# Bombardier Service Bulletin 100-24-29

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision 01 ("100-24-29 Rev01"), 14 pages: PDF https://openairdocs.org/files/sha256/61/d3/61d3fefd84b8a9dba0aacb5c15036464fe5bfd00d96f249de9b9b0dd4bbac2da; text https://openairdocs.org/service-documents/bombardier/sb-100-24-29/file/61d3fefd84b8.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-1003; AD 2024-18-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- 100-24-29 Basic ("100-24-29 Basic"), 11 pages: PDF https://openairdocs.org/files/sha256/db/26/db260677358318b9914aa308db4584d44832a91b32d829ea00d7d9dd8998b759; text https://openairdocs.org/service-documents/bombardier/sb-100-24-29/file/db2606773583.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-1662; AD 2023-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 100-24-29
- Latest revision known: 100-24-29, Revision 01, dated July 27, 2023 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-100-24-29

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2024-18-03](https://openairdocs.org/ad/2024-18-03.md), effective Nov 12, 2024: Revision 01
- [AD 2023-11-01](https://openairdocs.org/ad/2023-11-01.md), effective Aug 15, 2023: No revision named

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/bombardier/sb-100-24-29/proposed.md).

## Text (14 pages)

Revision 01, the newest copy. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-1003; AD 2024-18-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Discard the Basic Issue of this Service Bulletin dated Apr 09/2021 and the Information
Sheets dated Dec 23/2022 and Jul 21/2021, and replace in its entirety with this
Revision 01.
Service Bulletin No. 100−24−29
Date of Basic Issue Apr 09/2021
Revision No. 01 Dated Jul 27/2023
This revision has no effect for aircraft on which the Basic Issue of this Service
Bulletin was done thus no other action is necessary. Do not sign the log book if you
have not done this revision. Keep the previous log book entry. You may make an
entry as "Not Applicable" for this revision.
This revision is issued to:
1. Change, in the Service Bulletin Summary Sheet, to revise the AD Note.
2. Revise the Service Bulletin to reflect the latest template.
3. Incorporated Info Sheet dated Dec 23/2022, in Paragraph 1., to revise Note 5.
4. Change, in Paragraph 1., to add a new Note 3 and 6, update Notes 4 and 5, and move
and update old Note 3 to Note 7.
5. Change, in Paragraph 1.K., to update TCCA AD number, add Advisory Wire reference
and a Service Bulletin reference.
6. Change, in Paragraph 2.B., to revise Step (1) and sub steps.
7. Incorporated Info Sheet dated Jul 21/2021, in Paragraph 2.B., to add a CAUTION
statement before step (2).
8. Change, in Paragraph 2.B., to update the Note in Step (4).
9. Incorporated Info Sheet dated Dec 23/2022, in Paragraph 3.B., to add new alternate part
number.
SERVICE BULLETIN
MODEL BD−100−1A10 (CH−300)
100−24−29
Page 1 of 2
REVISION TRANSMITTAL SHEET

### Page 2

10.Make miscellaneous minor changes, as necessary, with no change of context.
MODEL BD−100−1A10 (CH−300)
100−24−29
Page 2 of 2

### Page 3

SPECIAL CHECK/REWORK – DC POWER CENTER (DCPC) SYSTEM –
REPLACEMENT OF THE LEFT DC POWER CENTER
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Refer to Paragraph 1.D.
EFFECTIVITY: A/C Serial No. 20001 to 20500
MANPOWER: 8 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN YES NO
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO
PREREQUISITE SERVICE BULLETINS: None
NOTE: This Service Bulletin is mandated by TCCA Airworthiness Directive (AD)
CF−2023−35, which will make it necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 24−31
ELECTRICAL POWER
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 1 of 1
This Service Bulletin is available at:

### Page 4

SPECIAL CHECK/REWORK – DC POWER CENTER (DCPC) SYSTEM –
REPLACEMENT OF THE LEFT DC POWER CENTER
1. PLANNING INFORMATION
NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
2. This Service Bulletin is covered by a dedicated schedule. Dedicated
schedules are used to reserve and manage inventory due to limited
availability of rotable stock, parts and/or kits. Parts are limited, therefore,
advance part scheduling with our In−Service Implementation Team (ISIT)
is recommended prior to a maintenance visit. They can be reached at
bacs_isit@aero.bombardier.com. The parts will be allocated on a first
come first serve basis.
Should you require additional information, please contact your Regional
Sales Manager (RM) or Field Service Representative (FSR).
For more information on dedicated schedules, refer to SB 100−00−02.
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 24−31
ELECTRICAL POWER
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2021−2023 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 1 of 9
This Service Bulletin is available at:

### Page 5

3. Left DCPC Part No. 975GC02Y08 fully meets the intent of Service
Bulletins 100−24−29 and 100−24−30.
For operators of Challengers 300 with left DCPC part numbers
975GC02Y04 or 975GC02Y05 installed, options are:
− Upgrade the aircraft right and APU DCPC’s to the Y06 electrical
system configuration (SB 100−24−12 or 100−24−15). Left DCPC part
number 975GC02Y07 can be intermixed with other Y06 configured
DCPC’s on the same aircraft.
− Send the left DCPC part numbers 975G02Y04 or 975G02Y05 to
Safran for the deep cleaning (customer own repair). Due to the
vendor limited repair capacity, the shipment will need to be closely
coordinated in advance with Bombardier Component Repair &
Overhaul team. Since no exchange unit will be provided by
Bombardier, a sufficient aircraft downtime should be allocated for the
unit rework.
4. This Service Bulletin is applicable for aircraft with left DC Power Center
(DCPC) part numbers 975GC02Y04, 975GC02Y05, 975GC02Y06 or
975GC02Y07 that have accumulated 3500 flight hours or more by
Dec 31/2023.
5. Bombardier only provides left DCPC exchange unit Part No. 975GC02Y08
for this campaign.
6. SB 100−24−29 is a prerequisite to SB 100−24−30 and must be done
before or at the same time as this Service Bulletin.
7. An update to the TLMC manual for this special check/rework is scheduled
for Q4/2023.
A. Effectivity
BD−100−1A10 aircraft, Serial No. 20001 to 20500.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
Condition:
Reports found that aircraft may experience electrical system misleading indication
(PBA, EICAS) as a result of left DCPC internal communication data bus
contamination, inducing poor electrical contact performance.
Objective/Benefit:
This Service Bulletin gives instructions to check and replace the left DCPC to
prevent the occurrence of an electrical system misleading indication.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 2 of 9

### Page 6

C. Description
This Service Bulletin gives instructions to:
− Get access to the left DCPC,
− Establish the total flight hours of left DCPC,
− If necessary, remove the left DCPC,
− Send the left DCPC to the address shown in Paragraph 1.G.,
− Install the left DCPC, and
− Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Recommended before Dec 31/2023, for all the affected left DC power (DCPC) units
that have accumulated 3500 total flight hours or more since date of manufacture.
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the aircraft configuration, submit an SRPSA for analysis and to
get an approved disposition to complete this Service Bulletin. Standard
SRPSA fees may apply. Refer to the Services section of the Bombardier
customer portal for the latest prices, rates and fees.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 100−00−02.
2. Labor hours are based on the fact that the modification will be done at
the next scheduled maintenance task or inspection. Therefore no
man−hours are allotted to prepare the aircraft for maintenance or to
prepare for this Service Bulletin.
8 man−hours are necessary to do this modification.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 3 of 9

### Page 7

Bombardier Aviation does not pay for the labor to do this Service Bulletin.
G. Material − Cost and Availability
No kit is necessary to do this modification.
The part in Paragraph 3.B. may be necessary to do this Service Bulletin.
Bombardier Aviation does not pay for the part to do this Service Bulletin.
This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are
used to reserve and manage inventory due to limited availability of rotable stock,
parts and/or kits. Parts are limited, therefore, advance part scheduling with our
In−Service Implementation Team (ISIT) is recommended prior to a maintenance
visit. They can be reached at bacs_isit@aero.bombardier.com. The parts will be
allocated on a first come first serve basis.
Should you require additional information, please contact your Regional Sales
Manager (RM) or Field Service Representative (FSR).
For more information on dedicated schedules, refer to SB 100−00−02.
Send the removed left DCPC, Part No. 975GC02Y04, 975GC02Y05, 975GC02Y06
or 975GC02Y07 to Bombardier Aviation at one of the two addresses given below:
Learjet Inc. − Core Returns
251−A Wille Road
Des Plaines, Illinois
60018−1861
USA
or
Distribution Centre Frankfurt − Core Returns
Bombardier Aviation Company GmbH
Hans−Boeckler−Strasse 9
GROSS−GERAU Hesse 64521
Germany
Refer to your Material Return Authorization (MRA) form to find the applicable return
address.
NOTE: Bombardier Aviation is maintaining a rotable pool of replacement left
DCPC, to be supplied to the operators under the terms and conditions
given below:
− The removed left DCPC, Part No. 975GC02Y04, 975GC02Y05,
975GC02Y06 or 975GC02Y07, must be returned to Bombardier
Aviation, Parts Services in less than 10 days of receipt of replacement
unit, with documentation showing the serial number of the aircraft.
− If the removed left DCPC, Part No. 975GC02Y04, 975GC02Y05,
975GC02Y06 or 975GC02Y07 is not returned in less than 10 days, the
operator will be charged for the replacement units full cost.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 4 of 9

### Page 8

For all parts transactions, Bombardier Aviation’s current Spare Parts and
Component Repair Price Catalogue General Terms and Conditions apply. These
terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com
All parts to be upgraded need to be coordinated with Bombardier Aviation
Component Repair and Overhaul organization.
Smart Parts pays for the part until Dec 31/2023 and unit accumulated more than
3500 total flight hours from the Service Bulletin distribution date (Basic Issue).
H. Tooling
The equipment and tools listed below are necessary to do this modification:
GSE REFERENCE
NO. PART NO. DESCRIPTION
Commercially Available − Torque Wrench 2.21 lbf in (0.25 Nm)
Commercially Available − Torque Wrench 20 to 25 lbf in (2.26 to2.82 Nm)
Commercially Available − Torque Wrench 33.80 to 41.58 lbf in(3.82 to 4.70 Nm)
Commercially Available − Torque Wrench 60.69 to 80.69 lbf in(6.86 to 9.12 Nm)
Commercially Available − Torque Wrench 98.47 to 134.49 lbf in(11.13 to 15.20 Nm)
NOTES: 1. Refer to the BD−100 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the BD−100 for
acceptable GSE equivalents.
3. This list is provided for a quick reference. In case of discrepancy
between this list and the tool called out in the SPM−WM, Chapter 20,
then the tool called in the SPM−WM will prevail. Other approved
alternative tools are acceptable and can also be used.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 5 of 9

### Page 9

K. References
− TCCA Airworthiness Directive, CF−2023−35.
− Bombardier Aviation, Restriction and/or Special Instruction (RSI),
C−100−000−24−0098, Rev. −−.
− Bombardier Aviation, SB 100−24−30 “Modification–DC Power Center (DCPC)
System–Installation of Protective Tape on the Left DCPC Card Cage”.
− Safran Electrical & Power (ECE), Service Bulletin 975GC02Y−24−018
(Attached).
− Advisory Wire, AW300−24−0141.
− Bombardier Aviation, Standard Practices Manual (SPM), Chapter 51.
− CH 300 Aircraft Maintenance Manual (AMM), Chapters 6, 24 and 52.
L. Other Publications Affected
None.
M. Equivalent Service Bulletin
− For the Challenger 350 aircraft, use Service Bulletin 350−24−004.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the BD−100,
Aircraft Maintenance Manual (AMM) unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
BD−100 Aircraft Maintenance Manual (AMM), Chapter 6.
A. Aircraft Setup
(1) Obey all the electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Obey all the electrostatic−discharge safety precautions. Refer to
AMM 24−00−00−910−802.
(3) Open the aft equipment compartment door (182GL). Refer to
AMM 52−41−00−010−801.
(4) Disconnect the batteries. Refer to AMM 24−32−00−040−801.
B. Special Check – Left DCPC Total Flight Hours
NOTE: If it is not possible to establish the total flight hours of left DCPC, submit an
SRPSA by email at SRPSA@aero.bombardier.com and request for
assistance to determine the flight hours of the unit.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 6 of 9

### Page 10

(1) Establish the left DCPC total flight hours (since date of manufacture).
NOTE: For original left DCPC units, the total flight hours accumulated is the
same than the aircraft total accumulated flight hours.
− Left DCPC total flight hours (since unit date of manufacture): ________
(a) With unit Part No. 975GC02Y08 installed, go to
Paragraph 2.D. (Close−out).
(b) With units with SB 100−24−29 already incorporated, then incorporate
SB 100−24−30.
(c) With units with more than 3500 total flight hours accumulated and
SB 100−24−29 not incorporated, go to Step 2.B.(2).
(d) If one of the steps above is followed, the intent of the SBs 100−24−29 and
100−24−30 will be met.
(e) With units that have less than 3500 total flight hours accumulated and
SB 100−24−29 not incorporated, no further action is required until they
reach 3500 total flight hours time in service. Proceed to
Paragraph 2.E. (Close−out).
NOTE: This Service Bulletin is recommended before Dec 31/2023. Units
that have not reached the 3500 flight hours threshold at the
moment of this check might reach it before Dec 31/2023 and the
SB 100−24−29 will need to be incorporated.
CAUTION: MAKE SURE THE DCPC THAT YOU REMOVED IS CORRECTLY
PUT IN THE SHIPPING CONTAINER. USE THE SHIPPING
CONTAINER AGAIN WITH ALL PROTECTIVE MATERIAL
SUPPLIED WITH THE NEW DCPC. IF YOU DO NOT DO THIS,
DAMAGE TO THE DCPC CAN OCCUR DURING SHIPMENT.
(2) Remove the left DCPC. Refer to AMM 24−61−01−000−801.
(3) Return the left DCPC to the address shown in Paragraph 1.G.
(4) Install the replacement left DCPC. Refer to AMM 24−61−01−400−801.
NOTE: The left DCPC received is POST Safran Service
Bulletins 975GC02Y−24−018 (Deep Cleaning) and
975GC02Y−24−020 (Improvement of PCB Protection). The
incorporation of this Service Bulletin resets the unit total flight hours to
zero at the date of incorporation. The Service Bulletin number and
date of incorporation can be found onto the left DCPC identification
placard. This date of incorporation should be used in the future
calculations of the total flight hours of this left DCPC.
(5) Perform the electrical bonding test for the left DCPC. Refer to
SPM−MM 51−80−00−760−801.
C. Testing
(1) Connect the batteries. Refer to AMM 24−32−00−440−801.
(2) Do the functional test of the DC power center (DCPC). Refer to
AMM 24−61−01−720−801.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 7 of 9

### Page 11

D. Close−out
(1) Remove all tools, equipment and unwanted materials from the aircraft.
(2) Close the aft equipment compartment door (182GL). Refer to
AMM 52−41−00−410−801.
E. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kit
No kits required.
B. Parts
The part that follows may be necessary to do this Service Bulletin and is available
from Bombardier Aviation Parts Services, Montreal:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTION -DISPOSITION
975GC02Y04
or
975GC02Y05
or
975GC02Y06
or
975GC02Y07
or
975GC02Y08
Post VSB
975GC02Y−24−018
1
Left DC
Power
Center
975GC02Y04
or
975GC02Y05
or
975GC02Y06
or
975GC02Y07
Return to
Bombardier. Refer
to Paragraph 1.G.
NOTES: 1. The part number for the item listed above is subject to change without
revision to this Service Bulletin. In case of discrepancy between this
list and any other list, the Illustrated Parts Catalog prevails and shall
be used to determine the latest part number.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 8 of 9

### Page 12

2. All parts to be upgraded need to be coordinated with Bombardier
Aviation Component Repair and Overhaul organization.
C. Material
No consumables are required.
D. Publications
No publications required.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Apr 09/2021
Revision 01: Jul 27/2023
100−24−29
Page 9 of 9

### Page 13

100−24−29 Rev. 01 Jul 27/2023
SPECIAL CHECK/REWORK – DC POWER CENTER (DCPC) SYSTEM –
REPLACEMENT OF THE LEFT DC POWER CENTER
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 14

SERVICE BULLETIN INCORPORATION SHEET − "100−24−29"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
100−24−29 01
COMPLIED WITH
YES    NO    N/A
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
