# Bombardier Alert Service Bulletin A600-0763: U.S. DOT/FAA - A600-0763-Basic

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2014-0054; AD 2014-03-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Alert Service Bulletin A600-0763](https://openairdocs.org/service-documents/bombardier/a600-0763.md)
- Title as filed: U.S. DOT/FAA - A600-0763-Basic
- Pages: 22
- PDF: https://openairdocs.org/files/sha256/fb/e6/fbe6b7b386b31eae7ca4a03203c6bbe1902b9594f1b8a39f475c0bd29ebbe282
- Page: https://openairdocs.org/service-documents/bombardier/a600-0763/file/fbe6b7b386b3

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Basic Issue: Sep 26/2013 A600-0763 
  Page 1 of 1 
ALERT SERVICE BULLETIN SUMMARY 
This Service Bulletin is available at: 
www.cic.bombardier.com 
MODEL CL-600-1A11 
ATA 57-40 
WINGS 
SPECIAL CHECK/MODIFICATION – ATTACHMENT FITTINGS –  
INBOARD FLAP HINGE BOX FORWARD ATTACHMENT FITTINGS FASTENERS 
The information below is provided for your reference.  For full details, please 
see corresponding paragraph contained within this bulletin. 
ALERT 
SPECIFIED TIME COMPLIANCE 
COMPLIANCE TIME 
PART A is recommended within 100 
landings from this Alert Service Bulletin 
release date (Basic Issue) and must be 
repeated every 100 landings until 
modification in PART B is complied with 
or PART C is Completed. 
PART B is recommended no later than  
48 months from this Service Bulletin 
release date (Basic Issue). 
EFFECTIVITY: A/C Serial No. 1004 to 1085 
MANPOWER: 1 man-hour for the special check in PART A  
58 man-hours for the modification in PART B 
CONTINUED AIRWORTHINESS (CAW)  
FLEET CAMPAIGN 
YES  NO  
KITS and/or PARTS YES  NO  
TOOLING/GSE YES  NO  
PLANNING INFORMATION:  See 
important information at the start of 
Paragraph 1. 
YES  NO  
DEDICATED SCHEDULE YES  NO  
PREREQUISITE SERVICE BULLETINS: N/A 
NOTES 1. Defueling and venting of the fuel tanks mu st be done to do PART B of this       
Service Bulletin. 
2. To minimize aircraft downtime and co st, it is recommended to do Service 
Bulletin 600-0762 in conjunction with PART B of this Service Bulletin. 
To place an order for parts or kits, please call Bombardier Aerospace Parts Services at: 
514-855-2999 or 1-866-538-1247

### Page 2

Refer to applicable governmental agency regulations and requirements and make sure that the work described in this 
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards. 
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or 
by any means without the prior written consent of Bombardier Inc. and/or its affiliates. 
© 2013 Bombardier Inc.  All rights reserved 
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries. 
Basic Issue: Sep 26/2013 A600-0763 
  Page 1 of 18 
ALERT SERVICE BULLETIN 
This Alert Service Bulletin is available at: 
www.cic.bombardier.com  
MODEL CL-600-1A11 
ATA 57-40 
WINGS 
SPECIAL CHECK/MODIFICATION – ATTACHMENT FITTINGS –  
INBOARD FLAP HINGE BOX FORWARD ATTACHMENT FITTINGS FASTENERS 
 
1. PLANNING INFORMATION 
NOTE: To minimize aircraft downtime and co st, it is recommended to do Service 
Bulletin 600-0762 in conjunction with PART B of this Service Bulletin. 
A. Effectivity 
CL-600-1A11 aircraft, Serial No. 1004 to 1085. 
NOTE: The instructions given in this Alert Service Bulletin are only applicable  
to the systems and parts installed at the time of delivery of the aircraft  
or as changed by Bombardier Aerospace Alert Service Bulletin(s).  
Before you do this bulletin, examine all STC, STA or equivalent  
action changes to make sure that this bulletin can be completed. 
B. Reason 
On a Challenger 605 zonal inspection, one of the two forward fasteners attaching 
the inboard flap hinge box forward hinge fitting at Wing Station (WS) 76.50 was 
found with its head missing.   
The investigation shows that when installed with their head outside, those 
fasteners will experience premature failure caused by higher pre-load due to 
clamping and alignment. 
This Alert Service Bulletin provides instruction to inspect and repair the forward 
fasteners attaching the forward fittings at WS 76.50 and WS 127.25 at both wings.

### Page 3

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 2 of 18 
C. Description 
This Alert Service Bulletin gives instructions in: 
PART A. to: 
– Do the inspection of the forward inboard flap fasteners on the hinge box wing 
forward fitting. 
PART B, to: 
– Remove the forward and aft inboard flap hinge-fairings, 
– Remove the applicable upper and lower access panels, 
– Do the inboard flap fasteners modifications as per APPENDIX 1 on the hinge 
box wing forward fittings, 
– Install the removed wing upper and lower access panels, and 
– Re-install the forward and aft inboard flap hinge-fairings.  
PART C. to: 
– Confirm that the forward fast eners heads are correctly oriented. 
Testing, to: 
– Do the necessary testing to ensure that the inboard flaps operate correctly. 
D. Compliance 
PART A is recommended within 100 landings from this Alert Service Bulletin 
release date (Basic Issue) and must be repeated every 100 landings until PART B 
is complied with or until PART C is completed to confirm that the forward 
fasteners heads are correctly oriented. 
PART B is recommended no later than 48 months from this Service Bulletin 
release date (Basic Issue). 
NOTES:  1. At any time, if any of the forward fasteners heads are found missing, 
PART B must be implemented before further flight. 
 2. If the modification in PART B is  incorporated or if the forward 
fasteners heads are correctly oriented as per PART C, no further 
action is required. 
E. Approval 
The technical content of this Service Bulletin has been approved under  
the authority of Transport Canada Civil Aviation (TCCA) Design Approval 
Organization (DAO) No. DAO #93-Q-02. 
NOTES: 1. The technical content of this Alert Service Bulletin is accepted by the  
FAA under the Canada/USA bilateral Aviation Safety Agreement. 
2. The technical content of this Service Bulletin is accepted by EASA  
in accordance with established procedures.

### Page 4

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 3 of 18 
F. Manpower 
NOTES: 1. The man-hours given are estimates to help you schedule the tasks  
given in this bulletin.  The estimates are for direct labor performed by  
an experienced crew and do not include the time for familiarization, 
planning, aircraft preparation in hangar such as towing and 
positioning of scaffolds, removal of interior furnishings, repainting, 
supervision and inspection.  
For more information related to the manpower estimates, refer to  
SB 600-0002. 
2. This Alert Service Bulletin may require consumable materials that 
have specific curing times (refer to Paragraph 3).  The accumulated 
curing time is not included in the labor estimates and should be 
considered for planning purposes before you schedule this Alert 
Service Bulletin. 
1 man-hour is necessary to do the special check in PART A. 
58 man-hours are necessary to do this modification in PART B. 
Bombardier does not pay for the special check in PART A and the Fuel Disposal 
fee at any time. 
The labor required to do the modification in PART B is at no cost if:  
(i) the work is done at Bombardier Business Aviation Services (BBAS) 
or Authorized Service Facilities (ASF), and  
(ii) this Alert Service Bulletin is scheduled in less than 48 months from its 
release date (Basic Issue). 
G. Material - Cost and Availability 
No kits or parts are necessary to do the special check in PART A or to confirm 
that the forward fasteners heads are correctly oriented as per PART C.  
When applicable, submit an SRPSA to Customer Support Engineering (CSE)  
to obtain kit and parts details necessary to do PART B of this modification. 
If applicable, the kit for PART B is available at no cost if a no-charge purchase 
order is sent to Bombardier Aerospace in less than 48 months from this Service 
Bulletin release date (Basic Issue). 
Bombardier does not pay for the bushings that may be necessary, to do PART B 
of this Service Bulletin. 
Bombardier does not pay for the Fuel Disposal fee at any time. 
During or after the above free period, Smart Parts Plus does not pay for the kit.

### Page 5

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 4 of 18 
H. Tooling 
The tools that follow, or equivalent, are necessary to do PART A of this Alert 
Service Bulletin: 
GSE REFERENCE NO. PART NO. DESCRIPTION 
24-00-24 S4933959 −501 Tag, Circuit Breaker 
Commercially Available - Borescope 
The tools that follow, or equivalent, are necessary to do PART B of this Alert 
Service Bulletin: 
GSE REFERENCE NO. PART NO. DESCRIPTION 
24-00-24 S4933959 −501 Tag, Circuit Breaker 
28-00-06 8320000 Fuel Fumes Detector 
Commercially Available - Torque Wrench 20 to 25 lbf in (2.26 to 2.82 Nm) 
Commercially Available - Torque Wrench 30 to 35 lbf in (3.39 to 3.95 Nm) 
The tools listed below or commercially available equivalent tools are required for 
the removal of the bushings. 
REFERENCE NO. PART NO. DESCRIPTION 
Commercially Available - C-Clamp 
See Note 3 - Support Block 
NOTES: 1. Refer to the Illustrated Tool  and Equipment Manual (ITEM), PSP611 
to make sure that you use the correct equipment configuration. 
2. Refer to the Introduction of the publication listed in NOTE 1 for 
acceptable GSE equivalents. 
3. For the support block manufacturing details, refer to Appendix 2. 
I. Weight and Balance 
No change. 
J. Electrical Load Data 
No change.

### Page 6

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 5 of 18 
K. References 
– Bombardier Aerospace, Restriction and/or Special Instruction (RSI),  
C-4095, Rev. B. 
– CL-600 Maintenance Manual, PSP 602, Chapters 6, 12, 24, 28, and 57. 
– CL-600 Illustrated Parts Cata log (IPC), PSP 604, Chapter 57. 
– CL-600 Structural Repair Manual  (SRM), PSP 607, Chapter 51. 
– CL-600 Illustrated Tool and Equipment  Manual (ITEM), PSP 611, Chapters 24 
and 28. 
– Bombardier Aerospace, Modifica tion Summary IS600-57-0001, Rev. A. 
– Bombardier Aerospace, Repair E ngineering Order (REO), 600-57-26-001. 
– Bombardier Aerospace, Appendix 1 (attached). 
– Bombardier Aerospace, Appendix 2 (attached). 
L. Other Publications Affected 
None 
M. Equivalent Service Bulletins 
– For the Challenger 605 aircraft, use SB A605-57-004. 
– For the Challenger 604 aircraft, use SB A604-57-006. 
– For the Challenger 601 aircraft, use SB A601-0627.

### Page 7

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 6 of 18 
2. ACCOMPLISHMENT INSTRUCTIONS 
NOTES: 1. If no other manual references are given, the procedures that follow  
are from the Maintenance Manual, PSP602, unless otherwise specified. 
2. All references made to zones, access panels and/or doors, are  
from the Maintenance Manual PSP602, Chapter 6. 
A. Aircraft Setup 
(1) Install the safety devices and the warning signs in the applicable positions and  
the warning placard on the flap control lever. 
(2) Obey all electrical/electronic safety  precautions. Refer to Chapter 24-00-00, 
ELECTRICAL POWER - Removal/Installation. 
(3) Connect the external ac power.  Re fer to Chapter 12-00-00, SERVICING – 
General. 
(4) Set the flap control lever to 45 and make  sure that the flaps are fully extended. 
(5) Remove the external ac power.  Refer to Chapter 12-00-00, SERVICING – 
General. 
(6) Open and tag the circuit breakers that follow: 
CB PANEL CB NO.  NAME ZONE 
CBP-A 20 (19, 21) FLAP MOTOR 1 221 
CBP-A 77 FLAP CONT 1 221 
CBP-B 176 (175, 178) FLAP MOTOR 2 222 
CBP-B 233 FLAP CONT 2 222 
CBP-B 188 (187, 189) BATT CHGR 222

### Page 8 (OCR)

CHALLENGÉR 600
MODEL CL-600-1A11
B. PART A: Special Check - Inboard Flap Fasteners on the Hinge Box Wing
Forward Fitting
(1) Do a detailed borescope inspection of the inboard flap fasteners of the hinge
box wing forward fitting of both wings. Refer to the steps that follow, Figure 1
and Figure 2.
NOTE: If the fairing is already removed, a visual inspection can be carried
out instead of a borescope inspection.
(a) Examine the orientation of the forward attachments of the inboard flap
hinge boxes at WS 76.50 and WS 127.25. Refer to Figure 1 and Figure 2.
For the FASTENERS CORRECTLY ORIENTED
The 2 Forward fasteners at WS 76. 50
and WS 127.25 are oriented with the heads
inside the wing box and the collars are
seated on the hinge fitting.
Figure 1
(i)  If all of the forward fasteners heads of the inboard flap hinge boxes at
WS 76.50 and WS 127.25 of both wings are correctly oriented as per
Figure 1, proceed to PART C in Paragraph 2.D.
For the FASTENERS INCORRECTLY ORIENTED
The 2 Forward fasteners at WS 76. 50
and WS 127.25 are oriented with the heads
on the hinge fitting and the collars are inside
the wing box, then
- Inspect each of the 2 Forward
HI-LOKS/HI-LITES fasteners to make sure
that the HI-LOKS/HI-LITES fasteners heads
are present.
Figure 2
Basic Issue: Sep 26/2013  A600-0763
Page 7 of 18

### Page 9

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 8 of 18 
(ii) If any of the forward fastener heads  are found missing as per Figure 2,  
|proceed to PART B in Paragraph 2.C. 
(iii) If any of the forward fasteners heads  are incorrectly oriented as per 
Figure 2 but no fasteners heads are found missing, then the 
borescope inspection of the forward inboard flap fasteners, hinge box 
wing forward fitting, must be repeated every 100 landings, until the 
modification, provided in PART B of this SB is complied with.  As 
applicable, Proceed to PART B or to the Close-out in Paragraph 2.F. 
C. PART B: Modification − Incorrectly Oriented Inboard Flap Fasteners on the 
Hinge Box Wing Forward Fitting  
(1) Remove fillet seal from perimeter  around the forward and aft inboard flap 
hinge fairings making contact with the wing surface and the inboard flap 
respectively.  Refer to SRM, Chapter 51-57-00, SEALING - Description. 
(2) Remove the forward and aft inboard fl ap hinge-fairings that follow, to gain 
access to inboard flap hinge boxes. Refer to Chapter 6-53-00, REMOVABLE 
FAIRINGS - General: 
ACCESS DESIGNATION 
571-CB (671-CB) Fairing, Forward Inboard Flap Hinge 
571-FB (671-FB) Fairing, Forward Inboard Flap Hinge 
572-DB (672-DB) Fairing,  Rear Inboard Flap Hinge 
572-GB (672-GB) Fairing, Rear Inboard Flap Hinge 
(3) Obey all the fuel system safety prec autions.  Refer to Chapter 28-10-11, FUEL 
TANKS - Maintenance Practices.  
(4) Defuel the aircraft.  Refer to  Chapter 12-10-28, FUEL SYSTEM - 
Replenishing. 
(5) Drain, purge and prepare the main left and right fuel tanks for access.  Refer 
to Chapter 28-10-11, FUEL TANKS – Maintenance Practices. 
(6) Remove the access panels that follow.   Refer to Chapter 6-51-00, ACCESS 
PANELS AND DOORS: 
ACCESS DESIGNATION 
571BB (671BB) Wing Lower Surface – Access Panel 
571AB (671AB) Wing Lower Surface – Access Panel 
540FB (640FB) Fuel Tank – Access Panels 
540GB (640GB) Fuel Tank – Access Panels 
NOTE: You can use the Fuel Fumes Detector, Part No. 8320000, as an 
alternative to the explosiometer.

### Page 10

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 9 of 18 
(7) Remove and isolate the electrical power  from the aircraft.  Refer to Chapter 
24-00-00, ELECTRICAL POWER - Maintenance Practices. 
(8) Put a DO NOT CONNECT − FUEL TANK MAINTENANCE placard on the 
battery. 
(9) Put a DO NOT CONNECT − FUEL TANK MAINTENANCE placard on the ac 
and the dc ground power receptacles. 
(10) Remove and replace each of the HI-L OK/Hi-LITE forward fasteners on the left 
and right wing at WS 76.50 and WS 127.25 as per  Appendix 1, PART A, and 
Figure 3.  
 
Figure 3

### Page 11

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 10 of 18 
(11) For each wing, disconnect one flap hinge box at a time  from the forward 
attachment fitting and aft attachment fitting.   Refer to the steps that follow:   
CAUTION: ONLY ONE FLAP HINGE BOX IS TO BE DISCONNECTED AT A 
TIME.  THE FLAP HINGE BOX MUST BE SUPPORTED DURING  
THE MODIFICATION SO AS NOT TO DAMAGE THE FLAPS AND 
ATTACHED COMPONENTS. 
NOTES: 1. The flap will be supported by the other attached flap hinge 
box/arm and both actuators. 
 2.  To reduce the load on the other attached flap hinge box/arm  
and actuators, the flaps should also be supported per best shop 
practice or with a bench and padding.  Refer to Figure 4. 
 
Figure 4 
(a) Disconnect the inboard flap hinge box (1) at location WS 76.50 and  
WS 127.25 as follows:  Refer to Figure 5 and Figure 6. 
(i) If necessary, remove and keep the hardware that attach the bonding 
jumpers to the flap hinge box (1). 
(ii) For the flap hinge box (1) located at WS 76.50 only, do as follows: 
(aa) If necessary, disconnect the electrical connector wire from 
any attached location on the structure, to allow downward 
movement of the flap hinge box. 
(bb) Remove and discard the cotter pin (4).  Refer to Maintenance 
Manual (PSP 602), 20-80-00 SAFETYING DEVICES, Cotter 
Pins. 
(cc) Remove and keep the nut (5), washer (6) and bolt (7) and 
disconnect the control rod (2) from the lever (8) of the flap 
position transmitter. 
(dd) If necessary, put protective covers on the open ends of the 
electrical connector (3) and on the electrical connection of the 
position transmitter.

### Page 12

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 11 of 18 
(iii) For the flap hinge box (1) located WS 76.50 and WS 127.25, remove 
and keep the nuts (9), washers (10) and (11), bolts (12), and hinge 
bushings (13), to disconnect the flap hinge box (1) from the forward 
attachment fitting.  Refer to Figure 5 and Figure 6. 
                       
  
 
CAUTION: TO REMOVE AND INSTALL THE HINGE 
BUSHINGS USE A C-CLAMP METHOD WITH 
THE SUPPORT BLOCK.  USE LIGHT  ANTI-
SEIZE LUBRICANT (WD-40 OR SIMILAR) IF 
THE BUSHINGS ARE SEIZED OR DIFFICULT 
TO REMOVE, MAKE SURE THAT THE 
LATERAL FORCE DOES NOT EXCEED  
200 LBS AND DO NOT USE A HAMMER TO 
REMOVE THE BUSHINGS, THIS CAN CAUSE 
DAMAGE. 
 BEFORE YOU INSTALL THE C-CLAMP, MAKE 
SURE YOU INSTALL A SUPPORT BLOCK 
BETWEEN THE FITTINGS, SHIMS IN ALL 
GAPS AS REQUIRED TO AVOID BENDING 
AND DAMAGE FROM THE CLAMP FORCE. 
 OTHER METHOD THAN C-CLAMP COULD BE 
USED, PROVIDED LUGS ARE SUPPORTED 
AND LATERAL FORCE DOES NOT EXCEED 
200 LBS TO AVOID DAMAGE. 
Figure 5 
(aa) Inspect the hinge bushings , Part No. 600-10300-611 (13) for 
damage and/or corrosion, if applicable, replace any damaged  
or corroded hinge bushings.  
(iv) For the flap hinge box (1) loca ted WS 76.50 and WS 127.25, remove 
and keep the nuts (14), washers (15) and (16), bolts (17), and hinge 
bushings (18), to disconnect the hinge box (1) from the aft 
attachment fitting.  Refer to Figure 5 and Figure 6. 
(aa) Inspect the hinge bushings , Part No. 600-10300-609 (18) for 
damage and/or corrosion, if applicable, replace any damaged  
or corroded hinge bushings.  
Install the support block, 
manufactured as per 
Appendix 2 or an 
equivalent commercially 
available tool between 
the fittings. 
Shim all gaps as 
required.

### Page 13 (OCR)

CHALLENGÉR 600
MODEL CL-600-1A11
(b) Carefully pull the flap hinge box (1) downward to allow access to the
forward attachment fitting.
RANENTTER  FAIRING
BRACKET
SUPPORT
CAUTION: ONLY ONE FLAP HINGE BOX IS TO BE
DISCONNECTED AT A TIME. THE FLAP
HINGE BOX MUST BE SUPPORTED
DURING THE MODIFICATION SO AS NOT
TO DAMAGE THE FLAPS AND ATTACHED
COMPONENTS.
AFT
ATTACHMENT FITTING
FORWARD
ATTACHMENT FITTING
13
10-
Figure 6
Basic Issue: Sep 26/2013  A600-0763
Page 12 of 18

### Page 14 (OCR)

CHALLENGÉR 600
MODEL CL-600-1A11
(12) Remove and replace each of the HI-LOK/Hi-LITE AFT fasteners on the left
and right wing at WS 76.50 and WS 127.25 as per Appendix 1, PART B,
and Figure 7.
FORWARD ATTACHMENT
HINGE FITTING
Remove and replace each of the
HI-LOK/Hi-LITE AFT fasteners on  FLAP HINGE
the left and right wing forward  ARM
attachment hinge fitting at
WS 76.50 and WS 127.25 as per
Appendix 1,PART B
CAUTION
DO NOT DRILL OFF HEADS OF HI-LOKS/HI-LITES AND
DRIVE SHANK INTO WING-BOX AS THIS COULD CAUSE
SEVERE SCORING OF THE HOLES. REMOVE COLLAR AND
DRIVE HI-LOKS/HI-LITES FROM THREADED END.
FLAP HINGE
BOX
Figure 7
(13) Attach the inboard flap hinge box (1) at locations WS 76.50 and WS 127.25.
Refer to the steps that follow, Figure 5 and Figure 6:
(a) Apply one layer of Mastinox 6856k to the hinge bushings (13) and hinge
bushings (18) on installation.
(b) Put the flap-hinge-box (1) in position.
(c) Install the bushings (18) on the flap hinge box (1) and aft attachment
fitting.
(d) Install the bushings (13) on the forward lugs of the flap hinge box (1) and
forward attachment fitting.
(e) Install bolts (17), washers (15) and (16), and nuts (14) to attach the flap
hinge box (1) to the aft attachment fitting.
NOTE:  Make sure the sum of the gap measurement between the aft
attachment fitting and lower surface of bolt head (17), and
between the aft attachment fitting and the lower surface of
washer (15), is 0.020 in to 0.105 in (0.508 mm to 2.667 mm).
Basic Issue: Sep 26/2013  A600-0763
Page 13 of 18

### Page 15

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 14 of 18 
(f) Install the bolts (12), washers (10) and (11), and nuts (9) to attach the flap 
hinge box (1) to the forward attachment fitting. 
NOTE: Make sure the sum of the gap measurement between the 
forward attachment fitting and lower surface of bolt head 
(12), and between the forward attachment fitting and the 
lower surface of washer (10), is 0.015 in to 0.060 in 
(0.381mm to 1.524 mm). 
(g) Torque the nuts (9), and (14) from 30 to 35 lbf in (3.39 to 3.95 Nm).  
Refer to Maintenance Manual, PSP 602, Chapter 20-20-11, THREADED 
FASTENERS. 
(h) Attach the control rod (2) and electrical connector (3) to the flap position 
transmitter as follows: 
(i) Align the eye of the control rod (2) with the lever (8). 
(ii) Install the bolt (7), washer (6) and the nut (5). 
(iii) Torque the nut (5), from 20 to 25 lb f in (2.26 to 2.82 Nm).  Refer to 
Maintenance Manual, PSP 602, Chapter 20-20-11, THREADED 
FASTENERS. 
(iv) Install the cotter pin (4).  Refer to Maintenance Manual, PSP 602, 
Chapter 20-80-00, SAFETYING DEVICES, Cotter Pins. 
(v) Remove the protective covers from the open ends of the electrical 
connector (3) and from the electrical connection of the position 
transmitter. 
(vi) Connect the electrical connector (3) to the flap position transmitter. 
NOTE: If detached, attach the electrical connector wire to the 
necessary locations on the structure. 
(i) Install the bonding jumper on the flap hinge box (1).  Refer to 
Maintenance Manual, PSP 602, Chapter 57-40-01, FLAP HINGE BOX, 
Removal/Installation. 
(j) Do the electrical bonding test for the applicable flap hinge box (1).  Refer 
to Maintenance Manual, PSP 602, Chapter 51-80-00, ELECTRICAL 
BONDING. 
(14) Install the access panels that follow:   
ACCESS DESIGNATION 
571BB (671BB) Wing Lower Surface – Access Panel 
571AB (671AB) Wing Lower Surface – Access Panel 
540FB (640FB) Fuel Tank – Access Panels 
540GB (640GB) Fuel Tank – Access Panels 
(15) Remove the DO NOT CONNECT − FUEL TANK MAINTENANCE placard 
from the battery.

### Page 16

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 15 of 18 
(16) Remove the DO NOT CONNECT − FUEL TANK MAINTENANCE placard 
from the ac and the dc ground power receptacles. 
(17) Restore the electrical power on t he aircraft.  Refer to Chapter 24-00-00, 
ELECTRICAL POWER - Maintenance Practices. 
(18) Proceed to the Test ing in Paragraph 2.E. 
D. PART C:  Correctly Oriented Inboa rd Flap Fasteners on the Hinge Box Wing 
Forward Fitting  
If the forward fasteners heads are correctly oriented as per Figure 1, you already 
meet the intention of this Service Bulletin and no further action is required, 
proceed to the Close-out in Paragraph 2.F. 
E. Testing 
(1) Remove the tags and close the circuit breakers that follow: 
CB PANEL CB NO.  NAME ZONE 
CBP-A 20 (19, 21) FLAP MOTOR 1 221 
CBP-A 77 FLAP CONT 1 221 
CBP-B 176 (175, 178) FLAP MOTOR 2 222 
CBP-B 233 FLAP CONT 2 222 
CBP-B 188 (187, 189) BATT CHGR 222 
(2) Connect the external ac power.  Re fer to Chapter 12-00-00, SERVICING – 
General. 
(3) Do an operational test of the inboard flaps to make sure the flap hinge box 
assemblies move freely, before installing the flap hinge-fairings.  Refer to 
Chapter 27-50-00, WING FLAP SYSTEM – Maintenance Practices. 
(4) Remove the external ac power.  Refer to Chapter 12-00-00, SERVICING. 
(5) Open and tag the circuit breakers that follow: 
CB PANEL CB NO.  NAME ZONE 
CBP-A 20 (19, 21) FLAP MOTOR 1 221 
CBP-A 77 FLAP CONT 1 221 
CBP-B 176 (175, 178) FLAP MOTOR 2 222 
CBP-B 233 FLAP CONT 2 222 
CBP-B 188 (187, 189) BATT CHGR 222 
(6) Install the forward and aft inboard flap hinge-fairings that follow.  Refer to 
Chapter 6-53-00, REMOVABLE FAIRINGS - General:

### Page 17

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 16 of 18 
ACCESS DESIGNATION 
571-CB (671-CB) Fairing, Forward Inboard Flap Hinge 
571-FB (671-FB) Fairing, Forward Inboard Flap Hinge 
572-DB (672-DB) Fairing,  Rear Inboard Flap Hinge 
572-GB (672-GB) Fairing, Rear Inboard Flap Hinge 
(7) Install fillet seal around perimeter of forward and aft inboard flap hinge-fairings 
making contact with the wing surface and the inboard flap respectively. Refer 
to SRM, Chapter 51-57-00, SEALING – Description, Aerodynamic Sealing. 
(8) Connect the external ac power.  Re fer to Chapter 12-00-00, SERVICING – 
General. 
(9) Carry out a flap operational test and check corresponding flap position 
indications in the flight compartment.  Refer to Chapter 27-50-00, WING FLAP 
SYSTEM – Maintenance Practices. 
F. Close-out 
(1) If not already done, remove the tags and close the circuit breakers that follow: 
CB PANEL CB NO.  NAME ZONE 
CBP-A 20 (19, 21) FLAP MOTOR 1 221 
CBP-A 77 FLAP CONT 1 221 
CBP-B 176 (175, 178) FLAP MOTOR 2 222 
CBP-B 233 FLAP CONT 2 222 
CBP-B 188 (187, 189) BATT CHGR 222 
(2) Remove all tools, equipment and unwanted materials from the aircraft. 
G. Recording 
You can do each PART of this Alert Service Bulletin independently.  When any 
PART of this Alert Service Bulletin is completed, make an entry in the aircraft log 
and send the attached Incorporation Notice to Bombardier Business Aircraft 
Customer Services (BBACS). 
This Alert Service Bulletin must be repeated every 100 landings and can only be 
closed when:  
- The modification in PART B is completed. 
or 
- PART C is completed to confirm that the forward fasteners heads are correctly 
oriented.  
In an effort to improve the quality of our technical communications, we are 
requesting your feedback.  Please take a moment to fill out our easy on-line Alert 
Service Bulletin survey: 
http://csefeedback.aero.bombardier.com

### Page 18

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 17 of 18 
3. MATERIAL INFORMATION 
A. Kit 
When applicable, submit an SRPSA to Customer Support Engineering (CSE) to 
obtain kit and parts details necessary to do PART B of this modification. 
B. Parts 
When applicable, submit an SRPSA to Customer Support Engineering (CSE) to 
obtain kit and parts details necessary to do PART B of this modification. 
C. Material 
The materials that follow, or equivalent, are necessary to do PART B of this  
Alert Service Bulletin.  These can be purchased from a local supplier.  Bombardier 
Aerospace does not pay for these consumables. 
DESCRIPTION PART 
No./NAME 
SPECIFICATION QUANTITY SUPPLIER
(See Note)
Corrosion 
inhibitor 
Compound 
Mastinox 6856K - As Necessary Code: A 
Integral Fuel 
Tank Sealant 
CT: (9 hours) B1/2  
(20 hours) B2 
P/S 870B  MIL-PRF-81733 Type II  As Necessary Code: A 
Sealant 
CT: (12 hours) B1/2  
(24 hours) B2 
PR1776M B1/2 
or 
PR1776M B2 
- As Necessary Code: A 
Durathane High 
Gloss Enamel  
CT: (12 hours) 
7600 line BAMS 565-002 As Necessary Code: B 
Epoxy Primer 
Grey  
CT: (2 hours) 
4500-P-40B 
(16473, FS 595B) BAMS 565-001 As Necessary Code: B 
Conversion 
Coating Alodine 1201  MIL-DTL-81706B Type II As Necessary Code: C 
Epoxy Resin 
CT: (24 hours) 
Hysol 
EA9309.3NA  AS9354002 As Necessary Code: C 
Fuel Tank 
Coatings  
(Primer Yellow) 
CT: (24 hours) 
20P1-10  BAMS 565-010 As Necessary Code: D 
Anti-Seize 
Lubricant WD-40 - As Necessary Code: E 
Brush, Natural or 
Synthetic Bristle - - As Necessary Code: E

### Page 19

MODEL CL-600-1A11  
Basic Issue: Sep 26/2013 A600-0763 
  Page 18 of 18 
DESCRIPTION PART 
No./NAME 
SPECIFICATION QUANTITY SUPPLIER
(See Note)
Scraper,  
Non-Metallic - - As Necessary Code: E 
NOTES: 1. Refer to the table that follows for each supplier’s address listed by 
codes. 
2. The Curing Time (CT), if applicable, for each consumable material is 
indicated with the description of each product. 
3. At time of release of this Alert Service Bulletin, the information on the 
supplier was valid and accurate.  In the event that this information 
has changed, the operator is encouraged to use the World Wide Web 
to find a local supplier. 
SUPPLIERS ADDRESSES BY CODES 
Code: A 
PRC – Desoto International 
5430 San Fernando Road,  
PO Box 1800, Glendale,  
CA, U.S.A. 91209 
Tel.: 1-800-228-5635  
Fax: (818)-549-7790 
Web Site: www.ppg.com/prc-desoto 
Code: B 
Tempo Aerospace Inc 
205 Fenmar Drive,  
Toronto, Ontario, Canada  
M9L 2X4 
Tel.: 1-416-746-2233 
Fax.: 1-416-746-2235  
E-mail: sales@tempo-aerospace.com 
Web Site: www.tempo-aerospace.com 
Code: C 
Henkel Corporation 
2850 Willow Pass Road 
Bay Point, California 94565 
Tel.: 1-925-458-8000  
Fax: 1-925-458-8030 
Web Site: www.henkelna.com 
 
Code: D 
AkzoNobel Aerospace Coatings. 
1 East Water Street 
Waukegan, IL 60085 
USA 
Tel.: 1-847-623-4200 
Fax.: 1-847-625-3200 
E-mail: customer.service@akzonobel.com 
Web Site: www.akzonobel.com  
 
Code: E 
Commercially Available 
D. Publications 
No publications required.

### Page 20

ALERT SERVICE BULLETIN EVALUATION FORM 
(Your ideas will help us provide better bulletins) 
SERVICE BULLETIN: A600-0763 ISSUE: Basic DATED: Sep 26/2013 
      
TITLE: Special Check/Modification – Attachment Fittings – Inboard Flap Hinge Box Forward 
Attachment Fittings Fasteners 
 
 
 
 
 
 
 
In an effort to improve the quality of our technical communications, we are replacing 
the standard Service Bulletin Evaluation Form with an on-line Service Bulletin 
Survey and we are requesting your feedback.  Please take a moment to fill out our 
easy on-line Service Bulletin survey:   
 
 
 
 
 
http://csefeedback.aero.bombardier.com

### Page 21

ALERT SERVICE BULLETIN INCORPORATION SHEET –  
“A600-0763” 
 
BOMBARDIER 
SUBMISSION Upon completion of the Service Bulletin, please fill-in, fax to 
(514) 855-8798 or e-mail to Fracas at fracas.montreal@aero.bombardier.com 
 
If your aircraft is registered on CAMP and you are reporting to them, 
please do not send the incorporation sheet to Bombardier. If your aircraft 
is on another tracking system, please contact Bombardier to make 
arrangements for automated data submission. 
 
 
           COMPLIED WITH  
 Alert Service 
Bulletin Number 
 Rev.  * Parts 
Completed 
YES NO N/A Remarks/Reason 
 A600-0763  Basic  PART A     
 “  “  PART B     
 “  “  PART C     
 
 Actual hours to accomplish Service Bulletin:    
 
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A, B, 
C, D, etc.) which can be carried out separately, indicate only those parts 
completed at this time. 
2. For repetitive checks (usually PART A) only the initial check should be reported 
unless otherwise stated in the Service Bulletin. 
* NOTES:  
 
 
  
  3. When more than one part is carried out at the same time, each part should be 
reported. 
 
 Aircraft Serial No.   Aircraft Reg. No.   
 Airframe Hours:   Airframe Landings   
 S.B. Incorporation date   Service Order No.   
  (dd/mm/yy)    
 Facility Incorporating S.B.  
 Name  Signature  Date  
                               (dd/mm/yy) Signature not required if sent by E-Mail

### Page 22

-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --  
 
 
 
 
 
Bombardier Business Aircraft Customer Services (BBACS) 
P.O. Box 6087, Station Centre-ville 
Montreal, Québec, Canada H3C 3G9 
 
Attention: Customer Support Department, Maintenance Engineering 
 
 
 
 
 
-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
