# Bombardier Service Bulletin 650-27-003

Copy: No revision named ("650-27-003 Basic_1"), 13 pages: PDF https://openairdocs.org/files/sha256/3b/b0/3bb07b842fc2bcef68755b38b9f3d45b9be575d7a483f344c3eb6438da017ae4; text https://openairdocs.org/service-documents/bombardier/sb-650-27-003/file/3bb07b842fc2.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0603; AD 2022-20-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 650-27-003
- Page: https://openairdocs.org/service-documents/bombardier/sb-650-27-003

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-20-05](https://openairdocs.org/ad/2022-20-05.md), effective Nov 25, 2022: No revision named

## Text (13 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0603; AD 2022-20-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK/MODIFICATION – RUDDER CONTROL SYSTEM –
INSPECTION OF RUDDER LOAD LIMITER
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Refer to Paragraph 1.D.
EFFECTIVITY: A/C Serial No. 6050 to 6158, and 6160 to 6162
MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make
it necessary to implement this Service Bulletin.
To place an order for parts, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 27−21
FLIGHT CONTROLS
Basic Issue: Dec 07/2020 650−27−003
Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK/MODIFICATION – RUDDER CONTROL SYSTEM –
INSPECTION OF RUDDER LOAD LIMITER
1. PLANNING INFORMATION
NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
2. AMM 27−21−34−400−801 Revision 19 is a prerequisite and must be
incorporated into the AMM before doing inspection of rudder PCU load
limiter for correct crimping.
A. Effectivity
CL−600−2B16 aircraft, Serial No. 6050 to 6158, and 6160 to 6162.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
Objective/Benefit:
The Service Bulletin introduces a periodic test to detect and replace possible
defective load limiters in conjunction with an existing 800 FH CMR task and perform
one−time visual inspection in conjunction with an existing 3200 FH CMR of rudder
PCU load limiters for correct crimping.
C. Description
This Service Bulletin gives instructions in PART A to:
− Do the temporary periodic test of the rudder PCU load limiters, and
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 27−21
FLIGHT CONTROLS
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2020 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 07/2020 650−27−003
Page 1 of 10
This Service Bulletin is available at:

### Page 3

− If the test produces at least one failed condition, do PART B of this Service
Bulletin.
This Service Bulletin gives instructions in PART B to:
− Do the visual inspection of nut and end cap of the rudder PCU load limiter for
correct crimping, and
− If the nut and end cap of the rudder PCU load limiter are not crimped properly,
do PART C of this Service Bulletin.
This Service Bulletin gives instructions in PART C to:
− Replace the rudder PCU load limiter.
After PART B and/or PART C, as applicable:
− Do the applicable test(s) as required per AMM.
D. Compliance
SB PART & ACTION INITIAL ACTION INSTRUCTION
PART A
Periodic Testing
Within 1000 FH from this SB
release (Basic Issue)
Recommended in conjunction
with TLMC 5−10−40
(27−21−00−101)
Repeat every
800 FH until
one−time visual
inspection is
performed
PART B
One−time Visual
Inspection
Within 3400 FH from this SB
release (Basic Issue)
Recommended in conjunction
with TLMC 5−10−40
(27−23−00−101)
−
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 2 of 10

### Page 4

F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 650−00−002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
1 man−hour is necessary to do PART A of this Service Bulletin.
1 man−hour is necessary to do PART B of this Service Bulletin.
10 man−hours are necessary to do PART C of this Service Bulletin.
For PART A and PART B, Bombardier Aviation does not pay for the labor to do this
special check.
The labor required to do PART C of this Service Bulletin is at no cost if:
− the work is done during new aircraft warranty period, and
− the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
− this Service Bulletin is scheduled in less than 12 months from its release date
(Basic Issue).
G. Material − Cost and Availability
No kit is necessary to do this Service Bulletin.
The parts in Paragraph 3.B may be necessary to do this Service Bulletin.
The parts are available at no cost if:
− ordered during new aircraft warranty period, and
− a no−charge purchase order is sent to Bombardier Aviation in less than 12
months from this Service Bulletin release date (Basic Issue).
For all parts transactions, Bombardier Aviation’s current Spare Parts and
Component Repair Price Catalogue General Terms and Conditions apply. These
terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 3 of 10

### Page 5

For those aircraft in new aircraft warranty at the time of Service Bulletin distribution,
Smart Parts does not pay for the parts at any time.
For those aircraft out of new aircraft warranty at the time of Service Bulletin
distribution, Smart Parts pays for the parts listed in Paragraph 3.B only if
replacement is required.
H. Tooling
The equipment and tools listed below are necessary to do this Service Bulletin:
GSE REFERENCE NO. PART NO. DESCRIPTION
24−00−24 − Circuit Breaker Tag − Red (Optional)
27−00−02 − Kit − Rigging Pins
Commercially Available − Wrench, Torque 25 to 30 lbf in (2.83to 3.38 Nm)
NOTES: 1. Refer to the CL−650 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the CL –650, for
acceptable GSE equivalents.
3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the SPM, WM, Chapter 20,
then the tools called in the SPM−WM prevail. Other approved
alternative tools are acceptable and can also be used.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive (Pending).
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4265,
Rev. −−.
− CL−650 Aircraft Maintenance Manual (AMM), Chapters 6, 12, 24, 27 and 55.
− CL−650 Aircraft Illustrated Parts Catalog (AIPC), Chapter 27.
L. Other Publications Affected
None.
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 4 of 10

### Page 6

M. Equivalent Service Bulletins
− For the Challenger 600 aircraft, use Service Bulletin 600−0776.
− For the Challenger 601 aircraft, use Service Bulletin 601−0648.
− For the Challenger 604 aircraft, use Service Bulletin 604−27−039.
− For the Challenger 605 aircraft, use Service Bulletin 605−27−010.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL−650 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL−650 Aircraft Maintenance Manual (AMM), Chapter 6.
A. Aircraft Setup
NOTE: The steps in the Aircraft Setup section of this Service Bulletin are
recommended steps. The steps give a recommendation to get access to
work area. This recommendation is to give a safe work area and to
minimize possible damage to surrounding aircraft parts. Alternative steps
can be used at the operator’s discretion.
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Obey all the flight control safety precautions. Refer to
AMM 27−00−00−910−801.
(3) Install the warning tags on the pilot and copilot rudder pedals and on the
AIL/RUD TRIM control panel.
(4) Open and tag the circuit breakers that follow:
LOCATION CB NUMBER CB NAME ZONE
CBP−1 B8 HYD PUMP 3B 221
CBP−1 B11 HYD PUMP 2B 221
CBP−2 A2 HYD PUMP 3A 222
CBP−2 A5 HYD PUMP 1B 222
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 5 of 10

### Page 7

B. PART A — Special Check — Temporary Periodic Testing of the Rudder PCU
Load Limiters — Initial inspection to be carried out within 1000 FH from this
Service Bulletin release date (Repeat inspection(s) to be carried out at
800 FH)
NOTES: 1. If it is not possible to complete all the instructions in this Service
Bulletin because of the configuration of the aircraft, submit an SRPSA
for analysis and to get an approved disposition to complete this
Service Bulletin.
2. This test can be done in conjunction with TLMC Task Functional Test
of the Rudder Backlash. Refer to TLMC 5−10−40 (Chapter 5 Task
No. 27−21−00−101 – Functional Test of the Rudder Backlash, refer to
AMM 27−21−00−720−805).
(1) Pressurize the hydraulic systems No. 1. Refer to AMM 12−00−04−862−801.
NOTES: 1. Ensure there is no residual pressure in the other two hydraulic
systems.
2. To release hydraulic pressure − systems No. 1 and No. 2, refer to
AMM 12−00−04−862−802.
3. To release hydraulic pressure − system No. 3, refer to
AMM 12−00−04−862−804.
(a) Trim rudder surface full trailing edge to right.
(b) Record the rudder angle Trim Position (TP) as indicated by the MDC in the
below table.
NOTE: Make sure that Right Rudder trim is within 8.8°±0.5°.
(c) Push pilot left pedal to hit mechanical stop to move rudder trailing edge to
left.
(d) Record Rudder Position (RP) as indicated on the MDC in the below table
(Trial 1).
(e) Release rudder pedal back to zero degrees and repeat pilot left rudder
pedal push to stop (step d).
(f) Record RP as indicated on the MDC in the below table (Trial 2).
(g) Perform steps (a) through (f) for each of the other Hydraulic systems No. 2
and No. 3 in turn. Record values in the table below.
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 6 of 10

### Page 8

LOAD LIMITER TEST
Hydraulic System
MDC Trim Position
(TP)
MDC Rudder Position (RP)
Trial
1 2
1
2
3
NOTE: For a load limiter to be acceptable, the lowest of the two RP
measurements must be larger than (24 minus TP reading).
(2) If step 1 produces a pass condition for all three Rudder Load Limiters, no
further action is required until:
(a) The next scheduled temporary periodic testing (800 FH) as given above in
step 1 (a) through (g) shall be done at the same interval and in conjunction
with TLMC 5−10−40 (Chapter 5 Task No. 27−21−00−101 – Functional
Test of the Rudder Backlash, refer to AMM 27−21−00−720−805).
(b) The one−time visual inspection given in PART B must be carried out
within 3400 FH from this Service Bulletin release date. It can be done in
conjunction with TLMC 5−10−40 (Chapter 5 Task No. 27−23−00−101 –
Operational test of the PCU load limiters, refer to
AMM 27−21−25−710−801).
(3) If step 1 produces a failed condition for any one of the three load limiters, do
PART B of this Service Bulletin prior to the next flight.
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 7 of 10

### Page 9

C. PART B — Special Check — One−time Visual Inspection of the Rudder PCU
Load Limiters — The one−time visual Inspection must be carried out at the
next scheduled 3400 FH from this Service Bulletin release date. If the nut and
end cap of the rudder PCU load limiter is not crimped properly, replace the
load limiter prior to the next flight
NOTES: 1. If it is not possible to complete all the instructions in this Service
Bulletin because of the configuration of the aircraft, submit an SRPSA
for analysis and to get an approved disposition to complete this
Service Bulletin.
2. The visual inspection can be done in conjunction with TLMC 5−10−40
(Chapter 5 Task No. 27−23−00−101 – Operational test of the PCU
load limiters, refer to AMM 27−21−25−710−801).
3. When the one−time visual inspection in PART B is carried out, the
next temporary periodic test as per PART A is no longer required.
(1) Do the visual inspection of the rudder PCU load limiter Part No. 600−91302−43
and 600−91302−53 for correct crimping. Refer to AMM 27−21−34−400−801.
NOTE: Make sure that the nut and end cap are properly crimped.
(2) If the nut and end cap of the rudder PCU load limiter Part No. 600−91302−43
and 600−91302−53 are not crimped properly, do PART C of this Service
Bulletin, prior to the next flight.
(3) If the nut and end cap of the rudder PCU load limiter Part No. 600−91302−43
and 600−91302−53 are crimped properly, go to Paragraph 2.E (Close−out).
NOTE: If you have disturbed the rudder system then do the required testing
as given in the AMM.
D. PART C — Modification — Replacement of the Rudder PCU Load Limiter(s)
NOTES: 1. If it is not possible to complete all the instructions in this Service
Bulletin because of the configuration of the aircraft, submit an SRPSA
for analysis and to get an approved disposition to complete this
Service Bulletin.
2. AMM 27−21−34−400−801 Revision 19 is a prerequisite and must be
incorporated into the AMM before installing a new PCU load limiter.
(1) Remove the rudder PCU load limiter Part No. 600−91302−43 and/or
600−91302−53. Refer to AMM 27−21−34−000−801.
(2) Install the new rudder PCU load limiter Part No. 600−91302−43 and/or
600−91302−53. Refer to AMM 27−21−34−400−801.
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 8 of 10

### Page 10

E. Close Out
NOTE: The steps in the Close−out section of this Service Bulletin, except for the
return−to−service tests, are recommended steps. The steps give a
recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to
return to service. Alternative steps can be used at the operator’s
discretion.
(1) Remove the tags and close the circuit breakers that follow:
LOCATION CB NUMBER CB NAME ZONE
CBP−1 B8 HYD PUMP 3B 221
CBP−1 B11 HYD PUMP 2B 221
CBP−2 A2 HYD PUMP 3A 222
CBP−2 A5 HYD PUMP 1B 222
(2) Remove all tools, equipment and other unwanted material from the aircraft.
(3) Remove the warning tags from the pilot and copilot rudder pedals and from the
AIL/RUD TRIM control panel.
F. Recording
You can do each PART of this Service Bulletin independently. When any PART of
this Service Bulletin is completed, make an entry in the aircraft log and send the
attached Incorporation Notice to Bombardier Business Aircraft Customer Services
(BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kit
No kits required.
B. Parts
The parts that follow may be necessary to do this Service Bulletin and are available
from Bombardier Aviation Parts Services, Montreal:
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 9 of 10

### Page 11

NEW PART
NO. QTY ITEM USEDPART NO. INSTRUCTIONS -DISPOSITION
600−91302−43 1 Load Limiter − −
600−91302−53 2 Bungee, LoadLimiter − −
NOTE: The part number for the item listed above is subject to change without
revision to this Service Bulletin. In case of discrepancy between this list
and any other list, the Illustrated Parts Catalog prevails and shall be used
to determine the latest part number.
C. Material
No materials required.
D. Publications
No publications required.
MODEL CL−600−2B16
Basic Issue: Dec 07/2020 650−27−003
Page 10 of 10

### Page 12

650−27−003 Basic Dec 07/2020
SPECIAL CHECK/MODIFICATION – RUDDER CONTROL SYSTEM –
INSPECTION OF RUDDER LOAD LIMITER
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 13

SERVICE BULLETIN INCORPORATION SHEET − "650−27−003"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
650−27−003 Basic
COMPLIED WITH
YES    NO    N/A
PART A
PART B
PART C
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
