# Bombardier Service Bulletin 100-36-10

Copy: No revision named ("SB 100-36-10"), 57 pages: PDF https://openairdocs.org/files/sha256/2d/83/2d83f2a5a491240f8d4bc5b567f8fd559496ee6924e7de8e861ae68d12ffe1c3; text https://openairdocs.org/service-documents/bombardier/sb-100-36-10/file/2d83f2a5a491.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1890; AD 2023-26-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 100-36-10
- Page: https://openairdocs.org/service-documents/bombardier/sb-100-36-10

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2023-26-02](https://openairdocs.org/ad/2023-26-02.md), effective Feb 27, 2024: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-100-36-10/proposed.md).

## Text (57 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1890; AD 2023-26-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK – BLEED-AIR LEAK-DETECTION SYSTEM –
FUNCTIONAL CHECK OF BLEED LEAK-DETECTION ELEMENTS
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within 96 months or 7500 flight cycles
whichever comes first from this Service
Bulletin release date (Basic Issue)
EFFECTIVITY: A/C Serial No. 20001 to 20457
MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin may be subjected to an Airworthiness Directive, which will
make it necessary to implement this Service Bulletin.
To place an order for parts, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 36−21
PNEUMATIC
Basic Issue: Dec 23/2022 100−36−10
Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK – BLEED-AIR LEAK-DETECTION SYSTEM –
FUNCTIONAL CHECK OF BLEED LEAK-DETECTION ELEMENTS
1. PLANNING INFORMATION
NOTES: 1. To reduce operator downtime due to aircraft set−up, access, close−out
and return to service testing, Bombardier is recommending that the work is
done at the 96 month scheduled maintenance event while still respecting
the Service Bulletin compliance time. Refer to Paragraph 1.F.
2. Two persons are necessary to perform this Service Bulletin. However, a
third person may be required to assist with heat gun operation.
3. Do not perform this test procedure when the ambient temperature around
the aircraft is below 0°C (32°F).
4. Send all Test Results to Bombardier Customer Support Engineering
through the SRPSA form to SRPSA@aero.bombardier.com or through
Salesforce for BAS Facilities.
5. Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
A. Effectivity
BD−100−1A10 aircraft, Serial No. 20001 to 20457.
The intent of this Service Bulletin was met on the aircraft that follow with the
Pre−Published Service Bulletin 100−36−10 listed below:
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL BD−100−1A10 (CH−300)
ATA 36−21
PNEUMATIC
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2022 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 23/2022 100−36−10
Page 1 of 54
This Service Bulletin is available at:

### Page 3

AIRCRAFT SERIAL NO. PRE-PUBLISHED DATE
20138 Apr 04/2022
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
1. Condition:
Some of the Leak Detection Loop (LDL) sensing elements supplied by Kidde
Aerospace & Defense may be non−conforming. These LDL sensing elements
present a risk due to the inability to detect a bleed air leak event at the specified
temperatures.
Appendix B presents a summary of the LDL sensing element P/Ns impacted
and locations.
2. Evidence:
Deficiencies in the manufacturer’s Acceptance Test Procedure (ATP), allowed
for non−conforming LDL sensing elements to pass as good units.
3. Objective/Benefit:
This Service Bulletin introduces an on−wing test procedure to test the
serviceability (examine the functionality) of each LDL sensing element installed
on the aircraft and to replace those that have failed.
C. Description
This Service Bulletin gives instructions in PART A to:
− Gain access and test the LDL sensing elements on the left wing.
This Service Bulletin gives instructions in PART B to:
− Gain access and test the LDL sensing elements on the right wing.
This Service Bulletin gives instructions in PART C to:
− Gain access and test the LDL sensing elements at left center fuselage (over
wing).
This Service Bulletin gives instructions in PART D to:
− Gain access and test the LDL sensing elements at right center fuselage (over
wing).
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 2 of 54

### Page 4

This Service Bulletin gives instructions in PART E to:
− Gain access and test the LDL sensing elements at rear fuselage (aft belly
fairing).
This Service Bulletin gives instructions in PART F to:
− Gain access and test the LDL sensing elements in the rear equipment bay.
This Service Bulletin gives instructions in PART G to:
− Gain access and test the LDL sensing elements located inside the pressurized
cabin, in the underfloor (under the baggage compartment).
D. Compliance
Recommended within 96 months or 7500 flight cycles whichever comes first from
this Service Bulletin release date (Basic Issue).
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the aircraft configuration, submit an SRPSA for analysis and to
get an approved disposition to complete this Service Bulletin. Standard
SRPSA fees may apply. Refer to the Services section of the Bombardier
customer portal for the latest prices, rates and fees.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 100−00−02.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 3 of 54

### Page 5

3. To reduce operator downtime due to aircraft set−up, access,
close−out and return to service testing, Bombardier is recommending
that the work is done at the 96 month scheduled maintenance event
while still respecting the Service Bulletin compliance time. Refer to
Paragraph 1.F.
1. If the aircraft is in scheduled heavy−maintenance: 15 total man−hours are
necessary to complete this Service Bulletin.
2. If the aircraft is outside scheduled heavy−maintenance: 76 total man−hours are
necessary to complete this Service Bulletin. The breakdown of the man−hours
is as follows:
− 2 man−hours are necessary to do Aircraft Setup of this Service Bulletin.
− 10 man−hours are necessary to do PART A of this Service Bulletin.
− 10 man−hours are necessary to do PART B of this Service Bulletin.
− 9 man−hours are necessary to do PART C of this Service Bulletin.
− 9 man−hours are necessary to do PART D of this Service Bulletin.
− 16 man−hours are necessary to do PART E of this Service Bulletin.
− 9 man−hours are necessary to do PART F of this Service Bulletin.
− 9 man−hours are necessary to do PART G of this Service Bulletin.
− 2 man−hours are necessary to do Testing of this Service Bulletin.
The labor required to do this Service Bulletin when the aircraft is in or outside
scheduled heavy−maintenance is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
− this Service Bulletin is scheduled in less than 96 months from its release date
(Basic Issue).
G. Material − Cost and Availability
No kit is necessary to do this special check. For material data refer to
paragraph 3.C.
The parts in Paragraph 3.B. may be necessary to do this Service Bulletin.
The parts are available at no cost if:
− a no−charge purchase order is sent to Bombardier Aviation in less than
96 months from this Service Bulletin release date (Basic Issue).
NOTE: If material coverage is required due to part failure, a scrap certificate will
be required. Claims will not be approved without the necessary scrap
certificate. Please see scrap certificate form attached with Service Bulletin.
Smart Parts does not pay for this recommended Service Bulletin at any time.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 4 of 54

### Page 6

H. Tooling
The equipment and tools listed below are necessary to do this special check:
GSE REFERENCE NO. PART NO. DESCRIPTION
Commercially Available
(See Note 4 and 5) Kit 173948 Testing Kit
Commercially Available
(See Note 6) Fluke 289 (or equivalent)
Digital Multi Meter (Type
K input 0−594°C
(32−1101.2°F), Accuracy
of ±2.2°C (±8.3°F) or
0.75%, 0−40°C
(32−104°F) operating
temp)
Commercially Available
(See Note 6)
STEINEL Model
HG 2620 E, HG 2220 E
(or equivalent)
Heat Gun (capable of
350°C (662°F) hot air
delivery with tolerence of
±5°C or 10°F)
Commercially Available
(See Note 6) − K Type Thermocoupler(or equivalent)
Commercially Available −
Marker (Green Sharpie
Marker or equivalent
permanent marker)
Commercially Available − Scraper, Non−Metallic
Commercially Available − Sharp Knife
Commercially Available
(See Note 6)
110048645
or
07051
STEINEL Heat Gun
Nozzle Deflector
Commercially Available
(See Note 6) −
Timer with 1 second
resolution or less (watch,
stopwatch)
Commercially Available − Walkie Talkies
Commercially Available − Wrench, Torque 18 to 22lbf in (2.03 to 2.49 Nm)
Commercially Available −
Wrench, Torque 20 to
25 lbf in (2.26 to
2.82 Nm)
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 5 of 54

### Page 7

GSE REFERENCE NO. PART NO. DESCRIPTION
Commercially Available −
Wrench, Torque 50 to
60 lbf in (5.65 to
6.77 Nm)
Commercially Available −
Wrench, Torque 60.19 to
73.46 lbf in (6.81 to
8.30 Nm)
NOTES: 1. Refer to the BD−100 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the BD−100 for
acceptable GSE equivalents.
3. This list is provided for a quick reference. In case of discrepancy
between this list and the tool called out in the SPM−WM, Chapter 20,
then the tool called in the SPM−WM will prevail. Other approved
alternative tools are acceptable and can also be used.
4. Operator can order kit 173948 from Collins Aerospace, which
contains digital multimeter, heat gun, K type thermocoupler, STEINEL
heat gun nozzle deflector and timer needed to perform testing.
5. The content, details and ordering information of kit 173948 is
available in LTS VSB No. CFD−F1958−26−1.
6. The component can be obtained separately.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive, (pending).
− Bombardier Aviation, Restriction and/or Special Instruction (RSI),
C−100−000−36−0006, Rev. B.
− Liebherr, Vendor Service Bulletin (LTS VSB),
CFD−F1958−26−01, Initial Issue, dated 6 May 2022.
− Bombardier Aviation, Standard Practices Manual (SPM), Chapter 20.
− CH 300 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 36, 53 and 54.
− Appendix A − Test Results.
− Appendix B − Test Matrix.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 6 of 54

### Page 8

− Appendix C − Test Locations.
− Bleed−Loop Scrap Certificate (attached).
L. Other Publications Affected
None.
M. Equivalent Service Bulletin
− For the Challenger 350 aircraft, use Service Bulletin 350−36−003.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the BD−100 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
BD−100 Aircraft Maintenance Manual, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Obey all the bleed−air leak−detection and warning system safety−precautions.
Refer to AMM 36−21−00−910−801.
(3) Do the standard aircraft configuration for maintenance. Refer to
AMM 12−00−00−867−803.
PART A
(4) Remove the LH leading edge access panels (from 522AL to 528DL). Refer to
AMM 57−41−09−000−801.
PART B
(5) Remove the RH leading edge access panels (from 622AR to 628DR). Refer to
AMM 57−41−09−000−801.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 7 of 54

### Page 9

SB350−36−003_001
Example of Access to Leak Detection Elements − Mid Board Wing
Figure 1
PART C
(6) Remove the main landing gear (MLG) wheel−bin fairings (171AZ and 171BZ).
Refer to AMM 53−32−01−000−801.
(7) Remove the over−wing fairings (183AL and 183BL). Refer to
AMM 53−63−13−000−801.
(8) Remove the forward wing−to−fuselage fairings (181AL). Refer to
AMM 53−63−01−000−801.
NOTE: Removal of forward wing−to−fuselage fairings (181AL) is not required
if this Service Bulletin is done outside of an heavy maintenance. In
that case the first loop test need to be done forward of the overwing.
PART D
(9) Remove the main landing gear (MLG) wheel−bin fairings (172AZ and 172BZ).
Refer to AMM 53−32−01−000−801.
(10) Remove the over−wing fairings (183AR and 183BR). Refer to
AMM 53−63−13−000−801.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 8 of 54

### Page 10

(11) Remove the forward wing−to−fuselage fairings (181AR). Refer to
AMM 53−63−01−000−801.
NOTE: Removal of forward wing−to−fuselage fairings (181AR) is not required
if this Service Bulletin is done outside of an heavy maintenance. In
that case the first loop test need to be done forward of the overwing.
PART E
(12) Remove the aft wing−to−fuselage fairings (182CL/182CR). Refer to
AMM 53−63−09−000−801.
(13) Remove the aft maintenance access panel (182BL). Refer to
AMM 53−63−17−000−802.
PART F
(14) Open the AFT equipment−compartment door (182GL). Refer to
AMM 52−41−00−010−801.
PART G
(15) Open the baggage door (834).
(16) Remove the AFT fuselage floor−panel (241ALF). Refer to
AMM 53−41−01−000−801.
B. PART A — Special Check — LDL Sensing Elements Test on the Left Wing
NOTES: 1. Both elements must be heated at approximately same time.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type N.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 10, for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) If a test point FAILS per Paragraph 2.L., test the failed test point again per
Paragraph 2.M. (Detailed Test Procedure − Dual Loop Troubleshooting).
(7) If necessary, replace the failed LDL sensing element by a conforming one.
(8) Install the applicable panels from the areas that were tested.
(9) Repeat the cockpit preparation per Paragraph 2.K.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 9 of 54

### Page 11

C. PART B — Special Check — LDL Sensing Elements Test on the Right Wing
NOTES: 1. Both elements must be heated at approximately same time.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type N.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 10 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) If a test point FAILS per Paragraph 2.L., test the failed test point again per
Paragraph 2.M. (Detailed Test Procedure − Dual Loop Troubleshooting).
(7) If necessary, replace the failed LDL sensing element by a conforming one.
(8) Install the applicable panels from the areas that were tested.
(9) Repeat the cockpit preparation per Paragraph 2.K.
D. PART C — Special Check — LDL Sensing Elements Test at Left Center
Fuselage (Over Wing)
NOTES: 1. Both elements must be heated at approximately same time.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 9 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) If a test point FAILS per Paragraph 2.L., test the failed test point again per
Paragraph 2.M. (Detailed Test Procedure − Dual Loop Troubleshooting).
(7) If necessary, replace the failed LDL sensing element by a conforming one.
(8) Install the applicable fairings/panels from the areas that were tested.
(9) Repeat the cockpit preparation per Paragraph 2.K.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 10 of 54

### Page 12

E. PART D — Special Check — LDL Sensing Elements Test at Right Center
Fuselage (Over Wing)
NOTES: 1. Both elements must be heated at approximately same time.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 9 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) If a test point FAILS per Paragraph 2.L., test the failed test point again per
Paragraph 2.M. (Detailed Test Procedure − Dual Loop Troubleshooting).
(7) If necessary, replace the failed LDL sensing element by a conforming one.
(8) Install the applicable fairings/panels from the areas that were tested.
(9) Repeat the cockpit preparation per Paragraph 2.K.
F. PART E — Special Check — LDL Sensing Elements Test at Rear Fuselage (Aft
Belly Fairing)
NOTES: 1. Both elements must be heated at approximately same time.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 9 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) If a test point FAILS per Paragraph 2.L., test the failed test point again per
Paragraph 2.M. (Detailed Test Procedure − Dual Loop Troubleshooting).
(7) If necessary, replace the failed LDL sensing element by a conforming one.
(8) Close/install the applicable fairings/panels/doors from the areas that were
tested.
(9) Repeat the cockpit preparation per Paragraph 2.K.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 11 of 54

### Page 13

G. PART F — Special Check — LDL Sensing Elements Test in the Rear
Equipment Bay
NOTES: 1. For Single Loop: One element must be heated.
2. For Double Loop: Both elements must be heated at approximately
same time.
3. CAS message will be posted when each LDL sensing element in the
single loop or double loop system reaches the temperature set point
specified in Table 1 for salt type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figures 5, 6, 7 and 9
for the location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) For double loop configuration, if a test point FAILS per Paragraph 2.L., test the
failed test point again per Paragraph 2.M. (Detailed Test Procedure − Dual
Loop Troubleshooting).
(7) If necessary, replace the failed LDL sensing element by a conforming one.
(8) Close doors from the areas that were tested.
(9) Repeat the cockpit preparation per Paragraph 2.K.
H. PART G — Special Check — LDL Sensing Elements Test inside the
Pressurized Cabin in the Underfloor (Under the Baggage Compartment)
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 8 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.L. (Detailed Test
Procedure − Single and Dual Loops).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 12 of 54

### Page 14

I. General Aircraft Test Setup
(1) Testing to be performed in a hangar (well ventilated) or tarmac conditions with
no precipitation.
(2) A/C power required. Engine, APU or Huffer Cart air supply are NOT required.
(3) Open the applicable panels/doors to access the areas to be tested.
J. Heat Gun Temperature Verification
WARNING: HEAT GUN SHOULD NOT BE USED NEAR FLAMMABLE LIQUIDS
OR IN AN EXPLOSIVE ENVIRONMENT (FUMES, GASES OR DUST). REMOVE
MATERIALS OR DEBRIS THAT MAY BECOME IGNITED FROM WORK AREA.
CAUTION: WHEN HEATING LEAK DETECTION ELEMENTS THE HEAT GUN
SHALL BE POSITIONED SUCH THAT THE HEAT IS NOT APPLIED WITHIN
1 INCH (2.5 CM) OF SENSOR WHITE/RED GROMMETS.
CAUTION: DO NOT DIRECT HEAT GUN AIRSTREAM AT CLOTHING, HAIR OR
OTHER BODY PARTS.
CAUTION: ALWAYS HOLD HEAT GUN BY PLASTIC ENCLOSURE. THE METAL
NOZZLE REQUIRES APPROXIMATELY 20 MINUTES TO COOL TO WHERE IT
CAN BE TOUCHED. DO NOT TOUCH NOZZLE OR ACCESSORY TIPS UNTIL
COOL.
CAUTION: DO NOT STORE HEAT GUN UNTIL NOZZLE HAS COOLED TO
ROOM TEMPERATURE. PLACE TOOL IN A CLEAR AREA AWAY FROM
COMBUSTIBLE MATERIALS WHILE COOLING.
CAUTION: DO NOT CUT OFF HEAT GUN AIRFLOW BY PLACING NOZZLE
TOO CLOSE TO WORK PIECE. KEEP INTAKE VENTS CLEAN AND CLEAR OF
OBSTRUCTIONS.
CAUTION: SHIELD MATERIALS AROUND THE HEATED AREA TO PREVENT
DAMAGE OR FIRE.
CAUTION: WEAR KEVLAR SLEEVES AND GLOVES WHEN WORKING IN
DIFFICULT AREAS WHERE THERE IS A RISK TO GET BURNT.
NOTE: To make sure that the heat gun temperature is consistent during all
testing, this verification procedure should be repeated after every four
(4) hours of testing or when the LDL sensing element set point changes or
when the ambient conditions in the test location change.
(1) Securely attach the heat gun nozzle deflector to heat gun.
(2) Connect the thermocouple wire to the digital meter and set the meter to
measure temperature in °C or °F.
(3) Place the thermocouple at the center of the heat protection shield (not touching
the shield) at the approximate location as identified in Figure 2.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 13 of 54

### Page 15

SB350−36−003_003
Testing a single loop
Testing two loops
Sensing
Element
1−1.25’’
1.25−1.5’’1.25−1.5’’
Heatgun Outlet
1−1.25’’
1.25−1.5’’
Sensing
Element
Heatgun Outlet
MODEL BD−100−1A10 (CH−300)
Test Item Placement within heat shield
Figure 2
Basic Issue: Dec 23/2022 100−36−10
Page 14 of 54

### Page 16

(4) Turn ON heat gun.
(5) Set airflow rate to maximum on the heat gun.
(6) Set the heat gun temperature so that the thermocouple reads the
thermocouple temperature verification value, as specified in Table 1 (Heat Gun
Temp. Settings).
TABLE 1 - HEAT GUN TEMPERATURE SETTINGS
SALT TYPE
LDL SENSING
ELEMENT TEMP.
SET POINT
THERMOCOUPLE TEMP.
VERIFICATION VALUE
A (Fuselage and AEB) 124°C or 255°F 135 (−0,+17)°C or 275(−0,+30)°F
N (Wing Leading Edge) 238°C or 460°F 255 (−0,+17)°C or 491(−0,+30)°F
(7) Repeat steps (1) to (6) for the second heat gun if required.
K. Cockpit Preparation
(1) Do the steps that follow to initiate IASC PBIT functioning:
(a) Set the aircraft to Weight−on−Wheels (WOW). Refer to
AMM 32−61−00−867−803.
(b) Set the aircraft power ON.
(c) On the RSP (Center Pedestal), set all knobs to “NORM” and set EICAS
knob to “L MFD”.
(d) Make sure that the conditions are met as follows,
(i) On the anti−ice control panel (Center Pedestal):
− WING SOURCE knob is set to “NORM”.
− All PBAs are pushed out.
(ii) On the engine control panel (Center Pedestal):
− L ENG FIRE and R ENG FIRE PBAs are pushed to out.
(e) Make sure that the circuit breakers that follow are set IN:
CB PANEL CB NO. NAME ZONE
LCBP CB1−D14 PRESS 1/PACK 211
LCBP CB1−D15 L BLEED VALVES 211
LCBP CB1−E10 L WING BLD LK 211
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 15 of 54

### Page 17

CB PANEL CB NO. NAME ZONE
RCBP CB2−D12 X BLEED VALVES 212
RCBP CB2−D14 PRESS 2/TRIM 212
RCBP CB2−D15 R BLEED VALVES 212
RCBP CB2−E10 R WING BLD LK 212
(f) If any items in step (d) and step (e) has to be corrected, then set aircraft
power to OFF, wait 10 seconds, then set to ON.
For alternative to cycling aircraft power, cycle all the circuit breakers that
follow to OUT, then set to IN, in the order that follow:
IASC CHANNEL CB NO.
IASC 2B CB2−E10
IASC 2A CB2−D14
IASC 1B CB1−E10
IASC 1A CB1−D14
(g) Wait atleast five (5) minutes in order for IASC PBIT to check short and
open events.
(h) Verify that there are no CAS messages related to leak detection loops:
CAS MESSAGE COLOR
PACK LOOP FAIL Amber
TRIM AIR LOOP FAIL Amber
L BLEED LOOP FAIL Amber
R BLEED LOOP FAIL Amber
L PYLON LOOP FAIL Amber
B PYLON LOOP FAIL Amber
BLEED LOOP FAULT Cyan
WING A/ICE LOOP FAIL Amber
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 16 of 54

### Page 18

(i) Access Leak Detection Loop data on the maintenance page as follows:
(i) On CCP 2 (Center Pedestal), simultaneously push A/I CE, ECS and
FUEL buttons.
a On MFD 2, verify that the MAINTENANCE MAIN MENU is
shown.
NOTE: Use button information on left side of MFD to command
MDS with CCP.
(ii) On CCP 2 (Center Pedestal), select CURRENT FAULTS.
a On MFD 2, verify that the CURRENT FAULTS page is shown.
b No fault is shown related to ATA 36−00 PNEUMATICS.
(iii) Return to main menu.
(iv) On CCP 2 (Center Pedestal), select CURRENT SERVICES
MESSAGES.
a On MFD 2, verify that CURRENT SERVICES MESSAGES page
is shown.
b No message is shown related to ATA 36−00 PNEUMATICS.
(v) Return to main menu.
(vi) On CCP 1 (Center Pedestal), push A/ICE button.
a On MFD 1, verify that ANTI−ICE synoptic page is shown.
(vii) Troubleshoot any anomalous readings prior to continuing with this
test.
L. Detailed Test Procedure − Single and Dual Loops
NOTE: If it is not possible to complete all the instructions of this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and to get an approved disposition to complete this Service Bulletin.
(1) Position one person in the cockpit to monitor CAS and MDC indications and
one person at the test site with heat gun(s), both with walkie talkies. Refer to
Appendix C and Figure 3, 5 to 10, for test site locations.
(2) Enter the element information on the Test Results sheet (Appendix A). Make
sure that the ambient temperature, part number of the LDL sensing element
are entered.
NOTE: The serial number can be found etched on the coupling of the Leak
Detection Element at one end and the part number at the other end.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 17 of 54

### Page 19

(3) Conduct the heat gun temperature verification as detailed in Paragraph 2.J. for
the associated element being tested.
NOTE: To make sure the heat gun temperature is consistent during all
testing, make sure this verification is repeated after every four (4)
hours of testing or when the ambient conditions in the test location
change or when the LDL sensing element temperature set point
changes.
(4) Allow the heat gun(s) to preheat for a minimum of 30 seconds to reach the
appropriate stable test temperature. Make sure that the exhaust of the heat
gun is directed in a safe direction.
CAUTION: SHIELD MATERIALS AROUND THE HEATED AREA TO
PREVENT DAMAGE OR FIRE. APPLY PROTECTIVE BARRIERS IF
NECESSARY.
CAUTION: WHEN HEATING LEAK DETECTION ELEMENTS THE HEAT
GUN SHALL BE POSITIONED SUCH THAT THE HEAT IS NOT APPLIED
WITHIN 1 INCH (25 MM) OF SENSOR WHITE/RED GROMMETS.
CAUTION: TESTING SHALL NOT BE PERFORMED WITHIN 1 INCH OF THE
CONNECTOR START OR ENDS AS THIS IS A NON−ACTIVE REGION OF
THE LEAK DETECTION ELEMENT.
(5) Record the heat gun temperature.
(6) If testing a two loop system, position the heat gun at the Leak Detection
Element test location over both of the bleed loops (IASC 1B and IASC 2B),
using the deflector sleeve.
If testing a single loop system, position the heat gun at the Leak Detection
Element test location over the loop under test. Make sure that the deflector
sleeve does not touch the Leak Detection Element(s).
NOTES: 1. Due to space constraints, the deflector sleeve might be omitted
providing that heat is directed to the element(s) and the
surrounding structure is protected by alternative means. It is also
required to make sure that the heat gun does not come too close
in contact with the loops.
2. When testing a two loop system, if there is insufficient space to
allow the heat gun to heat both elements without contacting the
Leak Detection Elements or clashing with surrounding
structure/systems, it is permissible to use two heat guns in the
same location.
3. Testing points should be as shown in Figure 3 that follows, if
access is limited then test locations can slightly be moved.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 18 of 54

### Page 20

PN
end
SN
end
Location 3Location 2Location 1
3−4 in
7.6−10.2
cm
3−4 in
7.6−10.2
cm
Center of the
element More than 1 inch of the
connector start or ends
Test Location on Element
Figure 3
(7) Heat the Leak Detection Element(s) location with the heat gun(s) for no more
than 120 seconds (two (2) minutes).
(8) Verify on CAS that one of the following LEAK WARNING messages posts
within the 120 seconds thermal exposure:
CAS MESSAGE COLOR
L BLEED LEAK Red
R BLEED LEAK Red
L PYLON BLEED LEAK Red
R PYLON BLEED LEAK Red
TRIM AIR LEAK Red
PACK LEAK Red
WING ANTI−ICE LEAK Red
NOTE: The posted CAS message shall correspond to the tested loop zone.
(9) For dual loops: Monitor MDC vs CAS to see if only one element is triggered.
(10) Remove the heat gun(s) from the Leak Detection Elements upon ALARM
detection or 120 seconds time out and let it cool. The WARNING message will
disappear after few seconds once the heat is removed.
NOTE: The sensor can be wipe with a damp cloth to restore it to room
temperature, if required.
(11) Check the PASS/FAIL criteria as follow:
(a) PASS: If a heated Leak Detection Element results in CAS LEAK
WARNING message (see list in step (8)) appears within the test period
defined.
(b) FAIL: If a heated Leak Detection Element that does not show a LEAK
WARNING message (see list in Step (8)) within the test period defined.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 19 of 54

### Page 21

(i) In single loop configuration: If the element fails, add the Serial
Number of the element on Test Results sheet (Appendix A).
(ii) In dual loops configuration :  If the MDC indicated that both elements
failed, replace both LDL sensing elements by conforming ones.  Add
the Serial Numbers of the elements on Test Results sheet (Appendix
A).
(iii) In dual loops configuration :  If the MDC indicated that only one
element failed, determine which element has failed, test the failed test
point again per Paragraph 2.M.
(12) The failed sensing element must be removed from the aircraft and red tagged.
Replace the failed element by a conforming part.
(13) Record the results on the supplied Test Results sheet (Appendix A).
(14) Wait for CAS and MDC indication to clear.
(15) Repeat the steps (2) to (13) for the next test point location of the LDL sensing
elements to be tested (refer to Appendix C and Figure 3, 5 to 10).
(16) Continue until each LDL sensing element test point location presented is tested
and results recorded.
(17) Mark one (1) face of one (1) connector hex nut with one (1) GREEN mark to
indicate that the active LDL sensing element has been thermally tested and
verified PASS at all locations. Refer to Figure 11.
SOCKET TYPE END PIN TYPE END
Figure 11
(18) Remove any protection thermal blankets or protection aids, close up any
panels opened/removed and advance to the next LDL sensing element to be
tested.
(19) When testing is completed, run each heat gun using fan only for five
(5) minutes to cool.
(20) Turn off the heat gun.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 20 of 54

### Page 22

(21) Submit all test results (Appendix A) to Bombardier Aviation at:
BBAD_SBgroup@aero.bombardier.com
M. Detailed Test Procedure – Dual Loops Troubleshooting
Procedure to identify a failed element in a dual loop configuration:
(1) Position one person in the cockpit to monitor MDC indications and one person
at the test site with heat gun(s), both with walkie talkies. Refer to Appendix C
and Figure 3, 5 to 10, for test site locations.
(2) Enter the LDL sensing element information on Test Results sheet (Appendix
A). Make sure that the ambient temperature, part number and serial number of
the LDL sensing element are entered.
NOTE: The serial number can be found etched on the coupling of the Leak
Detection Element at one end and the part number at the other end.
(3) Conduct the heat gun Temperature Verification as detailed in Paragraph 2.J.
for the associated LDL sensing element being tested.
NOTE: To make sure the heat gun temperature is consistent during all
testing, make sure this verification is repeated after every four (4)
hours of testing or when the ambient conditions in the test location
change or when the LDL sensing element temperature set point
changes.
(4) Allow the heat gun(s) to preheat for a minimum of 30 seconds to reach the
appropriate stable test temperature. Make sure that the exhaust of the heat
gun is directed in a safe direction.
CAUTION: SHIELD MATERIALS AROUND THE HEATED AREA TO
PREVENT DAMAGE OR FIRE. APPLY PROTECTIVE BARRIERS IF
NECESSARY.
CAUTION: WHEN HEATING LEAK DETECTION ELEMENTS THE HEAT
GUN SHALL BE POSITIONED SUCH THAT THE HEAT IS NOT APPLIED
WITHIN 1 INCH (25 MM) OF SENSOR WHITE/RED GROMMETS.
CAUTION: TESTING SHALL NOT BE PERFORMED WITHIN 1 INCH OF THE
CONNECTOR START OR ENDS AS THIS IS A NON−ACTIVE REGION OF
THE LEAK DETECTION ELEMENT.
(5) Record the heat gun temperature.
(6) Position the heat gun at the LDL sensing element test location over one of the
bleed loops (IASC 1B or IASC 2B), using the deflector sleeve. Make sure that
the deflector sleeve is not touching the LDL sensing element.
NOTE: Heat shield or thermal insulation may be used to make sure that only
one element is heated.
(7) Heat the LDL sensing element with the heat gun(s) for no more than
120 seconds (two (2) minutes).
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 21 of 54

### Page 23

(8) Verify on the MDC that a leak is detected within the 120 seconds thermal
exposure.
(a) If a leak is detected within the 120 seconds thermal exposure, stop
heating, wait for the MDC message to disappear and repeat step (7) by
heating the other LDL sensing element.
(b) If a leak is not detected within the 120 seconds thermal exposure, the
element is failed and shall replace the failed element by a conforming part.
(i) The failed sensing element must be removed from the aircraft and red
tagged.
(ii) If material coverage is required due to part failure, a scrap certificate
will be required. Claims will not be approved without the necessary
scrap certificate. Please see scrap certificate form attached with
Service Bulletin.
(9) Remove the heat gun from the LDL sensing element upon leak detection on
MDC or 120 seconds timeout and let it cool for three (3) minutes. Wipe the
sensor with a damp cloth to restore it to room temperature. The MDC message
will disappear after few seconds once the heat is removed.
(10) Record the results (including the Serial Numbers of the elements that failed) on
the supplied Test Results sheet (Appendix A).
(11) When testing completed, run each heat gun using fan only for five (5) minutes
to cool.
(12) Turn off the heat gun.
(13) Submit all test results (Appendix A) to Bombardier Aviation at:
BBAD_SBgroup@aero.bombardier.com
N. Testing
(1) Connect and energize the external DC power. Refer to
AMM 24−41−00−861−801.
(2) Do the operational test of the bleed−air leak−detection and warning system.
Refer to AMM 36−21−00−710−801.
(3) Remove the external DC power. Refer to AMM 24−00−00−861−801.
O. Close−out
(1) Remove all tools, equipment and unwanted materials from the aircraft.
PART A
(2) Install the LH leading edge access panels (from 522AL to 528DL). Refer to
AMM 57−41−09−400−801.
PART B
(3) Install the RH leading edge access panels (from 622AR to 628DR). Refer to
AMM 57−41−09−400−801.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 22 of 54

### Page 24

PART C
(4) Install the main landing gear (MLG) wheel−bin fairings (171AZ and 171BZ).
Refer to AMM 53−32−01−400−801.
(5) Install the over−wing fairings (183AL and 183BL). Refer to
AMM 53−63−13−400−801.
(6) If removed, install the forward wing−to−fuselage fairings (181AL). Refer to
AMM 53−63−01−400−801.
PART D
(7) Install the main landing gear (MLG) wheel−bin fairings (172AZ and 172BZ).
Refer to AMM 53−32−01−400−801.
(8) Install the over−wing fairings (183AR and 183BR). Refer to
AMM 53−63−13−400−801.
(9) If removed, install the forward wing−to−fuselage fairings (181AR). Refer to
AMM 53−63−01−400−801.
PART E
(10) Install the aft wing−to−fuselage fairings (182CL/182CR). Refer to
AMM 53−63−09−400−801.
PART F
(11) Close the AFT equipment−compartment door (182GL). Refer to
AMM 52−41−00−410−801.
PART G
(12) Install the AFT fuselage floor−panel (241ALF). Refer to
AMM 53−41−01−400−801.
(13) Close the baggage door (834).
P. Recording
You can do each PART of this Service Bulletin independently. When any PART of
this Service Bulletin is completed, make an entry in the aircraft log and send the
attached Incorporation Notice to Bombardier Business Aircraft Customer Services
(BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 23 of 54

### Page 25

3. MATERIAL INFORMATION
A. Kits
No kits required.
B. Parts
The “NEW PART” shall be a conforming part.
A Conforming part is a part manufactured before November 2004 or after the date
(date code) indicated in the LTS VSB No. CFD−F1958−26−1 or a part successfully
tested per the bench test defined in the LTS VSB No. CFD−F1958−26−1.
1. The parts that follow may be necessary to do PART A of this Service Bulletin for
Left Wing and are available from Bombardier Aviation Parts Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−107N AR LDL SensingElement 04−31102−107N Refer toParagraph 1.G.
04−31102−108N
(See Note 2) AR LDL SensingElement 04−31102−108N Refer toParagraph 1.G.
04−31102−125N AR LDL SensingElement 04−31102−125N Refer toParagraph 1.G.
04−31102−129N AR LDL SensingElement 04−31102−129N Refer toParagraph 1.G.
2. The parts that follow may be necessary to do PART B of this Service Bulletin for
Right Wing and are available from Bombardier Aviation Parts Services,
Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−107N AR LDL SensingElement 04−31102−107N Refer toParagraph 1.G.
04−31102−108N
(See Note 2) AR LDL SensingElement 04−31102−108N Refer toParagraph 1.G.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 24 of 54

### Page 26

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−125N AR LDL SensingElement 04−31102−125N Refer toParagraph 1.G.
04−31102−129N AR LDL SensingElement 04−31102−129N Refer toParagraph 1.G.
3. The part that follows may be necessary to do PART C of this Service Bulletin for
Left Center Fuselage Overwing and is available from Bombardier Aviation Parts
Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−164A AR LDL SensingElement 04−31102−164A Refer toParagraph 1.G.
4. The part that follows may be necessary to do PART D of this Service Bulletin for
Right Center Fuselage Overwing and is available from Bombardier Aviation
Parts Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−164A AR LDL SensingElement 04−31102−164A Refer toParagraph 1.G.
5. The parts that follow may be necessary to do PART E of this Service Bulletin for
Rear Fuselage (Aft Belly Fairing) and are available from Bombardier Aviation
Parts Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−124A AR LDL SensingElement 04−31102−124A Refer toParagraph 1.G.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 25 of 54

### Page 27

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−133A AR LDL SensingElement 04−31102−133A Refer toParagraph 1.G.
6. The parts that follow may be necessary to do PART F of this Service Bulletin for
Rear Equipment Bay and are available from Bombardier Aviation Parts
Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−031A
(See Note 2) AR LDL SensingElement 04−31102−031A Refer toParagraph 1.G.
04−31102−035A AR LDL SensingElement 04−31102−035A Refer toParagraph 1.G.
04−31102−036A AR LDL SensingElement 04−31102−036A Refer toParagraph 1.G.
04−31102−059A
(See Note 2) AR LDL SensingElement 04−31102−059A Refer toParagraph 1.G.
04−31102−061A
(See Note 2) AR LDL SensingElement 04−31102−061A Refer toParagraph 1.G.
04−31102−065A AR LDL SensingElement 04−31102−065A Refer toParagraph 1.G.
04−31102−067A AR LDL SensingElement 04−31102−067A Refer toParagraph 1.G.
04−31102−079A
(See Note 2) AR LDL SensingElement 04−31102−079A Refer toParagraph 1.G.
04−31102−082A AR LDL SensingElement 04−31102−082A Refer toParagraph 1.G.
04−31102−085A AR LDL SensingElement 04−31102−085A Refer toParagraph 1.G.
04−31102−100A AR LDL SensingElement 04−31102−100A Refer toParagraph 1.G.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 26 of 54

### Page 28

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−102A AR LDL SensingElement 04−31102−102A Refer toParagraph 1.G.
04−31102−106A AR LDL SensingElement 04−31102−106A Refer toParagraph 1.G.
04−31102−109A
(See Note 2) AR LDL SensingElement 04−31102−109A Refer toParagraph 1.G.
04−31102−111A AR LDL SensingElement 04−31102−111A Refer toParagraph 1.G.
04−31102−121A
(See Note 2) AR LDL SensingElement 04−31102−121A Refer toParagraph 1.G.
04−31102−125A AR LDL SensingElement 04−31102−125A Refer toParagraph 1.G.
04−31102−128A
(See Note 2) AR LDL SensingElement 04−31102−128A Refer toParagraph 1.G.
04−31102−132A AR LDL SensingElement 04−31102−132A Refer toParagraph 1.G.
04−31102−154A
(See Note 2) AR LDL SensingElement 04−31102−154A Refer toParagraph 1.G.
04−31102−162A AR LDL SensingElement 04−31102−162A Refer toParagraph 1.G.
04−31102−171A AR LDL SensingElement 04−31102−171A Refer toParagraph 1.G.
04−31102−176A AR LDL SensingElement 04−31102−176A Refer toParagraph 1.G.
7. The part that follows may be necessary to do PART G of this Service Bulletin for
Pressurized Cabin in the Underfloor (Under the Baggage Compartment) and is
available from Bombardier Aviation Parts Services, Montreal:
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 27 of 54

### Page 29

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
04−31102−041A AR LDL SensingElement 04−31102−041A Refer toParagraph 1.G.
NOTES: 1. The part number for the item listed above is subject to change without
revision to this Service Bulletin. In case of discrepancy between this
list and any other list, the Illustrated Parts Catalog prevails and shall
be used to determine the latest part number.
2. The LDL sensing elements that follow can be replaced by more
suitable elements to ease installation.
− 04−31102−031A can be replaced by 04−31102−036A.
− 04−31102−059A can be replaced by 04−31102−065A.
− 04−31102−061A can be replaced by 04−31102−067A.
− 04−31102−079A at Left pylon can be replaced by
04−31102−082A.
− 04−31102−079A at Right pylon can be replaced by
04−31102−085A.
− 04−31102−108N can be replaced by 04−31102−107N.
− 04−31102−109A can be replaced by 04−31102−111A (2
Locations).
− 04−31102−121A can be replaced by 04−31102−125A.
− 04−31102−128A can be replaced by 04−31102−132A.
− 04−31102−154A can be replaced by 04−31102−162A.
3. If material coverage is required due to part failure, a scrap certificate
will be required. Claims will not be approved without the necessary
scrap certificate. Please see scrap certificate form attached with
Service Bulletin.
C. Material
The materials that follow, or equivalent, are necessary to do this Service Bulletin.
These can be purchased from a local supplier. Bombardier Aviation does not pay
for these consumables.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 28 of 54

### Page 30

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY SUPPLIER(SEE NOTE)
Sealing
Compound,
high
Temperature
AC−350
B−1/2, B−2 AMS 3276, CL B AsNecessary Code: A
Isopropyl
Alcohol − TT−I−735 AsNecessary Code: B
Lockwire MS20995C32 CRES 0.032 in(0.81 mm) AsNecessary Code: B
Safety Cable − SAEAS3510−0218C AsNecessary Code: B
Safety Cable,
Ferrule − SAE AS3510−02F AsNecessary Code: B
Sealing
Compound
Aircraft
Firewall,
Silicone
− AMS 3374 AsNecessary Code: B
Silicone
Compound − SAE−AS8660 AsNecessary Code: B
Tape,
Silicone
Rubber
− A−A−59163 Type I AsNecessary Code: B
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. The Curing Time (CT), if applicable, for each consumable material is
indicated with the description of each product.
3. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 29 of 54

### Page 31

SUPPLIERS ADDRESSES BY CODES
Code: A
3M Specialty Adhesives
3211 Chestnut Expressway E.
Springfield, MO
U.S.A., 68502
Tel.: (417) 869−3501
www.3M.com
Code: B
Commercially Available
D. Publications
No Publications required.
MODEL BD−100−1A10 (CH−300)
Basic Issue: Dec 23/2022 100−36−10
Page 30 of 54

### Page 32

ELEMENT P/N
APPENDIX A − TEST RESULTS
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
ELEMENT S/N
PART A − WING ANTI−ICE − DUAL LOOPS
LOCATION: LEFT WING
FIGURE 10
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Wing tip
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
1.1
1.2
2.1
2.2
3.1
3.2
04−31102−108N/107N
04−31102−108N/107N
04−31102−108N/107N
04−31102−108N/107N
04−31102−129N
04−31102−129N
04−31102−129N
04−31102−129N
04−31102−125N
04−31102−125N
04−31102−125N
04−31102−125N
Wing root
Left wing shown, the right wing is identical
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 1 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 31 of 54

### Page 33

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART B − WING ANTI−ICE − DUAL LOOPS
LOCATION: RIGHT WING
FIGURE 10
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Wing tip
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
4.1
4.2
5.1
5.2
6.1
6.2
Wing root
04−31102−108N/107N
04−31102−108N/107N
04−31102−108N/107N
04−31102−108N/107N
04−31102−125N
04−31102−125N
04−31102−125N
04−31102−125N
04−31102−129N
04−31102−129N
04−31102−129N
04−31102−129N
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 2 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 32 of 54

### Page 34

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART C − WING ANTI−ICE − DUAL LOOPS
LOCATION: LEFT CENTER FUSELAGE − ABOVE THE WING
FIGURE 9
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Fus.Sta. 501
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
7.1
7.2
7.3
7.4
7.5
7.6
Fus.Sta. 587
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
7.7
7.8
7.9
Fus.Sta. 636
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 3 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 33 of 54

### Page 35

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART D − WING ANTI−ICE − DUAL LOOPS
LOCATION: RIGHT CENTER FUSELAGE − ABOVE THE WING
FIGURE 9
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Fus.Sta. 501
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
8.1
8.2
8.3
8.4
8.5
8.6
Fus.Sta. 587
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
8.7
8.8
8.9
Fus.Sta. 636
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
04−31102−164A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 4 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 34 of 54

### Page 36

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART E − WING ANTI−ICE − DUAL LOOPS
LOCATION: LEFT CENTER FUSELAGE − ABOVE THE WHEEL WELL − CROSSOVER DUCT
FIGURE 9
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Fus.Sta. 636
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
9.1
9.2
9.3
9.4
9.5
9.6
04−31102−133A
04−31102−133A
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
9.7
9.8
9.9
Fus.Sta. 695 − skin connector
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
04−31102−133A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 5 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 35 of 54

### Page 37

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART E − WING ANTI−ICE − DUAL LOOPS
LOCATION: RIGHT CENTER FUSELAGE − ABOVE THE WHEEL WELL − CROSSOVER DUCT
FIGURE 9
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Fus.Sta. 636
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
10.1
10.2
10.3
10.4
10.5
10.6
04−31102−124A
04−31102−124A
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
10.7
10.8
10.9
Fus.Sta. 695 − skin connector
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
04−31102−124A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 6 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 36 of 54

### Page 38

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART F − WING ANTI−ICE − DUAL LOOPS
LOCATION: LEFT REAR EQUIPMENT BAY
FIGURE 9
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Fus.Sta. 695 − skin connector just AFT of AFT pressure bulkhead
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
11.1
11.2
11.3
11.4
11.5
11.6
04−31102−079A/082A
04−31102−061A/067A
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
11.7
11.8
11.9
HPV
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
12.1
12.2
12.3
Engine port (HP)
04−31102−079A/082A
04−31102−035A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−061A/067A
04−31102−079A/082A
04−31102−035A
04−31102−079A/082A
04−31102−035A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 7 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 37 of 54

### Page 39

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART F − WING ANTI−ICE − DUAL LOOPS
LOCATION: RIGHT REAR EQUIPMENT BAY
FIGURE 9
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Fus.Sta. 695 − skin connector just AFT of AFT pressure bulkhead
13.1
13.2
13.3
13.4
11.5
13.6
04−31102−079A/085A
04−31102−059A/065A
13.7
13.8
13.9
HPV
14.1
14.2
14.3
Engine port (HP)
04−31102−079A/085A
04−31102−031A/036A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−059A/065A
04−31102−079A/085A
04−31102−031A/036A
04−31102−079A/085A
04−31102−031A/036A
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 1
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 8 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 38 of 54

### Page 40

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART F − TRIM LINE − SINGLE LOOP
LOCATION: LEFT REAR EQUIPMENT BAY
FIGURE 6 for 4−31102−106A/102A
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Ozone converter level
04−31102−106A/102A
04−31102−106A/102A
04−31102−100A
04−31102−100A
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
FIGURE 7 for 4−31102−100A AND 4−31102−109A/111A
15.1
15.2
15.3
15.4
15.5
15.6
15.7
15.8
15.9
16.1
16.2
16.3
16.4
16.5
16.6
16.7
16.8
Precooler level
04−31102−106A/102A
04−31102−106A/102A
04−31102−106A/102A
04−31102−106A/102A
04−31102−106A/102A
04−31102−106A/102A
04−31102−106A/102A
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
AFT pressure bulkhead
04−31102−109A/111A
04−31102−109A/111A
16.9
17.1
17.2
17.3
17.4
17.5
17.6
17.7
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
17.8
17.9
IASC 2
IASC 2
04−31102−100A
04−31102−100A
04−31102−100A
04−31102−100A
04−31102−100A
04−31102−100A
04−31102−100A
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 9 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 39 of 54

### Page 41

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART F − RH BLEED − SINGLE LOOP
LOCATION: RIGHT REAR EQUIPMENT BAY 
FIGURE 5
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
APU
04−31102−154A/162A
04−31102−154A/162A
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
18.1
18.2
18.3
18.4
18.5
18.6
18.7
18.8
18.9
19.1
19.2
19.3
19.4
19.5
19.6
19.7
19.8
HPGC
04−31102−121A/125A
04−31102−121A/125A
04−31102−121A/125A
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
19.9 IASC 2
04−31102−154A/162A
T−junction above the HPGC
Engine port for starter
T−junction FWD of the IPV on the RH side (crossover duct)
04−31102−128A/132A
04−31102−128A/132A20.1
20.2
20.3
20.4
20.5
20.6
20.7
20.8
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
IASC 2
20.9 IASC 2
04−31102−128A/132A
FCV level on the LH side
04−31102−128A/132A
04−31102−128A/132A
04−31102−128A/132A
04−31102−128A/132A
04−31102−128A/132A
04−31102−128A/132A
04−31102−154A/162A
04−31102−154A/162A
04−31102−154A/162A
04−31102−154A/162A
04−31102−154A/162A
04−31102−154A/162A
04−31102−121A/125A
04−31102−121A/125A
04−31102−121A/125A
04−31102−121A/125A
04−31102−121A/125A
04−31102−121A/125A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 10 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 40 of 54

### Page 42

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART F − LH BLEED − SINGLE LOOP
LOCATION: LEFT REAR EQUIPMENT BAY
FIGURE 6
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
Engine port for starter
IASC 1
IASC 1
IASC 1
21.1
21.2
21.3
FCV
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
IASC 1
IASC 1
IASC 1
21.4
21.5
21.6
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
IASC 1
IASC 1
IASC 1
21.7
21.8
21.9
04−31102−109A/111A
04−31102−109A/111A
04−31102−109A/111A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 11 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 41 of 54

### Page 43

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART F − PACK − DUAL LOOPS
LOCATION:LEFT REAR EQUIPMENT BAY
FIGURE 6
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
FCV
22.1
22.2
22.3
22.4
22.5
22.6
22.7
22.8
22.9
Precooler
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
IASC 2
IASC 1
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
04−31102−176A
04−31102−171A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 12 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 42 of 54

### Page 44

ELEMENT P/N
APPENDIX A − TEST RESULTS
ELEMENT S/N
PART G − TRIM LINE − SINGLE LOOP
LOCATION: UNDER BAGGAGE COMPARTMENT FLOOR (FWD OF AFT PRESSURE BULKHEAD)
FIGURE 8
TEST
POINT NO.
IASC
CHANNEL PASS/FAIL DATE & STAMPS
IASC 2
IASC 2
IASC 2
23.1
23.2
23.3
04−31102−041A
04−31102−041A
04−31102−041A
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL BD−100−1A10 (CH−300)
Appendix A − Test Results Sheet
Figure 1 (Sheet 13 of 13)
Basic Issue: Dec 23/2022 100−36−10
Page 43 of 54

### Page 45

APPENDIX B − TEST MATRIX
04−31102−108N 108 20001 to 20500
04−31102−164A 164 20001 to 20500
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
PART A − LEFT WING
ANTI−ICE − LEFT WING
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
ANTI−ICE − RIGHT WING
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
PART B − RIGHT WING
PART C − LEFT CENTER FUSELAGE (OVER−WING)
20001 to 2050004−31102−129N
04−31102−125N
129
125 20001 to 20500
04−31102−108N 108 20001 to 20500
20001 to 2050004−31102−129N
04−31102−125N
129
125 20001 to 20500
ANTI−ICE − LEFT FUSELAGE
04−31102−164A 164 20001 to 20500
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
PART D − RIGHT CENTER FUSELAGE (OVER−WING)
ANTI−ICE − RIGHT FUSELAGE
04−31102−124A 124 20001 to 20500
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
ANTI−ICE − RIGHT FUSELAGE
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
PART E − REAR FUSELAGE (AFT BELLY FAIRING)
PART F − REAR EQUIPMENT BAY
20001 to 2050004−31102−133A 133ANTI−ICE − LEFT FUSELAGE
04−31102−109A 109 20001 to 20155
04−31102−111A 111 20156 to 20500
AIR CONDITIONING − LH BLEED LOOP
AIR CONDITIONING − RH BLEED LOOP
04−31102−121A 121 20001 to 20155
04−31102−125A 125
04−31102−128A
04−31102−154A
128
154
20001 to 20155
20001 to 20155
20156 to 20500
04−31102−162A 162 20156 to 20500
04−31102−132A 132 20156 to 20500
AIR CONDITIONING − PACK LOOP A 04−31102−171A 171 20001 to 20500
AIR CONDITIONING − PACK LOOP B 04−31102−176A 176 20001 to 20500
MODEL BD−100−1A10 (CH−300)
Appendix B − Test Matrix
(Sheet 1 of 2)
Basic Issue: Dec 23/2022 100−36−10
Page 44 of 54

### Page 46

APPENDIX B − TEST MATRIX
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
PART F − REAR EQUIPMENT BAY
04−31102−102A 102 20114, 20116 to 20500
04−31102−109A
04−31102−111A
109
111
20001 to 20155
20156 to 20500
04−31102−100A 100 20001 to 20500
04−31102−106A 106 20001 to 20113, 20115
AIR CONDITIONING − TRIM LOOP
04−31102−035A 035 20001 to 20500ANTI−ICE − LH PYLON (UPPER)
04−31102−031A
04−31102−036A
031
036
20001 to 20155
20156 to 20500ANTI−ICE − RH PYLON (UPPER)
04−31102−061A 061 20001 to 20155
20156 to 2050004−31102−067A 067
ANTI−ICE − LH PYLON (LOWER)
20001 to 20155
04−31102−079A
059
20156 to 20500
04−31102−082A
065
20001 to 20155
20156 to 20500
20001 to 2015504−31102−079A 079
20156 to 2050004−31102−085A 085
SYSTEM ELEMENT P/N LENGTH (in) EFFECTIVITY
PART G − UNDER BAGGAGE COMPARTMENT FLOOR
AIR CONDITIONING − TRIM LOOP 04−31102−041A 041 20001 to 20500
ANTI−ICE − RH PYLON (LOWER)
ANTI−ICE − LEFT FUSELAGE
04−31102−059A
04−31102−065A
ANTI−ICE − RIGHT FUSELAGE
079
082
MODEL BD−100−1A10 (CH−300)
Appendix B − Test Matrix
(Sheet 2 of 2)
Basic Issue: Dec 23/2022 100−36−10
Page 45 of 54

### Page 47

APPENDIX C − BLEED LEAK DETECTION ELEMENT LOCATIONS
SYSTEM
NOTE: The part numbers listed in the second column correspond to the current production configuration.
PART A − LEFT WING
SINGLE OR
DUAL LOOP
NUMBER
OF TEST POINTS
2
2
2
ANTI−ICE − LEFT WING Dual Loop
Dual Loop
Dual Loop
SYSTEM
PART B − RIGHT WING
SINGLE OR
DUAL LOOP
NUMBER
OF TEST POINTS
2
2
2
ANTI−ICE − RIGHT WING Dual Loop
Dual Loop
Dual Loop
SYSTEM
PART C − LEFT CENTER FUSELAGE (OVER−WING)
SINGLE OR
DUAL LOOP
NUMBER
OF TEST POINTS
9ANTI−ICE − LEFT FUSELAGE Dual Loop
SYSTEM
PART D − RIGHT CENTER FUSELAGE (OVER−WING)
SINGLE OR
DUAL LOOP
NUMBER
OF TEST POINTS
9ANTI−ICE − RIGHT FUSELAGE Dual Loop
SYSTEM
PART E − REAR FUSELAGE (AFT BELLY FAIRING)
SINGLE OR
DUAL LOOP
NUMBER
OF TEST POINTS
ANTI−ICE − RIGHT FUSELAGE 9 Dual Loop
9 Dual LoopANTI−ICE − LEFT FUSELAGE
Number of test points − Air conditioning and Anti−Ice (ACS and AIPS)
1. Unless otherwise noted, for each sensing element, nine (9) test points are required: 3 test points located no less
than 1 inch away from one end/connector, 3 test points in the middle and 3 points no less than 1 inch away from
the other end/connector.
2. For dual loop configuration, the nine test points can be tested at the same time for the two sensing elements.
3. For N type elements in dual loop configuration in the wing leading edge, one test is sufficient at each end of the
element, for a total of two (2) test points.
4. For a single element in parallel with a dual element, refer to Special Case in Figure 4.
ELEMENT P/N
04−31102−125N
04−31102−129N
04−31102−108N
ELEMENT P/N
04−31102−125N
04−31102−129N
04−31102−108N
ELEMENT P/N
04−31102−164A
ELEMENT P/N
04−31102−164A
ELEMENT P/N
04−31102−124A
04−31102−133A
MODEL BD−100−1A10 (CH−300)
Appendix C − Bleed Leak Detection Elements Locations
(Sheet 1 of 2)
Basic Issue: Dec 23/2022 100−36−10
Page 46 of 54

### Page 48

APPENDIX C − BLEED LEAK DETECTION ELEMENT LOCATIONS
SYSTEM
NOTE: The part numbers listed in the second column correspond to the current production configuration.
PART G − UNDER BAGGAGE COMPARTMENT FLOOR
SINGLE OR
DUAL LOOP
NUMBER OF
TEST POINTS
Dual Loop
ELEMENT P/N
04−31102−041AAIR CONDITIONING − TRIM LOOP 3
SYSTEM
PART F − REAR EQUIPMENT BAY
SINGLE OR
DUAL LOOP
NUMBER OF
TEST POINTS
9 Single LoopAIR CONDITIONING − LH BLEED LOOP
9 Single Loop
9 Single Loop
9 Single Loop
9 Dual LoopAIR CONDITIONING − PACK LOOP AAIR CONDITIONING − PACK LOOP B
9 Single Loop
9 Single Loop
9 Single Loop
AIR CONDITIONING − TRIM LOOP
AIR CONDITIONING − RH BLEED LOOP
ELEMENT P/N
04−31102−109A/111A
04−31102−121A/125A
04−31102−154A/162A
04−31102−171A
04−31102−176A
04−31102−100A
04−31102−109A/111A
12
04−31102−035AANTI−ICE − LH PYLON (UPPER)
04−31102−079A/085A
04−31102−031A/036AANTI−ICE − RH PYLON (UPPER)
12
ANTI−ICE − RH PYLON (LOWER)
04−31102−061A/067A
04−31102−079A/082A
ANTI−ICE − LEFT FUSELAGE
ANTI−ICE − LH PYLON (LOWER)
04−31102−059A/065AANTI−ICE − RIGHT FUSELAGE
04−31102−106A/102A
04−31102−128A/132A
Total : 147 (39 in fuselage,
96 in AEB
and 12 in wing)
Special
case, see
Figure 4.
Special
case, see
Figure 4.
MODEL BD−100−1A10 (CH−300)
Appendix C − Bleed Leak Detection Elements Locations
(Sheet 2 of 2)
Basic Issue: Dec 23/2022 100−36−10
Page 47 of 54

### Page 49

SB350−36−003_005
NUMBER OF TEST POINTS
LEGEND
Test points
One element in parallel with 2 elements for the anti−ice ducts located in the AEB.
NOTE
1
1
LOWER
SKIN ENGINE
WING/FUSELAGE LOOP
LH : 04−31102−067A or 061A
RH : 04−31102−065A or 059A
WING/PYLON LOOP
LH : 04−31102−082A or 079A
RH : 04−31102−085A or 079A
PYLON LOOP
LH : 04−31102−035A
RH : 04−31102−036A or 031A
MODEL BD−100−1A10 (CH−300)
Special Cases − Test Locations
Figure 4
Basic Issue: Dec 23/2022 100−36−10
Page 48 of 54

### Page 50

SB350−36−003_011
04−31102−132A (OR) 128A
(RH BLEED LOOP)
(CROSSOVER DUCT)
04−31102−162A (OR) 154A
(RH BLEED LOOP)
04−31102−125A (OR) 121A
(RH BLEED LOOP)
AIR CONDITIONING − RH SIDE, FROM APU TO RH IP PORT
AND RH STARTER AND LH SIDE
MODEL BD−100−1A10 (CH−300)
Air Conditioning System − Test Locations
Figure 5
Basic Issue: Dec 23/2022 100−36−10
Page 49 of 54

### Page 51

SB350−36−003_012
04−31102−171A
04−31102−176A
(DUAL LOOPS − PACK LOOPS)
04−31102−111A (OR) 109A
(LH BLEED LOOP)
04−31102−102A (OR) 106A
(TRIM LOOP)
AIR CONDITIONING − RH SIDE, LH IP PORT, LH STARTER TO PRECOOLER
MODEL BD−100−1A10 (CH−300)
Air Conditioning System − Test Locations
Figure 6
Basic Issue: Dec 23/2022 100−36−10
Page 50 of 54

### Page 52

SB350−36−003_013
04−31102−111A (OR) 109A
(TRIM LOOP)
04−31102−100A
(TRIM LOOP)
AIR CONDITIONING − TRIM LINE AEB
MODEL BD−100−1A10 (CH−300)
Air Conditioning System − Test Locations
Figure 7
Basic Issue: Dec 23/2022 100−36−10
Page 51 of 54

### Page 53

SB350−36−003_014
04−31102−041A
(TRIM LOOP)
AIR CONDITIONING − TRIM LINE UNDER BAGGAGE COMPARTMENT FLOOR
(FWD OF PRESSURE BULKHEAD)
MODEL BD−100−1A10 (CH−300)
Air Conditioning System − Test Locations
Figure 8
Basic Issue: Dec 23/2022 100−36−10
Page 52 of 54

### Page 54

SB350−36−003_021
ANTI − ICE
04−31102−164A
(QTY 4)
LH: 04−31102−133A (QTY 2)
RH: 04−31102−124A (QTY 2)
04−31102−067A (OR) 061A
04−31102−082A (OR) 079A
04−31102−035A
(PYLON LOOP)
04−31102−036A (OR) 031A
(PYLON LOOP)
04−31102−065A (OR) 059A
04−31102−085A (OR) 079A
BLEED LEAK ELEMENT
CONNECTION AT FS636.30
HP DUCT CONNECTION
AT FS650.60
MODEL BD−100−1A10 (CH−300)
Anti−Ice Protection System − Test Locations
Figure 9
Basic Issue: Dec 23/2022 100−36−10
Page 53 of 54

### Page 55

04−31102−125N (QTY 2)
(INBOARD ELEMENT)
04−31102−129N (QTY 2)
(MID ELEMENT)
04−31102−107N (OR) 108N (QTY 2)
(OUTBOARD ELEMENT)
SB350−36−003_022
ANTI−ICE − WING
(LH SHOWN, RH SIMILAR)
MODEL BD−100−1A10 (CH−300)
Anti−Ice Protection System − Test Locations
Figure 10
Basic Issue: Dec 23/2022 100−36−10
Page 54 of 54

### Page 56

100−36−10 Basic Dec 23/2022
SPECIAL CHECK – BLEED−AIR LEAK−DETECTION SYSTEM –
FUNCTIONAL CHECK OF BLEED LEAK−DETECTION ELEMENTS
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 57

SERVICE BULLETIN INCORPORATION SHEET − "100−36−10"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
100−36−10 Basic
COMPLIED WITH
YES    NO    N/A
PART A
PART B
PART C
PART D
PART E
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
