# Bombardier Service Bulletin 605-24-002

Copy: No revision named ("U.S. DOT/FAA - Service Bulletin - SB 605-24-002"), 9 pages: PDF https://openairdocs.org/files/sha256/b7/3d/b73dce369e9dee2365c29d4d0658ccdc0bfd814b8804d30f86f5d3a859291523; text https://openairdocs.org/service-documents/bombardier/sb-605-24-002/file/b73dce369e9d.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-1095; AD 2012-08-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 605-24-002
- Page: https://openairdocs.org/service-documents/bombardier/sb-605-24-002

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2012-08-15](https://openairdocs.org/ad/2012-08-15.md), effective May 29, 2012: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-605-24-002/proposed.md).

## Text (9 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-1095; AD 2012-08-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

ČHÄLLỀNGĚŘ 605  CUSTOMER SERVICES
SERVICE BULLETIN SUMMARY
This Service Bulletin is available at:
www.cic.bombardier.com
MODEL CL-600-2B16
ATA 24-50
ELECTRICAL POWER
INSPECTION/REWORK - AC ELECTRICAL LOAD DISTRIBUTION -
INSPECTION OF LOOSE AND IMPROPERLY CRIMPED TERMINAL LUG
CONNECTIONS IN CBP-2, CBP-3, CBP-4, JB17 AND JB18
The information below is provided for your reference. For full details, please
see corresponding paragraph contained within this bulletin.
COMPLIANCE TIME
RECOMMENDED  Before or at the next 800 hour check
SPECIFIED TIME COMPLIANCE
EFFECTIVITY: A/C Serial No. 5701 to 5752, 5754 to 5756, 5758 to 5775, 5779, 5781,
5788, 5789, 5792, 5795, 5798, 5801 and 5804
MANPOWER: 3 man-hours
KITS and/or PARTS  YES  NO
TOOLING/GSE  YES  NO
PLANNING INFORMATION: See important  information at the start of Paragraph 1.  YES  J  NO
DEDICATED SCHEDULE  YES  NO
PREREQUISITE SERVICE BULLETINS: N/A
To place an order for parts or kits, please call Bombardier Parts Logistics at:
514-855-2999 or 1-866-538-1247
Basic Issue: Dec 07/2009  605-24-002
Page 1 of 1

### Page 2 (OCR)

CHALLENGER 605  OMBARDIE  CUSTOMER SERVICES
SERVICE BULLETIN
This Service Bulletin is available at:
www.cic.bombardier.com
MODEL CL-600-2B16
ATA 24-50
ELECTRICAL POWER
INSPECTION/REWORK - AC ELECTRICAL LOAD DISTRIBUTION -
INSPECTION OF LOOSE AND IMPROPERLY CRIMPED TERMINAL LUG
CONNECTIONS IN CBP-2, CBP-3, CBP-4, JB17 AND JB18
1. PLANNING INFORMATION.
A. Effectivity
CL-600-2B16 aircraft, Serial No. 5701 to 5752, 5754 to 5756, 5758 to 5775, 5779,
5781, 5788, 5789, 5792, 5795, 5798, 5801 and 5804.
All other subsequent CL-600-2B16 aircraft are scheduled for the modification
in production (Ref.: Restriction and/or Special Instruction, C-4040).
NOTE: The instructions given in this Service Bulletin are only applicable to
the systems and parts installed at the time of delivery of the aircraft
or as changed by Bombardier Aerospace Service Bulletin(s).
Before you do this bulletin, examine all STC, STA or equivalent
action changes to make sure that this bulletin can be completed.
B. Reason
Quality Control investigations have reported conditions affecting the wiring of
Circuit Breaker Panels 2, 3 and 4 (CBP-2, CBP-3, CBP-4) and Junction Boxes
JB17 and JB18. It was discovered that Foreign Object Damage (FOD) may be
found in these locations. In addition, the crimping process of the nickel plated
terminal lugs, size #22-20 with the green color insulating sleeve, may not have
been manufactured as per applicable standards.
This Service Bulletin gives instruction to inspect for FOD in the affected areas
and to replace any loose or badly crimped lugs to ensure safety, reliability and
wiring integrity.
tefer to applicable govemmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer's recommendations and/or acceptable industry standards
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior witten consent of Bombardier Inc. and/or its affiliates.
© 2009 Bombardier Inc. All rights reserved
Challenger*, Global Express*, Global Express **, Global 5000*, Learjet* are Trademarks of Bombardier Inc
Basic Issue: Dec 07/2009  605-24-002
Page 1 of 8

### Page 3 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
C. Description
This Service Bulletin gives instructions to:
- Get access to circuit breaker panels 2, 3 and 4 (CBP-2, CBP-3, CBP-4) and
junction boxes JB17 and JB18,
Inspect and pull test all terminal lugs, size #22-20 with the green color insulating
sleeve and replace if necessary,
• Perform a FOD inspection of the areas, and
- Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Recommended before or at the next 800 hour check from this Service Bulletin
release date (Basic Issue).
E. Approval
The technical content of this Service Bulletin has been approved under
the authority of Transport Canada Civil Aviation (TCCA) Design Approval
Organization (DAO) No. DAO #93-Q-02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the
FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by the
JAA and by EASA in accordance with established procedures.
F. Manpower
NOTES: 1. The man-hours given are estimates to help you schedule the tasks
given in this bulletin. The estimates are for direct labor performed by
an experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and positioning
of scaffolds, removal of interior furnishings, repainting, supervision and
inspection.
For more information related to the manpower estimates, refer to
SB 605-00-002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the labor estimates and should be considered
for planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at the
next scheduled maintenance task or inspection (e.g. 800 hour inspection).
3 man-hours are necessary to do this inspection/rework.
Basic Issue: Dec 07/2009  605-24-002
Page 2 of 8

### Page 4 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
The labor required to do this Service Bulletin is available at no cost if:
the work is done during new aircraft warranty period,
(i¡)  the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
(ili) this Service Bulletin is scheduled in less than 12 months from its
release date (Basic Issue).
G. Material - Cost and Availability
Parts may be necessary to do this inspection/rework. For material data, refer to
Paragraph 3.B.
The parts are available at no cost if:
(i)  ordered during new aircraft warranty period, and
(il) a no-charge purchase order is sent to Bombardier Aerospace in less
than 12 months from this Service Bulletin release date (Basic Issue).
For those aircraft in new aircraft warranty at the time of this Service Bulletin
distribution (Basic Issue), Smart Parts Plus does not pay for the parts at any time.
For those aircraft out of new aircraft warranty at the time of this Service Bulletin
distribution, Smart Parts Plus pays for the parts for up to one year from this
Service Bulletin distribution date (Basic Issue).
H. Tooling
GSE REFERENCE NO.  PART NO.  DESCRIPTION
Commercially Available  Tag Rag
Commercially Available  Vacuum
Commercially Available  69692-1  Crimper
Commercially Available  69710-1  Crimper
Commercially Available  22-20  Positioner
Commercially Available  69732  Positioner
NOTES: 1. Refer to the CL-605 Illustrated Tool and Equipment Manual to make
sure that you use the correct equipment configuration.
2. Refer to the Liability Statement for acceptable GSE equivalents.
Basic Issue: Dec 07/2009  605-24-002
Page 3 of 8

### Page 5 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
- Bombardier Aerospace, Restriction and/or Special Instruction (RSI),
C-4040, Rev. --.
- CL-605 Aircraft Maintenance Manual (AMM), Chapters 6, 24 and 31.
- CL-605 Wiring Manual (WM), Chapter 20.
L. Other Publications Affected
None
M. Equivalent Service Bulletin
None.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL-605 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL-605 Aircraft Maintenance Manual, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
TASK 24-00-00-910-801.
(2) Make sure that the BATT MASTER switch on the ELECTRICAL POWER
control panel is set to the OFF position. Put a tag on the BATT MASTER
switch.
(3) Disconnect the main battery. Refer to TASK 24-32-00-040-801.
(4) Disconnect the APU battery. Refer to TASK 24-32-00-040-802.
Basic Issue: Dec 07/2009  605-24-002
Page 4 of 8

### Page 6 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
B. Inspection/Rework
(1) Gain access to the affected CB panels and junction boxes. Refer to Figure 1
below:
CBP-2  CBP-3  CBP-4
604-54047-1  604-54052-3  604-54053-5
TASK  TASK  TASK
31-18-01-000-802  31-18-01-000-803  31-18-01-000-804
31-18-01-400-802  31-18-01-400-803  31-18-01-400-804
JB18
JB17  601A51646-1
604-51649-35  or 601A51646-9
TASK  TASK
24-01-17-000-801  24-01-18-000-801
24-01-17-400-801  24-01-18-400-801
Figure 1
Locations of Affected CB Panels and Junction Boxes
Basic Issue: Dec 07/2009  605-24-002
Page 5 of 8

### Page 7 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
(2) Inspect all green terminal lugs (Part No. B0808005-004N,-005N,-006N) within
CBP-2, CBP-3, CBP-4, JB17 and JB18 by performing the following:
(a) Verify all affected terminal lugs by doing a manual pull test (light finger
force) on all size #22 and #20 gauge wires located in the specified circuit
panel locations.
(b) If any wire is found loose or any wire separates from the lug, the lug must
be discarded and the wire tip is cut back and re-terminated with a new lug
of the appropriate part number. Refer to chapter 20, Wiring Manual,
Standard Practices and the Table 1 below:
Part Number  Equivalent P/N  Tool  Positioner  Remarks
B0808005-004N  N538-16362  69692-1  22-20  SEL #3 AWG 22
B0808005-004N  N538-16362  69710-1  69732  SEL #1 AWG 20-22
B0808005-005N  N538-8043  69692-1  22-20  SEL #1 AWG, #3 AWG 22
B0808005-006N  50832-1  69692-1  20-22  24 AWG + 1 FILLER
B0808005-006N  69710-1  69732  SEL #1 AWG 20-22
Table 1
(c) The above procedure is repeated until all wires successfully pass the pull
test.
(d) All crimped terminal lugs in these locations showing any of the following
conditions must also be repaired per the same standard practices:
Cracked lug barrel,
Cracked or perforated lug insulation,
Asymmetrical secondary crimp,
Broken wire strands, or
Insufficient or partial wire insertion into lug barrel.
Basic Issue: Dec 07/2009  605-24-002
Page 6 of 8

### Page 8 (OCR)

CHALLENGER 605  DIE
MODEL CL-600-2B16
(3) Verify all electrical connections involving screw and nut fasteners. Make sure
that there are no loose connections and that the lugs cannot rotate on the
fastener axis. Refer to Table 2 that follows for the recommended torque values:
Component  Screw / Stud Size  Torque Value (in Ibs)
Circuit Breaker  #8 - Steel  18 + 1
P/N MS24571-50  (Qty 2 per unit)
(Qty 7 units on CBP-2)
All other Circuit Breaker P/N's  #8 - Steel  14 ÷ 1
(Qty 2 per unit)
Power Diodes  M5 - Steel  27 + 3
(Qty 4 units in JB17)  (Qty 2 per unit)
Shunts  ¼ inch - Brass  35 + 5
(Qty 2 units in JB17)  (Qty 2 per unit)
#8 - Brass  8 + 1
(Qty 2 per unit)
Contactors  #10 - Steel  27 + 3
(Qty 1 unit in JB17)  (Power Terminals)
(Qty 2 units in JB18)  #6 - Steel  10 + 1
(Coil/AUX Terminals)
Table 2
(4) Do a visual inspection of the affected areas to ensure that there is no FOD.
(5) Reinstall the covers on JB17 and JB18.
(6) Close circuit breaker panels CBP-2, CBP-3 and CBP-4.
(7) Reconnect the main battery. Refer to TASK 24-32-00-440-801.
(8) Reconnect the APU battery. Refer to TASK 24-32-00-440-802.
(9) Set the BATT MASTER switch on the ELECTRICAL POWER control panel to
the ON position. Remove the tag on the BATT MASTER switch.
C. Testing
(1) Connect and energize the external ac power. Refer to TASK 24-41-00-861-801.
(2) When applicable, do the system operational test, associated with the lugs)
that was/were replaced.
(3) When applicable, do the operational test, of the circuit breaker panel(s),
disconnected in the accomplishment instructions of Paragraph 2.
(4) Do an operational test of the Junction Box JB17.
Refer to TASK 24-01-17-710-801.
(5) Do the operational test of the Junction Box JB18.
Refer to TASK 24-01-18-710-801.
Basic Issue: Dec 07/2009  605-24-002
Page 7 of 8

### Page 9 (OCR)

B O  CHALLENGER 605
MODEL CL-600-2B16
D. Close-out
(1) Remove all tools, equipment and unwanted materials from the aircraft.
(2) Ensure the side console panels 221EZ and 222EZ are closed.
E. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
3. MATERIAL INFORMATION
A. Kit
No kits required.
B. Parts
The parts that follow may be necessary to do this Service Bulletin and are available
from Bombardier Aerospace Parts Logistics, Montréal:
NEW  QTY  ITEM  USED  INSTRUCTIONS -
PART NO.  PART NO.  DISPOSITION
B0808005-004N  A/R  Terminal Lug  same  Discard
or 50831-1
B0808005-005N  A/R  Terminal Lug  same  Discard
or 50832
B0808005-006N  A/R  Terminal Lug  same  Discard
or 50832-1
NOTE: The part numbers for the items listed above are subject to change without
revision to this Service Bulletin. In case of discrepancy between this list
and any other list, the Illustrated Parts Catalog prevails and shall be used
to determine the latest part number.
C. Material
No materials required.
D. Publications
No publications required.
Basic Issue: Dec 07/2009  605-24-002
Page 8 of 8

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
