# Bombardier Service Bulletin 601R-32-110: U.S. DOT/FAA - Service Bulletin 601R-32-110

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2014-0489; AD 2014-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Service Bulletin 601R-32-110](https://openairdocs.org/service-documents/bombardier/601r-32-110.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin 601R-32-110
- Pages: 20
- PDF: https://openairdocs.org/files/sha256/b5/91/b591069ba044acc502d5da489e76fcaa1acb4798205a5d1ec2668784e5e4a70e
- Page: https://openairdocs.org/service-documents/bombardier/601r-32-110/file/b591069ba044

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BOMBARDIER
SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT,
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER HAS INCLUDED THE NEW
OPERATOR ON THE DISTRIBUTION LIST.
ATA SYSTEM: 32-43  NUMBER: 601R-32-110
SUBJECT: Landing Gear - Brake System - Installation of a Bracket to Prevent
Connection of the Hydraulic Lines of the Brakes to the Incorrect Swivel
Assembly Ports
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
Service:  CL-600-2B19 aircraft serial numbers 7003 thru 7067, 7069
thru 7990, and 8000 thru 8999.
Production:  There is no production effectivity at this time.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier service bulletins. Before you do this service
bulletin, examine all Supplemental Type Certificates (STCs), and
Supplemental Type Approvals (STAs) or equivalent action changes
to make sure you can complete this service bulletin.
Dec 19/2013  SB 601R-32-110
Page 1 of 16

### Page 2 (OCR)

SERVICE BULLETIN 601R-32-110
B. Reason
(1) Condition
The inboard and the outboard hydraulic lines of the brakes can be connected
to the incorrect port on the swivel assembly of the Main Landing Gear (MLG).
The incorrect installation of the brake hydraulic lines can cause the brakes
and/or the anti-skid system to operate incorrectly.
(2) Evidence
During in-service maintenance, some inboard and outboard hydraulic lines of
the brakes were found connected to the incorrect ports on the swivel
assembly of the MLG.
(3) Objective/Benefit
This service bulletin gives the procedure to install a new bracket on the left
and the right lower aft wing-planks. The bracket will prevent the hydraulic
brake lines to be connected to the incorrect ports on the swivel assembly of
the MLG.
C. Description
The landing gear lockpins are installed. If necessary, the aircraft is put on jacks.
The swivel assembly and the inboard brake hydraulic line installation is verified and
changed if necessary. A bracket is installed on the left and the right lower aft
wing-planks. If the aircraft was put on jacks, the aircraft is removed from the jacks.
The operational test of the brake system is done.
D. Compliance
Recommended service bulletin.
Bombardier recommends that this service bulletin be done at no more than 6600
flight hours from the release date on this service bulletin or before Mar 29/2017,
whichever comes first, unless otherwise directed by the airworthiness authority of
the operator.
For Business/Corporate operators (i.e. operators who do not have a commercial
airline operation), Bombardier recommends that this service bulletin be done no
later than Mar 29/2017.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93-Q-02.
Dec 19/2013  SB 601R-32-110
Page 2 of 16

### Page 3 (OCR)

SERVICE BULLETIN 601R-32-110
F. Manpower
The man-hours given below are estimates for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
-Administrative functions such as planning, liaising, familiarization, and report writing.
-Non-productive elapsed time such as rest time, having meals, and crew shift changes.
-Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
-Preparation for modification (unless specified in the Accomplishment Instructions)
such as cleaning and getting parts, tools, consumables, and ground equipment.
-Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
-All other activities that are not considered by Bombardier as directly related to the
accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services
representative for a quote. Contact the Fleet Services Team
through the CRC at 514-855-8500 or e-mail at
thd.crj@aero.bombardier.com.
It will take an estimated 7.50 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK  MAN-HOURS
(1) Job Set-Up  1.25
(2) Procedure  4.00
(3) Test  1.00
(4) Job Close-Out  1.25
Dec 19/2013  SB 601R-32-110
Page 3 of 16

### Page 4 (OCR)

SERVICE BULLETIN 601R-32-110
G. Material - Price and Availability
(1) The kits in the tables that follow are available from Bombardier.
NOTE: For a list of kit contents, refer to paragraph 3.A.
KIT NUMBER  NAME
601R32-110K1  Anti Brake Line Inversion Kit
(2) Please send a purchase order to the address below to schedule kit delivery:
Bombardier
Service Bulletin Kit Support Team
123 Garratt BIvd, N42-24
Toronto, Ontario
Canada M3K 1Y5
Fax: 416-375-3060
Phone: 416-375-3920
e-mail: sbkits@aero.bombardier.com
Please contact the Service Bulletin Kit Support Team at the address above for
terms and conditions.
(3)  The parts in the table that follows can be necessary to do this service bulletin
if kit 601 R32-110K1 is not used and are available from Bombardier.
PART NUMBER  NAME  QTY
B0206002AG6-6  Hi-Lite Pin  5
B0203013-3  Collar  5
HST111AG6-6  Hi-Lite Pin (1st oversize)  5
B0203038-3  Collar (1st oversize)  5
Dec 19/2013  SB 601R-32-110
Page 4 of 16

### Page 5 (OCR)

SERVICE BULLETIN 601R-32-110
(4) Please send a purchase order to the address below to schedule part delivery:
Bombardier
Service Bulletin Kit Support Team
123 Garratt Blvd, N42-24
Toronto, Ontario
Canada M3K 1Y5
Fax: 416-375-3060
Phone: 416-375-3920
e-mail: sbkits@aero.bombardier.com
Please contact the Service Bulletin Kit Support Team at the address above for
terms and conditions.
(5) Refer to paragraph 3.B. for a list of consumables for this service bulletin.
For Business/Corporate Operators
All Business/Corporate operators (i.e. operators who do not have a commercial
airline operation) refer to SB 800-00-004 for commercial policy coverage and
logistics/planning arrangements (refer to www.cic.bombardier.com/technical
library/service bulletins/challenger/850/SB 800-00-004).
To place an order for parts or kits, please call Bombardier Parts Logistics at
514-855-2999 or 1-866-538-1247.
H. Tooling - Price and Availability
There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of
special tools and equipment for this service bulletin.
Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
K. References
Refer to the SB Introduction document for definition or explanation of service
bulletin content.
Restriction and/or Special Instruction (RSI) C-A284
Modification Summary TC601R18330, Revision B
Aircraft Maintenance Manual (AMM)
Structural Repair Manual (SRM)
For Bombardier reference only: PCA 6666
Dec 19/2013  SB 601R-32-110
Page 5 of 16

### Page 6 (OCR)

SERVICE BULLETIN 601R-32-110
L. Other Publications Affected
None.
M. Relationship Chart
Not applicable.
Dec 19/2013  SB 601R-32-110
Page 6 of 16

### Page 7 (OCR)

SERVICE BULLETIN 601R-32-110
2. ACCOMPLISHMENT INSTRUCTIONS
Reference Information
REFERENCE  DESIGNATION
AMM 07-11-01-582-801  Put the Aircraft on Jacks
AMM 07-11-01-582-804  Removal of the Aircraft from Jacks
AMM 10-11-00-400-801  Installation of the Nose Landing Gear Lockpin
AMM 10-11-00-400-802  Installation of the Main Landing Gear Lockpins
AMM 32-11-20-400-801  Installation of the Upper Brake Swivel Assembly
AMM 32-43-00-710-801  Operational Test of the Brake System
SRM 51-23-00  Pressure, Environmental, Fuel Tank and Firewall
Sealing
SRM 51-25-06  Fluid-Resistant (FR) Epoxy Primer
SRM 51-25-16  Fluid-Resistant (FR) Polyurethane Topcoat
SRM 51-26-00  Cleaning
SRM 51-42-21  Hi-Lite Fasteners
Tolerance Information
Linear Tolerances  Angular Tolerance
X.XX in. (X.X mm)  X.X in. (X mm)
+/- 0.03 in.  +/- 0.1 in.  +/-0° 30"
+/- 0.8 mm  +/- 3 mm
NOTE: The tolerances above apply to the dimensions given in this service
bulletin, except when specified differently.
Dec 19/2013  SB 601R-32-110
Page 7 of 16

### Page 8 (OCR)

SERVICE BULLETIN 601R-32-110
A. Job Set-Up
(1) Make sure that the NG and MLG lockpins are installed (refer to AMM
10-11-00-400-801 and 10-11-00-400-802).
(2) If necessary, put the aircraft on jacks (refer to AMM 07-11-01-582-801).
B. Procedure
NOTE: This procedure is applicable to the left and the right sides. The procedure
that follows is written for the left side. The differences are given.
Refer to Figure 1.
(1) Make sure the forward port of the swivel assembly points down, in the
direction of the lower aft wing-plank.
(2)  Make sure that the hydraulic line of the inboard brake is connected to the
forward port of the swivel assembly.
(3)  If necessary, align the swivel assembly and connect the hydraulic line of the
inboard brake to the forward port of the swivel assembly (refer to AMM
32-11-20-400-801).
(4)  Clean the work area with solvent (refer to SRM 51-26-00).
(5) Remove and discard the Hi-Lite pins (1) and the collars (2) from the lower aft
wing-plank and the lower wing skin.
(6) Install the laminated shim (3) and the bracket (4) as follows:
NOTE: The laminated shim (3) and the bracket (4) can be made as shown in
Appendix A of this service bulletin or are available from Bombardier (kit
number 601R32-110K1).
(a) Peel the laminated shim (3) until the bracket (4) sits flat on the lower aft
wing-plank.
(b)  Temporarily secure the laminated shim (3) and the bracket (4) to the
lower att wing-plank as follows:
NOTE: A minimum edge distance of 1.5D is necessary.
Put the laminated shim (3) and the bracket (4) on the lower aft
wing-plank as follows:
Dec 19/2013  SB 601R-32-110
Page 8 of 16

### Page 9 (OCR)

SERVICE BULLETIN 601R-32-110
Make sure that the forward and aft edges of the laminated
shim (3) are aligned with the forward and aft edges of the
bracket (4).
Make sure that the inboard edge of the laminated shim (3)
and the inboard edge of the bracket (4) are aligned with the
inboard edge of the lower aft wing-plank.
Make sure there is a clearance of 0.25 in. (6.4 mm) between
the aft edge of the bracket (4) and the mounting trunnion of
the MLG, as shown on Sheet 3, View D.
Make sure that there is a minimum clearance of 0.130 in.
(3.30 mm) between the forward edge of the bracket (4) and
the fitting of the hydraulic line, as shown on Sheet 3, View D.
2  Measure the diameter of the two holes in the lower aft wing-plank
and the lower wing skin where the two Hi-Lite pins (1) were
removed.
If the diameter of one or the two holes in the lower aft wing-plank
and/or the lower wing skin is/are 0.1850 in. (4.699 mm) or more, do
as follows:
Backdrill the holes) from the lower aft wing-plank and the
lower wing skin to the laminated shim (3) and the bracket (4).
Increase the diameter of the hole(s) to 0.1981-0.2011 in.
(5.032-5.108 mm) in the lower aft wing-plank, the lower wing
skin, the laminated shim (3), and the bracket (4).
4  If the diameter of one or the two holes in the lower aft wing-plank
and/or the lower wing skin is/are less than 0.1850 in. (4.699 mm),
do as tollows:
a  Backdrill the hole(s) from the lower aft wing-plank and the
lower wing skin to the laminated shim (3) and the bracket (4).
Increase the diameter of the hole(s) to 0.1850-0.1880 in.
(4.699-4.775 mm) in the lower aft wing-plank, the lower wing
skin, the laminated shim (3), and the bracket (4).
(C)  Remove the laminated shim (3) and the bracket (4).
(d)  Remove burrs and sharp edges from the laminated shim (3) and the
bracket (4).
Dec 19/2013  SB 601R-32-110
Page 9 of 16

### Page 10 (OCR)

SERVICE BULLETIN 601R-32-110
(e) If necessary, remove burrs and sharp edges from the lower aft
wing-plank and the lower wing skin.
(f) Clean the work area with solvent (refer to SRM 51-26-00).
(g) Do the final installation of the laminated shim (3) and the bracket (4) on
the lower aft wing-plank as follows:
1 Apply faying surface sealant on the mating surface of the bracket
(4) (refer to SRM 51-23-00).
Apply faying surface sealant on the mating surface of the laminated
shim (3) (refer to SRM 51-23-00).
Install the laminated shim (3) and the bracket (4) on the lower aft
wing-plank with the Hi-Lite pins (5) wet with sealant with their heads
on the lower side and the collars (6) (refer to SRM 51-23-00 and
SRM 51-42-21).
Apply injection sealant on the area between the laminated shim (3),
the bracket (4), and the radius of the lower aft wing-plank, as
shown on Sheet 3, View C (refer to SRM 51-23-00).
5  Apply fluid-resistant primer to the head of the Hi-Lite pins (5) and
the collars (6) (refer to SRM 51-25-06).
Apply polyurethane topcoat to the head of the Hi-Lite pins (5) and
the collars (6) (refer to SRM 51-25-16).
C. Job Close-Out
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If the aircraft was put on jacks, remove the aircraft from the jacks (refer to
AMM 07-11-01-582-804).
(3) Do the operational test of the brake system (refer to AMM 32-43-00-710-801).
(4) When this service bulletin is completed, make this entry in the applicable
logbooks: "Service Bulletin 601R-32-110, Landing Gear - Brake System -
Installation of a Bracket to Prevent Connection of the Hydraulic Lines of the
Brakes to the Incorrect Swivel Assembly Ports."
Dec 19/2013  SB 601R-32-110
Page 10 of 16

### Page 11 (OCR)

SERVICE BULLETIN 601R-32-110
VIEW LOOKING FORWARD
NOTE  IN LEFT MLG BAY
1. Left side shown, right side opposite.
BRAKE OUTBOARD
HYDRAULIC LINE (REF)
AFT
•PORT
(REF)
SWIVEL
ASSEMBLY
(REF)
FORWARD  rsb601r32110_008.dg, kp, December 16, 2013
PORT (REF)
FWD
BRAKE INBOARD
HYDRAULIC LINE (REF)
Swivel Assembly - Bracket Installation
Figure 1 (Sheet 1 of 4)
Dec 19/2013  SB 601R-32-110
Page 11 of 16

### Page 12 (OCR)

SERVICE BULLETIN 601R-32-110
NOTES
1. Left side shown, right side opposite.
2. Some hydraulic lines are not shown for clarity.
LEGEND  VIEW LOOKING FORWARD
IN LEFT MLG BAY
1. Pin, Hi-Lite.
2. Collar.  SWIVEL
ASSEMBLY
(REF)  FORWARD
PORT (REF)
BRAKE INBOARD
HYDRAULIC LINE
(REF)
LOWER AFT WING  PLANK (REF)  rsb601r32110 003.dg, kp, November 26, 2013
LOWER WING
SKIN (REF)
PRE-MOD
Swivel Assembly - Bracket Installation
Figure 1 (Sheet 2 of 4)
Dec 19/2013  SB 601R-32-110
Page 12 of 16

### Page 13 (OCR)

SERVICE BULLETIN 601R-32-110
LEGEND
3. Laminated shim
601R75318-1 or K601R75217-5.
4. Bracket
601R75317-1 or K601R75217-3 (LH).
601R75317-2 or K601R75217-4 (RH).
5. Pin, Hi-Lite
B0206002AG6-6.
6. Collar
B0203013-3.
VIEW LOOKING FORWARD  SWIVEL
IN LEFT MLG BAY  ASSEMBLY
(REF)
NOTES
1. Left side shown, right side opposite.
2. Some hydraulic lines are not shown  FORWARD
for clarity.  PORT (REF)
It is necessary for the inboard edge
of the bracket and the laminated shim
to be aligned with the inboard edge of
the lower aft wing plank.
BRAKE INBOARD
It is permitted to install 1st oversize
Hi-Lite pin HST111AG6-6 and  HYDRAULIC LINE
collar B0203038-3.  (REF)
6/4
MLG MOUNTING
TRUNNION (REF)
3/3  rsb601r32110 004.dg, kp, November 26, 2013
LOWER WING
SKIN (REF)
LOWER AFT WING-
PLANK (REF)
POST-MOD
Swivel Assembly - Bracket Installation
Figure 1 (Sheet 3 of 4)
Dec 19/2013  SB 601R-32-110
Page 13 of 16

### Page 14 (OCR)

SERVICE BULLETIN 601R-32-110
NOTES
TBD  1. Left side shown, right side opposite.  2. Some hydraulic lines are not shown for clarity.
It is necessary for the inboard edge of the bracket
and the laminated shim to be aligned with the inboard
edge of the lower aft wing plank.
A minimum clearance of 0.130 in. (3.30 mm) is
necessary between the bracket and the brake
inboard hydraulic fitting.
Injection sealant between laminated shim, bracket, and
lower aft wing plank radius.
SWIVEL  BRAKE INBOARD
ASSEMBLY  HYDRAULIC LINE
(REF)  (REF)
LEGEND
3. Laminated shim
601R75318-1 or K601R75217-5.
4. Bracket  3/3
601R75317-1 or K601R75217-3 (LH).
601R75317-2 or K601R75217-4 (RH).
LOWER AFT WING
LOWER WING
PLANK (REF)
SKIN (REF)
BRAKE INBOARD
HYDRAULIC LINE
(REF)
0.25 in. (6.4 mm)  rsb601r32110 005.dg, kp, November 26, 2013
MOUNTING MLG
TRUNNION (REF)  POST-MOD
Swivel Assembly - Bracket Installation
Figure 1 (Sheet 4 of 4)
Dec 19/2013  SB 601R-32-110
Page 14 of 16

### Page 15 (OCR)

SERVICE BULLETIN 601R-32-110
3. MATERIAL INFORMATION
A. Kit Information
Kit Contents:
KIT 601R32-110K1 [I
PART NUMBER  QTY  NAME  ALTERNATE PARTS
601R75317-1  1  Bracket (LH)  K601R75217-3
601R75317-2  Bracket (RH)  K601R75217-4
601R75318-1  2  Laminated shim  K601R75217-5
B0206002AG6-6  5  Pin, Hi-Lite
HST111AG6-6  5  Pin, Hi-Lite
(1st oversize)
B0203013-3  5  Collar
B0203038-3  5  Collar
(1st oversize)
[I The kit can contain more hardware and/or material than necessary.
NOTE: For allowable superseded parts, refer to the Parts Supersession Cross
References Lists at www.iflybombardier.com under Resources -
Engineering Documents.
NOTE:  Some parts listed in the kit content of this service bulletin are supplied in
a temporary condition of supply configuration. These parts are identified
with a -SB, /SB, SB or other suffix after the Bombardier engineering part
number. When the parts are installed, with the instructions given in the
Accomplishment Instructions of this service bulletin, the parts agree with
the requirements of the engineering configuration. Refer to the SB
Introduction document for more explanation.
Dec 19/2013  SB 601R-32-110
Page 15 of 16

### Page 16 (OCR)

SERVICE BULLETIN 601R-32-110
B. Consumable Information
The materials that follow are necessary to do this service bulletin. You can order
them from Bombardier or purchased directly from industry sources. If the material
is ordered from Bombardier, there can be some lead time because of the shelf life
of the material.
CONSUMABLES
SPECIFICATION  QTY  NAME  REFERENCE
AMS QQ-A-250/5  As  Aluminum sheet
(AL 2024 T3) [I  necessary  (0.080 in. thick)
AMS DTL-22499/1,  As  Shim Stock,
Type 1, Class 2 I  necessary  Laminated,
Aluminum Alloy
(0.125 in. thick)
1 These materials are not necessary if kit 601R32-110K1 is ordered.
NOTE: To complete this list of consumables, refer to the different tasks that are
given as references in this service bulletin
C. Special Tools and Equipment
There are no special tools and equipment for this service bulletin.
D. Disposition of Parts
Not applicable.
Dec 19/2013  SB 601R-32-110
Page 16 of 16

### Page 17 (OCR)

BOMBARDIER
PPENDIX А
SERVICE BULLETIN 601R-32-110
Landing Gear - Brake System - Installation of a Bracket to Prevent Connection of the
Hydraulic Lines of the Brakes to the Incorrect Swivel Assembly Ports
The procedure contained in this appendix is given as reference in the
Accomplishment Instructions of Service Bulletin 601R-32-110.
Dec 19/2013  APPENDIX А
Page A1 of A3

### Page 18 (OCR)

APPENDIX A
SERVICE BULLETIN 601R-32-110
- 0.80 in. (20.3 mm)
1.75 in. (44.5 mm)
R 0.35 in. (8.9 mm)
- 4 PLACES
SHIM
K601R75217-5
NOTES  rsb601r32110_006.dg, kp, November 19, 2013
1. Use AMS-DTL-22499/1, Type 1, Class 2 (0.125 in. (3.18 mm) thick).
2. Make per SRM 51-24-36.
3. Break sharp edges.
4. Identify with ink per shop best practice.
Shim
Figure A1 (Sheet 1 of 2)
Dec 19/2013  APPENDIX A
Page A2 of A3

### Page 19 (OCR)

APPENDIX A
SERVICE BULLETIN 601R-32-110
R 0.35 in.
R 0.88 in.  (22.4 mm)  1.86 in. (47.2 mm)  0.63 in.  (8.9 mm)  4 PLACES
2 PLACES  (16.0 mm)
R 0.13 in. (3.3 mm)
2 PLACES  0.80 in. (20.3 mm)
FLG UP X 90°
X R 0.38 in. (9.7 mm)
BKL
0.50 in. (12.7 mm)
ML  1.75 in. (44.5 mm)
0.75 in. (19.1 mm)
0.54 in. (13.7 mm)
- 0.67 in. (17.0 mm)
0.67 in.
1.72 in. (43.7 mm)  (17.0 mm)
3.54 in. (89.9 mm)
BRACKET FLAT PATTERN
K601R75217-3 (LH) SHOWN
K601R75217-4 (RH) OPP
0.80 in. (20.3 mm)
3.00 in. (76.2 mm) ‡ 0.06 in. (1.5mm)
BRACKET FOLDED PART
K601R75217-3 (LH) SHOWN
K601R75217-4 (RH) OPP
NOTES  rsb6012110_007.dg, kp, October 2, 2013
1. Use AL alloy 2024-T3 clad sheet per AMS-QQ-A-250/5 (0.080 in. (2.03 mm) thick).
2. Make per SRM 51-24-36, 51-24-16 and 51-24-21.
3. Break sharp edges.
4. Finish per SRM 51-21-16 finish code A023.
5. Polyurethane topcoat color grey number #16473 per FED-STD-595.
6. Identify with ink per shop best practice.
Bracket
Figure A1 (Sheet 2 of 2)
Dec 19/2013  APPENDIX A
Page A3 of A3

### Page 20 (OCR)

BOMBARDIER
SERVICE BULLETIN FEEDBACK FORM/COMPLIANCE SHEET
(YOUR COMMENTS HELP US WRITE BETTER SERVICE BULLETINS)
Service Bulletin No.: 601R-32-110  Revision: --
Aircraft Serial Number:  Date:
STRONGLY  DISAGREE  AGREE  STRONGLY
DISAGREE  AGREE
Instructions to do the service bulletin are
accurate.
Comments:
Figure(s), picture(s), and/or Appendix
were helpful to do the service bulletin.
Comments:
Part(s) or kit(s) agreed with the service
bulletin requirement.
Comments:
The service bulletin was accomplished
within the estimated time given.
Comments:
Overall, I was satisfied with this service
bulletin.
Comments:
Operator:  Service Centre:
Name:  Telephone or Fax:
FAX your comments or feedback to (450) 476-7300
or e-mail to crj_sb_evaluation_form@aero.bombardier.com
THANK YOU FOR YOUR COMMENTS

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.