# MHI RJ Service Bulletin 601R-28-068

Copy: Revision A ("SB 601R-28-068A"), 32 pages: PDF https://openairdocs.org/files/sha256/45/51/45519aacf49847cafe83ad7bb04704864fd63fe68d31d7a9e1d0f74276b4f9f9; text https://openairdocs.org/service-documents/bombardier/601r-28-068/file/45519aacf498.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0011; AD 2022-18-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md) (issued as MHI RJ)
- Type: Service bulletin (Service Bulletin)
- Number: 601R-28-068
- Latest revision known: 601R-28-068, Revision A, dated December 21, 2020 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/601r-28-068

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-18-15](https://openairdocs.org/ad/2022-18-15.md), effective Nov 25, 2022: Revision A

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/601r-28-068/proposed.md).

## Text (32 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0011; AD 2022-18-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SB 601R−28−068
Page 1 of 1
Dec 21/2020
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
SERVICE BULLETIN 601R−28−068
SUBJECT:  Fuel − Distribution System − Replacement of the Couplings of the Fuel
Lines
This page transmits:
Revision A of Service Bulletin 601R−28−068, dated Dec 21/2020
The changes in this revision have no effect on aircraft that have had
this service bulletin incorporated.
Reason:
Revised Accomplishment Instructions, paragraph 2., to:
Change a /quoteblleftRefer to NO TAG’’ to /quoteblleftRefer to Figure 1’’.
Specified that the coupling assembly includes a sleeve and a clamshell coupling.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:  
Discard the copy of Service Bulletin 601R−28−068, dated Dec 03/2020. Replace with the
copy attached.
Service Bulletin History:  
Initial issue, dated Dec 03/2020
1

### Page 2

SB 601R−28−068
Page 1 of 31
Dec 03/2020
Revision A, Dec 21/2020
SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT MHIRJ HAS INCLUDED THE NEW
OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR
ATA SYSTEM: 28−20 NUMBER: 601R−28−068
SUBJECT:  Fuel − Distribution System − Replacement of the Couplings of the Fuel
Lines
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
Service Bulletin: CL−600−2B19 CRJ Series aircraft with serial numbers 7002
thru 7990, and 8000 thru 8112.
Production: There is no production effectivity.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by MHIRJ service bulletins. Before you do this service
bulletin, examine all Supplemental Type Certificates (STCs), and
Supplemental Type Approvals (STAs) or equivalent action changes
to make sure you can complete this service bulletin.

### Page 3

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 2 of 31
Dec 03/2020
Revision A, Dec 21/2020
B. Reason
(1) Condition
Corrosion were found on clamshell couplings 14C26−( )A, LC457−( )A and
LC459−( )A.
(2) Evidence
Condition was found on the aircraft in service at the opportunity of
inspections.
(3) Objective/Benefit
This service bulletin gives the procedure to replace coupling 14J26−( )A and
clamshell couplings P/N 14C26−( )A, LC459−( )A and LC457−( )A by new
coupling and clamshell couplings.
C. Description
The aircraft is defueled and the electrical power is removed.  The main and APU
batteries are disconnected.  Circuit breakers are opened, access panels are
removed, and the fuel tank is prepared for access.
The fuel couplings are removed and replaced by new couplings. A bonding check
of the couplings is done
A pressure and blockage check of the engine fuel−feed line and of the APU
fuel−feed line are done.  The panels are installed and the main and APU batteries
are connected.  The aircraft is fueled and a leak check is done.  The main and APU
batteries are connected, and the circuit breakers are closed.
D. Compliance
Recommended service bulletin.
MHIRJ recommends that this service bulletin be done at no more than 6,600 flight
hours or no later than 36 months, from the release date on this service bulletin,
whichever comes first, unless otherwise directed by the airworthiness authority of
the operator.
NOTE: If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative
of MHIRJ in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or
e-mail at thd.crj@MHIRJ.com for analysis and to get an approved
disposition to complete this service bulletin.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).

### Page 4

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 3 of 31
Dec 03/2020
Revision A, Dec 21/2020
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #20−Q−01.
F . Manpower
The man-hours given below are estimates for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
−Administrative functions such as planning, liaising, familiarization, and report writing.
−Non-productive elapsed time such as rest time, having meals, and crew shift
changes.
−Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
−Preparation for modification (unless specified in the Accomplishment
Instructions) such as cleaning and getting parts, tools, consumables, and
ground equipment.
−Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
−All other activities that are not considered by MHIRJ as directly related to the
accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services
representative for an estimate. Call the Fleet Services Team through the
CRC at 1−844−272−2720 (1−844−CRC−CRC0) or e-mail at
thd.crj@MHIRJ.com.
It will take an estimated 21.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 4.0
(2)  Procedure 8.0
(3)  Test 5.0
(4)  Job Close-Out 4.0

### Page 5

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 4 of 31
Dec 03/2020
Revision A, Dec 21/2020
G. Material − Price and Availability
(1) The kits in the tables that follow are available from MHIRJ.
NOTE: For a list of kit contents, refer to paragraph 3.A.
For All Aircraft
KIT NUMBER NAME
601R28−068K1 Fuel Couplings
For Aircraft Post SB 601R−28−024 and on Aircraft 7110 thru 7990, 8000 thru 8112
KIT NUMBER NAME
601R28−068K2 Fuel Couplings
For All Aircraft
(2) Please send a purchase order to the address below to schedule kit delivery:
MHIRJ ULC
Service Bulletin Kit Support Team
12655, boul. Henri−Fabre 
Mirabel, Québec
Canada  J7N 1E1
Phone: 1−844−272−2720 (1−844−CRC−CRC0)
e-mail: kits@MHIRJ.com
Please contact the Service Bulletin Kit Support Team at the address above for
terms and conditions.
(3) Refer to paragraph 3.B. for a list of consumables for this service bulletin.
For Business/Corporate Operators
All Business/Corporate operators (i.e. operators who do not have a commercial
airline operation) refer to SB 800-00-004 for commercial policy coverage and
logistics/planning arrangements (refer to www.cic.bombardier.com/technical
library/service bulletins/challenger/850/SB 800-00-004).
To place an order for parts or kits, please call Bombardier Parts Logistics at
514−855−2999 or 1−866−538−1247.

### Page 6

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 5 of 31
Dec 03/2020
Revision A, Dec 21/2020
H. Tooling − Price and Availability
There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of
special tools and equipment for this service bulletin.
I. Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
K. References
Refer to the SB Introduction document for definition or explanation of service
bulletin content.
Modification Summary TC601R18631, Rev A
For MHIRJ reference only: Restriction and/or Special Instruction (RSI) C−A309,
Issue NC
For MHIRJ reference only: PCA 77223
L. Other Publications Affected
Aircraft Maintenance Manual (AMM)
Aircraft Illustrated Parts Catalogue (AIPC)
Maintenance Requirement Manual (MRM)
M. Relationship Chart
PRE-SB
PART NUMBER NAME POST -SBPART NUMBER
14C02−20A ClamshellCoupling 14C18−20A
14C26−12A ClamshellCoupling 14C18−12A
14C26−16A ClamshellCoupling 14C26−16A
14C26−16A ClamshellCoupling 14C18−16A
14C26−20A ClamshellCoupling 14C18−20A

### Page 7

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 6 of 31
Dec 03/2020
Revision A, Dec 21/2020
PRE-SB
PART NUMBER
POST -SB
PART NUMBERNAME
14C26−24A ClamshellCoupling 14C18−24A
14C26−32A ClamshellCoupling 14C18−32A
14J26−20A Coupling LC697−20A
LC459−08A ClamshellCoupling 14C18−08A
LC457−24A ClamshellCoupling LC656−24A

### Page 8

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 7 of 31
Dec 03/2020
Revision A, Dec 21/2020
2. ACCOMPLISHMENT INSTRUCTIONS
Reference Information
REFERENCE DESIGNATION
AMM 12−11−28−650−801 Automatic Pressure Refueling
AMM 12−11−28−650−804 Suction Defueling
AMM 12−11−28−650−805 Gravity Defueling
AMM 20−30−00−910−802 Wiggins Couplings − Maintenance Practices
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 24−32−00−040−803 Deactivation of the Main Battery
AMM 24−32−00−040−804 Deactivation of the APU Battery
AMM 24−32−00−440−801 Reactivation of the APU Battery
AMM 24−32−00−440−802 Reactivation of the Main Battery
AMM 28−00−00−910−801 Fuel Safety Precautions
AMM 28−11−00−790−802 Leak Rate Check of the Fuel Tank
AMM 28−11−00−840−801 Prepare Fuel Tank for Access
AMM 28−11−00−840−802 Removal of Fuel Fumes
AMM 28−11−01−000−801 Removal of the Honeycomb Access Panel
AMM 28−11−01−000−802 Removal of the Aluminum Access Panel
AMM 28−11−01−400−801 Installation of the Honeycomb Access Panel
AMM 28−11−01−400−802 Installation of the Aluminum Access Panel
AMM 28−21−00−790−801 Leak Test of The Engine Fuel−Feed Tubes
AMM 51−80−00−760−803 Electrical Bonding test

### Page 9

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 8 of 31
Dec 03/2020
Revision A, Dec 21/2020
A. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
WARNING: OBEY ALL THE FUEL SAFETY PRECAUTIONS WHEN YOU DO WORK
ON THE FUEL SYSTEM AND/OR A FUEL SYSTEM COMPONENT . IF YOU
DO NOT DO THIS, YOU CAN CAUSE INJURIES TO PERSONS AND/OR
DAMAGE TO EQUIPMENT .
(1) Obey all the fuel safety precautions (refer to AMM 28−00−00−910−801).
(2) Defuel the aircraft (refer to AMM 12−11−28−650−804 or
12−11−28−650−805).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(3) Obey all the electrical/electronic safety precautions (refer
to AMM 24−00−00−910−801).
(4) Disconnect all AC and DC electrical power to the aircraft.
(5) Put a DO NOT CONNECT − FUEL TANK MAINTENANCE placard on the
ground power receptacle.
(6) Deactivate the main battery (refer to AMM 24−32−00−040−803).
(7) Deactivate the APU battery (refer to AMM 24−32−00−040−804).
(8) Put a DO NOT CONNECT − FUEL TANK MAINTENANCE placard on each
battery.

### Page 10

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 9 of 31
Dec 03/2020
Revision A, Dec 21/2020
(9) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 M6 L FUEL PUMP 221
CBP−1 M7 L FUEL PUMP CONT 221
CBP−1 S1 FUEL SOV R ENG 221
CBP−1 S2 FUEL SOV L ENG 221
CBP−1 S3 FUEL SOV APU 221
CBP−1 M12 FUEL SYST CONT 221
CBP−1 N9 XFER/APU LEFT FUEL SOV 221
CBP−1 N10 XFER/APU FUEL PUMP 221
CBP−1 N11 XFER/APU CONT 221
CBP−1 N12 XFER/APU APU ECU 221
CBP−2 G10 R FUEL PUMP 222
CBP−2 G11 R FUEL PUMP CONT 222
CBP−4 B9 GRAV XFLOW 222
CBP−4 B10 FUEL SYST CONT 222
For Aircraft Pre−SB 601R−24−090
(10) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−5 B14 FUEL DEFL 311
CBP−5 B15 EMRG REFL 311

### Page 11

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 10 of 31
Dec 03/2020
Revision A, Dec 21/2020
For Aircraft Post−SB 601R−24−090
(11) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−5 B6 FUEL DEFL 311
CBP−5 B7 EMRG REFL 311
For Aircraft Post−SB 601R−28−022
(12) Open, safety, and tag the circuit breaker that follows:
CB PANEL CB NO. NAME ZONE
CBP−2 P9 RIGHT FUEL XFER SOV 222
For All Aircraft
(13) Prepare the fuel tank for access (Refer to AMM 28−11−00−840−801).
(14) Remove the fuel fumes from the fuel tank
(refer to AMM 28−11−00−840−802).
(15) Remove the aluminum access panels 510AB, 510BB (610BB), 540AB
(640AB), 540CB (640CB), 540FB (640FB), and 550EB (650EB)
(refer to AMM 28−11−01−000−802).
(16) Remove the honeycomb access panels 610AB and 540BB (640BB)
(refer to AMM 28−11−01−000−801).

### Page 12

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 11 of 31
Dec 03/2020
Revision A, Dec 21/2020
B. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
MHIRJ in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or e-mail at
thd.crj@MHIRJ.com for analysis and to get an approved disposition to
complete this service bulletin.
Refer to Figure 1.
(2) Replace the clamshell couplings (7) from the standby fuel−feed tubes as
follows:
(a) Remove and discard the clamshell couplings (7) from the standby
fuel−feed tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (7) on the standby fuel−feed tubes
(refer to AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (7)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
Refer to Figure 2.
(3) Replace the clamshell couplings (7) from the gravity crossflow shutoff valve as
follows:
(a) Remove and discard the clamshell couplings (7) from the gravity
crossflow shutoff valve (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (7) on the gravity crossflow shutoff
valve (refer to AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (7)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
Refer to Figure 3.
(4) Replace the clamshell couplings (5) from the fuel transfer tubes as follows:
(a) Remove and discard the clamshell couplings (5) from the fuel transfer
tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.

### Page 13

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 12 of 31
Dec 03/2020
Revision A, Dec 21/2020
(b) Install the new clamshell couplings (5) on the fuel transfer tubes (refer to
AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (5)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
Refer to Figure 1.
(5) Replace the clamshell couplings (10) from the standby fuel−feed tubes as
follows:
(a) Remove and discard the clamshell couplings (10) from the standby
fuel−feed tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (10) on the standby fuel−feed tubes
(refer to AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (10)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
(6) Replace the clamshell couplings (9) from the standby fuel−feed tubes as
follows:
(a) Remove and discard the clamshell couplings (9) from the standby
fuel−feed tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (9) on the standby fuel−feed tubes
(refer to AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (9)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
(7) Replace the clamshell coupling (6) from the right standby fuel−feed tubes as
follows:
(a) Remove and discard the clamshell coupling (6) from the standby
fuel−feed tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeve.
(b) Install the new clamshell coupling (6) on the standby fuel−feed tubes
(refer to AMM 20−30−00−910−802).
(c) Do a bonding test for the clamshell coupling (6)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.

### Page 14

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 13 of 31
Dec 03/2020
Revision A, Dec 21/2020
Refer to Figure 4.
(8) Replace the clamshell coupling (3) from the APU fuel−feed tubes as follows:
(a) Remove and discard the clamshell coupling (3) from the APU fuel−feed
tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeve.
(b) Install the new clamshell coupling (3) on the APU fuel−feed tubes (refer
to AMM 20−30−00−910−802).
(c) Do a bonding test for the clamshell coupling (3)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
Refer to Figure 2.
(9) Replace the clamshell couplings (8) from the center tank relief system as
follows:
(a) Remove and discard the clamshell couplings (8) from the center tank
relief system (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (8) on the center tank relief system
(refer to AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (8)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
For Aircraft Post SB 601R−28−024 and on Aircraft 7110 thru 7990, 8000 thru 8112
Refer to Figure 4.
(10) Replace the clamshell couplings (9) from the vent tubes as follows:
(a) Remove and discard the clamshell couplings (9) from the vent tubes
(refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (9) on the vent tubes (refer to AMM
20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (9)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.

### Page 15

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 14 of 31
Dec 03/2020
Revision A, Dec 21/2020
(11) Replace the clamshell couplings (6) from the vent tubes as follows:
(a) Remove and discard the clamshell couplings (6) from the vent tubes
(refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (6) on the vent tubes (refer to AMM
20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (6)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
For All Aircraft
Refer to Figure 5.
(12) Replace the coupling assemblies (11) from the scavenge tubes as follows:
(a) Remove the couplings W701 to get access (refer to AMM
20−30−00−910−802).
(b) Remove and discard the coupling assemblies (11) from the scavenge
tubes (refer to AMM 20−30−00−910−802).
NOTE: Make sure to remove and discard the sleeves.
(c) Remove and discard o−rings (12) and (13).
(d) Install the new coupling assemblies (11) (sleeves and clamshell
couplings) with the new o−rings (12) and (13) on the scavenge tubes
(refer to AMM 20−30−00−910−802).
(e) Install the couplings W701 (refer to AMM 20−30−00−910−802).
(f) Do a bonding test for each of the couplings assemblies (11)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.

### Page 16

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 15 of 31
Dec 03/2020
Revision A, Dec 21/2020
Refer to Figure 6.
(13) Replace the clamshell couplings (6) from the engine fuel−feed tubes as
follows:
(a) Remove and discard the clamshell couplings (6) from the engine
fuel−feed tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the clamshell couplings (6) on the engine fuel−feed tubes (refer to
AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (6)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
(14) Replace the clamshell couplings (9) from the engine fuel−feed tubes as
follows:
(a) Remove and discard the clamshell couplings (9) from the engine
fuel−feed tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (9) on the engine fuel−feed tubes
(refer to AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (9)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
Refer to Figure 7.
(15) Near WS148.019 and WS85.500, replace the clamshell couplings (6) from the
balancing tubes as follows:
(a) Remove and discard the clamshell couplings (6) from the balancing
tubes (refer to AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (6) on the balancing tubes (refer to
AMM 20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (6)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.

### Page 17

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 16 of 31
Dec 03/2020
Revision A, Dec 21/2020
Refer to Figure 8.
(16) Near WS264.00, replace the clamshell couplings (4) as follows:
(a) Remove and discard the clamshell couplings (4) from the tube (refer to
AMM 20−30−00−910−802).
NOTE: Do not remove the sleeves.
(b) Install the new clamshell couplings (4) on the tube (refer to AMM
20−30−00−910−802).
(c) Do a bonding test for each of the clamshell couplings (4)
(refer to AMM 51−80−00−760−803). The maximum value is 0.10 ohm.
(17) If damage is found, speak with a CRC representative at 1−844−272−2720
(1−844−CRC−CRC0) or send an e-mail at thd.crj@MHIRJ.com for a
disposition.

### Page 18

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 17 of 31
Dec 03/2020
Revision A, Dec 21/2020
C. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install aluminum access panels 510AB, 510BB (610BB), 540AB (640AB),
540CB (640CB), 540FB (640FB), and 550EB (650EB)
(refer to AMM 28−11−01−400−802).
(3) Install honeycomb access panels 610AB and 540BB (640BB)
(refer to AMM 28−11−01−400−801).
(4) Reactivate the APU battery (refer to AMM 24−32−00−440−801).
(5) Reactivate the main battery (refer to AMM 24−32−00−440−802).
(6) Remove the DO NOT CONNECT − FUEL TANK MAINTENANCE placards
from the batteries.
(7) Remove the DO NOT CONNECT − FUEL TANK MAINTENANCE placard from
the ground power receptacle.
(8) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 M6 L FUEL PUMP 221
CBP−1 M7 L FUEL PUMP CONT 221
CBP−1 S1 FUEL SOV R ENG 221
CBP−1 S2 FUEL SOV L ENG 221
CBP−1 S3 FUEL SOV APU 221
CBP−1 M12 FUEL SYST CONT 221
CBP−1 N9 XFER/APU LEFT FUEL SOV 221
CBP−1 N10 XFER/APU FUEL PUMP 221

### Page 19

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 18 of 31
Dec 03/2020
Revision A, Dec 21/2020
CB PANEL ZONE NAMECB NO.
CBP−1 N11 XFER/APU CONT 221
CBP−1 N12 XFER/APU APU ECU 221
CBP−2 G10 R FUEL PUMP 222
CBP−2 G11 R FUEL PUMP CONT 222
CBP−4 B9 GRAV XFLOW 222
CBP−4 B10 FUEL SYST CONT 222
For Aircraft Pre−SB 601R−24−090
(9) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−5 B14 FUEL DEFL 311
CBP−5 B15 EMRG REFL 311
For Aircraft Post−SB 601R−24−090
(10) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−5 B6 FUEL DEFL 311
CBP−5 B7 EMRG REFL 311
For Aircraft Post−SB 601R−28−022
(11) Remove the tag and close the circuit breaker that follows:
CB PANEL CB NO. NAME ZONE
CBP−2 P9 RIGHT FUEL XFER SOV 222

### Page 20

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 19 of 31
Dec 03/2020
Revision A, Dec 21/2020
(12) Refuel the aircraft (refer to AMM 12−11−28−650−801).
(13) Do the leak test of the fuel−feed tubes (refer to AMM 28−21−00−790−801).
(14) Examine the access panels and general area for leaks
(refer to AMM 28−11−00−790−802).
(15) When this service bulletin is completed, make this entry in the applicable
logbook: /quoteblleftService Bulletin 601R−28−068, Revision A, Fuel − Distribution
System − Replacement of the Couplings of the Fuel Lines, incorporated."

### Page 21

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 20 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Standby Fuel − Feed System
Figure 1 (Sheet 1 of 2)
rsb601r28068_001.cgm, sr, sep29/2020
A
A
B
B
C D
C
NOTE
If there is no damage, replace only the
clamshell  couplings not the sleeves.
1
TYPICALB
LEGEND
7. Clamshell Coupling
    14C26−24A (Pre−Mod)
    14C18−24A (Post−Mod).
7 1

### Page 22

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 21 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Standby Fuel − Feed System
Figure 1  (Sheet 2 of 2)
rsb601r28068_002.cgm, sr, sep29/2020
6
C
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
1
D
9
LEGEND
  6. Clamshell Coupling
      14C26−20A (Pre−Mod)
      14C18−20A (Post−Mod).
  9. Clamshell Coupling
      LC457−24A (Pre−Mod)
      LC656−24A (Post−Mod).
10. Clamshell Coupling
      14C26−16A (Pre−Mod)
      14C26−16A (Post−Mod).
NOTE
If there is no damage, replace only the
clamshell  couplings not the sleeves.
1
101
1

### Page 23

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 22 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Fuel Balancing and Center Tank Relief Systems
Figure 2
F
E
rsb601r28068_003.cgm, sr, sep29/2020
8
8
1
1
F
7 1
E
LEGEND
7. Clamshell Coupling
    14C26−24A (Pre−Mod)
    14C18−24A (Post−Mod).
8. Clamshell Coupling
    14C26−32A (Pre−Mod)
    14C18−32A (Post−Mod).
NOTE
If there is no damage, replace only the
clamshell  couplings not the sleeves.
1
GRAVITY CROSSFLOW
SHUTTOFF VALVE
(REF)
71

### Page 24

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 23 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Fuel Transfer System
Figure 3
G
G
rsb601r28068_004.cgm, sr, sep29/2020
J
H
G
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
H J
LEGEND
5. Clamshell Coupling
    14C26−16A (Pre−Mod)
    14C18−16A (Post−Mod).
5 151
If there is no damage, replace only the
clamshell  couplings not the sleeves.
NOTE
1

### Page 25

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 24 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − APU Fuel − Feed and Fuel Vent Systems
Figure 4
rsb601r28068_005.cgm, sr, sep29/2020
3
FITTING
(REF)
9
1
4
K
L
L
K
L
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
M
N
N
4
4
6
M 4
1
1
LEGEND
3. Clamshell Coupling
    LC459−08A (Pre−Mod)
    14C18−08A (Post−Mod).
6. Clamshell Coupling
    14C26−20A (Pre−Mod)
    14C18−20A (Post−Mod).
9. Clamshell Coupling
    LC457−24A (Pre−Mod)
    LC656−24A (Post−Mod).
APU BULKHEAD
4
NOTES
If there is no damage, replace only the
clamshell  couplings not the sleeves.
Effectivity; Aircraft post−SB 601R−28−024
and on aircraft 7110−7990, 8000−8112.
1

### Page 26

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 25 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Fuel Scavenge System
Figure 5
rsb601r28068_006.cgm, sr, sep24/2020
11
P
P
R
12
12
LEGEND
11. Coupling Assembly
      14J26−20A  (Pre−Mod)
      LC697−20A  (Post−Mod).
12. O−Ring
      MS29513−218.
13. O−Ring
      MS29513−220.
13
P
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
R
COUPLING W701
(REF)

### Page 27

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 26 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Engine Fuel − Feed System
Figure 6
rsb601r28068_007.cgm, sr, sep29/2020
U
9 1
T
T
T
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
U
6
LEGEND
6. Clamshell Coupling
    14C26−20A or 14C02−20A (Pre−Mod)
    14C18−20A (Post−Mod).
9. Clamshell Coupling
    LC457−24A (Pre−Mod)
    LC656−24A (Post−Mod).
NOTE
If there is no damage, replace only the
clamshell  couplings not the sleeves.
1

### Page 28

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 27 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement − Balancing Pipes
Figure 7
W
rsb601r28068_008.cgm, sr, sep29/2020
WS148.019
WS85.500
V
V
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
W
61
W
LEGEND
6. Clamshell Coupling
    14C26−20A (Pre−Mod)
    14C18−20A (Post−Mod).
NOTE
If there is no damage, replace only the
clamshell  couplings not the sleeves.
1

### Page 29

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 28 of 31
Dec 03/2020
Revision A, Dec 21/2020
Coupling Replacement
Figure 8
rsb601r28068_009.cgm, sr, sep29/2020
Y
14
WS264.00
X
X
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
Y
NOTE
If there is no damage, replace only the
clamshell  couplings not the sleeves.
1
LEGEND
4. Clamshell Coupling
    14C26−12A (Pre−Mod)
    14C18−12A (Post−Mod).

### Page 30

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 29 of 31
Dec 03/2020
Revision A, Dec 21/2020
3. MATERIAL INFORMATION
A. Kit Information
For All Aircraft
KIT 601R28−068K1
PART NUMBER QTY NAME ALTERNATIVE NOTES
14C18−08A 1 Clamshell Coupling
14C18−12A 2 Clamshell Coupling
14C18−16A 4 Clamshell Coupling
14C18−20A 7 Clamshell Coupling
14C18−24A 8 Clamshell Coupling
14C18−32A 2 Clamshell Coupling
LC656−24A 4 Clamshell Coupling
14C26−16A 2 Clamshell Coupling
LC697−20A 2 Coupling Assembly  
MS29513−218 4 O−Ring
MS29513−220 2 O−Ring
For Aircraft Post SB 601R−28−024 and on Aircraft 7110 thru 7990, 8000 thru 8112
KIT 601R28−068K2
PART NUMBER QTY NAME ALTERNATIVE NOTES
14C18−20A 2 Clamshell Coupling
LC656−24A 2 Clamshell Coupling
For All Aircraft
NOTE: For permitted alternative to superseded parts, refer to the Parts
Supersession Cross References Lists at www.iflybombardier.com under
Resources − Engineering Documents.

### Page 31

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 30 of 31
Dec 03/2020
Revision A, Dec 21/2020
NOTE: Some parts listed in the kit content of this service bulletin are supplied in
a temporary condition of supply configuration. These parts are identified
with a −SB, /SB, SB or other suffix after the MHIRJ engineering part
number. When the parts are installed, with the instructions given in the
Accomplishment Instructions of this service bulletin, the parts agree with
the requirements of the engineering configuration. Refer to the SB
Introduction document for more explanation.
B. Consumable Information
The materials that follow are necessary to do this service bulletin. You can order
them from MHIRJ or purchased directly from industry sources. If the material is
ordered from MHIRJ, there can be some lead time because of the shelf life of the
material.
CONSUMABLES
SPECIFICATION QTY NAME REFERENCE
VV−P−236 As
necessary
Petrolatum
(Petroleum jelly)
06−002 /C0001
/C0001  Refer to AMM 51−31−00−990−801
C. Special Tools and Equipment
For a list of special tools and equipment, refer to the different tasks that are given
as references in this service bulletin.

### Page 32

SERVICE BULLETIN  601R−28−068
SB 601R−28−068
Page 31 of 31
Dec 03/2020
Revision A, Dec 21/2020
D. Disposition of Parts
The table that follows shows the relation between the new parts and/or modified
parts to be installed during the incorporation of this service bulletin and the
disposition of the affected parts from the aircraft (or spares).
PRE-SB
PART NUMBER
NAME QTY DC POST -SB
PART NUMBER
14C02−20A ClamshellCoupling 2 DIS 14C18−20A
14C26−12A ClamshellCoupling 2 DIS 14C18−12A
14C26−16A ClamshellCoupling 2 DIS 14C26−16A
14C26−16A ClamshellCoupling 4 DIS 14C18−16A
14C26−20A ClamshellCoupling 9 DIS 14C18−20A
14C26−24A ClamshellCoupling 8 DIS 14C18−24A
14C26−32A ClamshellCoupling 2 DIS 14C18−32A
14J26−20A ClamshellCoupling 2 DIS LC697−20A
LC457−24A ClamshellCoupling 6 DIS LC656−24A
LC459−08A ClamshellCoupling 1 DIS 14C18−08A
Disposition code (DC):
DIS: Discard Part.
1

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
