# Bombardier Service Bulletin 670BA-53-042: Revision B

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2018-0587; AD 2018-20-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Service Bulletin 670BA-53-042](https://openairdocs.org/service-documents/bombardier/670ba-53-042.md)
- Title as filed: Bombardier SB 670BA-53-042B
- Pages: 29
- PDF: https://openairdocs.org/files/sha256/af/ef/afefaafef16e06092be92a35e47d91b8b67ed476595fee925c08cf7293f65cb8
- Page: https://openairdocs.org/service-documents/bombardier/670ba-53-042/file/afefaafef16e

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SB 670BA- - - 53- - - 042
Page 1 of 1
Oct 20/2017
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
SERVICE BULLETIN 670BA - - -53 - - -042
S U B J E C T: F u s e l a g e --- M i d d l e F u s e l a g e --- I n s p e c t i o n o f t h e W i n g --- t o --- F u s e l a g e
Attachment Nuts
This page transmits:
Revision B of Service Bulletin 670BA- - - 53- - - 042,
pages 1 thru 28, dated Oct 20/2017
For aircraft that have incorporated a previous issue of this service
bulletin, refer to the compliance section.
Reason:
Revised Planning Information, paragraph 1., to:
Add aircraft models CL- - - 600- - - 2D15, CL- - - 600- - - 2D24, and CL- - - 600- - - 2E25 for the
inspection of the wing to fuselage attach nuts of the forward keel beam.
Change the compliance time from 6600 to 8800 flight hours for the repeat
inspection of the wing to fuselage attach nuts of the forward keel beam.
Remove the repeat inspection requirements for the nuts on the aft keel, rear spar
links, and the side stay fittings.
Revised Accomplishment Instructions, paragraph 2., to:
D i v i d et h ei n s t r u c t i o n si n t of i v ep a r t s .P A R TA ,P A R TB ,P A R TC ,P A R TD ,a n d
PART E.
Change the inspection of the wing to fuselage attach nuts of the forward keel beam
from two nuts to four nuts for all aircraft.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:
Discard the copy of Service Bulletin 670BA- - - 53- - - 042, Revision A, dated Apr 27/ 2012.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Dec 21/2011.
Revision A, dated Apr 27/2012
1

### Page 2

SB 670BA−53−042
Page 1 of 28
Dec 21/2011
Revision B, Oct 20/2017
SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER COMMERCIAL AIRCRAFT
HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR
ATA SYSTEM: 53−20 NUMBER: 670BA−53−042
SUBJECT:  Fuselage − Middle Fuselage − Inspection of the Wing−to−Fuselage
Attachment Nuts
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
Aircraft Model Service Aircraft SerialNumbers Production Aircraft SerialNumbers
CL−600−2C10 10002 thru 10999 none [1]
CL−600−2D15 and
CL−600−2D24
15001 thru 15990 none [1]
CL−600−2E25 19001 thru 19990 none [1]
[1] There is no production effectivity at this time.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Service Bulletins. Before you do this
bulletin, examine all STC, STA or equivalent action changes to make
sure you can complete this bulletin.
B. Reason

### Page 3

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 2 of 28
Dec 21/2011
Revision B, Oct 20/2017
(1) Condition
It is possible that some nuts of the wing−to−fuselage joints are
non−compliant with the certification design specifications.  Also, it is possible
that some nuts were not manufactured to MIL−DTL−25027 standards and do
not have self−locking properties. Non−compliant nuts only have a single
locking device and not the dual locking function necessary at these joints.
This increases the probability that a nut could loosen and let the bolt migrate
and cause a loss of integrity of the joint.
(2) Evidence
Non−compliant nuts were found on CRJ700/900 aircraft.
(3) Objective/Benefit
This service bulletin gives the procedure to inspect the wing−to−fuselage
attachments. This will make sure that one locking device (cotter pin) is
installed.
C. Description
This service bulletin is divided into 5 parts: PART A, PART B, PART C, PART D, and
PART E.
PART A − Detailed visual inspection of the wing to fuselage attach nuts of the
aft keel beam.
The Main Landing Gear (MLG) wheel bins are removed. A detailed visual inspection
of the nuts of the aft keel beam is done to make sure that cotter pins are installed.
The MLG wheel bins are installed.
PART B − Detailed visual inspection of the wing to fuselage attach nuts of the
rear spar links.
Access panels are removed. A detailed visual inspection of the nuts of the rear spar
links is done to make sure that cotter pins are installed. The access panels are
installed.
PART C − Detailed visual inspection of the wing to fuselage attach nuts of the
side stay fittings.
The Main Landing Gear (MLG) wheel bins are removed. A detailed visual inspection
of the nuts of the side stay fittings is done to make sure that cotter pins are installed.
The Main Landing Gear (MLG) wheel bins are installed.
PART D − Detailed visual inspection of the wing to fuselage attach nuts of the
forward keel beam.
The forward fairing access panels are removed. A detailed visual inspection of the

### Page 4

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 3 of 28
Dec 21/2011
Revision B, Oct 20/2017
nuts of the forward keel beam is done to make sure that cotter pins are installed.
The forward fairing access panels are installed.
PART E − Repeat detailed visual inspection of the wing to fuselage attach nuts
of the forward keel beam.
The forward fairing access panels are removed. A detailed visual inspection of the
nuts of the forward keel beam is done to make sure that cotter pins are installed.
The forward fairing access panels are installed.
D. Compliance
Recommended Service Bulletin.
For aircraft 10002 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have
not done a previous issue of this service bulletin.
Bombardier recommends that PART A of this service bulletin be done at no more
than 6600 flight hours from the initial release date of this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.
For aircraft 10002 thru 10329, and 15001 thru 15272 pre-service bulletin
670BA-57-016, and for aircraft 10330 thru 10331, and 15273 thru 15279, that
have not done a previous issue of this service bulletin.
Bombardier recommends that PART B of this service bulletin be done at no more
than 6600 flight hours from the initial release date of this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.
For aircraft 10011 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have
not done a previous issue of this service bulletin.
Bombardier recommends that PART C of this service bulletin be done at no more
than 6600 flight hours from the initial release date of this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.
For aircraft 10002 thru 10337 that have not done a previous issue of this
service bulletin.
Bombardier recommends that PART D of this service bulletin be done at no more
than 6600 flight hours from the initial release date of this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.
For aircraft 10338 thru 10999, 15001 thru 15990, and 19001 thru 19990 that have
not done a previous issue of this service bulletin.
Bombardier recommends that PART D of this service bulletin be done at no more
than 8800 flight hours from the revision B release date of this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.

### Page 5

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 4 of 28
Dec 21/2011
Revision B, Oct 20/2017
For aircraft 10002 thru 10999, 15001 thru 15990, and 19001 thru 19990
Bombardier recommends that PART E of this service bulletin be repeated every
8800 flight hours from the initial inspection date, unless otherwise directed by the
airworthiness authority of the operator.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93−Q−02.
F . Manpower
The man-hours given below are estimates for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
 Administrative functions such as planning, liaising, familiarization, and report writing.
 Non-productive elapsed time such as rest time, having meals, and crew shift changes.
 Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
 Preparation for modification (unless specified in the Accomplishment Instructions)
such as cleaning and getting parts, tools, consumables, and ground equipment.
 Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
 All other activities that are not considered by Bombardier as directly related to the
accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services
representative for a quote. Contact the Fleet Services Team
through the CRC at 514-855-8500 or email at
thd.crj@aero.bombardier.com.
PART A
It will take an estimated 3.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 1.0

### Page 6

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 5 of 28
Dec 21/2011
Revision B, Oct 20/2017
TASK MAN-HOURS
(2)  Procedure 0.5
(3)  Test 0.5
(4)  Job Close-Out 1.0
PART B
It will take an estimated 2.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 0.5
(2)  Procedure 0.5
(3)  Test 0.5
(4)  Job Close-Out 0.5
PART C
It will take an estimated 2.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 0.5
(2)  Procedure 0.5
(3)  Test 0.5
(4)  Job Close-Out 0.5
PART D

### Page 7

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 6 of 28
Dec 21/2011
Revision B, Oct 20/2017
It will take an estimated 2.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 0.5
(2)  Procedure 0.5
(3)  Test 0.5
(4)  Job Close-Out 0.5
PART E
It will take an estimated 2.0 man-hours to complete this service bulletin. The
man-hours are divided in the table that follows (elapsed cure time is not included in
the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 0.5
(2)  Procedure 0.5
(3)  Test 0.5
(4)  Job Close-Out 0.5
G. Material − Price and Availability
There are no kits for this service bulletin.
H. Tooling − Price and Availability
There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of
special tools and equipment for this service bulletin.
I. Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.

### Page 8

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 7 of 28
Dec 21/2011
Revision B, Oct 20/2017
K. References
Restriction and/or Special Instruction (RSI) C−53−1458−00, Revision H
Aircraft Maintenance Manual (AMM)
For Bombardier reference only: PCA 74320.
L. Other Publications Affected
None
M. Relationship Chart
Not applicable.

### Page 9

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 8 of 28
Dec 21/2011
Revision B, Oct 20/2017
2. ACCOMPLISHMENT INSTRUCTIONS
PART A − Detailed visual inspection of the wing to fuselage attach nuts of the aft keel
beam.
For aircraft 10002 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have
not done a previous issue of this service bulletin.
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 26−14−00−710−801 Operational test of the MLG Overheat detection
and Warning System
AMM 53−83−89−000−801 Removal of the Main Landing Gear (MLG)
Wheel Bin
AMM 53−83−89−400−801 Installation of the Main Landing Gear (MLG)
Wheel Bin
NDTM  51−20−009−210 Visual Inspection Procedures
A. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance 
(AMM 12−00−00−867−801).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions 
(AMM 24−00−00−910−801).
(3) Remove the MLG wheel bins 
(AMM 53−83−89−000−801).
B. Procedure

### Page 10

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 9 of 28
Dec 21/2011
Revision B, Oct 20/2017
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or
1−514−855−8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 1 .
(2) Do a detailed visual inspection of the two nuts that attach the aft keel−beam
to the fitting (refer to NDTM 51−20−009−210).
(3) Make sure that cotter pins are installed on the two nuts.
(4) If a nut does not have a cotter pin installed, speak with a customer response
center (CRC) representative at 1−844−272−2720
(1−844−CRC−CRC0) or 1−514−855−8500 or send an e−mail at
thd.crj@aero.bombardier.com for a disposition.

### Page 11

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 10 of 28
Dec 21/2011
Revision B, Oct 20/2017
Aft Keel Beam
Figure 1
ba7187a01.cgm, FP , 12/12/11
FITTING (REF)
B
B
A
COTTER PIN
(REF)
NUT
(REF)
TYPICAL 2 PLACESA
Aft
AFT KEEL BEAM (REF)
AFT KEEL BEAM (REF)

### Page 12

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 11 of 28
Dec 21/2011
Revision B, Oct 20/2017
C. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install the Main Landing Gear (MLG) wheel bins 
(AMM 53−83−89−400−801).
(3) Do the Operational test of the MLG Overheat detection and Warning System
(AMM 26−14−00−710−801)
(4) When PART A of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−53−042, Revision B, Fuselage
− Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts,
PART A, incorporated."

### Page 13

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 12 of 28
Dec 21/2011
Revision B, Oct 20/2017
PART B − Detailed visual inspection of the wing to fuselage attach nuts of the rear spar
links.
For aircraft 10002 thru 10329, and 15001 thru 15272 pre-service bulletin
670BA-57-016, and for aircraft 10330 thru 10331, and 15273 thru 15279 that
have not done a previous issue of this service bulletin.
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 53−82−82−000−803 Removal of the Overwing Fairing, FS768 −
FS801 (171CL/172CR)
AMM 53−82−82−400−803 Installation of the Overwing Fairing, FS768 −
FS801 (171CL/172CR)
NDTM 51−20−009−210 Visual Inspection Procedures
D. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance 
(AMM 12−00−00−867−801).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions 
(AMM 24−00−00−910−801).
(3) Remove the access panels that follow:
PANEL NAME REFERENCE
171CL /172CR Overwing Fairing, FS768
− FS801
AMM 53−82−82−000−803

### Page 14

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 13 of 28
Dec 21/2011
Revision B, Oct 20/2017
E. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or
1−514−855−8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 2
(2) On the rear−spar link on the right and left side, do a detailed inspection of the
two upper nuts that attach the rear−spar link to the fuselage fitting
 (refer to NDTM 51−20−009−210).
(3) Make sure that cotter pins are installed on the two upper nuts.
(4) If a nut does not have a cotter pin installed, speak with a customer response
center (CRC) representative at 1−844−272−2720
(1−844−CRC−CRC0) or 1−514−855−8500 or send an e−mail at
thd.crj@aero.bombardier.com for a disposition.

### Page 15

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 14 of 28
Dec 21/2011
Revision B, Oct 20/2017
Rear Spar Link
Figure 2
A
A
LBL45.00
RBL45.00
BL00.00
FRONT SPAR
REAR SPAR B
B
WING FITTING
(REF)
FUSELAGE
FRAME
(REF)
B
AFT SPAR
LINK (REF)
ba7188a01.cgm, FP , 12/12/11
C
COTTER PIN
(REF)
NUT
(REF)
C TYPICAL

### Page 16

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 15 of 28
Dec 21/2011
Revision B, Oct 20/2017
F . Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install the access panels that follow:
PANEL NAME REFERENCE
171CL /172CR Overwing Fairing, FS768
− FS801
AMM 53−82−82−400−803
(3) When PART B of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−53−042, Revision B, Fuselage
− Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts,
PART B, incorporated."

### Page 17

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 16 of 28
Dec 21/2011
Revision B, Oct 20/2017
PART C − Detailed visual inspection of the wing to fuselage attach nuts of the side stay
fittings.
For aircraft 10011 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have
not done a previous issue of this service bulletin.
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 26−14−00−710−801 Operational test of the MLG Overheat detection
and Warning System
AMM 53−83−89−000−801 Removal of the Main Landing Gear (MLG)
Wheel Bin
AMM 53−83−89−400−801 Installation of the Main Landing Gear (MLG)
Wheel Bin
NDTM 51−20−009−210 Visual Inspection Procedures
G. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance 
(AMM 12−00−00−867−801).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions 
(AMM 24−00−00−910−801).
(3) Remove the MLG wheel bins 
(AMM 53−83−89−000−801).

### Page 18

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 17 of 28
Dec 21/2011
Revision B, Oct 20/2017
H. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or
1−514−855−8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 3
(2) Do a detailed inspection of the two nuts that attach the frame fitting to the side
stay fitting of the wing (refer to NDTM 51−20−009−210).
(3) Make sure that cotter pins are installed on the the two nuts.
(4) If a nut does not have a cotter pin installed, speak with a customer response
center (CRC) representative at 1−844−272−2720
(1−844−CRC−CRC0) or 1−514−855−8500 or send an e−mail at
thd.crj@aero.bombardier.com for a disposition.

### Page 19

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 18 of 28
Dec 21/2011
Revision B, Oct 20/2017
Side Stay Fitting − Wing
Figure 3
ba7190a01.cgm, FP , 12/12/11
COTTER
PIN (REF)
NUT
(REF)
VIEW LOOKING FORWARD
ON WING−BOX REAR SPAR
FRAME
FITTING
(REF)
WING SIDE STAY
FITTING (REF)
FRAME
FITTING (REF)
WING SIDE STAY
FITTING (REF)
TYPICAL 2 PLACES BA
B
A
A

### Page 20

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 19 of 28
Dec 21/2011
Revision B, Oct 20/2017
I. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install the Main Landing Gear (MLG) wheel bins 
(AMM 53−83−89−400−801).
(3) Do the Operational test of the MLG Overheat detection and Warning System
(AMM 26−14−00−710−801)
(4) When PART C of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−53−042, Revision B, Fuselage
− Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts,
PART C, incorporated."

### Page 21

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 20 of 28
Dec 21/2011
Revision B, Oct 20/2017
PART D − Detailed visual inspection of the wing to fuselage attach nuts of the forward
keel beam.
For aircraft 10002 thru 10999, 15001 thru 15990, and 19001 thru 19990 that have
not done a previous issue of this service bulletin.
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 53−42−32−000−801 Removal of the Forward−Fairing Access Panel
(191CB/192CB)
AMM 53−42−32−400−801 Installation of the Forward−Fairing Access Pan-
el (191CB/192CB)
NDTM 51−20−009−210 Visual Inspection Procedures
J. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance 
(AMM 12−00−00−867−801).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions 
(AMM 24−00−00−910−801).
(3) Remove the access panels that follow:
PANEL NAME REFERENCE
191CB/192CB Forward−Fairing access
panel
AMM 53−42−32−000−801

### Page 22

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 21 of 28
Dec 21/2011
Revision B, Oct 20/2017
K. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or
1−514−855−8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 4
(2) Do a detailed visual inspection of the four nuts that attach the forward
keel−beam to the forward keel−beam links and wing attach bracket
(refer to NDTM 51−20−009−210).
(3) Make sure that cotter pins are installed on the four nuts.
(4) If a nut does not have a cotter pin installed, speak with a customer response
center (CRC) representative at 1−844−272−2720
(1−844−CRC−CRC0) or 1−514−855−8500 or send an e−mail at
thd.crj@aero.bombardier.com for a disposition.

### Page 23

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 22 of 28
Dec 21/2011
Revision B, Oct 20/2017
Forward Keel Beam
Figure 4
A
A
ba7189a01.cgm, FP , 12/12/11
KEEL BEAM
LINKS
WING ATTACH
BRACKET
FORWARD
KEEL BEAM
COTTER PIN
(REF)
NUT
(REF)
TYPICAL 4 PLACESA
A
A

### Page 24

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 23 of 28
Dec 21/2011
Revision B, Oct 20/2017
L. Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install the access panels that follow:
PANEL NAME REFERENCE
191CB/192CB Forward−Fairing access
panel
AMM 53−42−32−400−801
(3) When PART D of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−53−042, Revision B, Fuselage
− Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts,
PART D, incorporated."

### Page 25

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 24 of 28
Dec 21/2011
Revision B, Oct 20/2017
M. PART E − Repeat detailed visual inspection of the wing to fuselage attach
nuts of the forward keel beam.
For aircraft 10002 thru 10999, 15001 thru 15990, and 19001 thru 19990
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions
AMM 53−42−32−000−801 Removal of the Forward−Fairing Access Panel
(191CB/192CB)
AMM 53−42−32−400−801 Installation of the Forward−Fairing Access
Panel  (191CB/192CB)
NDTM  51−20−009−210 Visual Inspection Procedures
N. Job Set-Up
NOTE: The steps in the Job Set-Up section of this service bulletin are
recommended steps. The steps give a recommendation to get access
to the work area. This recommendation is to give a safe work area and
to minimize possible damage to surrounding aircraft parts. Alternative
steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance 
(AMM 12−00−00−867−801).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions 
(AMM 24−00−00−910−801).
(3) Remove the access panels that follow:
PANEL NAME REFERENCE
191CB/192CB Forward−Fairing access
panel
AMM 53−42−32−000−801

### Page 26

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 25 of 28
Dec 21/2011
Revision B, Oct 20/2017
O. Procedure
(1) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or
1−514−855−8500 or e-mail at thd.crj@aero.bombardier.com for analysis
and to get an approved disposition to complete this service bulletin.
Refer to Figure 5
(2) Do a detailed visual inspection of the four nuts that attach the forward
keel−beam to the forward keel−beam links and wing attach bracket
(refer to NDTM 51−20−009−210).
(3) Make sure that cotter pins are installed on the four nuts.
(4) If a nut does not have a cotter pin installed, speak with a customer response
center (CRC) representative at 1−844−272−2720
(1−844−CRC−CRC0) or 1−514−855−8500 or send an e−mail at
thd.crj@aero.bombardier.com for a disposition.

### Page 27

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 26 of 28
Dec 21/2011
Revision B, Oct 20/2017
Forward Keel Beam
Figure 5
A
A
ba7189a01.cgm, FP , 12/12/11
KEEL BEAM
LINKS
WING ATTACH
BRACKET
FORWARD
KEEL BEAM
COTTER PIN
(REF)
NUT
(REF)
TYPICAL 4 PLACESA
A
A

### Page 28

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 27 of 28
Dec 21/2011
Revision B, Oct 20/2017
P . Job Close-Out
NOTE: The steps in the Job Close-Out section of this service bulletin, except for
the return-to-service tests, are recommended steps. The steps give a
recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready
to return to service. Alternative steps can be used at the operator
discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install the access panels that follow:
PANEL NAME REFERENCE
191CB/192CB Forward−Fairing access
panel
AMM 53−42−32−400−801
(3) When PART E of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−53−042, Revision B, Fuselage
− Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts,
PART E, incorporated."

### Page 29

SERVICE BULLETIN  670BA−53−042
SB 670BA−53−042
Page 28 of 28
Dec 21/2011
Revision B, Oct 20/2017
3. MATERIAL INFORMATION
A. Kit Information
None.
B. Consumable Information
There are no consumables for this service bulletin.
C. Special Tools and Equipment
None.
D. Disposition of Parts
Not applicable.
1

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
