# Bombardier Alert Service Bulletin A601R-24-120

Copy: Revision C ("U.S. DOT/FAA - Service Information - 1"), 12 pages: PDF https://openairdocs.org/files/sha256/8c/b4/8cb44861c1f87b02f12276519b89aa8958ab7a2040c93597fd362b2f71d3670e; text https://openairdocs.org/service-documents/bombardier/a601r-24-120/file/8cb44861c1f8.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2010-0550; AD 2010-20-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: A601R-24-120
- Latest revision known: A601R-24-120, Revision C, dated April 20, 2009 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/a601r-24-120

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2010-20-19](https://openairdocs.org/ad/2010-20-19.md), effective Nov 5, 2010: Revision C

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/a601r-24-120/proposed.md).

## Text (12 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2010-0550; AD 2010-20-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BOMBARDIER
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CL-600-2B19 Canadair Regional Jet (CRJ) Aircraft
ALERT SERVICE BULLETIN A601R-24-120
SUBJECT: Electrical Power System - Emergency AC Power Generation System -
Special Detailed Inspection of the Air Driven Generator (ADG) Strut
This page transmits:
Revision C of Alert Service Bulletin A601R-24-120,
pages 1 thru 9, dated Apr 20/2009.
The changes in this revision have no effect on aircraft that have
incorporated a previous issue of this service bulletin.
Reason:
Revised Planning Information, paragraph 1., to:
Change the Hamilton Sunstrand service bulletin revision.
This revision also includes small editorial changes that do not have an effect on the technical
content.
Instructions:
Discard the copy of Alert Service Bulletin A601R-24-120, Revision B, dated Dec
07/2006. Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Apr 20/2005.
Revision A, dated Dec 01/2005.
Revision B, dated Dec 07/2006.
Apr 20/2009  SB A601R-24-120
Page 1 of 1

### Page 2 (OCR)

BOMBARDIER
ALERT SERVICE BULLETIN
Technical
Publications
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED
AIRCRAFT, THIS SERVICE BULLETIN MUST BE SENT TO THE LESSEE. IF THE OPERATOR
HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, THIS SERVICE
BULLETIN MUST BE SENT TO THE NEW OWNER, UNLESS CONFIRMATION WAS RECEIVED
THAT BOMBARDIER REGIONAL AIRCRAFT DIVISION HAS INCLUDED THE NEW OPERATOR
ON THE DISTRIBUTION LIST.
ATA SYSTEM: 24-23  NUMBER: A601R-24-120
SUBJECT: Electrical Power System - Emergency AC Power Generation System -
Special Detailed Inspection of the Air Driven Generator (ADG) Strut
1. PLANNING INFORMATION
A. Effectivity
(1)  Aircraft Affected:
Service Bulletin: CL-600-2B19 Canadair Regional Jet (CRJ) Aircraft Serial
Numbers 7305 thru 7990, 8000 thru 8051.
NOTE: The inspection of this service bulletin was incorporate on Aircraft
Serial Number 8020 thru 8051 after Certificate of Airworthiness and
before delivery.
Production:  There is no production effectivity.
NOTE: The instructions in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aerospace Service Bulletin(s). Before you
do this bulletin, examine all STC, STA or equivalent action changes
to make sure this bulletin can be completed.
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 1 of 9

### Page 3 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
B. Reason
(1) Condition
It is possible for a crack to start on the aft area of the strut assembly of the
ADG.
(2)  Evidence
During an inspection of the ADG, damage was found on the strut of one ADG
in the area adjacent to the generator.
(3) Objective/Benefit
This service bulletin gives instructions to do a special detailed inspection of
the dry ADG and, if necessary, to replace the ADG.
C. Description
Circuit breakers are opened and tagged. The dry ADG is lowered. The Hamilton
Sundstrand service bulletin ERPS10AG-24-3 is done. If damage is found, the
ADG is replaced and the damaged ADG is sent to Hamilton Sundstrand. The dry
ADG is retracted to the stow position. If the ADG was replaced, a dry ADG
clearance checks and functional test of the dry ADG is done. The circuit breakers
are closed and the aircraft is returned to service.
D.  Compliance
Alert Service Bulletin. Bombardier Aerospace recommends that this service bulletin
be done no more than 1000 flight hours from the release date on this service
bulletin unless otherwise directed by the airworthiness authority of the operator.
E. Approval
The technical content of this service bulletin has been approved under the authority
of the TCCA Design Approval Organization No: DAO #93-Q-02.
F. Manpower
The man hours given below are an estimate for direct labor done by an
experienced crew on an aircraft prepared for maintenance.
This estimate does not include the time necessary for:
- Administrative tunctions such as planning, liaison, familiarization, and report writing.
- Non productive elapsed time such as rest time, having meals, and crew shift
changes.
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 2 of 9

### Page 4 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
- Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
- Preparation for modification (unless specified in the accomplishment
instructions) such as cleaning and getting parts, tools, consumables, and
ground equipment.
- Quality assurance inspections, troubleshooting and/or correction of
discrepancies found when a task is done.
- All other activities that are not considered by Bombardier Aerospace as directly
related to the accomplishment of this procedure.
It will take an estimated 0.5 man-hours to complete this service bulletin. The
man-hours are divided as shown in the table that follows:
TASK  MAN-HOURS
(1) Job Set-Up  0.25
(2) Procedure  N/A
(3) Test  N/A
(4) Job Close-Out  0.25
NOTE: This estimate does not include the man- hours necessary to do Hamilton
Sundstrand Service Bulletin ERPS10AG-24-3.
NOTE: The man-hours to replace the ADG, do the functional test and the clearance
checks are not shown in the table. If it is necessary to replace the ADG, add
4.0 man-hours to replace the ADG and to do the related tests.
G. Material - Price and Availability
Refer to Hamilton Sundstrand Service Bulletin ERPS10AG-24-3.
H. Tooling - Price and Availability
Refer to Hamilton Sundstrand Service Bulletin ERPS10AG-24-3.
Weight and Balance
Not changed.
J. Electrical Load Data
Not changed.
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 3 of 9

### Page 5 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
K. References
Restriction and/or Special Instruction (RSI) C-A114, Revision E.
Hamilton Sundstrand Service Bulletin ERPS10AG-24-3, Revision 3,
dated Mar 12/09.
Aircraft Maintenance Manual, CSP A-001, Revision 34.
For Bombardier Aerospace reference only: PCA 4800.
Other Publications Affected
Aircraft Maintenance Manual (AMM), CSP B-001.
M. Relationship Chart
Not applicable.
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 4 of 9

### Page 6 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
2. ACCOMPLISHMENT INSTRUCTIONS
A. Job Set-Up
Reference Information
REFERENCE
AMM 24-00-00-910-801
AMM 24-23-01-020-803
AMM 24-23-01-420-801
AMM 24-23-01-720-803
AMM 24-23-01-840-804
AMM 24-23-01-840-805
AMM 24-23-28-220-801
AMM 29-00-00-910-801
DESIGNATION
Electrical/electronic Safety Precautions
Removal of the Dry ADG
Installation of the Dry ADG
Functional Test of the Dry ADG
Manual Lowering of the Dry ADG
Retraction of the Dry ADG after Deployment
Dry ADG Clearance Checks
Hydraulic Safety Precautions
WARNING: OBEY ALL THE HYDRAULIC SAFETY PRECAUTIONS WHEN YOU DO
WORK ON ANY HYDRAULIC SYSTEM OR ON A HYDRAULIC SYSTEM
COMPONENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
YOU CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO
EQUIPMENT.
(1) Obey all the hydraulic safety precautions
(Refer to AMM 29-00-00-910-801)
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE  ON  OR NEAR  ELECTRICAL/ELECTRONIC
EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN
OCCUR.
(2) Obey all the electrical/electronic safety precautions
(Refer to AMM 24-00-00-910-801).
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 5 of 9

### Page 7 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
(3) Open, safety, and tag the circuit breakers that follow:
CB PANEL  CB NO.  NAME  ZONE
CBP -2  N6  ADG DEPLOY CONT AUTO  222
CBP -2  N7  ADG DEPLOY CONT MAN  222
CBP -5  B10  ADG AUTO  311
CBP -5  B11  ADG MAN  311
(4) If not deployed, manually lower the dry ADG
(Refer to AMM 24-23-01-840-804).
B. Procedure
Refer to Figure 1.
(1) Do the Hamilton Sundstrand Service Bulletin ERPS10AG-24-3 (Fluorescent
Penetrant Inspection).
(2) If a crack is found do as follows:
(a) Remove the dry ADG (Refer to AMM 24-23-01-020-803).
(b) Return the damaged part to the address below:
Hamilton Sundstrand
4747 Harrison Avenue
P.O. Box 7002
Rockford, IL 61125
Attention: Repair Administration
Mail Stop 265-6
Phone: 815-226-6849
Fax:  815-226-6826
(c) Install the new dry ADG (Refer to AMM 24-23-01-420-801).
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 6 of 9

### Page 8 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
C. Job Close-Out
(1) If the dry ADG was not replaced, do as follows:
(a) Retract the dry ADG to the stowed position
(Refer to AMM 24-23-01-840-805).
(b) Remove the tags and close the circuit breakers that follow:
CB PANEL  CB NO.  NAME  ZONE
CBP -2  N6  ADG DEPLOY CONT AUTO  222
CBP -2  N7  ADG DEPLOY CONT MAN  222
CBP -5  B10  ADG AUTO  311
CBP -5  B11  ADG MAN  311
(2) If the dry ADG was replaced do as follows:
(a) Do the dry ADG clearance checks
(Refer to AMM 24-23-28-220-801).
(b) Remove the tags and close the circuit breakers that follow:
CB PANEL  CB NO.  NAME  ZONE
CBP -2  N6  ADG DEPLOY CONT AUTO  222
CBP -2  N7  ADG DEPLOY CONT MAN  222
CBP —5  B10  ADG AUTO  311
CBP -5  B11  ADG MAN  311
(c) Do the functional test of the dry ADG
(Refer to AMM 24-23-01-720-803).
(3) Remove all tools, equipment, and unwanted materials from the work area.
(4) When this service bulletin is completed, make this entry in the applicable
logbook(s): "Alert Service Bulletin A601R-24-120, Revision C, Electrical
Power System - Emergency AC Power Generation System - Special
Detailed Inspection of the Air Driven Generator (ADG) Strut, incorporated."
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 7 of 9

### Page 9 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
AIR DRIVEN
GENERATOR
rsb601r24120_001.dg, om, 06/04/05
Air Driven Generator (ADG)
Figure 1
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 8 of 9

### Page 10 (OCR)

ALERT SERVICE BULLETIN A601R-24-120
3. MATERIAL INFORMATION
A. Kit Information
None.
B. Rotable Information
Refer to Hamilton Sundstrand Service Bulletin ERPS10AG-24-3.
C. Consumable Information
For a list of consumables, refer to the different tasks and the Hamilton Sundstrand
Service Bulletin given as references in this service bulletin.
D. Special Tools and Equipment
For a list of special tools and equipment, refer to the different tasks and the
Hamilton Sundstrand Service Bulletin given in this references in this service bulletin.
E. Disposition of Parts
Not applicable.
Apr 20/2005  S.B. A601R-24-120
Revision C, Apr 20/2009  Page 9 of 9

### Page 11 (OCR)

BOMBARDIER
SERVICE BULLETIN EVALUATION FORM/COMPLIANCE SHEET
(YOUR IDEAS WILL HELP US PROVIDE BETTER BULLETINS)
SERVICE BULLETIN: 601R-24-120  ISSUE: C
STRONGLY  DISAGREE NEUTRAL  AGREE  STRONGLY
DISAGREE  AGREE
• Instructions to do the Service Bulletin
were accurate.
Comments:
• Illustration(s), figure(s), picture(s) and/or
kit drawing(s) were helpful to carry out
instructions.
Comments:
• If a parts kit was required, did the kit
contents received agree with the
contents listed in the bulletin?
Comments:
• Aircraft hands-on work was
accomplished in estimated time.
Comments:
• Overall, I was satisfied with this Service
Bulletin.
Comments:
PLEASE SUPPLY US WITH THE FOLLOWING DATA AND FAX TO (450) 476-7300:
OPERATOR:  NAME (Please print)
SERVICE CENTER:  TELEPHONE:
AIRCRAFT SERIAL NO.:  FACSIMILE:
DATE OF SB
INCORPOARTION
THANK YOU FOR ANSWERING THIS EVALUATION FORM
UPON COMPLETION OF THIS EVALUATION FORM/COMPLIANCE SHEET, FAX TO
450-476-7300

### Page 12

(No text on this page.)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
