRIER
(RIGHT STRUT OPPOSITE)
1.0
VIEW LOOKING UP
2345313
Original Issue: October 30, 2014
Export Controlled ECCN: 9E991 - BOEING  777-54-0035
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  7 of 31

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
8 of 31
BOEING SERVICE BULLETIN 777-54-0035
BLANK PAGE

### Page 9

Commercial 
Airplanes
777
Service Bulletin
SPECIAL ATTENTION
Number: 777-54-0035
Original Issue: October 30, 2014
ATA System: 5451
SUBJECT: NACELLES/PYLONS - Nacelle Strut - Flammable Fluid Drain Path Change
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D624W001 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is applicable to 777-200, 777-200LR, 777-300, 777-300ER, and 777F Airplanes,
line numbers 1-1243 in 1 Group(s). The Variable Numbers and Group Information for the applicable
airplanes is given below. An equivalent change is on subsequent production airplanes. Refer to
PRR 62777-94S for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
Airplane line numbers 1 through 1243.-1
Airplane Models:
777-200, 777-200LR, 777-300, 777-300ER, 777F
GroupVariable Number
1WA001 - WA017
1WA076 - WA080
1WA086 - WA093
1WA101 - WA104
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
9 of 31

### Page 10

GroupVariable Number
1WA196 - WA198
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281 - WA283
1WA301 - WA304
1WB001 - WB021
1WB031 - WB046
1WB051 - WB088
1WB101 - WB106
1WB121 - WB125
1WB131 - WB148
1WB151 - WB155
1WB161 - WB177
1WB181 - WB194
1WB201 - WB215
1WB231 - WB247
1WB271 - WB273
1WB276 - WB286
1WB291 - WB302
1WB306 - WB307
1WB311 - WB337
1WB341 - WB342
1WB366 - WB368
1WB371 - WB388
1WB406
1WB411 - WB413
1WB416 - WB439
1WB446 - WB453
1WB476
1WB481 - WB484
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
10 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 11

GroupVariable Number
1WB501 - WB512
1WB531 - WB537
1WB551 - WB554
1WB591 - WB597
1WB601 - WB606
1WB611 - WB622
1WB631 - WB638
1WB646 - WB649
1WC051 - WC073
1WC101 - WC104
1WC111 - WC120
1WC221 - WC224
1WC241 - WC243
1WC281 - WC290
1WC301 - WC308
1WC361 - WC364
1WC371 - WC374
1WC381 - WC395
1WC441
1WC446 - WC449
1WC456 - WC459
1WC486 - WC493
1WC506 - WC508
1WC521 - WC522
1WC531 - WC536
1WC546 - WC548
1WC556
1WC566 - WC567
1WC571 - WC574
1WC581
1WC586 - WC587
1WC591 - WC595
1WD001 - WD002
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
11 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 12

GroupVariable Number
1WD011 - WD018
1WD031 - WD036
1WD046 - WD055
1WD066 - WD075
1WD081 - WD089
1WD091
1WD096
1WD101 - WD106
1WD111
1WD116 - WD117
1WD121 - WD122
1WD501 - WD513
1WD521 - WD541
1WD546 - WD554
1WD561 - WD573
1WD581 - WD599
1WD606 - WD609
1WD621 - WD632
1WD651 - WD665
1WD671 - WD677
1WD691 - WD709
1WD741 - WD752
1WD761 - WD771
1WD786 - WD788
1WD796 - WD837
1WD846 - WD867
1WD871 - WD897
1WD911 - WD918
1WD921 - WD930
1WD936 - WD957
1WD966 - WD970
1WD981 - WD982
1WD986 - WD987
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
12 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 13

GroupVariable Number
1WD991 - WD994
1WD996
1WE001 - WE004
1WE011 - WE012
1WE021 - WE026
1WE031 - WE034
1WE051 - WE057
1WE071 - WE078
1WE081 - WE084
1WE091 - WE095
1WE126 - WE146
1WE151 - WE170
1WE176 - WE178
1WE186 - WE219
1WE226 - WE231
1WE236 - WE249
1WE251 - WE253
1WE261 - WE267
1WE271 - WE278
1WE291 - WE293
1WE301 - WE315
1WE331 - WE340
1WE351 - WE356
1WE376 - WE377
1WE381
1WE386 - WE387
1WE396 - WE399
1WE416 - WE420
1WE426
1WE436 - WE437
1WE441 - WE443
1WE451
1WE501
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
13 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 14

GroupVariable Number
1WE556 - WE558
1WF001 - WF004
1WF016 - WF023
1WF031 - WF041
1WF046 - WF066
1WF075 - WF077
1WF081 - WF088
1WF096 - WF101
1WF106 - WF109
1WF111 - WF117
1WF121 - WF124
1WF131 - WF133
1WF136 - WF139
1WF146 - WF147
1WF151 - WF152
1WF156 - WF159
1WF166 - WF170
1WF176
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of this service bulletin will prevent fire and smoke in the pylon area in the event of a
fuel leak. The existing drainage provisions in the wing leading edge flammable fluid leakage zone above
the strut may allow leaked flammable fluid (fuel) to come in contact with an ignition source (aft strut
heat shield). When the flammable fluid comes in contact with an ignition source, there is a risk of fire
in the pylon area, including uncontrolled fire in the upper strut inside the pylon and personal injury
during ground operations.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
14 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 15

Boeing has received two in-service events that reported fire and smoke from the aft pylon area after
landing and engine shutdown. Subsequent investigation found that there was a fuel leak caused by a
damaged o-ring in the fuel coupling attached to the wing front spar. The fuel was captured by the fuel
coupling rubber boot and was discharged into the strut-to-wing cavity flammable fluid leakage zone as
intended. The fuel did not follow its intended drain paths into the aft strut and lower wing panel drains,
but instead followed an unintended drain path through an unsealed gap between the lower wing panels
above the strut aft vapor barrier. The leaking fuel then followed gaps and seams in the aft fairing
structure and eventually ignited after contact with the hot engine exhaust heat shield causing the fires.
Boeing has done factory testing to analyze and verify the flammable fluid drainage path in the
strut-to-wing cavity. The test results showed that the interface between the strut aft vapor barrier and
the lower wing panel had an unsealed gap that allowed the fuel to drain down and eventually contact
the engine exhaust heat shield, which is an ignition source. Subsequent to the factory testing and
analysis, Boeing has developed a sealing method to better control the flammable fluid drain path and
prevent fire and smoke in the aft pylon area in the event of a fuel leak.
This service bulletin is sent to provide a wing panel gap sealing method to prevent flammable fluids
from taking the unintended path and reaching a possible ignition source.
Boeing Fleet Team Digest (FTD) 777 FTD 54-13004 is related to this service bulletin.
Boeing Service Related Problem (SRP) 777-54-0146 is related to this service bulletin.
D. Description
Get access to the inboard side of the strut-to-wing front spar area by removing fairing and access
panels. Apply sealant to fill the gap between the lower wing panels adjacent to the strut aft vapor barrier.
Close access.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
431, 441777-200, 777-200LR, 777-300,
777-300ER, 777F
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 1,875 days after the
original issue date of this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
15 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 16

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Elapsed HoursTask HoursNumber of PersonsTask
1.251.251Open Access
0.100.101FIGURE 1 (Left side)
0.100.101FIGURE 2 (Right
side)
1.251.251Close Access
2.702.70TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 62777-94S
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
16 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 17

b. Boeing Service Related Problem (SRP) 777-54-0146
c. Service Bulletin Index D624W001
d. Standard Overhaul Practices Manual (SOPM) 20-50-11
e. 777 Aircraft Maintenance Manual (AMM) 20-41-00, 27-81-00, 54-52-03, 78-31-00
f. 777 Fleet Team Digest (FTD) 54-13004
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
17 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 18

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
18 of 31
BOEING SERVICE BULLETIN 777-54-0035
BLANK PAGE

### Page 19

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are available for 777 airplanes in warranty as of February 28, 2013. For
task hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Fleet Support Contracts - Warranty. The kits for airplanes in warranty as of that date will be supplied
at no charge. Send a purchase order for the kits to Boeing Material Management. Please refer to this
service bulletin number and reference the airplane variable number(s) in your purchase order. The
warranty remedies will expire eight years from the original issue date of this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
NotesNameQTYPart Number /
Specification
(a)SEALANT4 OZBMS 5-142
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
19 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 20

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
20 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 21

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 777 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 777
Airplane Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 777
Airplane Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
4. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. Refer to APPENDIX A for a clarification of the location of the gap between the lower
wing panels.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
21 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 22

7. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
10. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
11. Some steps in the Work Instructions are identified as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
identified as RC must be done to comply with the AD. Alternative procedures for
steps not identified with RC can be used if the RC steps can still be done as specified,
and the airplane can be put back in a serviceable condition. An Alternative Method
of Compliance (AMOC) is not necessary for deviations to steps that are not identified
as RC.
B. WORK INSTRUCTIONS
1. Do the following tasks to prepare the strut for the maintenance operations:
a. Statically ground the airplane. Refer to 777 AMM 20-41-00 as an accepted procedure.
b. Retract the leading edge slats. Refer to 777 AMM 27-81-00 as an accepted procedure.
c. Deactivate the leading edge slats. Refer to 777 AMM 27-81-00 as an accepted procedure.
d. Deactivate the thrust reversers. Refer to 777 AMM 78-31-00 as an accepted procedure.
2. Remove the underwing inboard fairing panels, 431FR (left nacelle strut) and 441FL (right nacelle
strut). Refer to 777 AMM 54-52-03 as an accepted procedure.
3. Remove the underwing inboard access panels, 431GR (left nacelle strut) and 441GL (right nacelle
strut). Refer to 777 AMM 54-52-03 as an accepted procedure.
4. RC - Apply sealant to fill the gap between the lower wing panels in accordance with the figures
below:
Right SideLeft Side
FIGURE 2FIGURE 1
5. Install the underwing inboard access panels, 431GR (left nacelle strut) and 441GL (right nacelle
strut). Refer to 777 AMM 54-52-03 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
22 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 23

6. Install the underwing inboard fairing panels, 431FR (left nacelle strut) and 441FL (right nacelle
strut). Refer to 777 AMM 54-52-03 as an accepted procedure.
7. Activate the thrust reversers. Refer to 777 AMM 78-31-00 as an accepted procedure.
8. Activate the leading edge slats. Refer to 777 AMM 27-81-00 as an accepted procedure.
9. Remove the static ground from the airplane. Refer to 777 AMM 20-41-00 as an accepted procedure.
10. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
23 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 24 (OCR)

BOEING SERVICE BULLETIN 777-54-0035
2345492
FIGURE 1: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - LEFT
SIDE
(SHEET 1 OF 3)
Original Issue: October 30, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-54-0035
Work - See page 1 for details.  24 of 31

### Page 25 (OCR)

BOEING SERVICE BULLETIN 777-54-0035
FRONT
SPAR
WING LEADING
EDGE PANELS
VAPOR
BARRIER  GAP BETWEEN WING PANELS
LEADING EDGE
PANELS
VAPOR
BARRIER
1.0
• MINIMUM
VIEW LOOKING UP
(STRUT NOT SHOWN
FOR CLARITY)
2345741
FIGURE 1: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - LEFT
SIDE
(SHEET 2 OF 3)
Original Issue: October 30, 2014
Export Controlled ECCN: 9E991 - BOEING  777-54-0035
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  25 of 31

### Page 26

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
Refer to SOPM 20-
50-11 as an accept-
ed procedure.(b)
--GAPClean1
(a) (b)-BMS 5-142SEALANTApply
(a) Apply sealant to fill the gap between the lower wing panels from the inboard side of the strut. On the forward
side of the vapor barrier, apply sealant from the start of the gap at the wing leading edge going aft to
where the gap interfaces with the vapor barrier seal, applying as far underneath the seal as is accessible.
On the aft side of the vapor barrier, apply sealant from a minimum of 1.0 inch aft along the gap between
the wing panels, forward to where the gap interfaces with the vapor barrier seal, applying as far underneath
the seal as is accessible. Refer to SOPM 20-50-11 as an accepted procedure.
Refer to APPENDIX A for a clarification of the location of the gap between the lower wing panels.
(b) Areas underneath the seal that are not accessible do not need to be cleaned and prepared for sealant
application. Any sealant underneath the seal that is not accessible does not need to be faired to a smooth
finish.
FIGURE 1: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - LEFT
SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
26 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 27 (OCR)

BOEING SERVICE BULLETIN 777-54-0035
2346550
FIGURE 2: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - RIGHT
SIDE
(SHEET 1 OF 3)
Original Issue: October 30, 2014
Export Controlled ECCN: 9E991 - BOEING  777-54-0035
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  27 of 31

### Page 28 (OCR)

BOEING SERVICE BULLETIN 777-54-0035
FRONT
SPAR
WING LEADING
EDGE PANELS
VAPOR
BARRIER
GAP BETWEEN WING PANELS
LEADING EDGE
PANELS
•VAPOR
BARRIER
MINIMUM:  1.0
WD
VIEW LOOKING UP
(STRUT NOT SHOWN
FOR CLARITY)
2346560
FIGURE 2: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - RIGHT
SIDE
(SHEET 2 OF 3)
Original Issue: October 30, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-54-0035
Work - See page 1 for details.  28 of 31

### Page 29

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
Refer to SOPM 20-
50-11 as an accept-
ed procedure.(b)
--GAPClean1
(a) (b)-BMS 5-142SEALANTApply
(a) Apply sealant to fill the gap between the lower wing panels from the inboard side of the strut. On the forward
side of the vapor barrier, apply sealant from the start of the gap at the wing leading edge going aft to
where the gap interfaces with the vapor barrier seal, applying as far underneath the seal as is accessible.
On the aft side of the vapor barrier, apply sealant from a minimum of 1.0 inch aft along the gap between
the wing panels, forward to where the gap interfaces with the vapor barrier seal, applying as far underneath
the seal as is accessible. Refer to SOPM 20-50-11 as an accepted procedure.
Refer to APPENDIX A for a clarification of the location of the gap between the lower wing panels.
(b) Areas underneath the seal that are not accessible do not need to be cleaned and prepared for sealant
application. Any sealant underneath the seal that is not accessible does not need to be faired to a smooth
finish.
FIGURE 2: STRUT TO WING FRONT SPAR - LOWER WING PANELS - SEALANT APPLICATION - RIGHT
SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
29 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 30

The pictures below show the location of the gap between the lower wing panels adjacent to the strut aft vapor
barrier from the inboard side of the strut. Refer to this appendix to help locate the gap for the sealant application.
APPENDIX A:  GAP BETWEEN LOWER WING PANELS ADJACENT TO STRUT AFT VAPOR BARRIER
(SHEET 1 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
30 of 31
BOEING SERVICE BULLETIN 777-54-0035

### Page 31

APPENDIX A:  GAP BETWEEN LOWER WING PANELS ADJACENT TO STRUT AFT VAPOR BARRIER
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 30, 2014
777-54-0035
31 of 31
BOEING SERVICE BULLETIN 777-54-0035

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.