# Bombardier Service Bulletin 605-36-002

Copy: No revision named ("605-36-002 Basic"), 42 pages: PDF https://openairdocs.org/files/sha256/84/97/849744ce52fde5db78995fefaab1f95ead1a4fed5e560767585dc92d021449d1; text https://openairdocs.org/service-documents/bombardier/sb-605-36-002/file/849744ce52fd.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1710; AD 2023-22-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 605-36-002
- Page: https://openairdocs.org/service-documents/bombardier/sb-605-36-002

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2023-22-16](https://openairdocs.org/ad/2023-22-16.md), effective Jan 5, 2024: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-605-36-002/proposed.md).

## Text (42 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1710; AD 2023-22-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK/REWORK – BLEED-AIR LEAK DETECTION SYSTEM –
SPECIAL CHECK OF THE BLEED LEAK DETECTION ELEMENTS
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within 96 months or 7800 flight cycles
whichever comes first from this Service
Bulletin release date (Basic Issue)
EFFECTIVITY: A/C Serial No. 5701 to 5988
MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make
it necessary to implement this Service Bulletin.
To place an order for parts, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 36−21
PNEUMATIC
Basic Issue: Dec 23/2022 605−36−002
Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK/REWORK – BLEED-AIR LEAK DETECTION SYSTEM –
SPECIAL CHECK OF THE BLEED LEAK DETECTION ELEMENTS
1. PLANNING INFORMATION
NOTES: 1. To reduce operator downtime due to aircraft set−up, access, close−out
and return to service testing, Bombardier is recommending that the work is
done at the 96 month scheduled maintenance event while still respecting
the Service Bulletin compliance time. Refer to Paragraph 1.F.
2. Two persons are necessary to perform this Service Bulletin. However, a
third person may be required to assist with heat gun operation.
3. Do not perform this test procedure when the ambient temperature around
the aircraft is below 0°C (32°F).
4. Send all Test Results to Bombardier Customer Support Engineering
through the SRPSA form to SRPSA@aero.bombardier.com or through
Salesforce for BAS Facilities.
5. Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
A. Effectivity
CL−600−2B16 Aircraft, Serial No. 5701 to 5988.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 36−21
PNEUMATIC
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2022 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 23/2022 605−36−002
Page 1 of 39
This Service Bulletin is available at:

### Page 3

B. Reason
1. Condition:
Some of the Leak Detection Loop (LDL) sensing elements supplied by Kidde
Aerospace & Defense may be non−conforming. These LDL sensing elements
present a risk due to the inability to detect a bleed air leak event at the specified
temperatures.
Appendix B presents a summary of the bleed leak detection element P/Ns
impacted and locations.
2. Evidence:
Deficiencies in the manufacturer’s Acceptance Test Procedure (ATP), allowed
for non−conforming LDL sensing elements to pass as good units.
3. Objective/Benefit:
This Service Bulletin introduces an on−wing test procedure to test the
serviceability (examine the functionality) of each LDL sensing element installed
on the aircraft and to replace those that have failed.
C. Description
This Service Bulletin gives instructions in PART A to:
− Gain access and test the LDL sensing elements (single loop) at the left wing
root, over the left wing center fuselage and in the left wheel well area.
This Service Bulletin gives instructions in PART B to:
− Gain access and test the LDL sensing elements (single loop) at the right wing
root, over the right wing center fuselage and in the right wheel well area.
This Service Bulletin gives instructions in PART C to:
− Gain access and test the LDL sensing elements (single loop) below the left side
lavatory and left side baggage compartment.
This Service Bulletin gives instructions in PART D to:
− Gain access and test the LDL sensing elements (single loop) below the right
side lavatory and right side baggage compartment.
This Service Bulletin gives instructions in PART E to:
− Gain access and test the LDL sensing elements (single loop and dual loop) in
the rear equipment bay.
This Service Bulletin gives instructions in PART F to:
− Gain access and test the LDL sensing elements (single loop) in the left pylon
area.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 2 of 39

### Page 4

This Service Bulletin gives instructions in PART G to:
− Gain access and test the LDL sensing elements (single loop) in the right pylon
area.
D. Compliance
Recommended within the 96 months or 7800 flight cycles, whichever comes first
from this Service Bulletin release date (Basic Issue).
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the aircraft configuration, submit an SRPSA for analysis and to
get an approved disposition to complete this Service Bulletin. Standard
SRPSA fees may apply. Refer to the Services section of the Bombardier
customer portal for the latest prices, rates and fees.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 605−00−002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
3. To reduce operator downtime due to aircraft set−up, access,
close−out and return to service testing, Bombardier is recommending
that the work is done at the 96 month scheduled maintenance event
while still respecting the Service Bulletin compliance time. Refer to
Paragraph 1.F.
1. If the aircraft is in scheduled heavy−maintenance: 16 total man−hours are
necessary to complete this Service Bulletin.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 3 of 39

### Page 5

2. If the aircraft is outside scheduled heavy−maintenance: 37 total man−hours are
necessary to complete this Service Bulletin. The breakdown of the man−hours
is as follows:
− 10 man−hours are necessary to do PART A of this Service Bulletin.
− 10 man−hours are necessary to do PART B of this Service Bulletin.
− 1.5 man−hours are necessary to do PART C of this Service Bulletin.
− 1.5 man−hours are necessary to do PART D of this Service Bulletin.
− 7 man−hours are necessary to do PART E of this Service Bulletin.
− 3.5 man−hours are necessary to do PART F of this Service Bulletin.
− 3.5 man−hours are necessary to do PART G of this Service Bulletin.
The labor required to do this Service Bulletin when the aircraft is in or outside
scheduled heavy−maintenance is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
− this Service Bulletin is scheduled in less than 96 months from its release date
(Basic Issue).
G. Material − Cost and Availability
No kit is necessary to do this Special Check. For material data, refer to
Paragraph 3.C.
The parts listed in Paragraph 3.B may be necessary to do this service Bulletin.
The parts are available at no cost if:
− a no−charge purchase order is sent to Bombardier Aviation in less than
96 months from this Service Bulletin release date (Basic Issue).
NOTE: If material coverage is required due to part failure, a scrap certificate will
be required. Claims will not be approved without the necessary scrap
certificate. Please see scrap certificate form attached with Service Bulletin.
Smart Parts does not pay for this recommended Service Bulletin at any time.
H. Tooling
The equipment and tools listed below are necessary to do special check.
GSE
REFERENCE
NO.
PART NO. DESCRIPTION
Commercially
Available
(See Note 4 and
5)
Kit 173948 Testing Kit
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 4 of 39

### Page 6

GSE
REFERENCE
NO.
PART NO. DESCRIPTION
Commercially
Available
(See Note 6)
Fluke 289 (or
equivalent)
Digital Multi Meter (Type K input
0−594°C (32−1101.2°F), Accuracy of
±2.2°C (±8.3°F) or 0.75%, 0−40°C
(32−104°F) operating temp)
Commercially
Available
(See Note 6)
STEINEL Model
HG 2620 E,
HG 2220 E (or
equivalent)
Heat Gun (capable of 350°C (662°F) hot
air delivery with tolerence of ±10°F or
±5°C)
Commercially
Available −
Heat Gun, Extension, Flexible
Or
(Operator can built an equivalent GSE
from a metallic tube)
Refer to Figure 5
Commercially
Available
(See Note 6)
− K Type Thermocoupler (or equivalent)
Commercially
Available − Marker (Green Sharpie Marker orequivalent permanent marker)
Commercially
Available − Scraper, Non−Metallic
Commercially
Available − Sharp Knife
Commercially
Available
(See Note 6)
110048645
or
07051
STEINEL Heat Gun Nozzle Deflector
Commercially
Available
(See Note 6)
− Timer with 1 second resolution or less(watch, stopwatch)
Commercially
Available − Walkie Talkies
NOTES: 1. Refer to the CL−605 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the CL−605, for
acceptable GSE equivalents.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 5 of 39

### Page 7

3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the SPM, WM, Chapter 20,
then the tools called in the SPM−WM prevail. Other approved
alternative tools are acceptable and can also be used.
4. Operator can order kit 173948 from Collins Aerospace, which
contains digital multimeter, heat gun, K type thermocoupler ,
STEINEL heat gun nozzle deflector and timer needed to perform
testing.
5. The content, details and ordering information of kit 173948 is
available in KIDDE VSB No. CFD−26−1.
6. The component can be obtained separately.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive, (pending).
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4274,
Rev. B.
− Kidde, Vendor Service Bulletin, CFD−26−1, Revision 6,
dated 28 February 2022.
− CL−605 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 36, 51 and 53.
− CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapters 20 and 51.
− Bombardier Aviation, Standard Practices Manual (SPM), Chapter 20.
− Appendix A − Test Results Sheet (attached).
− Appendix B − Test Matrix Sheet (attached).
− Bleed−Loop Scrap Certificate (attached).
L. Other Publications Affected
None.
M. Equivalent Service Bulletins
− For the Challenger 650 aircraft, use SB 650−36−001.
− For the Challenger 604 aircraft, use SB 604−36−005.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 6 of 39

### Page 8

2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL−605 Aircraft
Maintenance Manual (AMM) unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL−605 Aircraft Maintenance Manual (AMM), Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Do the standard aircraft configuration for maintenance. Refer to
AMM 12−00−00−867−801.
PART A
(3) Remove the MLG wheel bin (163AZ). Refer to AMM 53−65−01−000−801.
(4) Remove the forward wing−to−fuselage fairing (191BB). Refer to
AMM 53−62−01−000−802.
(5) Remove the center side fairing (161EL). Refer to AMM 53−64−01−000−803.
(6) Remove the aft side fairing (161FL). Refer to AMM 53−64−01−000−804.
PART B
(7) Remove the MLG wheel bin (164AZ). Refer to AMM 53−65−01−000−801.
(8) Remove the forward wing−to−fuselage fairing (192BB). Refer to
AMM 53−62−01−000−802.
(9) Remove the center side fairing (162EL). Refer to AMM 53−64−01−000−803.
(10) Remove the aft side fairing (162FL). Refer to AMM 53−64−01−000−804.
PART C
(11) Remove the cargo compartment floor−panels (241CLF/241DLF). Refer to
AMM 53−01−01−000−803.
PART D
(12) Remove the cargo compartment floor−panel (242DRF). Refer to
AMM 53−01−01−000−803.
PART E
(13) Open the aft equipment compartment access−door (311BB). Refer to
AMM 52−41−00−010−801.
PART F
(14) Open the aft equipment compartment access−door (311BB). Refer to
AMM 52−41−00−010−801.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 7 of 39

### Page 9

(15) Remove the pylon detachable−leading edge (411AL). Refer to
AMM 54−60−07−000−801.
(16) Remove the pylon access panels 412AT and 412AB. Refer to
AMM 54−60−01−000−801.
PART G
(17) Open the aft equipment compartment access−door (311BB). Refer to
AMM 52−41−00−010−801.
(18) Remove the pylon detachable−leading edge (421AL). Refer to
AMM 54−60−07−000−801.
(19) Remove the pylon access panels 422AT and 422AB. Refer to
AMM 54−60−01−000−801.
B. PART A — Special Check — LDL Sensing Elements Test at the Left Wing
Root, over the Left Wing Center Fuselage and in the Left Wheel Well Area
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 2 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.M. (Detailed
Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
C. PART B — Special Check — LDL Sensing Elements Test at the Right Wing
Root, over the Right Wing Center Fuselage and in the Right Wheel Well Area
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 8 of 39

### Page 10

(4) For each LDL sensing element, refer to Appendix A and Figure 2 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.M. (Detailed
Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
D. PART C — Special Check — LDL Sensing Elements Test below the Left Side
Lavatory and Left Side Baggage Compartment
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 2 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.M. (Detailed
Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
E. PART D — Special Check — LDL Sensing Elements Test below the Right Side
Lavatory and Right Side Baggage Compartment
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type A.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 2 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.M. (Detailed
Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 9 of 39

### Page 11

(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
F. PART E — Special Check — LDL Sensing Elements Test in the Rear
Equipment Bay
NOTES: 1. For single loop: One LDL sensing element must be heated.
2. For dual loop: Both LDL sensing elements must be heated at
approximately same time.
3. CAS message will be posted when each LDL sensing element or both
LDL sensing elements in the loop reach the temperature set point
specified in Table 1 for salt type C.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 3 for the
location of each test point.
(5) For all test point locations, test each paired LDL sensing element per
Paragraph 2.L. (Detailed Test Procedure − Dual Loops) and each single LDL
sensing element per Paragraph 2.M (Detailed Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
G. PART F — Special Check — LDL Sensing Elements Test in the Left Pylon
Area
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type C.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 4 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.M. (Detailed
Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 10 of 39

### Page 12

H. PART G — Special Check — LDL Sensing Elements Test in the Right Pylon
Area
NOTES: 1. One element must be heated.
2. CAS message will be posted when each LDL sensing element in the
loop reaches the temperature set point specified in Table 1 for salt
type C.
(1) Do the aircraft general test setup per Paragraph 2.I.
(2) Do the heat gun temperature verification per Paragraph 2.J.
(3) Do the cockpit preparation per Paragraph 2.K.
(4) For each LDL sensing element, refer to Appendix A and Figure 4 for the
location of each test point.
(5) For all test point locations, test each element per Paragraph 2.M. (Detailed
Test Procedure − Single Loop).
(6) If necessary, replace the failed LDL sensing element by a conforming one.
(7) Install the applicable panels from the area that were tested.
(8) Repeat the cockpit preparation per Paragraph 2.K.
I. General Aircraft Test Setup
(1) The testing must be performed in a well ventilated hangar or tarmac conditions
with no precipitation.
(2) A/C power required. Engine, APU or Huffer Cart air supply are NOT required.
(3) Open the applicable panels/doors to access the areas to be tested.
J. Heat Gun Temperature Verification
WARNING: HEAT GUN SHOULD NOT BE USED NEAR FLAMMABLE LIQUIDS
OR IN AN EXPLOSIVE ENVIRONMENT (FUMES, GASES OR DUST). REMOVE
MATERIALS OR DEBRIS THAT MAY BECOME IGNITED FROM WORK AREA.
CAUTION: WHEN HEATING LEAK DETECTION ELEMENTS THE HEAT GUN
SHALL BE POSITIONED SUCH THAT THE HEAT IS NOT APPLIED WITHIN
1 INCH (2.5 CM) OF SENSOR WHITE/RED GROMMETS.
CAUTION: DO NOT DIRECT HEAT GUN AIRSTREAM AT CLOTHING, HAIR OR
OTHER BODY PARTS.
CAUTION: ALWAYS HOLD HEAT GUN BY PLASTIC ENCLOSURE. THE METAL
NOZZLE REQUIRES APPROXIMATELY 20 MINUTES TO COOL TO WHERE IT
CAN BE TOUCHED. DO NOT TOUCH NOZZLE OR ACCESSORY TIPS UNTIL
COOL.
CAUTION: DO NOT STORE HEAT GUN UNTIL NOZZLE HAS COOLED TO
ROOM TEMPERATURE. PLACE TOOL IN A CLEAR AREA AWAY FROM
COMBUSTIBLE MATERIALS WHILE COOLING.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 11 of 39

### Page 13

CAUTION: DO NOT CUT OFF HEAT GUN AIRFLOW BY PLACING NOZZLE
TOO CLOSE TO WORK PIECE. KEEP INTAKE VENTS CLEAN AND CLEAR OF
OBSTRUCTIONS.
CAUTION: SHIELD MATERIALS AROUND THE HEATED AREA TO PREVENT
DAMAGE OR FIRE.
CAUTION: WEAR KEVLAR SLEEVES AND GLOVES WHEN WORKING IN
DIFFICULT AREAS WHERE THERE IS A RISK TO GET BURNT.
(1) Do the heat gun temperature verification as follows:
NOTE: To make sure the heat gun temperature is consistent during all
testing, make sure this verification is repeated after every four
(4) hours of testing or when the ambient conditions in the test location
change or when the sensing element temperature set point changes.
(a) Correctly attach the heat gun nozzle reflector to the heat gun.
(b) Connect the thermocouple wire to the digital multimeter and set the meter
to measure temperature in °C or °F.
(c) Place the thermocouple at the center of the heat protection shield, not
touching the shield, at the approximate location as identified in Figure 1.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 12 of 39

### Page 14

SB650−36−001_009
Sensing
Element
1−1.25’’
1.25−1.5’’
1−1.25’’
1.25−1.5’’
1.25−1.5’’
Heatgun Outlet
Sensing
Element
Testing a single loop
Testing two loops
Heatgun Outlet
MODEL CL−600−2B16
Test item placement within heat shield
Figure 1
Basic Issue: Dec 23/2022 605−36−002
Page 13 of 39

### Page 15

(d) Set the heat gun temperature so that the thermocouple reads the
thermocouple temperature verification value, as specified in Table 1 (Heat
Gun Temp. Settings).
NOTE: The last three (3) digits of the LDL sensing element part number
provides the temperature set point for each element being tested.
For example, LDL sensing element Part No. 35552−3−255 has a
temperature set point of  255°F (124°C) and LDL sensing
element Part No. 35607−2−310 has a temperature set point of
310°F (154°C).
Basically, all the LDL sensing elements in the aft equipment
compartment and pylons have a temperature set point of 310°F
(154°C) and the LDL sensing elements installed forward of the
rear pressure bulkhead (FS 621.00) on the wing anti−ice ducts
have a temperature set point of 255°F (124°C).
TABLE 1: HEAT GUN TEMPERATURE SETTINGS
SALT
TYPE
LDL SENSING
ELEMENT TEMP.
SET POINT
THERMOCOUPLE TEMP.
VERIFICATION VALUE
A 124°C or 255°F 135 (−0, +17)°C or 275 (−0, +30)°F
C 154°C or 310°F 167 (−0, +17)°C or 332 (−0, +30)°F
(e) Turn on the heat gun and set the airflow rate to maximum on the heat gun.
(f) Make sure the thermocouple temperature value increases to the
thermocouple temperature verification value as specified in Table 1.
(g) If necessary, repeat steps (a) to (f) for the second heat gun.
K. Cockpit Preparation
(1) Perform the integrity test of the bleed air leak detection system as follows:
(a) Set aircraft power ON.
(b) Make sure the following circuit breakers are closed:
LOCATION CBNUMBER CB NAME ZONE
CBP3 B1 B/LEAK L DET 221
CBP3 B2 B/LEAK R DET 221
CBP4 B12 B/LEAK TEST 222
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 14 of 39

### Page 16

(c) If any items in step (b) had to be modified, set aircraft power to OFF. Wait
10 seconds, and set aircraft power to ON. For an alternative to cycling
aircraft power, open and then close the following circuit breakers in the
following sequence:
(i) CBP4−B12, B/LEAK TEST
(ii) CBP3−B1, B/LEAK L DET
(iii) CBP3−B2, B/LEAK R DET
(d) On Bleed Air control panel, turn and hold DUCT MON knob to “TEST”.
Make sure of the following:
(i) On Speakers the “BLEED AIR DUCT” is heard.
(ii) On Bleed Air Control Panel:
a 10TH STAGE L and R DUCT FAIL PBAs come ON
b 14TH STAGE Land R DUCT FAIL PBAs come ON
(iii) On both MFDs the following messages are shown:
− ANTI−ICE DUCT (Red) Warning
− L 10TH DUCT (Red) Warning
− L 14TH DUCT (Red) Warning
− R 10TH DUCT (Red) Warning
− R 14TH DUCT (Red) Warning
− DUCT TEST OK (Green) Advisory
(iv) After 25 seconds the following messages are not shown:
a CAS MISCOMP (White) Status / TO−LDG
(e) On Bleed Air control panel, release DUCT MON knob. Make sure all
indications and messages listed in step (d) are not shown and aurals not
heard.
(f) Open and tag the circuit breaker that follows:
LOCATION CBNUMBER CB NAME ZONE
CBP4 B12 B/LEAK TEST 222
(g) On Bleed Air control panel, turn and hold DUCT MON knob to “TEST”.
Make sure all indications and messages listed in step (d) are not shown
and aurals not heard.
(h) Remove the tag and close the circuit breaker that follows:
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 15 of 39

### Page 17

LOCATION CBNUMBER CB NAME ZONE
CBP4 B12 B/LEAK TEST 222
(i) Open and tag the circuit breaker that follows:
LOCATION CBNUMBER CB NAME ZONE
CBP3 B1 B/LEAK L DET 221
(j) On Bleed Air control panel, turn and hold DUCT MON knob to “TEST”:
(i) On both MFDs the following messages are shown:
− ANTI−ICE DUCT (Red) Warning
− R 10TH DUCT (Red) Warning
− R 14TH DUCT (Red) Warning
(ii) On both MFDs the following message is not shown:
− L 10TH DUCT (Red) Warning
(k) Release the DUCT MON knob.
(l) Open and tag the circuit breaker that follows:
LOCATION CBNUMBER CB NAME ZONE
CBP3 B2 B/LEAK R DET 221
(m) On Bleed Air control panel, turn and hold DUCT MON knob to “TEST”:
(i) On both MFDs the following messages are not shown:
− R 14TH DUCT (Red) Warning
− LOOP A TEST OK (Green) Advisory
− LOOP B TEST OK (Green) Advisory
(n) Release the DUCT MON knob.
(o) Remove the tags and close the circuit breakers that follows:
LOCATION CBNUMBER CB NAME ZONE
CBP3 B1 B/LEAK LDET 221
CBP3 B2 B/LEAK R DET 221
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 16 of 39

### Page 18

(p) On Bleed Air control panel, turn and hold DUCT MON knob to “LOOP A”:
(i) On both MFDs the following message is shown:
− LOOP A TEST OK (Green) Advisory
(ii) On both MFDs the following messages are not shown:
− L 10TH DUCT (Red) Warning
− R 14TH DUCT (Red) Warning
(q) Release the DUCT MON knob.
(r) On Bleed Air control panel, turn and hold DUCT MON knob to “LOOP B”.
(i) On both MFDs the following message is shown:
− LOOP B TEST OK (Green) Advisory
(ii) On both MFDs the following messages are not shown:
− L 10TH DUCT (Red) Warning
− R 14TH DUCT (Red) Warning
(s) Release the DUCT MON knob.
L. Detailed Test Procedure − Dual loops
NOTES: 1. For dual loops, two loop system; both LDL sensing elements must be
heated at approximately same time.
2. CAS message will be posted when both LDL sensing elements in the
loop reach the TEMP SET POINT, specified in Table 1.
3. For each paired LDL sensing element, refer to Appendix A for the
location of each test point.
4. For elements tested at 3 locations, test the elements at both
extremities (not less than 1 inch from the connectors) and in the
middle. If access is limited, then test locations can be moved few
inches.
(1) Position one person in the cockpit to monitor CAS and BLEED AIR cockpit
control panel indications and one person at the test site with heat gun(s); both
with walkie talkies. Refer to Appendix A for test site locations.
(2) Enter the element information on the Test Results sheet (Appendix A). Make
sure that the ambient temperature, part number of the LDL sensing element
are entered.
NOTE: The serial number can be found etched on the coupling of the Leak
Detection Element at one end and the part number at the other end.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 17 of 39

### Page 19

(3) Conduct the heat gun Temperature Verification as detailed in Paragraph 2.J.
for the associated LDL sensing elements being tested.
NOTE: To make sure the heat gun temperature is consistent during all
testing, make sure this verification is repeated after every four (4)
hours of testing or when the ambient conditions in the test location
change or when the LDL sensing element temperature set point
changes.
(4) Allow the heat gun(s) to preheat for a minimum of 30 seconds to reach the
appropriate stable test temperature. Make sure that the exhaust of the heat
gun is directed in a safe direction.
CAUTION: SHIELD MATERIALS AROUND THE HEATED AREA TO PREVENT
DAMAGE OR FIRE. APPLY PROTECTIVE BARRIERS IF NECESSARY.
WHEN HEATING THE SENSING ELEMENTS THE HEAT GUN MUST
BE POSITIONED SUCH THAT THE HEAT IS NOT APPLIED WITHIN 1
INCH (2.5 CM) OF SENSOR WHITE GROMMETS.
TESTING MUST NOT BE PERFORMED WITHIN 1 INCH OF THE
CONNECTOR START OR ENDS AS THIS IS A NON−ACTIVE REGION
OF THE LDL SENSING ELEMENT.
(5) Record the heat gun temperature.
(6) Position the heat gun at the LDL sensing element test location over both LDL
sensing elements (LOOP A and LOOP B), using the deflector sleeve. Make
sure the deflector sleeve does not touch the LDL sensing elements.
NOTES: 1. If there is insufficient space to allow the heat gun to heat both
LDL sensing elements without contacting the LDL sensing
elements or clashing with surrounding structure/systems, it is
permitted to use two heat guns in the same location.
2. Some LDL sensing elements might be hard to reach. For those
particular cases it will be necessary to attach the snorkel
extension shown in Figure 5. All the component part numbers are
provided for BBAS/ASF to fabricate the snorkel extension if
required.
(7) Heat the LDL sensing elements with the heat gun(s) for no more than
120 seconds (2 minutes).
(8) Make sure that one of the following corresponding CAS LEAK WARNING
messages is shown within the 120 second thermal exposure:
− ANTI−ICE DUCT (Red)
− L 10TH DUCT (Red)
− L 14TH DUCT (Red)
− R 10TH DUCT (Red)
− R 14TH DUCT (Red)
NOTE: The posted CAS message shall correspond to the tested loop zone.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 18 of 39

### Page 20

(9) Remove the heat gun(s) from the LDL sensing elements when the associated
CAS LEAK WARNING message is posted or when the 120 second time out is
reached. Let the LDL sensing elements cool for three (3) minutes or until the
CAS LEAK WARNING message disappears.
(10) PASS/FAIL criteria:
(a) PASS: A heated LDL sensing element results in CAS LEAK WARNING
message (see list in Step 8) posting within the 120 second thermal
exposure.
(b) FAIL: A heated LDL sensing element that DOES NOT show a CAS LEAK
WARNING message (see list in Step 8) within the 120 second thermal
exposure.
(i) To determine which LDL sensing element has failed, do the following:
a To validate that loop A is OK or not, hold the DUCT MON knob to
LOOP A (it is spring loaded to the NORM position). This has for
effect to short out loop B.
b Heat element A at the same test point location.
c If a CAS LEAK WARNING message is displayed in the cockpit,
then the loop A is OK.
d If no CAS LEAK WARNING message is displayed in the cockpit,
then the loop A is not OK. The next steps are facultative.
e To validate that loop B is OK or not, hold the DUCT MON knob to
LOOP B.
f Heat element B at the same test point location. This has for effect
to short out loop A.
g If a CAS LEAK WARNING message is displayed in the cockpit,
then the loop B is OK.
h If no CAS LEAK WARNING message is displayed in the cockpit,
then the loop B is not OK.
(c) If a LDL sensing element fails due to the 120 second timeout, then the
LDL sensing element must be removed and red tagged. Replace the failed
element by a conforming part.
(i) If the LDL sensing element fails, record the element serial No., Date
and Stamps in Appendix A.
(ii) If material coverage is required due to part failure, a scrap certificate
will be required. Claims will not be approved without the necessary
scrap certificate. Please see scrap certificate form attached with
Service Bulletin.
(11) Record results on the supplied Test Results Sheet (Appendix A).
(12) Repeat Steps (2) to (11) at the next test point location of the LDL sensing
elements to be tested. Refer to Appendix A.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 19 of 39

### Page 21

(13) Continue until each LDL sensing element test point location presented is tested
and results recorded.
(14) Mark one (1) face of one (1) connector hex nut with one (1) GREEN mark to
indicate that the active LDL sensing element has been thermally tested and
verified PASS at all locations. Refer to Figure 6.
SOCKET TYPE END PIN TYPE END
Figure 6
(15) Remove any protection thermal blankets or protection aids. Continue to the
next applicable LDL sensing element to be tested.
(16) When testing is complete, run each heat gun with fan for five (5) minutes to
cool.
(17) Turn off the heat gun.
(18) Submit all test results (Appendix A) to Bombardier Aviation at:
BBAD_SBgroup@aero.bombardier.com
M. Detailed Test Procedure − Single loop
NOTES: 1. For single loop, one loop system; one element must be heated.
2. CAS message will be posted when each LDL sensing elements in the
loop reach the TEMP SET POINT, specified in Table 1.
3. For each LDL sensing element, refer to Appendix A for the location of
each test point.
4. For all locations test each element per the Detailed Test Procedure.
5. For elements tested at 3 locations, test the elements at both
extremities (not less than 1 inch from the connectors) and in the
middle. If access is limited, then test locations can be moved few
inches.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 20 of 39

### Page 22

(1) Position one person in the cockpit to monitor CAS and BLEED AIR cockpit
control panel indications and one person at the test site with heat gun; both
with walkie talkies. Refer to Appendix A for each test point.
(2) Enter the element information on the Test Results sheet (Appendix A). Make
sure that the ambient temperature, part number of the LDL sensing element
are entered.
NOTE: The serial number can be found etched on the coupling of the Leak
Detection Element at one end and the part number at the other end.
(3) Conduct the heat gun Temperature Verification as detailed in Paragraph 2.J.
for the associated LDL sensing element being tested.
NOTE: To make sure the heat gun temperature is consistent during all
testing, make sure this verification is repeated after every four (4)
hours of testing or when the ambient conditions in the test location
change or when the LDL sensing element temperature set point
changes.
(4) Allow the heat gun(s) to preheat for a minimum of 30 seconds to reach the
appropriate stable test temperature. Ensure that the exhaust of the heat gun is
directed in a safe direction.
CAUTION: SHIELD MATERIALS AROUND THE HEATED AREA TO PREVENT
DAMAGE OR FIRE. APPLY PROTECTIVE BARRIERS IF NECESSARY.
WHEN HEATING THE SENSING ELEMENTS THE HEAT GUN MUST
BE POSITIONED SUCH THAT THE HEAT IS NOT APPLIED WITHIN 1
INCH (2.5 CM) OF SENSOR WHITE GROMMETS.
TESTING MUST NOT BE PERFORMED WITHIN 1 INCH OF THE
CONNECTOR START OR ENDS AS THIS IS A NON−ACTIVE REGION
OF THE LDL SENSING ELEMENT.
(5) Record the heat gun temperature.
(6) Position the heat gun at the LDL sensing element test location over the LDL
sensing element, using the deflector sleeve. Make sure the deflector sleeve is
not touching the LDL sensing element.
NOTE: Some LDL elements might be hard to reach. For those particular
cases it will be necessary to attach the snorkel extension shown in
Figure 5. All the component part numbers are provided for BBAS/ASF
to fabricate the snorkel extension if required.
(7) Heat the LDL sensing element with the heat gun(s) for no more than
120 seconds (two (2) minutes).
(8) Make sure one of the following corresponding CAS LEAK WARNING
messages is shown within the 120 second thermal exposure:
− ANTI−ICE DUCT (Red)
− L 10TH DUCT (Red)
− L 14TH DUCT (Red)
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 21 of 39

### Page 23

− R 10TH DUCT (Red)
− R 14TH DUCT (Red)
(9) Remove the heat gun(s) from the LDL sensing elements when the associated
CAS LEAK WARNING message is posted or when the 120 second time out is
reached. Let the LDL sensing elements cool for three (3) minutes or until the
CAS LEAK WARNING message disappears.
(10) PASS/FAIL criteria:
(a) PASS: A heated LDL sensing element results in CAS LEAK WARNING
message (see list in Step 7) posting within the 120 second thermal
exposure.
(b) FAIL: A heated LDL sensing element that DOES NOT result in a CAS
LEAK WARNING message (see list in step 7) within the 120 second
thermal exposure.
(c) If a LDL sensing element fails due to the 120 second timeout, then the
LDL sensing element must be removed and red tagged. Replace the failed
element by conforming part.
(i) If the LDL sensing element fails, record the element serial No., Date
and Stamps in Appendix A.
(ii) If material coverage is required due to part failure, a scrap certificate
will be required. Claims will not be approved without the necessary
scrap certificate. Please see scrap certificate form attached with
Service Bulletin.
(11) Record results on the supplied Test Results Sheet (Appendix A).
(12) Continue to the next applicable LDL sensing element to be tested.
(13) When testing is complete, run each heat gun with fan for five (5) minutes to
cool.
(14) Turn off the heat gun.
(15) Submit all test results (Appendix A) to Bombardier Aviation at:
BBAD_SBgroup@aero.bombardier.com
N. Testing
(1) Connect and energize the external AC power. Refer to
AMM 12−00−07−861−801.
(2) Do the operational test of the bleed−air leak−detection and warning system.
Refer to AMM 36−21−00−710−801.
(3) Remove the external AC power. Refer to AMM 12−00−07−861−802.
O. Close−out
(1) Remove all tools, equipment and unwanted materials from the aircraft.
PART A
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 22 of 39

### Page 24

(2) Install the aft side fairing (161FL). Refer to AMM 53−64−01−400−804.
(3) Install the center side fairing (161EL). Refer to AMM 53−64−01−400−803.
(4) Install the forward wing−to−fuselage fairing (191BB). Refer to
AMM 53−62−01−400−802.
(5) Install the MLG wheel bin (163AZ). Refer to AMM 53−65−01−400−801.
PART B
(6) Install the aft side fairing (162FL). Refer to AMM 53−64−01−400−804.
(7) Install the center side fairing (162EL). Refer to AMM 53−64−01−400−803.
(8) Install the forward wing−to−fuselage fairing (192BB). Refer to
AMM 53−62−01−400−802.
(9) Install the MLG wheel bin (164AZ). Refer to AMM 53−65−01−400−801.
PART C
(10) Install the cargo compartment floor−panels (241CLF/241DLF). Refer to
AMM 53−01−01−400−803.
PART D
(11) Install the cargo compartment floor−panel (242DRF). Refer to
AMM 53−01−01−400−803.
PART E
(12) Close the aft equipment compartment access−door (311BB). Refer to
AMM 52−41−00−410−801.
PART F
(13) Install the pylon access panels 412AT and 412AB. Refer to
AMM 54−60−01−400−801.
(14) Install the pylon detachable−leading edge (411AL). Refer to
AMM 54−60−07−400−801.
(15) Close the aft equipment compartment access−door (311BB). Refer to
AMM 52−41−00−410−801.
PART G
(16) Install the pylon access panels 422AT and 422AB. Refer to
AMM 54−60−01−400−801.
(17) Install the pylon detachable−leading edge (421AL). Refer to
AMM 54−60−07−400−801.
(18) Close the aft equipment compartment access−door (311BB). Refer to
AMM 52−41−00−410−801.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 23 of 39

### Page 25

P. Recording
You can do each PART of this Service Bulletin independently. When any PART of
this Service Bulletin is completed, make an entry in the aircraft log and send the
attached Incorporation Notice to Bombardier Business Aircraft Customer Services
(BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kit
No kit required.
B. Parts
The “NEW PART” shall be a conforming part.
A Conforming part is a part manufactured before November 2004 or after the date
(date code) indicated in the Kidde, Service Bulletin, CFD−26−1 or a part
successfully tested per the bench test defined in the Kidde, Service Bulletin,
CFD−26−1.
(1) The parts that follow may be necessary to do PART A of this Service Bulletin
for the left wing root, over the left center fuselage and in the left wheel well
area and are available from Bombardier Aviation Parts Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35541−3−255 1
Element,
LDL
Sensing
Left
Fuselage
35541−3−255 Refer toParagraph 1.G.
35552−3−255 1
Element,
LDL
Sensing
Left
Fuselage
35552−3−255 Refer toParagraph 1.G.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 24 of 39

### Page 26

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35584−4−255 1
Element,
LDL
Sensing
Left
Fuselage
35584−4−255 Refer toParagraph 1.G.
(2) The parts that follow may be necessary to do PART B of this Service Bulletin
for right wing root, over the right center fuselage and in the right wheel well
area and are available from Bombardier Aviation Parts Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35541−3−255 1
Element,
LDL
Sensing
Right
Fuselage
35541−3−255 Refer toParagraph 1.G.
35552−3−255 1
Element,
LDL
Sensing
Right
Fuselage
35552−3−255 Refer toParagraph 1.G.
35584−4−255 1
Element,
LDL
Sensing
Right
Fuselage
35584−4−255 Refer toParagraph 1.G.
(3) The part that follows may be necessary to do PART C of this Service Bulletin
for the left side below lavatory and baggage compartment and is available from
Bombardier Aviation Parts Services, Montreal:
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 25 of 39

### Page 27

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35596−2−255 1
Element,
LDL
Sensing
Left
Fuselage
35596−2−225 Refer toParagraph 1.G.
(4) The part that follows may be necessary to do PART D of this Service Bulletin
for the right side below lavatory and baggage compartment and is available
from Bombardier Aviation Parts Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35596−2−255 1
Element,
LDL
Sensing
Right
Fuselage
35596−2−225 Refer toParagraph 1.G.
(5) The parts that follow may be necessary to do PART E of this Service Bulletin
for the rear equipment bay and are available from Bombardier Aviation Parts
Services, Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35518−2−310 2
Element,
LDL
Sensing
Left
Manifold/
APU
35518−2−310 Refer toParagraph 1.G.
35550−2−310 2
Element,
LDL
Sensing
Right
Manifold/
APU
35550−2−310 Refer toParagraph 1.G.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 26 of 39

### Page 28

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35563−2−310 4
Element,
LDL
Sensing
Left
Manifold
35563−2−310 Refer toParagraph 1.G.
35563−2−310 2
Element,
LDL
Sensing
Right
Manifold
35563−2−310 Refer toParagraph 1.G.
35602−4−310 1
Element,
LDL
Sensing
Right
Manifold
35602−4−310 Refer toParagraph 1.G.
35607−2−310 2
Element,
LDL
Sensing
Left
Manifold
35607−2−310 Refer toParagraph 1.G.
35607−2−310 2
Element,
LDL
Sensing
Right
Manifold
35607−2−310 Refer toParagraph 1.G.
35612−4−310 1
Element,
LDL
Sensing
Left
Manifold
35612−4−310 Refer toParagraph 1.G.
(6) The part that follows may be necessary to do PART F of this Service Bulletin
for the left pylon and is available from Bombardier Aviation Parts Services,
Montreal:
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 27 of 39

### Page 29

NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35602−4−310 1
Element,
LDL
Sensing
Left Pylon
35602−4−310 Refer toParagraph 1.G.
(7) The part that follows may be necessary to do PART G of this Service Bulletin
for the right pylon and is available from Bombardier Aviation Parts Services,
Montreal:
NEW PART
NO.
(CONFORMING
PART)
QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
35602−4−310 1
Element,
LDL
Sensing
Right Pylon
35602−4−310 Refer toParagraph 1.G.
NOTES: 1. The part numbers for the items listed above are subject to
change without revision to this Service Bulletin. In case of
discrepancy between this list and any other list, the Illustrated
Parts Catalog prevails and must be used to determine the latest
part number.
2. If material coverage is required due to part failure, a scrap
certificate will be required. Claims will not be approved without
the necessary scrap certificate. Please see scrap certificate form
attached with Service Bulletin.
C. Material
The materials that follows, or equivalent, are necessary to do this Service Bulletin.
They can be purchased from a local supplier. Bombardier Aviation does not pay for
these consumables.
DESCRIPTION PART
NO./NAME
SPECIFICATION QUANTITY SUPPLIER
(SEE
NOTE)
Contact
Cleaner, CFC
Free 3316
− LPSLaboratories As Necessary Code: A
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 28 of 39

### Page 30

DESCRIPTION PART
NO./NAME
SPECIFICATION QUANTITY SUPPLIER
(SEE
NOTE)
Acetone − ASTM D 329 As Necessary Code: B
Alcohol,
Isopropyl − TT−I−35 As Necessary Code: B
Lockwire,
CRES 0.020
in. (0.51 mm)
− MS20995C20 As Necessary Code: B
Nitrogen −
A−A 59503,
Type 1, Grade A,
Class 1
As Necessary Code: B
Safety Cable − AS3510−0118C As Necessary Code: B
Safety Cable,
Ferrule − AS3510−01F As Necessary Code: B
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. The Curing Time (CT), if applicable, for each consumable material is
indicated with the description of each product.
3. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
SUPPLIERS ADDRESSES BY CODES
Code: A
ITW INC, L P S Laboratories
4647 Hugh Howell RD
Tucker, GA 30084–5052, USA
1−770−243−8800
www.itwprobrands.com
Code: B
Commercially Available
D. Publications
No publications required.
MODEL CL−600−2B16
Basic Issue: Dec 23/2022 605−36−002
Page 29 of 39

### Page 31

2 3
4
1
1
2
3
4
LDL SENSING ELEMENTS
LHS SHOWN, RHS OPPOSITE
35596−2−255
35584−4−255
2 (One on each side)
2 (One on each side) In leading edge and above wing
Anti−ice
Anti−ice
Anti−ice
Anti−ice
Below lavatory and baggage compartment 
(under floor in pressurized area)
ITEM PART NO. LOCATION SYSTEMQTY PERAIRCRAFT
35541−3−255 2 (One on each side) Above wheel well
35552−3−255 2 (One on each side) Above wing
APPENDIX A − TEST RESULTS
Figure 2 − Fuselage and Wing
Test locations on element 35584−4−255
3 − 4 in
(7.6 − 10.2 cm) More than 1 inch (2.5 cm) of
the connector start or ends
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 1 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 30 of 39

### Page 32

Note :
PART A − WING ANTI−ICE − SINGLE LOOP
LOCATION: LEFT CENTER FUSELAGE − ABOVE THE WING AND WHEEL WELL
FIGURE 2
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
Fus.Sta. 421
1.1
1.2
1.3
1.4
1.5
1.6
35584−4−255
35584−4−255
35584−4−255
35584−4−255
35584−4−255
35584−4−255
Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
PASS/FAIL
In leading edge at wing root
In leading edge at wing root
Above the wing at AFT end of element
In leading edge at wing root
Above the wing at AFT end of element
Above the wing at AFT end of element
(Leading edge)
Fus.Sta. 469
2.1
2.2
2.3
2.4
35541−3−255
35541−3−255
35541−3−255
35541−3−255
In wheel well area in front of vent hole
In wheel well area in front of vent hole
In wheel well area in front of AFT coupling
In wheel well area in front of vent hole
Fus.Sta. 513
3.1
3.2 35552−3−255
35552−3−255
Above the wing in front of vent hole and coupling
Above the wing in front of vent hole
Fus.Sta. 559 (Bulkhead)
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
PART B − WING ANTI−ICE − SINGLE LOOP
LOCATION: RIGHT CENTER FUSELAGE − ABOVE THE WING AND WHEEL WELL
FIGURE 2
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
Fus.Sta. 421
4.1
4.2
4.3
4.4
4.5
4.6
35584−4−255
35584−4−255
35584−4−255
35584−4−255
35584−4−255
35584−4−255
PASS/FAIL
In leading edge at wing root
In leading edge at wing root
Above the wing at AFT end of element
In leading edge at wing root
Above the wing at AFT end of element
Above the wing at AFT end of element
(Leading edge)
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Fus.Sta. 469
5.1
5.2
5.3
5.4
35541−3−255
35541−3−255
35541−3−255
35541−3−255
In wheel well area in front of vent hole
In wheel well area in front of vent hole
In wheel well area in front of AFT coupling
In wheel well area in front of vent hole
Fus.Sta. 513
6.1
6.2 35552−3−255
35552−3−255
Above the wing in front of vent hole and coupling
Above the wing in front of vent hole
Fus.Sta. 559 (Bulkhead)
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 2 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 31 of 39

### Page 33

PART C − WING ANTI−ICE − SINGLE LOOP
LOCATION: LEFT CENTER FUSELAGE − BELOW LAVATORY AND BAGGAGE COMPARTMENT
FIGURE 2
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
Fus.Sta. 559
7.1
7.2
7.3
35596−2−255
35596−2−255
35596−2−255
PASS/FAIL
Below lavatory and baggage compartment
Below lavatory and baggage compartment
Below lavatory and baggage compartment
Fus.Sta. 621
(Bulkhead)
(Bulkhead)
PART D − WING ANTI−ICE − SINGLE LOOP
LOCATION: RIGHT CENTER FUSELAGE − BELOW LAVATORY AND BAGGAGE COMPARTMENT
FIGURE 2
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
Fus.Sta. 559
8.1
8.2
8.3
35596−2−255
35596−2−255
35596−2−255
PASS/FAIL
Below lavatory and baggage compartment
Below lavatory and baggage compartment
Below lavatory and baggage compartment
Fus.Sta. 621
(Bulkhead)
(Bulkhead)
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Note : Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 3 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 32 of 39

### Page 34

6
5 2A
1A
1B
4
3 2C
2B
ITEM PART NO.
1A
1B
3
4
5
6
35607−2−310
35607−2−310
35518−2−310
35550−2−310
35612−4−310
35602−4−310
2
2
2
2
1
1
LOCATION
On LH side − Top
On RH side − Top
On RH side − On the transversal beam
On LH side − On the transversal beam
On LH side − Close to AFT pressure bulkhead
On RH side − Close to AFT pressure bulkhead
SYSTEM
AIR CONDITIONING
AIR CONDITIONING
AIR CONDITIONING
AIR CONDITIONING
ANTI−ICE
ANTI−ICE
QTY PER
AIRCRAFT
2A
2B
35563−2−310
35563−2−310
2
2
On LH side − Bottom
On LH side − Top
AIR CONDITIONING
AIR CONDITIONING
2C 35563−2−310 2 On RH side − Top AIR CONDITIONING
Figure 3 − Rear Fuselage
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 4 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 33 of 39

### Page 35

Note :
PART E − WING ANTI−ICE AND AIR CONDITIONING − SINGLE AND DUAL LOOPS
LOCATION: REAR FUSELAGE
FIGURE 3
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
9.1
35607−2−310
35607−2−310
35607−2−310
35607−2−310
35607−2−310
35607−2−310
Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
PASS/FAIL
On LH side − Top (Item 1A in figure 3)9.2
9.3
10.1
35607−2−310
35607−2−310
35607−2−310
35607−2−310
35607−2−310
35607−2−310
On RH side − Top (Item 1B in figure 3)10.2
10.3
11.1
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
On LH side − Bottom (Item 2A in figure 3)11.2
11.3
12.1
On LH side − Top (Item 2B in figure 3)12.2
12.3
13.1
On RH side − Top (Item 2C in figure 3)13.2
13.3
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
35563−2−310
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 5 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 34 of 39

### Page 36

Note :
PART E − WING ANTI−ICE AND AIR CONDITIONING − SINGLE AND DUAL LOOPS
LOCATION: REAR FUSELAGE
FIGURE 3
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
14.1
35518−2−310
35518−2−310
35518−2−310
35518−2−310
Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
PASS/FAIL
14.2
15.1
35550−2−310
35550−2−310
35550−2−310
35550−2−310
35550−2−310
35550−2−310
15.2
15.3
On LH side − On the transversal beam
(Item 4 in figure 3)
16.1
16.2
16.3
35612−4−310
35612−4−310
35612−4−310
17.1
17.2
17.3
35602−4−310
35602−4−310
35602−4−310
On LH side − Close to AFT pressure bulkhead
(Item 5 in figure 5)
On RH side − Close to AFT pressure bulkhead
(Item 6 in figure 3)
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
On RH side − On the transversal beam at
approximately 6 in (15 cm) from each extremities
(Item 3 in figure 3)
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 6 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 35 of 39

### Page 37

1
LDL SENSING ELEMENT
LHS SHOWN, RHS OPPOSITE
1 35602−4−310 2 In pylon − one on each side
ITEM PART NO. LOCATIONQTY PER AIRCRAFT
Figure 4 − Pylon
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 7 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 36 of 39

### Page 38

Note :
PART F − COWL ANTI−ICE − SINGLE LOOP
LOCATION: LH PYLON
FIGURE 4
Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
Note :
PART G − COWL ANTI−ICE − SINGLE LOOP
LOCATION: RH PYLON
FIGURE 4
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
Element serial numbers are required only for failed units. The serial numbers can be found etched on the coupling of the
sensing element at one end and the part number at the other end.
PASS/FAILLDL SENSINGELEMENT P/N LDL SENSINGELEMENT S/N
19.1
19.2
19.3
35602−4−310
35602−4−310
35602−4−310
In RH pylon − Second compartment
In RH pylon − First compartment
In RH pylon − Third compartment
TEST
POINT NO. LOCATION OF TEST POINT DATE & STAMPS
18.1
18.2
18.3
35602−4−310
35602−4−310
35602−4−310
PASS/FAIL
In LH pylon − Second compartment
In LH pylon − First compartment
In LH pylon − Third compartment
LDL SENSING
ELEMENT P/N
LDL SENSING
ELEMENT S/N
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
Ambient Temp. (°C or °F): ________ Heat Gun Temp. (°C or °F): ________
MODEL CL−600−2B16
Test Results
APPENDIX − A (Sheet 8 of 8)
Basic Issue: Dec 23/2022 605−36−002
Page 37 of 39

### Page 39

Left pylon
APPENDIX B − TEST MATRIX
LOOP ELEMENTS QTY PER
AIRCRAFT LOCATION
Left manifold
Left fuselage
LENGTH
(in)
Right pylon
Right manifold
35602−4−310
35612−4−310
35552−3−255
35584−4−255 
35602−4−310
35602−4−310
35541−3−255 
35596−2−255
102
112
52
84
102
102
41
96
1
1
1
1
1
1
1
1
ANTI−ICE
(SINGLE LOOP)
Right fuselage
Left manifold
Manifold/APU
Left manifold
Manifold/APU
35552−3−255 
35584−4−255
35607−2−310
35518−2−310
35541−3−255 
35596−2−255
35563−2−310 
35550−2−310 
52
84
107
18
41
96
63
50
1
1
2
2
1
1
4
2
AIR CONDITIONING
(DUAL LOOP)
35563−2−310 63 2Right manifold
Right manifold 35607−2−310 107 2
Pylon
Aft Equipment Bay
Fuselage
Aft Equipment Bay
Total number of elements per aircraft: 26
MODEL CL−600−2B16
Test Matrix
APPENDIX − B
Basic Issue: Dec 23/2022 605−36−002
Page 38 of 39

### Page 40 (OCR)

CHÄLLENGĚR 605
MODEL CL-600-2B16
- INITIAL PELEASHANEE  ED ME MAY 2022
3O HEAT GUN EXTENSION
1- UNLESS NOTED OTHERWISE. ALTERNATE MANUFA  TITUTION WITH
(2) - IDENTIFY BY METAL STAMP OR VIBRO PEEN ASSY PART NUMBER ON A COMERCIALLY AVAILA
3) - SHALL BE WRAPPED WITH HEAT RESISTANI SILICON TAPE ALL AROUND lASSY ITEM I AND SE
4 - SILICONE TAPE OMTTED FOR CLARITY.
3) - CLAMP TO BE INSTALLED OVER SILICONE TAPE ITEM 7.
STEINEL HEAT GUN REFLECTOR NOZZLE 10 MM  ISTE INFI
/2" DIA - 1 1/4" DIA EVERBILT
3/4" DIA - 1 3/4" DIA EVERBILT
FITTING REDUCER 1" x 1/2"
MF P/N SS3088FLEXIBLF SHARKBI TE
M/F P/N C607-2  DANCO
HEAT GUN EXTENSION ASSI  PART DESCRIPTION  MATL / SIZE  MFG / SUPPLIER  B650-36-001-61010.
Snorkel, Heat Gun Extension
Figure 5
Basic Issue: Dec 23/2022  605-36-002
Page 39 of 39

### Page 41

605−36−002 Basic Dec 23/2022
SPECIAL CHECK/REWORK – BLEED−AIR LEAK DETECTION SYSTEM –
SPECIAL CHECK OF THE BLEED LEAK DETECTION ELEMENTS
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 42

SERVICE BULLETIN INCORPORATION SHEET − "605−36−002"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
605−36−002 Basic
COMPLIED WITH
YES    NO    N/A
PART A
PART B
PART C
PART D
PART E
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.