# Bombardier Service Bulletin 100-27-17

Copy: Revision 03 ("SB 100-27-17 R3"), 23 pages: PDF https://openairdocs.org/files/sha256/1c/fa/1cfaead6301a6d9bf5667c8f0f9337cc0d364356de25642533847e09d5c73750; text https://openairdocs.org/service-documents/bombardier/sb-100-27-17/file/1cfaead6301a.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0101; AD 2021-09-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 100-27-17
- Latest revision known: 100-27-17, Revision 03, dated June 19, 2020 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-100-27-17

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2021-09-17](https://openairdocs.org/ad/2021-09-17.md), effective Jun 23, 2021: Revision 03

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-100-27-17/proposed.md).

## Text (23 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0101; AD 2021-09-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Discard the Revision 02 of this Service Bulletin dated Jun 05/2018, and replace in its
entirety with this Revision 03.
Service Bulletin No. 100−27−17
Date of Basic Issue Dec 05/2012
Revision No. 01 Dated Jul 20/2017
Revision No. 02 Dated Jun 05/2018
Revision No. 03 Dated Jun 19/2020
For action applicable to aircraft on which Basic Issue, Revision 01, or Revision 02 of
this Service Bulletin was done, refer to the retroactive action box on Page 1 of this
Service Bulletin.
This revision is issued to:
1. Change, in the Service Bulletin Summary Sheet, to revise the Compliance Time to within
12 months from this Service Bulletin release date (Revision 03).
2. Change, in the Service Bulletin Summary Sheet and Paragraph 1.A., the effectivity.
3. Add, in the Service Bulletin Summary Sheet, an Airworthiness Directive Note.
4. Add, in Paragraph 1, a retroactive action box.
5. Revise, in Paragraphs 1.D., the Compliance Time to within 12 months from this Service
Bulletin release date (Revision 03).
6. Add, in Paragraph 1.D., a Note as per latest template.
7. Change, in Paragraphs 1.F., to revise the labor required to do this Service Bulletin
statement.
8. Change, in Paragraph 1.G., to revise kit and parts required to do this Service Bulletin
statement.
SERVICE BULLETIN
MODEL BD−100−1A10 (CH−300)
100−27−17
Page 1 of 2
REVISION TRANSMITTAL SHEET

### Page 2

9. Add, in Paragraph 1.K., a reference to TCCA Airworthiness Directive, (Pending).
10.Delete, in Paragraph 1.K., a reference to RSI C−100−000−27−0297, Rev. E.
11.Add, in Paragraph 1.K., a reference to RSI C−100−000−27−0318, Rev. A.
12.Revise, in Paragraph 1.M., to add CH 350 equivalent Service Bulletin.
13.Change, in Paragraph 2.B., to revise step (1).
14.Make miscellaneous minor changes, as necessary, with no change of context.
MODEL BD−100−1A10 (CH−300)
100−27−17
Page 2 of 2

### Page 3

SPECIAL CHECK/MODIFICATION – MULTI-FUNCTION SPOILER – REPLACEMENT
OF THE MULTIFUNCTION SPOILER POWER CONTROL UNIT (MFS PCU) SEALS
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within 12 months from this
Service Bulletin release date
(Revision 03)
EFFECTIVITY: A/C Serial No. 20003 to 20457
MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN YES NO
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin is subject to an Airworthiness Directive which will make it
necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 27−62
FLIGHT CONTROLS
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 1 of 1
This Service Bulletin is available at:

### Page 4

SPECIAL CHECK/MODIFICATION – MULTI-FUNCTION SPOILER – REPLACEMENT
OF THE MULTIFUNCTION SPOILER POWER CONTROL UNIT (MFS PCU) SEALS
RETROACTIVE ACTION
THE ACTION THAT FOLLOWS IS RECOMMENDED FOR AIRCRAFT ON WHICH
THE BASIC ISSUE, REVISION 01, REVISION 02 OF THIS SERVICE BULLETIN WAS
DONE:
(1) DO REVISION 03 OF THIS SERVICE BULLETIN.
1. PLANNING INFORMATION
NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
2. This Service Bulletin is covered by a dedicated schedule. Dedicated
schedules are used to reserve and manage inventory due to limited
availability of rotable stock, parts and/or kits. Parts are limited, therefore,
advance part scheduling with our In−Service Implementation Team (ISIT)
is recommended prior to a maintenance visit. Please contact your
Regional Manager (RM), Field Service Representative (FSR) or Customer
Service Representative (CSR) to schedule your aircraft as there is a
limited availability. The parts will be allocated on a first come first serve
basis.
For more information on dedicated schedules, refer to SB 100−00−02.
3. Two persons are necessary to remove and install the Multi−Function
Spoiler Power Control Unit (MFS PCU).
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 27−62
FLIGHT CONTROLS
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2012−2020 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 1 of 18
This Service Bulletin is available at:

### Page 5

4. This Service Bulletin is also applicable to the MFS PCUs in the operator’s
stock room.
5. The MFS are operated by two separate hydraulic systems as follows:
The Left Hydraulic System operates the inboard MFS.
The Right Hydraulic System operates the outboard MFS.
For aircraft where inboard and outboard MFC PCUs are replaced, it is
necessary to bleed both hydraulic systems.
A. Effectivity
BD−100−1A10 aircraft, Serial No. 20003 to 20457.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
During production flight tests, at the emergency descent testing (Maximum Mach
Operating (MMO) speed and spoilers at EMER position), there was a malfunction of
the inboard multifunction spoiler system at deployment. This malfunction shut down
the Proportional Lift Dumping (PLD) and Ground Lift Dumping (GLD) function of this
pair of spoilers. Detailed inspection of the MFS PCU showed that the piston seal
did not have the necessary notches. These notches are necessary to prevent
internal leakage when a load is applied to the actuator. This Service Bulletin
replaces the MFS seals with ones that have the applicable notches. This prevents
internal leakage and improves MFS reliability.
C. Description
This Service Bulletin gives instructions to:
− Get access to the MFS PCUs,
− Identify the MFS PCU serial numbers,
− Replace the applicable MFS PCU, and
− Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Recommended within 12 months from this Service Bulletin release date
(Revision 03).
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the aircraft configuration, submit an SRPSA for analysis and to
get an approved disposition to complete this Service Bulletin.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 2 of 18

### Page 6

E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by the JAA
and by EASA under the Canada/EU bilateral Aviation Safety
Agreement.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 100−00−02.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
PART A: 1 man−hour are necessary to do this modification.
PART B: 5 man−hours are necessary to do this modification.
PART C: 5 man−hours are necessary to do this modification.
PART D: 4 man−hours are necessary to do this modification if PART C is
incorporated at the same time. 5 man−hours are necessary to do this modification if
PART C is not incorporated at the same time.
PART E: 4 man−hours are necessary to do this modification if PART B is
incorporated at the same time. 5 man−hours are necessary to do this modification if
PART B is not incorporated at the same time.
Bombardier Aviation does not pay for the labor to do this modification.
G. Material − Cost and Availability
PART A: No kit or parts are necessary to do this special check.
PART B, PART C, PART D and PART E: Kit 100K27−17 and the parts given in
Paragraph 3.B. are necessary to do this modification.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 3 of 18

### Page 7

KIT NO. PRICE
100K27−17
Please contact Bombardier Aviation
Parts Services, in Montreal, for delivery
lead times and confirmation of prices.
Bombardier Aviation does not pay for the kit and parts to do this modification.
This Service Bulletin is covered by a dedicated schedule. To ensure a timely and
effective return/upgrade program, advance scheduling is required through our
In−Service Implementation Team (ISIT). Please contact your Regional Manager
(RM), Field Service Representatives (FSR) or Customer Service Representative
(CSR) as soon as is practical to schedule your aircraft.
Send units for rework or upgrade or disposal to Bombardier Aviation at the address
given below:
Learjet Inc. − Core Returns
251−A Wille Road
Des Plaines, Illinois
60018−1861
USA
or
Distribution Centre Frankfurt − Core Returns
Bombardier Aviation Germany Gmb H
Hans−Boeckler−Strasse 9
GROSS−GERAU Hesse 64521
Germany
Refer to your Material Return Authorization (MRA) form to find the applicable return
address.
NOTE: Bombardier Aviation is maintaining a rotable pool of replacement MFS
PCUs, to be supplied to the operators under the terms and conditions
given below:
− The removed MFS PCU must be returned to Bombardier Aviation,
Parts Services in less than 10 days of receipt of replacement unit, with
documentation showing the serial number of the aircraft.
− If the removed MFS PCU is not returned in less than 10 days, the
operator will be charged for the replacement unit.
For all parts transactions, Bombardier Aviation’s current Spare Parts and
Component Repair Price Catalogue General Terms and Conditions apply. These
terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com
Smart Parts does not pay for the kit or parts at any time.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 4 of 18

### Page 8

H. Tooling
The equipment and tools listed below are necessary to do this modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
10−10−10 − Wheel Chocks, Rubber
20−00−04 − Inclinometer (Qty. 3 or 5)See Note 3
20−00−24 S4933959−501 Tag, Circuit Breaker
20X−00−04 − Portable Bonding Testeror equivalent
− Commercially Available
Container, Hydraulic
Fluid, 5 U.S. gal (18.92
L)
− Commercially Available Scraper, Non−Metallic
− Commercially Available Tape, Double Sided
− Commercially Available
Tube, Transparent
Extension, Hydraulic
Fluid Draining
− Commercially Available Wrench, Torque
NOTES: 1. Refer to the BD−100 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the BD−100, for
acceptable GSE equivalents.
3. Three inclinometers are necessary if only inner OR outer MFS PCUs
must be replaced. Five inclinometers are necessary if only inner AND
outer MFS PCUs must be replaced.
The equipment and tools listed below may be necessary to do this modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
07−10−01 − Pad, Jacking
07−10−02 − Jack, Tripod, Wing
07−10−03 − Jack, Forward Fuselage
07C−10−06 − Support, Rear Fuselage
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 5 of 18

### Page 9

GSE REFERENCE NO. PART NO. DESCRIPTION
27C−00−02 G1002720042−063 Rigging Pin Kit
NOTES: 1. Refer to the BD−100 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the BD−100, for
acceptable GSE equivalents.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive, (Pending).
− Bombardier Aviation, Restriction and/or Special Instruction (RSI),
C−100−000−27−0318, Rev. A.
− Bombardier Aviation, Modification Summary, BB100T010703, Rev. A.
− Bombardier Aviation, Standard Practices Manual (SPM), Chapter 20 and 51.
− Bombardier Aviation, SB 100−00−02, Service Bulletin Description and Policy.
− CH 300 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 27, 29 and 57.
− CH 300 Aircraft Illustrated Parts Catalog (AIPC), Chapter 27 and 57.
− Moog Aerospace Group, Service Bulletin C47030−27−01.
L. Other Publications Affected
None.
M. Equivalent Service Bulletin
− For the Challenger 350 aircraft, use Service Bulletin 350−27−010.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the BD−100 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
BD−100 Aircraft Maintenance Manual, Chapter 6.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 6 of 18

### Page 10

A. Aircraft Setup
NOTE: The steps in the Aircraft Setup section of this Service Bulletin are
recommended steps. The steps give a recommendation to get access to
the work area. This recommendation is to give a safe work area and to
minimize possible damage to surrounding aircraft parts. Alternative steps
can be used at the operator’s discretion.
(1) Obey all flight−control safety precautions. Refer to AMM 27−00−00−910−801.
(2) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(3) Connect the electrical power to the aircraft. Refer to AMM 24−00−00−861−801.
(4) Obey all hydraulic safety precautions. Refer to AMM 29−00−00−910−801.
(5) Obey all hydraulic technical precautions. Refer to AMM 29−00−00−910−802.
(6) Make sure that the weight of the fuel in left and right fuel tanks is approximately
equal.
WARNING: BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEMS, MAKE
SURE THAT NO PERSONS OR EQUIPMENT ARE NEAR THE
FLIGHT CONTROLS AND THE HYDRAULIC COMPONENTS.
WHEN YOU PRESSURIZE THE HYDRAULIC SYSTEMS, THE
FLIGHT CONTROLS CAN MOVE AND THE HYDRAULIC
COMPONENTS CAN EJECT HYDRAULIC FLUID. THIS CAN
CAUSE INJURY TO PERSONS AND DAMAGE TO THE
EQUIPMENT.
(7) Pressurize the left and right hydraulic systems. Refer to
AMM 29−10−00−862−801.
(8) Set the FLAP lever to the 30 degree position.
(9) Make sure that the flap control surfaces are fully extended.
(10) Set the flight−spoiler control lever (FSCL) in the flight compartment to the MAX
position.
(11) Release the pressure from the left and right hydraulic systems. Refer to
AMM 29−10−00−862−802.
(12) Remove the electrical power from the aircraft. Refer to
AMM 24−00−00−861−802.
(13) Open and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
LCBP B9 SPOILER CTRL 1 211
LCBP B13 L FLAP IND 211
LCBP B14 FLAP CTRL 211
LCBP C9 L HYDRAULIC IND 211
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 7 of 18

### Page 11

CB PANEL CB NO. NAME ZONE
LCBP C11 R HYDRAULIC DC PUMP 211
LCBP D10 AUX HYDRAULIC DCPUMP 211
RCBP B9 SPOILER CTRL 2 212
RCBP B12 R FLAP IND 212
RCBP C8 R HYDRAULIC IND 212
RCBP C11 L HYDRAULIC DC PUMP 212
B. PART A − Visual Check of the MFS PCU Serial Numbers
(1) Look at each of the four MFS PCUs and make a record of the serial numbers.
Replace MFC PCUs which have serial numbers between 0001 and 1410,
except for serial numbers in the table below and MFS PCU with suffix −A at the
end of the Serial No (example SER NO.1025A). These MFS PCUs were
inspected and repaired by the vendor (Moog) prior to release of the Service
Bulletin revision and do not need to be returned.
MFS Control Units with the following Serial Numbers DO NOT need to be
replaced.
66 498 887 1373 1400
72 499 991 1376 1401
175 561 1049 1380 1403
200 605 1208 1382 1404
331 671 1236 1385 1405
441 720 1284 1386 1406
448 727 1287 1387 1407
449 728 1334 1388 1408
456 773 1337 1394 1409
470 778 1368 1395 −
494 812 1369 1396 −
495 831 1370 1397 −
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 8 of 18

### Page 12

(2) For aircraft that do not need any MFS PCU replacement (refer to Paragraph
2.B.(1)), no further action is necessary. Go to Close−Out, Paragraph 2.G.
(3) For aircraft where the serial number of the left outboard MFS PCU is one that
must be replaced (refer to Paragraph 2.B.(1)), do PART B of this Service
Bulletin.
(4) For aircraft where the serial number of the left inboard MFS PCU is one that
must be replaced (refer to Paragraph 2.B.(1)), do PART C of this Service
Bulletin.
(5) For aircraft where the serial number of the right inboard MFS PCU is one that
must be replaced (refer to Paragraph 2.B.(1)), do PART D of this Service
Bulletin.
(6) For aircraft where the serial number of the right outboard MFS PCU is one that
must be replaced (refer to Paragraph 2.B.(1)), do PART E of this Service
Bulletin.
C. PART B − Replacement of the Left Outboard MFS PCU
NOTE: If it is not possible to complete all the instructions of this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and to get an approve disposition to complete this Service Bulletin.
(1) Remove the trailing edge access panels 571DB and 571EB. Refer to
AMM 57−52−01−000−801.
(2) Remove the left outboard MFS PCU. Refer to AMM 27−62−01−000−801.
NOTE: Use the Table 1 to record the MFS angles as necessary.
(3) Discard the self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter
pins, Part No. MS24665−162 and MS24665−302. Keep the remaining
hardware for later installation.
(4) Send the MFS control unit for repair to the address shown in Paragraph 1.G.
(5) Install a reworked/new MFS PCU using the retained hardware and the new
self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter pins, Part
No. MS24665−162 and MS24665−302 supplied in the kit. Torque the nuts,
Part No. MS21042L3, from 12 to 15 lbf in (1.36 to 1.69 Nm). Torque the nuts,
Part No. MS35650−302, from 20 to 25 lbf in (2.26 to 2.82 Nm). Refer to
AMM 27−62−01−400−801.
NOTE: The replacement MFS PCU will have the suffix −A at the end of the
Serial No. if it was reworked as a result of MOOG SB C47030−27−01.
However, you can have a replacement MFS PCU without the suffix
−A if it was not affected by Bombardier Aviation SB 100−27−17
(Moog SB C47030−27−01).
(6) Do the electrical bonding test of the MFS PCU. Refer to
SPM−MM 51−80−00−760−801.
NOTE: The maximum allowable resistance is 10 milliohms between the unit
and the aircraft primary structure.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 9 of 18

### Page 13

(7) Bleed the right hydraulic system. Refer to AMM 29−10−00−870−801.
NOTES: 1. If more than one MFS PCU is to be replaced, do this task and
subsequent referenced tasks after all of the applicable MFS
PCUs have been replaced.
2. Use the Table 1 to record the MFS angles as necessary.
D. PART C − Replacement of the Left Inboard MFS PCU
NOTE: If it is not possible to complete all the instructions of this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and to get an approve disposition to complete this Service Bulletin.
(1) Remove the trailing edge access panels 571BB and 571CB. Refer to
AMM 57−52−01−000−801.
(2) Remove the RVDT bracket from the left inboard MFS panel. Discard the two
cotter pins, Part No. MS24665−86. Keep the remaining hardware for later
installation. Refer to AMM 27−62−01−000−801.
(3) Remove the left inboard MFS PCU. Refer to AMM 27−62−01−000−801.
NOTE: Use the Table 1 to record the MFS angles as necessary.
(4) Discard the self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter
pins, Part No. MS24665−162 and MS24665−302. Keep the remaining
hardware for later installation.
(5) Send the MFS control unit for repair to the address shown in Paragraph 1.G.
(6) Install a reworked/new MFS PCU using the retained hardware and the new
self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter pins, Part
No. MS24665−162 and MS24665−302 supplied in the kit. Torque the nuts,
Part No. MS21042L3, from 12 to 15 lbf in (1.36 to 1.69 Nm). Torque the nuts,
Part No. MS35650−302, from 20 to 25 lbf in (2.26 to 2.82 Nm). Refer to
AMM 27−62−01−400−801.
NOTE: The replacement MFS PCU will have the suffix −A at the end of the
Serial No. if it was reworked as a result of MOOG SB C47030−27−01.
However, you can have a replacement MFS PCU without the suffix
−A if it was not affected by Bombardier Aviation SB 100−27−17
(Moog SB C47030−27−01).
(7) Install the RVDT bracket on the left inboard MFS panel using the retained
hardware and the two cotter pins, Part No. MS24665−86 supplied in the kit.
Refer to AMM 27−62−01−000−801.
(8) Do the electrical bonding test of the MFS PCU. Refer to
SPM−MM 51−80−00−760−801.
NOTE: The maximum allowable resistance is 10 milliohms between the unit
and the aircraft primary structure.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 10 of 18

### Page 14

(9) Bleed the left hydraulic system. Refer to AMM 29−10−00−870−801.
NOTES: 1. If more than one MFS PCU is to be replaced, do this task and
subsequent referenced tasks after all of the applicable MFS
PCUs have been replaced.
2. Use the Table 1 to record the MFS angles as necessary.
E. PART D − Replacement of the Right Inboard MFS PCU
NOTE: If it is not possible to complete all the instructions of this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and to get an approve disposition to complete this Service Bulletin.
(1) Remove the trailing edge access panels 671BB and 671CB. Refer to
AMM 57−52−01−000−801.
(2) Remove the RVDT bracket from the right inboard MFS panel. Discard the two
cotter pins, Part No. MS24665−86. Keep the remaining hardware for later
installation. Refer to AMM 27−62−01−000−801.
(3) Remove the right inboard MFS PCU. Refer to AMM 27−62−01−000−801.
NOTE: Use the Table 1 to record the MFS angles as necessary.
(4) Discard the self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter
pins, Part No. MS24665−162 and MS24665−302. Keep the remaining
hardware for later installation.
(5) Send the MFS control unit for repair to the address shown in Paragraph 1.G.
(6) Install a reworked/new MFS PCU using the retained hardware and the new
self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter pins, Part
No. MS24665−162 and MS24665−302 supplied in the kit. Torque the nuts,
Part No. MS21042L3, from 12 to 15 lbf in (1.36 to 1.69 Nm). Torque the nuts,
Part No. MS35650−302, from 20 to 25 lbf in (2.26 to 2.82 Nm). Refer to
AMM 27−62−01−400−801.
NOTE: The replacement MFS PCU will have the suffix −A at the end of the
Serial No. if it was reworked as a result of MOOG SB C47030−27−01.
However, you can have a replacement MFS PCU without the suffix
−A if it was not affected by Bombardier Aviation SB 100−27−17
(Moog SB C47030−27−01).
(7) Install the RVDT bracket on the right inboard MFS panel using the retained
hardware and the two cotter pins, Part No. MS24665−86 supplied in the kit.
Refer to AMM 27−62−01−000−801.
(8) Do the electrical bonding test of the MFS PCU. Refer to
SPM−MM 51−80−00−760−801.
NOTE: The maximum allowable resistance is 10 milliohms between the unit
and the aircraft primary structure.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 11 of 18

### Page 15

(9) Bleed the left hydraulic system. Refer to AMM 29−10−00−870−801.
NOTES: 1. If more than one MFS PCU is to be replaced, do this task and
subsequent referenced tasks after all of the applicable MFS
PCUs have been replaced.
2. Use the Table 1 to record the MFS angles as necessary.
F. PART E − Replacement of the Right Outboard MFS PCU
NOTE: If it is not possible to complete all the instructions of this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and to get an approve disposition to complete this Service Bulletin.
(1) Remove the trailing edge access panels 671DB and 671EB. Refer to
AMM 57−52−01−000−801.
(2) Remove the right outboard MFS PCU. Refer to AMM 27−62−01−000−801.
NOTE: Use the Table 1 to record the MFS angles as necessary.
(3) Discard the self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter
pins, Part No. MS24665−162 and MS24665−302. Keep the remaining
hardware for later installation.
(4) Send the MFS control unit for repair to the address shown in Paragraph 1.G.
(5) Install a reworked/new MFS PCU using the retained hardware and the new
self−locking nuts, Part No. MS21042L3, MS35650−302 and cotter pins, Part
No. MS24665−162 and MS24665−302 supplied in the kit. Torque the nuts,
Part No. MS21042L3, from 12 to 15 lbf in (1.36 to 1.69 Nm). Torque the nuts,
Part No. MS35650−302, from 20 to 25 lbf in (2.26 to 2.82 Nm). Refer to
AMM 27−62−01−400−801.
NOTE: The replacement MFS PCU will have the suffix −A at the end of the
Serial No. if it was reworked as a result of MOOG SB C47030−27−01.
However, you can have a replacement MFS PCU without the suffix
−A if it was not affected by Bombardier Aviation SB 100−27−17
(Moog SB C47030−27−01).
(6) Do the electrical bonding test of the MFS PCU. Refer to
SPM−MM 51−80−00−760−801.
NOTE: The maximum allowable resistance is 10 milliohms between the unit
and the aircraft primary structure.
(7) Bleed the right hydraulic system. Refer to AMM 29−10−00−870−801.
NOTES: 1. If more than one MFS PCU is to be replaced, do this task and
subsequent referenced tasks after all of the applicable MFS
PCUs have been replaced.
2. Use the Table 1 to record the MFS angles as necessary.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 12 of 18

### Page 16

G. Close−out
NOTE: The steps in the Close−out section of this Service Bulletin, except for the
return−to−service tests, are recommended steps. The steps give a
recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to
return to service. Alternative steps can be used at the operator’s
discretion.
(1) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
LCBP B9 SPOILER CTRL 1 211
LCBP B13 L FLAP IND 211
LCBP B14 FLAP CTRL 211
LCBP C9 L HYDRAULIC IND 211
LCBP C11 R HYDRAULIC DC PUMP 211
LCBP D10 AUX HYDRAULIC DCPUMP 211
RCBP B9 SPOILER CTRL 2 212
RCBP B12 R FLAP IND 212
RCBP C8 R HYDRAULIC IND 212
RCBP C11 L HYDRAULIC DC PUMP 212
(2) Pressurize the left and right hydraulic systems. Refer to
AMM 29−10−00−862−801.
(3) Set the FLAP lever to the 0 degree position.
(4) Make sure that the flap control surfaces are fully retracted.
(5) Set the FLIGHT SPOILERS lever to STOW.
(6) Make sure that the flight spoilers are fully stowed.
(7) Remove all tools, equipment and unwanted materials from the aircraft.
H. Recording
You can do each PART of this Service Bulletin independently. When any PART of
this Service Bulletin is completed, make an entry in the aircraft log and send the
attached Incorporation Notice to Bombardier Business Aircraft Customer Services
(BBACS).
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 13 of 18

### Page 17

For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kit
Kit 100K27−17 is necessary to do PART B, PART C, PART D and PART E and
contains the parts that follow:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
1005771054−003 10 Pad 1005771054−003 Discard
MS21042L3 6 Nut,Self−Locking MS21042L3 Discard
MS24665−162 6 Pin, Cotter MS24665−143 Discard
MS24665−302 10 Pin, Cotter MS24665−302 Discard
MS24665−86 3 Pin, Cotter MS24665−86 Discard
MS35650−302 6 Nut,Self−Locking MS35650−302 Discard
NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit
Parts List contained in the respective kit, then the later list prevails.
2. The actual quantity for some of the hardware contained in the kit can
be greater than the amount shown in the table as these items are
supplied in prepackaged quantities.
B. Parts
The part that follows may be necessary to do this Service Bulletin is available from
Bombardier Aviation Parts Services, Montreal:
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 14 of 18

### Page 18

NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
C47030−003 Up to4 MFS PowerControl Unit C47030−003 Refer toParagraph 1.G.
NOTES: 1. The part number for the item listed above is subject to change without
revision to this Service Bulletin. In case of discrepancy between this
list and any other list, the Illustrated Parts Catalog prevails and shall
be used to determine the latest part number.
2. One MFS PCU is necessary for each of PART B, PART C, PART D
and PART E of this Service Bulletin.
C. Material
The materials that follow, or equivalent, are necessary to do this Service Bulletin.
These can be purchased from a local supplier. Bombardier Aviation does not pay
for these consumables.
DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER
(SEE
NOTE)
Fluid,
Hydraulic,
Phosphate
Ester Base,
Fire Resistant
Hyjet IV−A
Plus
BAMS 564−03
Type IV As Necessary Code: A
Alodine 1000
Type II − MIL−C−81706 As Necessary Code: B
Acrylic
Conformal
Coating
CT: 24 hours
Humiseal Type 1B15 As Necessary Code: C
Brush, Paint,
Natural or
Synthetic
Bristle
− − As Necessary Code: D
Cloth,
Cleaner,
Low−lint
− MIL−C−85043 As Necessary Code: D
Grease Aeroshell 33 MIL−PRF−23827CType 1 As Necessary Code: D
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 15 of 18

### Page 19

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER
(SEE
NOTE)
Lockwire CRES 0.032in. (0.81 mm) MS20995C32 As Necessary Code: D
Paper,
Abrasive,
Aluminium
Oxide,
320−Grit
− − As Necessary Code: D
Paper,
Abrasive,
Aluminium
Oxide,
240−Grit
− − As Necessary Code: D
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. The Curing Time (CT), if applicable, for each consumable material is
indicated with the description of each product.
3. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
SUPPLIERS ADDRESSES BY CODES
Code: A
ExxonMobil Aviation Lubricants
Technical Support Center
3225 Gallows Road
Fairfax, VA 22037
Tel.: 1−800−662−4525
E−mail:
www.exxonmobilaviation.com
Code: B
PRC−Desoto International
5430 San Fernando Road
PO Box 1800
Glendale, CA, 91209
Tel.: 1−800−228−5635 or
818−240−2060
Fax.: 818−549−7790
www.ppq.com/coatings/aerospace/
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 16 of 18

### Page 20

SUPPLIERS ADDRESSES BY CODES
Code: C
Humiseal Division of Chase Corp.
128 First Street
Pittsburgh, PA 15238
USA
Tel: (866) 932−0800
Fax.: 818−549−7790
www.humiseal.com/
Code: D
Commercially Available
D. Publications
No publications required.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 17 of 18

### Page 21

TABLE 1 − INCLINOMETER POSITION
Reading
Set
Reference LHS Outer
MFS
LHS Inner
MFS
RHS Inner
MFS
RHS Outer
MFS
1
2
3
4
5
6
7
8
9
10
11
12
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 05/2012
Revision 03: Jun 19/2020
100−27−17
Page 18 of 18

### Page 22

100−27−17 Rev. 03 Jun 19/2020
SPECIAL CHECK/MODIFICATION – MULTI−FUNCTION SPOILER –
REPLACEMENT OF THE MULTIFUNCTION SPOILER POWER CONTROL
UNIT (MFS PCU) SEALS
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 23

SERVICE BULLETIN INCORPORATION SHEET − "100−27−17"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
100−27−17 03
COMPLIED WITH
YES    NO    N/A
PART A
PART B
PART C
PART D
PART E
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
