# Bombardier Service Bulletin 100-24-28

Copy: No revision named ("SB 100-24-28"), 12 pages: PDF https://openairdocs.org/files/sha256/9c/66/9c6692a8458dfd876da31d4d364738df8cfa7b54a041c7438927269aa1b6b2aa; text https://openairdocs.org/service-documents/bombardier/sb-100-24-28/file/9c6692a8458d.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0481; AD 2017-17-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 100-24-28
- Page: https://openairdocs.org/service-documents/bombardier/sb-100-24-28

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-17-13](https://openairdocs.org/ad/2017-17-13.md), effective Oct 2, 2017: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-100-24-28/proposed.md).

## Text (12 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0481; AD 2017-17-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK/MODIFICATION - PRIMARY DC-POWER SYSTEM - MODIFICATION
OF THE ROUTING OF THE AUXILIARY POWER UNIT (APU) GENERATOR POWER
CABLES
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
within 24 months from the
release of this Service Bulletin
(Basic Issue)
EFFECTIVITY: A/C Serial No. 20003 to 20500
MANPOWER: 1 man−hour. Additional man−hours can be required for repair. Refer toParagraph 1.F. for details.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin is expected to be the subject of an Airworthiness Directive
which will make it necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aerospace Parts Services
at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
www.cic.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 24−31
ELECTRICAL POWER
Basic Issue: Jul 27/2016 100−24−28
Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK/MODIFICATION - PRIMARY DC-POWER SYSTEM - MODIFICATION
OF THE ROUTING OF THE AUXILIARY POWER UNIT (APU) GENERATOR POWER
CABLES
1. PLANNING INFORMATION
A. Effectivity
BD−100−1A10 aircraft, Serial No. 20003 to 20500.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aerospace Service Bulletin(s).
Before you do this bulletin, examine all STC, STA or equivalent action
changes to make sure that this bulletin can be completed.
B. Reason
Low clearance between the APU generator power cables and a hydraulic line was
found in the aft equipment bay on some aircraft in service. This can cause damage
to the insulation of the wire, which can lead to a fault in the APU electrical system
or arcing with the metallic hydraulic line. The arcing, if there is flammable fluid in the
area, could cause a fire in the aft equipment area.
This Service Bulletin does an inspection of the APU generator power cables and
the hydraulic line and modifies the clamp arrangement to give sufficient clearance
between the APU generator power cables and the hydraulic lines.
C. Description
This Service Bulletin gives instructions to:
− Get access to the aft equipment compartment,
SERVICE BULLETIN
www.cic.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 24−31
ELECTRICAL POWER
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2016 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Jul 27/2016 100−24−28
Page 1 of 9
This Service Bulletin is available at:

### Page 3

− Remove the clamps from the APU generator power cables,
− Do an inspection of the APU generator power cables and the hydraulic line for
damage,
− Do a repair of the APU generator power cables and/or hydraulic line, if
necessary, and
− Install the APU generator power cables with a new clamps.
D. Compliance
Recommended within 24 months from this Service Bulletin release date (Basic
Issue).
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA in
accordance with established procedures.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to SB
100−00−002.
0.25 man−hour is necessary to do this special check.
0.75 man−hour is necessary to do this modification.
If damage is found during this special check, to the APU power cable:
− Up to 1 man−hour is necessary if the recommendation of the SRPSA is to repair
the APU power cable insulation.
− Up to 5 man−hours are necessary if the recommendation of the SRPSA is to
replace the APU power cable.
If damage is found during the special check, to the hydraulic line (refer to
SPM−MM 20−22−00−910−805 for repair descriptions):
− Up to 1 man−hour is necessary for a surface repair of the hydraulic tube.
− Up to 2 man−hours are necessary for a Type 1 repair of the hydraulic tube.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Jul 27/2016 100−24−28
Page 2 of 9

### Page 4

− Up to 2.5 man−hours are necessary for Type 2 repair of the hydraulic tube.
The labor required to do this Service Bulletin is at no cost if:
− the work is done during new aircraft warranty period, and
− the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
− this Service Bulletin is scheduled in less than 24 months from its release date
(Basic Issue).
G. Material − Cost and Availability
No kit is necessary to do this special check/modification. For parts and material
data, refer to Paragraph 3.
These parts are available at no cost if:
NOTE: These conditions also apply to the parts required for an SRPSA for the
repair of damage found to the power cable or hydraulic line during the
special check.
− ordered during new aircraft warranty period, and
− a no−charge purchase order is sent to Bombardier Aerospace in less than 24
months, whichever comes first, from this Service Bulletin release date.
For those aircraft in new aircraft warranty at the time of Service Bulletin distribution,
Smart Parts Plus does not pay for the parts at any time.
For those aircraft out of new aircraft warranty at the time of Service Bulletin
distribution, Smart Parts Plus pays for the parts for up to 24 months from the
Service Bulletin distribution date (Basic Issue).
H. Tooling
The equipment and tools listed below are necessary to do this Special
Check/Modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
− Commercially Available Torque Wrench
NOTES: 1. Refer to the CH 300 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for acceptable GSE
equivalents.
I. Weight and Balance
No change.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Jul 27/2016 100−24−28
Page 3 of 9

### Page 5

J. Electrical Load Data
No change.
K. References
− Bombardier Aerospace, Modification Summary, BB100T010864, Rev. B.
− Bombardier Aerospace, Restriction and/or Special Instruction (RSI),
C−100−000−24−0096, Rev. −−.
− Bombardier Aerospace, Kit Drawing K1000070340, Rev. −−.
− Bombardier Aerospace, Standard Practices Manual (SPM), Chapter 20.
− Bombardier Aerospace, SB 100−00−02, Service Bulletin Description and Policy.
− CH 300 Aircraft Maintenance Manual (AMM), Chapters 6, 24 and 52.
L. Other Publications Affected
None.
M. Equivalent Service Bulletin
For Challenger 350, use SB 350−24−003.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTE: All references made to zones, access panels and/or doors, are from the
CH 300 AMM, Chapter 6.
A. Aircraft Setup.
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Remove the electrical power from the aircraft. Refer to
AMM 24−00−00−861−802.
(3) Open the aft equipment compartment door 182GL. Refer to
AMM 52−41−00−010−801.
B. Special Check
(1) Remove the bolt, Part No. NAS1801−3−14, the spacer, Part No.
NAS43DD3−18FC, the washer, Part No. NAS1149D0332J, and the clamps,
Part No. B0305090A9S04, B0305090A9S07, and B0305090A9S16, as shown
in View B−B, Pre−Mod, of Kit Drawing K1000070340. Discard the bolt, the
spacer and the clamps, and keep the washer. Refer to the Figure 1.
NOTE: Some aircraft can have a different configuration with two clamps.
Remove and discard all clamps and/or spacer and/or bolt and keep
the washer.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Jul 27/2016 100−24−28
Page 4 of 9

### Page 6

(2) Do an inspection of the power cables SAD0001, SAD0002, and SAF0001 in
the area of FS688.45 as follows. Refer to the Figure 1.
(a) Make sure that there is no damage to the insulation of the power cables.
(b) If there are signs of damages, send a Service Request for Product
Support Action (SRPSA) and the necessary detail by e−mail at
SRPSA@aero.bombardier.com.
NOTE: The SRPSA will be at no−charge for aircraft in−warranty.
(3) Do an inspection of the hydraulic line, Part No. 1005354244−007 in the area of
FS688.45 as follows. Refer to Figure 1.
(a) Make sure that there is no damage to the hydraulic line.
(b) If there is damage to the hydraulic line, make sure it is not more than the
limits. Refer to SPM−MM 20−22−00−910−805.
(c) If the damage is more than the limits, repair the damaged area of the
hydraulic line. Refer to SPM−MM 20−22−00−910−805.
(4) If necessary, complete all repairs/replacement of the harnesses and hydraulic
line.
C. Modification
(1) Do the modification of the routing of the power cables as follow. Refer to Kit
Drawing K1000070340.
(a) Install the new clamp, Part No. M85052/2−20 on the power cables
SBM3553, SBX0001, SAD0001, SAD0002, and SAF0001.
(b) Install the clamp to the standoff with bolt, Part No. NAS1801−3−10 and
washer, Part No. NAS1149D0332J. Make sure you have a minimum
clearance of 0.5 in (12.5 mm) with the hydraulic line. Refer to Figure 1.
(c) Torque the bolt from 12 to 15 lbf in (1.36 to 1.69 Nm). Refer to
SPM−MM 20−21−00−01.
D. Close−out
(1) Remove all tools, equipment and unwanted materials from the aircraft.
(2) Close the aft equipment compartment door 182GL. Refer to
AMM 52−41−00−410−801.
E. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
MODEL BD−100−1A10 (CH−300)
Basic Issue: Jul 27/2016 100−24−28
Page 5 of 9

### Page 7

In an effort to improve the quality of our technical communications, we are
requesting your feedback. Please take a moment to fill out our easy on−line Service
Bulletin survey:
http://csefeedback.aero.bombardier.com
3. MATERIAL INFORMATION
A. Kits
No kits required.
B. Parts
The parts that follow are necessary to do this Service Bulletin and are available
from Bombardier Aerospace Parts Services, Montreal:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
M85052/2−20 1 Clamp
B0305090A9S04
B0305090A9S07
B0305090A9S16
Discard
NAS1801−3−10 1 Bolt NAS1801−3−14 Discard
NOTE: The part numbers for the items listed above are subject to change without
revision to this Service Bulletin. In case of discrepancy between this list
and any other list, the Illustrated Parts Catalog prevails and shall be used
to determine the latest part number.
C. Material
No material required.
D. Publications
No publications required.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Jul 27/2016 100−24−28
Page 6 of 9

### Page 8

CSB2428_001
A
A
B
FS688.45
FS707.15
B
FOULING AREA
APU GENERATOR
HYDRAULIC LINE
POWER CABLE
PART NO.1005354244−007
MODEL BD−100−1A10 (CH−300)
Inspection of the APU Generator Power Cables
Figure 1
Basic Issue: Jul 27/2016 100−24−28
Page 7 of 9

### Page 9

K1000070340−S1−PL 
MODEL BD−100−1A10 (CH−300)
K1000070340 − Kit − APU Power Feeder − Routing Change
(Sheet 1 of 1, Rev. −−)
Basic Issue: Jul 27/2016 100−24−28
Page 8 of 9

### Page 10

K1000070340−S1 
K1000070340 − Kit − APU Power Feeders − Routing Change
(Sheet 1 of 1, Rev. −−)
Basic Issue: Jul 27/2016 100−24−28
Page 9 of 9

### Page 11

100−24−28 Basic Jul 27/2016
SPECIAL CHECK/MODIFICATION − PRIMARY DC−POWER SYSTEM −
MODIFICATION OF THE ROUTING OF THE AUXILIARY POWER UNIT
(APU) GENERATOR POWER CABLES
In an effort to improve the quality of our technical communications, we are replacing the
standard Service Bulletin Evaluation Form with an on−line Service Bulletin Survey
and we are requesting your feedback. Please take a moment to fill out our easy on−line
Service Bulletin survey at:
http://csefeedback.aero.bombardier.com
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:

### Page 12

SERVICE BULLETIN INCORPORATION SHEET − "100−24−28"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If your aircraft is registered on CAMP and you are reporting to them,
please do not send the incorporation sheet to Bombardier. If your aircraft
is on another tracking system, please contact Bombardier to make
arrangements for automated data submission.
100−24−28 Basic
COMPLIED WITH
YES    NO    N/A
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
