# Bombardier Service Bulletin 605-28-014

Copy: No revision named ("605-28-014 Basic"), 14 pages: PDF https://openairdocs.org/files/sha256/f5/fc/f5fc2ef396f1f0fff4c114608144293f5976d86241a1fafeaa316a48d0adac56; text https://openairdocs.org/service-documents/bombardier/sb-605-28-014/file/f5fc2ef396f1.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-0467; AD 2024-13-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 605-28-014
- Page: https://openairdocs.org/service-documents/bombardier/sb-605-28-014

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2024-13-01](https://openairdocs.org/ad/2024-13-01.md), effective Aug 16, 2024: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-605-28-014/proposed.md).

## Text (14 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-0467; AD 2024-13-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK/REWORK – PRESSURE REFUEL/DEFUEL SYSTEM –
INSPECTION OF WIRES AND REMOVAL OF SCUPPER ATTACHMENT FASTENER
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within four (4) years from this Service
Bulletin release date (Basic Issue)
EFFECTIVITY: A/C Serial No. 5775 to 5990
MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS NOYES
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 28−25
FUEL SYSTEM
Basic Issue: May 10/2023 605−28−014
Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK/REWORK – PRESSURE REFUEL/DEFUEL SYSTEM –
INSPECTION OF WIRES AND REMOVAL OF SCUPPER ATTACHMENT FASTENER
1. PLANNING INFORMATION
NOTE: Before you do this Service Bulletin, examine all STC, STA or equivalent
action changes to make sure that this Service Bulletin can be completed.
A. Effectivity
CL−600−2B16 aircraft, Serial No. 5775 to 5990.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
1. Condition:
There have been reports of damage on wiring isolation due to one bolt in fueling
adapter and it leads the bolt to intermittently short.
2. Evidence:
Some aircraft in service found one bolt fouling with harness causes damage on
wiring isolation.
3. Objective/Benefit:
This Service Bulletin instructs to inspect the electrical wires for damage and
remove the bolt and nutplate at harness fouling location to avoid the damages to
fueling adapter and wires around it. Repair or replace the wires if damaged.
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 28−25
FUEL SYSTEM
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2023 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: May 10/2023 605−28−014
Page 1 of 11
This Service Bulletin is available at:

### Page 3

C. Description
This Service Bulletin gives instructions in PART A to:
− Get access, remove the fueling adapter rings and gasket, and
− Inspect the electrical wires.
− If wires are not damaged, do the PART B of this Service Bulletin.
− If wires are damaged, do the PART C of this Service Bulletin.
This Service Bulletin gives instructions in PART B to:
− Remove the nutplate and rivets,
− Fill the nutplate and rivet holes with sealant, and
− Install the fueling adapter rings and gasket.
This Service Bulletin gives instructions in PART C to:
− Repair or replace the damaged electrical wires as required,
− Remove the nutplate and rivets,
− Fill the nutplate and rivet holes with sealant,
− Install the fueling adapter rings and gasket, and
− Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Recommended within four (4) years from this Service Bulletin release date
(Basic Issue).
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the aircraft configuration, submit an SRPSA for analysis and to
get an approved disposition to complete this Service Bulletin. Standard
SRPSA fees may apply. Refer to the Services section of the Bombardier
Customer Portal for the latest prices, rates and fees.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 2 of 11

### Page 4

F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 605−00−002.
2. Labor hours are based on the fact that the modification will be done at
the next scheduled maintenance task or inspection. Therefore no
man−hours are allotted to prepare the aircraft for maintenance or to
prepare for this Service Bulletin.
1.5 man−hours are necessary to do PART A of this Service Bulletin.
1.5 man−hours are necessary to do PART B of this Service Bulletin.
4 man−hours are necessary to do PART C of this Service Bulletin, excluding wire
repair.
Man−hours for the wire repair are not provided as it varies from case to case based
on actual discrepancies.
Bombardier Aviation does not pay for the labor to do this Service Bulletin.
G. Material − Cost and Availability
No kit or parts are necessary to do this Special Check/Rework. For material data,
refer to Paragraph 3.C.
H. Tooling
The equipment and tools listed below are necessary to do this Service Bulletin:
GSE REFERENCE NO. PART NO. DESCRIPTION
24−00−24 − Circuit Breaker Tag − Red
Commercially Available − Wrench, Torque 20 to 25 lbf in(2.26 to 2.82 Nm)
NOTES: 1. Refer to the CL−605 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the CL –605, for
acceptable GSE equivalents.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 3 of 11

### Page 5

3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the SPM, WM, Chapter 20,
then the tools called in the SPM−WM prevail. Other approved
alternative tools are acceptable and can also be used.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− Bombardier Aviation, Modification Summary, 600−6693, Rev. A.
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4303,
Rev. −−.
− Bombardier Aviation, Kit Drawing K604−62551, Rev. −−.
− Bombardier Aviation, Standard Practices Manual (SPM), Chapter 20.
− CL−605 Aircraft Maintenance Manual (AMM), Chapters 6, 20, 24, 28, 52
and 53.
− CL−605 Supplemental Maintenance Manual (SMM), Chapter 33.
− CL−605 Structural Repair Manual (SRM), Chapter 51.
L. Other Publications Affected
− CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.
− CL−605 Aircraft Maintenance Manual (AMM), Chapter 28.
M. Equivalent Service Bulletin
− For challenger 650 aircraft, use SB 650−28−003.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL−605 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL−605 Aircraft Maintenance Manual, Chapter 6.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 4 of 11

### Page 6

A. Aircraft Setup
WARNING: OBEY ALL SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL EQUIPMENT. IF YOU
DO NOT DO THIS, YOU CAN CAUSE INJURIES TO PERSONS
AND/OR DAMAGE TO THE EQUIPMENT.
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Obey fuel system safety precautions. Refer to AMM 28−00−00−910−801.
(3) Put DO NOT CONNECT − FUEL TANK MAINTENANCE placards on the AC
and the DC ground power receptacles.
(4) Put a warning tag on the BATT MASTER switch on the ELECTRICAL POWER
control panel, on the overhead panel. Make sure that the BATT MASTER
switch is set to OFF.
(5) Open the aft equipment−compartment door (311BB). Refer to
AMM 52−41−00−010−801.
(6) Open and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 G8 FUEL DEFUEL SOV POS 221
CBP−5 B5 FUEL DEFUEL FSCU 311
CBP−5 B6 FUEL DEFUEL L/R AUX SOVS 311
CBP−5 B7 FUEL DEFUEL T/T SOVS 311
CBP−5 B8 FUEL DEFUEL PANEL 311
B. PART A − Inspection of Electrical Wires
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and get an approved disposition to complete this Service Bulletin.
Standard SRPSA fees may apply. Refer to the Services section of the
Bombardier customer portal for the latest prices, rates and fees.
(1) Remove and retain the bolts, Part No. NAS6203−3 (qty 16) and AN3−5A
(qty 8), rings, Part No. 600−62736−7 and 600−62736−27, and the gasket, Part
No. S5805−2, from the fueling adapter. Refer to AMM 28−25−01−000−801 and
Figure 1, Detail A.
NOTES: 1. It is not necessary to remove the right wing−to−fuselage fairing
(192BB).
2. Make sure that the ring, Part No. 600−62736−17 does not rotate.
Refer to Figure 1, Detail A.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 5 of 11

### Page 7

(2) Inspect the electrical wires attached to connector J274. Refer to Figure 1,
Detail A.
NOTE: Use the boroscope for inspection, if necessary.
(a) If electrical wires are not damaged, do the PART B of this Service Bulletin.
(b) If electrical wires are damaged, do the PART C of this Service Bulletin.
C. PART B − Removal of Scupper Attachment Fastener
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and get an approved disposition to complete this Service Bulletin.
Standard SRPSA fees may apply. Refer to the Services section of the
Bombardier customer portal for the latest prices, rates and fees.
(1) Remove and discard the rivets, Part No. MS20426AD3 (qty 2), and the
nutplate, Part No. MS21061L3 (qty 1) at one specific location as shown in
Figure 1, Detail A and B.
(2) Inspect the scupper, Part No. 600−62736−21 for any damage. Refer to
Figure 1, Detail A.
(a) If there is damage, contact Bombardier Aviation for the repair instructions.
(3) Fill the nutplate and rivet holes with sealant (MIL−PRF−81733 type II, class I)
at the location as shown in Figure 1, Detail A and B. Refer to SRM 51−23−04
or SPM−MM 51−23−00.
NOTE: It is permissible to use sealant AC−380 B−1/2 or B−2, MC−780 B−1/2
or B−2, PR−2007 B−1/2 or B−2, or WS−8032S B−1/2 or B−2 as
alternative.
(4) Install the retained rings, Part No. 600−62736−7 and 600−62736−27, gasket,
Part No. S5805−2, and the bolts, Part No. NAS6203−3 (qty 15) and AN3−5A
(qty 8), on the fueling adapter. Refer to AMM 28−25−01−400−801 and
Figure 1, Detail A.
NOTE: Do not install the bolt, Part No. NAS6203−3 at one specific location as
shown in Figure 1, Detail A.
D. PART C − Repair or Replacement of Electrical Wires and Removal of Scupper
Attachment Fastener
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and get an approved disposition to complete this Service Bulletin.
Standard SRPSA fees may apply. Refer to the Services section of the
Bombardier customer portal for the latest prices, rates and fees.
(1) Remove the right wing−to−fuselage fairing (192BB). Refer to
AMM 53−62−01−000−802.
(2) Replace all electrical wires damaged with exposed core. Refer to
SPM−WM 20−12−00.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 6 of 11

### Page 8

(3) Repair all electrical wires damaged only in the insulation (no exposed core).
Refer to SPM–WM 20−12−11.
(4) Remove and discard the rivets, Part No. MS20426AD3 (qty 2), and the
nutplate, Part No. MS21061L3 (qty 1) at one specific location as shown in
Figure 2, Detail A and B.
(5) Inspect the scupper, Part No. 600−62736−21 for any damage. Refer to
Figure 2, Detail A.
(a) If there is damage, contact Bombardier Aviation for the repair instructions.
(6) Fill the nutplate and rivet holes with sealant (MIL−PRF−81733 type II, class I)
at the location as shown in Figure 2, Detail A and B. Refer to SRM 51−23−04
or SPM−MM 51−23−00.
NOTE: It is permissible to use sealant AC−380 B−1/2 or B−2, MC−780 B−1/2
or B−2, PR−2007 B−1/2 or B−2, or WS−8032S B−1/2 or B−2 as
alternative.
(7) Install the retained rings, Part No. 600−62736−7 and 600−627 36−27, gasket,
Part No. S5805−2, and the bolts, Part No. NAS6203−3 (qty 15) and AN3−5A
(qty 8), on the fueling adapter. Refer to AMM 28−25−01−400−801 and
Figure 2, Detail A.
NOTE: Do not install the bolt, Part No. NAS6203−3 at one specific location as
shown in Figure 2, Detail A.
(8) Install the right wing−to−fuselage fairing (192BB). Refer to
AMM 53−62−01−400−802.
E. Testing for PART C
(1) Do the operational test of the wing inspection light. Refer to
AMM 33−43−00−710−801.
(2) Do the operational test of the warning switch for the pressure refuel/defuel
adapter door. Refer to AMM 52−72−01−710−801.
(3) If aircraft has been modified to include service compartment lightning, do the
operational test for the service compartment lightning. Refer to
SMM 33−37−00−710−801.
F. Close−out
(1) Remove the warning tag from the BATT MASTER switch and the placards
from the AC and DC round power receptacles.
(2) Remove the tag and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE
CBP−1 G8 FUEL DEFUEL SOV POS 221
CBP−5 B5 FUEL DEFUEL FSCU 311
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 7 of 11

### Page 9

CB PANEL CB NO. NAME ZONE
CBP−5 B6 FUEL DEFUEL L/R AUX SOVS 311
CBP−5 B7 FUEL DEFUEL T/T SOVS 311
CBP−5 B8 FUEL DEFUEL PANEL 311
(3) Remove all tools, equipment and unwanted materials from the work area.
(4) Close the aft equipment−compartment door (311BB). Refer to
AMM 52−41−00−410−801.
G. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kits
No kits required.
B. Parts
No parts required.
C. Material
The material that follows, or equivalent, is necessary to do this Service Bulletin. It
can be purchased from a local supplier. Bombardier Aviation does not pay for this
consumable.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 8 of 11

### Page 10

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER
(SEE
NOTE)
Sealant
Pro−Seal 80
CL B
(See Note 3)
MIL−PRF−81733,
Type II, Class 1,
Grade A
As Necessary Code: A
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
3. It is permissible to use sealant AC−380 B−1/2 or B−2, MC−780 B−1/2
or B−2, PR−2007 B−1/2 or B−2, or WS−8032S B−1/2 or B−2 as
alternative.
SUPPLIERS ADDRESSES BY CODES
Code: A
Commercially Available
D. Publications
No publications required.
MODEL CL−600−2B16
Basic Issue: May 10/2023 605−28−014
Page 9 of 11

### Page 11

FS411.00
SB650−28−003_001
600−62736−9/−23/−27
(RETAINING RING)
600−62736−7
(RETAINING RING)
S5805−1/−2
(GASKET)
NAS6203−3
(BOLT)
(QTY 15)
AN3−5A
(BOLT)
(QTY 8)
J274
(CONNECTOR)
600−62736−17
(RETAINING RING)
SCUPPER
(REF)
1
MS20426AD3
(RIVET)
MS21061L3
(NUTPLATE)
SCUPPER
(REF)
3
3
NOTES
1
2 Fill the nutplate and rivet holes with sealant after removal.
Make sure that the retaining ring does not rotate.
3 Do not install the bolt at one specific location as shown.
3
MODEL CL−600−2B16
PART A − Inspection of Electrical Wires and Removal of Scupper Attaching Fastener
Figure 1
Basic Issue: May 10/2023 605−28−014
Page 10 of 11

### Page 12

FS411.00604−50223−1
(BRACKET)
J274
(CONNECTOR)
600−62736−21
(SCUPPER)
S5805−1/−2
(GASKET)
600−62736−7
(RETAINING RING)
600−62736−9/−23/−27
(RETAINING RING)
MS20426AD3
(RIVET)
MS21061L3
(NUTPLATE)
NAS6203−3
(BOLT)
(QTY 15) AN3−5A
(BOLT)
(QTY 8)
SB650−28−003_011
SCUPPER
(REF)
600−62736−17
(RETAINING RING)
3
3
NOTES
1
2 Fill the nutplate and rivet holes with sealant after removal.
Make sure that the retaining ring does not rotate.
3 Do not install the bolt at one specific location as shown.
1
3
MODEL CL−600−2B16
PART B − Repair or Replacement of Electrical Wires and Removal of Scupper Attaching
Fastener
Figure 2
Basic Issue: May 10/2023 605−28−014
Page 11 of 11

### Page 13

605−28−014 Basic May 10/2023
SPECIAL CHECK/REWORK – PRESSURE REFUEL/DEFUEL SYSTEM –
INSPECTION OF WIRES AND REMOVAL OF SCUPPER ATTACHMENT
FASTENER
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 14

SERVICE BULLETIN INCORPORATION SHEET − "605−28−014"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
605−28−014 Basic
COMPLIED WITH
YES    NO    N/A
PART A
PART B
PART C
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
