# Bombardier Service Bulletin 670BA-57-024: No revision named

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2015-2457; AD 2016-10-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Service Bulletin 670BA-57-024](https://openairdocs.org/service-documents/bombardier/670ba-57-024.md)
- Title as filed: BA Service Bulletin 670BA-57-024
- Pages: 21
- PDF: https://openairdocs.org/files/sha256/2a/63/2a63ddf05ec8161a4d33529c1a62796ecfa54b8c693215150861bc479b6d19c8
- Page: https://openairdocs.org/service-documents/bombardier/670ba-57-024/file/2a63ddf05ec8

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SB 670BA−57−024
Page 1 of 20
July 23/2014
SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER HAS INCLUDED THE NEW
OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR
ATA SYSTEM: 57−12 NUMBER: 670BA−57−024
SUBJECT:  Wings − Center Wing Secondary Structure − Inspection/Installation of the
Insulation Blankets in the Upper Wing Box Area
1. PLANNING INFORMATION
A. Effectivity
(1) Aircraft Affected:
AIRCRAFT MODEL SERVICE AIRCRAFT SERIALNUMBERS PRODUCTIONAIRCRAFTSERIAL NUMBERS
CL−600−2C10 10004, 10028−10029, 10033,
10039, 10048, 10054, 10077,
10082, 10108, 10112, 10118,
10120, 10138, 10164, 10183,
10185, 10187, 10204, 10206,
10217, 10247, 10258,
10267−10268, 10270−10271,
10274−10275, 10279, 10289,
10303, 10327
None

### Page 2

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 2 of 20
July 23/2014
AIRCRAFT MODEL
PRODUCTION
AIRCRAFT
SERIAL NUMBERS
SERVICE AIRCRAFT SERIAL
NUMBERS
CL−600−2D15 and
CL−600−2D24
15001, 15014, 15018−15026,
15028−15029, 15031, 15034,
15036−15059, 15063,
15065−15066, 15068, 15071,
15074, 15076−15077, 15079,
15087, 15090, 15092,
15102−15104, 15106,
15110−15115, 15117−15124,
15126−15127, 15130−15131,
15134−15145, 15148−15152,
15154−15156, 15160, 15163,
15165, 15167, 15169, 15172,
15174−15175, 15177,
15179−15180, 15183−15185,
15188−15194, 15196,
15198−15199, 15201−15202,
15204, 15209−15210,
15213−15214, 15216, 15220,
15229−15230, 15232, 15236,
15238, 15241, 15243, 15245,
15247−15249, 15251−15279
None
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier service bulletins. Before you do this service
bulletin, examine all Supplemental Type Certificates (STCs) and
Supplemental Type Approvals (STAs) or equivalent action changes
to make sure you can complete this service bulletin.

### Page 3

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 3 of 20
July 23/2014
B. Reason
(1) Condition
It is possible that the insulation blankets are not installed in the upper wing
box area, and if a bleed air leak is not sensed by the bleed leak detection
system and hot air goes in the direction of the adjacent structure and/or the
system components, an unwanted effect on the structural and the system
components can occur.
(2) Evidence
Some operators reported that they removed the insulation blankets from the
upper wing box area during the incorporation of the initial issue or Revision A
of Service Bulletin 670BA−36−016. Service Bulletin 670BA−36−016 gives the
procedure to add protective shields above the insulation blankets.
(3) Objective/Benefit
This service bulletin gives the procedure to do an inspection of the insulation
blanket installation in the upper wing box area .This will make sure that the
adjacent structure and/or the system components are fully protected.
C. Description
This service bulletin is divided into two parts: PART A and PART B.
PART A − Inspection of the Insulation Blankets in the Upper Wing Box Area
Circuit breakers are opened. The wheel bins are removed. If necessary, the
overwing fairings between FS697.00−FS735.00 are removed. An inspection is
done to find if some insulation blankets are installed in the upper wing box area. If
one or more insulation blanket(s) is/are missing, PART B of this service bulletin is
done. If removed, the left and the right overwing fairings between
FS697.00−FS735.00 are installed. The wheel bins are installed. The circuit breakers
are closed.
PART B − Installation of the Insulation Blankets in the Upper Wing Box Area
Circuit breakers are opened. The wheel bins and the overwing fairings are
removed. If necessary, the left and the right wing anti-ice ducts are removed. An
inspection is done to find if all the insulation blankets are installed in the upper wing
box area. An approved disposition is requested from Bombardier. If removed, the
left and the right wing anti-ice ducts are installed. The overwing fairings and the
wheel bins are installed. Circuit breakers are closed.

### Page 4

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 4 of 20
July 23/2014
D. Compliance
Bombardier recommends that PART A of this service bulletin be done at no more
than 800 flight hours from the release date on this service bulletin, unless otherwise
directed by the airworthiness authority of the operator.
During the inspection done in PART A, if one or more insulation blanket(s) is/are
missing, Bombardier recommends that PART B of this service bulletin be done at
no more than 1200 flight hours from the release date on this service bulletin, unless
otherwise directed by the airworthiness authority of the operator.
NOTE: Initial Issue or Revision A of Service Bulletin 670BA−36−016, Pneumatic
− Bleed-Air Leak Detection and Warning System − Installation of
Protective Blankets and New Sensing Elements in the Main Landing Gear
and Overwing Areas, is a prerequisite to this service bulletin.
NOTE: It is not necessary to do this service bulletin if Revision B or a later revision
of Service Bulletin 670BA−36−016, Pneumatic − Bleed-Air Leak
Detection and Warning System − Installation of Protective Blankets and
New Sensing Elements in the Main Landing Gear and Overwing Areas,
is done.
NOTE: If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative
of Bombardier Customer Response Centre at phone number
514−855−8500 or send an e−mail at thd.crj@bombardier.com for
analysis and to get an approved disposition to complete this service
bulletin.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93−Q−02.
F . Manpower
The man-hours given below are estimates for direct labor done by an experienced
crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
−Administrative functions such as planning, liaising, familiarization, and report writing.
−Non-productive elapsed time such as rest time, having meals, and crew shift
changes.
−Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.

### Page 5

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 5 of 20
July 23/2014
−Preparation for modification (unless specified in the Accomplishment
Instructions) such as cleaning and getting parts, tools, consumables, and
ground equipment.
−Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
−All other activities that are not considered by Bombardier as directly related to the
accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services
representative for a quote. Contact the Fleet Services Team
through the CRC at 514-855-8500 or e-mail at
thd.crj@aero.bombardier.com.
FOR PART A
It will take an estimated 3.50 man-hours to complete PART A of this service bulletin.
The man-hours are divided in the table that follows (elapsed cure time is not
included in the man-hour summary given above):
TASK MAN-HOURS
(1)  Job Set-Up 1.00
(2)  Procedure 1.50
(3)  Test N/A
(4)  Job Close-Out 1.00
FOR PART B
There are no man-hour estimates provided for PART B of this service bulletin.
G. Material − Price and Availability
(1) There are no kits for this service bulletin. Some parts can be necessary to
accomplish the disposition supplied by Bombardier in PART B of this service
bulletin and are available from Bombardier.

### Page 6

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 6 of 20
July 23/2014
(2) Please send a purchase order to the address below to schedule part delivery:
Bombardier
Service Bulletin Kit Support Team
123 Garratt Blvd, N42−24
Toronto, Ontario
Canada  M3K 1Y5
Fax:     416-375-3060
Phone: 416-375-3920
e-mail: sbkits@aero.bombardier.com
Please contact the Service Bulletin Kit Support Team at the address above for
terms and conditions.
(3) Refer to paragraph 3.B. for a list of consumables for this service bulletin.
H. Tooling − Price and Availability
There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of
special tools and equipment for this service bulletin.
I. Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
K. References
Refer to the SB Introduction document for definition or explanation of service
bulletin content.
Restriction and/or Special Instruction (RSI) C−57−1619−00, Revision D
Aircraft Maintenance Manual (AMM)
For Bombardier reference only: PCA 75848
L. Other Publications Affected
None.
M. Relationship Chart
Not applicable.

### Page 7

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 7 of 20
July 23/2014
2. ACCOMPLISHMENT INSTRUCTIONS
PART A − Inspection of the Insulation Blankets in the Upper Wing Box Area
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 53−82−82−000−801 Removal of the Overwing Fairing, FS697 − FS735
(171AL/172AR)
AMM 53−82−82−400−801 Installation of the Overwing Fairing, FS697 − FS735
(171AL/172AR)
AMM 53−83−89−000−801 Removal of the Main Landing Gear (MLG) Wheel Bin
AMM 53−83−89−400−801 Installation of the Main Landing Gear (MLG) Wheel Bin
A. Job Set-Up
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12−00−00−867−801).
(2) Remove the left and the right MLG wheel bins
(refer to AMM 53−83−89−000−801).
B. Procedure
Refer to Figure 1 and Figure 2.
(1) Do an inspection of the upper wing box area to find if the insulation blankets
are installed as follows:
NOTE: Two layers of protection are installed. The insulation blanket is the
bottom layer and the protective shield is the top layer.
NOTE: Insulation blankets are silicone foam and fiberglass with a thickness of
0.25 in. (6.35 mm). Insulation blankets are white when they are new.
NOTE: Protective shields are fiberglass with a thickness of 0.13 in. (3.30 mm).
Protective shields are grey when they are new.
NOTE: It is permitted to carefully lift the protective shield if the edge of the
insulation blanket is not visible.

### Page 8

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 8 of 20
July 23/2014
(a) Do an inspection to find if insulation blankets are installed between
LBL45.00 and RBL45.00 at FS794.50.
(b) Do an inspection to find if an insulation blanket is installed on the fuel
vent tube at BL0.00 near FS794.50.
NOTE: On the middle section of the fuel vent tube, there is a space
between the left protective shield and the right protective shield.
(c) Do an inspection to find if an insulation blanket is installed between
FS697.00 and FS735.00, near LBL30.00 or LBL45.00.
NOTE: If you cannot see an insulation blanket or you cannot get
access to the inspection area, the overwing fairing, FS697.00 −
FS735.00 panel 171AL can be removed (refer to AMM
53−82−82−000−801).
(d) Do an inspection to find if an insulation blanket is installed between
FS697.00 and FS735.00, near RBL30.00 or RBL45.00.
NOTE: If you cannot see an insulation blanket or you cannot get
access to the inspection area, the overwing fairing, FS697.00 −
FS735.00 panel 172AR can be removed (refer to AMM
53−82−82−000−801).
(2) If one or more insulation blanket(s) is/are missing, do PART B of this service
bulletin.
(3) For protective shields that were lifted, make sure they are lowered.
(4) If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a representative of
Bombardier Customer Response Centre at phone number 514−855−8500 or
send an e−mail at thd.crj@bombardier.com for analysis and to get an
approved disposition to complete this service bulletin.
C. Job Close-Out
(1) Remove all tools, equipment, and unwanted materials from the work area.

### Page 9

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 9 of 20
July 23/2014
(2) If removed, install the access panels that follow:
PANEL NAME REFERENCE
171AL/
172AR
Overwing Fairing, FS697 − FS735 AMM 53−82−82−400−801
(3) Install the left and the right MLG wheel bins
(refer to AMM 53−83−89−400−801).
(4) When PART A of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−57−024, Wings − Center Wing
Secondary Structure − Inspection/Installation of the Insulation Blankets in the
Upper Wing Box Area, PART A, incorporated."

### Page 10

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 10 of 20
July 23/2014
PART B − Installation of the Insulation Blankets in the Upper Wing Box Area
Reference Information
REFERENCE DESIGNATION
AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance
AMM 30−11−06−000−801 Removal of the Supply Duct
AMM 30−11−06−400−801 Installation of the Supply Duct
AMM 53−82−82−000−801 Removal of the Overwing Fairing, FS697 − FS735
(171AL/172AR)
AMM 53−82−82−400−801 Installation of the Overwing Fairing, FS697 − FS735
(171AL/172AR)
AMM 53−82−82−000−802 Removal of the Overwing Fairing, FS735 − FS768
(171BL/172BR)
AMM 53−82−82−400−802 Installation of the Overwing Fairing, FS735 − FS768
(171BL/172BR)
AMM 53−82−82−000−803 Removal of the Overwing Fairing, FS768 − FS801
(171CL/172CR)
AMM 53−82−82−400−803 Installation of the Overwing Fairing, FS768 − FS801
(171CL/172CR)
AMM 53−83−89−000−801 Removal of the Main Landing Gear (MLG) Wheel Bin
AMM 53−83−89−400−801 Installation of the Main Landing Gear (MLG) Wheel Bin
D. Job Set-Up
(1) Make sure that the aircraft is in standard configuration for maintenance
(refer to AMM 12−00−00−867−801).
(2) Open, safety, and tag the circuit breakers that follow:
CB PANEL CB NO. NAME
CBP−1 D7 A/ICE CONT CH A
CBP−1 K6 ACS CONT 2 CH A
CBP−1 L1 ACS CONT 1 CH A

### Page 11

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 11 of 20
July 23/2014
CB PANEL NAMECB NO.
CBP−2 J4 ACS CONT 1 CH B
CBP−2 K6 ACS R MAN
CBP−2 LOWER T1 A/ICE CONT CH B
CBP−2 LOWER T7 ACS CONT 2 CH B
CBP−2 LOWER T8 ACS L MAN
CBP−2 N9 MLG BAY OVHT DET
CBP−5 A3 APU BATT CONT
(3) Remove the access panels that follow:
PANEL NAME REFERENCE
171AL/
172AR
Overwing Fairing, FS697 −
FS735
AMM 53−82−82−000−801
171BL/
172BR
Overwing Fairing, FS735 −
FS768
AMM 53−82−82−000−802
171CL/
172CR
Overwing Fairing, FS768 −
FS801
AMM 53−82−82−000−803
(4) Remove the left and the right MLG wheel bins
(refer to AMM 53−83−89−000−801).
(5) If necessary, remove the applicable left and the applicable right supply duct(s)
(refer to AMM 30−11−06−000−801).

### Page 12

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 12 of 20
July 23/2014
E. Procedure
For aircraft 10004, 10028−10029, 10033, 10039, 10048, 10054, 10077, 10082, 10108,
10112, 10118, 10120, 10138, 10164, 10183, 10185, 10187, 10204, 10206, 10217,
10247, 10258, 10267−10268, 10270−10271, 10274−10275, 10279, 10289, 10303,
10327
Refer to Figure 2 and Figure 3.
(1) Do an inspection of the upper wing box area to find if all the insulation
blankets are installed.
NOTE: Two layers of protection are installed. The insulation blanket is the
bottom layer and the protective shield is the top layer.
NOTE: Insulation blankets are silicone foam and fiberglass with a thickness of
0.25 in. (6.35 mm). Insulation blankets are white when they are new.
NOTE: Protective shields are fiberglass with a thickness of 0.13 in. (3.30 mm).
Protective shields are grey when they are new.
NOTE: It is permitted to carefully lift the protective shield if the edge of the
insulation blanket is not visible.
NOTE: It is permitted to open the Velcro of the protective shield if the edge of
the insulation blanket is not visible.
(2) Speak with a representative of Bombardier Customer Response Centre at
phone number 514−855−8500 or send an e−mail at
thd.crj@bombardier.com for analysis and to get an approved disposition to
complete this service bulletin.
For aircraft 15001, 15014, 15018−15026, 15028−15029, 15031, 15034,
15036−15059, 15063, 15065−15066, 15068, 15071, 15074, 15076−15077, 15079,
15087, 15090, 15092, 15102−15104, 15106, 15110−15115, 15117−15124,
15126−15127, 15130−15131, 15134−15145, 15148−15152, 15154−15156, 15160,
15163, 15165, 15167, 15169, 15172, 15174−15175, 15177, 15179−15180,
15183−15185, 15188−15194, 15196, 15198−15199, 15201−15202, 15204,
15209−15210, 15213−15214, 15216, 15220, 15229−15230, 15232, 15236, 15238,
15241, 15243, 15245, 15247−15249, 15251−15279
Refer to Figure 2 and Figure 4.
(3) Do an inspection of the upper wing box area to find if all the insulation
blankets are installed.
NOTE: Two layers of protection are installed. The insulation blanket is the
bottom layer and the protective shield is the top layer.

### Page 13

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 13 of 20
July 23/2014
NOTE: Insulation blankets are silicone foam and fiberglass with a thickness of
0.25 in. (6.35 mm). Insulation blankets are white when they are new.
NOTE: Protective shields are fiberglass with a thickness of 0.13 in. (3.30 mm).
Protective shields are grey when they are new.
NOTE: It is permitted to carefully lift the protective shield if the edge of the
insulation blanket is not visible.
NOTE: It is permitted to open the Velcro of the protective shield if the edge of
the insulation blanket is not visible.
(4) Speak with a representative of Bombardier Customer Response Centre at
phone number 514−855−8500 or send an e−mail at
thd.crj@bombardier.com for analysis and to get an approved disposition to
complete this service bulletin.
For all aircraft
(5) For protective shields that had Velcro opened, make sure the Velcro is closed.
(6) For protective shields that were lifted, make sure they are lowered.

### Page 14

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 14 of 20
July 23/2014
F . Job Close-Out
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) If removed, install the left and the right supply duct(s)
(refer to AMM 30−11−06−400−801).
(3) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME
CBP−1 D7 A/ICE CONT CH A
CBP−1 K6 ACS CONT 2 CH A
CBP−1 L1 ACS CONT 1 CH A
CBP−2 J4 ACS CONT 1 CH B
CBP−2 K6 ACS R MAN
CBP−2 LOWER T1 A/ICE CONT CH B
CBP−2 LOWER T7 ACS CONT 2 CH B
CBP−2 LOWER T8 ACS L MAN
CBP−2 N9 MLG BAY OVHT DET
CBP−5 A3 APU BATT CONT
(4) Install the access panels that follow:
PANEL NAME REFERENCE
171AL/
172AR
Overwing Fairing, FS697 −
FS735
AMM 53−82−82−400−801
171BL/
172BR
Overwing Fairing, FS735 −
FS768
AMM 53−82−82−400−802
171CL/
172CR
Overwing Fairing, FS768 −
FS801
AMM 53−82−82−400−803
(5) Install the left and the right MLG wheel bins
(refer to AMM 53−83−89−400−801).
(6) When PART B of this service bulletin is completed, make this entry in the
applicable logbooks: /quoteblleftService Bulletin 670BA−57−024, Wings − Center Wing
Secondary Structure − Inspection/Installation of the Insulation Blankets in the
Upper Wing Box Area, PART B, incorporated."

### Page 15

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 15 of 20
July 23/2014
Inspection of the Insulation Blankets
Figure 1 (Sheet 1 of 1)
ba8235a01.cgm, kp, May 27, 2014
A
TYPICAL
A
3
RBL30.00
FS735.00
FS697.00
LBL30.00
FS794.50
BL0.00
LBL45.00
RBL45.00
CENTER WING
BOX (REF)
FUEL VENT
TUBE (REF)
3
NOTES
1.   Inspection areas are shaded.
2.   It is permitted to carefully lift the protective shield
      if the edge of the insulation blanket is not visible.
      On the middle section of the fuel vent tube,
      there is a space between the left and the
      right protective shields.

### Page 16

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 16 of 20
July 23/2014
Examples of Insulation Blanket Installation
Figure 2 (Sheet 1 of 2)
ba8236a01.cgm, kp, May 20, 2014
A
FS794.50
RBL45.00
RBL30.00
LBL30.00
FS735.00
FS697.00
BL0.00
INSULATION
BLANKET (REF)
A
PROTECTIVE
SHIELD (REF)
B
TYPICAL BLANKET INSTALLATION
B
LBL45.00

### Page 17

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 17 of 20
July 23/2014
Examples of Insulation Blanket Installation
Figure 2 (Sheet 2 of 2)
ba8236a02.cgm, kp, May 6, 2014
FS794.50 LBL45.00
RBL30.00
LBL30.00
FS735.00
FS697.00
BL0.00
INSULATION
BLANKET (REF)
A
PROTECTIVE
SHIELD (REF)
C
TYPICAL BLANKET INSTALLATION −
FUEL VENT TUBE MIDDLE SECTION
RBL45.00
C

### Page 18

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 18 of 20
July 23/2014
Inspection of the Insulation Blankets on CRJ700 Aircraft
Figure 3 (Sheet 1 of 1)
A
ba8239a01.cgm, kp, May 27, 2014
C
2
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
2
NOTES
1.   Protective shields not shown
      for clarity.
      Above insulation blanket
      not shown for clarity.
3.   The shaded areas show the
      locations of the insulation
      blankets.
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
B
A
RBL30.00
LBL30.00
FS794.50
LBL45.00
RBL45.00
CENTER WING
BOX (REF)
FS697.00
B
C
BL0.00
B
C

### Page 19

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 19 of 20
July 23/2014
Inspection of the Insulation Blankets on CRJ900 Aircraft
Figure 4 (Sheet 1 of 1)
ba8240z01.cgm, kp, May 27, 2014
A
C
2
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
2
NOTES
1.   Protective shields not shown
      for clarity.
      Above insulation blanket
      not shown for clarity.
3.   The shaded areas show the
      locations of the insulation
      blankets.
A
RBL30.00
LBL30.00
FS794.50 LBL45.00
RBL45.00
CENTER WING
BOX (REF)
FS697.00
B
C
BL0.00
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
B
B
C

### Page 20

SERVICE BULLETIN  670BA−57−024
SB 670BA−57−024
Page 20 of 20
July 23/2014
3. MATERIAL INFORMATION
A. Kit Information
None.
B. Consumable Information
For a list of consumables, refer to the different tasks that are given as references in
this service bulletin.
C. Special Tools and Equipment
For a list of special tools and equipment, refer to the different tasks that are given
as references in this service bulletin.
D. Disposition of Parts
None.
1

### Page 21

THANK YOU FOR YOUR COMMENTS
SERVICE BULLETIN FEEDBACK FORM/COMPLIANCE SHEET
(YOUR COMMENTS HELP US WRITE BETTER SERVICE BULLETINS)
Service Bulletin No.: 670BA-57-024                                               Revision: --
Aircraft Serial Number: Date:
ST R ONG LY
DISAGREE
DISAGREE AGREE ST R ONG LY
AGREE
Instructions to do the service bulletin are
accurate.
Comments:
- - - -
Figure(s), picture(s), and/or Appendix
were helpful to do the service bulletin.
Comments:
- - - -
Part(s) or kit(s) agreed with the service
bulletin requirement.
Comments:
- - - -
The service bulletin was accomplished
within the estimated time given.
Comments:
- - - -
Overall, I was satisfied with this service
bulletin.
Comments:
- - - -
Operator: Service Centre:
Name: Telephone or Fax:
FAX your comments or feedback to (450) 476- - -7300
or e-mail tocrj_sb_evaluation_form@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
