# Bombardier Service Bulletin 60-57-7

Copy: No revision named ("U.S. DOT/FAA - SB 60-57-7"), 19 pages: PDF https://openairdocs.org/files/sha256/6c/0f/6c0f0260591d2e5ef40044463cf9cc8938a7b2a7795a0dcbd17c4a65e2a758f5; text https://openairdocs.org/service-documents/bombardier/sb-60-57-7/file/6c0f0260591d.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2013-0214; AD 2013-13-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 60-57-7
- Page: https://openairdocs.org/service-documents/bombardier/sb-60-57-7

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2013-13-09](https://openairdocs.org/ad/2013-13-09.md), effective Aug 6, 2013: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-60-57-7/proposed.md).

## Text (19 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2013-0214; AD 2013-13-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

b 2
THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
Refer to applicable government agency regulations and requirements and make sure that the work described 
in this publication is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards. 
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by 
any means without the prior written consent of Bombardier Inc. and/or its affiliates. 
© 2012, Bombardier Inc. All rights reserved. 
Challenger*, Global Express*, Learjet*, are Trademarks of Bombardier Inc.
SB 60-57-7
Recommended
Page 1 of 19
Basic Issue:  Jul 23/12
Contact Information Distribution Date
Business Aircraft 
Learjet Inc.
MS 53
P.O. Box 7707
Wichita, Kansas 67277-7707
Customer Response Center (CRC)
1-866-538-0247 (Toll Free)
(316) 946-6100 (Tel)
Push 2 for Parts Services or push 4 then 
push 1 for Technical Publications.
July 23, 2012
LEARJET 60
If you cannot complete the instructions in this publication because of an STC change to the aircraft, speak to
the STC holder or the regional Federal Aviation Administration (FAA) office for information and disposition.
Service Bulletin
These commodities, technology or software were exported from the United States in accordance
with the Export Administration Regulations. Diversion contrary to United States law is prohibited.
SB 60-57-7
Recommended
WINGS - INSTALLATION OF THE MAIN LA NDING GEAR ANTI-SKID VALVE SHIELDING
IMPROVEMENTS
1. Planning Information
A. Effectivity
(1) Learjet 60-001 thru 60-413.
B. Reason
(1) To improve the protective shielding of the anti-skid system components located in the main landing
gear wheel well. 
C. Description
(1) This service bulletin provides inst ructions to modify and install prot ective shielding to the anti-skid
system in the main landing gear wheel well.

### Page 2

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 2 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
D. Compliance
(1) Recommended - Bombardier Learjet Inc. recommend s that you complete these instructions in less
than 600 flight hours or less than 24 months from the initial distribution da te of this publication,
whichever comes first.
E. Approval
(1) The Federal Aviation Administration (FAA) has ap proved the technical content in this publication
that has an effect on the airplane type design.
(2) The European Aviation Safety Agency (EASA) has  accepted the technical content in this publica-
tion that has an effect on the airplane type design.
F. Labor Hours - Estimated Accomplishment Time
NOTE: These labor hours are an estimate and ar e for planning purposes only. Facility and per-
sonnel capabilities may cause the labor hours to change.
When planning to complete these instructions, please contact Bombardier Aerospace,
Learjet Inc. Business Aircraft  Customer Service, Parts Logi stics for parts availability and
shipping times as necessary. (Refer to the title page of this document for contact informa-
tion.)
G. Expense Coverage
(1) Labor Coverage
(a) Aircraft in the Learjet manufactured warranty period, labor coverage is provided.
NOTE: For labor coverage to apply, you must complete these instructions at a Bombar-
dier Business Aviation Service Facility or at a Bombardier Learjet Authorized Ser-
vice Facility. You must complete these instructions within 24  months from the
Basic Issue date of this publication.
(b) Aircraft out of the Learjet manufactured warranty period, no labor coverage is provided.
(2) Material Coverage - Material coverage applies to  all aircraft affected by this publication.
NOTE: For material coverage to apply, you must  place an order for this kit from Bombardier
Learjet within 12 months from the Basic Issue distribution date of this publication.
LABOR 
HOURS TASK
2.0 Labor hours to gain access.
16.0 Labor hours to do the aircraft modification.
4.0 Labor hours to do a functi onal test/operational check.
2.5 Labor hours to return the aircraft to airworthy status.
24.5 Total Labor Hours

### Page 3

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 3 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
(3) Smart Parts Plus Coverage
(a) During or after the above free period, Smart Parts Plus does not pay for the kit.
H. Material Required
NOTE: The above price can change. 
For prices, availability, orderin g and shipping info rmation, please ca ll Bombardier Aero-
space, Learjet Inc. Business Aircraft Customer Service, Parts Logistics. (Refer to the title
page of this document for contact information.) 
(1) Other materials/parts that may be nec essary to complete these instructions.
NOTE: * This part is required for aircraft that have convex (round) landing light lamps
installed. The convex (round) landing light will not clear the new shielding installed by
this modification.
For ordering and shipping information, please contact Bombardier Aerospace, Learjet
Inc., Business Aircraft Customer Service, Pa rts Logistics. (Refer to the title page of
this document for contact information.)
I. Tools and Equipment
(1) Refer to Chapter 29 of the Maintenance Manual , Safety Practices, Chapter 7 of the Maintenance
Manual, Jacking the Aircraft and Chapter 12 of the Maintenance Manual , Service the Hydraulic
Reservoir.
PART NUMBER QTY NOMENCLATURE PRICING
6032040001-801 1 Service Bulletin Kit $17,960.00
PART 
NUMBER NOMENCLATURE QTY SUPPLIER
A/KQ4681 or Q4681
(* See Note)
Landing Light Lamp 
(Flat)
As 
Required
Amglo Kemlite Inc.
Largo, FL 33733
MS35206-233
(* See Note) Screw As Required Obtain Locally
PART NUMBER NOMENCLATURE SUPPLIER USAGE
N/A 0.1660 inch Reamer Obtain Locally Open Drilled Holes

### Page 4

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 4 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
J. Weight and Balance
(1) Change in basic weight and moment for aircraft that do the landing light change.
(2) Change in basic weight and moment for airc raft that do not do the landing light change.
K. References
NOTE: If applicable, referenced third party documentation can be found by opening the attach-
ment tab in the Adobe Acrobat Reader software.
(1) Service Bulletin Co mpliance Response Form.
(2) Service Bulletin Evaluation Sheet.
(3) Learjet Maintenance Manual, Chapters 7, 12, 20, 24, 29 and 33.
L. Other Publications Affected
(1) Learjet Illustrated Part s Catalog, Chapter 57.
2. Material Information
A. Parts Required
(1) The 6032040001-801 kit contains the parts that follow:
CHANGE IN BASIC WEIGHT CHANGE IN BASIC MOMENT
Plus (+) 2.00 pounds Plus (+) 779.10 inch-pounds
CHANGE IN BASIC WEIGHT CHANGE IN BASIC MOMENT
Plus (+) 1.78 pounds Plus (+) 692.70 inch-pounds
PART NUMBER QTY NOMENCLATURE ALTERNATEPART NUMBER
AN525-832R7 8 Screw
AN525-832R9 20 Screw
MS20470AD3-6 8 Rivet
MS21042-08 26 Nut
MS21042-3 4 Nut
MS21266-2N 2 Grommet
MS21919WDG4 6 Clamp
MS27039-1-23 8 Screw
NAS1149F0316P 4 Washer
NAS1149F0332P 22 Washer
NAS1149FN832P 2 Washer
NAS1801-3-8 16 Screw
NAS1801-08-10 2 Screw

### Page 5

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 5 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
NOTE: Some hardware comes in pre-packaged quantities. When that occurs, the quantity in the
kit will be more than the quantity in the parts list.
B. Parts Removed List
S-151-1 4 Bracket Assembly
5418401-033 2 Strap
6029109002-005 1 Shield, Anti-Skid, LH 6029109002-003
6029109002-006 1 Shield, Anti-Skid, RH 6029109002-004
6029109003-001 1 Bracket Assembly, Upper Inboard, LH
6029109003-002 1 Bracket Assembly, Upper inboard, RH
6029109004-005 4 Bracket Assembly, Upper Outboard
6029109006-001 2 Bracket Assembly, Lower inboard
6032040001-811 2 Cover, Electrical, Forward
6032040001-812 1 Cover, Electrical, Aft, LH
6032040001-813 1 Cover, Electrical, Aft, RH
6032040001-816 1 Rayrim Edge Protection (No. 7, 15 in [38.1 cm].)
PART 
NUMBER QTY NOMENCLATURE DISPO-SITION EFFECTIVITY REPLACEDBY
2448000-42 6 Strap Destroy When Installed Not Replaced
5418401-22 6 Strap Destroy When Installed Not Replaced
5418401-033 2 Strap Destroy 60-313 and Subsequent 5418401-033
MS21919WDG14 2 Clamp Destroy When Installed Not Replaced
HL70-6 4 Hi-Lok Collar Destroy All MS21042-3
GE-4580 2 Landing Light (Convex) Destroy When Installed
A/KQ4681
or
Q4681
2484021-16 2 Landing Light Cover Destroy When Installed Not Replaced
2484108-801 2 Landing Light Cover Destroy When Installed Not Replaced
51-0723-1 2 Grille Assembly Destroy When Installed Not Replaced
PART NUMBER QTY NOMENCLATURE ALTERNATEPART NUMBER

### Page 6

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 6 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
C. Identification Table
NOTE: * There is no direct spares replacement available. For spares replacement, order part
number shown prior to the modification, and match drill hole pattern to current aircraft
configuration.
3. Accomplishment Instructions
A. Gain Access
NOTE: The instructions that follow are for both the left and right main landing gear.
(1) Put the aircraft on jacks. (Refer to Chapter 7 of the Maintenance Manual.)
(2) Set the battery switches off and disconnect the aircraft batteries. (Refer to Chapter 24 of the Main-
tenance Manual.)
(3) Depressurize the aircraft hydraulic system. (Refer to Chapter 12 of the Maintenance Manual.)
(4) Lower the inboard main landing gear door as follows:
(a) Override the inboard main landing gear door uplock actuator using a screwdriver to release
the uplock hook.
(b) Using another person, pump the brake pedals while pulling inboard gear door to the down
position.
(5) Disconnect the inboard main landing gear door from the door actuator. Retain attaching hardware
for installation.
NAS43DD1-16 8 Spacer Destroy When Installed Not Replaced
AN515-6R20 8 Screw Destroy When Installed MS35206-233
PART 
NUMBER NOMENCLATURE IDENTIFY TO SPARESREPLACEMENT EFFECTIVITY
12225-0065-085 Forward Stiffener, LH 6032040001-802 (* See Note) When Installed
12225-0065-086 Forward Stiffener, RH 6032040001-803 (* See Note) When Installed
12225-0065-089 Forward Stiffener, LH 6032040001-804 (* See Note) When Installed
12225-0065-090 Forward Stiffener, RH 6032040001-805 (* See Note) When Installed
12225-0065-027 Aft Stiffener, LH 6032040001-806 (* See Note) All
12225-0065-028 Aft Stiffener, RH 6032040001-807 (* See Note) All
6032040001-811 Forward Electrical Cover 6032040001-808 (* See Note) All
6032040001-812 Aft Electrical Cover, LH 6032040001-809 (* See Note) All
6032040001-813 Aft Electrical Cover, RH 6032040001-810 (* See Note) All
PART 
NUMBER QTY NOMENCLATURE DISPO-SITION EFFECTIVITY REPLACEDBY

### Page 7

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 7 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
B. Modification of Aircraft
NOTE: The instructions that follow are for both the left and right main landing gear.
(1) Install the outboard bracket assemblies on the aircraft (Wing Spar No. 5) as follows: (See  Figure 1,
Detail A and View B-B.)
(a) Remove and discard the existing screws and wa shers that attach the upper and lower shuttle
valves to the aircraft.
NOTE: Do not disconnect the hydraulic lines from the upper and lower shuttle valves.
(b) If necessary, open pilot holes in the outboard bracket assemblies to a No. 10 (0.194 in) [4.92
mm] drill size.
(c) Secure the outboard bracket assemblies to the upper and lower shuttle valves using new
screws and washers. 
(2) Install the anti-skid shield as follows:
(a) Attach grommet to the anti-skid shield. (See  Figure 1, Detail A.)
(b) If necessary, open pilot holes in the anti-skid shield to 0.219 in [5.56 mm] diameter.
(c) Temporarily install the anti-skid shie ld to the outboard bracket assemblies.
(d) Trim the edge of the anti-skid shield as necessa ry to clear anti-skid valve and adjacent tubing.
NOTE: Make sure to maintain minimum cleara nce of 1/4 inch (0.25 in) [6.35 mm] with
adjacent tubing.
(e) Deburr and apply alodine and epoxy primer to bare metal surfaces. (Refer to Chapter 20 of the
Maintenance Manual.)
(f) Install the anti-skid shield to the outboard bracket assemblies with fasteners.
(3) Locate and install the forward electrical co ver on the forward stiffener as follows: (See  Figure 1 ,
Detail A and View E-E.)
(a) Remove the existing clamps and screws that se cure the electrical wire harnesses to the for-
ward stiffener.
(b) Position the new electrical cover on the forward stiffener. (See  Figure 1, View E-E.)
(c) Use a marker to transfer the hole pattern fo r the aft outboard fasteners that secures the for-
ward electrical cover.
(d) Remove the cover and drill two 0.166 in [4.21 mm] dia. holes at the marked location. (See Fig-
ure 1, View E-E and Detail F.)
(e) Temporarily install the forward electrical cover to the forward stiffener at the aft hole locations.
(f) Match drill a third hole location at the forw ard outboard location pe rpendicular to the hole
located on the opposite side of the stiffener.
NOTE: Make sure to maintain minimum edge distance of 0.30 in [7.62 mm] when locating
and drilling the holes through the cover and forward stiffener.
(g) Remove the forward electrical cover from the aircraft.
(h) Locate and drill two 0.17 7 in [4.49 mm] dia. holes  in the forward electrical cover for electrical
wire harness clamp installation. (See Figure 1, Detail G.)
(i) Deburr all drilled hole locations. (Refer to Chapter 20 of the Maintenance Manual.)
(j) Apply alodine and epoxy primer  to all drilled holes. (Refer to Chapter 20 of the Maintenance
Manual.)
(k) Identify the forward stiffener. (See Paragraph 2.C.)
(l) Install clamps and attaching hardware to secure the electrical wire harness to the forward elec-
trical cover.

### Page 8

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 8 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
(m) Install the forward electrical co ver to the aircraft at the three mounting locations using supplied
hardware. 
(4) Install the upper inboard bracket assembly as follows: (See  Figure 1, Detail C.)
(a) Temporarily install the upper inboard bracket assembly to the shield  assembly with the pro-
vided hardware.
(b) Make sure the upper bracket assembly is positioned along the forward side of the forward stiff-
ener. 
(c) On aircraft that have an existing hole location in the stiffener for mounting the upper inboard
bracket, do as follows:
1) Make sure the hole location provides for mi nimum edge distance of 0.30 in [7.62 mm] with
the upper inboard bracket.
2) If minimum edged distance cannot be obtained, proceed to Step 3.B.(4)(d).
3) If minimum edged distance can be obtained, use a marker to mark a hole location to
secure the upper inboard bracket assembly to the stiffener.
NOTE: Make sure to maintain a minimum edge distance of 0.30 in [7.62 mm]. (See
Figure 1, Detail C.)
4) Drill a 0.166 in [4.21 mm] hol e through the upper inboard bracket assembly, the electrical
cover, and the stiffener at the marked location.
(d) On aircraft that do not have an existing hole  location in the stiffener for mounting the upper
inboard bracket or where the hole location does not provide for minimum edge distance, do as
follows:
1) Use a marker to mark a new hole location to secure the upper inboard bracket assembly
to the stiffener.
NOTE: Make sure to maintain a minimum edge distance of 0.30 in [7.62 mm]. (See
Figure 1, Detail C.)
2) Drill a 0.166 in [4.21 mm] hol e through the upper inboard bracket assembly, the electrical
cover, and the stiffener at the marked location.
(e) Remove the upper inboard bracket assembly an d forward electrical cover from the aircraft.
(f) Deburr drilled hole lo cations. (Refer to Chapter 20 of the Maintenance Manual.)
(g) Apply alodine and epoxy primer to drilled holes. (Refer to Chapter 20 of the Maintenance Man-
ual.)
(h) Identify the forward electrical cover. (See Paragraph 2.C.)
(i) Install the forward electrical cover and upper inboard bracket assembly using provided hard-
ware. 
(5) Install clamps that support elec trical wire harness as it routes  inboard along the forward stiffener
using provided hardware. 
(6) Install the lower inboard bracket assembly as follows: (See  Figure 1, Detail A and View D-D.)
(a) Temporarily position the lower inboard bracket assembly to the shield assembly and locate the
Hi-Loc fasteners where the inboard bracket assemb ly is to be installed (two places on the
lower wing spar). 
(b) Remove the Hi-Loc fastener collars from the win g spar where the inboard bracket assembly is
to be installed.
(c) If necessary, use a No. 2 drill size, to enlarg e the holes in the lower inboard bracket assembly
to 0.221 in [5.61 mm].
(d) Deburr all drilled hole locations. (Refer to Chapter 20 of the Maintenance Manual.)
(e) Apply alodine and epoxy primer to drilled holes. (Refer to Chapter 20 of the Maintenance Man-
ual.)
(f) Install the shield to the lower in board bracket assembly as follows:

### Page 9

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 9 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
1) With the shield assembly lo osely installed, visually check the lower inboard bracket
mounting hole location for alignment with the anti-skid shield.
2) If holes do not align, mark a new hole location on the anti-skid shield.
3) Slot or relocate the lower inboard hole in th e anti-skid shield as necessary to attach the
anti-skid shield to the lower inboard bracket. Hole to be 7/32 (0.219) in [5.56 mm] diame-
ter. Slot to be a maximum width of 0.50 in [12.70 mm].
4) Deburr all drilled and/or slotte d holes and apply alodine and epoxy primer to all bare metal
surfaces. (Refer to Chapter 20 of the Maintenance Manual.)
5) Install the anti-skid shield to the lower bracket support.
(7) Modify the aft stiffener for new electr ical wire harness support as follows: (See  Figure 1, Detail A
and View G-G.)
(a) Remove the existing three outboard straps that  support the electrical wire harness inside the
aft stiffener. Discard existing attaching hardware and straps. 
(b) On aircraft 60-001 thru 60-312, do the steps that follow: 
1) Remove the existing inboard clamp and attach ing hardware that support the electrical wire
harnesses as they route inboard along the aft stiffener. Discard clamp and attaching hard-
ware.
2) As necessary, remove electrical wire harnesses away from the aft stiffener to allow for
installation of the S-151-1 brackets.
3) Install the S-151-1 bracket assemblies on the aft stiffener. (See  Figure 1 View K-K.) 
4) Identify the aft stiffener. (See Paragraph 2.C.)
(c) On aircraft 60-313 thru 60-413 , remove and discard the existing inboard strap and attaching
hardware. 
(8) Locate and install the aft electrical cover and strap on the aft stiffener as follows: (See  Figure 1
Detail A and View G-G.)
(a) Install rayrim edge protection on the strap. 
(b) Position the anti-skid wheel and squat switch elec trical wire harnesses back inside the aft stiff-
ener. 
(c) Secure wire harnesses in the aft stiffener using strap and supplied hardware. 
(d) Position the new aft electric al cover on the aft stiffener.
NOTE: When locating the right aft electrical cover, make sure the louver faces aft.
(e) Use a marker to transfer the (s ix) (6) hole pattern of the stiffener onto the aft electrical cover.
(f) Remove the aft electrical cover from the aircraft.
(g) Drill six (6) 0.166 in [4.21 mm] dia. holes at the marked locations on the aft electrical cover.
(h) Deburr all drilled hole locations. (Refer to Chapter 20 of the Maintenance Manual.)
(i) Apply alodine and epoxy primer  to all drilled holes. (Refer to Chapter 20 of the Maintenance
Manual.)
(j) Install rayrim edge protection to the edge of the aft electrical cover. 
NOTE: Make sure to install the rayrim edge protection to the louvered portion of the right
aft electrical cover.
(k) As necessary for fit, remove the tie wraps from the area of the electric al wire harnesses cov-
ered by the new aft electrical cover.

### Page 10

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 10 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
(l) Make sure the holes in the stiffener are large enough for the shank on the AN525-832R9
screws used to install the cover to pass through the stiffener.
1) If the holes in the stiffener are large enough to install all screws, proceed to Step
3.B.(8)(m).
2) If the holes are not large enough, use a 0.166 in [4.216 mm] reamer to open the holes in
the stiffener.
NOTE: Make sure that the nutplate is not damaged when hole is opened with reamer.
3) Apply alodine and epoxy primer to all bare metal. (Refer to Chapter 20 of the Maintenance
Manual.)
(m) Install the new aft electrical cover on the aircraft.
(n) Identify the aft electrical cover. (See Paragraph 2.C.)
(9) On aircraft with a convex (round) shape landing light lamp (P/N GE-4580) and/or a protective land-
ing light lens cover installed, do as follows:
NOTE: During main landing gear retraction, the convex (round) shape landing light assembly
and/or protective lens cover will not clear th e new shielding provided by this modifica-
tion.
(a) Remove the protective landing light lens co ver, attaching screws, spacers and nuts. Discard
attaching screws, spacers and lens cover. Retain the nuts for installation. (Refer to Chapter 33
of the Maintenance Manual.)
(b) Remove and discard the convex (round) landing light lamp. (Refer to Paragraph 1.H.(1) for
landing light lamp parts required.) (Refer to Chapter 33 of the Maintenance Manual.)
(c) Install the new flat landing light lamp with MS35206-233  screws and retained nuts. (Refer to
Paragraph 1.H.(1) for landing light lamp parts required.) (Refer to Chapter 33 of the Mainte-
nance Manual.)
(10) Make sure all electrical wire harnesses affect ed by this modification have been secured and sup-
ported.
(11) Make sure all hardware used to install the shield assembly, brackets and straps have been tight-
ened to the proper torque values. (Refer to Chapter 20 of the Maintenance Manual.)
C. Functional Test/Operational Check
(1) Use retained attaching hardware to connect the inner main landing gear door to the door actuator.
(2) Disconnect the outer main landing gear door push rod from the main landing gear strut assembly.
Retain attaching hardware for installation.
(3) Connect the batteries to the aircraft. (Refer to Chapter 24 of the Maintenance Manual.)
(4) Connect external hydraulic power source to the aircraft. (Refer to Chapter 29 of the Maintenance
Manual.)
(5) Pressurize the aircraft hydraulic system. (Refer to Chapter 29 of the Maintenance Manual.)
NOTE: Apply hydraulic pressure to the gear incrementally starting at zero (0) PSI and
increase cart pressure slowly to cycle the landing gear.
WARNING: USE EXTREME CARE WHEN LANDING GEAR IS RETRACTED AND EXTENDED.
MAKE SURE TO OBSERVE FROM AN ADEQUATE DISTANCE AND KEEP ALL
BODILY PARTS OUT OF THE WAY OF ALL LANDING GEAR AND LANDING
GEAR DOORS. FAILURE TO KEEP SAFE DISTANCE CAN RESULT IN PER-
SONAL INJURY OR DAMAGE TO THE AIRCRAFT.

### Page 11

THIS PUBLICATION IS AVAILABLE AT:
www.cic.bombardier.com
SB 60-57-7
Recommended
Page 11 of 19
Basic Issue: Jul 23/12
LEARJET 60
Service Bulletin
(6) Slowly retract and extend the main landing gear and check for clearance between the landing light
lens, hydraulic lines and electrical wire harn esses with the new shielding. (Refer to Chapter 32 of
the Maintenance Manual.)
(7) Use retained attaching hardware to connect the outer main landing gear door push rod to the main
landing gear strut assembly.
D. Return Aircraft to Airworthy Status
(1) With the landing gear fully extended and locked, remove aircraft from jacks. (Refer to Chapter 7 of
the Maintenance Manual.)
(2) Unless already done, connect the batteries to the aircraft. (Refer to Chapter 24 of the Maintenance
Manual.)
E. Compliance Response Form
(1) Complete the compliance response form.
(2) Send the compliance response form to Learjet Inc. as soon as possible.
F. Aircraft Maintenance Records
(1) Complete the Aircraft Maintenance Records in  accordance with the regulatory requirements of
your aircraft certification authority.
G. General Information
(1) The table below lists standard tolerances wh ich shall apply to dimensions defined within the
instructions or illustrations of this document that do not have specified tolerances.
UNLESS OTHERWISE SPECIFIED
ALL TOLERANCES ARE AS FOLLOWS:
DECIMALS ANGLES
  0.0 ± 0.1 [0.0 mm ± 2.54 mm]
0.00 ± 0.03 [0.00 mm ± 0.76 mm]
0.000 ± 0.010 [0.000 mm ± 0.254 mm] 
MACHINED FORMED
± 0°30’ ± 2 °

### Page 12 (OCR)

LEARJET 60
Service Bulletin
UPPER INBOARD
BRACKET ASSEMBLY
6029109003-001 (LH)
UPPER OUTBOARD  6029109003-002 (RH)
BRACKET ASSEMBLY  (1 REQUIRED)
6029109004-005  STIFFENER
(1 REQUIRED,  (REF)  B
UPPER LOCATION)  E
G
GROMMET
MS21266-2N
(1 REQUIRED)
SCREW
NAS1801-3-8  SCREW  LOWER INBOARD
WASHER  AN525-832R9  BRACKET ASSEMBLY
NAS1149F0332P  (1 REQUIRED)  6029109006-001
(7 EACH REQUIRED)  (1 REQUIRED)
SCREW
MS27039-1-23
LOWER OUTBOARD
WASHER  NAS1149F0332P  (4 EACH REQUIRED)  (1 REQUIRED,  BRACKET ASSEMBLY  6029109004-005  6029109002-005 (LH)  •ANTI-SKID SHIELD  6029109002-006 (RH)
LOWER LOCATION)  (1 REQUIRED)
UP
INBDI
(VIEW LOOKING FORWARD FROM INSIDE THE LH MLG WHEEL WELL)
LEFT MAIN LANDING GEAR SHOWN)
NOTE  Notes information is found on  Detail A
the last sheet of the figure.
K60-605707-001-01
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 1 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 12 of 19

### Page 13 (OCR)

LEARJET 60
Service Bulletin
BRAKE
SHUTTLE  HYDRAULIC
OUTBOARD  VALVE  FUSE
BRACKET ASSEMBLY  (REF)  , (REF)
6029109004-005
(REF)
ANTI-SKID SHIELD
6029109002-005 (LH)  БОЯ
6029109002-006 (RH)
(REF)
UPPER INBOARD
BRACKET ASSEMBLY
FWD  (REF)  6029109003-001 (LH)  6029109003-002 (RH)  FORWARD  STIFFENER  (REF)
INBDI  ELECTRICAL
COVER
View B-B  (REF)
STIFFENER
SHIELD  (REF)
ASSEMBLY
(REF)
UPPER INBOARD
BRACKET
ASSEMBLY
(REF)
FORWARD
ELECTRICAL
NUT  COVER
MS21042-08  (REF)
(1 REQUIRED)
2
(BRACKET ASSEMBLY INSTALLATION ON STIFFENER)
NOTE  Detail C
Notes information is found on
the last sheet of the figure.  K60-605707-001-02
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 2 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 13 of 19

### Page 14 (OCR)

LEARJET 60
Service Bulletin
5 LOWER
INBOARD
BRACKET
ASSEMBLY
LOWER  6029109006-001
SPAR CAP  (REF)
(REF)  4.80 in
[12.19 cm]
0.41 in
[10.41 mm]
WASHER
FWD  NAS1149F0316P
NUT  ANTI-SKID
INBDD  MS21042-3  SHIELD
(2 EACH REQUIRED)  (REF)
View D-D
NOTE
Notes information is found on
the last sheet of the figure.
K60-605707-001-03
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 3 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 14 of 19

### Page 15 (OCR)

LEARJET 60
Service Bulletin
FWD ELECTRICAL
> UPPER,  COVER
INBOARD  6032040001-811  WIRE
BRACKET  (1 REQUIRED)  BUNDLE
ASSEMBLY  (REF)
(REF)
ANTI-SKID
SHIELD
DRILL HOLE  (REF)  0.030 in
0.166 in [4.216 mm]  [0.762 mm]
SCREW  (REF)
AN525-832R9
NUT
MS21042-08  EXISTING
(1 EACH REQUIRED;  HOLE
3 PLACES)  (REF)
NUT
FWD  13.00 in  MS21042-08
STIFFENER  [33.02 cm]  (1 REQUIRED)
(REF)  (REF)
CLAMP
MS21919WDG4
SCREW  FWD
NAS1801-08-10
WASHER  GOUTBD
NAS1149FN832P
AFT  (1 EACH REQUIRED)
STIFFENER  EXISTING HOLE
(REF)  IN STIFFENER
(REF)
SCREW
AN525-832R9
NUT
MS21042-08
(1 EACH REQUIRED)
(LOOKING DOWN THRU WING INSIDE WHEEL WELL)
(LH SHOWN, RH TYPICAL EXCEPT AS NOTED)
(WING SKIN AND STRUCTURE NOT SHOWN FOR CLARITY)
NOTE  View E-E
Notes information is found on
the last sheet of the figure.
K60-605707-001-04
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 4 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 15 of 19

### Page 16 (OCR)

LEARJET 60
Service Bulletin
MOUTBD
FWD
DRILL 0.166 in [4.216 mm]
HOLE AS MARKED
FROM AFT SIDE OF
[10.16 mm] →  0.40 in  (2 PLACES)  FWD STIFFENER
1.03 in
[2.61 cm]  0.40 in
[10.16 mm]
DRILL HOLE
0.177 in [4.49 mm]
THROUGH
FWD ELECTRICAL
COVER  FWD
(2 PLACES)  FWD  STIFFENER
STIFFENER
(REF)
(REF)  DRILL 0.166 in [4.216 mm]
HOLES IN FWD SIDE
OF FWD STIFFENER
UPON INSTALLATION
(2 PLACES)
(FORWARD ELECTRICAL COVER HOLE LOCATIONS)
(VIEW LOOKING UP AS INSTALLED, LH SHOWN, RH TYPICAL)
Detail F
K60-605707-001-05
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 5 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 16 of 19

### Page 17 (OCR)

LEARJET 60
Service Bulletin
FWD  AFT  STRAP  SCREW
STIFFENER  STIFFENER  5418401-033  AN525-832R7
(REF)  (REF)  WIRE  (REF)  WASHER
BUNDLE  AN960-8
(REF)  (1 EACH REQUIRED,
2 PLACES)
WIRE  K-
BUNDLE
(REF)
SCREW
AN525-832R9  K-
NUT
MS21042-08  6.25 in
(1 EACH REQUIRED,  BRACKET  [15.87 cm]
6 PLACES)  ASSEMBLY  (REF)
S-151-1
FWD  (REF)
IOUTBD  (LOOKING DOWN THRU WING INSIDE WHEEL WELL)
(LH SHOWN, RH TYPICAL EXCEPT AS NOTED)
(WING SKIN AND STRUCTURE NOT SHOWN FOR CLARITY)
View G-G
INBD D  INBD
FWD  WIRE  FWD
AFT  BUNDLE  LOUVER
STIFFENER  (REF)  (REF)
(REF)
AFT
STIFFENER
> DRILL 0.166 in  (REF)  DRILL 0.166 in
LEFT AFT  [4.216 mm] HOLE  [4.216 mm] HOLE
(1 REQUIRED)  ELECTRICAL COVER  6032040001-812  (6 PLACES)  AND DEBURR  RIGHT AFT  ELECTRICAL COVER  6032040001-813  (6 PLACES)  AND DEBURR  AFT  STIFFENER
(1 REQUIRED)  (REF)
LEFT SIDE  RIGHT SIDE
AFT ELECTRICAL COVERS
NOTE
(MIEWS LOOKING UP AS INSTALLED)
Notes information is found on
the last sheet of the figure.  Detail H  K60-605707-001-06
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 6 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 17 of 19

### Page 18 (OCR)

LEARJET 60
Service Bulletin
UPPER INBOARD  CLAMP
BRACKET ASSEMBLY  (REF)  FWD  STIFFENER  MS21919WDG4  SCREW
(REF)  AN525-832R7
NUT
MS21042-08
(1 EACH REQUIRED,
2 PLACES)
WIRE BUNDLE -
(REF)  FWD
FWD ELECTRICAL
COVER
(REF)
(TYPICAL 2 PLACES)
View J-J
DRILL HOLE No. 40
BRACKET  (0.098 in [2.489 mm])
ASSEMBLY  DIAMETER
S-151-1  2 PLACES, EACH IN
STRAP  (1 EACH REQUIRED,  BRACKET ASSEMBLY
5418401-033  RIVET
(1 REQUIRED)  MS20470AD3-6
(2 REQUIRED, EACH
BRACKET ASSEMBLY)
INSTALL RAYRIM  WIRE BUNDLE
EDGE PROTECTION  (REF)
OF STRAPS  TO BOTH SIDES  AFT
STIFFENER
(REF)
View K-K
K60-605707-001-07
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 7 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 18 of 19

### Page 19 (OCR)

LEARJET 60
Service Bulletin
NOTES
Use Class Il adhesive to bond grommet to the shield assembly.
(Refer to Chapter 20 of the Maintenance Manual.)
Position the upper bracket assembly on the stiffener as shown and mark the hole location. Maintain
minimum edge distance and drill 0.166 in [4.216 mm] dia hole through the upper bracket assembly,
forward electrical cover and forward stiffener.
Maintain a 0.35 in [8.89 mm] edge distance on the bracket assembly and cover.
Maintain a 0.30 in [7.62 mm] edge distance on the stiffener.
Assemble bracket assembly to the shield assembly and install in place. Pick up two existing
fastener locations on spar cap as shown and match drill through the bracket assembly.
Remove existing Hi-Lok collar, install new nuts and torque nut 25 to 35 in/Ibs [2.82 to 3.95 Nm].
• Nut is required only if existing nutplate is not installed.
Install 2.5 in [6.35 cm] Rayrim edge protection to louvered portion of the right aft electrical cover
and make sure that the louver faces aft when the RH aft electrical cover is installed.
Install Rayrim edge protection to the exposed edges of right and left aft electrical covers and straps.
Trim edge of anti-skid shield as necessary to clear anti-skid valve and adjacent tubing.
(0.25 in [6.35 mm] clearance required on adjacent tubing.)
It is permissible to slot or relocate hole to attach anti-skid shield to lower inboard bracket assembly.
If the holes are not large enough, use a 0.166 in [4.216 mm] reamer to open the holes in the stiffener.
Make sure that the nutplate is not damaged when hole is opened with reamer. Apply alodine and
epoxy primer to all bare metal. (Refer to Chapter 20 of the Maintenance Manual.)
K60-605707-001-08
Installation of the Main Landing Gear Shielding Improvements
Figure 1 (Sheet 8 of 8)
Basic Issue: Jul 23/12  THIS PUBLICATION IS AVAILABLE AT:  SB 60-57-7
www.cic.bombardier.com  Recommended
Page 19 of 19

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
