# Bombardier Service Bulletin 601R-30-031: Revision D

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2010-0436; AD 2011-07-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Service Bulletin 601R-30-031](https://openairdocs.org/service-documents/bombardier/601r-30-031.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin
- Pages: 128
- PDF: https://openairdocs.org/files/sha256/eb/fa/ebfa5a265bbdd75f3ee58f7d5539a93fc8786c460e6e0a39eb8f26ca06ef3df9
- Page: https://openairdocs.org/service-documents/bombardier/601r-30-031/file/ebfa5a265bbd

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Page 1 of 1
SB 601R- - - 30- - - 031Feb 03/2010
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CL- - -600- - -2B19Canadair Regional Jet (CRJ) Aircraft
SERVICE BULLETIN 601R - - -30 - - -031
S U B J E C T: I c e a n d R a i n P r o t e c t i o n --- W i n g A n t i --- I c i n g S y s t e m --- I n s t a l l a t i o n o f L o w
Heat Detection- - -Switches on the Leading Edge
This page transmits:
Revision D of Service Bulletin 601R- - - 30- - - 031,
pages 1 thru 126, dated Feb 03/2010.
The changes in this revision have no effect on aircraft that have
incorporated a previous issue of this service bulletin.
Reason:
Revised Accomplishment Instructions, paragraph 2., to:
Change the data in a wire table of PART D.
Add the P/N of the crimping tool for terminal lug P/N MS20659- - - 101.
Add an alternate task for the operational test of the wing anti- - - ice ducts.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:
Discard the copy of Service Bulletin 601R- - - 30- - - 031, Revision C, dated Dec 23/ 2009.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated May 15/2009.
Revision A, dated Sep 08/2009.
Revision B, dated Oct 28/2009.
Revision C, dated Dec 23/2009.
1

### Page 2

Page 1 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
SERVICE BULLETIN
T echnical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED
HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, THIS SERVICE
BULLETIN MUST BE SENT TO THE NEW OWNER, UNLESS CONFIRMATION WAS RECEIVED
THAT BOMBARDIER COMMERCIAL AIRCRAFT HAS INCLUDED THE NEW OPERATOR
AIRCRAFT , THIS SERVICE BULLETIN MUST BE SENT TO THE LESSEE. IF THE OPERATOR
ON THE DISTRIBUTION LIST .
ATA SYSTEM: 30- - -12 NUMBER: 601R - - -30- - -031
S U B J E C T: I c e a n d R a i n P r o t e c t i o n --- W i n g A n t i --- I c i n g S y s t e m --- I n s t a l l a t i o n o f L o w
Heat Detection- - -Switches on the Leading Edge
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
Service Bulletin: CL- - - 600- - - 2B19 Canadair Regional Jet (CRJ) Aircraft Serial
Numbers 7003 thru 7067, 7069 thru 7990 and 8000 thru
8101.
Production: This change will be incorporated before delivery on Aircraft
Serial Numbers 8102 and subsequent.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aerospace Service Bulletin(s). Before you
do this bulletin, examine all STC, STA or equivalent action changes
to make sure this bulletin can be completed.
NOTE: The procedure in this service bulletin was validated on Aircraft Serial
Number 7028.

### Page 3

SERVICE BULLETIN 601R- - -30- - -031
Page 2 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
B. Reason
(1) Condition
It is possible for the Wing Anti- - -Ice (WAI) system to not correctly sense low
heat on the outboard leading edges.
(2) Evidence
The wing anti- - -ice system of some aircraft in service did not correctly sense a
low heat condition on the wing during a malfunction of the piccolo duct.
(3) Objective/Benefit
This service bulletin gives the procedure to install two low heat
detection- - -switches on the outboard leading edge. This will monitor the
temperature and indicate low heat conditions at the wing tip during all phases
of the flight.
C. Description
This service bulletin is divided into six parts: PART A, PART B, PART C, PART D,
PART E and PART F .
PART A - - - Installation of the Low Heat Detection - - -Switches on the Left Wing
Circuit breakers are opened. The electrical power is removed. Access panels are
removed. The left leading edges are removed.
The shroud is removed from the outboard leading edge. Holes are drilled through
the outboard leading edge and the shroud. Two low heat detection- - -switches
(written as “thermal switches” in this service bulletin) are installed in outboard
leading edge.
New wires are installed from the thermal switches to a connector on the wing. The
shroud is installed on the outboard leading edge. The left leading edges are
installed. The circuit breakers are closed. The electrical power is applied.
For Aircraft that have incorporated PART A from the initial issue of this service bulletin
PART B - - - Activation of the Low Heat Detection - - -Switches
Circuit breakers are opened. The electrical power is removed. The Data
Concentrator Units (DCUs) are removed. In the main avionics- - -compartment, two
wires per DCUs are connected. The circuit breakers are closed. The electrical
power is applied. The operational test of the outboard low heat
detection- - -switches and the DCUs are done.

### Page 4

SERVICE BULLETIN 601R- - -30- - -031
Page 3 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For all Aircraft
PART C - - - Installation of the Low Heat Detection - - -Switches on the Right Wing
Circuit breakers are opened. The electrical power is removed. Access panels are
removed. The leading edges are removed.
The shroud is removed from the outboard leading edge. Holes are drilled through
the outboard leading edge and the shroud. Two thermal switches are installed in
the outboard leading edge.
New wires are installed from the thermal switches to a connector on the wing. The
shroud is installed on the outboard leading edge. The leading edges are installed.
The circuit breakers are closed. The electrical power is applied.
PART D - - - Installation of the Wing A/ICE box assembly on the Left Side of the
Main Avionics- - -Compartment
Circuit breakers are opened. The electrical power is removed. Some passenger
seats on the left side are removed. Floor covering and some floor panels are
removed. Access panels are removed. DCU 1, the Global Positioning Unit Sensor
Unit (GPSU 1) and the Attitude and Heading Computer (AHC 1) are removed.
New wires are installed from connector J423, at FS409L+128, to the main
avionics- - -compartment. The wires to DCU 1 are caped and stowed. The WING
A/ICE box assembly is installed and connected. Circuit breakers, on the WING
A/ICE box assembly, are opened. AHC 1, GPSU1 and the DCUs are installed. The
circuit breakers are closed. The electrical power is applied.
The access panels are installed. The floor panels and floor covering are installed.
The passenger seats are installed.
PART E - - - Installation of the wires for the Wing A/ICE box assembly on the
Right Side of the Main Avionics- - -Compartment
Circuit breakers are opened. The electrical power is removed. Some passenger
seats on the right side are removed. Floor covering and some floor panels are
removed. Access panels are removed.
New wires are installed from connector J422, at FS409R+128, to the main
avionics- - -compartment. The wires to DCU 2 are caped and stowed. If DCU 3 is
installed, the wires to DCU 3 are caped and stowed. DCU 2 is installed. If
applicable, DCU 3 is installed. The circuit breakers are closed. The electrical power
is applied.
The access panels are installed. The floor panels and floor covering are installed.
The passenger seats are installed.

### Page 5

SERVICE BULLETIN 601R- - -30- - -031
Page 4 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART F - - - Activation of the Low Heat Detection - - -Switches
NOTE: PART A, PART C, PART D and PART E are prerequisites to do PART F.
Circuit breakers are opened. The avionics- - -compartment door is opened. In the
main avionics- - -compartment, some wires are unstowed and connected to the
connectors of the WING A/ICE box assembly. The lockrings are removed from the
circuit breakers of the WING A/ICE box assembly. The circuit breakers are closed.
The electrical power is applied. The operational test of the outboard low heat
detection- - -switches is done.
D. Compliance
For Aircraft that have incorporated PART A from the initial issue of this service
bulletin
Recommended Service Bulletin. Bombardier Aerospace recommends that PART B
o ft h ei n i t i a li s s u eo rs u b s e q u e n tr e v i s i o no ft h i ss e r v i c eb u l l e t i nb ed o n en om o r e
than 24 months from the initial release date on this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.
For Aircraft that have not incorporated the initial issue of this service bulletin
Recommended Service Bulletin. Bombardier Aerospace recommends that PART A,
PART C, PART D, PART E and PART F of this service bulletin be done no more than
24 months from the initial release date on this service bulletin, unless otherwise
directed by the airworthiness authority of the operator.
For Aircraft 7003 thru 7067, 7069 thru 7990 and 8000 thru 8095
NOTE: Service Bulletin 601R- - - 31- - - 034 Indicating and Recording Systems - - -
General - - - Data Concentrator Unit (DCU- - - 4000) Update is a prerequisite
to PART B and PART F of this service bulletin.
For all Aircraft
NOTE: When this service bulletin is incorporated, use Airplane Flight Manual
(AFM) Temporary Revision TR RJ/164- - -2 or subsequent applicable
revision.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance inspections (DTIs).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93- - -Q- - -02.

### Page 6

SERVICE BULLETIN 601R- - -30- - -031
Page 5 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
F. M a n p o w e r
Man hours given below are an estimate for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
− Administrative functions such as planning, liaison, familiarization, and report writing.
− Non productive elapsed time such as rest time, having meals, and crew shift
changes.
− Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
− Preparation for modification (unless specified in the accomplishment
instructions) such as cleaning and getting parts, tools, consumables, and
ground equipment.
− Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
− All other activities that are not considered by Bombardier Aerospace as directly
related to the accomplishment of this procedure.
NOTE: For on- - -site labor assistance, please speak with a Fleet Services
representative for a quote. The Fleet Services Team can be
contacted via the CRC at 514- - - 855- - - 8500 or email at
thd.crj@aero.bombardier.com.
PART A - - - Installation of the Low Heat Detection - - -Switches on the Left Wing
It will take an estimated 18.0 man- - - hours to complete this service bulletin. The
man- - - hours are divided as shown in the table that follows:
TASK M A N --- H O U R S
( 2 ) J o b S e t --- U p 4.0
(3) Procedure 8.0
(4) T est 0.0¡
(5) Job Close- - -Out 6.0
¡ Does not include the time to do AMM 20- - - 10- - - 00- - - 910- - - 803

### Page 7

SERVICE BULLETIN 601R- - -30- - -031
Page 6 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART B - - - Activation of the Low Heat Detection - - -Switches
It will take an estimated 5.0 man- - -hours to complete PART B of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK M A N --- H O U R S
( 2 ) J o b S e t --- U p 0.5
(3) Procedure 2.0
(4) T est 2.0
(5) Job Close- - -Out 0.5
PART C - - - Installation of the Low Heat Detection - - -Switches on the Right Wing
It will take an estimated 18.0 man- - - hours to complete this service bulletin. The
man- - - hours are divided as shown in the table that follows:
TASK M A N --- H O U R S
( 2 ) J o b S e t --- U p 4.0
(3) Procedure 8.0
(4) T est 0.0¡
(5) Job Close- - -Out 6.0
¡ Does not include the time to do AMM 20- - - 10- - - 00- - - 910- - - 803

### Page 8

SERVICE BULLETIN 601R- - -30- - -031
Page 7 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART D - - - Installation of the Wing A/ICE box assembly on the Left Side of the Main
A v i o n i c s --- C o m p a r t m e n t
It will take an estimated 18.0 man- - - hours to complete this service bulletin. The
man- - - hours are divided as shown in the table that follows:
TASK M A N --- H O U R S
( 2 ) J o b S e t --- U p 4.0
(3) Procedure 10.0
(4) T est 0.0 ¡
(5) Job Close- - -Out 4.0
¡ Does not include the time to do AMM 20- - - 10- - - 00- - - 910- - - 803
PART E - - - Installation of the wires for the Wing A/ICE box assembly on the Right Side of
the Main Avionics- - -Compartment
It will take an estimated 13.0 man- - - hours to complete this service bulletin. The
man- - - hours are divided as shown in the table that follows:
TASK M A N --- H O U R S
( 2 ) J o b S e t --- U p 4.0
(3) Procedure 6.0
(4) T est 0.0 ¡
(5) Job Close- - -Out 3.0
¡ Does not include the time to do AMM 20- - - 10- - - 00- - - 910- - - 803

### Page 9

SERVICE BULLETIN 601R- - -30- - -031
Page 8 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART F - - - Activation of the Low Heat Detection - - -Switches
It will take an estimated 4.0 man- - -hours to complete this service bulletin. The
man- - - hours are divided as shown in the table that follows:
TASK M A N --- H O U R S
( 2 ) J o b S e t --- U p 0.5
(3) Procedure 1.5
(4) T est 1.5
(5) Job Close- - -Out 0.5
G. Material - - - Price and Availability
(1) The kits in the table that follows are available from Bombardier Aerospace
Regional Aircraft. Refer to the paragraphs below for terms and conditions.
NOTE: For a list of the kit contents, refer to paragraph 3.A.
KIT NUMBER NAME
601R30- - - 031K2A W i n g A / I c e S y s t e m --- ( L e f t W i n g )
601R30- - - 031K3A Wing A/Ice System- - - (Right Wing)
601R30- - - 031K4 Wing A/Ice System- - -(Left Fuselage)
601R30- - - 031K5 Wing A/Ice System- - - (Right Fuselage)
601R30- - - 031K6 Wing A/Ice System- - -(Final Installation)

### Page 10

SERVICE BULLETIN 601R- - -30- - -031
Page 9 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(2) Please send a purchase order to the address below to schedule the kit:
Bombardier
Service Bulletin Kit Support T eam
123 Garratt Blvd, N42- - - 24
T oronto, Ontario
Canada M3K 1Y5
Fax: 416- - - 375- - - 3060
Phone: 416- - - 375- - - 3920
Email: sbkits@aero.bombardier.com
Please contact the Service Bulletin Kit Support T eam at the address above for
terms and conditions.
For Aircraft that have not incorporated PART A and PART C of this service bulletin
and that have ordered kits 601R30 - - -031K2 and 601R30 - - -031K3
(3) It is possible that the parts in the table that follows are replaced during the
incorporation of PART A and PART C of this service bulletin. These parts are
available from Bombardier Commercial Aircraft.
PART NUMBER NAME QUANTITY
202K153- - - 25- - - 01/225- - - 0 Boot 2
600- - - 052- - - 1 Strap 2
(4) Please send a purchase order to the address below to schedule the parts:
Bombardier
Service Bulletin Kit Support T eam
123 Garratt Blvd, N42- - - 24
T oronto, Ontario
Canada M3K 1Y5
Fax: 416- - - 375- - - 3060
Phone: 416- - - 375- - - 3920
Email: sbkits@aero.bombardier.com
Please contact the Service Bulletin Kit Support T eam at the address above for
terms and conditions.
(5) Refer to paragraph 3.B. for a list of consumables for this service bulletin.
H. T ooling - - - Price and Availability
There are no tool kits for this service bulletin.

### Page 11

SERVICE BULLETIN 601R- - -30- - -031
Page 10 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
I. Weight and Balance
PART A - - - Installation of the Low Heat Detection - - -Switches on the Left Wing
WEIGHT ARM MOMENT ¡
1.0 (lb) 510.4 (in.) 0.510 ( 1000 lb--- in.)
0.5 (kg) 12.96 (m) 0.006 (1000 kg- - - m)
¡ The value in the Moment column is divided by 1000. Refer
to the Weight & Balance Manual CSP A- - - 041.
PART B - - - Activation of the Low Heat Detection - - -Switches
Not changed.
PART C - - - Installation of the Low Heat Detection - - -Switches on the Right Wing
WEIGHT ARM MOMENT ¡
1.0 (lb) 510.4 (in.) 0.510 ( 1000 lb--- in.)
0.5 (kg) 12.96 (m) 0.006 (1000 kg- - - m)
¡ The value in the Moment column is divided by 1000. Refer
to the Weight & Balance Manual CSP A- - - 041.
PART D - - - Installation of the Wing A/ICE box assembly on the Left Side of the Main
A v i o n i c s --- C o m p a r t m e n t
WEIGHT ARM MOMENT ¡
2.1 (lb) 280.3 (in.) 0.589 ( 1000 lb--- in.)
1.0 (kg) 7.12 (m) 0.007 (1000 kg- - - m)
¡ The value in the Moment column is divided by 1000. Refer
to the Weight & Balance Manual CSP A- - - 041.

### Page 12

SERVICE BULLETIN 601R- - -30- - -031
Page 11 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART E - - - Installation of the wires for the Wing A/ICE box assembly on the Right Side of
the Main Avionics- - -Compartment
WEIGHT ARM MOMENT ¡
0.4 (lb) 338.9 (in.) 0.136 ( 1000 lb--- in.)
0.2 (kg) 8.61 (m) 0.002 (1000 kg- - - m)
¡ The value in the Moment column is divided by 1000. Refer
to the Weight & Balance Manual CSP A- - - 041.
For aircraft that have the third DCU option (CR31- - - 310 or CR31- - - 001), it is
necessary to add the table that follows:
WEIGHT ARM MOMENT ¡
0.1 (lb) 281.8 (in.) 0.028 ( 1000 lb--- in.)
0.05 (kg) 7.16 (m) 0.0003 (1000 kg- - - m)
¡ The value in the Moment column is divided by 1000. Refer
to the Weight & Balance Manual CSP A- - - 041.
PART F - - - Activation of the Low Heat Detection - - -Switches
Not changed.
J. Electrical Load Data
Not changed.
K. References
Restriction and/or Special Instruction (RSI) C- - -A220.
Modification Summary TC601R17364, Revision N.
Service Non Incorporated Engineering Order K601R54002 SNIEO S04
Service Non Incorporated Engineering Order K601R50586 SNIEO S04
Aircraft Maintenance Manual, CSP A- - - 001.
Electrical/Electronic Components - - - Standard Practices Manual (ESPM),
CSP A- - - 115.
For Bombardier Aerospace reference only: PCA 04858.

### Page 13

SERVICE BULLETIN 601R- - -30- - -031
Page 12 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
L. Other Publications Affected
Aircraft Maintenance Manual (AMM) CSP A- - - 001...................
Wiring Diagram Manual (WDM) CSP A- - - 003.......................
Illustrated Parts Catalog (IPC) CSP A- - -006........................
Fault Isolation Manual (FIM) CSP A- - - 009..........................
Maintenance Requirement Manual (MRM) CSP A- - - 053.............
Flight Crew Operating Manual Vol 2 CSP A- - - 013...................
Airplane Flight Manual (AFM) CSP A- - - 012........................
Quick Reference Handbook (QRH) CSP A- - -022...................
M. Relationship Chart
Not applicable.

### Page 14

SERVICE BULLETIN 601R- - -30- - -031
Page 13 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
2. ACCOMPLISHMENT INSTRUCTIONS
PART A - - - Installation of the Low Heat Detection - - -Switches on the Left Wing
A . J o b S e t --- U p
Reference Information
REFERENCE DESIGNATION
A M M 1 1 --- 3 0 --- 0 0 --- 4 0 0 --- 8 0 1Installation of the Adhesive- - -Backed Label
A M M 2 0 --- 1 0 --- 0 0 --- 9 1 0 --- 8 0 3Connector Integrity After a Disconnect and
Re- - -connection
A M M 2 0 --- 2 1 --- 0 0 --- 9 1 0 --- 8 0 1T orque Procedures for Threaded Fasteners
A M M 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 Remove Electrical Power to the Aircraft
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1 Electrical/Electronic Safety Precautions
A M M 3 0 --- 1 1 --- 0 0 --- 7 4 0 --- 8 0 1 Self- - -T est of the Anti Ice Duct System
A M M 3 0 --- 1 1 --- 0 0 --- 7 9 0 --- 8 0 1Operational test of the Wing Anti- - -Ice Ducts
(External Air Supply)
A M M 3 0 --- 1 1 --- 0 0 --- 7 9 0 --- 8 0 2Operational test of the Wing Anti- - -Ice Ducts
(Engine Bleed Air Supply)
A M M 3 0 --- 1 1 --- 4 1 --- 0 0 0 --- 8 0 1Removal of the Leading Edge Anti- - - Ice Wing
Ducts (Piccolo Tubes)
A M M 3 0 --- 1 1 --- 4 1 --- 4 0 0 --- 8 0 1Installation of the Leading Edge Anti- - -Ice Wing
Ducts (Piccolo Tubes)
A M M 3 0 --- 1 2 --- 1 7 --- 7 2 0 --- 8 0 1Functional T est of the Backup Sufficient- - -Heat
Switches
A M M 3 3 --- 4 3 --- 0 0 --- 7 1 0 --- 8 0 1Operational T est of the Wing Inspection Lights
A M M 3 6 --- 2 1 --- 0 0 --- 7 1 0 --- 8 0 1 Operational T est of the Bleed- - -Air Leak
Detection and Warning System
A M M 5 1 --- 8 0 --- 0 0 --- 1 0 0 --- 8 0 2Surface Preparation for Electrical Bonding
A M M 5 1 --- 8 0 --- 0 0 --- 7 6 0 --- 8 0 2 Electrical Bonding Resistance Values

### Page 15

SERVICE BULLETIN 601R- - -30- - -031
Page 14 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
REFERENCE DESIGNATION
A M M 5 3 --- 8 2 --- 0 1 --- 0 0 0 --- 8 0 3R e m o v a l o f t h e L e f t F o r w a r d W i n g --- t o --- F u s e -
lage Fairing
A M M 5 3 --- 8 2 --- 0 1 --- 4 0 0 --- 8 0 3 Installation of the Left Forward Wing- - -to
Fuselage Fairing
A M M 5 7 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 3Removal of the Inboard Leading Edge Assem-
bly 520JL (620JL)
A M M 5 7 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 4Removal of the Center Leading Edge Assembly
530JL (630JL)
A M M 5 7 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 6 Removal of the Outboard Leading Edge
Assembly 530KL (630KL)
A M M 5 7 --- 4 1 --- 0 1 --- 1 4 0 --- 8 0 3 Polishing of the Wing Leading Edges
A M M 5 7 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 3 Installation of the Inboard Leading Edge
Assembly 520JL (620JL)
A M M 5 7 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 4 Installation of the Center Leading Edge
Assembly 530JL (630JL)
A M M 5 7 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 6Installation of the Outboard Leading Edge
Assembly 530KL (630KL)
E S P M 2 0 --- 1 1 --- 0 0 Wire Stripping and Wire/Cable Damage Repair
Maintenance Practices
E S P M 2 0 --- 1 2 --- 0 0 Wiring - - - Removal/Installation
E S P M 2 0 --- 1 2 --- 0 1 Electrical Wiring - - - Continuity T esting
E S P M 2 0 --- 1 4 --- 0 0 Convolex Tubing/Conduit - - -
Removal/Installation
E S P M 2 0 --- 1 7 --- 1 0 Electrical Connectors - - - Maintenance Practices
E S P M 2 0 --- 2 0 --- 0 0 T erminal Lugs - - - Removal/Installation
E S P M 2 0 --- 2 3 --- 0 0 Circuit Breakers - - - Removal/Installation
S R M 5 1 --- 2 1 --- 1 1 Corrosion Prevention Procedures
S R M 5 1 --- 2 1 --- 1 6 Finish Codes
S R M 5 1 --- 2 2 --- 0 0 Bonding and Attaching Parts with Adhesives

### Page 16

SERVICE BULLETIN 601R- - -30- - -031
Page 15 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
REFERENCE DESIGNATION
S R M 5 1 --- 2 3 --- 0 0 Pressure, Environmental, Fuel T ank and Firewall
Sealing
S R M 5 1 --- 2 5 --- 0 6 Fluid- - -Resistant (FR) Epoxy Primer
S R M 5 1 --- 2 5 --- 1 6 Fluid- - -Resistant (FR) Polyurethane T opcoat
S R M 5 1 --- 2 6 --- 0 0 Cleaning
S R M 5 1 --- 4 1 --- 0 4 T orque Procedures - - - Bolts and Screws
S R M 5 1 --- 4 2 --- 0 6 Solid Rivets
S R M 5 1 --- 4 2 --- 1 0 Blind Rivets - - - General
T olerance Information
Linear T olerances Angular T olerance
0.XX in. (0.X mm) 0.X in. (X mm)
/ 0° 30”+/- - - 0.03 in. +/--- 0.1 in. +/--- 0° 30”
+ / --- 0 . 8 m m + / --- 2 m m
NOTE: The tolerances above apply to the dimensions given in this service
bulletin except if specified differently.
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT . IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(1) Obey all the electrical/electronic safety precautions
(Refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(2) Remove electrical power to the aircraft
(Refer to AMM 24- - - 00- - - 00- - - 861- - - 802).
(3) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
C B P --- 1 F10 1 4 t hS TB / A I RS O VL 221

### Page 17

SERVICE BULLETIN 601R- - -30- - -031
Page 16 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CB PANEL ZONE NAMECB NO.
C B P --- 1 G2 A/ICE AUTO 1 221
C B P --- 1 G9 WING INSP 221
C B P --- 1 M2 ENG IGN A 221
C B P --- 1 M3 ENG IGN B 221
C B P --- 2 F10 1 4 t hS TB / A I RS O VR 221
C B P --- 2 G2 A/ICE AUTO 2 222
C B P --- 2 N5 A/ICE MAN 2 222
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 2 Q5 EICAS DCU 2 CH B 222
C B P --- 3 B1 B/LEAK CONT L 221
C B P --- 3 B2 B/LEAK CONT R 221
C B P --- 4 B2 BLEED LEAK TEST 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311
(4) Remove the Left Forward Wing- - - to- - - Fuselage Fairing 191BB
(Refer to AMM 53- - - 82- - - 01- - - 000- - - 803).
(5) Remove inboard leading edge assembly 520JL
(Refer to AMM 57- - - 41- - - 01- - - 000- - - 803).
(6) Remove center leading edge assembly 530JL
(Refer to AMM 57- - - 41- - - 01- - - 000- - - 804).
(7) Remove outboard leading edge assembly 530KL
(Refer to AMM 57- - - 41- - - 01- - - 000- - - 806).

### Page 18

SERVICE BULLETIN 601R- - -30- - -031
Page 17 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(8) Remove the access panel 530KZ and 530LZ
(Refer to AMM 30- - - 11- - - 41- - - 000- - - 801).
(9) Remove the outboard leading edge anti- - -ice wing ducts
(Refer to AMM 30- - - 11- - - 41- - - 000- - - 801).

### Page 19

SERVICE BULLETIN 601R- - -30- - -031
Page 18 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
B. Procedure
NOTE: Use kit 601R30- - - 031K2A to do PART A
Refer to Figure 1.
(1) Remove the shroud from the outboard leading edge as follows:
(a) Remove and discard the rivets that hold the shroud.
(b) Remove the shroud.
Refer to Figure 2, View B.
(2) On the leading edge, at approximately WS355.99, drill two holes as follows:
(a) Drill one hole to a diameter of 0.120 in. (3.05 mm) at 0.95 in. (24.1 mm)
inboard of the vent hole and 2.17 in. (55.1 mm) forward of the center of
the holes that attach the leading edge.
(b) Use the bracket of thermal switch P/N M2SL0920305- - - 101 as a template
to drill a second 0.120 in. (3.05 mm) hole inboard of the vent hole.
(c) Do two countersinks on the outboard side of the leading edge for the
screws (2) (Refer to Figure 4 sheet 1 and sheet 2).
(d) Remove the burrs and the sharp edges.
(3) On the leading edge, at approximately WS362.77, drill two holes as follows:
(a) Drill one hole to a diameter of 0.120 in. (3.05 mm) at 0.77 in. (19.6 mm)
outboard of the vent hole and 2.09 in. (53.1 mm) forward of the center of
the holes that attach the leading edge.
(b) Use the bracket of thermal switch P/N M2SL0920305- - - 101 as a template
to drill a second 0.120 in. (3.05 mm) hole outboard of the vent hole.
(c) Do two countersinks on the outboard side of the leading edge for the
screws (2) (Refer to Figure 4 sheet 1 and sheet 2).
(d) Remove the burrs and the sharp edges.

### Page 20

SERVICE BULLETIN 601R- - -30- - -031
Page 19 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
Refer to Figure 1, View D.
(4) Visually identify the configuration of leading- - -edge shroud that is installed
(Refer to Figure 1, View D).
NOTE: Do not use the number written on the shroud to identify the
configuration. This number identifies a production work station and can
be mistaken for the part number.
For Aircraft that have the configuration 2 (P/N 601R12310 - - -1) leading edge installed
Refer to Figure 2, View C and F .
(5) Between WS352 and WS366, on the shroud, drill four holes as follows:
NOTE: If you are not able to respect 4D pitch between the holes or minimal
edge distance, it is possible to drill the holes at different locations inside
the grey area (Refer to view F).
(a) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.35 in. (34.3 mm) outboard of the access hole and
0.48 in. (12.2 mm) below the upper shroud edge (Refer to view C).
(b) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.35 in. (34.3 mm) outboard of the access hole and
1.60 in. (40.6 mm) below the upper shroud edge.
(c) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.80 in. (45.7 mm) inboard of the access hole and
0.63 in. (16.0 mm) below the upper shroud edge.
(d) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.60 in. (45.7 mm) inboard of the access hole and
1.60 in. (45.7 mm) below the upper shroud edge.
(e) Remove the burrs and sharp edges.
For Aircraft that have the configuration 1 (P/N 601R12062 - - -3 or - - -5 or - - -7) leading edge
installed
Refer to Figure 2, View D and G.
(6) Between WS352 and WS366, on the shroud, drill four holes as follows:
NOTE: If you are not able to respect 4D pitch between the holes or minimal
edge distance, it is permitted to drill the holes at different locations
inside the grey area (Refer to view G).

### Page 21

SERVICE BULLETIN 601R- - -30- - -031
Page 20 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(a) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.35 in. (34.3 mm) inboard of the shroud and 1.75 in.
(44.5 mm) from lower edge of the shroud (Refer to view D).
(b) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 2.00 in. (50.8 mm) inboard of the shroud edge and 1.10
in. (27.9 mm) from lower edge of the shroud.
(c) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 4.00 in. (101.6 mm) inboard of the shroud edge and
1.75 in. (44.5 mm) from lower edge of the shroud.
(d) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 4.65 in. (118.0 mm) inboard of the shroud edge and
1.10 in. (27.9 mm) from lower edge of the shroud.
(e) Remove the burrs and sharp edges.
For all Aircraft
(7) Clean the area with solvent (Refer to SRM 51- - - 26- - - 00).
(8) Apply chemical conversion coating to bare metal areas
( R e f e r t o S R M 5 1 --- 2 1 --- 1 1 ) .
Refer to Figure 2 View E.
(9) On the leading edge, prepare the surface for electrical bonding
(Refer to AMM 51- - - 80- - - 00- - - 100- - - 802).
Refer to Figure 3.
(10) Prepare the thermal switches (1) 1S7HA and 1S8HA for the installation as
follows:
(a) Install approximately 10 in. (254 mm) of the thermal insulating cover (2)
on the wires of the thermal switches.
(b) Install the lacing cord (3) at 0.50 ±0.25 in. (12.7 mm ±6.4 mm) from the
thermal switches (1) (Refer to ESPM 20- - - 12- - - 00).
(c) Apply Glyptol on the knot of the lacing cord.

### Page 22

SERVICE BULLETIN 601R- - -30- - -031
Page 21 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
Refer to Figure 4.
(11) Install the thermal switches (3) 1S7HA and 1S8HA as follows:
(a) Clean the installation area of the thermal switches (3) with naphtha and
dry immediately with a clean cloth.
CAUTION: MAKE SURE TO APPLY THERMAL COMPOUND ON THE
COMPLETE CONTACT SURFACE OF THE THERMAL SWITCH, IF
THERMAL COMPOUND IS NOT APPLIED ON ALL THE CONTACT
SURFACE OF THE THERMAL SWITCH THE ANTI- - -ICE SYSTEM
WILL NOT OPERATE CORRECTLY .
(b) With a spatula, apply a layer of thermal compound (4) to the leading
edge and on the temperature sensitive side of the thermal switches (3).
NOTE: The temperature sensitive side of the thermal switch (3) must be
installed against the leading edge. The temperature sensitive side
of the thermal switch (3) is specified on the thermal switch (3) as
TEMP SIDE.
(c) Put the thermal switches (3) in position on the leading edge.
(d) Carefully push on the thermal switches (3) and make sure that the
thermal compound (4) comes out along the outer edges of the thermal
switches (3).
(e) Install the thermal switches and the bracket (3) with the screws (2) and
nuts (1).
(f) T orque the screws (2) to 5 to 7 lbf •in. (0.6 to 0.8 N •m)
(Refer to AMM 20- - - 21- - - 00- - - 910- - - 801).
(g) Do a detailed inspection of the thermal switches (3). Make sure that
there is a small amount of thermal compound (4) around the thermal
switches (3).
(h) Remove the unwanted thermal compound (4) with a clean dry cloth.
(i) Measure the resistance between the top of the thermal switches (3) and
the leading edge (Refer to AMM 51- - - 80- - - 00- - - 760- - - 802).
(j) Apply chemical conversion coating to the bare metal areas
( R e f e r t o S R M 5 1 --- 2 1 --- 1 1 ) .

### Page 23

SERVICE BULLETIN 601R- - -30- - -031
Page 22 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CAUTION: MAKE SURE THE SILICONE COVERS COMPLETEL Y THE
THERMAL SWITCH AND SCREWS. IF SILICONE DOES NOT
COVER COMPLETELY THE THERMAL SWITCH AND SCREWS
THE SYSTEM WILL NOT OPERATE CORRECTL Y .
(k) Apply a layer of silicone (5), maximum thickness of approximately
0.10 in. (2.5 mm), on the thermal switches (3) and the screws (2)
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .
Refer to Figure 2, sheet 2, View B.
(12) Between WS353 and WS365, in the leading edge, install the decals that
follow:
(a) Install decals 1S7HA, 1S8HA
(Refer to AMM 11- - - 30- - - 00- - - 400- - - 801).
(b) Apply a layer of clear polyurethane topcoat over the decals.
Refer to Figure 2, sheets 3 and 4.
(13) Between WS352.00 and WS362, on the back side of the shroud, install the
decals that follow:
(a) Install decals TB1HA, TB3HA, TB5HA and TB7HA
(Refer to AMM 11- - - 30- - - 00- - - 400- - - 801).
(b) Apply a layer of clear polyurethane topcoat over the decals.
Refer to Figure 4.
(14) In the leading edge, between WS350 and WS366, connect the thermal
switches to the applicable terminal block as follows:
FROM TO TERMINAL
1S7HA WIRE 1 TB7HA MS20659- - - 101
1S7HA WIRE 2 TB1HA MS20659- - - 101
1S8HA WIRE 1 TB5HA MS20659- - - 101
1S8HA WIRE 2 TB3HA MS20659- - - 101

### Page 24

SERVICE BULLETIN 601R- - -30- - -031
Page 23 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For Aircraft that have kit 601R30 - - -031K2
(a) Remove and discard sleeve kit 601R30- - - 031K111.
For all Aircraft
NOTE: The installation of shrinkable identification sleeves is not recommended
on these wires.
(b) Cut the wires and the thermal insulating covers (6) to the correct length.
(c) Remove the insulation from the wires
(Refer to ESPM 20- - - 17- - - 10).
(d) Install the terminal lugs (10) on the wires
(Refer to ESPM 20- - - 20- - - 00).
NOTE: Crimping tools WT - - - 110M (for the insulation support) and AMP
49935 with Die 16- - - 22 or equivalent can be used.
(e) Attach the thermal insulating cover (6) to the lug barrel (10) with lacing
cord (16) (Refer to ESPM 20- - - 12- - - 00).
(f) Attach the thermal insulating cover (6) with lacing cord (16) as shown
( v i e w B ) ( R e f e r t o E S P M 2 0 --- 1 2 --- 0 0 ) .
(g) Apply Glyptol on the knots of the lacing cord.
(h) Connect each thermal switch wire on the shroud with the screw (8),
three washers (9), the shoulder washer (11), washer (12), lock washer
(13) and the nut (14) (Refer to SRM 51- - - 41- - - 04).
(15) Attach the wires of the thermal switches to the leading edge and shroud with
beads of silicone (7) at intervals of 2 in. (50 mm).
(16) If there is no clearance between the wires of the thermal switches and the
nutplates, add a bead of silicone on the wires and the nutplates so that the
wires do not move.
NOTE: The thermal insulating cover (6), installed on the wires of thermal switch
can touch the nutplate but not the threaded part of the fastener that will
be installed.

### Page 25

SERVICE BULLETIN 601R- - -30- - -031
Page 24 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
Refer to Figure 4 and Figure 6.
(17) At the back of the leading edge, between WS350.00 and WS366.00, connect
the wires that follow:
WIRE TO TERMINAL
1HA2N22 TB1HA MS20659- - - 101
1HA2T22 TB3HA MS20659- - - 101
1HA51N22 TB5HA MS20659- - - 101
1HA51G22 TB7HA MS20659- - - 101
(a) Remove the insulation from the wires
(Refer to ESPM 20- - - 17- - - 10).
(b) Put the wires through the nipple terminals (15).
(c) Install the terminal lugs on the wires
(Refer to ESPM 20- - - 20- - - 00).
NOTE: Crimping tools WT - - - 110M (for the insulation support) and AMP
49935 with Die 16- - - 22 or equivalent can be used.
(d) Install the crimped terminal lugs on the screws (8) with the washers (9),
lock washers (13) and nuts (14) (Refer to SRM 51- - - 41- - - 04).
(e) Install the nipple terminals (15).
Refer to Figure 5, sheet 1.
(18) Near WS45.00, disconnect connector P427 from receptacle J427.
Refer to Figure 5, sheet 1 thru sheet 5, and Figure 6.
(19) Between WS45.00 and WS362.00, install and connect the wires that follow:
.
WIRE FROM TO TERMINAL
1HA2N22 TB1HA J427- - - A M39029/58- - - 363
1HA2T22 TB3HA J427- - - B M39029/58- - - 363
1HA51N22 TB5HA J427- - - C M39029/58- - - 363

### Page 26

SERVICE BULLETIN 601R- - -30- - -031
Page 25 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
WIRE TERMINAL TOFROM
1HA51G22 TB7HA J427- - - S M39029/58- - - 363
(a) Install the wires along with wire LJ20C22.
(b) If necessary, remove and replace clamps and/or cable ties to help the
wiring installation. If necessary, r eplace the clamp to get the correct fit
around the wires.
(c) If necessary, use a minimum of three turns of fiberglass tape to prevent
damage to the harness.
Refer to Figure 5, Sheet 5.
(d) If necessary, install conduit P/N S10155C14 or equivalent on the four
wires in the area between the wing and the leading edge electrical
harness.
NOTE: The conduit will prevent damage on the four wires during the
installation of the leading edge on the wing.
Refer to Figure 5, sheet 1, and Figure 6.
(e) Remove the insulation from the wires (Refer to ESPM 20- - - 17- - - 10).
(f) Install the terminals on the wires (Refer to ESPM 20- - - 20- - - 00).
(g) Install the wires in receptacles J427 (Refer to ESPM 20- - - 17- - - 10).
(h) Do a continuity check of the installed wires (Refer to ESPM 20- - - 12- - - 01).
Refer to Figure 5, sheet 6.
(20) At FS409+128, disconnect connector P423 from receptacle J423.
Refer to Figure 5, sheet 1, and Figure 6.
(21) Between WS29.42 and BL45.00, install and connect the wires that follow:
.
WIRE FROM TERMINAL TO TERMINAL
1HA2M22 P427- - - A M39029/56- - - 351 P423- - - J M39029/58- - - 363
1HA2S22 P427- - - B M39029/56- - - 351 P423- - - K M39029/58- - - 363

### Page 27

SERVICE BULLETIN 601R- - -30- - -031
Page 26 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
WIRE TERMINAL TOTERMINALFROM
1HA51M22 P427- - - C M39029/56- - - 351 P423- - - L M39029/58- - - 363
1HA51F22 P427- - - S M39029/56- - - 351 P423- - - d M39029/58- - - 363
(a) If necessary, remove and replace clamps and/or cable ties to help the
wiring installation. If necessary, r eplace the clamp to get the correct fit
around the wires.
(b) If necessary, use a minimum of three turns of fiberglass tape to prevent
damage to the harness.
(c) Install the new wires along with wires 1HA48B22 and 1HA2H22.
(d) If necessary, to help the installation of the wires in the conduit, remove
the backshell of connector P423 as follows:
1 Disconnect and tag all the wires from connector P423.
2 Remove and discard the boot and the tinel- - -ring.
3 Remove and keep the backshell of connector P423.
(e) Install the wires through the conduit.
(f) If removed, install the boot and the backshell of connector P423 as
follows (Refer to ESPM 20- - - 14- - - 00):
1 Put boot P/N 202K153- - - 25- - - 01/225- - - 0 and strap P/N 600- - - 052- - - 1
on the conduit.
2 Put the backshell in the conduit.
3 Put the braid from the conduit on the backshell.
4 With the hand banding tool P/N 600- - - 058 or equivalent, install the
s t r a po v e rt h eb r a i da n dt h eb a c k s h e l l .
5 Install the boot on the backshell and the conduit.
(g) Remove the insulation from the wires (Refer to ESPM 20- - - 17- - - 10).

### Page 28

SERVICE BULLETIN 601R- - -30- - -031
Page 27 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(h) Install the applicable terminal on the wires (Refer to ESPM 20- - -20- - -00).
(i) Install the wires in connector P427 (Refer to ESPM 20- - - 17- - - 10).
(j) Install the wires in connector P423 (Refer to ESPM 20- - - 17- - - 10).
(k) Do a continuity check of the installed wires (Refer to ESPM 20- - - 12- - - 01).
Refer to Figure 5.
(22) Near WS45.00, connect connector P427 to receptacle J427.
(23) At FS409+128, connect connector P423 to receptacle J423.
For Aircraft that have the configuration 2 (P/N 601R12310 - - -1) leading edge installed
Refer to Figure 7, sheets 1 and 2.
(24) Install the shroud on the leading edge as follows:
(a) Apply adhesive on the mating surfaces of the shroud and the leading
edge (Refer to SRM 51- - - 22- - - 00).
(b) Apply faying surface sealant on each rib (Refer to SRM 51- - -23- - -00).
( c ) P u tt h es h r o u di np o s i t i o no nt h el e a d i n ge d g e .
(d) Wet install the rivets (2) (Refer to SRM 51- - - 42- - - 06).
(e) Wet install the blind rivets (1) and (3) (Refer to SRM 51- - - 42- - - 10).
(f) Apply silicone adhesive on the head of blind rivets (1) and (3)
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .
Refer to Figure 7, sheet 2, view C.
(g) Seal gaps with sealant at the outboard end of the leading edge.
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .
For Aircraft that have the configuration 1 (P/N 601R12062 - - -3 or - - -5 or - - -7) leading edge
installed
Refer to Figure 7, sheet 3 and 4.
(25) Install the shroud on the leading edge as follows:
(a) Apply faying surface sealant on the mating surfaces of the shroud and
the leading edge assembly (Refer to SRM 51- - -23- - -00).
( b ) P u tt h es h r o u di np o s i t i o no nt h el e a d i n ge d g e .
(c) Wet install the blind rivets (4), (5), (6) and (7) (Refer to SRM 51- - - 42- - - 10).
(d) Apply silicone adhesive on the head of blind rivets (4), (5), (6) and (7)
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .

### Page 29

SERVICE BULLETIN 601R- - -30- - -031
Page 28 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
C . J o b C l o s e --- O u t
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Polish the outboard leading edge on the local work area
(Refer to AMM 57- - - 41- - - 01- - - 140- - - 803).
For all Aircraft
(3) Install the outboard leading edge anti- - -ice wing ducts
(Refer to AMM 30- - - 11- - - 41- - - 400- - - 801).
(4) Install the access panel 530KZ and 530LZ
(Refer to AMM 30- - - 11- - - 41- - - 400- - - 801).
(5) Install the outboard leading edge assembly 530KL
(Refer to AMM 57- - - 41- - - 01- - - 400- - - 806).
(6) Install center leading edge assembly 530JL
(Refer to AMM 57- - - 41- - - 01- - - 400- - - 804).
(7) Install the inboard leading edge assembly 520JL
(Refer to AMM 57- - - 41- - - 01- - - 400- - - 803).
(8) Install the left forward wing- - - to- - - fuselage fairing 191BB
(Refer to AMM 53- - - 82- - - 01- - - 400- - - 803).
(9) Remove the tags and close the circuit breakers that follow:
For all Aircraft
CB PANEL CB NO. NAME ZONE
C B P --- 1 F10 1 4 t hS TB / A I RS O VL 221
C B P --- 1 G2 A/ICE AUTO 1 221
C B P --- 1 G9 WING INSP 221
C B P --- 1 M2 ENG IGN A 221
C B P --- 1 M3 ENG IGN B 221
C B P --- 2 F10 1 4 t hS TB / A I RS O VR 221
C B P --- 2 G2 A/ICE AUTO 2 222
C B P --- 2 N5 A/ICE MAN 2 222

### Page 30

SERVICE BULLETIN 601R- - -30- - -031
Page 29 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CB PANEL ZONE NAMECB NO.
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 2 Q5 EICAS DCU 2 CH B 222
C B P --- 3 B1 B/LEAK CONT L 221
C B P --- 3 B2 B/LEAK CONT R 221
C B P --- 4 B2 BLEED LEAK TEST 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311
(10) Do the connector integrity after a disconnect and re- - -connection
(Refer to AMM 20- - - 10- - - 00- - - 910- - - 803).
(11) Do the self- - -test of the anti- - -ice duct system
(Refer to AMM 30- - - 11- - - 00- - - 740- - - 801).
(12) Do the operational test of the WING A/ICE ducts
(Refer to AMM 30- - - 11- - - 00- - - 790- - - 801 or AMM 30- - - 11- - - 00- - - 790- - - 802).
(13) Do the operational test of the bleed- - -air leak detection system
(Refer to AMM 36- - - 21- - - 00- - - 710- - - 801).
(14) Do the operational test of the wing inspection lights
(Refer to AMM 33- - - 43- - - 00- - - 710- - - 801).
(15) Do the functional test of the backup sufficient- - -heat switches
(Refer to AMM 30- - - 12- - - 17- - - 720- - - 801).

### Page 31

SERVICE BULLETIN 601R- - -30- - -031
Page 30 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For all Aircraft
(16) When PART A of this service bulletin is completed, add the weight and
balance data shown in paragraph 1.I. of this service bulletin to the Weight and
Balance Manual. Under ‘Description of Change’ enter “Service Bulletin
601R- - - 30- - - 031, Revision D, PART A, incorporated.”
(17) When PART A of this service bulletin is completed, make this entry in the
applicable logbook(s): “ Service Bulletin 601R- - - 30- - - 031, Revision D, Ice and
R a i n P r o t e c t i o n --- W i n g A n t i --- I c i n g S y s t e m --- I n s t a l l a t i o n o f L o w H e a t
Detection- - -Switches on the Leading Edge, PART A, incorporated.”

### Page 32

SERVICE BULLETIN 601R- - -30- - -031
Page 31 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For Aircraft that have incorporated PART A from the initial issue of this service bulletin
PART B - - - Activation of the Low Heat Detection - - -Switches
D . J o b S e t --- U p
Reference Information
REFERENCE DESIGNATION
A M M 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 Remove Electrical Power to the Aircraft
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1 Electrical/Electronic Safety Precautions
A M M 3 0 --- 1 2 --- 1 5 --- 7 1 0 --- 8 0 1Operational T est of the Outboard Low Heat
Switches
A M M 3 1 --- 4 1 --- 0 4 --- 0 0 0 --- 8 0 1 Removal of the DCU
A M M 3 1 --- 4 1 --- 0 4 --- 4 0 0 --- 8 0 1 Installation of the DCU
A M M 3 1 --- 4 1 --- 0 4 --- 7 1 0 --- 8 0 1 Operational T est of the DCU
E S P M 2 0 --- 1 1 --- 0 0 Wire Stripping and Wire/Cable Damage Repair
Maintenance Practices
E S P M 2 0 --- 1 7 --- 1 0 Electrical Connectors - - - Maintenance Practices
E S P M 2 0 --- 2 0 --- 0 0 T erminal Lugs - - - Removal/Installation
E S P M 2 0 --- 2 3 --- 0 0 Circuit Breakers - - - Removal/Installation
(1) Obey all the electrical/electronic safety precautions
(Refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(2) Open, safety, and tag the circuit breakers that follow:
For Aircraft with the third DCU option (CR31 - - -310 or CR31 - - -001)
CB PANEL CB NO. NAME ZONE
C B P --- 2 K6 EICAS DCU 3 CH A 222
C B P --- 2 K7 EICAS DCU 3 CH B 222

### Page 33

SERVICE BULLETIN 601R- - -30- - -031
Page 32 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For all Aircraft
CB PANEL CB NO. NAME ZONE
C B P --- 2 N5 A/ICE MAN 2 222
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311
(3) Remove DCU 1 and DCU 2 (Refer to AMM 31- - - 41- - - 04- - - 000- - - 801).
For Aircraft with the third DCU option (CR31 - - -001 or CR31 - - -310)
(4) Remove DCU 3
(Refer to AMM 31- - - 41- - - 04- - - 000- - - 801).

### Page 34

SERVICE BULLETIN 601R- - -30- - -031
Page 33 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
E. Procedure
Refer to Figure 5, sheet 6.
NOTE: This wiring diagram configuration is not shown on the Figures.
(1) On left side of the main avionics- - - compartment, at FS384.00, unstow and
connect the wires that follow:
WIRE FROM TO TERMINAL W
2HA51L22 P595- - - 12 1P1WA- - - B- - - 11A B0802050- - - 010 8
1HA51A22 P595- - - 13 1P1WA- - - A- - - 11A B0802050- - - 010 8
(a) Remove the insulation from the wires (Refer to ESPM 20- - - 11- - - 00).
(b) Install the applicable terminals on the wires (Refer to ESPM 20- - - 20- - - 00).
(c) Install the wires at the locations given (Refer to ESPM 20- - - 17- - - 10).
(d) Do a continuity check of the installed wires (Refer to ESPM 20- - - 17- - - 10).
Refer to Figure 5, sheets 6, and 7.
NOTE: This wiring diagram configuration is not shown on the Figures.
(2) On the right side of the main avionics- - - compartment, at FS374, unstow and
connect the wires that follow:
WIRE FROM TO TERMINAL W
2HA51A22 J194- - - 27 2P1WA- - - B- - - 11A B0802050- - - 010 9
1HA54A22 J196- - - 87 2P1WA- - - A- - - 11A B0802050- - - 010 9
(a) Remove the insulation from the wires (Refer to ESPM 20- - - 11- - - 00).
(b) Install the applicable terminal on the wires (Refer to ESPM 20- - -20- - -00).
(c) Install the wires at the locations given (Refer to ESPM 20- - - 17- - - 10).
(d) Do a continuity check of the installed wires (Refer to ESPM 20- - - 12- - - 01).

### Page 35

SERVICE BULLETIN 601R- - -30- - -031
Page 34 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For Aircraft with the third DCU option (CR31 - - -001 or CR31 - - -310)
Refer to Figure 5, sheets 6 and 7.
NOTE: This wiring diagram configuration is not shown on the Figures.
(3) In the main avionics- - - compartment, at FS386, unstow and connect the wires
that follow:
WIRE FROM TO TERMINAL W
1HA52A22 J193- - - 47 P 1 W H --- B --- 1 1 A B0802050- - - 010 9
1HA53A22 J196- - - 90 P 1 W H --- A --- 1 1 A B0802050- - - 010 9
(a) Remove the insulation from the wire ends (Refer to ESPM 20- - - 11- - - 00).
(b) Install the applicable terminal on the wires (Refer to ESPM 20- - -20- - -00).
(c) Install the wires in the connectors (Refer to ESPM 20- - - 17- - - 10).
(d) Do a continuity check of the installed wires (Refer to ESPM 20- - - 12- - - 01).
(4) Remove the lockrings and close the circuit breakers of the WING A/ICE box
assembly (1) that follows (Refer to ESPM 20- - - 23- - - 00):
CB ON THE WAI
BOX
NAME
1CB2HA RHS OUTBOARD 1
2CB2HA RHS OUTBOARD 2
1CB1HA LHS OUTBOARD 1
2CB1HA LHS OUTBOARD 2

### Page 36

SERVICE BULLETIN 601R- - -30- - -031
Page 35 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
F. J o b C l o s e --- O u t
(1) Remove all tools, equipment, and unwanted materials from the work area.
For Aircraft with the third DCU option (CR31 - - -001 or CR31 - - -310)
(2) Install DCU 3 (Refer to AMM 31- - - 41- - - 04- - - 400- - - 801).
For all Aircraft
(3) Install DCU 1 and DCU 2 (Refer to AMM 31- - - 41- - - 04- - - 400- - - 801).
(4) Remove the tags and close the circuit breakers that follow:
For Aircraft with the third DCU option (CR31 - - -310 or CR31 - - -001)
CB PANEL CB NO. NAME ZONE
C B P --- 2 K6 EICAS DCU 3 CH A 222
C B P --- 2 K7 EICAS DCU 3 CH B 222
For all Aircraft
CB PANEL CB NO. NAME ZONE
C B P --- 2 N5 A/ICE MAN 2 222
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 2 Q5 EICAS DCU 2 CH B 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311

### Page 37

SERVICE BULLETIN 601R- - -30- - -031
Page 36 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(5) Do the operational test of the outboard low heat detection- - -switches
(Refer to AMM 30- - - 12- - - 15- - - 710- - - 801).
(6) Do the operational test of the DCU (Refer to AMM 31- - - 41- - - 04- - - 710- - - 801).
For all Aircraft
(7) Close the main avionics- - -compartment door.
(8) When PART B of this service bulletin is completed, make this entry in the
applicable logbook(s): “ Service Bulletin 601R- - - 30- - - 031, Revision D, Ice and
R a i n P r o t e c t i o n --- W i n g A n t i --- I c i n g S y s t e m --- I n s t a l l a t i o n o f L o w H e a t
Detection- - -Switches on the Leading Edge, PART B, incorporated.”

### Page 38

SERVICE BULLETIN 601R- - -30- - -031
Page 37 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART C - - - Installation of the Low Heat Detection - - -Switches on the Right Wing
G . J o b S e t --- U p
Reference Information
REFERENCE DESIGNATION
A M M 1 1 --- 3 0 --- 0 0 --- 4 0 0 --- 8 0 1Installation of the Adhesive- - -Backed Label
A M M 2 0 --- 1 0 --- 0 0 --- 9 1 0 --- 8 0 3Connector Integrity After a Disconnect and
Re- - -connection
A M M 2 0 --- 2 1 --- 0 0 --- 9 1 0 --- 8 0 1T orque Procedures for Threaded Fasteners
A M M 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 Remove Electrical Power to the Aircraft
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1 Electrical/Electronic Safety Precautions
A M M 3 0 --- 1 1 --- 0 0 --- 7 4 0 --- 8 0 1 Self- - -T est of the Anti Ice Duct System
A M M 3 0 --- 1 1 --- 0 0 --- 7 9 0 --- 8 0 1Operational test of the Wing Anti- - -Ice Ducts
(External Air Supply)
A M M 3 0 --- 1 1 --- 0 0 --- 7 9 0 --- 8 0 2Operational test of the Wing Anti- - -Ice Ducts
(Engine Bleed Air Supply)
A M M 3 0 --- 1 1 --- 4 1 --- 0 0 0 --- 8 0 1Removal of the Leading Edge Anti- - - Ice Wing
Ducts (Piccolo Tubes)
A M M 3 0 --- 1 1 --- 4 1 --- 4 0 0 --- 8 0 1Installation of the Leading Edge Anti- - -Ice Wing
Ducts (Piccolo Tubes)
A M M 3 0 --- 1 2 --- 1 7 --- 7 2 0 --- 8 0 1Functional T est of the Backup Sufficient- - -Heat
Switches
A M M 3 3 --- 4 3 --- 0 0 --- 7 1 0 --- 8 0 1Operational T est of the Wing Inspection Lights
A M M 3 6 --- 2 1 --- 0 0 --- 7 1 0 --- 8 0 1 Operational T est of the Bleed- - -Air Leak
Detection and Warning System
A M M 5 1 --- 8 0 --- 0 0 --- 1 0 0 --- 8 0 2Surface Preparation for Electrical Bonding
A M M 5 1 --- 8 0 --- 0 0 --- 7 6 0 --- 8 0 2 Electrical Bonding Resistance Values
A M M 5 3 --- 8 2 --- 0 1 --- 0 0 0 --- 8 0 2R e m o v a l o f t h e R i g h t F o r w a r d W i n g --- t o --- F u s e -
lage Fairing
A M M 5 3 --- 8 2 --- 0 1 --- 4 0 0 --- 8 0 2Installation of the Right Forward Wing- - -to- - -Fu-
selage Fairing

### Page 39

SERVICE BULLETIN 601R- - -30- - -031
Page 38 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
REFERENCE DESIGNATION
A M M 5 7 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 3Removal of the Inboard Leading Edge Assem-
bly 520JL (620JL)
A M M 5 7 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 4Removal of the Center Leading Edge Assembly
530JL (630JL)
A M M 5 7 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 6 Removal of the Outboard Leading Edge
Assembly 530KL (630KL)
A M M 5 7 --- 4 1 --- 0 1 --- 1 4 0 --- 8 0 3 Polishing of the Wing Leading Edges
A M M 5 7 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 3 Installation of the Inboard Leading Edge
Assembly 520JL (620JL)
A M M 5 7 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 4 Installation of the Center Leading Edge
Assembly 530JL (630JL)
A M M 5 7 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 6Installation of the Outboard Leading Edge
Assembly 530KL (630KL)
E S P M 2 0 --- 1 1 --- 0 0 Wire Stripping and Wire/Cable Damage Repair
Maintenance Practices
E S P M 2 0 --- 1 2 --- 0 0 Wiring - - - Removal/Installation
E S P M 2 0 --- 1 2 --- 0 1 Electrical Wiring - - - Continuity T esting
E S P M 2 0 --- 1 4 --- 0 0 Convolex Tubing/Conduit - - -
Removal/Installation
E S P M 2 0 --- 1 7 --- 1 0 Electrical Connectors - - - Maintenance Practices
E S P M 2 0 --- 2 0 --- 0 0 T erminal Lugs - - - Removal/Installation
E S P M 2 0 --- 2 3 --- 0 0 Circuit Breakers - - - Removal/Installation
S R M 5 1 --- 2 1 --- 1 1 Corrosion Prevention Procedures
S R M 5 1 --- 2 1 --- 1 6 Finish Codes
S R M 5 1 --- 2 2 --- 0 0 Bonding and Attaching Parts with Adhesives
S R M 5 1 --- 2 3 --- 0 0 Pressure, Environmental, Fuel T ank and Firewall
Sealing
S R M 5 1 --- 2 5 --- 0 6 Fluid- - -Resistant (FR) Epoxy Primer
S R M 5 1 --- 2 5 --- 1 6 Fluid- - -Resistant (FR) Polyurethane T opcoat

### Page 40

SERVICE BULLETIN 601R- - -30- - -031
Page 39 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
REFERENCE DESIGNATION
S R M 5 1 --- 2 6 --- 0 0 Cleaning
S R M 5 1 --- 4 1 --- 0 4 T orque Procedures - - - Bolts and Screws
S R M 5 1 --- 4 2 --- 0 6 Solid Rivets
S R M 5 1 --- 4 2 --- 1 0 Blind Rivets - - - General
T olerance Information
Linear T olerances Angular T olerance
0.XX in. (0.X mm) 0.X in. (X mm)
/ 0° 30”+/- - - 0.03 in. +/--- 0.1 in. +/--- 0° 30”
+ / --- 0 . 8 m m + / --- 2 m m
NOTE: The tolerances above apply to the dimensions given in this service
bulletin except if specified differently.
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT . IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(1) Obey all the electrical/electronic safety precautions
(Refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(2) Remove electrical power to the aircraft (Refer to AMM 24- - - 00- - - 00- - - 861- - - 802).
(3) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
C B P --- 1 F10 1 4 t hS TB / A I RS O VL 221
C B P --- 1 G2 A/ICE AUTO 1 221
C B P --- 1 G9 WING INSP 221
C B P --- 1 M2 ENG IGN A 221
C B P --- 1 M3 ENG IGN B 221

### Page 41

SERVICE BULLETIN 601R- - -30- - -031
Page 40 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CB PANEL ZONE NAMECB NO.
C B P --- 2 F10 1 4 t hS TB / A I RS O VR 221
C B P --- 2 G2 A/ICE AUTO 2 222
C B P --- 2 N5 A/ICE MAN 2 222
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 2 Q5 EICAS DCU 2 CH B 222
C B P --- 3 B1 B/LEAK CONT L 221
C B P --- 3 B2 B/LEAK CONT R 221
C B P --- 4 B2 BLEED LEAK TEST 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311
(4) Remove the right forward wing- - - to- - - fuselage fairing 192BB
(Refer to AMM 53- - - 82- - - 01- - - 000- - - 803).
(5) Remove inboard leading edge assembly 620JL
(Refer to AMM 57- - - 41- - - 01- - - 000- - - 803).
(6) Remove center leading edge assembly 630JL
(Refer to AMM 57- - - 41- - - 01- - - 000- - - 804).
(7) Remove outboard leading edge assembly 630KL
(Refer to AMM 57- - - 41- - - 01- - - 000- - - 806).
(8) Remove the access panel 630KZ and 630LZ
(Refer to AMM 30- - - 11- - - 41- - - 000- - - 801).
(9) Remove the outboard leading edge anti- - -ice wing ducts
(Refer to AMM 30- - - 11- - - 41- - - 000- - - 801).

### Page 42

SERVICE BULLETIN 601R- - -30- - -031
Page 41 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
H. Procedure
NOTE: Use kit 601R30- - - 031K3A to do PART C.
Refer to Figure 1
(1) Remove the shroud from the outboard leading edge as follows:
(a) Remove and discard the rivets that hold the shroud.
(b) Remove the shroud.
Refer to Figure 2, View B.
(2) On the leading edge, at approximately WS355.99, drill two holes as follows:
(a) Drill one hole to a diameter of 0.120 in. (3.05 mm) at 0.95 in. (24.1 mm)
inboard of the vent hole and 2.17 in. (55.1 mm) forward of the center of
the holes that attach the leading edge.
(b) Use the bracket of thermal switch P/N M2SL0920305- - - 101 as a template
to drill a second 0.120 in. (3.05 mm) hole inboard of the vent hole.
(c) Do two countersinks on the outboard side of the leading edge for the
screws (2) (Refer to Figure 4 sheet 1 and sheet 2).
(d) Remove the burrs and the sharp edges.
(3) On the leading edge, at approximately WS362.77, drill two holes as follows:
(a) Drill one hole to a diameter of 0.120 in. (3.05 mm) at 0.77 in. (19.6 mm)
outboard of the vent hole and 2.09 in. (53.1 mm) forward of the center of
the holes that attach the leading edge.
(b) Use the bracket of thermal switch P/N M2SL0920305- - - 101 as a template
to drill a second 0.120 in. (3.05 mm) hole outboard of the vent hole.
(c) Do two countersinks on the outboard side of the leading edge for the
screws (2) (Refer to Figure 4 sheet 1 and sheet 2).
(d) Remove the burrs and the sharp edges.

### Page 43

SERVICE BULLETIN 601R- - -30- - -031
Page 42 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
Refer to Figure 1, View D.
(4) Visually identify the configuration of leading- - -edge shroud that is installed
(Refer to Figure 1, View D).
NOTE: Do not use the number written on the shroud to identify the
configuration. This number identifies a production work station and can
be mistaken for the part number.
For Aircraft that have the configuration 2 (P/N 601R12310 - - -2) leading edge installed
Refer to Figure 2, View C and F .
(5) Between WS352 and WS366, on the shroud, drill four holes as follows:
NOTE: If you are not able to respect 4D pitch between the holes or minimal
edge distance, it is permitted to drill the holes at different locations
inside the grey area (refer to view F).
(a) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.35 in. (34.3 mm) outboard of the access hole and
0.48 in. (12.2 mm) below the upper shroud edge (Refer to view C).
(b) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.35 in. (34.3 mm) outboard of the access hole and
1.60 in. (40.6 mm) below the upper shroud edge.
(c) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.80 in. (45.7 mm) inboard of the access hole and
0.63 in. (16.0 mm) below the upper shroud edge.
(d) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.60 in. (45.7 mm) inboard of the access hole and
1.60 in. (45.7 mm) below the upper shroud edge.
(e) Remove the burrs and sharp edges.
For Aircraft that have the configuration 1 (P/N 601R12062 - - -4 or - - -6 or - - -8) leading edge
installed
Refer to Figure 2, View D and G.
(6) Between WS352 and WS366, on the shroud, drill four holes as follows:
NOTE: If you are not able to respect 4D pitch between the holes or minimal
edge distance, it is permitted to drill the holes at different locations
inside the grey area (refer to view G).

### Page 44

SERVICE BULLETIN 601R- - -30- - -031
Page 43 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(a) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 1.35 in. (34.3 mm) inboard of the shroud and 1.75 in.
(44.5 mm) from lower edge of the shroud (Refer to view D).
(b) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 2.00 in. (50.8 mm) inboard of the shroud edge and 1.10
in. (27.9 mm) from lower edge of the shroud.
(c) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 4.00 in. (101.6 mm) inboard of the shroud edge and
1.75 in. (44.5 mm) from lower edge of the shroud.
(d) Drill one hole to a diameter between 0.241 in. and 0.246 in. (6.12 mm
and 6.25 mm) at 4.65 in. (118.0 mm) inboard of the shroud edge and
1.10 in. (27.9 mm) from lower edge of the shroud.
(e) Remove the burrs and sharp edges.
For all Aircraft
(7) Clean the area with solvent (Refer to SRM 51- - - 26- - - 00).
(8) Apply chemical conversion coating to bare metal areas
( R e f e r t o S R M 5 1 --- 2 1 --- 1 1 ) .
Refer to Figure 2, View E.
(9) On the leading edge, prepare the surface for electrical bonding
(Refer to AMM 51- - - 80- - - 00- - - 100- - - 802).
Refer to Figure 3.
(10) Prepare the thermal switches (1) 2S7HA and 2S8HA for installation as follows:
(a) Install approximately 10 in. (254 mm) of the thermal insulating cover (2)
on the wires of the thermal switches.
(b) Install the lacing cord (3) at 0.50 ±0.25 in. (12.7 mm ±6.4 mm) from the
thermal switches (1) (Refer to ESPM 20- - - 12- - - 00).
(c) Apply Glyptol on the knot of the lacing cord.

### Page 45

SERVICE BULLETIN 601R- - -30- - -031
Page 44 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
Refer to Figure 4, sheets 1, and 2.
(11) Install the thermal switches (3) 2S7HA and 2S8HA as follows:
(a) Clean the installation area of the thermal switches (3) with naphtha and
dry immediately with a clean cloth.
CAUTION: MAKE SURE TO APPLY THERMAL COMPOUND ON THE
COMPLETE CONTACT SURFACE OF THE THERMAL SWITCH, IF
THERMAL COMPOUND IS NOT APPLIED ON ALL THE CONTACT
SURFACE OF THE THERMAL SWITCH THE ANTI- - -ICE SYSTEM
WILL NOT OPERATE CORRECTLY .
(b) With a spatula, apply a layer of thermal compound (4) to the leading
edge and on the temperature sensitive side of the thermal switches (3).
NOTE: The temperature sensitive side of the thermal switch (3) must be
installed against the leading edge. The temperature sensitive side
of the thermal switch (3) is specified on the thermal switch (3) as
TEMP SIDE.
(c) Put the thermal switches (3) in position on the leading edge.
(d) Carefully push on the thermal switches (3) and make sure that the
thermal compound (4) comes out along the outer edges of the thermal
switches (3).
(e) Install the thermal switches and the bracket (3) with the screws (2) and
nuts (1).
(f) T orque the screws (2) to 5 to 7 lbf •in. (0.6 to 0.8 N •m)
(Refer to AMM 20- - - 21- - - 00- - - 910- - - 801).
(g) Do a detailed inspection of the thermal switches (3). Make sure that
there is a small amount of thermal compound (4) around the thermal
switches (3).
(h) Remove the unwanted thermal compound (4) with a clean dry cloth.
(i) Measure the resistance between the top of the thermal switches (3) and
the leading edge (Refer to AMM 51- - - 80- - - 00- - - 760- - - 802).
(j) Apply chemical conversion coating to the bare metal areas
( R e f e r t o S R M 5 1 --- 2 1 --- 1 1 ) .

### Page 46

SERVICE BULLETIN 601R- - -30- - -031
Page 45 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CAUTION: MAKE SURE THE SILICONE COVERS COMPLETEL Y THE
THERMAL SWITCH AND SCREWS. IF SILICONE DOES NOT
COVER COMPLETELY THE THERMAL SWITCH AND SCREWS
THE SYSTEM WILL NOT OPERATE CORRECTL Y .
(k) Apply a layer of silicone (5), maximum thickness of approximately
0.10 in. (2.5 mm), on the thermal switches (3) and the screws (2)
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .
Refer to Figure 2, sheet 2, View B.
(12) Between WS353 and WS365, in the leading edge, install the decals that
follow:
(a) Install decals 2S7HA, 2S8HA
(Refer to AMM 11- - - 30- - - 00- - - 400- - - 801).
(b) Apply a layer of clear polyurethane topcoat over the decals.
Refer to Figure 2, sheets 2, and 3.
(13) Between WS352.00 and WS362, on the back side of the shroud, install the
decals that follow:
(a) Install decals TB2HA, TB4HA, TB6HA and TB8HA
(Refer to AMM 11- - - 30- - - 00- - - 400- - - 801).
(b) Apply a layer of clear polyurethane topcoat over the decals.
Refer to Figure 4 and Figure 9.
(14) In the leading edge, between WS350 and WS366, connect the thermal
switches to the applicable terminal block as follows:
FROM TO TERMINAL
2S7HA WIRE 1 TB8HA MS20659- - - 101
2S7HA WIRE 2 TB2HA MS20659- - - 101
2S8HA WIRE 1 TB6HA MS20659- - - 101
2S8HA WIRE 2 TB4HA MS20659- - - 101

### Page 47

SERVICE BULLETIN 601R- - -30- - -031
Page 46 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For Aircraft that have kit 601R30 - - -031K3
(a) Remove and discard sleeve kit 601R30- - - 031K112.
For all Aircraft
NOTE: The installation of shrinkable identification sleeves is not recommended
on these wires.
(b) Cut the wires and the thermal insulating covers (6) to the correct length.
(c) Remove the insulation from the wires (Refer to ESPM 20- - - 17- - - 10).
(d) Install the terminal lugs (10) on the wires (Refer to ESPM 20- - - 20- - - 00).
NOTE: Crimping tools WT - - - 110M (for the insulation support) and AMP
49935 with Die 16- - - 22 or equivalent can be used.
(e) Attach the thermal insulating cover (6) to the lug barrel (10) with lacing
cord (16) (Refer to ESPM 20- - - 12- - - 00).
(f) Attach the thermal insulating cover (6) with lacing cord (16) as shown
( v i e w B ) ( R e f e r t o E S P M 2 0 --- 1 2 --- 0 0 ) .
(g) Apply Glyptol on the knots of the lacing cords.
(h) Connect each thermal switch wire on the shroud with the screw (8),
three washers (9), one shoulder washer (11), one washer (12), one lock
washer (13) and the nut (14) (Refer to SRM 51- - - 41- - - 04).
(15) Attach the wires of the thermal switches to the leading edge and shroud with
beads of silicone (7) at intervals of 2 in. (50 mm).
(16) If there is no clearance between the wires of the thermal switches and the
nutplates, add a bead of silicone on the wires and the nutplates so that the
wires do not move.
NOTE: The thermal insulating cover (6), installed on the wires of thermal switch
can touch the nutplate but not the threaded part of the fastener that will
be installed.

### Page 48

SERVICE BULLETIN 601R- - -30- - -031
Page 47 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
Refer to Figure 4 and Figure 9.
(17) At the back of the leading edge, between WS350 and WS366, connect the
wires that follow:
WIRE TO TERMINAL
2HA2Q22 TB2HA MS20659- - - 101
2HA2U22 TB4HA MS20659- - - 101
2HA51T22 TB6HA MS20659- - - 101
2HA51K22 TB8HA MS20659- - - 101
(a) Remove the insulation from the wires (Refer to ESPM 20- - - 17- - - 10).
(b) Put the wires through the nipple terminals (15).
(c) Install the terminals on the wires (Refer to ESPM 20- - - 20- - - 00).
NOTE: Crimping tools WT - - - 110M (for the insulation support) and AMP
49935 with Die 16- - - 22 or equivalent can be used.
(d) Install the crimped terminal lugs on the screws (8) with the washers (9),
lock washers (13) and nuts (14) on the terminal board
( R e f e r t o S R M 5 1 --- 4 1 --- 0 4 ) .
(e) Install the nipple terminals (15) over the terminal board.
Refer to Figure 5, sheet 1.
(18) Near WS45.00, disconnect connector P426 from receptacle J426.
Refer to Figure 5, sheet 1 thru sheet 5, and Figure 9.
(19) Between WS45.00 and WS362.00 install and connect the wires that follow:
.
WIRE FROM TO TERMINAL
2HA2Q22 TB2HA J426- - - A M39029/58- - - 363
2HA2U22 TB4HA J426- - - B M39029/58- - - 363
2HA51T22 TB6HA J426- - - C M39029/58- - - 363

### Page 49

SERVICE BULLETIN 601R- - -30- - -031
Page 48 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
WIRE TERMINAL TOFROM
2HA51K22 TB8HA J426- - - S M39029/58- - - 363
(a) Install the wires along with wire LJ19D22.
(b) If necessary, remove and replace clamps and/or cable ties to help the
wiring installation. If necessary, r eplace the clamp to get the correct fit
around the wires.
(c) If necessary, use a minimum of three turns of fiberglass tape to prevent
damage to the harness.
Refer to Figure 5, Sheet 5.
(d) If necessary, install conduit P/N S10155C14 or equivalent on the four
wires in the area between the wing and the leading edge electrical
harness.
NOTE: The conduit will prevent damage on the four wires during the
installation of the leading edge on the wing.
Refer to Figure 5, sheet 1, and Figure 9.
(e) Remove the insulation from the wires (Refer to ESPM 20- - - 17- - - 10).
(f) Install the applicable terminal on the wires (Refer to ESPM 20- - -20- - -00).
(g) Install the wires in receptacles J426 (Refer to ESPM 20- - - 17- - - 10).
(h) Do a continuity check of the installed wires (Refer to ESPM 20- - - 12- - - 01).
Refer to Figure 5, sheet 6.
(20) At FS409+128, disconnect connector P422 from receptacle J422.
Refer to Figure 5, sheet 1, and Figure 9.
(21) Between WS29.42 and BL45.00, install and connect the wires that follow:
.
WIRE FROM TERMINAL TO TERMINAL
2HA2P22 P426- - - A M39029/56- - - 351 P422- - - J M39029/58- - - 363
2HA2T22 P426- - - B M39029/56- - - 351 P422- - - K M39029/58- - - 363
2HA51S22 P426- - - C M39029/56- - - 351 P422- - - L M39029/58- - - 363
2HA51J22 P426- - - S M39029/56- - - 351 P422- - - d M39029/58- - - 363

### Page 50

SERVICE BULLETIN 601R- - -30- - -031
Page 49 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(a) If necessary, remove and replace clamps and/or cable ties to help the
wiring installation. If necessary, r eplace the clamp to get the correct fit
around the wires.
(b) If necessary, use a minimum of three turns of fiberglass tape to prevent
damage to the harness.
(c) Install the new wires along with wires 2HA48B22 and 2HA2H22.
(d) If necessary, to help the installation of the wires in the conduit, remove
the backshell of connector P422 as follows:
1 Disconnect and tag all the wires from connector P422.
2 Remove and keep the backshell of connector P422.
3 Remove and discard the boot and the tinel- - -ring.
(e) Install the wires through the conduit.
(f) If removed, install the boot and the backshell of connector P422 as
follows (Refer to ESPM 20- - - 14- - - 00):
1 Put boot P/N 202K153- - - 25- - - 01/225- - - 0 and strap P/N 600- - - 052- - - 1
on the conduit.
2 Put the backshell in the conduit.
3 Put the braid from the conduit on the backshell.
4 With the hand banding tool P/N 600- - - 058 or equivalent, install the
s t r a po v e rt h eb r a i da n dt h eb a c k s h e l l .
5 Install the boot on the backshell and the conduit.
(g) Remove the insulation from the wires (Refer to ESPM 20- - - 17- - - 10).
(h) Install the applicable terminal on the wires (Refer to ESPM 20- - -20- - -00).
(i) Install the wires in connector P426 (Refer to ESPM 20- - - 17- - - 10).
(j) Install the wires in connector P422 (Refer to ESPM 20- - - 17- - - 10).

### Page 51

SERVICE BULLETIN 601R- - -30- - -031
Page 50 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(k) Do a continuity check of the installed wires (Refer to ESPM 20- - - 12- - - 01).
Refer to Figure 5.
(22) Near WS45.00, connect connector P426 to receptacle J426.
(23) At FS409+128, connect connector P422 to receptacle J422.
For Aircraft that have the configuration 2 (P/N 601R12310 - - -2) leading edge installed
Refer to Figure 7, sheet 1, and 2.
(24) Install the shroud on the leading edge as follows:
(a) Apply adhesive on the mating surfaces of the shroud and the leading
edge (Refer to SRM 51- - - 22- - - 00).
(b) Apply faying surface sealant on each rib (Refer to SRM 51- - -23- - -00).
( c ) P u tt h es h r o u di np o s i t i o no nt h el e a d i n ge d g e .
(d) Wet install the rivets (2) (Refer to SRM 51- - - 42- - - 06).
(e) Wet install the blind rivets (1) and (3) (Refer to SRM 51- - - 42- - - 10).
(f) Apply silicone adhesive on the head of blind rivets (1) and (3)
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .
Refer to Figure 7, sheet 2, View C.
(g) Seal gaps with sealant at the outboard end of the leading edge.
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .
For Aircraft that have the configuration 1 (P/N 601R12062 - - -4 or - - -6 or - - -8) leading edge
installed
Refer to Figure 7, sheets 3 and 4.
(25) Install the shroud on the leading edge as follows:
(a) Apply faying surface sealant on the mating surfaces of the shroud and
the leading edge assembly (Refer to SRM 51- - -23- - -00).
( b ) P u tt h es h r o u di np o s i t i o no nt h el e a d i n ge d g e .
(c) Wet install the blind rivets (4), (5), (6) and (7) (Refer to SRM 51- - - 42- - - 10).
(d) Apply silicone adhesive on the head of blind rivets (4), (5), (6) and (7)
( R e f e r t o S R M 5 1 --- 2 3 --- 0 0 ) .

### Page 52

SERVICE BULLETIN 601R- - -30- - -031
Page 51 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
I . J o b C l o s e --- O u t
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Polish the leading edge at the area of the installation of the thermal switches
(AMM 57- - - 41- - - 01- - - 140- - - 803).
For all Aircraft
(3) Install the outboard leading edge anti- - -ice wing ducts
(Refer to AMM 30- - - 11- - - 41- - - 400- - - 801).
(4) Install the access panel 630KZ and 630LZ
(Refer to AMM 30- - - 11- - - 41- - - 400- - - 801).
(5) Install the outboard leading edge assembly 630KL
(Refer to AMM 57- - - 41- - - 01- - - 400- - - 806).
(6) Install center leading edge assembly 630JL
(Refer to AMM 57- - - 41- - - 01- - - 400- - - 804).
(7) Install the inboard leading edge assembly 620JL
(Refer to AMM 57- - - 41- - - 01- - - 400- - - 803).
(8) Install the right forward wing- - -to- - -fuselage fairing 192BB
(Refer to AMM 53- - - 82- - - 01- - - 400- - - 803).
(9) Remove the tags and close the circuit breakers that follow:
For all Aircraft
CB PANEL CB NO. NAME ZONE
C B P --- 1 F10 1 4 t hS TB / A I RS O VL 221
C B P --- 1 G2 A/ICE AUTO 1 221
C B P --- 1 G9 WING INSP 221
C B P --- 1 M2 ENG IGN A 221
C B P --- 1 M3 ENG IGN B 221
C B P --- 2 F10 1 4 t hS TB / A I RS O VR 221
C B P --- 2 G2 A/ICE AUTO 2 222
C B P --- 2 N5 A/ICE MAN 2 222

### Page 53

SERVICE BULLETIN 601R- - -30- - -031
Page 52 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CB PANEL ZONE NAMECB NO.
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 2 Q5 EICAS DCU 2 CH B 222
C B P --- 3 B1 B/LEAK CONT L 221
C B P --- 3 B2 B/LEAK CONT R 221
C B P --- 4 B2 BLEED LEAK TEST 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311
(10) Do the connector integrity after a disconnect and re- - -connection
(Refer to AMM 20- - - 10- - - 00- - - 910- - - 803).
(11) Do the self- - -test of the anti- - -ice duct system
(Refer to AMM 30- - - 11- - - 00- - - 740- - - 801).
(12) Do the operational test of the WING A/ICE ducts
(Refer to AMM 30- - - 11- - - 00- - - 790- - - 801 or AMM 30- - - 11- - - 00- - - 790- - - 802).
(13) Do the operational test of the bleed- - -air leak detection system
(Refer to AMM 36- - - 21- - - 00- - - 710- - - 801).
(14) Do the operational test of the wing inspection lights
(Refer to AMM 33- - - 43- - - 00- - - 710- - - 801).
(15) Do the functional test of the backup sufficient- - -heat switches
(Refer to AMM 30- - - 12- - - 17- - - 720- - - 801).

### Page 54

SERVICE BULLETIN 601R- - -30- - -031
Page 53 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
(16) When PART C of this service bulletin is completed, add the weight and
balance data shown in paragraph 1.I. of this service bulletin to the Weight and
Balance Manual. Under ‘Description of Change’ enter “Service Bulletin
601R- - - 30- - - 031, Revision D, PART C, incorporated.”
(17) When PART C of this service bulletin is completed, make this entry in the
applicable logbook(s): “ Service Bulletin 601R- - - 30- - - 031, Revision D, Ice and
R a i n P r o t e c t i o n --- W i n g A n t i --- I c i n g S y s t e m --- I n s t a l l a t i o n o f L o w H e a t
Detection- - -Switches on the Leading Edge, PART C, incorporated.”

### Page 55

SERVICE BULLETIN 601R- - -30- - -031
Page 54 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
PART D - - - Installation of the Wing A/ICE box assembly on the Left Side of the Main
A v i o n i c s --- C o m p a r t m e n t
J . J o b S e t --- U p
Reference Information
REFERENCE DESIGNATION
A M M 1 1 --- 3 0 --- 0 0 --- 4 0 0 --- 8 0 1Installation of the Adhesive- - -Backed Label
A M M 2 0 --- 1 0 --- 0 0 --- 9 1 0 --- 8 0 3Connector Integrity After a Disconnect and
Re- - -connection
A M M 2 0 --- 2 1 --- 0 0 --- 9 1 0 --- 8 0 1T orque Procedures for Threaded Fasteners
A M M 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 Remove Electrical Power to the Aircraft
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1 Electrical/Electronic Safety Precautions
A M M 2 5 --- 2 1 --- 0 1 --- 0 0 0 --- 8 0 1 Removal of the Passenger Seat
A M M 2 5 --- 2 1 --- 0 1 --- 4 0 0 --- 8 0 1 Installation of the Passenger Seat
A M M 2 5 --- 2 5 --- 0 1 --- 0 0 0 --- 8 0 1 Removal of the T extile Floor Covering
A M M 2 5 --- 2 5 --- 0 1 --- 4 0 0 --- 8 0 1 Installation of the T extile Floor Covering
A M M 3 1 --- 4 1 --- 0 4 --- 0 0 0 --- 8 0 1 Removal of the DCU
A M M 3 1 --- 4 1 --- 0 4 --- 4 0 0 --- 8 0 1 Installation of the DCU
A M M 3 1 --- 4 1 --- 0 4 --- 7 1 0 --- 8 0 1 Operational T est of the DCU
A M M 3 4 --- 2 1 --- 0 1 --- 0 0 0 --- 8 0 1 Removal of the AHC
A M M 3 4 --- 2 1 --- 0 1 --- 4 0 0 --- 8 0 1 Installation of the AHC
A M M 3 4 --- 2 1 --- 0 1 --- 7 1 0 --- 8 0 1 Operational T est of the AHC
A M M 3 4 --- 5 8 --- 0 1 --- 0 0 0 --- 8 0 1Removal of the Global Positioning System
Sensor Unit
A M M 3 4 --- 5 8 --- 0 1 --- 4 0 0 --- 8 0 1 Installation of the GPSSU
A M M 3 4 --- 5 8 --- 0 1 --- 7 0 0 --- 8 0 1Operational T est of the Global Positioning
System Sensor Unit
A M M 5 1 --- 8 0 --- 0 0 --- 1 0 0 --- 8 0 2Surface Preparation for Electrical Bonding

### Page 56

SERVICE BULLETIN 601R- - -30- - -031
Page 55 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
REFERENCE DESIGNATION
A M M 5 1 --- 8 0 --- 0 0 --- 7 6 0 --- 8 0 2 Electrical Bonding Resistance Values
A M M 5 3 --- 0 1 --- 0 1 --- 0 0 0 --- 8 0 2Removal of the Passenger Compartment Floor
Panels
A M M 5 3 --- 0 1 --- 0 1 --- 4 0 0 --- 8 0 2Installation of the Passenger Compartment
Floor Panels
A M M 5 3 --- 8 2 --- 0 1 --- 0 0 0 --- 8 0 3R e m o v a l o f t h e L e f t F o r w a r d W i n g --- t o --- F u s e -
lage Fairing
A M M 5 3 --- 8 2 --- 0 1 --- 4 0 0 --- 8 0 3 Installation of the Left Forward Wing- - -to
Fuselage Fairing
E S P M 2 0 --- 1 1 --- 0 0 Wire Stripping and Wire/Cable Damage Repair
Maintenance Practices
E S P M 2 0 --- 1 2 --- 0 0 Wiring - - - Removal/Installation
E S P M 2 0 --- 1 2 --- 0 1 Electrical Wiring - - - Continuity T esting
E S P M 2 0 --- 1 7 --- 1 0 Electrical Connectors - - - Maintenance Practices
E S P M 2 0 --- 2 0 --- 0 0 T erminal Lugs - - - Removal/Installation
E S P M 2 0 --- 2 3 --- 0 0 Circuit Breakers - - - Removal/Installation
S R M 5 1 --- 2 1 --- 1 1 Corrosion Prevention Procedures
S R M 5 1 --- 2 1 --- 1 6 Finish Codes
S R M 5 1 --- 2 5 --- 0 6 Fluid- - -Resistant (FR) Epoxy Primer
S R M 5 1 --- 2 5 --- 1 6 Fluid- - -Resistant (FR) Polyurethane T opcoat
S R M 5 1 --- 2 6 --- 0 0 Cleaning
S R M 5 1 --- 4 1 --- 0 4 T orque Procedures - - - Bolts and Screws
S R M 5 1 --- 4 2 --- 0 6 Solid Rivets
S R M 5 1 --- 4 5 --- 0 0 Nut Plates (Anchor Nuts)- - -General

### Page 57

SERVICE BULLETIN 601R- - -30- - -031
Page 56 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
T olerance Information
Linear T olerances Angular T olerance
0.XX in. (0.X mm) 0.X in. (X mm)
/ 0° 30”+/- - - 0.03 in. +/--- 0.1 in. +/--- 0° 30”
+ / --- 0 . 8 m m + / --- 2 m m
NOTE: The tolerances above apply to the dimensions given in this service
bulletin except if specified differently.
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT . IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(1) Obey all the electrical/electronic safety precautions
(Refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(2) Remove electrical power to the aircraft (Refer to AMM 24- - - 00- - - 00- - - 861- - - 802).
(3) Open, safety, and tag the circuit breakers that follow:
For Aircraft with the third DCU option (CR31 - - -310 or CR31 - - -001)
CB PANEL CB NO. NAME ZONE
C B P --- 2 K6 EICAS DCU 3 CH A 222
C B P --- 2 K7 EICAS DCU 3 CH B 222
For Aircraft with the Global Positioning System (GPS) Option (CR34 - - -352 or
CR34 - - -350)
CB PANEL CB NO. NAME ZONE
C B P --- 1 H13 GPS 1 221

### Page 58

SERVICE BULLETIN 601R- - -30- - -031
Page 57 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For Aircraft with the Attitude and Heading Reference System (AHRS) Option
(TS34 - - -320)
CB PANEL CB NO. NAME ZONE
C B P --- 2 H14 AHRS 2 222
C B P --- 2 H15 AHRS FAN 2 222
C B P --- 4 D8 AHRS 1 222
C B P --- 4 D9 AHRS FAN 1 222
For Aircraft 7003 thru 7609 with the Attitude and Heading Reference System
(AHRS) Option (TS34 - - -320)
CB PANEL CB NO. NAME ZONE
C B P --- 5 A8 ATT/HDG 1 311
C B P --- 5 A9 ATT/HDG 2 311
C B P --- 5 A7 STBY PWR CONT 311
For Aircraft 7610 thru 7990 and 8000 thru 8101 with the Attitude and Heading
Reference System (AHRS) Option (TS34 - - -320)
CB PANEL CB NO. NAME ZONE
C B P --- 1 N4 ATT/HDG 1 221
C B P --- 1 N5 ATT/HDG 2 221
For all Aircraft
CB PANEL CB NO. NAME ZONE
C B P --- 1 F10 1 4 t hS TB / A I RS O VL 221
C B P --- 1 G2 A/ICE AUTO 1 221
C B P --- 1 G9 WING INSP 221
C B P --- 1 M2 ENG IGN A 221
C B P --- 1 M3 ENG IGN B 221
C B P --- 2 F10 1 4 t hS TB / A I RS O VR 221

### Page 59

SERVICE BULLETIN 601R- - -30- - -031
Page 58 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
CB PANEL ZONE NAMECB NO.
C B P --- 2 G2 A/ICE AUTO 2 222
C B P --- 2 N5 A/ICE MAN 2 222
C B P --- 2 Q2 EICAS DCU 1 CH A 222
C B P --- 2 Q3 EICAS DCU 1 CH B 222
C B P --- 2 Q4 EICAS DCU 2 CH A 222
C B P --- 2 Q5 EICAS DCU 2 CH B 222
C B P --- 3 B1 B/LEAK CONT L 221
C B P --- 3 B2 B/LEAK CONT R 221
C B P --- 4 B2 BLEED LEAK TEST 222
C B P --- 4 B4 A/ICE MAN 1 222
C B P --- 4 C10 EICAS DCU 1 CH A 222
C B P --- 4 C11 EICAS DCU 1 CH B 222
C B P --- 5 A6 DCU 2/3 311
(4) On the left side, remove the passenger seats from FS349.00 to FS424.00
(Refer to AMM 25- - - 21- - - 01- - - 000- - - 801).
(5) On the left side, remove the floor covering between the FS349.00 to FS424.00
(Refer to AMM 25- - - 25- - - 01- - - 000- - - 801).
(6) Remove the inboard floor panels (241CLF and 251CLF)
(Refer to AMM 53- - - 01- - - 01- - - 000- - - 802).
(7) Remove the left forward wing- - -to- - -fuselage fairing 191BB
(Refer to AMM 53- - - 82- - - 01- - - 000- - - 803).
(8) Open the main avionics- - -compartment door.
(9) Remove DCU 1 (Refer to AMM 31- - - 41- - - 04- - - 000- - - 801).

### Page 60

SERVICE BULLETIN 601R- - -30- - -031
Page 59 of 126
SB 601R- - - 30- - - 031May 15/2009
Revision D, Feb 03/2010
For Aircraft with the Global Positioning System (GPS) Option (CR34 - - -352 or
CR34 - - -350)
(10) Remove the Global Positioning System Sensor Unit (GPSSU 1) (Refer to AMM
34- - - 58- - - 01- - - 000- - - 801).
For Aircraft with the Attitude and Heading Reference System (AHRS) Option
(TS34 - - -320)
(11) Remove the Attitude and Heading Computer (AHC 1)
(Refer to AMM 34- - - 21- - - 01- - - 000- - - 801).

The text continues at https://openairdocs.org/service-documents/bombardier/601r-30-031/file/ebfa5a265bbd.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
