# Bombardier Service Bulletin 650-27-004

Copy: No revision named ("650-27-004 Basic"), 9 pages: PDF https://openairdocs.org/files/sha256/dc/fb/dcfba9aa5f7f90244e6d4fcdcb5989c9ed9d6496cffdaa56693d3e938a413f53; text https://openairdocs.org/service-documents/bombardier/sb-650-27-004/file/dcfba9aa5f7f.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1052; AD 2023-17-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 650-27-004
- Page: https://openairdocs.org/service-documents/bombardier/sb-650-27-004

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2023-17-06](https://openairdocs.org/ad/2023-17-06.md), effective Oct 19, 2023: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-650-27-004/proposed.md).

## Text (9 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1052; AD 2023-17-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL CHECK – FLAPS – INTRODUCTION OF INITIAL AND REPEAT
OPERATIONAL TEST OF THE FLAPS TO VERIFY
THE RETRACTION / EXTENSION TIME
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within 100 FH from this Service Bulletin
release date (Basic Issue). Refer to
Paragraph 1.D. for more details.
EFFECTIVITY: A/C Serial No. 6050 to 6999
MANPOWER: 0.5 man−hour
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS NOYES
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make
it necessary to implement this Service Bulletin.
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 27−54
FLIGHT CONTROLS
Basic Issue: Dec 29/2022 650−27−004
Page 1 of 1
This Service Bulletin is available at:

### Page 2

SPECIAL CHECK – FLAPS – INTRODUCTION OF INITIAL AND REPEAT
OPERATIONAL TEST OF THE FLAPS TO VERIFY
THE RETRACTION / EXTENSION TIME
1. PLANNING INFORMATION
NOTE: Before you do this Service Bulletin, examine all STC, STA or equivalent
action changes to make sure that this Service Bulletin can be completed.
A. Effectivity
CL−600−2B16 aircraft, Serial No. 6050 to 6999.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
1. Condition:
A Challenger 604 experienced an unarrested uncommanded flaps extension,
from 0 to 45 degrees, accompanied by a FLAPS FAIL Caution message, a
scenario which requires multiple independent failures. Investigation has
determined that one of the failures was in the Retract Relay on motor channel 1
and this prevented the system from arresting the uncommanded flaps
extension. Failure of the Retract Relay also resulted in the flaps moving at half
speed. A failure of the Retract Relay on motor channel 2, or a failure of either of
the extend relays (motor channel 1 or motor channel 2), will have a similar
effect.
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 27−54
FLIGHT CONTROLS
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2022 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 29/2022 650−27−004
Page 1 of 6
This Service Bulletin is available at:

### Page 3

2. Objective/Benefit:
This Service Bulletin instructs to do an initial and repeat operational test of the
inboard and outboard flaps to validate if the extension / retraction time are within
limits, at the intervals as specified in Paragraph 1.D.
C. Description
This Service Bulletin gives instructions to:
− Do the operational test of the inboard and outboard flaps to verify the extension
/ retraction time.
D. Compliance
Specified Time Compliance
SB ACTION INITIAL ACTION INSTRUCTION
Operational test of
the inboard and
outboard flaps.
Within 100 FH from this
Service Bulletin release
date (Basic Issue).
Repeat every 400 FH from
the initial action.
NOTES: 1. This Service Bulletin is in reference to Advisory Wire
AW600−27−2631.
2. If it is not possible to complete all the instructions in this Service
Bulletin because of the aircraft configuration, submit an SRPSA for
analysis and to get an approved disposition to complete this Service
Bulletin. Standard SRPSA fees may apply. Refer to the Services
section of the Bombardier customer portal for the latest prices, rates
and fees.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower
NOTE: The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization, planning,
aircraft preparation in hangar such as towing and positioning of scaffolds,
removal of interior furnishings, repainting, supervision and inspection.
MODEL CL−600−2B16
Basic Issue: Dec 29/2022 650−27−004
Page 2 of 6

### Page 4

For more information related to the manpower, refer to SB 650−00−002.
0.5 man−hour is necessary to do this Special Check.
Bombardier Aviation does not pay for the labor to do this Special Check.
G. Material − Cost and Availability
No kit or parts are necessary to do this Special Check.
H. Tooling
The equipment listed below is necessary to do this Service Bulletin:
GSE REFERENCE NO. PART NO. DESCRIPTION
Commercially Available − Stopwatch
NOTES: 1. Refer to the CL−650 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the CL –650, for
acceptable GSE equivalents.
3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the SPM, WM, Chapter 20,
then the tools called in the SPM−WM prevail. Other approved
alternative tools are acceptable and can also be used.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive, (pending).
− Advisory Wire AW600−27−2631.
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4297,
Rev. A.
− CL−650 Aircraft Maintenance Manual (AMM), Chapters 6, 12, 24 and 27.
L. Other Publications Affected
None.
MODEL CL−600−2B16
Basic Issue: Dec 29/2022 650−27−004
Page 3 of 6

### Page 5

M. Equivalent Service Bulletins
− For the Challenger 600 aircraft, use Service Bulletin 600−0780.
− For the Challenger 601 aircraft, use Service Bulletin 601−1112.
− For the Challenger 604 aircraft, use Service Bulletin 604−27−040.
− For the Challenger 605 aircraft, use Service Bulletin 605−27−011.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL−650 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL−650 Aircraft Maintenance Manual (AMM), Chapter 6.
A. Aircraft Setup
WARNING: OBEY ALL SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL EQUIPMENT. IF YOU
DO NOT DO THIS, YOU CAN CAUSE INJURIES TO PERSONS
AND/OR DAMAGE TO THE EQUIPMENT.
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Obey all the flight control safety precautions. Refer to
AMM 27−00−00−910−801.
(3) Install the safety devices and the warning placards in the area near the
flap−control surfaces.
(4) Connect and energize the external AC power. Refer to
AMM 12−00−07−861−801.
B. Special Check — Operational Test of the Inboard and Outboard Flaps
NOTES: 1. If it is not possible to complete all the instructions in this Service
Bulletin because of the configuration of the aircraft, submit an SRPSA
for analysis and to get an approved disposition to complete this
Service Bulletin.
2. Repeat the operational test of the inboard and outboard flaps every
400 FH.
MODEL CL−600−2B16
Basic Issue: Dec 29/2022 650−27−004
Page 4 of 6

### Page 6

(1) Do the operational test of the inboard and outboard flaps to verify the extension
/ retraction time as follows:
NOTE: If you get the condition that follows, make sure that the flap motors
are cooled (6 minutes cooling) before you operate them again: the
FLAPS FAIL indication. No anomalous flap messages should be
indicated before commencing this verification.
(a) Push the FLT button on the cursor control panel (CCP). Make sure that
you get the FLIGHT CONTROL page on the MFD primary EICAS.
(b) Set the flap control lever at 0.
(c) Make sure that the FLAPS position digital readout shows 0 degree and the
FLAPS position bar does not show.
(d) Make sure there are no FLAP FAIL (C) or FLAPS MOTOR OVHT (S)
EICAS messages.
(e) Set the flap control lever at 45. Make sure that the flap extension time is
17 to 19 seconds.
CAUTION WAIT 6 MINUTES BEFORE PROCEEDING TO STEP (f),
TO COOL THE FLAP MOTORS.
(f) Set the flap control lever at 0. Make sure that the flap retraction time is 17
to 19 seconds.
(2) If any anomalies are found, submit an SRPSA to report back to Bombardier.
C. Close−out
(1) Remove the external AC power. Refer to AMM 12−00−07−861−802.
(2) Remove all tools, equipment and other unwanted material from the aircraft.
(3) Remove the warning placards from the area near the flap−control surfaces.
D. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kit
No kits required.
MODEL CL−600−2B16
Basic Issue: Dec 29/2022 650−27−004
Page 5 of 6

### Page 7

B. Parts
No parts required.
C. Material
No materials required.
D. Publications
No publications required.
MODEL CL−600−2B16
Basic Issue: Dec 29/2022 650−27−004
Page 6 of 6

### Page 8

650−27−004 Basic Dec 29/2022
SPECIAL CHECK – FLAPS – INTRODUCTION OF INITIAL AND REPEAT
OPERATIONAL TEST OF THE FLAPS TO VERIFY
THE RETRACTION / EXTENSION TIME
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 9

SERVICE BULLETIN INCORPORATION SHEET − "650−27−004"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
650−27−004 Basic
COMPLIED WITH
YES    NO    N/A
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
