# Bombardier Service Bulletin 670BA-25-101: Revision B

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0810; AD 2018-07-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Service Bulletin 670BA-25-101](https://openairdocs.org/service-documents/bombardier/670ba-25-101.md)
- Title as filed: SB 670BA-25-101 Rev B
- Pages: 33
- PDF: https://openairdocs.org/files/sha256/00/3c/003cd4cc3ccab724f96f828a433cdb52bfb2aa855c7453a4337c1d3e08a45e7a
- Page: https://openairdocs.org/service-documents/bombardier/670ba-25-101/file/003cd4cc3cca

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

the evolution of mobility
SB 670BA- - - 25- - - 101
Page 1 of 1
Jan 12/2017
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
SERVICE BULLETIN 670BA - - -25 - - -101
SUBJECT : Equipment and Furnishings - - - General - - - Installation of a Protective
Sleeve on the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward
Lavatory and Aft Lavatory
This Page transmits:
Revision B of Service Bulletin 670BA- - - 25- - - 101, dated Jan 12/2017
For aircraft that have had the initial issue or Revision A of this ser-
vice bulletin incorporated, it is necessary to refer to the Compliance
p a r a g r a p h1 . D .o ft h i ss e r v i c eb u l l e t i n .
Reason:
Revised Planning Information, paragraph 1., to:
Change the Compliance
Change a Reference
Revised Accomplishment Instructions, paragraph 2., to:
Add the C&D Zodiac Service Bulletin Revision numbers in the Procedure sections.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:
Discard the copy of Service Bulletin 670BA- - - 25- - - 101 Revision A, dated Oct 31/2016.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Dec 17/2015
Revision A, dated Oct 31/2016
1

### Page 2

the evolution of mobility
SB 670BA- - - 25- - - 101
Page 1 of 32
Dec 17/2015
Revision B, Jan 12/2017
SERVICE BULLETIN
T echnical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER HAS INCLUDED THE NEW
OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR
ATA SYSTEM: 25- - -00 NUMBER: 670BA - - -25- - -101
SUBJECT : Equipment and Furnishings - - - General - - - Installation of a Protective
Sleeve on the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward
Lavatory and Aft Lavatory
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
AIRCRAFT
MODEL
SERVICE AIRCRAFT
SERIAL NUMBERS
PRODUCTION
AIRCRAFT
SERIAL NUMBERS
CL- - - 600- - - 2C1010001 thru 10344 [1] [1]
CL- - - 600- - - 2D15
and
CL- - - 600- - - 2D24
15001 thru 15382 [1] [1]
CL- - - 600- - - 2E2519001 thru 19044 [1] [1]
[1] Aircraft serial numbers 10345 and subsequent serial numbers, 15383
and subsequent serial numbers, and 19045 and subsequent serial
numbers will have an equivalent modification incorporated before delivery.

### Page 3

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 2 of 32
Dec 17/2015
Revision B, Jan 12/2017
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier service bulletins. Before you do this service
bulletin, examine all Supplemental Type Certificates (STCs) and
Supplemental Type Approvals (STAs) or equivalent action changes
to make sure you can complete this service bulletin.
B. Reason
(1) Condition
It is possible for the un-insulated bonding jumper wire of the galleys and
lavatories (lavs) to have an electrical short. This can cause an electrical fire in
the aircraft.
(2) Evidence
One in-service aircraft had this condition reported.
(3) Objective/Benefit
This service bulletin gives the instruction to do the applicable C&D Zodiac
Service Bulletin. This is to add a protective sleeve on the bonding jumper
wires for the galleys and lavs. This is to protect the bonding jumper wire and
prevent an electrical short.
C. Description
This service bulletin is divided into six parts: PART A, PART B, PART C, PART D,
PART E and PART F .
PART A - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Galley 1
If necessary, the G1 galley is removed or the applicable galley equipment, doors
and access panels are removed or opened. C&D Zodiac Service Bulletin
9327336- - - 25- - - 01 is done. If removed, the G1 galley is installed. The removed or
opened access panels, doors and galley equipment are installed or closed.
PART B - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Galley 2
If necessary, the G2 galley is removed, or the applicable galley equipment, doors
and access panels are removed or opened. A detailed inspection is done to find if
a bonding jumper is installed. If a bonding jumper is installed, C&D Zodiac Service
Bulletin 9327336- - - 25- - - 02 is done. If removed, the G2 galley is installed. The
removed or opened access panels, doors and galley equipment are installed or
closed.

### Page 4

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 3 of 32
Dec 17/2015
Revision B, Jan 12/2017
PART C - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Galley 4
If necessary, the G4 galley is removed, or the applicable galley equipment, doors
and access panels are removed or opened. A detailed inspection is done to find if
a bonding jumper is installed. If a bonding jumper is installed, C&D Zodiac Service
Bulletin 9327336- - - 25- - - 03 is done. If removed, the G4 galley is installed. The
removed or opened access panels, doors and galley equipment are installed or
closed.
PART D - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Forward Lavatory
If necessary, the forward lav is removed, or the applicable access doors and
access panels are removed or opened. C&D Zodiac Service Bulletin
9327336- - - 25- - - 04 is done. If removed, the forward lav is installed. The removed or
opened access panels and access doors are installed or closed.
PART E - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Aft Lavatory
If necessary, the aft lav is removed, or the applicable access doors and access
panels are removed or opened. C&D Zodiac Service Bulletin 9327336- - - 25- - - 05 is
done. If removed, the aft lav is installed. The removed or opened access panels
and access doors are installed or closed.
PART F - - - Detailed Inspection for the Installation of a Protective Sleeve on the
Bonding Jumper of the G1 galley, G2 galley, G4 galley, Forward Lavatory and
Aft Lavatory
The applicable access doors and access panels are removed or opened. For
aircraft that have a G2 and/or a G4 galley installed, a detailed inspection is done to
find if a bonding jumper is installed. A detailed inspection is done to find if a
protective sleeve is installed on the bonding jumper for the monuments that follow:
--- G 1 g a l l e y,
- - - G2 galley if installed and if a bonding jumper is installed,
- - - G4 galley if installed and if a bonding jumper is installed,
- - - Forward lav if installed,
--- A f t l a v.
If a protective sleeve is not installed on a bonding jumper, the applicable PART A
and/or PART B and/or PART C and/or PART D and/or PART E of this service bulletin
is done. The removed or opened access panels and access doors are installed or
closed.

### Page 5

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 4 of 32
Dec 17/2015
Revision B, Jan 12/2017
D. Compliance
Recommended service bulletin.
For aircraft that have not had the initial issue or Revision A of this service bulletin
incorporated
For all aircraft
B o m b a r d i e rr e c o m m e n d st h a tP A R TAo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e
than 6600 flight hours or no later than 36 months from the initial release date of this
service bulletin, whichever comes first, unless otherwise directed by the
airworthiness authority of the operator.
For aircraft that have a G2 galley installed
B o m b a r d i e rr e c o m m e n d st h a tP A R TBo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e
than 6600 flight hours or no later than 36 months from the initial release date of this
service bulletin, whichever comes first, unless otherwise directed by the
airworthiness authority of the operator.
For aircraft that have a G4 galley installed
B o m b a r d i e rr e c o m m e n d st h a tP A R TCo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e
than 6600 flight hours or no later than 36 months from the initial release date of this
service bulletin, whichever comes first, unless otherwise directed by the
airworthiness authority of the operator.
For aircraft that have a forward lavatory installed
B o m b a r d i e rr e c o m m e n d st h a tP A R TDo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e
than 6600 flight hours or no later than 36 months from the initial release date of this
service bulletin, whichever comes first, unless otherwise directed by the
airworthiness authority of the operator.
For all aircraft
B o m b a r d i e rr e c o m m e n d st h a tP A R TEo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e
than 6600 flight hours or no later than 36 months from the initial release date of this
service bulletin, whichever comes first, unless otherwise directed by the
airworthiness authority of the operator.

### Page 6

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 5 of 32
Dec 17/2015
Revision B, Jan 12/2017
For aircraft that have had the initial issue of this service bulletin incorporated
AND
For aircraft that have had Revision A of this service bulletin incorporated and did
not use Revision 2 of C&D Zodiac Service Bulletins 9327336 - - -25 - - -01,
9327336 - - -25 - - -02, 9327336 - - -25 - - -03, and/or 9327336 - - -25 - - -05, and/or Revision 4 of
C&D Zodiac Service Bulletin 9327336 - - -25 - - -04
B o m b a r d i e rr e c o m m e n d st h a tP A R TFo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e
than 6600 flight hours or no later than 36 months from the release date of Revision
A of this service bulletin, whichever comes first, unless otherwise directed by the
airworthiness authority of the operator:
During the detailed inspection done in PART F , Bombardier recommends that the
applicable PART of this service bulletin be done as shown in the table below, unless
otherwise directed by the airworthiness authority of the operator:
Monument/Result Action
For all aircraft, if there is no
protective sleeve on the bonding
jumper of the G1 galley
PART A must be done at no more than 6600
flight hours or no later than 36 months from
the release date of Revision A of this service
bulletin, whichever comes first.
F o ra i r c r a f tt h a th a v eaG 2g a l l e y
installed with a bonding jumper,
i ft h e r ei sn op r o t e c t i v es l e e v eo n
the bonding jumper of the G2
galley
PART B must be done at no more than 6600
flight hours or no later than 36 months from
the release date of Revision A of this service
bulletin, whichever comes first.
F o ra i r c r a f tt h a th a v eaG 4g a l l e y
installed with a bonding jumper,
i ft h e r ei sn op r o t e c t i v es l e e v eo n
the bonding jumper of the G4
galley
PART C must be done at no more than 6600
flight hours or no later than 36 months from
the release date of Revision A of this service
bulletin, whichever comes first.
For aircraft that have a forward
lavatory installed, if there is no
protective sleeve on the bonding
jumper of the forward lavatory
PART D must be done at no more than 6600
flight hours or no later than 36 months from
the release date of Revision A of this service
bulletin, whichever comes first.
For all aircraft, if there is no
protective sleeve on the bonding
jumper of the aft lavatory
PART E must be done at no more than 6600
flight hours or no later than 36 months from
the release date of Revision A of this service
bulletin, whichever comes first.

### Page 7

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 6 of 32
Dec 17/2015
Revision B, Jan 12/2017
For all aircraft
NOTE: If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative
of Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0)
or 1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for
analysis and to get an approved disposition to complete this service
bulletin.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance Inspections (DTIs).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93- - -Q- - -02.
F. M a n p o w e r
The man-hours given below are estimates for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
- - - Administrative functions such as planning, liaising, familiarization, and report writing.
- - - Non-productive elapsed time such as rest time, having meals, and crew shift
changes.
- - - Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
- - -Preparation for modification (unless specified in the Accomplishment
Instructions) such as cleaning and getting parts, tools, consumables, and
ground equipment.
- - -Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
- - -All other activities that are not considered by Bombardier as directly related to the
accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services
representative for an estimate. Call the Fleet Services Team through the
CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or 1- - - 514- - - 855- - - 8500 or
e-mail at thd.crj@aero.bombardier.com.

### Page 8

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 7 of 32
Dec 17/2015
Revision B, Jan 12/2017
FOR PART A
It will take an estimated 1.5 man-hours to complete PART A of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75
NOTE: These estimates do not include the man-hours necessary to remove and
install the G1 galley.
NOTE: These estimates do not include the man-hours necessary to do C&D
Zodiac Service Bulletin 9327336- - - 25- - - 01.
FOR PART B
It will take an estimated 1.5 man-hours to complete PART B of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75
NOTE: These estimates do not include the man-hours necessary to remove and
install the G2 galley.
NOTE: These estimates do not include the man-hours necessary to do C&D
Zodiac Service Bulletin 9327336- - - 25- - - 02.

### Page 9

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 8 of 32
Dec 17/2015
Revision B, Jan 12/2017
FOR PART C
It will take an estimated 1.5 man-hours to complete PART C of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75
NOTE: These estimates do not include the man-hours necessary to remove and
install the G4 galley.
NOTE: These estimates do not include the man-hours necessary to do C&D
Zodiac Service Bulletin 9327336- - - 25- - - 03.
FOR PART D
It will take an estimated 1.5 man-hours to complete PART D of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75
NOTE: These estimates do not include the man-hours necessary to remove and
install the forward lav.
NOTE: These estimates do not include the man-hours necessary to do C&D
Zodiac Service Bulletin 9327336- - - 25- - - 04.

### Page 10

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 9 of 32
Dec 17/2015
Revision B, Jan 12/2017
FOR PART E
It will take an estimated 1.5 man-hours to complete PART E of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75
NOTE: These estimates do not include the man-hours necessary to remove and
install the aft lav.
NOTE: These estimates do not include the man-hours necessary to do C&D
Zodiac Service Bulletin 9327336- - - 25- - - 05.
FOR PART F
It will take an estimated 1.75 man-hours for each monument to complete PART F of
this service bulletin The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure 0.25
(3) T est N/A
(4) Job Close-Out 0.75
G. Material - - - Price and Availability
Refer to paragraph 3.B. and to C&D Zodiac Service Bulletins 9327336- - - 25- - - 01,
9327336- - - 25- - - 02, 9327336- - - 25- - - 03, 9327336- - - 25- - - 04 and 9327336- - - 25- - - 05 for a
list of consumables for this service bulletin.
H. T ooling - - - Price and Availability
Refer paragraph 3.C. and to C&D Zodiac Service Bulletins 9327336- - - 25- - - 01,
9327336- - - 25- - - 02, 9327336- - - 25- - - 03, 9327336- - - 25- - - 04, and 9327336- - - 25- - - 05 for a
list of special tools and equipment for this service bulletin.

### Page 11

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 10 of 32
Dec 17/2015
Revision B, Jan 12/2017
I. Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
K. References
Refer to the SB Introduction document for definition or explanation of service
bulletin content.
Restriction and/or Special Instruction (RSI) C- - -25- - -1712- - -00, Revision C
Modification Summary 670T014674, Revision A
Modification Summary 670T014850, Revision A
C&D Zodiac Service Bulletin 9327336- - - 25- - - 01, Revision 2 dated Sep13/16
C&D Zodiac Service Bulletin 9327336- - - 25- - - 02, Revision 2 dated Sep13/16
C&D Zodiac Service Bulletin 9327336- - - 25- - - 03, Revision 2 dated Sep13/16
C&D Zodiac Service Bulletin 9327336- - - 25- - - 04, Revision 4 dated Sep13/16
C&D Zodiac Service Bulletin 9327336- - - 25- - - 05, Revision 2 dated Sep13/16
Aircraft Maintenance Manual (AMM)
For Bombardier reference only: PCA 76217
L. Other Publications Affected
Aircraft Illustrated Parts Catalogue (AIPC)
M. Relationship Chart
Not applicable.

### Page 12

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 11 of 32
Dec 17/2015
Revision B, Jan 12/2017
2. ACCOMPLISHMENT INSTRUCTIONS
PART A - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 1
Reference Information
REFERENCE DESIGNATION
A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions
A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 2 Removal of the Galley 1
A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 2 Installation of the Galley 1
A. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(3) If necessary, remove the G1 galley (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).
(4) If the G1 galley is not removed, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).
(b) Remove or open the applicable galley equipment, doors and access
panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).

### Page 13

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 12 of 32
Dec 17/2015
Revision B, Jan 12/2017
B. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or
1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
(2) Do C&D Zodiac Service Bulletin 9327336- - - 25- - - 01 Revision 2.
C. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If removed, install the G1 galley (refer to AMM 25- - - 31- - - 01- - - 400- - - 802).
(3) If the G1 galley was not removed, do the steps that follow:
(a) Install or close the removed or opened galley equipment, doors and
access panels (refer to AMM 25- - - 31- - - 01- - - 400- - - 802).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 31- - - 01- - - 400- - - 802).
(4) When PART A of this service bulletin is completed, make this entry in the
applicable logbooks: “Service Bulletin 670BA- - - 25- - - 101, Revision B,
Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on
the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and
Aft Lavatory, PART A, incorporated.”

### Page 14

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 13 of 32
Dec 17/2015
Revision B, Jan 12/2017
PART B - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 2
Reference Information
REFERENCE DESIGNATION
A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions
A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 1 Removal of the Galley 2
A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 1 Installation of the Galley 2
D. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(3) If necessary, remove the G2 galley (refer to AMM 25- - - 31- - - 01- - - 000- - - 801).
(4) If the G2 galley is not removed, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 801).
(b) Remove or open the applicable galley equipment, doors and access
panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 801).

### Page 15

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 14 of 32
Dec 17/2015
Revision B, Jan 12/2017
E. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or
1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 1, Sheet 2
(2) Do a detailed inspection to find if a bonding jumper is installed between the
G2 galley and aircraft.
(3) If a bonding jumper is installed, do C&D Zodiac Service Bulletin
9327336- - - 25- - - 02 Revision 2.
F. J o b C l o s e - O u t
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If removed, install the G2 galley (refer to AMM 25- - - 31- - - 01- - - 400- - - 801).
(3) If the G2 galley was not removed, do the steps that follow:
(a) Install or close the removed or opened galley equipment, doors and
access panels (refer to AMM 25- - - 31- - - 01- - - 400- - - 801).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 31- - - 01- - - 400- - - 801).
(4) When PART B of this service bulletin is completed, make this entry in the
applicable logbooks: “Service Bulletin 670BA- - - 25- - - 101, Revision B,
Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on
the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and
Aft Lavatory, PART B, incorporated.”

### Page 16

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 15 of 32
Dec 17/2015
Revision B, Jan 12/2017
PART C - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 4
Reference Information
REFERENCE DESIGNATION
A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions
A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 4 Removal of the Galley 4
A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 4 Installation of the Galley 4
G. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(3) If necessary, remove the G4 galley (refer to AMM 25- - - 31- - - 01- - - 000- - - 804).
(4) If the G4 galley is not removed, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 804).
(b) Remove or open the applicable galley equipment, doors and access
panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 804).

### Page 17

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 16 of 32
Dec 17/2015
Revision B, Jan 12/2017
H. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or
1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 1, Sheet 3
(2) Do a detailed inspection to find if a bonding jumper is installed between the
G4 galley and aircraft.
(3) If a bonding jumper is installed, do C&D Zodiac Service Bulletin
9327336- - - 25- - - 03 Revision 2.
I. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If removed, install the G4 galley (refer to AMM 25- - - 31- - - 01- - - 400- - - 804).
(3) If the G4 galley was not removed, do the steps that follow:
(a) Install or close the removed or opened galley equipment, doors and
access panels (refer to AMM 25- - - 31- - - 01- - - 400- - - 804).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 31- - - 01- - - 400- - - 804).
(4) When PART C of this service bulletin is completed, make this entry in the
applicable logbooks: “Service Bulletin 670BA- - - 25- - - 101, Revision B,
Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on
the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and
Aft Lavatory, PART C, incorporated.”

### Page 18

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 17 of 32
Dec 17/2015
Revision B, Jan 12/2017
PART D - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Forward Lavatory
Reference Information
REFERENCE DESIGNATION
A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions
A M M 2 5 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 1Removal of the Forward T oilet Enclosure
A M M 2 5 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 1Installation of the Forward T oilet Enclosure
J. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(3) If necessary, remove the forward toilet enclosure
(refer to AMM 25- - - 41- - - 01- - - 000- - - 801).
(4) If the forward toilet enclosure is not removed, do the step that follows:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 41- - - 01- - - 000- - - 801).
(b) Remove or open the applicable access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 000- - - 801).

### Page 19

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 18 of 32
Dec 17/2015
Revision B, Jan 12/2017
K. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or
1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
(2) Do C&D Zodiac Service Bulletin 9327336- - - 25- - - 04 Revision 4.
L. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If removed, install the forward toilet enclosure
(refer to AMM 25- - - 41- - - 01- - - 400- - - 801).
(3) If the forward toilet enclosure was not removed, do the steps that follow:
(a) Install or close the removed or opened access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 400- - - 801).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 41- - - 01- - - 400- - - 801).
(4) When PART D of this service bulletin is completed, make this entry in the
applicable logbooks: “Service Bulletin 670BA- - - 25- - - 101, Revision B,
Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on
the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and
Aft Lavatory, PART D, incorporated.”

### Page 20

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 19 of 32
Dec 17/2015
Revision B, Jan 12/2017
PART E - - - Installation of a Protective Sleeve on the Bonding Jumper of the
Aft Lavatory
Reference Information
REFERENCE DESIGNATION
A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions
A M M 2 5 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 2 R e m o v a lo ft h eA f tT o i l e tE n c l o s u r e
A M M 2 5 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 2 Installation of the Aft T oilet Enclosure
M. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(3) If necessary, remove the aft toilet enclosure
(refer to AMM 25- - - 41- - - 01- - - 000- - - 802).
( 4 ) I ft h ea f tt o i l e te n c l o s u r ei sn o tr e m o v e d ,d ot h es t e p st h a tf o l l o w :
(a) Open and tag the circuit breakers (refer to AMM 25- - - 41- - - 01- - - 000- - - 802).
(b) Remove or open the applicable access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 000- - - 802).

### Page 21

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 20 of 32
Dec 17/2015
Revision B, Jan 12/2017
N. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or
1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
(2) Do C&D Zodiac Service Bulletin 9327336- - - 25- - - 05 Revision 2.
O. Job Close -Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If removed, install the aft toilet enclosure
(refer to AMM 25- - - 41- - - 01- - - 400- - - 802).
(3) If the aft toilet enclosure was not removed, do the steps that follow:
(a) Install or close the removed or opened access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 400- - - 802).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 41- - - 01- - - 400- - - 802).
(4) When PART E of this service bulletin is completed, make this entry in the
applicable logbooks: “Service Bulletin 670BA- - - 25- - - 101, Revision B,
Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on
the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and
Aft Lavatory, PART E, incorporated.”

### Page 22

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 21 of 32
Dec 17/2015
Revision B, Jan 12/2017
PART F - - - Detailed Inspection for the Installation of a Protective Sleeve on the Bonding
Jumper of the G1 galley, G2 galley, G4 galley, Forward Lavatory and Aft Lavatory
Reference Information
REFERENCE DESIGNATION
A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance
A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions
A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 1 Removal of the Galley 2
A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 2 Removal of the Galley 1
A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 4 Removal of the Galley 4
A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 1 Installation of the Galley 2
A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 2 Installation of the Galley 1
A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 4 Installation of the Galley 4
A M M 2 5 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 1Removal of the Forward T oilet Enclosure
A M M 2 5 --- 4 1 --- 0 1 --- 0 0 0 --- 8 0 2 R e m o v a lo ft h eA f tT o i l e tE n c l o s u r e
A M M 2 5 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 1Installation of the Forward T oilet Enclosure
A M M 2 5 --- 4 1 --- 0 1 --- 4 0 0 --- 8 0 2 Installation of the Aft T oilet Enclosure
P. J o b S e t - U p
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions
(refer to AMM 24- - - 00- - - 00- - - 910- - - 801).

### Page 23

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 22 of 32
Dec 17/2015
Revision B, Jan 12/2017
For all aircraft
(3) For the G1 galley, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).
(b) Remove or open the applicable galley equipment, doors and access
panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).
For aircraft that have a G2 galley installed
(4) For the G2 galley, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 801).
(b) Remove or open the applicable galley equipment, doors and access
panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 801).
For aircraft that have a G4 galley installed
(5) For the G4 galley, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 804).
(b) Remove or open the applicable galley equipment, doors and access
panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 804).
For aircraft that have a forward lavatory installed
(6) For the forward lavatory, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 41- - - 01- - - 000- - - 801).
(b) Remove or open the applicable access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 000- - - 801).
For all aircraft
(7) For the aft lavatory, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 41- - - 01- - - 000- - - 802).
(b) Remove or open the applicable access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 000- - - 802).

### Page 24

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 23 of 32
Dec 17/2015
Revision B, Jan 12/2017
Q. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or
1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
For all aircraft
Refer to Figure 1, Sheet 1 and Sheet 6
(2) On the G1 galley, do the steps that follow:
(a) Do a detailed inspection to find if a protective sleeve is installed on the
bonding jumper between the galley and aircraft.
(b) If a protective sleeve is not installed on the bonding jumper , do PART A
of this service bulletin.
For aircraft that have a G2 galley installed
Refer to Figure 1, Sheet 2 and Sheet 6
(3) On the G2 galley, do the steps that follow:
(a) Do a detailed inspection to find if a bonding jumper is installed between
the galley and aircraft.
(b) If a bonding jumper is installed, do the steps that follow:
1 Do a detailed inspection to find if a protective sleeve is installed on
the bonding jumper.
2 If a protective sleeve is not installed on the bonding jumper, do
PART B of this service bulletin.
For aircraft that have a G4 galley installed
Refer to Figure 1, Sheet 3 and Sheet 6
(4) On the G4 galley, do the steps that follow:
(a) Do a detailed inspection to find if a bonding jumper is installed between
the galley and aircraft.

### Page 25

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 24 of 32
Dec 17/2015
Revision B, Jan 12/2017
(b) If a bonding jumper is installed, do the steps that follow:
1 Do a detailed inspection to find if a protective sleeve is installed on
the bonding jumper.
2 If a protective sleeve is not installed on the bonding jumper, do
PART C of this service bulletin.
For aircraft that have a forward lavatory installed
Refer to Figure 1, Sheet 4 and Sheet 6
(5) On the forward lavatory, do the steps that follow:
(a) Do a detailed inspection to find if a protective sleeve is installed on the
bonding jumper between the forward lavatory and aircraft.
(b) If a protective sleeve is not installed on the bonding jumper , do PART D
of this service bulletin.
For all aircraft
Refer to Figure 1, Sheet 5 and Sheet 6
(6) On the aft lavatory, do the steps that follow:
(a) Do a detailed inspection to find if a protective sleeve is installed on the
bonding jumper between the aft lavatory and aircraft.
(b) If a protective sleeve is not installed on the bonding jumper , do PART E
of this service bulletin.
R. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.

### Page 26

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 25 of 32
Dec 17/2015
Revision B, Jan 12/2017
For all aircraft
(2) For the G1 galley, do the steps that follow:
(a) Install or close the removed or opened galley equipment, doors and
access panels (refer to AMM 25- - - 31- - - 01- - - 400- - - 802).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 31- - - 01- - - 400- - - 802).
For aircraft that have a G2 galley installed
(3) For the G2 galley, do the steps that follow:
(a) Install or close the removed or opened galley equipment, doors and
access panels (refer to AMM 25- - - 31- - - 01- - - 400- - - 801).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 31- - - 01- - - 400- - - 801).
For aircraft that have a G4 galley installed
(4) For the G4 galley, do the steps that follow:
(a) Install or close the removed or opened galley equipment, doors and
access panels (refer to AMM 25- - - 31- - - 01- - - 400- - - 804).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 31- - - 01- - - 400- - - 804).
For aircraft that have a forward lavatory installed
(5) For the forward lavatory, do the steps that follow:
(a) Install or close the removed or opened access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 400- - - 801).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 41- - - 01- - - 400- - - 801).
For all aircraft
(6) For the aft lavatory, do the steps that follow:
(a) Install or close the removed or opened access doors and access panels
(refer to AMM 25- - - 41- - - 01- - - 400- - - 802).
(b) Remove the tags and close the circuit breakers
(refer to AMM 25- - - 41- - - 01- - - 400- - - 802).
(7) When PART F of this service bulletin is completed, make this entry in the
applicable logbooks: “Service Bulletin 670BA- - - 25- - - 101, Revision B,
Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on
the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and
Aft Lavatory, PART F , incorporated.”

### Page 27

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 26 of 32
Dec 17/2015
Revision B, Jan 12/2017
Galley and Lavatory Bonding Jumpers
F i g u r e1( S h e e t1o f6 )
ba8803a01.cgm_fp_30 Sept 2016
A
G1 GALLEY
TYPICALA
BONDING
JUMPER
(REF)

### Page 28

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 27 of 32
Dec 17/2015
Revision B, Jan 12/2017
Galley and Lavatory Bonding Jumpers
F i g u r e1( S h e e t2o f6 )
ba8803a02.cgm_fp_30 Sept 2016
G2 GALLEY
TYPICAL
B
B
BONDING
JUMPER
(REF)

### Page 29

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 28 of 32
Dec 17/2015
Revision B, Jan 12/2017
Galley and Lavatory Bonding Jumpers
F i g u r e1( S h e e t3o f6 )
ba8803a03.cgm_fp_30 Sept 2016
G4 GALLEY
TYPICAL
C
C
BONDING
JUMPER
(REF)

### Page 30

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 29 of 32
Dec 17/2015
Revision B, Jan 12/2017
Galley and Lavatory Bonding Jumpers
F i g u r e1( S h e e t4o f6 )
ba8803a04.cgm_fp_30 Sept 2016
FORWARD LAVATORY
TYPICAL
BONDING
JUMPER
(REF)
D
D

### Page 31

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 30 of 32
Dec 17/2015
Revision B, Jan 12/2017
Galley and Lavatory Bonding Jumpers
F i g u r e1( S h e e t5o f6 )
E
ba8803a05, kp, Oct. 7, 2016
AFT LAVATORY
TYPICAL
BONDING
JUMPER
(REF)
E

### Page 32

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 31 of 32
Dec 17/2015
Revision B, Jan 12/2017
Galley and Lavatory Bonding Jumpers
F i g u r e1( S h e e t6o f6 )
ba8803a06.cgm_fp_30 Sept 2016
1
2
3
GALLEY OR LAV
GROUND (REF)
TYPICAL
AIRCRAFT
GROUND
(REF)
GALLEY OR LAV
GROUND (REF)
TYPICAL
AIRCRAFT
GROUND
(REF)
GALLEY AND LAVATORY
BONDING JUMPER
NOTES
S h o w nw i t hn op r o t e c t i v e
sleeve installed.
Shown with protective
sleeve installed.
It is possible for some
protective sleeves to be
installed with cable ties.
1
2
3

### Page 33

SERVICE BULLETIN 670BA- - -25- - -101
SB 670BA- - - 25- - - 101
Page 32 of 32
Dec 17/2015
Revision B, Jan 12/2017
3. MATERIAL INFORMATION
A. Kit Information
None.
B. Consumable Information
For a list of consumables, refer to the different tasks and the C&D Zodiac service
bulletins that are given as references in this service bulletin.
C. Special T ools and Equipment
For a list of special tools and equipment, refer to the different tasks and the C&D
Zodiac service bulletins that are given as references in this service bulletin.
D. Disposition of Parts
Not applicable.
1

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.