# Bombardier Service Bulletin 601R-57-048

Copy: Revision C ("SB 601R-57-048 Rev C"), 78 pages: PDF https://openairdocs.org/files/sha256/86/5d/865db26f0f9abc20e22154d9c9ef7dcbcfc388604fb50fd2458ff72f797e4814; text https://openairdocs.org/service-documents/bombardier/601r-57-048/file/865db26f0f9a.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2018-0801; AD 2019-08-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 601R-57-048
- Latest revision known: 601R-57-048, Revision C, dated June 6, 2013 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/601r-57-048

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2019-08-11](https://openairdocs.org/ad/2019-08-11.md), effective Jul 11, 2019: Revisions A, B and C

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/601r-57-048/proposed.md).

## Text (78 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2018-0801; AD 2019-08-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SB 601R- - - 57- - - 048
Page 1 of 1
Jun 06/2013
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CL- - -600- - -2B19Canadair Regional Jet (CRJ) Aircraft
SERVICE BULLETIN 601R - - -57 - - -048
SUBJECT : Wings - - - Center Wing Primary Structure - - - Cold Work of Holes on the web
of the Main Landing Gear (MLG) Trunnion
This page transmits:
Revision C of Service Bulletin 601R- - - 57- - - 048,
pages 1 thru 67, dated Jun 06/2013
and
Initial issue of Appendix A, pages A1 thru A9, dated Aug 24/2012.
The changes in this revision have no effect on aircraft that have had
this service bulletin incorporated.
Reason:
Revised Planning Information, paragraph 1., to:
Add revision A to kit 601R57- - - 048K90.
Revised Accomplishment Instructions, paragraph 2., to:
Add revision A to kit 601R57- - - 048K90.
Revised Material Information, paragraph 3., to:
Add revision A to kit 601R57- - - 048K90.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:
Discard the copy of Service Bulletin 601R- - - 57- - - 048, Revision B, dated Aug 24/ 2012.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Jul 17/2009.
Revision A, dated Nov 24/2009.
Revision B, dated Aug 24/2012.
1

### Page 2

SB 601R−57−048
Page 1 of 67
Jul 17/2009
Revision C, Jun 06/2013
SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED 
HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, THIS SERVICE
BULLETIN MUST BE SENT TO THE NEW OWNER, UNLESS CONFIRMATION WAS RECEIVED 
THAT BOMBARDIER REGIONAL AIRCRAFT DIVISION HAS INCLUDED THE NEW OPERATOR
AIRCRAFT , THIS SERVICE BULLETIN MUST BE SENT TO THE LESSEE. IF THE OPERATOR
ON THE DISTRIBUTION LIST .
ATA SYSTEM: 57−11 NUMBER: 601R−57−048
SUBJECT:  Wings − Center Wing Primary Structure − Cold Work of Holes on the web
of the Main Landing Gear (MLG) Trunnion
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
Service Bulletin: CL−600−2B19 Canadair Regional Jet (CRJ) Aircraft Serial
Numbers 7003 thru 7067, 7069 thru 7990, and 8000 thru
8106.
Production: This change will be incorporated before delivery on Aircraft
Serial Numbers 8107 and subsequent.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Service Bulletins. Before you do this
bulletin, examine all Supplemental Type Certificates (STCs),
Supplemental Type Approvals (STAs) or equivalent action changes
to make sure you can complete this service bulletin.
NOTE: The procedure in this service bulletin was validated on Aircraft Serial
Number 7731.

### Page 3

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 2 of 67
Jul 17/2009
Revision C, Jun 06/2013
B. Reason
(1) Condition
It is possible that cracks can occur in the fastener and tooling holes on the
web of the Main Landing Gear (MLG) trunnion.
(2) Evidence
Engineering analysis, supported by component fatigue test has found that
cracks can occur in the holes on the web of the MLG trunnion.
(3) Objective/Benefit
This service bulletin gives the procedure to cold work the holes on the web of
the MLG trunnion. This will prevent cracks in the MLG trunnion and stop the
repetitive inspection in the Maintenance Requirement Manual (MRM).
C. Description
This service bulletin is divided in three parts: PART A, PART B and PART C.
PART A − Cold Work the Web of the Left MLG Trunnion
The electrical extension of the flaps is done. The electrical power is removed from
the aircraft. The pressure of hydraulic system No. 2 and No. 3 is released. Circuit
breakers are opened. The aircraft is put on jacks. The MLG is removed. Cold work
is done to the holes on the web of the MLG trunnion. Identification of the MLG
trunnion is done.
The MLG is installed. The flaps are retracted. The circuit breakers are closed. The
hydraulic system No. 2 and No. 3, and the breaks are bled. The functional test of
the landing gear extension/retraction system is done. The operational test of the
landing gear manual-release-system is done. The operational test of the brake
system is done. The aircraft is removed from the jacks.
PART B − Cold Work the Web of the Right MLG Trunnion
The electrical extension of the flaps is done. The electrical power is removed from
the aircraft. The pressure of hydraulic system No. 2 and No. 3 is released. Circuit
breakers are opened. The aircraft is put on jacks. The MLG is removed. Cold work
is done to the holes on web of the MLG trunnion. Identification of the MLG trunnion
is done.
The MLG is installed. The flaps are retracted. The circuit breakers are closed. The
hydraulic system No. 2 and No. 3, and the breaks are bled. The functional test of
the landing gear extension/retraction system is done. The operational test of the
landing gear manual-release-system is done. The operational test of the brake
system is done. The aircraft is removed from the jacks.

### Page 4

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 3 of 67
Jul 17/2009
Revision C, Jun 06/2013
For Aircraft that have incorporated issue NC or revision A of this service bulletin
PART C − Identification of the Left and Right MLG Trunnion
Lockpins are installed in the nose landing gear (NLG) and MLG. The left and right
MLG trunnions are identified.
For all Aircraft
D. Compliance
Recommended Service Bulletin. Bombardier Aerospace recommends that PART A
and PART B of this service bulletin be done before the aircraft has 34900 flight
cycles, unless otherwise directed by the airworthiness authority of the operator.
For Aircraft that have incorporated issue NC or revision A of this service bulletin
Recommended Service Bulletin. Bombardier Aerospace recommends that PART C
of this service bulletin be done before the aircraft has 38900 flight cycles, unless
otherwise directed by the airworthiness authority of the operator.
NOTE: If the identification of the MLG trunnion was done with Service Bulletin
601R−57−046 or 601R−57−047, it is not necessary to do PART C of this
service bulletin.
For all Aircraft
This service bulletin affects Airworthiness Limitations (AWLs) and/or Damage
Tolerance Inspections (DTIs). Reference applicable Post/Pre Modsum
TC601R17554 and/or Service Bulletin 601R−57−048 in the Maintenance
Requirements Manual (MRM).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93−Q−02.
F . Manpower
These estimates do not include the time necessary for:
−  Administrative functions such as planning, liaison, familiarization, and report writing.
−  Non productive elapsed time such as rest time, having meals, and crew shift
changes.

### Page 5

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 4 of 67
Jul 17/2009
Revision C, Jun 06/2013
−  Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
−  Preparation for modification (unless specified in the accomplishment
instructions) such as cleaning and getting parts, tools, consumables, and
ground equipment.
−  Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
−  All other activities that are not considered by Bombardier Aerospace as directly
related to the accomplishment of this procedure.
NOTE: For any on-site labor assistance, please speak with a Fleet
Services representative for a quote.  The Fleet Services Team can
be contacted through the CRC at 514−855−8500 or email at
thd.crj@aero.bombardier.com.
PART A − Cold Work the Web of the Left MLG Trunnion
It will take an estimated 26.0 man−hours to complete PART A of this service
bulletin. The man−hours are divided as shown in the table that follows:
TASK MAN−HOURS
(1)  Job Set−Up 10.0
(2)  Procedure 7.0
(3)  Test 5.0
(4)  Job Close−Out 4.0
PART B − Cold Work the Web of the Right MLG Trunnion
It will take an estimated 26.0 man−hours to complete PART B of this service
bulletin. The man−hours are divided as shown in the table that follows:
TASK MAN−HOURS
(1)  Job Set−Up 10.0
(2)  Procedure 7.0
(3)  Test 5.0
(4)  Job Close−Out 4.0

### Page 6

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 5 of 67
Jul 17/2009
Revision C, Jun 06/2013
PART C − Identification of the Left and Right MLG Trunnion
It will take an estimated 0.25 man-hours to complete PART C of this service bulletin.
The man-hours are divided as shown in the table that follows:
TASK MAN-HOURS
(1)  Job Set−Up 0.0
(2)  Procedure 0.25
(3)  Test 0.0
(4)  Job Close−Out 0.0
G. Material − Price and Availability
(1) The kits in the tables that follow are available from Bombardier Commercial
Aircraft.  Refer to the paragraphs below for terms and conditions.
NOTE: For a list of the kit contents, refer to paragraph 3.A.
For Aircraft 7003 thru 7067, 7069 thru 7990 and 8000 thru 8017
KIT NUMBER NAME
601R57−048K2 MLG trunnion cold work
oversize
NOTE: The kit 601R57−048K2 contains alternate oversize hardware(s) for the
incorporation of PART A and PART B.
For Aircraft 7003 thru 7067, 7069 thru 7990 and 8000 thru 8017, that do PART A
KIT NUMBER NAME
601R57−048K1 Left side MLG trunnion cold
work

### Page 7

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 6 of 67
Jul 17/2009
Revision C, Jun 06/2013
For Aircraft 7003 thru 7067, 7069 thru 7990 and 8000 thru 8017, that do PART B
KIT NUMBER NAME
601R57−048K5 Right side MLG trunnion cold
work
For Aircraft 8018 thru 8106
KIT NUMBER NAME
601R57−048K4 MLG trunnion cold work
oversize
NOTE: The kit 601R57−048K4 contains alternate oversize hardware(s) for the
incorporation of PART A and PART B.
For Aircraft 8018 thru 8106, that do PART A
KIT NUMBER NAME
601R57−048K3 Left side MLG trunnion cold
work
For Aircraft 8018 thru 8106, that do PART B
KIT NUMBER NAME
601R57−048K6 Right side MLG trunnion cold
work
For all Aircraft
(2) Please send a purchase order to the address below to schedule the kits:
Bombardier
Service Bulletin Kit Support Team
123 Garratt Blvd, N42−24
Toronto, Ontario
Canada  M3K 1Y5

### Page 8

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 7 of 67
Jul 17/2009
Revision C, Jun 06/2013
Fax:     416−375−3060
Phone: 416−375−3920
Email: sbkits@aero.bombardier.com
Please contact the Service Bulletin kit Support Team at the address above for
terms and conditions.
(3) Refer to paragraph 3.B. for a list of consumables for this service bulletin.
H. Tooling − Price and Availability
(1) The tool kits in the tables that follow are available from Bombardier. Refer to
the paragraphs below for the terms and conditions.
NOTE: For a list of the kit contents, refer to paragraph 3.A.
KIT NUMBER NAME
601R57−048K90A Drills and Reamers kit − MLG Trunnion
601R57−048K91B Cold work kit −MLG Trunnion
601R57−048K92 Cold work kit for Offset Adapter
SBTOOL−004K90 FTI Hydraulic powerpak
SBTOOL−005K90 LB Puller assy
SBTOOL−008K90 LB Offset Adapter
Refer to paragraph 3.C. for a list of special tools and equipment for this service
bulletin.
(2) Please send a purchase order to the address below to schedule the kits:
Bombardier
Service Bulletin Kit Support Team
123 Garratt Blvd, N42−24
Toronto, Ontario
Canada  M3K 1Y5
Fax:     416−375−3060
Phone: 416−375−3920
Email: sbkits@aero.bombardier.com

### Page 9

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 8 of 67
Jul 17/2009
Revision C, Jun 06/2013
Please contact the Service Bulletin Kit Support Team at the address above for
terms and conditions.
NOTE: When this service bulletin is completed, tooling kits SBTOOL−004K90,
SBTOOL−005K90 and SBTOOL−008K90 must be returned to the
address below. Please contact the Customer Account Service Team −
Kit Group to get a Return Material Approval (RMA):
Bombardier −  Chicago Warehouse Distribution
251−A Wille Road
Des Plaines, Illinois
USA 60018−1817
I. Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
K. References
Modification Summary TC601R17554, Revision D
Restriction and/or Special Instruction C−A201, Revision D
Aircraft Maintenance Manual (AMM)
Structural Repair Manual (SRM)
Non Destructive Testing Manual (NDTM)
For Bombardier Aerospace reference only: PCA 3993.
L. Other Publications Affected
Aircraft Illustrated Parts Catalogue (AIPC)
Maintenance Requirement Manual (MRM)

### Page 10

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 9 of 67
Jul 17/2009
Revision C, Jun 06/2013
M. Relationship Chart
PRE−SB 
PART NUMBER NAME POST−SBPART NUMBER NAME
601R10031−1 MLG Trunnion
K601R10032−1 /C0001
or
K601R10032−3 /C0019
or
K601R10032−9 /C0004
MLG Trunnion
601R10031−2 MLG Trunnion
K601R10032−2 /C0001
or
K601R10032−4 /C0019
or
K601R10032−10 /C0004
MLG Trunnion
601R10031−11 MLG Trunnion K601R10032−3 /C0006 MLG Trunnion
601R10031−12 MLG Trunnion K601R10032−4 /C0006 MLG Trunnion
601R10068−1 MLG Trunnion K601R10032−5 /C0007 MLG Trunnion
601R10068−2 MLG Trunnion K601R10032−6 /C0007 MLG Trunnion
601R10068−5 MLG Trunnion K601R10032−7 /C0008 MLG Trunnion
601R10068−6 MLG Trunnion K601R10032−8 /C0008 MLG Trunnion

### Page 11

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 10 of 67
Jul 17/2009
Revision C, Jun 06/2013
PRE−SB 
PART NUMBER NAMEPOST−SBPART NUMBERNAME
/C0001 For Aircraft 7003−7010, 7013−7067 and 7069−7138 Pre−REO
601R−57−21−003 and Pre−SB 601R−32−054 that have incorporated Service
Bulletins 601R−57−046, 601R−57−047 and 601R−57−048.
/C0019 For Aircraft 7003−7010, 7013−7067 and 7069−7138 Post−REO
601R−57−21−003 or Post−SB 601R−32−054 that have incorporated Service
Bulletins 601R−57−046, 601R−57−047 and 601R−57−048.
/C0004 For Aircraft 7011 and 7012 that have incorporated Service Bulletins 601R−32−097,
601R−57−046 and 601R−57−048.
/C0006 For Aircraft 7139−7990 and 8000−8017 that have incorporated Service Bulletins
601R−57−046, 601R−57−047 and 601R−57−048.
/C0007 For Aircraft 8018−8079 that have incorporated Service Bulletins 601R−57−046
and 601R−57−048.
/C0008 For Aircraft 8080−8106 that have incorporated Service Bulletins 601R−57−046
and 601R−57−048.

### Page 12

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 11 of 67
Jul 17/2009
Revision C, Jun 06/2013
2. ACCOMPLISHMENT INSTRUCTIONS
PART A − Cold Work the Web of the Left MLG Trunnion
A. Job Set−Up
Reference Information
REFERENCE DESIGNATION
AMM 06−44−00 Access Panel
AMM 07−11−01−582−801 Put the Aircraft on Jacks
AMM 07−11−01−582−804 Removal of the Aircraft from Jacks
AMM 10−11−00−000−801 Removal of the Nose Landing Gear Lockpin
AMM 10−11−00−000−802 Removal of the Main Landing Gear Lockpins
AMM 10−11−00−400−801 Installation of the Nose Landing Gear Lockpin
AMM 10−11−00−400−802 Installation of the Main Landing Gear Lockpins
AMM 12−00−06−863−802 Release Hydraulic Pressure − System No. 1
and No. 2
AMM 12−00−06−863−804 Release Hydraulic Pressure − System No. 3
AMM 12−00−07−861−801 Connect External AC Power
AMM 12−00−07−861−802 Remove External AC Power
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 27−54−00−866−801 Electrical Extension of the Flaps
AMM 27−54−00−866−802 Electrical Retraction of the Flaps
AMM 29−00−00−910−801 Hydraulic Safety Precautions
AMM 29−10−00−870−801 Bleed Hydraulic System No.1
AMM 29−10−00−870−802 Bleed Hydraulic System No.2
AMM 29−10−00−870−803 Bleed Hydraulic System No.3
AMM 32−11−00−000−801 Removal of the MLG

### Page 13

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 12 of 67
Jul 17/2009
Revision C, Jun 06/2013
REFERENCE DESIGNATION
AMM 32−11−00−400−801 Installation of the MLG
AMM 32−12−01−000−801 Removal of the Main Landing Gear Doors
AMM 32−12−01−400−801 Installation of the Main Landing Gear Doors
AMM 32−12−01−820−801 Adjustment of Main Landing Gear Doors
AMM 32−30−00−720−801 Functional Test of the Landing Gear
Extension/Retraction System
AMM 32−34−00−710−801 Operational Test of the Landing Gear
Manual−Release−System
AMM 32−43−00−710−801 Operational Test of the Brake System
NDTM 53−00−097 Eddy Current
SRM 51−21−11 Corrosion Prevention Procedures
SRM 51−23−00 Pressure, Environment, Fuel Tank and Firewall
Sealing
SRM 51−24−38 Cold Working of  Fastener Holes
SRM 51−25−06 Fluid−Resistant (FR) Epoxy Primer
SRM 51−25−16 Fluid−Resistant (FR) Polyurethane Topcoat
SRM 51−26−00 Cleaning
SRM 51−42−21 Hi−Lite Fasteners
(1) Install the lockpins on the nose and the main landing gears
(Refer to AMM 10−11−00−400−801 and AMM 10−11−00−400−802).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT.  IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions
(Refer to AMM 24−00−00−910−801).

### Page 14

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 13 of 67
Jul 17/2009
Revision C, Jun 06/2013
(3) Connect the external AC power to the aircraft (Refer to AMM
12−00−07−861−801).
WARNING: PUT THE SAFETY DEVICES, THE WARNING SIGNS, AND THE
WARNING PLACARDS IN POSITION BEFORE YOU START A
PROCEDURE ON OR NEAR:
− FLIGHT CONTROLS
− FLIGHT CONTROL SURFACES AND
− COMPONENTS THAT MOVE.
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT ON OR
NEAR THE FLIGHT CONTROL SURFACE. ACCIDENTAL MOVEMENT
OF THE FLIGHT CONTROL CAN CAUSE INJURIES TO PERSON
AND/OR DAMAGE TO EQUIPMENT .
WARNING: OBEY ALL THE HYDRAULIC SAFETY PRECAUTIONS WHEN YOU DO
WORK ON ANY HYDRAULIC SYSTEM OR ON A HYDRAULIC SYSTEM
COMPONENT.  IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
YOU CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO
EQUIPMENT.
(4) Obey all the hydraulic safety precautions 
(Refer to AMM 29−00−00−910−801).
(5) Extend the flaps (Refer to AMM 27−54−00−866−801).
(6) Release the hydraulic pressure from system No.1 and No.2
(Refer to AMM 12−00−06−863−802).
(7) Release the hydraulic pressure from system No.3
(Refer to AMM 12−00−06−863−804).
(8) On the inboard flap, pull the movable leading−edge vane in the direction of
the flap to get access to the work area on the rear spar.
(9) Use a strap to keep the movable leading−edge vane retracted.
(10) Remove external AC power from the aircraft
(Refer to AMM 12−00−07−861−802).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT.  IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.

### Page 15

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 14 of 67
Jul 17/2009
Revision C, Jun 06/2013
(11) Obey all the electrical/electronic safety precautions
(Refer to AMM 24−00−00−910−801).
(12) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 A2 HYD PUMP 3B 221
CBP−1 A5 HYD PUMP 2 221
CBP−1 F4 FLAPS CONT CH 1 221
CBP−1 F6 LGC/D1 221
CBP−1 F7 WOW 1 221
CBP−1 G3 BRAKE TEMP MON 221
CBP−1 G4 ANTI SKID 221
CBP−1 G11 HYD SYST AC PUMP CONT 3B 221
CBP−1 G14 HYD SYST AC PUMP CONT 2 221
CBP−2 A2 HYD PUMP 3A 222
CBP−2 F3 SECS PWR 2 222
CBP−2 F9 PROX SENS WOW 2 222
CBP−2 G4 ANTI SKID 222
CBP−2 G14 HYD SYST AC PUMP CONT 1 222
CBP−2 G15 HYD SYST AC PUMP CONT 3A 222
CBP−2 N8 SECU2 222
CBP−2 P2 LGC/D1 222
CBP−2 P3 LGC/D2 WOW 1 + 2 222
CBP−2 F4 FLAPS CONT CH 2 222
CBP−4 B13 LGC/D2 222

### Page 16

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 15 of 67
Jul 17/2009
Revision C, Jun 06/2013
(13) Remove the access panel that follows:
ACCESS DESIGNATION
540AT Access Panel
CAUTION: INSTALL THE DOOR SUPPORT CABLE IF THE DOOR WILL BE
OPEN AT ANY TIME THE AIRCRAFT IS ON THE JACKS. IF YOU DO
NOT INSTALL THE SUPPORT CABLE, YOU CAN CAUSE DAMAGE
TO THE PASSENGER DOOR.
(14) Put the aircraft on jacks (Refer to AMM 07−11−01−582−801).

### Page 17

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 16 of 67
Jul 17/2009
Revision C, Jun 06/2013
B. Procedure
(1) Remove the left Main Landing Gear (MLG) from aircraft
(Refer to AMM 32−11−00−000−801).
(2) Remove the left Main Landing Gear (MLG) door from aircraft
(Refer to AMM 32−12−01−000−801).
Refer to Figure 1.
(3) Remove the door hinge fittings (3) as follows:
(a) Remove and discard the six nuts (6) and washers (2) that attach the
door hinge fittings (3).
(b) Remove the two door hinge fittings (3), two serrated plates (4), and the
two laminated shims (5) from the stud pins (8).
(c) Measure and record the thickness, and the location of the laminated
shims (5).
(d) Discard the laminated shims (5).
(e) Remove the six nuts (1) and the radius washer (10) from the stud pins
(8).
(f) Discard the nuts (1).
(g) Remove and keep the radius washers (10).
(h) Remove and discard the stud pins (8) from the MLG trunnion.
(i) Remove and discard the two hi−lites (7) and collars (9) from the MLG
trunnion.
(4) If hi−lites are installed in the tooling holes, remove and discard two hi−lites
(7) and collars (9) from the MLG trunnion
(Refer to Figure 1, Note 2).

### Page 18

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 17 of 67
Jul 17/2009
Revision C, Jun 06/2013
Refer to Figures 2 and 3.
NOTE: Use SBTOOL−004K90 (hydraulic powerpak), SBTOOL−005K90 (LB
puller assy) and SBTOOL−008K90 (LB offset adapter) to do the cold
work procedures.
NOTE: Use tool kit 601R57−048K90A (drills and reamers), 601R57−048K91B
(cold work) and 601R57−048K92 (cold work for LB offset adapter).
(5) Cold work six countersink holes (1/4") in the MLG trunnion as follows (Refer to
SRM 51−24−38):
(a) Make sure that holes for stud pins (8), (9) and (10) have  countersinks
on the inboard side of MLG trunnion
(Refer to Figure 4 and 5).
(b) If no countersinks are found, do countersinks for stud pins (8), (9) and
(10) on the inboard side of the MLG trunnion 
(Refer to Figure 4 and 5).
(c) With starting reamer (P/N 601R57048K90−9), increase the countersink
holes to a diameter of 0.2526 to 0.2544 in. (6.416 to 6.462 mm).
(d) Do a detailed inspection of the six countersink holes as follows:
1 With a combination gage (go−no−go) (P/N 601R57048K91−17),
make sure that the diameter of holes is correct.
2 Do an eddy current on the inner surface of the six holes (Refer to
NDTM 53−00−097).
(e) For the hole(s) that have no damage on the inner surface and that have
a diameter of 0.2526 to 0.2544 in. (6.416 to 6.462 mm), do as follows:
1 Cold work the countersink hole(s) in the MLG trunnion with
nosecap P/N KBC−081−1A, mandrel P/N
KBM−8−1−N−1−35−V1 and straight sleeves P/N
CBS−8−1−N−16S.
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes is
(STDN) 8−1−N.

### Page 19

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 18 of 67
Jul 17/2009
Revision C, Jun 06/2013
2 With the first oversize final reamer (P/N 601R57048K90−21),
increase the countersink holes to a diameter of 0.2620 to 0.2646 in.
(6.655 to 6.721 mm), (Refer to Figure 3).
3 Make sure that countersinks have no ridge(s).
4 If ridge(s) is/are found, manually remove the ridge(s) with a
countersink tool.
5 Apply chemical conversion coating inside the hole.
(f) For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.2544 in. (6.462 mm), do as follows:
1 With starting reamer (P/N 601R57048K90−11), increase the
countersink hole(s) to a diameter of 0.2684 to 0.2694 in. (6.817 to
6.843 mm).
2 Do a detailed inspection as follows:
a With a combination gage (go−no−go) (P/N
601R57048K91−25), make sure that the diameter of holes
is/are correct.
b Do an eddy current on the inner surface of the hole(s),
(Refer to NDTM 53−00−097).
3 For hole(s) that have no damage on the inner surface and have a
diameter of 0.2684 to 0.2694 in. (6.817 to 6.843 mm), do as
follows:
a Cold work the countersink hole(s) for the second oversize
with nosecap P/N KBC−082−1A, mandrel P/N
KBM−8−2−N−1−35−V1 and straight sleeves P/N
CBS−8−2−N−16S.
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes
is (STDN) 8−2−N.
b With the second oversize final reamer (P/N
601R57048K90−23), increase the hole (s) to a diameter of
0.2775 to 0.2802 in. (7.049 to 7.117 mm).

### Page 20

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 19 of 67
Jul 17/2009
Revision C, Jun 06/2013
c Make sure that the countersinks have no ridge(s).
d If ridge(s) is/are found, manually remove the ridge(s) with a
countersink tool.
e Apply chemical conversion coating inside the hole.
4 For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.2694 in. (6.843 mm), do as follows:
a Speak with a representative of Bombardier Aerospace at the
Customer Response Center (CRC) at phone number
514−855−8500 for a disposition.
(6) Cold work two straight holes (3/16") in the MLG trunnion as follows (Ref. SRM
51−24−38):
(a) With starting reamer (P/N 601R57048K90−13), increase two holes to a
diameter of 0.1703 to 0.1715 in. (4.326 to 4.356 mm).
(b) Do a detailed inspection of the two straight holes as follows:
1 With a combination gage (go−no−go) (P/N 601R57048K91−3),
make sure that the diameter of holes is correct.
2 Do an eddy current on the inner surface of the two straight holes
(Refer to NDTM 53−00−097).
(c) For hole(s) that have no damage on the inner surface and have a
diameter of 0.1703 to 0.1715 in. (4.326 to 4.356 mm), do as follows:
1 Cold work the straight hole(s) in the MLG trunnion with nosecap
P/N MEN−14A−0601F , mandrel P/N CBM−4−4−N−1−30−V1
and flared sleeves P/N CBS−4−4−N−16F .
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes is
(STDN) 4−4−N.
2 With final reamer (P/N 601R57048K90−25), increase the hole(s) to
a diameter of 0.1865 to 0.1890 in. (4.737 to 4.801 mm), (Refer to
Figure 3).
3 Apply chemical conversion coating inside the hole.

### Page 21

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 20 of 67
Jul 17/2009
Revision C, Jun 06/2013
(d) For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.1715 in. (4.356 mm), do as follows:
1 With starting reamer (P/N 601R57048K90−15), increase the
damaged hole(s) to a first oversize diameter of 0.1935 to 0.1953 in.
(4.915 to 4.961mm).
2 Do a detailed inspection as follows:
a With a combination gage (go−no−go) (P/N
601R57048K91−11), make sure that the diameter of holes is
correct.
b Do an eddy current on the inside of the straight hole(s) (Refer
to NDTM 53−00−097).
3 For hole(s) that have no damage on the inner surface and have a
diameter of 0.1935 to 0.1953 in. (4.915 to 4.961mm), do as follows:
a Cold work the hole(s) for the first oversize with nosecap P/N
MEN−14A−0601F , mandrel P/N CBM−6−1−N−1−30−V1
and flared sleeves P/N CBS−6−1−N−16F .
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes
is (STDN) 6−1−N.
b With the first oversize final reamer (P/N 601R57048K90−27),
increase hole(s) to a diameter of 0.1995 to 0.2021 in. (5.067 to
5.133 mm), (Refer to Figure 3).
c Apply chemical conversion coating inside the hole.
4 For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.1953 in. (4.961mm), do as follows:
a Speak with a representative of Bombardier Aerospace at the
Customer Response Center (CRC) at phone number
514−855−8500 for a disposition.

### Page 22

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 21 of 67
Jul 17/2009
Revision C, Jun 06/2013
(7) Cold work two tooling holes (5/16") in the MLG trunnion as follows
(Refer to SRM 51−24−38):
(a) With a drill no.19/64 in., increase two tooling holes to a diameter of
0.2969 in. (7.541 mm).
(b) With starting reamer (P/N 601R57048K90−17), increase the two holes to
a diameter of 0.2995 to 0.3005 in. (7.607 to 7.633 mm).
(c) Do a detailed inspection of the two tooling holes as follows:
1 With a combination gage (go−no−go) (P/N 601R57048K91−33),
make sure that the diameter of holes is correct.
2 Do an eddy current on the inside of the two tooling holes (Refer to
NDTM 53−00−097).
(d) For hole(s) that have no damage on the inner surface and have a
diameter of 0.2995 to 0.3005 in. (7.607 to 7.633 mm), do as follows:
1 Cold work two tooling holes (5/16") in the MLG trunnion with
nosecap P/N MEN−14A−1001F , mandrel P/N
CBM−10−0−N−1−40−V1 and flared sleeves P/N
CBS−10−0−N−16F.
2 If you don’t have sufficient space to do the cold work, it is possible
to install LB offset adapter (P/N SBTOOL−008K90) on the puller
(P/N SBTOOL−005K90). Use nosecap P/N CBC−40−1001F and
mandrel P/N CBM−10−0−N−1−10−V1 from tool kit P/N
601R57−048K92.
NOTE: Refer to Appendix A for installation of the LB offset 
adapter (P/N SBTOOL−008K90) on the puller 
(P/N SBTOOL−005K90).
NOTE: Point the split in the sleeve  to the up or down position.
The standard tool diameter number to cold work holes is
(STDN) 10−0−N.
3 With final reamer (P/N 601R57048K90−29), increase tooling
hole(s) to a diameter of 0.3090 to 0.3105 in. (7.849 to 7.887 mm),
(Refer to Figure 3).
4 Apply chemical conversion coating inside the hole.

### Page 23

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 22 of 67
Jul 17/2009
Revision C, Jun 06/2013
(e) For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.3005 in. (7.633 mm), do as follows:
1 With starting reamer (P/N 601R57048K90−19), increase the
damaged hole(s) to a diameter of 0.3155 to 0.3165 in. (8.014 to
8.039 mm).
2 Do a detailed inspection as follows:
a With a combination gage (go−no−go) (P/N
601R57048K91−41), make sure that the diameter of holes is
correct.
b Do an eddy current on the inside of the hole(s),
(Refer to NDTM 53−00−097).
3 For hole(s) that have no damage on the inner surface and have a
diameter of 0.3155 to 0.3165 in. (8.014 to 8.039 mm), do as
follows:
a Cold work the tooling hole(s) for the first oversize with
nosecap P/N MEN−14A−1001F , mandrel P/N
CBM−10−1−N−1−40−V1 and straight sleeves P/N
CBS−10−1−N−16F .
b If you don’t have sufficient space to do the cold work, it is
possible to install LB offset adapter (P/N SBTOOL−008K90)
on the puller (P/N SBTOOL−005K90). Use nosecap P/N
CBC−40−1001F and mandrel P/N
CBM−10−1−N−1−10−V1 from tool kit P/N
601R57−048K92.
NOTE: Refer to Appendix A for installation of the LB offset 
adapter (P/N SBTOOL−008K90) on the puller 
(P/N SBTOOL−005K90).
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes
is (STDN) 10−1−N.
c With the first oversize final reamer (P/N 601R57048K90−31),
increase the hole(s) to a diameter of 0.3245 to 0.3261 in.
(8.242 to 8.283 mm), (Refer to Figure 3).
d Apply chemical conversion coating inside the hole.

### Page 24

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 23 of 67
Jul 17/2009
Revision C, Jun 06/2013
4 For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.3165 in. (8.039 mm), do as follows:
a Speak with a representative of Bombardier Aerospace at the
Customer Response Center (CRC) at phone number
514−855−8500 for a disposition.
For Aircraft 7003 thru 7067, 7069 thru 7990 and 8000 thru 8017
Refer to Figure 4.
(8) Install the two door hinge fittings (3) to the MLG trunnion as follows:
(a) With a drill, increase the hole of the radius washer (7) to a diameter of
0.266 to 0.270 in. (6.76 to 6.86 mm) for the first oversize hole in the MLG
trunnion.
(b) If necessary, use a drill to increase hole of the radius washer (7) to
diameter of  0.281 to 0.285 in. (7.14 to 7.24 mm) for the second oversize
hole in the MLG trunnion, (Refer to view B).
(c) Apply chemical conversion coating inside hole of radius washer (7).
(d) With sealant, wet−install the stud pins (8) and (9) on the MLG trunnion
with the nuts (1) and the radius washer (7), (Refer to view A and B).
NOTE: Use kit 601R57−048K1 for first oversize (1/4"). If necessary, use
kit 601R57−048K2 for second oversize.
(e) Peel laminated shims (5) to the same dimension before removal.
(f) Apply MIL−PRF−81733 type IV sealant on both sides of the laminated
shims (5).
(g) Install the two door hinge fittings (3), two laminated shims (5), two
serrated plates (4) on the stud pins with the washers (2) and nuts (6),
(Refer to view B, sheet 2).
(9) With sealant, wet−install two hi−lites and nuts (11) and (13) in the two tooling
holes of the MLG trunnion.
NOTE: Use kit 601R57−048K1 for next fastener size (5/16"). If necessary,
use kit 601R57−048K2 for first oversize.

### Page 25

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 24 of 67
Jul 17/2009
Revision C, Jun 06/2013
(10) With sealant, wet−install two hi−lites and nuts (15) and (17) in the two holes
of the MLG trunnion and the fittings.
NOTE: Use kit 601R57−048K1 for next fastener size (3/16"). If necessary,
use kit 601R57−048K2 for first oversize.
For Aircraft 8018 thru 8106
Refer to Figure 5.
(11) Install two door hinge fittings (3) to the MLG trunnion as follows:
(a) With a drill, increase the hole of the radius washer (7) to a diameter of
0.266 to 0.270 in (6.76 to 6.86 mm) for first oversize hole in the MLG
trunnion.
(b) If necessary, use a drill to increase the hole of the radius washer (7) to
diameter of 0.281 to 0.285 in. (7.14 to 7.24 mm) for the second oversize
in the MLG trunnion, (Refer to view B).
(c) Apply chemical conversion coating in the hole of the radius washer (7)
and in the cold worked holes of the MLG  trunnion.
(d) With sealant, wet−install the stud pins (8), (9) and (10) in the MLG
trunnion with the nuts (1) and the radius washer (7), (Refer to view A and
B).
NOTE: Use kit 601R57−048K3 for first oversize (1/4"). If necessary, use
kit 601R57−048K4 for second oversize.
(e) Peel laminated shims (5) to the same dimension before removal.
(f) Apply MIL−PRF−81733 type IV sealant on both sides of the laminated
shims (5).
(g) Attach two laminated shims (5), two serrated plates (4), two door hinge
fittings (3) on the stud pins with the washers (2) and nuts (6), (Refer to
view B, sheet 2).
(12) With sealant, wet−install two hi−lites and nuts (11) and (13) in the two tooling
holes of the MLG trunnion.
NOTE: Use kit 601R57−048K3 for next fastener size (5/16"). If necessary,
use kit 601R57−048K4 for first oversize.

### Page 26

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 25 of 67
Jul 17/2009
Revision C, Jun 06/2013
(13) With sealant, wet−install two hi−lites and nuts (15) and (17) in the two holes
of the MLG trunnion and the fittings.
NOTE: Use kit 601R57−048K3 for next fastener size (3/16"). If necessary,
use kit 601R57−048K4 for first oversize.
For all Aircraft
(14) Install the left MLG on aircraft (Refer to AMM 32−11−00−400−801).
(15) Install the left MLG door on aircraft (Refer to AMM 32−12−01−400−801).
(16) Do the identification of the MLG trunnion as follows:
(a) If an MLG trunnion was repaired or replaced, speak with a representative
of the Customer Response Centre (CRC) at 514−855−8500 for an
identification number.
For Aircraft 7011 and 7012
(b) If Service Bulletins 601R−32−097, 601R−57−046 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−9.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7003−7010, 7013−7067 and 7069−7138 Pre-REO 601R−57−21−003 and
Pre-SB 601R−32−054
(c)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−1.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).

### Page 27

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 26 of 67
Jul 17/2009
Revision C, Jun 06/2013
For Aircraft 7003−7010, 7013−7067 and 7069−7138 Post-REO 601R−57−21−003 or
Post-SB 601R−32−054
(d)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−3.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7139−7990 and 8000−8017
(e)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−3.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 8018−8079
(f) If Service Bulletins 601R−57−046 and 601R−57−048 have been
incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−5.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 8080−8106
(g) If Service Bulletins 601R−57−046 and 601R−57−048 have been
incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−7.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).

### Page 28

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 27 of 67
Jul 17/2009
Revision C, Jun 06/2013
C. Job Close−Out
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 A2 HYD PUMP 3B 221
CBP−1 A5 HYD PUMP 2 221
CBP−1 F4 FLAPS CONT CH 1 221
CBP−1 F6 LGC/D1 221
CBP−1 F7 WOW 1 221
CBP−1 G3 BRAKE TEMP MON 221
CBP−1 G4 ANTI SKID 221
CBP−1 G11 HYD SYST AC PUMP CONT 3B 221
CBP−1 G14 HYD SYST AC PUMP CONT 2 221
CBP−2 A2 HYD PUMP 3A 222
CBP−2 F3 SECS PWR 2 222
CBP−2 F9 PROX SENS WOW 2 222
CBP−2 G4 ANTI SKID 222
CBP−2 G14 HYD SYST AC PUMP CONT 1 222
CBP−2 G15 HYD SYST AC PUMP CONT 3A 222
CBP−2 N8 SECU2 222
CBP−2 P2 LGC/D1 222
CBP−2 P3 LGC/D2 WOW 1 + 2 222
CBP−2 F4 FLAPS CONT CH 2 222
CBP−4 B13 LGC/D2 222
(3) Apply external AC power to the aircraft (Refer to AMM 12−00−07−861−801).
(4) Bleed hydraulic system No.1 (Refer to AMM 29−10−00−870−801).

### Page 29

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 28 of 67
Jul 17/2009
Revision C, Jun 06/2013
(5) Bleed hydraulic system No.2 (Refer to AMM 29−10−00−870−802).
(6) Bleed hydraulic system No.3 (Refer to AMM 29−10−00−870−803).
(7) Adjust the MLG door (Refer to AMM 32−12−01−820−801).
(8) Retract the inboard flap, (Refer to AMM 27−54−00−866−802).
(9) Do the functionnal test of the landing gear extension and retraction system
(Refer to AMM 32−30−00−720−801).
(10) Do the operational test of the landing gear manual release system
(Refer to 32−34−00−710−801).
(11) Do the operational test of the brake system,
(Refer to 32−43−00−710−801).
(12) Install the access panel that follows:
ACCESS DESIGNATION
540AT Access Panel
(13) Remove the nose landing gear lockpin
(Refer to AMM 10−11−00−000−801).
(14) Remove the MLG lockpins
(Refer to AMM 10−11−00−000−802).
(15) Remove the aircraft from jacks 
(Refer to AMM 07−11−01−582−804).
(16) When PART A of this service bulletin is completed, make this entry in the
applicable logbook(s): /quoteblleftService Bulletin 601R−57−048, Revision C, Wings −
Center Wing Primary Structure − Cold Work of Holes on the web of the Main
Landing Gear (MLG) Trunnion, PART A, incorporated."

### Page 30

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 29 of 67
Jul 17/2009
Revision C, Jun 06/2013
PART B − Cold Work the Web of the Right MLG Trunnion
D. Job Set−Up
Reference Information
REFERENCE DESIGNATION
AMM 06−44−00 Access Panel
AMM 07−11−01−582−801 Put the Aircraft on Jacks
AMM 07−11−01−582−804 Removal of the Aircraft from Jacks
AMM 10−11−00−000−801 Removal of the Nose Landing Gear Lockpin
AMM 10−11−00−000−802 Removal of the Main Landing Gear Lockpins
AMM 10−11−00−400−801 Installation of the Nose Landing Gear Lockpin
AMM 10−11−00−400−802 Installation of the Main Landing Gear Lockpins
AMM 12−00−06−863−802 Release Hydraulic Pressure − System No. 1
and No. 2
AMM 12−00−06−863−804 Release Hydraulic Pressure − System No. 3
AMM 12−00−07−861−801 Connect External AC Power
AMM 12−00−07−861−802 Remove External AC Power
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 27−54−00−866−801 Electrical Extension of the Flaps
AMM 27−54−00−866−802 Electrical Retraction of the Flaps
AMM 29−00−00−910−801 Hydraulic Safety Precautions
AMM 29−10−00−870−801 Bleed Hydraulic System No.1
AMM 29−10−00−870−802 Bleed Hydraulic System No.2
AMM 29−10−00−870−803 Bleed Hydraulic System No.3
AMM 32−11−00−000−801 Removal of the MLG
AMM 32−11−00−400−801 Installation of the MLG
AMM 32−12−01−000−801 Removal of the Main Landing Gear Doors

### Page 31

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 30 of 67
Jul 17/2009
Revision C, Jun 06/2013
REFERENCE DESIGNATION
AMM 32−12−01−400−801 Installation of the Main Landing Gear Doors
AMM 32−12−01−820−801 Adjustment of Main Landing Gear Doors
AMM 32−30−00−720−801 Functional Test of the Landing Gear
Extension/Retraction System
AMM 32−34−00−710−801 Operational Test of the Landing Gear
Manual−Release−System
AMM 32−43−00−710−801 Operational Test of the Brake System
NDTM 53−00−097 Eddy Current
SRM 51−21−11 Corrosion Prevention Procedures
SRM 51−23−00 Pressure, Environment, Fuel Tank and Firewall
Sealing
SRM 51−24−38 Cold Working of  Fastener Holes
SRM 51−25−06 Fluid−Resistant (FR) Epoxy Primer
SRM 51−25−16 Fluid−Resistant (FR) Polyurethane Topcoat
SRM 51−26−00 Cleaning
SRM 51−42−21 Hi−lite Fasteners
(1) Install the lockpins on the nose and the main landing gears
(Refer to AMM 10−11−00−400−801 and AMM 10−11−00−400−802).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT.  IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions
(Refer to AMM 24−00−00−910−801).

### Page 32

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 31 of 67
Jul 17/2009
Revision C, Jun 06/2013
(3) Connect the external AC power to the aircraft (Refer to AMM
12−00−07−861−801).
WARNING: PUT THE SAFETY DEVICES, THE WARNING SIGNS, AND THE
WARNING PLACARDS IN POSITION BEFORE YOU START A
PROCEDURE ON OR NEAR:
− FLIGHT CONTROLS
− FLIGHT CONTROL SURFACES AND
− COMPONENTS THAT MOVE.
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT ON OR
NEAR THE FLIGHT CONTROL SURFACE. ACCIDENTAL MOVEMENT
OF THE FLIGHT CONTROL CAN CAUSE INJURIES TO PERSON
AND/OR DAMAGE TO EQUIPMENT .
WARNING: OBEY ALL THE HYDRAULIC SAFETY PRECAUTIONS WHEN YOU DO
WORK ON ANY HYDRAULIC SYSTEM OR ON A HYDRAULIC SYSTEM
COMPONENT.  IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
YOU CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO
EQUIPMENT.
(4) Obey all the hydraulic safety precautions 
(Refer to AMM 29−00−00−910−801).
(5) Extend the flaps (Refer to AMM 27−54−00−866−801).
(6) Release the hydraulic pressure from system No.1 and No.2
(Refer to AMM 12−00−06−863−802).
(7) Release the hydraulic pressure from system No.3
(Refer to AMM 12−00−06−863−804).
(8) On the inboard flap, pull the movable leading−edge vane in the direction of
the flap to get access to the work area on the rear spar.
(9) Use a strap to keep the movable leading−edge vane retracted.
(10) Remove the external AC power from the aircraft
(Refer to AMM 12−00−07−861−802).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT.  IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.

### Page 33

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 32 of 67
Jul 17/2009
Revision C, Jun 06/2013
(11) Obey all the electrical/electronic safety precautions
(Refer to AMM 24−00−00−910−801).
(12) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 A2 HYD PUMP 3B 221
CBP−1 A5 HYD PUMP 2 221
CBP−1 F4 FLAPS CONT CH 1 221
CBP−1 F6 LGC/D1 221
CBP−1 F7 WOW 1 221
CBP−1 G3 BRAKE TEMP MON 221
CBP−1 G4 ANTI SKID 221
CBP−1 G11 HYD SYST AC PUMP CONT 3B 221
CBP−1 G14 HYD SYST AC PUMP CONT 2 221
CBP−2 A2 HYD PUMP 3A 222
CBP−2 F3 SECS PWR 2 222
CBP−2 F9 PROX SENS WOW 2 222
CBP−2 G4 ANTI SKID 222
CBP−2 G14 HYD SYST AC PUMP CONT 1 222
CBP−2 G15 HYD SYST AC PUMP CONT 3A 222
CBP−2 N8 SECU2 222
CBP−2 P2 LGC/D1 222
CBP−2 P3 LGC/D2 WOW 1 + 2 222
CBP−2 F4 FLAPS CONT CH 2 222
CBP−4 B13 LGC/D2 222

### Page 34

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 33 of 67
Jul 17/2009
Revision C, Jun 06/2013
(13) Remove the access panel that follows:
ACCESS DESIGNATION
640AT Access Panel
CAUTION: INSTALL THE DOOR SUPPORT CABLE IF THE DOOR WILL BE
OPEN AT ANY TIME THE AIRCRAFT IS ON THE JACKS. IF YOU DO
NOT INSTALL THE SUPPORT CABLE, YOU CAN CAUSE DAMAGE
TO THE PASSENGER DOOR.
(14) Put the aircraft on jacks (Refer to AMM 07−11−01−582−801).

### Page 35

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 34 of 67
Jul 17/2009
Revision C, Jun 06/2013
E. Procedure
(1) Remove the right Main Landing Gear (MLG) from aircraft
(Refer to AMM 32−11−00−000−801).
(2) Remove the right Main Landing Gear (MLG) door from aircraft
(Refer to AMM 32−12−01−000−801).
Refer to Figure 1.
(3) Remove the door hinge fittings (3) as follows:
(a) Remove and discard the six nuts (6) and washers (2) that attach the
door hinge fittings (3).
(b) Remove the two door hinge fittings (3), two serrated plates (4), and the
two laminated shims (5) from the stud pins (8).
(c) Measure and record the thickness, and the location of the laminated
shims (5).
(d) Discard the laminated shims (5).
(e) Remove the six nuts (1) and the radius washer (10) from stud pins (8).
(f) Discard the nuts (1).
(g) Remove and keep the radius washer (10).
(h) Remove and discard the stud pins (8) from the MLG trunnion.
(i) Remove and discard the two hi−lites (7) and collars (9) from the MLG
trunnion.
(4) If hi−lites are installed in the tooling holes, remove and discard two hi−lites
(7) and collars (9) from the MLG trunnion
(Refer to Figure 1, Note 2).

### Page 36

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 35 of 67
Jul 17/2009
Revision C, Jun 06/2013
Refer to Figures 2 and 3.
NOTE: Use SBTOOL−004K90 (hydraulic powerpak), SBTOOL−005K90 (LB
puller assy) and SBTOOL−008K90 (LB offset adapter) to do the cold
work procedures.
NOTE: Use tool kit 601R57−048K90A (drills and reamers), 601R57−048K91B
(cold work) and 601R57−048K92 (cold work for LB off set adapter).
(5) Cold work six countersink holes (1/4") in the MLG trunnion as follows (Ref.
SRM 51−24−38):
(a) Make sure that holes for stud pins (8), (9) and (10) have  countersinks
on the inboard side of MLG trunnion
(Refer to Figure 4 and 5).
(b) If no countersinks are found, do countersinks for stud pins (8), (9) and
(10) on the inboard side of the MLG trunnion (Refer to Figure 4 and 5).
(c) With starting reamer (P/N 601R57048K90−9), increase the six
countersink holes to a diameter of 0.2526 to 0.2544 in. (6.416 to 6.462
mm).
(d) Do a detailed inspection of the six countersink holes as follows:
1 With a combination gage (go−no−go) (P/N 601R57048K91−17),
make sure that the diameter of holes is correct.
2 Do an eddy current on the inner surface of the six holes (Refer to
NDTM 53−00−097).
(e) For the hole(s) that have no damage on the inner surface and that have
a diameter of 0.2526 to 0.2544 in. (6.416 to 6.462 mm), do as follows:
1 Cold work the countersink hole(s) in the MLG trunnion with
nosecap P/N KBC−081−1A, mandrel P/N
KBM−8−1−N−1−35−V1 and straight sleeves P/N
CBS−8−1−N−16S.
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes is
(STDN) 8−1−N.

### Page 37

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 36 of 67
Jul 17/2009
Revision C, Jun 06/2013
2 With the first oversize final reamer (P/N 601R57048K90−21) ,
increase the countersink holes to a diameter of 0.2620 to 0.2646 in.
(6.655 to 6.721 mm), (Refer to Figure 3).
3 Make sure that the countersinks have no ridge(s).
4 If ridge(s) is/are found, manually remove the ridge(s) with a
countersink tool.
5 Apply chemical conversion coating inside the hole.
(f) For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.2544 in. (6.462 mm), do as follows:
1 With starting reamer (P/N 601R57048K90−11), increase the
countersink hole(s) to a diameter of 0.2684 to 0.2694 in. (6.817 to
6.843 mm).
2 Do a detailed inspection as follows:
a With a combination gage (go−no−go) (P/N
601R57048K91−25), make sure that the diameter of holes
is/are correct.
b Do an eddy current on the inner surface of the hole(s),
(Refer to NDTM 53−00−097).
3 For hole(s) that have no damage on the inner surface and have a
diameter of 0.2684 to 0.2694 in. (6.817 to 6.843 mm), do as
follows:
a Cold work the countersink hole(s) for the second oversize
with nosecap P/N KBC−082−1A, mandrel P/N
KBM−8−2−N−1−35−V1 and straight sleeves P/N
CBS−8−2−N−16S.
NOTE: Point the split in the sleeve  to the up or down position.
The standard tool diameter number to cold work holes
is (STDN) 8−2−N.
b With the second oversize final reamer (P/N
601R57048K90−23), increase the hole (s) to a diameter of
0.2775 to 0.2802 in. (7.049 to 7.117 mm).

### Page 38

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 37 of 67
Jul 17/2009
Revision C, Jun 06/2013
c Make sure that countersinks have no ridge(s).
d If ridge(s) is/are found, manually remove the ridge(s) with a
countersink tool.
e Apply chemical conversion coating inside the hole.
4 For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.2694 in. (6.843 mm), do as follows:
a Speak with a representative of Bombardier Aerospace at the
Customer Response Center (CRC) at phone number
514−855−8500 for a disposition.
(6) Cold work two straight holes (3/16") in the MLG trunnion as follows (Ref. SRM
51−24−38):
(a) With starting reamer (P/N 601R57048K90−13), increase two holes to a
diameter of 0.1703 to 0.1715 in. (4.326 to 4.356 mm).
(b) Do a detailed inspection of the two straight holes as follows:
1 With a combination gage (go−no−go) (P/N 601R57048K91−3),
make sure that the diameter of holes is correct.
2 Do an eddy current on the inner surface of the two straight holes
(Refer to NDTM 53−00−097).
(c) For hole(s) that have no damage on the inner surface and have a
diameter of 0.1703 to 0.1715 in. (4.326 to 4.356 mm), do as follows:
1 Cold work the straight hole(s) in the MLG trunnion with nosecap
P/N MEN−14A−0601F , mandrel P/N CBM−4−4−N−1−30−V1
and flared sleeves P/N CBS−4−4−N−16F .
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes is
(STDN) 4−4−N.
2 With final reamer (P/N 601R57048K90−25), increase the hole(s) to
a diameter of 0.1865 to 0.1890 in. (4.737 to 4.801 mm), (Refer to
Figure 3).
3 Apply chemical conversion coating inside the hole.

### Page 39

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 38 of 67
Jul 17/2009
Revision C, Jun 06/2013
(d) For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.1715 in. (4.356 mm), do as follows:
1 With starting reamer (P/N 601R57048K90−15), increase the
damaged hole(s) to a first oversize diameter of 0.1935 to 0.1953 in.
(4.915 to 4.961mm).
2 Do a detailed inspection as follows:
a With a combination gage (go−no−go) (P/N
601R57048K91−11), make sure that the diameter of holes is
correct.
b Do an eddy current on the inside of the straight hole(s)
(Refer to NDTM 53−00−097).
3 For hole(s) that have no damage on the inner surface and have a
diameter of 0.1935 to 0.1953 in. (4.915 to 4.961mm), do as follows:
a Cold work the hole(s) for the first oversize with nosecap P/N
MEN−14A−0601F , mandrel P/N CBM−6−1−N−1−30−V1
and flared sleeves P/N CBS−6−1−N−16F .
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes
is (STDN) 6−1−N.
b With the first oversize final reamer (P/N 601R57048K90−27),
increase hole(s) to a diameter of 0.1995 to 0.2021 in. (5.067 to
5.133 mm), (Refer to Figure 3).
c Apply chemical conversion coating inside the hole.
4 For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.1953 in. (4.961mm), do as follows:
a Speak with a representative of Bombardier Aerospace at the
Customer Response Center (CRC) at phone number
514−855−8500 for a disposition.

### Page 40

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 39 of 67
Jul 17/2009
Revision C, Jun 06/2013
(7) Cold work two tooling holes (5/16") in the MLG trunnion as follows
(Refer to SRM 51−24−38):
(a) With a drill no.19/64 in., increase two tooling holes to a diameter of
0.2969 in.(7.541 mm).
(b) With starting reamer (P/N 601R57048K90−17), increase the two holes to
a diameter of 0.2995 to 0.3005 in. (7.607 to 7.633 mm).
(c) Do a detailed inspection of the two tooling holes as follows:
1 With a combination gage (go−no−go) (P/N 601R57048K91−33),
make sure that the diameter of holes is correct.
2 Do an eddy current on the inside of the two tooling holes (Refer to
NDTM 53−00−097).
(d) For hole(s) that have no damage on the inner surface and have a
diameter of 0.2995 to 0.3005 in. (7.607 to 7.633 mm), do as follows:
1 Cold work two tooling holes (5/16") in the MLG trunnion with
nosecap P/N MEN−14A−1001F , mandrel P/N
CBM−10−0−N−1−40−V1 and flared sleeves P/N
CBS−10−0−N−16F.
2 If you don’t have sufficient space to do the cold work, it is possible
to install LB offset adapter (P/N SBTOOL−008K90) on the puller
(P/N SBTOOL−005K90). Use nosecap P/N CBC−40−1001F and
mandrel P/N CBM−10−0−N−1−10−VI from tool kit P/N
601R57−048K92.
NOTE: Refer to Appendix A for installation of the LB offset 
adapter (P/N SBTOOL−008K90) on the puller 
(P/N SBTOOL−005K90).
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes is
(STDN) 10−0−N.
3 With final reamer (P/N 601R57048K90−29), increase tooling
hole(s) to a diameter of 0.3090 to 0.3105 in. (7.849 to 7.887 mm),
(Refer to Figure 3).
4 Apply chemical conversion coating inside the hole.

### Page 41

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 40 of 67
Jul 17/2009
Revision C, Jun 06/2013
(e) For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.3005 in. (7.633 mm), do as follows:
1 With starting reamer (P/N 601R57048K90−19), increase the
damaged hole(s) to a diameter of 0.3155 to 0.3165 in. (8.014 to
8.039 mm).
2 Do a detailed inspection as follows:
a With a combination gage (go−no−go) (P/N
601R57048K91−41), make sure that the diameter of holes is
correct.
b Do an eddy current on the inside of the hole(s),
(Refer to NDTM 53−00−097).
3 For hole(s) that have no damage on the inner surface and have a
diameter of 0.3155 to 0.3165 in. (8.014 to 8.039 mm), do as
follows:
a Cold work the tooling hole(s) for the first oversize with
nosecap P/N MEN−14A−1001F , mandrel P/N
CBM−10−1−N−1−40−V1 and straight sleeves P/N
CBS−10−1−N−16F .
b If you don’t have sufficient space to do the cold work, it is
possible to install LB offset adapter (P/N SBTOOL−008K90)
to the puller (P/N SBTOOL−005K90). Use nosecap P/N
CBC−40−1001F and mandrel P/N
CBM−10−0−N−1−10−V1 from tool kit P/N
601R57−048K92.
NOTE: Refer to Appendix A for installation of the LB offset 
adapter (P/N SBTOOL−008K90) on the puller 
(P/N SBTOOL−005K90).
NOTE: Point the split in the sleeve to the up or down position.
The standard tool diameter number to cold work holes
is (STDN) 10−1−N.
c With the first oversize final reamer (P/N 601R57048K90−31),
increase the hole(s) to a diameter of 0.3245 to 0.3261 in.
(8.242 to 8.283 mm), (Refer to Figure 3).
d Apply chemical conversion coating inside the hole.

### Page 42

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 41 of 67
Jul 17/2009
Revision C, Jun 06/2013
4 For hole(s) that have damage on the inner surface and/or have a
diameter more than 0.3165 in. (8.039 mm), do as follows:
a Speak with a representative of Bombardier Aerospace at the
Customer Response Center) CRC) at phone number
514−855−8500 for a disposition.
For Aircraft 7003 thru 7067, 7069 thru 7990 and 8000 thru 8017
Refer to Figure 4.
(8) Install the two hinge door fittings (3) to the MLG trunnion as follows:
(a) With a drill, increase the hole of the radius washer (7) to a diameter of
0.266 to 0.270 in. (6.76 to 6.86 mm) for the first oversize hole in the MLG
trunnion.
(b) If necessary, use a drill to increase hole of the radius washer (7) to
diameter of  0.281 to 0.285 in. (7.14 to 7.24 mm) for the second oversize
hole in the MLG trunnion, (Refer to view B).
(c) Apply chemical conversion coating inside hole of radius washer (7).
(d) With sealant, wet−install the stud pins (8), and (9) on the MLG trunnion
with the nuts (1) and the radius washer (7), (Refer to view A and B).
NOTE: Use kit 601R57−048K5 for first oversize (1/4"). If necessary, use
kit 601R57−048K2 for second oversize.
(e) Peel laminated shims (5) to the same dimension before removal.
(f) Apply MIL−PRF−81733 type IV sealant on both sides of the laminated
shims (5).
(g) Install the two door hinge fittings (3), two laminated shims (5), two
serrated plates (4) on the stud pins with the washers (2) and nuts (6),
(Refer to view B, sheet 2).
(9) With sealant, wet−install two hi−lites and nuts (11) and (13) in the two tooling
holes of the MLG trunnion.
NOTE: Use kit 601R57−048K5 for next fastener size (5/16"). If necessary,
use kit 601R57−048K2 for first oversize.

### Page 43

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 42 of 67
Jul 17/2009
Revision C, Jun 06/2013
(10) With sealant, wet−install two hi−lites and nuts (15) and (17) in the two holes
of the MLG trunnion and the fittings.
NOTE: Use kit 601R57−048K5 for next fastener size (3/16"). If necessary,
use kit 601R57−048K2 for first oversize.
For Aircraft 8018 thru 8106
Refer to Figure 5.
(11) Install the two door hinge fittings (3) to the MLG trunnion as follows:
(a) With a drill, increase the hole of the radius washer (7) to diameter of
0.266 to 0.270 in. (6.76 to 6.86 mm) for first oversize hole in the MLG
trunnion.
(b) If necessary, use a drill to increase the hole of the radius washer (7) to
diameter of 0.281 to 0.285 in. (7.14 to 7.24 mm) for the second oversize
hole in the MLG trunnion, (Refer to view B).
(c) Apply chemical conversion coating in the hole of the radius washer (7)
and in the cold worked holes of the MLG  trunnion.
(d) With sealant, wet−install the stud pins (8), (9) and (10) in the MLG
trunnion with the nuts (1) and the radius washer (7), (Refer to view A and
B).
NOTE: Use kit 601R57−048K6 for first oversize (1/4"). If necessary, use
kit 601R57−048K4 for second oversize.
(e) Peel laminated shims (5) to the same dimension before removal.
(f) Apply MIL−PRF−81733 type IV sealant on both sides of laminated
shims (5).
(g) Install the two laminated shims (5), two serrated plates (4), two door
hinge fittings (3) on the stud pins with the washers (2) and nuts (6),
(Refer to view B, sheet 2).
(12) With sealant, wet−install two hi−lites and nuts (11) and (13) in the two tooling
holes of the MLG trunnion.
NOTE: Use kit 601R57−048K6 for next fastener size (5/16"). If necessary,
use kit 601R57−048K4 for first oversize.

### Page 44

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 43 of 67
Jul 17/2009
Revision C, Jun 06/2013
(13) With sealant, wet−install two hi−lites and nuts (15) and (17) in the two holes
of the MLG trunnion and the fittings.
NOTE: Use kit 601R57−048K6 for next fastener size (3/16"). If necessary,
use kit 601R57−048K4 for first oversize.
For all Aircraft
(14) Install the right MLG on aircraft (Refer to AMM 32−11−00−400−801).
(15) Install the right MLG door on aircraft (Refer to AMM 32−12−01−400−801).
(16) Do the identification of the MLG trunnion as follows:
(a) If an MLG trunnion was repaired or replaced, speak with a representative
of the Customer Response Centre (CRC) at 514−855−8500 for an
identification number.
For Aircraft 7011 and 7012
(b) If Service Bulletins 601R−32−097, 601R−57−046 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−10.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7003−7010, 7013−7067 and 7069−7138 Pre-REO 601R−57−21−003 and
Pre-SB 601R−32−054
(c)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−2.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).

### Page 45

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 44 of 67
Jul 17/2009
Revision C, Jun 06/2013
For Aircraft 7003−7010, 7013−7067 and 7069−7138 Post-REO 601R−57−21−003 or
Post-SB 601R−32−054
(d)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−4.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7139−7990 and 8000−8017
(e)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−4.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 8018−8079
(f) If Service Bulletins 601R−57−046 and 601R−57−048 have been
incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−6.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 8080−8106
(g) If Service Bulletins 601R−57−046 and 601R−57−048 have been
incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the MLG trunnion as K601R10032−8.
3 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).

### Page 46

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 45 of 67
Jul 17/2009
Revision C, Jun 06/2013
F . Job Close−Out
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 A2 HYD PUMP 3B 221
CBP−1 A5 HYD PUMP 2 221
CBP−1 F4 FLAPS CONT CH 1 221
CBP−1 F6 LGC/D1 221
CBP−1 F7 WOW 1 221
CBP−1 G3 BRAKE TEMP MON 221
CBP−1 G4 ANTI SKID 221
CBP−1 G11 HYD SYST AC PUMP CONT 3B 221
CBP−1 G14 HYD SYST AC PUMP CONT 2 221
CBP−2 A2 HYD PUMP 3A 222
CBP−2 F3 SECS PWR 2 222
CBP−2 F9 PROX SENS WOW 2 222
CBP−2 G4 ANTI SKID 222
CBP−2 G14 HYD SYST AC PUMP CONT 1 222
CBP−2 G15 HYD SYST AC PUMP CONT 3A 222
CBP−2 N8 SECU2 222
CBP−2 P2 LGC/D1 222
CBP−2 P3 LGC/D2 WOW 1 + 2 222
CBP−2 F4 FLAPS CONT CH 2 222
CBP−4 B13 LGC/D2 222
(3) Apply external AC power to the aircraft (Refer to AMM 12−00−07−861−801).
(4) Bleed hydraulic system No.1 (Refer to AMM 29−10−00−870−801).

### Page 47

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 46 of 67
Jul 17/2009
Revision C, Jun 06/2013
(5) Bleed hydraulic system No.2 (Refer to AMM 29−10−00−870−802).
(6) Bleed hydraulic system No.3 (Refer to AMM 29−10−00−870−803).
(7) Adjust the MLG door (Refer to AMM 32−12−01−820−801).
(8) Retract the inboard flap, (Refer to AMM 27−54−00−866−802).
(9) Do the functionnal test of the landing gear extension and retraction system
(Refer to AMM 32−30−00−720−801).
(10) Do the operational test of the landing gear manual release system
(Refer to AMM 32−34−00−710−801).
(11) Do the operational test of the brake system,
(Refer to AMM 32−43−00−710−801).
(12) Install the access panel that follows:
ACCESS DESIGNATION
640AT Access Panel
(13) Remove the nose landing gear lockpin
(Refer to AMM 10−11−00−000−801).
(14) Remove the MLG lockpins
(Refer to AMM 10−11−00−000−802).
(15) Remove the aircraft from jacks 
(Refer to AMM 07−11−01−582−804).
(16) When PART B of this service bulletin is completed, make this entry in the
applicable logbook(s): /quoteblleftService Bulletin 601R−57−048, Revision C, Wings −
Center Wing Primary Structure − Cold Work of Holes on the web of the Main
Landing Gear (MLG) Trunnion, PART B, incorporated."

### Page 48

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 47 of 67
Jul 17/2009
Revision C, Jun 06/2013
Removal of door hinge fitting and fasteners
Figure 1
MLG
TRUNNION
(REF)
rsb601r57048_002.dg, gb, 04/09/09
A
9
7
7
9
1
8
5
5
4
4
3
3
2 6
2
6
LEGEND
1. Nut.
2. Washer.
3. Door hinge fitting.
4. Serrated plate.
5. Laminated shim.
6. Nut.
7. Hi−Lite.
8. Stud pin.
A
9. Collar.
8
10. Radius washer.
10
1
1
2 Hi−lites and collars for
tooling holes
7 2
9
7 2
2
9 2
NOTES
1. Left side is shown,
Right side is opposite.

### Page 49

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 48 of 67
Jul 17/2009
Revision C, Jun 06/2013
Cold Work
Figure 2
NOTES
rsb601r57048_003.dg, gb, 04/09/09
A
A
VIEW LOOKING OUTBOARD
SYMBOL FASTENERSIZE STARTING HOLE DIAMETER
3/16”
3/16” 1st O/S
0.1703 to 0.1715 in. (4.326 to 4.356 mm)
0.1935 to 0.1953 in. (4.915 to 4.961 mm)
1/4” 1st O/S
1/4” 2nd O/S
0.2526 to 0.2544 in. (6.416 to 6.462 mm)
0.2684 to 0.2694 in. (6.817 to 6.843 mm)
5/16”
5/16” 1st O/S
0.2995 to 0.3005 in. (7.607 to 7.633 mm)
0.3155 to 0.3165 in. (8.014 to 8.039 mm)
COLD WORK
Point the split in the sleeve to
the up or down position.  This is
2
2
applicable to all cold work holes.
UP
DOWN
MLG
TRUNNION
(REF)
FITTING
(REF) FITTING
(REF)
1. Left side is shown,
Right side is opposite.

### Page 50

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 49 of 67
Jul 17/2009
Revision C, Jun 06/2013
Final reaming of the MLG trunnion
Figure 3
Left side is shown,
right side is opposite.
NOTE
rsb601r57048_004.dg, lr, apr02/2008
A
A
VIEW LOOKING OUTBOARD
SYMBOL FASTENERSIZE FINAL HOLE DIAMETER
3/16”
3/16” 1st O/S
0.1865 to 0.1890 in. (4.737 to 4.801 mm)
0.1995 to 0.2021 in. (5.067 to 5.133 mm)
1/4” 1st O/S
1/4” 2nd O/S
0.2620 to 0.2646 in. (6.655 to 6.721 mm)
0.2775 to 0.2802 in. (7.049 to 7.117 mm)
5/16”
5/16” 1st O/S
0.3090 to 0.3105 in. (7.849 to 7.887 mm)
0.3245 to 0.3261 in. (8.242 to 8.283 mm)
MLG
TRUNNION
(REF)
FITTING
(REF) FITTING
(REF)

### Page 51

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 50 of 67
Jul 17/2009
Revision C, Jun 06/2013
Door hinge fitting installation for 601R10031−1/−2/−11/−12 MLG trunnion
Figure 4 (Sheet 1 of 2)
rsb601r57048_005.dg, gb, 04/09/09
A
A
VIEW LOOKING OUTBOARD
SYMBOL NAME PART NUMBER NUT
Stud pin HST245AG −8−9−8 N/A
ITEM
8
OVERSIZE
PART NUMBER
HST345AG−8−9−8
Stud pin HST245AG −8−7−8 N/AHST345AG−8−7−89
Hi−Lite HST10AG10 −9 B0203038 −5HST110AG10−911
Hi−Lite HST10AG10 −7 B0203038 −5HST110AG10−713
Hi−Lite HST10AG6 −11 B0203013 −3HST110AG6−1115
Hi−Lite HST10AG6 −9 B0203013 −3HST110AG6−917
B
MLG
TRUNNION
(REF)
7069−7990, and 8000−8017 or
NOTES
1. Left side is shown,
Right side is opposite.
2. For aircraft 7003−7067,
aircraft that have MLG trunnion P/N
601R10031−1,−2,−1 1, or −12
installed.

### Page 52

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 51 of 67
Jul 17/2009
Revision C, Jun 06/2013
Door hinge fitting installation for 601R10031−1/−2/−11/−12 MLG trunnion
Figure 4 (Sheet 2 of 2)
rsb601r57048_006.dg, lr, mar06/2008
MLG
TRUNNION
(REF)
NOTE
1
1
5
5
4
4
3
3
2 6
2
6
LEGEND
1. Nut B0203038−4.
2. Washer AN960KD416L.
3. Door hinge fitting.
4. Serrated plate.
5. Laminated shim 601R31181−84.
6. Nut MS21042L4.
7. Radius washer.
B
7
1
1. Left side is shown,
Right side is opposite.
2. For aircraft 7003−7067, 7069−7990, and 8000−8017 or aircraft
that have MLG trunnion P/N 601R10031−1,−2,−11 , or −12 installed.

### Page 53

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 52 of 67
Jul 17/2009
Revision C, Jun 06/2013
Door hinge fitting installation for 601R10068−1/−2/−5/−6 MLG trunnion
Figure 5 (Sheet 1 of 2)
rsb601r57048_007.dg, gb, 04/09/09
A
A
VIEW LOOKING OUTBOARD
SYMBOL NAME PART NUMBER NUT
Stud pin HST245AG −8−9−8 N/A
ITEM
8
OVERSIZE
PART NUMBER
HST345AG−8−9−8
Stud pin HST245AG −8−8−8 N/AHST345AG−8−8−89
Stud pin HST245AG −8−10−8 N/AHST345AG−8−10−810
Hi−Lite HST10AG10 −9 B0203038 −5HST110AG10−911
Hi−Lite HST10AG10 −8 B0203038 −5HST110AG10−813
Hi−Lite HST10AG6 −11 B0203013 −3HST110AG6−1115
Hi−Lite HST10AG6 −10 B0203013 −3HST110AG6−1017
B
MLG
TRUNNION
(REF)
FITTING
(REF) FITTING
(REF)
2. For aircraft 8018−8106 or
NOTES
1. Left side is shown,
Right side is opposite.
aircraft that have MLG trunnion P/N
601R10068−1, −2, −5, or −6
installed.

### Page 54

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 53 of 67
Jul 17/2009
Revision C, Jun 06/2013
Door hinge fitting installation for 601R10068−1/−2/−5/−6 MLG trunnion
Figure 5 (Sheet 2 of 2)
rsb601r57048_009.dg, gb, 04/09/09
MLG
TRUNNION
(REF)
2. For aircraft 8018−8106 or aircraft that have MLG trunnion
NOTES
1
1
5
5
4
4
3
3
2 6
2
6
LEGEND
1. Nut B0203038−4.
2. Washer AN960KD416L.
3. Door hinge fitting.
4. Serrated plate.
5. Laminated shim 601R31181−84.
6. Nut MS21042L4.
7. Radius washer.
B
7
1
1. Left side is shown,
Right side is opposite.
P/N 601R10068−1,−2,−5, or −6 installed.

### Page 55

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 54 of 67
Jul 17/2009
Revision C, Jun 06/2013
For Aircraft that have incorporated the initial issue or revision A of this service bulletin
PART C − Identification of the Left and Right MLG Trunnion
NOTE: If the identification of the MLG trunnion was done with Service Bulletin
601R−57−046 or 601R−57−047, it is not necessary to do this PART.
G. Job Set−Up
Reference Information
REFERENCE DESIGNATION
AMM 10−11−00−400−801 Installation of the Nose Landing Gear Lockpin
AMM 10−11−00−400−802 Installation of the Main Landing Gear Lockpins
SRM 51−25−16 Fluid-Resistant (FR) Polyurethane Topcoat
SRM 51−26−00 Cleaning
(1) Make sure that the lockpins are installed in the nose and the main landing gears
(Refer to AMM 10−11−00−400−801 and 10−11−00−400−802).

### Page 56

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 55 of 67
Jul 17/2009
Revision C, Jun 06/2013
H. Procedure
(1) Do the identification of the MLG trunnion as follows:
(a) If an MLG trunnion was repaired or replaced, speak with a representative
of the Customer Response Centre (CRC) at 514−855−8500 for an
identification number.
For Aircraft 7011 and 7012
(b) If Service Bulletins 601R−32−097, 601R−57−046 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the left MLG trunnion as K601R10032−9.
3 Identify the right MLG trunnion as K601R10032−10.
4 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7003−7010, 7013−7067 and 7069−7138 Pre-REO 601R−57−21−003 and
Pre-SB 601R−32−054
(c)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the left MLG trunnion as K601R10032−1.
3 Identify the right MLG trunnion as K601R10032−2.
4 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7003−7010, 7013−7067 and 7069−7138 Post-REO 601R−57−21−003 or
Post-SB 601R−32−054
(d)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:

### Page 57

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 56 of 67
Jul 17/2009
Revision C, Jun 06/2013
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the left MLG trunnion as K601R10032−3.
3 Identify the right MLG trunnion as K601R10032−4.
4 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 7139−7990 and 8000−8017
(e)  If Service Bulletins 601R−57−046, 601R−57−047 and 601R−57−048
have been incorporated, do as follows:
1 Clean the identification areas with solvent 
(refer to SRM 51−26−00).
2 Identify the left MLG trunnion as K601R10032−3.
3 Identify the right MLG trunnion as K601R10032−4.
4 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 8018−8079
(f) If Service Bulletins 601R−57−046 and 601R−57−048 have been
incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the left MLG trunnion as K601R10032−5.
3 Identify the right MLG trunnion as K601R10032−6.
4 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).
For Aircraft 8080−8106
(g) If Service Bulletins 601R−57−046 and 601R−57−048 have been
incorporated, do as follows:
1 Clean the identification areas with solvent
(refer to SRM 51−26−00).
2 Identify the left MLG trunnion as K601R10032−7.
3 Identify the right MLG trunnion as K601R10032−8.
4 Apply a layer of clear polyurethane topcoat on the identifications
(refer to SRM 51−25−16).

### Page 58

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 57 of 67
Jul 17/2009
Revision C, Jun 06/2013
I. Job Close−Out
For all Aircraft
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) When PART C of this service bulletin is completed, make this entry in the
applicable logbook(s): /quoteblleftService Bulletin 601R−57−048, Revision C, Wings −
Center Wing Primary Structure − Cold Work of Holes on the web of the Main
Landing Gear (MLG) Trunnion, PART C, incorporated."

### Page 59

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 58 of 67
Jul 17/2009
Revision C, Jun 06/2013
3. MATERIAL INFORMATION
A. Kit Information
Kit Content:
KIT 601R57−048K1
PART NUMBER QUANTITY/C0001 NAME ALTERNATEPARTS
601R31181−84 2 Shim laminated
AN960KD416L
B0203013−3
B0203038−4
B0203038−5
CBS−10−0−N−16F
CBS−4−4−N−16F
CBS−8−1−N−16S
HST10AG10−7
HST10AG10−9
HST10AG6−11
HST10AG6−9
HST245AG−8−7−8
7
3
7
3
4
4
12
2
2
2
2
3
Washer
Nut
Nut 1st and 2 nd O/S
Nut 1st & 2nd O/S
Flared sleeve
Flared sleeve
Straight sleeve
Hi−lites 5/16
Hi−lites 5/16
Hi−lites 3/16
Hi−lites 3/16
Stud pin 1/4 1st O/S
HST245AG−8−9−8 5 Stud pin 1/4 1st O/S
MS21042L4 7 Nut
/C0001 The kit can contain more hardware and/or material than necessary.
KIT 601R57−048K2
PART NUMBER QUANTITY/C0001 NAME ALTERNATEPARTS
CBS−10−1−N−16F 8 Flared sleeve

### Page 60

SERVICE BULLETIN  601R−57−048
SB 601R−57−048
Page 59 of 67
Jul 17/2009
Revision C, Jun 06/2013
PART NUMBER
ALTERNATE
PARTSNAMEQUANTITY/C0001
CBS−6−1−N−16F
CBS−8−2−N−16S
8
24
Flared sleeve
Straight sleeve
HST110AG10−7 3 Hi−lites 5/16 1st O/S
HST110AG10−9 3 Hi−lites 5/16 1st O/S
HST110AG6−11 3 Hi−lites 3/16 1st O/S
HST110AG6−9 3 Hi−lites 3/16 1st O/S
HST345AG−8−7−8 5 Stud pin 1/4 2nd O/S
HST345AG−8−9−8 9 Stud pin 1/4 2nd O/S
/C0001 The kit can contain more hardware and/or material than necessary.
KIT 601R57−048K3
PART NUMBER QUANTITY/C0001 NAME ALTERNATEPARTS
601R31181−84 2 Shim laminated
AN960KD416L 7 Washer
B0203013−3 3 Nut
B0203038−4 7 Nut 1st and 2 nd O/S
B0203038−5 3 Nut 1st & 2nd O/S
CBS−10−0−N−16F 4 Flared sleeve
CBS−4−4−N−16F 4 Flared sleeve
CBS−8−1−N−16S 12 Straight sleeve
HST10AG10−8 2 Hi−lites 5/16
HST10AG10−9 2 Hi−lites 5/16
HST10AG6−10 2 Hi−lites 3/16
HST10AG6−11 2 Hi−lites 3/16

The text continues at https://openairdocs.org/service-documents/bombardier/601r-57-048/file/865db26f0f9a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
