# Bombardier Service Bulletin 605-24-004

Copy: No revision named ("U.S. DOT/FAA - Service Bulletin - SB 605-24-004"), 13 pages: PDF https://openairdocs.org/files/sha256/a8/b9/a8b976ae42b961c2bec45696b95d5a639b986d9884d0e5e86b0360dc589274eb; text https://openairdocs.org/service-documents/bombardier/sb-605-24-004/file/a8b976ae42b9.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-1095; AD 2012-08-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 605-24-004
- Page: https://openairdocs.org/service-documents/bombardier/sb-605-24-004

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2012-08-15](https://openairdocs.org/ad/2012-08-15.md), effective May 29, 2012: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-605-24-004/proposed.md).

## Text (13 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-1095; AD 2012-08-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

CHALLENGÉR 605  CUSTOMER SERVICES  AIRCRA
SERVICE BULLETIN SUMMARY
This Service Bulletin is available at:
www.cic.bombardier.com
MODEL CL-600-2B16
ATA 24-50
ELECTRICAL POWER
INSPECTION/MODIFICATION - AC ELECTRICAL LOAD DISTRIBUTION -
INSPECTION OF LOOSE AND IMPROPERLY CRIMPED TERMINAL LUG
CONNECTIONS IN CBP-1 AND REPLACEMENT/RELOCATION OF BUS BARS
The information below is provided for your reference. For full details, please
see corresponding paragraph contained within this bulletin.
RECOMMENDED  Before or at the next 800 hour check  COMPLIANCE TIME
SPECIFIED TIME COMPLIANCE
EFFECTIVITY: AC Serial No. 5701 to 5752, 5754 to 5775, 5777, 5780 to 5781, 5783
to 5790, 5792, 5794 to 5796, 5798, 5801 and 5804
MANPOWER: 3 man-hours
KITS and/or PARTS  YES  NO
TOOLING/GSE  YES  NO
information at the start of Paragraph 1.  PLANNING INFORMATION: See important  YES  NO
DEDICATED SCHEDULE  YES  NO
PREREQUISITE SERVICE BULLETINS: N/A
To place an order for parts or kits, please call Bombardier Parts Logistics at:
514-855-2999 or 1-866-538-1247
Basic Issue: Jan 18/2010  605-24-004
Page 1 of 1

### Page 2 (OCR)

CHÄLLỀNGÉR 605  CUSTOMER SERVICES  SINE  AIRCRAF
SERVICE BULLETIN
This Service Bulletin is available at:
www.cic.bombardier.com
MODEL CL-600-2B16
ATA 24-50
ELECTRICAL POWER
INSPECTION/MODIFICATION - AC ELECTRICAL LOAD DISTRIBUTION -
INSPECTION OF LOOSE AND IMPROPERLY CRIMPED TERMINAL LUG
CONNECTIONS IN CBP-1 AND REPLACEMENT/RELOCATION OF BUS BARS
1. PLANNING INFORMATION.
NOTE: To minimize aircraft downtime, it is suggested to do SB 605-24-002 at the
same time as this Service Bulletin.
A. Effectivity
CL-600-2B16 aircraft, Serial No. 5701 to 5752, 5754 to 5775, 5777, 5780 to 5781,
5783 to 5790, 5792, 5794 to 5796, 5798, 5801 and 5804.
All other subsequent CL-600-2B16 aircraft are scheduled for the modification in
production (Ref.: Restriction and/or Special Instruction, C-4038 and Production
Modsum 600-6046).
NOTE: The instructions given in this Service Bulletin are only applicable to
the systems and parts installed at the time of delivery of the aircraft
or as changed by Bombardier Aerospace Service Bulletin(s).
Before you do this bulletin, examine all SIC, STA or equivalent
action changes to make sure that this bulletin can be completed.
Refer to applicable govemmental agency regulations and requirements and make sure that the work described in this
service Bulletin is performed in compliance with manufacturer's recommendations and/or acceptable industry standards
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
y any means without the prior witten consent of Bombardier Inc. and/or its affiliates
© 2010 Bombardier Inc. All rights reserved
Challenger*, Global Express*, Global Express **+, Global 5000*, Learjet* are Trademarks of Bombardier Inc
Basic Issue: Jan 18/2010  605-24-004
Page 1 of 12

### Page 3 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
B. Reason
Quality Control investigations have reported conditions affecting the wiring of
Circuit Breaker Panel 1 (CBP-1). It was discovered that Foreign Object Damage
(FOD) may be found in this locations. In addition, the crimping process of the
nickel plated terminal lugs, size #22-20 with the green color insulating sleeve, may
not have been manufactured as per applicable standards. It was also discovered
that the possibility of a short circuit (arcing) between specific bus bars and the
circuit breaker panel structure could occur, due to their close proximity.
This Service Bulletin gives instruction to inspect for FOD in the affected areas, to
replace any loose or badly crimped lugs and to relocate and replace the CBP-1
Bus Bars to ensure safety, reliability and wiring integrity.
C. Description
This Service Bulletin gives instructions to:
- Get access to circuit breaker panels 1, (CBP-1),
Replace/relocate the CBP-1 Bus Bars,
Do the wiring modification per kit drawing,
- Inspect and pull test all terminal lugs, size #22-20 with the green color insulating
sleeve and replace if necessary,
Perform a FOD inspection of the areas, and
- Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Recommended before or at the next 800 hour check from this Service Bulletin
release date (Basic Issue).
The access and time required to perform this modification are minimal, and we
therefore recommend you do it to improve reliability.
E. Approval
The technical content of this Service Bulletin has been approved under
the authority of Transport Canada Civil Aviation (TCCA) Design Approval
Organization (DAO) No. DAO #93-Q-02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the
FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by the
JAA and by EASA in accordance with established procedures.
Basic Issue: Jan 18/2010  605-24-004
Page 2 of 12

### Page 4 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
F. Manpower
NOTES: 1. The man-hours given are estimates to help you schedule the tasks
given in this bulletin. The estimates are for direct labor performed by
an experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and positioning
of scaffolds, removal of interior furnishings, repainting, supervision and
inspection.
For more information related to the manpower estimates, refer to
SB 605-00-002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the labor estimates and should be considered
for planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done
at the next scheduled maintenance task or inspection (e.g. 800 hour
inspection).
3 man-hours are necessary to do this inspection/rework.
The labor required to do this Service Bulletin is available at no cost if:
the work is done during new aircraft warranty period, and
(i¡)  the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
(III) this Service Bulletin is scheduled in less than 12 months from its
release date (Basic Issue).
G. Material - Cost and Availability
Kit 605K24-004 is necessary to do this inspection/modification. Only the U.S.
domestic price is shown:
KIT NO.  PRICE
605K24-004  $346.80
The above price can change. For the price outside of the U.S., refer to the last
applicable Spare Parts Price Catalog. This data is also available from Bombardier
Business Aviation Services (BBAS) at the addresses shown in the catalog.
Sufficient kits will be kept for the estimated amount of orders.
In addition to the kit shown above, the part in Paragraph 3.B. may be necessary to
do this inspection/modification.
The kit and/or part are available at no cost if:
ordered during new aircraft warranty period, and
(i¡)  a no-charge purchase order is sent to Bombardier Aerospace in less
than 12 months from this Service Bulletin release date (Basic Issue).
Basic Issue: Jan 18/2010  605-24-004
Page 3 of 12

### Page 5 (OCR)

čHẤLLỀNGÉR 605  OM
MODEL CL-600-2B16
Smart Parts Plus does not pay for the kit at any time as all affected aircraft were in
warranty at the time of this Service Bulletin distribution.
H. Tooling
GSE REFERENCE NO.  PART NO.  DESCRIPTION
Commercially Available  Tag Rag
Commercially Available  Vacuum
Commercially Available  69692-1  Crimper
Commercially Available  69710-1  Crimper
Commercially Available  22-20  Positioner
Commercially Available  69732  Positioner
NOTES: 1. Refer to the CL-605 Illustrated Tool and Equipment Manual to make
sure that you use the correct equipment configuration.
2. Refer to the Liability Statement for acceptable GSE equivalents.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
- Bombardier Aerospace, Modification Summary, 600-6056, Rev. B-1.
- Bombardier Aerospace, Modification Summary, 600-6046, Rev. B-1.
Bombardier Aerospace, Restriction and/or Special Instruction (RSI),
C-4038, Rev. B.
Bombardier Aerospace, Kit Drawing K604-54046, Rev. A.
- CL-605 Aircraft Maintenance Manual (AMM), Chapters 6, 24 and 31.
- CL-605 Wiring Manual (WM), Chapter 20.
L. Other Publications Affected
- CL-605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 31.
M. Equivalent Service Bulletin
None.
Basic Issue: Jan 18/2010  605-24-004
Page 4 of 12

### Page 6 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL-605 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL-605 Aircraft Maintenance Manual, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
TASK 24-00-00-910-801.
(2) Make sure that the BATT MASTER switch on the ELECTRICAL POWER
control panel is set to the OFF position. Put a tag on the BATT MASTER
switch.
(3) Disconnect the main battery. Refer to TASK 24-32-00-040-801.
(4) Disconnect the APU battery. Refer to TASK 24-32-00-040-802.
B. Inspection/Rework
(1) Gain access to the affected CBP-1 panel. Refer to Figure 1:
CBP-1 Part # 604-54046-1, -3 or -5
Remove, TASK 31-18-01-000-801
Install, TASK 31-18-01-400-801
Figure 1
Location of Affected CBP-1 Panel
(2) Remove existing bus bars W50PA & W52PA and retain for re-installation.
Refer to the attached Kit Drawing K604-54046.
NOTE: Bus bar W52PA may be installed in position L2 - Q2 due to a
production modification.
(3) Relocate wires PA94D8 and PA31M8 as per attached Kit Drawing
K604-54046. Refer to Chapter 20, Wiring Manual, Standard Practices.
Basic Issue: Jan 18/2010  605-24-004
Page 5 of 12

### Page 7 (OCR)

CHÄLLENGER 605  ARDIER
MODEL CL-600-2B16
(4) Replace existing bus bar W5PA. Refer to the attached Kit Drawing
K604-54046.
(5) Re-install existing bus bar W50PA (previously retained at step (2)) at the new
location. Refer to the attached Kit Drawing K604-54046.
(6) Relocate or replace existing bus bar W25PA (if required). Refer to the
attached Kit Drawing K604-54046.
(7) Re-install existing bus bar W52PA (previously retained at step (2)) at the new
location. Refer to the attached Kit Drawing K604-54046.
(8) Add new wires PA309A20 and PA310A20 as per attached Kit Drawing
K604-54046. Refer to Chapter 20, Wiring Manual, Standard Practices and
the Table 1 below for crimping tool required
(9) Inspect all green terminal lugs (Part No. B0808005-005N) within CBP-1 by
doing the following:
(a) Verify all affected terminal lugs by doing a manual pull test (light finger force)
on all size #22 and #20 gauge wires located in the specified circuit panel
locations. This also includes the Lower part of CBP-1 (P/N 604-54043-1).
(b) If any wire is found loose or any wire separates from the lug, the lug must
be discarded and the wire tip cut back and re-terminated with a new lug
of the appropriate part number. Refer to Chapter 20, Wiring Manual,
Standard Practices and Table 1, which follows:
Part Number  Equivalent P/N  Tool  Positioner  Remarks
B0808005-005N  N538-8043  69692-1  22-20  SEL #1 AWG, #3 AWG 22
M7928/4-149  47386  47806-2
Table 1
(c) The above procedure is repeated until all wires successfully pass the pull test.
(d) All crimped terminal lugs showing any of the following conditions must also
be repaired per the same standard practices:
- Cracked lug barrel,
- Cracked or perforated lug insulation,
- Asymmetrical secondary crimp,
- Broken wire strands, and
Insufficient or partial wire insertion into lug barrel.
Basic Issue: Jan 18/2010  605-24-004
Page 6 of 12

### Page 8 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
(10) Verify all electrical connections involving screw and nut fasteners. Make
sure that there are no loose connections and that the lugs cannot rotate on
the fastener axis. Refer to the following Table 2 for the recommended torque
values:
Component  Screw / Stud Size  Torque Value (in Ibs)
Circuit Breaker  #8 - Steel  17 - 19
P/N MS24571-50 (Qty 3 units)  (Qty 2 per unit)
All other Circuit Breaker P/N's  #8 - Steel  13-15
(Qty 2 per unit)
Power Diodes (Qty 2 units)  M5 Steel (Qty 2 per unit)  24 - 30
Table 2
C. Testing
(1) Do a continuity test of all newly installed wires, relocated wires and any wiring
disturbed by this inspection/modification.
(2) Do a visual inspection of CBP-1 upper and CBP-1 lower to ensure that there is
no FOD. If FOD is found to be present, clean as required.
(3) Connect and energize the external ac power. Refer to
TASK 24-41-00-861-801.
(4) Verify if power is available on the bus bar of CBP 1, rows F, G, L, M, N and P.
(5) Verify if power is available on load side of circuit breakers on rows Hand Q.
(6) Do the operational test of the associated system of any lug that was replaced.
(7) Remove power from the aircraft. Refer to TASK 24-00-00-861-802.
(8) Close circuit breaker panel CBP-1.
D. Close-out
Remove all tools, equipment and unwanted materials from the aircraft.
E. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
Basic Issue: Jan 18/2010  605-24-004
Page 7 of 12

### Page 9 (OCR)

CHALLENGER 605  DI
MODEL CL-600-2B16
3. MATERIAL INFORMATION
A. Kit
Kit 605K24-004 is necessary to do this Service Bulletin and contains the parts that
follow:
NEW  QTY  ITEM  USED  INSTRUCTIONS -
PART NO.  PART NO.  DISPOSITION
K604-54046-1/01  1  Wire Kit
S1448-10-28-13  1  Bus Bar
NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit
Parts List" contained in the respective kit, then the latter list prevails.
2. The actual quantity for some of the hardware contained in the kit
can be greater than the amount shown in the table as these items
are supplied in prepackaged quantities.
B. Parts
The part that follows may be necessary to do this Service Bulletin and is available
from Bombardier Aerospace Parts Logistics, Montréal:
NEW  QTY  ITEM  USED  INSTRUCTIONS -
PART NO.  PART NO.  DISPOSITION
B0808005-005N  AIR  Terminal Lug  same  Discard
NOTE: The part number for the item listed above is subject to change without
revision to this Service Bulletin. In case of discrepancy between this list
and any other list, the Illustrated Parts Catalog prevails and shall be used
to determine the latest part number.
C. Material
No materials required.
D. Publications
No publications required.
Basic Issue: Jan 18/2010  605-24-004
Page 8 of 12

### Page 10 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
REV
CODE C  z
MS CODE  PLK604-54048  cc  MODEL VERSION04 MODEL TYPE:  MATERIAL SPEC  B0801220-20-9  B0801220-20-9  CB1-H1, -H3, -Q1, -Q2
SHEET  DRAWN BY:  1 OF 2  J.-M. BENOIT  TITLE  KIT-INSTL'N, CBP-1 REWORK  CAGE CODE 88308  SIZE  DESCRIPTION  KIT-INSTL'N. CBP-1 REWORK  12 INS
BUS BAR  WIRE  WIRE  LUG
PART, DASH OR  IDENTIFYING NO.  K804-54046-1  S1448-10-28-13  PA309A20  PA310A20  M7928/4-149
P.O. Box 6087, Station Centre-ville  Montreal, Quebec, Canada H3C 3GB  CAGE  CODE  88308  88308  88308  88308  88308
BOMBARDIER  AEROSPACE  Bombardier Inc., Montreal  ZONE  FIND  SHEET  NO.  11  18  18  BT0501-1 CT4 REV 1999-05  SB804-24-004-54048-A-S1-PL
QTY REQ'D  LH
PER
RH
PL K604-54046 - Kit Installation - Rework of CBP-1
(Sheet 1 of 2, Rev. A)
Basic Issue: Jan 18/2010  605-24-004
Page 9 of 12

### Page 11 (OCR)

CHALLENGER 605
MODEL CL-600-2B16
TREV
ASSY  ©19g0 Bombardier Inc.
MS CODE  PL K604-54048  cc  MODEL VERSION: 04 MODEL TYPE:  CULING CONDITION AS REVISION ORBUTT  ENSURE THAT CIRCUIT BREAKERS ELECTRICAL ATTACHMENT POINTS (A1 & A2  TERMINALS SCREW) LENGTH IS ADEQUATE. i.e. 3 TO 7 THREADS SHOULD BE  A/C INCORPORATED WITH S/B 805-34-004 "3RD IRS" REVISION 02 OR  EARLIER ARE FITTED WITH A BUS BAR P/N S1448-10-28-10 (10 CIRCUIT  IN THIS CASE, THE BUS BAR P/N -10 SHALL BE REPLACED WITH A BUS BAR  ¡.e. THE FINAL CONFIGURATION SHOULD SHOW A BUS BAR FROM POSITION
SHEET  DRAWN BY:  J.-M. BENOIT  CAGE CODE 88308  DENOTES NEW WIRE.  DENOTES EXISTING WIRE OR CABLE.  PROTRUDING AND, NO FOULING CONDITIONS SHOULD OCCUR.  BREAKER HOLE LOCATIONS) FROM POSITION CB1-Q1 TO -Q10.  -9 (8 CIRCUIT BREAKER HOLE LOCATIONS).
Bombardier Inc., Montreal  400 Cote Vertu Road, West  Dorval, Quebec, Canada H4S 1Y8  CB1-Q2 TO -Q10 ONLY.
BOMBARDIER  AEROSPACE  NOTES  2.  BT0501-2 CT4 REY 1999-01  SB604-24-004-54048-A-S2-PL
PL K604-54046 - Kit Installation - Rework of CBP-1
(Sheet 2 of 2, Rev. A)
Basic Issue: Jan 18/2010  605-24-004
Page 10 of 12

### Page 12 (OCR)

605-24-004  Page 11 of 12
2221  VIEM LOOKINA FED REAR OF PANEL  K604-54046 - Kit Installation - Rework of CBP-1
95525552  (Sheet 1 of 1, Rev. A)
Basic Issue: Jan 18/2010

### Page 13 (OCR)

83004-21-001-54015-1-91-2
| 01-54018
605-24-004  Page 12 of 12
SATCOM  K604-54046 - Kit Installation - Rework of CBP-1  (Sheet 1 of 1, Rev. A continued)
Basic Issue: Jan 18/2010

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
