# Bombardier Service Bulletin BULLETIN84-55-15

Copy: No revision named ("SB84-55-15"), 24 pages: PDF https://openairdocs.org/files/sha256/79/ac/79ac57a9f86e17ffe4c350d2c6fc515e783bc0e1b3de2f2d65fb33a3ac3a2691; text https://openairdocs.org/service-documents/bombardier/bulletin84-55-15/file/79ac57a9f86e.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2025-0482, the docket of AD 2025-19-05. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: BULLETIN84-55-15
- Page: https://openairdocs.org/service-documents/bombardier/bulletin84-55-15

## Text (24 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2025-0482, the docket of AD 2025-19-05. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Page 1 of 2
GN 
Tx Ltr SB 84-55-15Revision ‘A’ 07 Jan 2025 
DHC-8(DASH 8) 
SERVICE BULLETIN84-55-15 
Stabilizers – Elevator – Retrofit Installation of Front Spa r Doublers –
ModSum 4-114074 
This page transmits Revision ‘A’ of Service Bulletin 84-55-15, pages 1 thru 
20, dated 07 Jan 2025. 
This service bulletin is re-issued in its entirety for the reasons that follow: 
- The Effectivity section is revised to add a new note 
- The Reason section section is revised to update the solution paragraph
- The Description section is revised to add a new step related to the 
inspection of the elevator front spar, upper and lower skin 
- The References section is revised to convey the latest revision of this 
service bulletin and engineering documentation 
- The Procedure section is revised to add the new step 3. B. (2). 
The Compliance in the previous issue(s) of this service bulletin is not 
affected by this revision. No additional rework to the aircraft is introduced by 
this revision. 
Remove the initial issue of Service Bulletin 84-55-15 and re place with 
attached. 
Previous issue(s) of Service Bulletin 84-55-15:
Initial issue – Pages 1 thru 20 dated 30 Jan 2024

### Page 2

SERVICEBULLETIN 84-55-15
Page 2 of 2
GN
Tx Ltr SB 84-55-15Revision ‘A’ 07 Jan 2025 
This Page Intentionally Blank

### Page 3

GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page1of20 
SERVICE BULLETIN
ATASYSTEM: 5500 NUMBER: 84-55-15
DE HAVILLAND AIRCRAFT OF CANADA LIMITED (DHC) CONSIDERS 
URGES OPERATORS TO PROMPTLY EVALUATE THE CONTENTS 
THIS SERVICE BULLETIN TO BE PARTICULARLY SIGNIFICANT AND 
SUBJECT: Stabilizers – Elevator – Retrofit Installation of Front Spar Doublers –
ModSum 4-114074
1. PLANNING INFORMA TION 
A. Effectivity 
AircraftAffected:
In-Service: DHC-8 Aircraft Models 401 and 402 Serial Number s 4059 thru 
4633.
Related 
ModSum Title 
4-114001 Stabilizers–Elevator–IntroductionofFrontSpar 
Doublers 
NOTE1: Aircraft 4001-4058 are in the pre-ModSum 4-153256 configuration 
which has elevator assemblies 85527021-001/002/003/004 installed 
with the elevator front spar that has adequate reinforcement and do 
not require the web reinforcement to be installed per this service 
bulletin.
NOTE2: The instructions in this service bulletin are only applicable to the 
systems and parts installed at the time of delivery on the aircraft or as 
changed by DHC Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this 
bulletincanbecompleted.

### Page 4

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page2of20 
SparesAffected:
The following is a list of spares affected by this change. Review spares and 
procurement systems to determine the existence of any listed parts. See 
Paragraph 2.D.,ExistingPartsAccountability,fordispos ition.
Part Number Description 
85527021-005
85527021-006
ElevatorStructureAssembly(LH) 
ElevatorStructureAssembly(RH) 
B. Reason 
Problem: Elevatorfrontsparcrackinghasbeenreportedonf ourDHC-8-400aircraft.
Labexaminationdeterminedthecracks,emanatingfrommult ipleorigins,
were the result of fatigue. Investigations identified two locations on the 
front spar web that may experience high stress levels due to potential
PowerControlUnit(PCU)forcefight.
Solution: Thisservicebulletinalsoconductsinspectiono ftheelevatorleadingedge 
frontsparintheareasadjacenttoPCUfittingsandtheTechn icalHelpDesk 
isinformedifdamageisfound.Ifnodamagewasfound,theser vicebulletin 
installs doubler 85520121-107 between the ribs 12 and 13 andinstalls 
doubler85520121-105betweentheribs13and14atthefronts parofthe 
elevator structure assembly to enhance fatigue strength ofthe elevator 
frontsparforthePostModSum4-153256aircraft.Theexisti nglowermid 
skinpanels(85527112)areremovedandre-installedwithne wblindrivets.
C. Description 
Theproceduresinthisservicebulletingivetheinstructio nstodothetasksthatfollow:
- Aircraftelectricalpowerisremoved 
- Thenoselandinggearlockisengaged 
- Themainlandinggearlockpinsareinstalledthrougheachm aingearandmaingear 
doormechanism 
- Gainedaccesstohorizontalstabilizer 
- TheLHandRHelevatorstructureassembliesareremovedfro mtheaircraft
- Inspectionoftheelevatorfrontspar,upperandlowerskin sisconducted.Ifdamage 
isfound,reportedtotheTHD 
- Skinpanelsareremoved 
- BHECinspectionofthefastenerholesisdone

### Page 5

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page3of20 
- Thepressuresensitivetapesareremovedfromtheaffected lighteningholes 
- BHECinspectionisdoneonthefrontspar 
- Thefrontsparwebissolventcleaned 
- Theholesaredrilledonthefrontspar 
- HFECinspectionisdoneatthebendradiusoftheribslighte ninghole 
- Sealanttothefayingsurfacesofthecomponentsareapplie d 
- Thedoublersareinstalledbetweentherespectiveribsusi ngthesolidrivets 
- The reworked area on the exterior faces of the elevator front spar are treated with 
corrosionpreventivecompound 
- Thepressuresensitivetapesandadhesivetapesareapplie d 
- TheLHareRHelevatorstructureassembliesarere-identif ied 
- Skinpanelsareinstalled 
- TheLHandRHelevatorstructureassembliesareinstalledt otheaircraft
- Closeout.
D. Compliance 
DeHavillandAircraftofCanadaLimitedhighlyrecommendsi ncorporationofModSum 
4-114074 at the earliest opportunity unless otherwise directed by the operator’s 
airworthinessauthority.
ATransportCanadaAirworthinessDirectivePending.
E. Approval 
Thetechnicalcontentofthisservicebulletinhasbeenappr ovedundertheauthorityof
the Transport Canada Civil Aviation (TCCA) Design ApprovalOrganization No: DAO 
#19-Q-01.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage 
ToleranceInspections(DTIs).

### Page 6

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page4of20 
F. Manpower 
It will take an estimated 24.00 man-hours to complete this service bulletin. The 
breakdownoftheman-hoursisshowninthetablethatfollows :
TASK MAN-HOURS 
JobSet-Up 1.00 
Procedure 22.00 
Test/RTS 0.00 
Close-Out 1.00 
This estimate is for direct labour done by an experienced crew and it does not
include, planning, familiarization, cure time, part fabrication, tool acquisition or lost
time.
G. Material – Price and Availability 
TheModificationKitrequiredtodothisservicebulletinis listedinthetablebelow.
Kit Number Description 
8MK5023-001 Kit–DoublerInstallation,Elevator 
Operators should submit a purchase order through the Customer Response Center 
(CRC) to the Customer Accounts Service Team (CAST) at DHC specifying aircraft
serialnumber(s).Submitthepurchaseorderto:
DeHavillandAircraftofCanadaLimited 
MaterialServices 
5800ExplorerDrive 
Mississauga 
Ontario 
CanadaL4W5K9 
DHCPhoneNumbers :
NorthAmerica:TollFree: 1-855-310-1013or 
Direct: 1-647-277-5820 
DHC Emails:
Parts: Europe,MiddleEast,Africa,andRussia: emear.parts@deha villand.com 
AmericasandRestofWorld: parts@dehavilland.com

### Page 7

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page5of20 
H. Tooling – Price and Availability 
None 
I. Weight and Balance 
A/C Type and 
Model 
Weight (Lb) Arm (Inches) 
Moment 
(Inches x Lb) 
x 0.001 
DHC-8Model401
Kit–8MK5023-001
+0.27 1066.45 0.29 
DHC-8Model402
Kit–8MK5023-001
+0.27 1066.45 0.29 
J. Electrical Load Data 
Notaffected 
K. Publications Affected 
AircraftIllustratedPartsCatalog PSM 1-84-4.....................
ModSumsManual PSM 1-84-12 .................................
WeightandBalanceManual(Imperial) PSM 1-84-8...............
WeightandBalanceManual(Metric) PSM 1-84-8M .................
L. References 
Revision ‘A’ of this service bulletin was prepared to the engineering drawings and 
relateddatathatfollows:
DRAWING SHEET REV 
8MK5023 1 A
8Z10511 1 C
8Z10511 2 A
85520121 1 A
ModSum4Q114074Rev.‘D’
ModSum4-114074Rev.‘D’
PCA47136Revision0(forinternalreferenceonly).

### Page 8

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page6of20 
2. MATERIAL INFORMA TION 
A. Parts Required Per Aircraft 
(1) ModificationKit8MK5023-001 
(2) DetailedKitContent:
Quantity Per Kit 
-001 Part Number Description Remarks 
8 B0205016AD3-5S SolidRivet SeeNotebelow 
102 B0205016AD3-4S SolidRivet SeeNotebelow 
12 NAS9305E-4-04 BlindRivet SeeNotebelow 
108 NAS9305E-4-03 BlindRivet SeeNotebelow 
22 NAS9305E-4-02 BlindRivet SeeNotebelow 
36 NAS9303E-5-05 BlindRivet SeeNotebelow 
48 NAS9303E-5-04 BlindRivet SeeNotebelow 
120 NAS9303E-5-03 BlindRivet SeeNotebelow 
76 NAS9303E-5-02 BlindRivet SeeNotebelow 
20 NAS9304E-4-03 BlindRivet SeeNotebelow 
126 NAS9304E-4-02 BlindRivet SeeNotebelow 
72 B0205016AD4-6S SolidRivet SeeNotebelow 
2 85520121-107 Doubler 
2 85520121-105 Doubler 
REF 8Z10511 Retrofit–Doubler 
Installation 
Dwgonly 
NOTE: These parts are not included in the kit and must be supplied bythe 
operator,orobtainedthroughDeHavillandspares.
Listed drawings that are required to complete the kits abovecan be requested by 
writingtothefollowingemailaddress:
dwg.request@dehavilland.com

### Page 9

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page7of20 
(3) Inadditiontotheabovepart(s),thefollowingmaterial (s)arerequired 
forthecompletionofthisservicebulletinandmaybeprocur edassingleitems 
fromDHCorpurchaseddirectlyfromindustrysources.
Each consumable product listed in the table below is given its own unique 
Product ID Number. The number is used to identify a particular recommended 
product, the specifications and the trade names any of whichcan be used 
unlessspecifiedotherwise(refertoPSM1-84-18Consumabl eProductsManual).
Consumable 
Product ID 
Number 
Quantity Per 
Kit 
-001 
Description Remarks 
07-01C A/R Compound,F13,Corro-
sionInhibitingCoating–
CorrosionPreventive,
Clear,SoftFilm 
MIL-PRF-16173E
14-173 A/R Tape,Pressure–Sensi-
tive,InsulationCover 
Splicing 
DSC91-21
B. Parts Required to Modify Spares 
None 
C. Special Tools and Equipment Required 
None

### Page 10

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page8of20 
D. Existing Parts Accountability 
The following parts may be affected by this service bulletin. Indented parts are 
components of thenexthigherassembly. Thequantity(Qty.) columnlists thequantity 
that may be affected per aircraft for non-indented parts andthe quantity per next
higherassemblyforindentedparts.
Existing 
Part Number Description Qty. IC DC New Part Number PNC 
85527021-005 ElevatorStructure 
Assembly(LH) 
1 C RWI 8Z10511-001 R
85527021-006 ElevatorStructure 
Assembly(RH) 
1 C RWI 8Z10511-002 R
IC Interchangeability Code 
A Notinterchangeable.
B RemovedPart.Nodirectreplacement.
C Conditionally Interchangeable. Installation of superse ded part negates the 
intentofthisservicebulletin.
DC Disposition 
DIS DiscardPart.
MUI MultipleUsageItem:Returntostockifserviceable.
RWK Reworkexistingpartinaccordancewiththisservicebul letin.
RWI Reworkexistingpartperdrawing.
SAL Salvage.Returntooperator’sstoresforsalvageconsid eration.
PNC Part Number Code 
N No equivalent DHC part number for reworked part. Indicate o n part that
thisservicebulletinhasbeenaccomplished.
R Partnumberafterrework.
S Supersedingorequivalentpartnumber.
X Reworked part and superseding part are functionally and ph ysically 
equivalentbutnotidentical.

### Page 11

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page9of20 
3. ACCOMPLISHMENT INSTRUCTIONS 
A. Job Set-Up 
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING 
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU 
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALLY
RETRACT. THIS CAN CAUSE INJURIES TO PERSONS AND 
DAMAGE TO THE EQUIPMENT.
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR 
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS 
CAN ACCIDENTALLY CLOSE THE LANDING GEAR DOORS. THIS 
CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO THE 
EQUIPMENT.
(1) Placard and select all aircraft electrical power to OFF. Obey all relevant
WARNINGS and CAUTIONS (refer to AMM TASK 24-00-00-861-802 and TASK 
24-00-00-910-801).
(2) Make sure that lock pins are installed through each main gear and main gear 
doormechanism.
(3) Makesurethenosegeargroundlockisengaged.
(4) Setwheelchocksinfrontandbehindthelandinggeartire s.
(5) Set up work platforms as required to gain access to the horizontal stabilizer.
Makesuretheworkplatformsareelectricallygrounded.
B. Procedure 
(1) Remove the LH and RH elevator structure assemblies 85527 021-005 and 
85527021-006fromtheaircraftrespectively(refertoAMMT ASK27-34-01-000-801).
(2) Doadetailedvisualinspectionoftheelevatorfrontspa rcaps,upper(85527122)and 
lower(85527169)anddoadetailedinspectionoftheuppersk inpanel(85527102).If
damagefound,contactDHCtechnicalhelpdeskforanapprove drepair.
(3) PuttheLHandRHelevatoronaflatsurfaceandsecureinpl acewithstrapsduring 
rework.
(4) RemovetherivetsfromtheLHandRHlowermiddleskinpane l85527112(referto 
SRMTASK51-42-15-02-01).

### Page 12

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page10of20 
(5) RemovetheLHandRHlowermiddleskinpanel85527112.
(6) Perform Bolt Hole Eddy Current (BHEC) inspection at the holes where fasteners 
areremoved(refertoFigure1andNDTPSM1-84-7A,Part6TASK
51-00-05-250-801).
(a) Ifanycracksarefound,contactDHCtechnicalhelpdeskf orsupport.
(7) Removepressuresensitivetapefromtheaffectedlighte ningholesoftheelevator.
(8) Perform BHEC inspection on the front spar where the fasteners are removed 
(refertoFigure1andNDTPSM1-84-7A,Part6TASK51-00-05-2 50-801).
(a) Ifanycracksarefound,contactDHCtechnicalhelpdeskf orsupport.
(9) SolventcleanthesurfaceasperSRMTASK51-26-00-02-01 .
(10) Drill holes on thefront spar at the correctlocations forthe installationof thesolid 
rivets. Remove the burrs and touch-up with F19 primer (referto Figure 1 and 
SRMTASK51-25-10-02-01).
(11) Perform HFEC inspection at bend radius of ribs 12-13 and13-14 lightening hole 
to detect radial cracking (refer to Figure 1 and NDT PSM 1-84-7A, Part 6 TASK 
51-00-08-250-801).
(a) Ifanycracksarefound,contactDHCtechnicalhelpdeskf orsupport.
(12) Applythesealanttothefayingsurfacesofthedoublers andcomponents(referto 
SRMTASK51-23-00-00-01).
(13) Installthedoubler85520121-105usingsolidrivetsB0 205016AD4-6Sbetweenthe 
ribs13and14(refertoFigure1,2andSRM51-42-05-02-01).
NOTE 1: Pickupexistingrivetholes.Ifrequired,useoversizedrep airrivets(refer 
toSRM51-42-05-02-01).
NOTE 2: Maintain a minimum distance of two times the fastener diameter edge 
distance from the center of the hole to the nearest material edge.
Maintain minimum pitch of four times the fastener diameter to the 
nearestfastener.

### Page 13

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page11of20 
(14) Installthedoubler85520121-107usingsolidrivetsB0 205016AD4-6Sbetweenthe 
ribs12and13(refertoFigure1,2andSRM51-42-05-02-01).
NOTE 1: Pickupexistingrivetholes.Ifrequired,useoversizedrep airrivets(refer 
toSRMTASK51-42-05-02-01).
NOTE 2: Maintain a minimum distance of two times the fastener diameter edge 
distance from the center of the hole to the nearest material edge.
Maintain minimum pitch of four times the fastener diameter to the 
nearestfastener.
(15) Makesurethereisnodamagefortherib13(85527166)and lowermid frontspar 
85527169whilerivetinstallation.
(16) Applysealanttothefayingsurfacesofthedoublers(re fertoSRMTASK 
51-23-00-00-01).
(17) ApplyF13grade3corrosionpreventivecompound(07-01 C)tothereworkedarea 
onelevatorfrontsparexteriorfaces(refertoAMMTASK51-2 5-01-390-801).
(18) Applypressuresensitivelighteningtape70-1C,7inch wide(14-173)onthedoubler 
lighteningholes.
(19) Inspect the pressure sensitive lightening tape 70-1C,7 inch wide (14-173) on the 
otherlighteningholesandreplacewiththenewpressuresen sitivelighteningtape 
70-1C,7inchwide(14-173)ifrequired.
(20) Applyadhesivetapesintheapplicablearea(refertoAM MTASK20-00-06-400-801).
(21) Re-identify the reworked LH elevator structure assembly 85527021-005 and RH 
elevator structure assembly 85527021-006 as 8Z10511-001 and 8Z10511-002
respectively(refertoAMMTASK20-00-01-910-802).
NOTE: Elevatorstructureassembly8Z10511-001/-002isoneway 
interchangeablewith85527021-005/-006.
NOTE: Elevatorstructureassembly8Z10511-001/-002istwoway 
interchangeablewith8Z10494-001/-002.

### Page 14

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page12of20 
(22) InstalltheLHandRHlowermiddleskinpanel85527112us ingnewblindrivets(refer 
toFigure1sheet5andSRMTASK51-42-15-02-01).
(b) IfrequireduseoversizedrepairrivetsperSRMTASK51-4 2-15-02-01.
(23) Apply the sealant to the faying surfaces of skin panel 85527112 (refer to SRM 
TASK51-23-00-00-01).
(24) Remove the straps and install the LH and RH elevator structure assemblies 
8Z10511-001 and 8Z10511-002 to the aircraft respectively (refer to AMM TASK 
27-34-01-400-801).
C. Close Out 
(1) Removealltoolsandequipmentfromtheworkarea.
(2) On incorporation of this ModSum, add the weight and balance data shown in 
Section I of this service bulletin to the Weight and Balance Manual PSM 1-84-8
(1-84-8M).Under‘DescriptionofChange’enter“ModSum4-1 14074incorporated.” 
(3) On incorporation of this ModSum, make an entry that confo rms to local
regulatory requirements in the applicable logbook(s). Enter component serial
numbers if applicable. Enter this ModSum number only after complete and 
functionalincorporationofallworkdefinedinthisservic ebulletin.

### Page 15

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page13of20 
Doubler Installation, Elevator – Retrofit 
Figure 1 (Sheet 1 of 6)
cg6433a01.dg,sk/sk,jan16/2024 
FWD 
ELEVATOR 
HINGELINE 
FRONTSPAR 
DATUM 
REARSPAR 
DATUM 
RIB15 
DATUM 
RIB14 
DATUM 
RIB13 
DATUM 
RIB12 
DATUM 
RIB11
DATUM 
RIB10 
DATUM 
VIEW LOOKING DOWN 
8Z10511- 001 SHOWN 
8Z10511- 002 OPPOSITE 
Y0.000 
LHELEVATOR 
RHELEVATOR

### Page 16

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page14of20 
Doubler Installation, Elevator – Retrofit 
Figure 1 (Sheet 2 of 6)
cg6433a02.dg,sk/sk,dec22/2023 
ARMFITTINGASSY 
85527270 
X =-0.546602D 
Y =-82.500602D 
Z =2.286 602D 
X =-0.000602D 
Y =-76.500602D 
Z =0.000 602D 
X =-0.546602D 
Y =-70.500602D 
Z =2.286 602D 
HINGEFITTINGASSY 
85527170 
ARMFITTINGASSY 
85527270 
FRONT 
SPAR 
DATUM 
FRONTSPAR 
MIDUP 
85527122 
DOUBLER 
85520121-105
DOUBLER 
85520121-107
RIB14 
85527165 
RIB13 
85527166 
RIB12 
85527165 
Y =-82.500602D 
RIB14 
DATUM 
X =-76.500602D 
RIB13 
DATUM 
Y =-70.500602D 
RIB12 
DATUM 
FWD 
SKIN, STRAP LWR FRONT SPAR AND STRAP 
UPR MID NOT SHOWN FOR CLARITY

### Page 17

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page15of20 
Doubler Installation, Elevator – Retrofit 
Figure 1 (Sheet 3 of 6)
cg6433a03.dg,sk/sk,jan22/2024 
BEFORE DOUBLER INSTALLATION 
VIEW LOOKING AFT 
(FRONT SPAR) 
UP 
ARMFITTINGASSY 
85527270 
ARMFITTINGASSY 
85527270 
HINGEFITTINGASSY 
85527170 FRONTSPAR 
MIDLWR 
85527169 
Y =-82.500602D 
RIB14 
DATUM 
Y =-76.500602D 
RIB13 
DATUM 
Y =-70.500602D 
RIB12 
DATUM 
FRONTSPAR 
MIDUP 
85527122 
2.20in.
DIAMETER 
PerformBHECInspectionperNDTPSM1-84-7A,
Part6TASK51-00-05-250-801.
PerformHFECInspectionperNDTPSM1-84-7A,
Part6TASK51-00-08-250-801.
NOTES

### Page 18

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page16of20 
Doubler Installation, Elevator – Retrofit 
Figure 1 (Sheet 4 of 6)
cg6433a04.dg,sk/sk,jan22/2024 
ARMFITTINGASSY 
85527270 
ARMFITTINGASSY 
85527270 
HINGEFITTINGASSY 
85527170 FRONTSPAR 
MIDLWR 
85527169 
Y =-82.500602D 
RIB14 
DATUM 
DOUBLER 
85520121-105 DOUBLER 85520121-107
Y =-76.500602D 
RIB13 
DATUM 
Y =-70.500602D 
RIB12 
DATUM 
FRONTSPAR 
MIDUP 
85527122 
AFTER DOUBLER INSTALLATION 
VIEW LOOKING AFT 
(FRONT SPAR) 
UP 
SOLIDRIVET B0205016AD4-6S3
3
3 3 3
3
333333

### Page 19

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page17of20 
Doubler Installation, Elevator – Retrofit 
Figure 1 (Sheet 5 of 6)
cg6433a05.dg,sk/sk,jan16/2024 
ELEVATOR 
HINGELINE 
FRONTSPAR 
DATUM 
REARSPAR 
DATUM 
Y0.000 
VIEW LOOKING UP 
8Z10511- 001 SHOWN 
8Z10511- 002 OPPOSITE 
RIB11
DATUM 
RIB12 
DATUM 
RIB13 
DATUM 
RIB14 
DATUM 
RIB15 
DATUM 
RIB16 
DATUM 
RIB17 
DATUM 
FWD

### Page 20

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page18of20 
Doubler Installation, Elevator – Retrofit 
Figure 1 (Sheet 6 of 6)
cg6433a06.dg,sk,jan22/2024 
BLINDRIVET 9 NAS9303E-5-02
BLINDRIVET 10 NAS9303E-5-03
BLINDRIVET 11 NAS9303E-5-04
BLINDRIVET 12 NAS9303E-5-05
BLINDRIVET 4 NAS9304E-4-02
BLINDRIVET 5 NAS9304E-4-03
BLINDRIVET 6 NAS9305E-4-02
BLINDRIVET 7 NAS9305E-4-03
BLINDRIVET 8 NAS9305E-4-04
Y =-65.000
RIB11
DATUM 
602D 
(X =-0.546)602D 
(Y =-70.500)602D 
(Z =-2.286)602D 
(X =-0.000)602D 
(Y =-76.500)602D 
(Z =0.000) 602D 
(X =-0.546)602D 
(Y =-82.500)602D 
(Z =2.286) 602D 
(X =-0.546)602D 
(Y =-90.500)602D 
(Z =2.286) 602D 
(X =-0.000)602D 
(Y =-96.500)602D 
(Z =0.000) 602D 
Y =-70.500
RIB12 
DATUM 
602D Y =-76.500
RIB13 
DATUM 
602D Y =-82.500
RIB14 
DATUM 
602D Y =-90.500
RIB15 
DATUM 
602D Y =-96.500
RIB16 
DATUM 
602D Y =-103.400
RIB17 
DATUM 
602D 
SKINPANEL 
LOWERMID 
85527112 
4 4
4 4 4 5
45477
7
5 7
77 87
6 9
7
10 
11
12 
12 12 
FWD 
14 
13 13 14 
SOLIDRIVET 13 B0205016AD3-4S
SOLIDRIVET 14 B0205016AD3-5S
1111
11 11 111111
11
11
10 
10 
10 
10 
10 
10 
10 10 
10 
10 
9 9
9
9
15 
PerformBHECInspectionper 
NDTPSM1-84-7A,Part6
NOTE 
TASK51-00-05-250-801
wherefastenersareremoved.
15

### Page 21

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page19of20 
Doubler – Elevator Front Spar 
Figure 2
cg6434a01.dg,sk/nn,jan08/2024 
DOUBLER 
85520121- 107
FLAT PATTERN 
DOUBLER 
85520121- 105
FLAT PATTERN 
SIDE VIEW 
SIDE VIEW 
(0.100.in) 
(0.100.in)

### Page 22

SERVICE BULLETIN 84-55-15
GN
S.B.84-55-1530Jan2024 
Revision‘A’07Jan2025 Page20of20 
This Page Intentionally Blank

### Page 23

Oct 2019
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
DASH 8 AIRCRAFT
To : CMDB Focal
Email: cmdb.request@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
The data that you provide below will help us record the incorporation of this Service
Bulletin and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Email PDF to:
cmdb.request@dehavilland.com

### Page 24

Oct2019
SERVICE BULLETIN(SB) - COMMENT SHEET - DASH8AIRCRAFT
To: SB Focal, DE HAVILLAND AIRCRAFT OF CANADA LIMITED 
Phone: 1-844-359-3428 
Email: SB.Comments@dehavilland.com 
From: 
Company: 
Phone: Extn: 
Facsimile: Date: 
Email: 
Selectappropriatebox(es)andaddcommentsorsuggestions youwould likeustoknow 
thatmay enhance the quality ofourservice bulletins. 
Service Bulletin: Revision: ModSum: 
1. PLANNING INFORMATION 
 Effectivity  Reason  Description  Compliance 
 Approval  Manpower  Material  Weight and Balance 
 Electrical Load  Tooling  References  Publications Affected 
2. MATERIALINFORMATION 
 Kit Content  Special Tools/Equipment  Parts to Modify Spares 
 Consumables  Disposition of Existing Parts  Other 
3. ACCOMPLISHMENT INSTRUCTIONS 
 Job Set- Up  Procedure  Close- Out  Test 
 Illustration(s)  Other 
4. COMMENTS,REMARKS,SUGGESTIONS 
Email PDF to: 
SB.Comments@dehavilland.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
