# Bombardier Service Bulletin 601R-32-109

Copy: Revision A ("U.S. DOT/FAA - Service Bulletin 1072-601R-32-109A"), 18 pages: PDF https://openairdocs.org/files/sha256/ff/0c/ff0c77815ea1b84cce877ecee2c56d8a34a7a16629b8642db7abee1ac8017ff1; text https://openairdocs.org/service-documents/bombardier/601r-32-109/file/ff0c77815ea1.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2012-1072; AD 2013-09-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 601R-32-109
- Latest revision known: 601R-32-109, Revision A, dated February 26, 2013 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/601r-32-109

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2013-09-07](https://openairdocs.org/ad/2013-09-07.md), effective Jun 18, 2013: Revision A

## Text (18 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2012-1072; AD 2013-09-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SB 601R- - - 32- - - 109
Page 1 of 1
Feb 26/2013
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CL- - -600- - -2B19 Canadair Regional Jet (CRJ) Aircraft
SERVICE BULLETIN 601R - - -32 - - -109
SUBJECT : Landing Gear - - - Extension and Retraction, Main Gear - - - Installation of
Stopper Plates to Prevent Incorrect Installations of MLG Uplock
Assemblies
This page transmits:
Revision A of Service Bulletin 601R- - - 32- - - 109,
pages 1 thru 16, dated Feb 26/2013
The changes in this revision have no effect on aircraft that have
incorporated a previous issue of this service bulletin.
Reason:
Revised Planning Information, paragraph 1.G. Material - - - Price and Availability, to:
Add supercession information for parts that are listed.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:
Discard the copy of Service Bulletin 601R- - - 32- - - 109, Initial Issue, dated May 29/ 2012.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated May 29/2012.
1

### Page 2

SB 601R−32−109
Page 1 of 16
May 29/2012
Revision A, Feb 26/2013
SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER COMMERCIAL AIRCRAFT
HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR
ATA SYSTEM: 32−32 NUMBER: 601R−32−109
SUBJECT:  Landing Gear − Extension and Retraction, Main Gear − Installation of
Stopper Plates to Prevent Incorrect Installations of MLG Uplock
Assemblies
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
Service: CL−600−2B19 aircraft with serial numbers 7003 thru 7067,
7069 thru 7990 and 8000 thru 8999.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Service Bulletins. Before you do this service
bulletin, examine all Supplement Type Certificates (STCs),
Supplemental Type Approvals (STAs) or equivalent action changes
to make sure you can complete this bulletin.
B. Reason
(1) Condition
It is possible to have an incorrect installation of the MLG uplock assembly
when the upper bolt is installed through the structure only and not through the
MLG uplock assembly. This could prevent the extension of the MLG.

### Page 3

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 2 of 16
May 29/2012
Revision A, Feb 26/2013
(2) Evidence
Incorrect installation of the MLG uplock assembly was found in-service.
(3) Objective/Benefit
This service bulletin gives the instructions to install a new stopper plate
adjacent to the MLG uplock assembly. This will prevent incorrect installation of
the MLG uplock assembly.
C. Description
Lockpins are installed in the NLG and MLG. The circuit breakers are opened and
tagged. The MLG wheel bins are removed.
New stopper plates are installed adjacent to the MLG uplock assembly.
A test of the manual-release-system is done. The MLG wheel bins are installed.
The circuit breakers are closed.  An operational test of the MLG overheat detection
and warning system is done.
D. Compliance
Recommended Service Bulletin.
Bombardier recommends that this service bulletin be done at no more than 5500
flight hours from the release date of this service bulletin, unless otherwise directed
by the airworthiness authority of the operator.
For Business/Corporate operators (i.e. operators who do not have a commercial
airline operation), Bombardier recommends that this service bulletin be done no
later than 48 months from the release date of this service bulletin, unless otherwise
directed by the airworthiness authority of the operator.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93−Q−02.

### Page 4

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 3 of 16
May 29/2012
Revision A, Feb 26/2013
F . Manpower
The man-hours given below are estimates for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
 Administrative functions such as planning, liaising, familiarization, and report writing.
 Non-productive elapsed time such as rest time, having meals, and crew shift changes.
 Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
 Preparation for modification (unless specified in the Accomplishment Instructions)
such as cleaning and getting parts, tools, consumables, and ground equipment.
 Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
 All other activities that are not considered by Bombardier as directly related to the
accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services
representative for a quote. Contact the Fleet Services Team
through the CRC at 514-855-8500 or e-mail at
thd.crj@aero.bombardier.com.
It will take an estimated 5.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 1.0
(2)  Procedure 2.5
(3)  Test 0.5
(4)  Job Close-Out 1.0

### Page 5

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 4 of 16
May 29/2012
Revision A, Feb 26/2013
G. Material − Price and Availability
There are no kits for this service bulletin.
(1) There are no kits for this service bulletin. The parts in the table that follows are
necessary to do this service bulletin and are available from Bombardier
Commercial Aircraft.
PART NUMBER NAME QUANTITY
B0206002AG5−6 /C0001 Hi-Lite 5/32 Dia. 4
B0203013−08 /C0001 Nut 4
/C0001 For allowable superceded parts refer to the Parts Supercession Cross
     References Lists at www.iflybombardier.com under
     Resources−Engineering Documents.
(2) Please send a purchase order to the address below to schedule part delivery:
Bombardier
Service Bulletin Kit Support Team
123 Garratt Blvd, N42−24
Toronto, Ontario
Canada  M3K 1Y5
Fax:     416-375-3060
Phone: 416-375-3920
Email: sbkits@aero.bombardier.com
Please contact the Service Bulletin Kit Support Team at the address above for
terms and conditions.
(3) Refer to paragraph 3.B. for a list of consumables for this service bulletin.
For Business/Corporate Operators
All Business/Corporate operators (i.e. operators who do not have a commercial
airline operation) refer to SB 800-00-004 for commercial policy coverage and
logistics/planning arrangements (refer to www.cic.bombardier.com/technical
library/service bulletins/challenger/850/SB 800-00-004).
To place an order for parts or kits, please call Bombardier Parts Logistics at
514-855-2999 or 1-866-538-1247.
H. Tooling − Price and Availability
There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of
special tools and equipment for this service bulletin.

### Page 6

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 5 of 16
May 29/2012
Revision A, Feb 26/2013
I. Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
K. References
Restriction and/or Special Instruction (RSI) C−A279, Issue NC
Modification Summary TC601R18206, Revision A
Refer to the SB introduction document for definition or explanation of Service
Bulletin content.
Aircraft Maintenance Manual (AMM)
Structural Repair Manual (SRM)
For Bombardier reference only: PCA 6637
L. Other Publications Affected
Aircraft Maintenance Manual (AMM)
M. Relationship Chart
Not applicable.

### Page 7

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 6 of 16
May 29/2012
Revision A, Feb 26/2013
2. ACCOMPLISHMENT INSTRUCTIONS
Reference Information
REFERENCE DESIGNATION
AMM 10−11−00−400−801 Installation of the Nose Landing Gear Lockpin
AMM 10−11−00−400−802 Installation of the Main Landing Gear Lockpins
AMM 12−00−06−863−804 Release Hydraulic Pressure − System No. 3
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 26−14−00−710−801 Operational Test of the MLG Overheat Detection
and Warning System
AMM 32−22−01−980−801 Open and Isolate the Nose-Landing-Gear
Forward Doors
AMM 32−32−05−400−801 Installation of the MLG Uplock Assembly
AMM 32−34−00−710−801 Operational Test of the Landing Gear Manual-
Release-System
AMM 53−83−01−000−801 Removal of the MLG Wheel Bin
AMM 53−83−01−400−801 Installation of the MLG Wheel Bin
SRM 51−21−11 Corrosion Prevention Procedures
SRM 51−23−00 Pressure, Environmental, Fuel Tank and Firewall
Sealing
SRM 51−24−36 Cutting of Sheet Metal
SRM 51−25−06 Fluid−Resistant (FR) Epoxy Primer
SRM 51−25−16 Fluid−Resistant (FR) Polyurethane Topcoat
SRM 51−26−00 Cleaning
SRM 51−40−11 How to Prepare Fastener Holes
SRM 51−42−21 Hi-Lite Fasteners

### Page 8

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 7 of 16
May 29/2012
Revision A, Feb 26/2013
Tolerance Information
Linear Tolerances Angular Tolerance
X.XX in. (X.X mm) X.X in. (X mm)
+/−0° 30"+/− 0.03 in. +/− 0.1 in.
+/− 0.8 mm +/− 3 mm
NOTE: The tolerances above apply to the dimensions given in this service
bulletin, except when specified differently.
A. Job Set-Up
(1) Make sure that the NLG and MLG lockpins are installed
(refer to AMM 10−11−00−400−801 and AMM 10−11−00−400−802).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24−00−00−910−801).
(3) Open, safety, and tag the circuit breaker that follows:
CB PANEL CB NO. NAME ZONE
CBP−2 N9 MLG BAY OVHT DET 222
(4) Remove the MLG wheel bins (refer to AMM 53−83−01−000−801).
B. Procedure
NOTE: This procedure is applicable to the left and the right sides. The procedure
that follows is written for the left side. The differences are given.
Refer to Figure 2 .
(1) Use 2024−T3 aluminum alloy of 0.125 in. (3.18 mm) thick to make the
stopper plate (1) to the temporary dimensions.
Refer to Figure 3 .
(2) Install the stopper plate (1) on the aft uplock frame (3) as follows:
(a) Make sure that the MLG uplock assembly (4) is correctly installed with
its two attachment bolts (refer to AMM 32−32−05−400−801).
NOTE: The MLG uplock assembly (4) is correctly installed when you have
a maximum distance of 0.83 in. (21.1 mm) between the inboard
edge of the aft uplock frame (3) and the inboard edge of the cutout
in the MLG uplock assembly (4).

### Page 9

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 8 of 16
May 29/2012
Revision A, Feb 26/2013
CAUTION: BEFORE THE DRILLING PROCEDURES IT IS NECESSARY TO PUT
PROTECTION ON THE MLG UPLOCK ASSEMBLY . IF YOU DO NOT
DO THIS, YOU CAN HAVE CONTAMINATION IN THE MLG UPLOCK
ASSEMBLY THAT COULD PREVENT CORRECT OPERATION.
(b) Make sure that you put sufficient protection on the MLG uplock
assembly (4) to prevent contamination during installation of the stopper
plate (1).
(c) Clean the work area with solvent (refer to SRM 51−26−00).
(d) Temporarily install the stopper plate (1) on the aft uplock frame (3) as
follows:
NOTE: Make sure to keep a minimum edge distance of 1.5D.
NOTE: Make sure to keep a pitch distance between 3.5D and 6.5D.
1 On the aft side of the aft uplock frame, draw a horizontal line at
1.94 in. (49.3 mm) from the lower edge of the pocket that contains
the upper attachment hole of the MLG uplock assembly (4) (refer
to view C).
2 Draw a vertical line at 0.43 in. (10.9 mm) from the inboard edge of
the pocket that contains the upper attachment hole of the MLG
uplock assembly (4) (refer to view C).
3 Draw a vertical line at 1.13 in. (28.7 mm) from the inboard edge of
the aft uplock frame (3) in the pocket that contains the upper
attachment hole of the MLG uplock assembly (4) (refer to view C).
4 At the intersection of the two lines, drill two holes to a diameter of
0.098 in. (2.49 mm) with a #40 drill.
5 Temporarily install the stopper plate (1) on the forward side of the
aft uplock frame (3).  Make sure that the inboard edge of the
stopper plate (1) is flush with the inboard edge of the aft uplock
frame (3).  Make sure that the lower edge of the stopper plate (1) is
against the MLG uplock assembly (4).
6 With a #40 drill, backdrill two holes from the aft uplock frame (3) to
the stopper plate (1) to a diameter of 0.098 in. (2.49 mm).

### Page 10

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 9 of 16
May 29/2012
Revision A, Feb 26/2013
7 Open the holes in the stopper plate (1) and the aft uplock frame (3)
to a final diameter of 0.159 to 0.162 in. (4.04 to 4.11 mm)(refer to
SRM 51−42−21).
NOTE: It is also permitted to have a final diameter of 0.164 to 0.167
in. (4.17 to 4.24 mm) in the stopper plate (1) and the aft
uplock frame (3) (refer to SRM 51−42−21).
8 Remove the stopper plate (1) from the aft uplock frame (3).
Refer to Figure 2 .
9 Remove 0.09 in. (2.3 mm) of material from the lower area of the
stopper plate to get to the final dimensions (refer to SRM
51−24−36).
NOTE: Make sure that the lower edge of the stopper plate (1) has
the same contour than the MLG uplock assembly (4).
Refer to Figure 3 .
10 Remove the burrs and sharp edges.
11 Apply chemical conversion coating on the bare metal areas (refer
to SRM 51−21−11).
12 Apply a layer of fluid-resistant primer on the stopper plate (1) (refer
to SRM 51−25−06).
13 Apply a layer of grey fluid-resistant topcoat on the stopper plate (1)
(refer to SRM 51−25−16).
14 With an indelible ink pen or equivalent, identify the stopper plate
(1) as K601R31058−20.
(e) Clean the work area with solvent (refer to SRM 51−26−00).
(f) Do the final installation of the stopper plate (1) as follows:
1 Apply faying surface sealant on the stopper plate (1)
(refer to SRM 51−23−00).

### Page 11

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 10 of 16
May 29/2012
Revision A, Feb 26/2013
2 Install the stopper plate (1) on the forward side of the aft uplock
frame (3) with hi-lites (5) wet with sealant, with their heads on the
forward side, and the collars (6) (refer to SRM 51−23−00 and SRM
51−42−21).
3 Apply a brush coat of sealant on the collars (6)
(refer to SRM 51−23−00).
(g) Make sure that there is a clearance of 0.09 in. (2.3 mm) between the
contours of the stopper plate (1) and of the MLG uplock assembly (4).
(h) Apply a layer of fluid-resistant primer on the head of the hi-lites (5) (refer
to SRM 51−25−06).
(i) Apply a layer of grey fluid-resistant topcoat on the head of the hi-lites
(5)(refer to SRM 51−25−16).
(j) Apply corrosion inhibiting compound on the aft uplock frame (3)
(refer to SRM 51−21−11).

### Page 12

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 11 of 16
May 29/2012
Revision A, Feb 26/2013
Dimensions of the Stopper Plate
Figure 2 
1.50 in.
(38.1 mm)
0.25 in. (6.4 mm)
(3 PLACES)
RADIUS
0.75 in.
(19.1 mm)
0.10 in. (2.5 mm)
(2 PLACES)
RADIUS 0.125 in.
(3.18 mm)
rsb601r32109_003.dg, sd, 11mai12
LEGEND
1. Stopper plate
    K601R31058−20.
1.50 in.
(38.1 mm)
0.25 in. (6.4 mm)
(3 PLACES)
RADIUS
0.75 in.
(19.1 mm)
0.10 in. (2.5 mm)
(2 PLACES)
RADIUS 0.125 in.
(3.18 mm)
1
TEMPORARY DIMENSIONS
FINAL DIMENSIONS
0.91 in.
(23.1 mm)
1.00 in.
(25.4 mm)
STOPPER
(REF) 1.09 in.(27.7mm)
NOTE
0.09 in. (2.3 mm) of material is removed from the
 lower edge of the stopper plate (1) before final installation.
1.00 in.
(25.4 mm)

### Page 13

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 12 of 16
May 29/2012
Revision A, Feb 26/2013
Installation of the Stopper Plate
Figure 3 
rsb601r32109_001.dg, sd, 11mai12
LEGEND
1. Stopper plate
    K601R31058−20.
2. Forward uplock frame.
3. Aft upock frame.
4. MLG uplock assembly.
5. Hi−lite
    B0206002AG5−6.
6. Collar
    B0203013−08.
FINAL INSTALLATION
TEMPORARY INSTALLATION 1.   Left side shown,right side opposite.
NOTES
1.13 in.
(28.7 mm)
(REF)
1.94 in.
(49.3 mm)
(REF)
0.43 in.
(10.9 mm)
(REF)
3
0.09 in.
(2.3 mm)
1
3
4
4
2
3
1
6
5
4
0.83 in.
(21.1 mm)
MAXIMUM
0.99 in.
(25.1mm)
(REF)
4
STOPPER
(REF)
STOPPER
(REF)
Clearance of 0.09 in. (2.3 mm)
between the contours of the
stopper plate (1) and of the
MLG uplock assembly (4).

### Page 14

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 13 of 16
May 29/2012
Revision A, Feb 26/2013
MLG Uplock Latch Positions
Figure 4 
VIEW LOOKING FORWARD
rsb601r32109_002.dg, sd, 5avril12
UPLOCK LATCH
IN LOCKED
POSITION
UPLOCK LATCH
IN UNLOCKED
POSITION
1
LEGEND
1. MLG uplock assembly.

### Page 15

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 14 of 16
May 29/2012
Revision A, Feb 26/2013
C. Job Close-Out
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Remove the protection that was put on the MLG uplock assembly.
(3) Do the manual test of the MLG Uplock assemblies as follows:
NOTE: You can do the operational test of the landing gear
manual-release-system (refer to AMM 32−34−00−710−801) as
an alternative to the manual test of the MLG uplock assemblies
given below.
(a) Open and isolate the Nose-Landing-Gear (NLG) forward doors (refer to
AMM 32−22−01−980−801).
(b) Release the pressure from hydraulic system No. 3
(refer to AMM 12−00−06−863−804).
(c) In the MLG bay, manually move the two uplock latches into the locked
position (refer to Figure 4 ).
(d) In the cockpit, pull the handle of the landing-gear manual-release.
(e) In the MLG bay, make sure that the two uplock latches are in the
unlocked position (refer to Figure 4 ).
(f) Push the button and stow the handle of the landing-gear
manual-release.
(4) Install the MLG wheel bins (refer to AMM 53−83−01−400−801).
(5) Remove the tag and close the circuit breaker that follows:
CB PANEL CB NO. NAME ZONE
CBP−2 N9 MLG BAY OVHT DET 222
(6) Do the operational test of the MLG overheat detection and warning system
(refer to AMM 26−14−00−710−801).
(7) When this service bulletin is completed, make this entry in the applicable
logbooks: /quoteblleftService Bulletin 601R−32−109, Revision A, Landing Gear −
Extension and Retraction, Landing Gear − Installation of Stopper Plates to
Prevent Incorrect Installations of MLG Uplock Assemblies, incorporated."

### Page 16

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 15 of 16
May 29/2012
Revision A, Feb 26/2013
3. MATERIAL INFORMATION
A. Kit Information
None.
B. Consumable Information
The materials that follow are necessary to do this service bulletin. You can order
them from Bombardier or purchased directly from industry sources. If the material
is ordered from Bombardier, there can be some lead time because of the shelf life
of the material.
CONSUMABLES
SPECIFICATION QUANTITY NAME REFERENCE
MIL−PRF−81733,
Type IV
As
necessary
Sealant, faying and
wet-installation
/C0019
MIL−C−81706
Class 1A, Form II or
III, Method B or C
As
necessary
Chemical conversion
compound
05−025 /C0001
BAMS 565−001 As
necessary
Primer, epoxy,
fluid-resistant
13−007 /C0001
BAMS 565−006
Type I
As
necessary
Corrosion inhibiting
compound
15−004 /C0001
BAMS 565−009 As
necessary
Polyurethane paint,
fluid-resistant enamel
for aircraft exterior
(color grey 16473
per FED−STD−595)
16−011 /C0001
AMS QQ−A−250/5
(AL 2024−T3)
2 /C0004 Aluminum sheet
/C0001  Refer to AMM 51−31−00−990−801
/C0019  Refer to SRM 51−32−00
/C0004  (Length x Height x Thickness) = (2.0 in. (51 mm) x 1.5 in. (38 mm) x 0.125 in.
(3.175 mm))
NOTE: To complete this list of consumables, refer to the different tasks that are
given as references in this service bulletin.

### Page 17

SERVICE BULLETIN  601R−32−109
SB 601R−32−109
Page 16 of 16
May 29/2012
Revision A, Feb 26/2013
C. Special Tools and Equipment
There are no special tools and equipment for this service bulletin.
NOTE: To complete this list of special tools and equipment, refer to the different
tasks that are given as references in this service bulletin.
D. Disposition of Parts
Not applicable.
1

### Page 18

THANK YOU FOR ANSWERING THIS EVALUATION FORM 
UPON COMPLETION OF THIS EVALUATION FORM/COMPLIANCE SHEET, FAX TO 
450-476-7300 or email to CRJ_SB_Evaluation_Form@aero.bombardier.com 
 
SERVICE BULLETIN EVALUATION FORM/COMPLIANCE SHEET 
(YOUR IDEAS WILL HELP US PROVIDE BETTER BULLETINS) 
SERVICE BULLETIN :  ISSUE:  
 
 STRONGLY DISAGREE NEUTRAL AGREE STRONGLY 
 DISAGREE    AGREE 
 Instructions to do the Service Bulletin 
were accurate. 
Comments: 
     
 Illustration(s), figure(s), picture(s) and/or 
kit drawing(s) were helpful to carry out 
instructions. 
 Comments: 
     
 If a parts kit was required, did the kit 
contents received agree with the 
contents listed in the bulletin? 
 Comments: 
 
     
 Aircraft hands-on work was 
accomplished in estimated time. 
      Comments: 
     
 Overall, I was satisfied with this Service 
Bulletin. 
 Comments: 
     
PLEASE SUPPLY US WITH THE FOLLOWING DATA AND FAX TO (450) 476-7300: 
OPERATOR:  NAME (Please print)  
SERVICE CENTER:  TELEPHONE:  
AIRCRAFT SERIAL NO.:  FACSIMILE:  
DATE  OF SB 
INCORPOARTION

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.