# Bombardier Service Bulletin 350-25-002

Copy: No revision named ("SB 350 25 002 Basic Issue 2015 10 26"), 21 pages: PDF https://openairdocs.org/files/sha256/f1/8d/f18d83f509e5ab54fbd56c1f73e9c5dd6a29ceae262bd25a20ede094d95a8818; text https://openairdocs.org/service-documents/bombardier/sb-350-25-002/file/f18d83f509e5.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2016-9387; AD 2017-12-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 350-25-002
- Page: https://openairdocs.org/service-documents/bombardier/sb-350-25-002

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-12-11](https://openairdocs.org/ad/2017-12-11.md), effective Jul 20, 2017: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-350-25-002/proposed.md).

## Text (21 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2016-9387; AD 2017-12-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

MODIFICATION - EQUIPMENT RACKS - MODIFICATION OF THE RIGHT EQUIPMENT
RACK
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
within 96 months from this
Service Bulletin release date
(Basic Issue)
EFFECTIVITY: A/C Serial No. 20501 to 20532
MANPOWER: 5 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
To place an order for parts or kits, please call Bombardier Aerospace Parts Services
at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
www.cic.bombardier.com
MODEL BD−100−1A10 (CH−350)
ATA 25−72
EQUIPMENT/FURNISHINGS
Basic Issue: Oct 26/2015 350−25−002
Page 1 of 1
This Service Bulletin is available at:

### Page 2

MODIFICATION - EQUIPMENT RACKS - MODIFICATION OF THE RIGHT EQUIPMENT
RACK
1. PLANNING INFORMATION
NOTE: It is recommended to do this modification at the 96−month inspection.
A. Effectivity
BD−100−1A10 aircraft, Serial No. 20501 to 20532.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aerospace Service Bulletin(s).
Before you do this bulletin, examine all STC, STA or equivalent action
changes to make sure that this bulletin can be completed.
B. Reason
It was found that the Secondary Power Center (SPC) is heavier than designed. This
can cause stress on the equipment rack structure.
This Service Bulletin installs a doubler on the structure of the rack, which increases
the strength of the structure to sustain the increased structural load of the heavier
SPC.
C. Description
This Service Bulletin gives instructions to install doubler and packers on the right
equipment rack.
SERVICE BULLETIN
www.cic.bombardier.com
MODEL BD−100−1A10 (CH−350)
ATA 25−72
EQUIPMENT/FURNISHINGS
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2015 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Oct 26/2015 350−25−002
Page 1 of 18
This Service Bulletin is available at:

### Page 3

D. Compliance
Recommended in less than 96 months from this Service Bulletin release date
(Basic Issue).
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA in
accordance with established procedures.
F. Manpower
NOTES: 1. The man−hours given are estimates to help you schedule the tasks
given in this bulletin. The estimates are for direct labor performed by
an experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower estimates, refer to SB
350−00−002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the labor estimates and should be considered
for planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at
the next 96−months inspection or next earlier access. Therefore no
man−hours are allotted to prepare the aircraft for maintenance, to
prepare for this Service Bulletin or access other than the one
specified in this service bulletin.
5 man−hours are necessary to do this modification.
The labor required to do this Service Bulletin is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
− this Service Bulletin is done at the next 96−month inspection or next earlier
access.
NOTE: No labor hours will be covered for access (i.e interior removal/installation)
based on the fact that the modification will be done at the next 96−month
inspection or next earlier access.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 2 of 18

### Page 4

G. Material − Cost and Availability
Kit 100K25−39A is necessary to do this modification.
KIT NO. PRICE
100K25−39A
Please contact Bombardier Aerospace
Parts Services, in Montreal, for delivery
lead times and confirmation of prices.
This kit is available at no cost, if a no−charge purchase order is sent to Bombardier
Aerospace in less than 96−months from this Service Bulletin release date (Basic
Issue).
During or after the above free period, Smart Parts Plus does not pay for the kit.
H. Tooling
The equipment and tools listed below are necessary to do this modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
Commercially Available − Wrench, Torque
NOTES: 1. Refer to the CH350 BD−100 Illustrated Tool and Equipment Manual
(ITEM) to make sure that you use the correct equipment
configuration.
2. Refer to the Liability Statement in the ITEM for acceptable GSE
equivalents.
I. Weight and Balance
WEIGHT MOMENT
+0.123 pound (+0.056 kg) +42.28 pound−inches (+0.49 kgm)
J. Electrical Load Data
No change.
K. References
− Bombardier Aerospace, Restriction and/or Special Instruction (RSI),
C−100−000−25−0029, Rev. −−.
− Bombardier Aerospace, Modification Summary, BB100T010755, Rev. C.
− Bombardier Aerospace, Standard Practices Manual (SPM), Chapters 20 and 51.
− Bombardier Aerospace, Kit Drawing K1000070316, Rev. A.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 3 of 18

### Page 5

− Bombardier Aerospace, SB 350−00−002, Service Bulletin Description and
Policy.
− CH350 BD−100 Aircraft Maintenance Manual (AMM), Chapters 6, 21, 24 and
25.
− CH350 BD−100 Structural Repair Manual (SRM), Chapter 51.
L. Other Publications Affected
None.
M. Equivalent Service Bulletin
For the Challenger 300 aircraft , use SB 100−25−39
2. ACCOMPLISHMENT INSTRUCTIONS
NOTE: All references made to zones, access panels and/or doors, are from the
Challenger 350 AMM, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Remove the electrical power from the aircraft. Refer to
AMM 24−00−00−861−802.
(3) Remove the access panels that follows. Refer to AMM 25−72−01−000−803.
(a) 222BZ
(b) 222AZ
(4) Remove the bolts, Part No. NAS6604−4 (10), NAS6604−3 (1) and
NAS1297−4−3 (3), washers, Part No. MS21299C4 (9) and (2), U312−0130−S
(4), B0202013S2118−32 (5) and B0202013S2118−60 (6), and remove the
fittings 1005336308−007 (6) and the plate 1005331412−003 (7). Refer to
Figure 1.
(5) Remove the bolts, Part No NAS1801−3−9 (1) and the washers, Part No.
NAS1149D0332J (2), and remove the clamps, Part No. MS21919WDG14 (4).
Move the flight−compartment gasper feed duct (4) away from the work area.
Refer to Figure 2.
(6) Remove the ground stud and washers, and disconnect the bonding jumper.
(7) Remove part of the tape and lift the drip tray away from the work area.
(8) Remove the harnesses from the attachment point, and keep hardware for later
installation.
(9) Remove any insulation blanket to get access as required. Refer to
AMM 25−80−21−000−801.
(10) Make sure to protect all electrical/electronic equipment and wiring from debris.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 4 of 18

### Page 6

B. Modification
NOTE: On Drawing K1000070316, only installation K1000070316−004 is
required for this Service Bulletin.
(1) Remove the rivets (12), and remove the stand−off lug (11). Refer to Figure 1.
(2) Remove the hi−lites that attaches angle Part No. 1005336361−011 to aft
sidewall. Refer to SRM 51−42−36 and drawing K1000070316, page 1,
Pre−Mod view.
(3) Remove the blind ground stud.
NOTE: Make sure to remove the sleeve. Final diameter of the hole in 0.312
in. (7.92 mm).
(4) Put the packers Part No. K1000070316−005 and K1000070316−006, and the
doubler Part No. K1005336304−002 in position with clamps. Refer to drawing
K1000070316, Sheet 2, Detail J.
(5) Make sure you have correct edge distance, and a minimum of 0.19 in (4.83
mm) at both end.
(6) Backdrill six holes from the doubler to the top of the machined sidewall, to a
diameter of 0.160 to 0.164 in (4.06 to 4.17 mm). Refer to drawing
K1000070316, Sheet 2,View H.
(7) Backdrill two holes from the top of the machined sidewall and upper angle
through the doubler and the packer, to a diameter of 0.159 to 0.162 in. (4.039
to 4.115 mm). Refer to drawing K1000070316, Sheet 2,View H.
(8) Backdrill two holes from the machined sidewall and upper angle through the
packer and the doubler, to a diameter of 0.159 to 0.162 in (4.039 to 4.115 mm).
Refer to drawing K1000070316, Sheet 2,View G.
(9) Backdrill four holes from the doubler through the machined sidewall to a
diameter of 0.160 to 0.164 in (4.06 to 4.17 mm). Refer to drawing
K1000070316, Sheet 2,View G.
(10) Drill hole for ground in the middle of the previous hole for ground in the
machined sidewall through the doubler to a diameter of 0.189 to 0.192 in (4.81
to 4.87 mm).
(11) Remove the doubler and the packers.
(12) Countersink the six holes in the doubler for installation of rivets B0205018AD5.
Refer to drawing K1000070316, Sheet 2,View H.
(13) Remove burrs and sharp edges.
(14) Touch up holes (except the hole for the ground) with chemical conversion
coating.
(15) Install doubler and packers on the machine sidewall and angle with rivets Part
No. MS20470AD5−6A, B0205018AD5−5S, and hi−lites B02060001AG5−4 with
collars B0203013−08. Refer to drawing K1000070316, Sheet 2, views G and
H, SRM 51−42−36, and SRM 51−42−08.
(16) Install the removed stand−off lug (11) with the rivets, Part no.
B0205018AD4−5S (12). Refer to Figure 1.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 5 of 18

### Page 7

(17) Touch up fastener heads with primer and topcoat, finish code X186. Refer to
SRM 51−01−04.
(18) Prepare the surface around the hole for ground return. Refer to
SPM−MM 51−80−00−140−801.
(19) Install the screw Part No. MS35207−266, the lockwasher Part No.
MS35338−43, the washers Part No. NAS1149D0332J and
B0202013S1320−63, and the nut MS35650−302 and connect the bonding
strap. Refer to SPM−MM 51−80−00−400−801. Torque the nut from 16 to 22 lbf
in (1.81 to 2.48 Nm).
C. Close−out
(1) Install the drip tray with tape.
NOTE: It is permissible to have a gap under the drip tray. It is also
permissible to cold work the drip tray. Refer to Note 11 and
SRM 51−28−32.
(2) Install the fittings 1005336308−007 (8) and the plate 1005331412−003 (7) with
the bolts, Part No. NAS6604−4 (10), NAS6604−3 (1) and NAS1297−4−3 (3),
washers, Part No. MS21299C4 (9) and (2), U312−0130−S (4),
B0202013S2118−32 (5) and B0202013S2118−60 (6). Torque the bolts (10)
and (1) from 70 to 90 lbf in (7.91 to 10.16 Nm) and the bolt (3) from 50 to 70 lbf
in (5.65 to 7.90 Nm). Refer to Figure 1.
(3) Put the flight−compartment gasper feed duct (4) back in position with the
clamps, Part No. MS21919WDG14 (3), the screw, Part No NAS1801−3−9 (1)
and the washers, Part No. NAS1149D0332J (2). Torque the bolt from 22.5 to
27.5 lbf in (2.55 to 3.10 Nm). Refer to Figure 2.
(4) Install the harnesses to their attachment points, with kept hardware.
(5) Install any insulation blanket removed to get access. Refer to
AMM 25−80−21−400−801.
(6) Remove all tools, equipment and unwanted materials from the aircraft.
(7) Install the access panels that follows. Refer to AMM 25−72−01−400−803:
(a) 222AZ
(b) 222BZ
D. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
In an effort to improve the quality of our technical communications, we are
requesting your feedback. Please take a moment to fill out our easy on−line Service
Bulletin survey:
http://csefeedback.aero.bombardier.com
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 6 of 18

### Page 8

3. MATERIAL INFORMATION
A. Kit
Kit 100K25−39A is necessary to do this modification and contains the parts that
follow:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
1005336304−002 1 Doubler (RH) − −
B0202013S1320−63 1 Washer − −
B0203013−08 5 Collar − −
B0205018AD4−5S 3 Solid Rivet − −
B0205018AD5−5S 8 Solid Rivet − −
B0206001AG5−4 5 Hi−lite − −
K1000070316−005 1 VerticalPacker − −
K1000070316−006 1 Packer − −
MS20470AD5−6 5 Solid Rivet − −
MS35207−266 1 Screw − −
MS35338−43 1 Lockwasher − −
MS35650−302 1 Nut − −
NAS1149D0332J 1 Washer − −
NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit
Parts List contained in the respective kit, then the later list prevails.
2. The actual quantity for some of the hardware contained in the kit can
be greater than the amount shown in the table as these items are
supplied in prepackaged quantities.
B. Parts
No parts required.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 7 of 18

### Page 9

C. Material
The materials that follow, or equivalent, are necessary to do this Service Bulletin.
These can be purchased from a local supplier. Bombardier Aerospace does not pay
for these consumables.
DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER
(SEE
NOTE)
Polyurethane
Topcoat
CT: 6 hours
− BAMS 565−002 As Necessary Code: A
Primer, Epoxy
CT: 3.5 hours − BAMS 565−001 As Necessary Code: A
Tape,
Pressure
Sensitive
LT−16 − As Necessary Code: B
Tape,
Pressure
Sensitive
P−55 − As Necessary Code: C
Aliphatic
Naphtha − TT−N−95, TypeII As Necessary Code: D
Coating
Chemical
Conversion
Alodine
1200S
MIL−DTL−81706,
Class 1A As Necessary Code: D
Coating
Chemical
Conversion,
Electrically
Conductive
Alodine 1000 MIL−DTL−81706,Class 3 As Necessary Code: D
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. The Curing Time (CT), if applicable, for each consumable material is
indicated with the description of each product.
3. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 8 of 18

### Page 10

SUPPLIERS ADDRESSES BY CODES
Code: A
Tempo Aerospace.
205 Fenmar Dr.
North York, ON, Canada
M9L 2X4
Tel.: (416) 746−2233
Tel.: (416) 746−2235
www.tempo−aeropace.com
Code: B
3M Canada (3M Polyfab)
7381 Pacific Circle
Mississauga, ON, Canada
L5T 2A3
Tel.: (905) 564−9700
Tel.: (905) 564−8886
www.3m.com
Code: C
Orcon Aeropace
1570 Atlantic Street
Union City, CA 94587−2040
U.S.A.
Tel.: (510) 489−8100
Fax: (510) 489−0489
www.orcon−aeropace.com
Code: D
Commercially Available
D. Publications
No publications required.
MODEL BD−100−1A10 (CH−350)
Basic Issue: Oct 26/2015 350−25−002
Page 9 of 18

### Page 11

E
11
12
C
C
BSB25002_001
9
2
6
5
3
D
10 1
4
7
8
Bolt
Washer
3
4
LEGEND
Washer5
Washer6
Fitting8
Washer9
10 Bolt
11
12
Stand−Off Lug
Rivet
Bolt
Washer2
Plate7
D
E
1
MODEL BD−100−1A10 (CH−350)
Figure 1 − Fitting and Stand−Off Removal/Installation
Basic Issue: Oct 26/2015 350−25−002
Page 10 of 18

### Page 12

CSB22539_003
4
3
2
1
A
A
B
B
B
Clamp
Gasper Feed Duct
3
4
LEGEND
Bolt
Washer
1
2
MODEL BD−100−1A10 (CH−350)
Figure 2 − Gasper Feed Duct
Basic Issue: Oct 26/2015 350−25−002
Page 11 of 18

### Page 13

K1000070316A S2−S −S1−PL 
MODEL BD−100−1A10 (CH−350)
PLK1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 1 of 3, Rev. A)
Basic Issue: Oct 26/2015 350−25−002
Page 12 of 18

### Page 14

MODEL BD−100−1A10 (CH−350)
PLK1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 2 of 3, Rev. A)
Basic Issue: Oct 26/2015 350−25−002
Page 13 of 18

### Page 15

K1000070316A S2−S −S3−PL 
MODEL BD−100−1A10 (CH−350)
PLK1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 3 of 3, Rev. A)
Basic Issue: Oct 26/2015 350−25−002
Page 14 of 18

### Page 16

K1000070316A S1−1 
K1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 1 of 2, Rev. A)
Basic Issue: Oct 26/2015 350−25−002
Page 15 of 18

### Page 17

K1000070316A S1−2 
K1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 1 of 2, Rev. A, continued)
Basic Issue: Oct 26/2015 350−25−002
Page 16 of 18

### Page 18

K1000070316A S2−1 
K1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 2 of 2, Rev. A)
Basic Issue: Oct 26/2015 350−25−002
Page 17 of 18

### Page 19

K1000070316A S2−2 
K1000070316 − Kit − LH and RH Equipment Rack Reinforcement
(Sheet 2 of 2, Rev. A, continued)
Basic Issue: Oct 26/2015 350−25−002
Page 18 of 18

### Page 20

350−25−002 Basic Oct 26/2015
Modification − Equipment Racks − Modification of the Right Equipment Rack
In an effort to improve the quality of our technical communications, we are replacing the
standard Service Bulletin Evaluation Form with an on−line Service Bulletin Survey
and we are requesting your feedback. Please take a moment to fill out our easy on−line
Service Bulletin survey at:
http://csefeedback.aero.bombardier.com
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:

### Page 21

SERVICE BULLETIN INCORPORATION SHEET − "350−25−002"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If your aircraft is registered on CAMP and you are reporting to them,
please do not send the incorporation sheet to Bombardier. If your aircraft
is on another tracking system, please contact Bombardier to make
arrangements for automated data submission.
350−25−002 Basic
COMPLIED WITH
YES    NO    N/A
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
