# Bombardier Service Bulletin 605-28-009

Copy: No revision named ("FAA-2016-7418_SB 605-28-009"), 23 pages: PDF https://openairdocs.org/files/sha256/1e/af/1eaf726d9a9c426c3f6a499cc29155526a279ff06a606a825117158d3904b009; text https://openairdocs.org/service-documents/bombardier/sb-605-28-009/file/1eaf726d9a9c.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2016-7418; AD 2016-20-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 605-28-009
- Page: https://openairdocs.org/service-documents/bombardier/sb-605-28-009

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-20-09](https://openairdocs.org/ad/2016-20-09.md), effective Jan 9, 2017: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-605-28-009/proposed.md).

## Text (23 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2016-7418; AD 2016-20-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK/MODIFICATION - AUXILIARY POWER UNIT (APU) FUEL-FEED
SYSTEM - POSSIBLE CHAFING OF THE APU NEGATIVE-G FUEL-FEED DRAIN LINE
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDEDSPECIFIED TIME COMPLIANCE COMPLIANCE TIMESee Paragraph 1. D.
EFFECTIVITY: AC Serial No. 5701 to 5970
MANPOWER: 0.5 man−hour is necessary to do the special check in Part A.
8 man−hours may be necessary for the modification in Part B.
22 man−hours may be necessary for the modification in Part C.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
SERVICE BULLETIN SUMMARY
www.cic.bombardier.com
MODEL CL−600−2B16
ATA 28−24
FUEL
Basic Issue: May 19/2015 605−28−009Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK/MODIFICATION - AUXILIARY POWER UNIT (APU) FUEL-FEED
SYSTEM - POSSIBLE CHAFING OF THE APU NEGATIVE-G FUEL-FEED DRAIN LINE
1. PLANNING INFORMATION
A. Effectivity
CL−600−2B16 aircraft Serial No. 5701 to 5970.
B. Reason
There is a possibility that the APU negative−G fuel−feed drain line attached to the
drain shroud at the pressure bulkhead FS621.00, LBL20.30 and WL59.00, may be
interfering with the wires and/or backshell of the connector P251 and/or frame at
FS625.00.
This Service Bulletin gives instructions to do an inspection of the affected aircraft to
make sure that there is sufficient clearance along the APU negative−G fuel−feed
drain line. Instructions are given to replace the APU negative−G fuel−feed drain
line, hose and/or fuel feed tube assembly, if there is any fouling of the APU
negative−G fuel−feed drain line with wires and backshell of the connector P251
and/or with frame.
C. Description
This Service Bulletin gives instructions to:
− Open the Aft equipment compartment door (311BB) to access the area around
the APU negative−G fuel−feed drain line at FS621.00, LBL20.30 and WL59.00,
− Inspect the APU negative−G fuel−feed drain line (drain line),
SERVICE BULLETIN
www.cic.bombardier.com
MODEL CL−600−2B16
ATA 28−24
FUEL
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2015 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: May 19/2015 605−28−009Page 1 of 20
This Service Bulletin is available at:

### Page 3

− Remove components for access to replace the APU negative−G fuel feed tube
assembly, if necessary,
− Replace the APU negative−G fuel−feed tube, if necessary,
− Replace the drain line, if necessary,
− Install components that were removed for access, if necessary,
− Do the fuel feed line leak check, if necessary,
− Do the pressure and blockage test to make sure that the APU fuel−feed tube is
correctly installed, if necessary, and
− Close the Aft equipment compartment door (311BB) which was opened for
access.
D. Compliance
Recommended within 24 months from this Service Bulletin release date (Basic
Issue).
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA in
accordance with established procedures.
F. Manpower
NOTES: 1. The man −hours given are estimates to help you schedule the tasks
given in this bulletin. The estimates are for direct labor performed by
an experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower estimates, refer to SB
605−00−002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the labor estimates and should be considered
for planning purposes before you schedule this Service Bulletin.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 2 of 20

### Page 4

0.5 to 22 man−hours total may be necessary to do this special check/modification.
− 0.5 man−hour is necessary for the special check in Part A,
− 8 man−hours may be necessary for the modification in Part B,
− 22 man−hours may be necessary for the modification in Part C.
Note:The 22 man−hours for Part C also includes the man−hours to perform Part B.
For aircraft in new aircraft warranty at the time of the Service Bulletin (Basic Issue)
release date, labor (does not include the Special Check, Part A) required to do this
modification (Part B or C) is at no cost if:
1. the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
2. this Service Bulletin is scheduled in less than 24 months from its release date
(Basic Issue).
For aircraft out of warranty, Bombardier Aerospace does not pay for the labor to do
this special check or for any rework that may be necessary.
G. Material − Cost and Availability
Kit 605K28−009A may be necessary for aircraft, Serial No. 5701 to 5913, 5917,
5918, 5923 to 5970 to do this modification.
KIT NO. PRICE
605K28−009A
Please contact Bombardier Aerospace
Parts Services, in Montreal, for delivery
lead times and confirmation of prices.
Kit 605K28−009B is necessary for aircraft, Serial No. 5914 to 5916 and 5919 to
5922 to do this modification.
NOTE: The kit 605K28 −009B will be available to order at the end of June 2015.
KIT NO. PRICE
605K28−009B
Please contact Bombardier Aerospace
Parts Services, in Montreal, for delivery
lead times and confirmation of prices.
The kits are available at no cost for aircraft in new aircraft warranty at time of the
Service Bulletin (Basic Issue) release date if:
− a no−charge purchase order is sent to Bombardier Aerospace in less than 24
months from this Service Bulletin release date (Basic Issue).
For those aircraft in new aircraft warranty at the time of Service Bulletin distribution
Smart Parts Plus does not pay for the kit to do this modification at any time.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 3 of 20

### Page 5

For those aircraft out of new aircraft warranty at the time of Service Bulletin
distribution Smart Parts Plus pays for the kit for up to 24 months from the Service
Bulletin distribution date (Basic Issue).
H. Tooling
The equipment and tools listed below are necessary to do this modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
Commercially Available − Air Test Stand
Commercially Available − Plug, Shroud Drain
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− Bombardier Aerospace, Modification Summary, 600−6425, Rev. C.
− Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C−4121,
Rev. A.
− Bombardier Aerospace, Kit Drawing K601−62706, Rev. B.
− CL−605 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 28, 51 and 53.
L. Publications Affected
− CL−605 Aircraft Maintenance Manual (AMM), Chapters 28.
− CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.
M. Equivalent Service Bulletins
− For the CL−601 aircraft, use SB 601−0640.
− For the CL−604 aircraft, use SB 604−28−021.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 4 of 20

### Page 6

2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL −605 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL−605 Aircraft Maintenance Manual, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Remove electrical power from the aircraft. Refer to AMM 24 −00−00−861−802.
(3) Obey the fuel system safety precautions. Refer to AMM 28 −00−00−910−801.
(4) Open the aft equipment compartment door (311BB). Refer to
AMM 52−41−00−010−801.
(5) For access to do the pressure and blockage check of the shroud, remove the
cargo compartment floor panels 241DLF and 241FLF. Refer to
AMM 53−01−01−000−803.
(6) If the replacement of the APU negative −G fuel feed tube assembly is
necessary, remove the components that follow to get access:
(a) Remove the APU battery. Refer to AMM 24 −32−04−000−801.
(b) Remove the radio altimeter transceiver. Refer to
AMM 34−44−01−000−801.
(c) Remove the LH wing anti −ice manifold duct (Part No. 14246−1). Refer to
AMM 30−11−01−000−801.
B. PART A: Special Check − Possible Chafing of the APU Negative−G Fuel Feed
Drain Line (Applicable for aircraft Serial No. 5701 to 5913, 5917, 5918 and
5923 to 5970)
For aircraft Serial No. 5914 to 5916 and 5919 to 5922, PART A is not
applicable, you must proceed to do Part C in Paragraph 2.D.
(1) Inspect the drain line which is attached to the shroud, at FS621.00, LBL20.30
and WL59.00, as follows: Refer to Figures 1, 2, 3, 4 and 5 for examples of
potential fouling.
(a) Make sure that the drain line does not foul with the following:
(i) The connector P251 backshell or wires.
(ii) The wing Anti −Ice shroud boot which is located immediately above
and to the left of the drain line at FS621.00.
(iii) The frame at FS625.00.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 5 of 20

### Page 7

(iv) Any other component.
(2) For aircraft, Serial No. 5701 to 5913, 5917, 5918 and 2923 to 5970, make sure
that there is a 0.5 in (12.7 mm) minimum clearance along the drain line and the
surrounding structure and other components as follows:
(a) For aircraft, Serial No. 5923 and 5928 to 5970, to avoid a potential risk of
fouling between the drain line and the electrical wiring from the connector
P251, do the step that follows:
(i) Reclock the connector P251 backshell to get a 0.5 in (12.7 mm)
minimum clearance.
(b) If the clearance is below 0.50 in (12.7 mm) and is greater or equal to 0.25
in (6.35 mm) along the drain line and the surrounding structure and other
components, locally apply a small hand pressure load of 5 to 10 lbs (2.3 to
4.5 kg) in all directions to the drain line, and continue as follows:
(i) If no fouling is found, condition is acceptable. Proceed to the
Close−Out in Paragraph 2.F.
(ii) If fouling occurs or if clearance is less than 0.25 in (6.4 mm) replace
the drain line. Proceed to do Part B in Paragraph 2.C.
C. PART B: Modification − Replacement of the APU Negative−G Fuel−Feed Drain
Line
(1) Replace the APU negative −G fuel−feed drain line as follows:
(a) Remove and discard the drain line Part No. 601 −62706−21 and hose Part
No. 600−97000−53. Refer to Kit Drawing K601−62706.
NOTE: Make sure you keep all the clamps for the new installation.
(b) Install new drain hose Part No. K601 −62706−003 and elbow Part No.
N4EUB4 per Kit Drawing K601−62706.
NOTES: 1. Make sure that there is 0.5 in (12.7 mm) minimum clearance
between the drain hose and structure, connector or any
other components.
2. Make sure you install the short end of the elbow Part No.
N4EUB4 to the shroud Part No. 600−62247−1 and the long
end to the drain hose Part No. K601−62706−003.
3. It is permissible to cut the drain hose to Part No.
K601−62706−003 to suit installation.
4. Keep the drain hose Part No. K601 −62706−003 as short as
possible to prevent it from sagging.
5. Reclock the shroud between 5 o’clock and 8 o’clock position
to achieve maximum possible clearance with the structure,
connector and any other components.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 6 of 20

### Page 8

6. Replace teflon tape between shroud and clamps.
(c) Secure the drain hose Part No. K601 −62706−003 on the LH stringer No.3
at FS630.00 with the new clamping installation using the new standoff Part
No. B0204046AA3−16T and associated hardware. It is permissible to
install clamp on existing standoff or spacer with screw Part No.
NAS1801−3−20 and spacer Part No. NAS43DD3−32C. Refer to Kit
Drawing K601−62706 and Figure 6.
(d) If after the installation of the new drain hose and fuel feed tube assembly
the clearances still cannot be achieved, submit an SRPSA to Customer
Support Engineering (CSE) for an approved rework by email at:
SRPSA@aero.bombardier.com for corrective action.
D. PART C: Modification − Replacement of the APU Negative−G Fuel Feed Tube
Assembly (Applicable for aircraft, Serial No. 5914 to 5916 and 5919 to 5922)
(1) For aircraft Serial No. 5914 to 5916 and 5919 to 5922, you must replace the
APU negative−G fuel feed tube assembly and the drain line. Do the steps that
follow:
(a) Replace the APU negative −G fuel feed tube assembly Part No.
601−62706−31 with the new APU negative−G fuel feed tube assembly
Part No. 604−62161−1, per Kit Drawing K601−62706. Refer to
AMM 28−24−10−400−801.
NOTE: Make sure there is a second technician FWD of the bulkhead to
hold the opposite coupling−nut on the bulkhead fitting While you
loosen/torque the coupling−nut on the fuel feed tube assembly.
(i) Before the final installation of the shroud Part No. 600 −62247−1 onto
the bulkhead flange, make sure there are no leaks of the APU
negative−G fuel feed tube assembly. Do the leak check of the APU
negative−G fuel feed line as follows:
a Connect the electrical power to the aircraft. Refer to
AMM 24−00−00−861−801.
b In the flight compartment, on the overhead panel, push the
switch/lights that follow:
i On the FUEL control panel, push in the left L BOOST PUMP
switch/light.
ii Do a general visual inspection of the area around the
connections of the new fuel−feed tube for fuel leaks. No
leaks are permitted.
iii On the FUEL control panel, push out the left L BOOST
PUMP switch/light.
(b) Install the new drain hose Part No. K601 −62706−003. Proceed to do Part
B in Paragraph 2.C.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 7 of 20

### Page 9

(c) Do the final installation of the shroud Part No. 600 −62247−1 onto the
bulkhead flange.
E. Testing
(1) Testing applicable to Part B:
(a) Do the pressure and blockage test of the shroud. Refer to
AMM 28−24−10−780−801.
(2) Testing applicable to Part C:
(a) Do the pressure and blockage test of the shroud. Refer to
AMM 28−24−10−780−801.
(b) Install the components as follows:
(i) Install the APU battery. Refer to AMM 24 −32−04−400−801.
(ii) Install the radio altimeter transceiver. Refer to
AMM 34−44−01−400−801.
(iii) Install the LH wing anti −ice manifold duct (Part No. 14246−1). Refer
to AMM 30−11−01−400−801.
(c) Do the operational test of the APU battery. Refer to
AMM 24−32−04−710−801.
(d) Do the operational test of the radio altimeter transceiver. Refer to
AMM 34−44−01−710−801.
(e) Do the leak test of the wing anti −ice duct manifold system. Refer to
AMM 30−11−01−790−801.
F. Close −Out
(1) Remove all tools, equipment and unwanted materials from the work area.
(2) If removed, close the cargo compartment floor panels 241DLF and 241FLF.
Refer to AMM 53−01−01−400−803.
(3) Close the aft equipment compartment door (311BB).
G. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
In an effort to improve the quality of our technical communications, we are
requesting your feedback. Please take a moment to fill out our easy on−line Service
Bulletin survey:
http://csefeedback.aero.bombardier.com
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 8 of 20

### Page 10

3. MATERIAL INFORMATION
A. Kit
Kit 605K28−009A may be necessary for aircraft, Serial No. 5701 to 5913, 5917,
5918, 5923 to 5970 to do this Service Bulletin and contains the parts that follow:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS-DISPOSITION
B0204046AA3−16T 1 Standoff − −
K601−62706−003 1
Drain Hose
28 in Length
MIL−DTL−6000
M6000−04−00204
601−62706−21 Discard
M85052/1−8 1 Clamp − −
M85052/1−9 2 Clamp − −
MS21042−3 1 Nut − −
N4EUB4 1 Elbow − −
NAS1801−3−7 1 Screw − −
NAS1149F0332P 2 Washer − −
NAS1801−3−9 1 Screw − −
NAS43DD3−32FC 1 Spacer − −
NAS1801−3−20 1 Screw − −
Kit 605K28−009B is necessary for aircraft, Serial No. 5914 to 5916 and 5919 to
5922 to do this Service Bulletin and contains the parts that follow:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
B0204046AA3−16T 1 Standoff − −
K601−62706−003 1
Drain Hose
28 in Length
MIL−DTL−6000
M6000−04−00204
601−62706−21 Discard
604−62161−1 1 Tube Assembly,APU Fuel Feed 601−62706−31 Discard
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 9 of 20

### Page 11

NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
M85052/1−8 1 Clamp − −
M85052/1−9 2 Clamp − −
MS21042−3 1 Nut − −
N4EUB4 1 Elbow − −
NAS1801−3−7 1 Screw − −
NAS1149F0332P 2 Washer − −
NAS1801−3−9 1 Screw − −
NAS43DD3−32FC 1 Spacer − −
NAS1801−3−20 1 Screw − −
NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit
Parts List contained in the respective kit, then the latter list prevails.
2. The actual quantity for some of the hardware contained in the kit  can
be greater than the amount shown in the table as these items  are
supplied in prepackaged quantities
B. Parts
No parts required.
C. Materials
The materials that follow, or equivalent, are necessary to do this Service Bulletin.
These can be purchased from a local supplier. Bombardier Aerospace does not pay
for these consumables.
DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER
(SEE
NOTE)
Leak
Detector, Fuel
System
− A−A−59110 As Necessary Code: A
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 10 of 20

### Page 12

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER
(SEE
NOTE)
Tape, Teflon −
A−A−59474
Type I
Class 5
As Necessary Code: A
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
SUPPLIERS ADDRESSES BY CODES
Code: A
Commercially Available
D. Publications
No publications required.
MODEL CL−600−2B16
Basic Issue: May 19/2015 605−28−009Page 11 of 20

### Page 13 (OCR)

čHÄLLỀNGÈŘ6o5  BO M
MODEL CL-600-2B16
POTENTIAL FOULING
DOES NOT MATCH CLEARANCE REQUIREMENT
SHROUD
J261
APU NEGATIVE-G FUEL FEED DRAIN LINE
SB604_29_006_001
APU Negative-G Drain Line Potential Fouling
Figure 1
Basic Issue: May 19/2015  605-28-009
Page 12 of 20

### Page 14 (OCR)

CHALLENGER 605  MBARDIER
MODEL CL-600-2B16
POTENTIAL FOULING
APU NEGATIVE-G FUEL FEED DRAIN LINE  DOES NOT MEET CLEARANCE REQUIREMENT
SHROUD
SB604 29 006 002
APU Negative-G Drain Line Potential Fouling
Figure 2
Basic Issue: May 19/2015  605-28-009
Page 13 of 20

### Page 15 (OCR)

OMBARDIE
CHALLENGER 60S
MODEL CL-600-2B16
APU NEGATIVE-G FUEL FEED DRAIN LINE  POTENTIAL FOULING
DOES NOT MEET CLEARANCE REQUIREMENT
Z010/  1g
J251
WING ANTI-ICE COUPLING BOOT
SHROUD
SB604_29_006_003
APU Negative-G Drain Line Potential Fouling
Figure 3
Basic Issue: May 19/2015  605-28-009
Page 14 of 20

### Page 16 (OCR)

BOMBARDIER
CHALLENGER 605
MODEL CL-600-2B16
POWER FEEDER
BUNDLE OF WIRES FOULING WITH DRAIN LINE
SB604_29_006_004
APU Negative-G Drain Line potential Fouling
Figure 4
Basic Issue: May 19/2015  605-28-009
Page 15 of 20

### Page 17 (OCR)

BOMBARDIE
CHALLENGER 605
MODEL CL-600-2B16
BENT SHROUD
APU NEGATIVE-G FUEL FEED DRAIN LINE
APU Negative- Digure be potential Fouling
Basic Issue: May 19/2015  605-28-009
Page 16 of 20

### Page 18 (OCR)

OMBARDIE
CHALLENGER 605
MODEL CL-600-2B16
CLAMPING INSTALLATION
NEW APU NEGATIVE-G FUEL FEED DRAIN HOSE
APU Negative-G Fuel-Feed Drain Hose Clamping
Figure 6
Basic Issue: May 19/2015  605-28-009
Page 17 of 20

### Page 19

K601−62706−B−S −S1−PL
MODEL CL−600−2B16
K601−62706 − PL K601−62706 − Kit − APU Neg−G Fuel Feed Drain Line − Modification
(Sheet 1 of 2, Rev. B)
Basic Issue: May 19/2015 605−28−009Page 18 of 20

### Page 20

K601−62706−B−S −S2−PL
MODEL CL−600−2B16
K601−62706 − PL K601−62706 − Kit − APU Neg−G Fuel Feed Drain Line − Modification
(Sheet 2 of 2, Rev. B)
Basic Issue: May 19/2015 605−28−009Page 19 of 20

### Page 21

K601−62706−B−S1
K601−62706 − K601−62706 − Kit − APU Neg−G Fuel Drain Line − Modification
(Sheet 1, Rev. B)
Basic Issue: May 19/2015 605−28−009Page 20 of 20

### Page 22

605−28−009 Basic May 19/2015
SPECIAL CHECK/MODIFICATION − AUXILIARY POWER UNIT (APU)
FUEL−FEED SYSTEM − POSSIBLE CHAFING OF THE APU
NEGATIVE−G FUEL−FEED DRAIN LINE
In an effort to improve the quality of our technical communications, we are replacing the
standard Service Bulletin Evaluation Form with an on−line Service Bulletin Survey
and we are requesting your feedback. Please take a moment to fill out our easy on−line
Service Bulletin survey at:
http://csefeedback.aero.bombardier.com
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:

### Page 23

SERVICE BULLETIN INCORPORATION SHEET − "605−28−009"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If your aircraft is registered on CAMP and you are reporting to them,
please do not send the incorporation sheet to Bombardier. If your aircraft
is on another tracking system, please contact Bombardier to make
arrangements for automated data submission.
605−28−009 Basic
COMPLIED WITH
YES    NO    N/A
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
