# Bombardier Service Bulletin 650-28-002

Copy: No revision named ("650-28-002 Basic"), 28 pages: PDF https://openairdocs.org/files/sha256/e5/1e/e51e1b8cf3a56d32ef5722043fad35aaafb2b6be9e87f2783c4ccc7b432c9fdf; text https://openairdocs.org/service-documents/bombardier/sb-650-28-002/file/e51e1b8cf3a5.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0725; AD 2021-26-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 650-28-002
- Page: https://openairdocs.org/service-documents/bombardier/sb-650-28-002

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2021-26-23](https://openairdocs.org/ad/2021-26-23.md), effective Feb 25, 2022: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-650-28-002/proposed.md).

## Text (28 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0725; AD 2021-26-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

MODIFICATION – FUEL SYSTEM –
ENGINE AND APU FUEL BOOST PUMP SEALING IMPROVEMENT
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within 5 years from Service Bulletin
release (Basic Issue)
EFFECTIVITY: A/C Serial No 6050 to 6163
MANPOWER: Refer to Paragraph 1.F
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES
TLMC, CH 5 AFFECTED NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO
PREREQUISITE SERVICE BULLETINS: N/A
NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make
it necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 28−00
FUEL
Basic Issue: Jun 16/2020 650−28−002
Page 1 of 1
This Service Bulletin is available at:

### Page 2

MODIFICATION – FUEL SYSTEM –
ENGINE AND APU FUEL BOOST PUMP SEALING IMPROVEMENT
1. PLANNING INFORMATION
NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
2. This Service Bulletin is covered by a dedicated schedule. Dedicated
schedules are used to reserve and manage inventory due to limited
availability of rotable stock, parts and/or kits. Parts are limited, therefore,
advance part scheduling with our In−Service Implementation Team (ISIT)
is recommended prior to a maintenance visit. Please contact your
Regional Manager (RM), Field Service Representative (FSR) or Customer
Service Representative (CSR) to schedule your aircraft as there is a
limited availability. The parts will be allocated on a first come first serve
basis.
For more information on dedicated schedules, refer to Service
Bulletin 650−00−002.
A. Effectivity
CL−600−2B16 aircraft, Serial No. 6050 to 6163.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
Evidence:
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL CL−600−2B16
ATA 28−00
FUEL
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2020 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Jun 16/2020 650−28−002
Page 1 of 25
This Service Bulletin is available at:

### Page 3

There were reports on several electric fuel boost pump (fuel boost pump) leakages
that were found during inspection in service and production aircraft. Fuel leakage at
the APU and engine electric fuel boost pump wiring harness conduit were located
on the front spar and in the connector cavity of the fuel boost pump. The fuel
leakage is caused either by low pinch of the O−ring at the cartridge connector
location, the same O−ring rolling onto itself during insertion or by a protective
sleeve interference at the connector harness conduit B−nut interface with the boost
pump canister.
Objective/Benefit:
The Service Bulletin gives instructions to replace the existing O−rings with the new
O−rings and a custom made O−ring on the cartridges. Removal of the protective
sleeve on each of the connector harness assemblies or replacement of the
damaged connector harness assemblies in the canister.
C. Description
This Service Bulletin gives instructions in PART A, to inspect the fuel boost pump
canister (601R62181−1):
− Get access to the LH engine fuel boost pump, RH engine fuel boost pump and
the APU fuel boost pump canisters,
− Remove and discard the protective sleeve from the connector harness assy and
remove sealant from the cover of the connector cavity. Inspect the connector
harness assy for damage after sleeve and sealant removal, and
− Replace the O−ring, Part No. MS29513−027, on the cover of the connector
cavity after sleeve and sealant removal and wiring harness inspection.
This Service Bulletin gives instructions in PART B, to modify the fuel boost pump
canister (601R62181−1) after inspection:
− Install new connector harness assy if deemed necessary after inspection,
− Replace the O−ring, Part No. MS29513−027, on the cover of the connector
cavity if the connector harness assy was replaced, and
− Update the canister amendment plate as “B”.
This Service Bulletin gives instructions in PART C, to modify the fuel boost pump
cartridges (601R62181−5) and/or (601R62181−7):
− Get access to the LH engine fuel boost pump, RH engine fuel boost pump and
the APU fuel boost pump cartridges,
− Remove and discard the cartridges O−rings,
− Install the new O−ring kit, Part No. KP99−1546,
− For the LH and RH engine fuel boost pumps, the existing O−rings
MS29513−118, MS29513−034, MS29513−142 are replaced with new O−rings
CJ0074, M25988−3−034 and M25988−3−142. The new custom made O−ring
(CJ0074) is introduced at the connector cavity interface on the cartridge,
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 2 of 25

### Page 4

− For the APU fuel boost pump, O−ring M25988−3−118 is replaced by the new
custom made O−ring CJ0074 at the connector cavity interface on the cartridge.
O−rings M25988−3−034 and M25988−3−142 on the cartridge remain the same,
and
− Reidentify the cartridge as 601R62181−11 (Engine fuel boost pump cartridge)
and/or 601R62181−13 (APU fuel boost pump cartridge).
After PART A, PART B and PART C:
− Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Recommended within 5 years from this Service Bulletin release date (Basic Issue).
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by the EASA
under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 650−00−002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at
the next scheduled maintenance task or inspection. Therefore no
man−hours are allotted to prepare the aircraft for maintenance or to
prepare for this Service Bulletin.
4 to 10 man−hours are necessary to do this modification.
− 3 man−hours are necessary to do PART A of this modification.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 3 of 25

### Page 5

− 2 man−hours are necessary to do PART B for each canister modification as
needed.
− 1 man−hours are necessary to do PART C of this modification.
The labor required to do this Service Bulletin is at no cost if:
1. the work is done during new aircraft warranty period,
2. the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
3. this Service Bulletin is accomplished in less than 60 months from its release
date (Basic Issue).
G. Material − Cost and Availability
No kit is necessary to do this modification.
The parts in Paragraph 3.B. are necessary to do this modification.
These parts are available at no cost if:
− ordered during new aircraft warranty period, and
− a no−charge purchase order is sent to Bombardier Aviation in less than
60 months from this Service Bulletin release date (Basic Issue).
This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are
used to reserve and manage inventory due to limited availability of rotable stock,
parts and/or kits. Parts are limited, therefore, advance part scheduling with our
In−Service Implementation Team (ISIT) is recommended prior to a maintenance
visit. Please contact your Regional Manager (RM), Field Service Representative
(FSR) or Customer Service Representative (CSR) to schedule your aircraft as there
is a limited availability. The parts will be allocated on a first come first serve basis.
For more information on dedicated schedules, refer to Service
Bulletin 650−00−002.
For all parts transactions, Bombardier Aviation’s current Spare Parts and
Component Repair Price Catalogue General Terms and Conditions apply. These
terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com
For those aircraft in new aircraft warranty at the time of Service Bulletin distribution,
Smart Parts does not pay for the parts at any time.
For those aircraft out of new aircraft warranty at the time of Service Bulletin
distribution, Smart Parts pays for the parts up to 60 months from this Service
Bulletin release date (Basic Issue).
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 4 of 25

### Page 6

H. Tooling
The equipment and tools listed below are necessary to do this modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
24−00−24 S4933959−501 Tag, Circuit Breaker − Red(Optional)
Commercially Available − Fuel Container, 5 U.S. gallon(20L)
Commercially Available − Wrench, Torque 0 to 250 lbf in(0 to 28.24 Nm)
NOTES: 1. Refer to the CL−650 Illustrated Tool and Equipment Manual (ITEM) to
make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the CL−650, for
acceptable GSE equivalents.
3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the SPM, WM, Chapter 20,
then the tools called in the SPM−WM prevail. Other approved
alternative tools are acceptable and can also be used.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive (Pending).
− Bombardier Aviation, Modification Summary, 600−6632, Rev. B.
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4257, Rev.
A−1.
− Bombardier Aviation, Kit Drawing K604−62252, Rev. A.
− CL−650 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 28 and 53.
− CL−650 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.
− CL−650 Standard Practice Manual (SPM), Chapters 20 and 51.
− CL−650 Structural Repair Manual (SRM), Chapter 51.
L. Other Publications Affected
− CL−650 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 5 of 25

### Page 7

M. Equivalent Service Bulletins
− For the Challenger 604 aircraft, use the Service Bulletin 604−28−024.
− For the Challenger 605 aircraft, use the Service Bulletin 605−28−012.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the CL−650 Aircraft
Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the
CL−650 Aircraft Maintenance Manual, Chapter 6.
A. Aircraft Setup
NOTE: The steps in the Aircraft Setup section of this Service Bulletin are
recommended steps. The steps give a recommendation to get access to
the work area. This recommendation is to give a safe work area and to
minimize possible damage to surrounding aircraft parts. Alternative steps
can be used at the operator’s discretion.
(1) Obey all electrical/electronic safety precautions. Refer to
AMM 24−00−00−910−801.
(2) Obey the fuel system safety precautions. Refer to AMM 28−00−00−910−801.
(3) Defuel the aircraft fuel tanks. Refer to AMM 12−11−28−650−803 or
AMM 12−11−28−650−804.
(4) Lift the aircraft on jacks. Refer to AMM 07−10−01−581−801.
(5) Vent out the fuel tanks. Refer to AMM 28−10−00−840−802.
(6) For the left engine fuel boost pump, open and tag the circuit breakers that
follow:
LOCATION CB NO. NAME ZONE
CBP−1 M9 FUEL L PUMPCONT 221
CBP−1 M10 FUEL L PUMP 221
(7) For the right engine fuel boost pump, open and tag the circuit breakers that
follow:
LOCATION CB NO. NAME ZONE
CBP−2 G7 R FUEL PUMPCONT 222
CBP−2 G8 R FUEL PUMP 221
(8) For the APU fuel boost pump, open and tag the circuit breakers that follow:
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 6 of 25

### Page 8

LOCATION CB NO. NAME ZONE
CBP−2 P4 APU FUELPUMP 222
CBP−1 L1 APU CONTROL 222
(9) Remove the fuel pump cartridge access covers Part No. 601R62182−9 or Part
No. 604−62182−1 for LH, RH engine and APU boost pumps. Refer to
AMM 28−11−01−000−801 and Figures 1 and 2.
B. PART A — Harness Inspection and Sleeve Removal on the Fuel Boost Pump
Canister, Part No. 601R62181−1.
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and get an approved disposition to complete this Service Bulletin.
(1) For inspection of the connector harness assy within the LH and/or RH engine
fuel boost−pump canister, remove the fuel tank access panels (510BB and
610BB) and leave the harness conduit in place. Refer to
AMM 28−11−01−000−801.
Access the left or right canister without removing it from aircraft. Do not remove
the canister from the fuel tank access panel 510BB (610BB). Refer to Figures
3 and 4.
(2) For inspection of the connector harness assy within the APU fuel boost−pump
canister, remove the fuel tank access panel (640BB) and leave the harness
conduit in place. Refer to AMM 28−11−01−000−801.
Access the canister without removing it from aircraft. Do not remove the
canister from the fuel tank access panel (640BB). Refer to Figures 3 and 4.
(3) Hold the canister/panel assy on the support device allowing for the inspection
directly underneath the access hole. Refer to Figures 3 and 4.
NOTE: If necessary, remove the clamps which hold the fuel hoses to allow
the assembly to be moved out from the wing access holes.
(4) Loosen completely the B−nut from the harness conduit and slide the conduit to
expose cables to allow inspection of the sleeve area. Refer to Figures 3 and 4.
(5) Do not remove the cover Part No. 246045.
(6) Disconnect the B−nut from the fuel hose to allow a better access to the sleeve
area of the wiring harness. Refer to Figures 3 and 4.
(a) For LH and RH engine fuel boost−pump canister, remove the fuel hose
assembly, Part No. AE713510−1.
(b) Remove the pressure sensing line from the side of the LH, RH and APU
canister.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 7 of 25

### Page 9

(c) For APU fuel boost−pump canister, remove the fuel hose assembly, Part
No. AE1014208K0132.
(d) Do not remove adaptor, Part No. MS24398D16−12 from the APU fuel
boost−pump canister assy.
(7) Cut and remove the protective sleeve protruding from the canister cover Part
No. 246045 as follows:
(a) Slide the protective sleeve on connector harness, and remove and discard
the protective sleeve without damaging the wires. Refer to Figure 5.
NOTE: If unable to remove sleeve by the top of the cover, the sleeve
could be removed at next step.
(8) Remove the cover Part No. 246045 from the canister as follows:
(a) Remove screws from the cover Part No. 246045.
(b) Lift the cover Part No. 246045 to access the connector cavity area.
(c) Slide and remove the protective sleeve from the connector harness assy
(if not already removed).
(d) Remove and discard the O−ring Part No. MS29513−027 from the cover.
(9) The canister and access panel assy can be moved away from below the
access panel holes area.
(10) Inspect the internal cavity of the cover for presence of sealant.
(11) Remove the sealant carefully if any is found in the cover internal cavity,
connector cavity of the canister, around the cover seam, outside the connector
cover, and spring washer.
(12) Inspect carefully the external surface and internal cavity of the cover and the
spring washer for any deformation and/or damage. If any deformation and/or
damage is found, the cover and/or spring washer must be replaced with a new
cover and/or spring washer at installation in Para 2.C., PART B.
(13) Inspect the wires for damage and make sure there are no cuts.
(14) If the wires are not found damaged, reinstall cover Part No. 246045 with the
wires and connector still in the cover as follows:
(a) Lubricate the new O−ring and install O−ring, Part No. MS29513−027 or
alternate on the cover.
(b) Install the cover on the canister with the screws, Part No. MS24693−C27.
NOTES: 1. Ensure the cover seats flat with no gaps around it.
2. Apply a light drop of loctite 242 to the threads of the screws,
Part No. MS24693−C27.
3. Torque the screw, Part No. MS24693−C27 to 15 lbf in
(1.69 Nm). Refer to SPM−MM 20−21−00−910−801.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 8 of 25

### Page 10

(c) Reinstall the conduit B−nut of the connector harness assy carefully. Make
sure the B−nut is installed and torqued per AMM 28−11−01−400−810 and
reidentify canister per Para 2.C., PART B., steps 18 and 19.
(d) Install the fuel hoses and pressure sensing lines on the engine and APU
fuel boost−pump canisters per AMM 28−11−01−400−801.
(e) For the LH/RH engine fuel boost−pump canister, install the fuel boost
canister mounted on its access panel assembly into the fuel tank. Refer to
AMM 28−11−01−400−801 and Figure 3, Detail A.
(f) For the APU fuel boost−pump canister, install the fuel boost canister
mounted on its access panel assembly into the fuel tank. Refer to
AMM 28−11−01−400−801 and Figure 3, Detail B.
(g) Do the electrical bonding test between the re−installed access panels and
the aircraft primary structure. The electrical bonding value must not be
more than the maximum resistance value of 2.5 mΩ.  Refer to SPM−MM
51−80−00−760−801.
(15) If wires are found damaged during inspection, do Para 2.C., PART B for
modification of connector harness assy.
C. PART B−Modification of the Electric Fuel Boost Pump Canister Part No.
601R62181−1 or −951 after inspection (LH, RH and APU)
(1) For all canisters inspected in PART A that require harness replacement, do the
following steps.
(2) If the LH engine fuel boost−pump connector harness assy needs to be
replaced, remove the LH forward wing−to−fuselage fairing (191BB). Refer to
AMM 53−62−01−000−802.
(3) If the RH engine fuel boost−pump connector harness assy needs to be
replaced, remove the RH forward wing−to−fuselage fairing (192BB). Refer to
AMM 53−62−01−000−802.
(4) If the APU fuel boost−pump connector harness assy needs to be replaced,
remove the Right forward wing−to−fuselage fairing (192BB). Refer to
AMM 53−62−01−000−802.
(5) Connector harness assy must be replaced if during the inspection in PART A
any of the following was found:
− Harness is found damaged,
− The protective sleeve cannot be completely removed as per Para 2B,
PART A, step 7(a),
− The sealant cannot be completely removed from internal cavity of the
cover, or
− The sealant cannot be completely removed from the connector cavity of the
canister.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 9 of 25

### Page 11

(6) Remove and replace the existing connector harness assy with a new
connector harness assy, Part No. C93−649 or alternate.
(a) Make sure protective sleeve is removed from new connector harness assy
before installation.
(7) Remove the connector harness assy from the canister as follows:
(a) Disconnect the wires (MPE1KD) of the APU canister connector harness
assy at terminal block TB442 at FS409 and wire to ground stud N412.
Refer to WM 49−61−00.
(b) Disconnect the wires (MPE1QA) of the LH Engine canister connector
harness assy at connector P421 and wire to ground stud N403 and N423.
(c) Disconnect the wires (MPE2QA) of the RH Engine canister connector
harness assy at connector P420 and wire to ground stud N404 and N424.
(d) Remove and discard the connector harness assembly.
(8) Remove and clean the sealant if any, from the cover.
(9) Remove and clean the sealant if any, from the connector cavity of the canister
and around seam of cover on the canister assembly.
CAUTION: Do not use a metallic device to remove sealant, this can damage
the cover or the internal of the connector cavity in the canister.
(10) If cover cannot be completely cleaned or damage is found on the cover,
replace with new cover. Submit an SRPSA to Technical Support by e−mail to
SRPSA@aero.bombardier.com for analysis of damage to possibly reuse the
cover. Before ordering a cover, the SRPSA must approve the order of the new
part.
(11) Install the new connector harness assy, Part No. C93−649 or alternate into the
canister as follows:
(a) Prior to installation of the new connector harness assy, visually inspect the
three wires on the canister’s wires harness.
(b) Make sure there are no cuts on the wires.
(c) If any cut is found on the wires, place an order for a new harness assy
C93−649 or alternate.
(d) If no cuts are found on the wires, continue the procedure to replace the old
connector harness assy with the new connector harness assy.
(e) Slide the wiring harness, Part No. C93−649 or alternate through the spring
washer, Part No. 6301.
(i) Make sure the protective sleeve is removed from the connector
harness assy before installation.
(f) Lubricate the new O−ring, Part No. MS29513−027 or alternate with
petrolatum grease.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 10 of 25

### Page 12

(g) Install O−ring, Part No. MS29513−027 or alternate on the cover.
(h) Slide the connector harness assy through the cover.
(i) Make sure the notch on the connector of the connector harness assy is
correctly engaged in the pin of the connector cavity in the canister.
(j) Install the cover on the canister with the screws, Part No. MS24693−C27.
NOTES: 1. Ensure the cover seats flat with no gaps around it.
2. Apply a light drop of loctite 242 to the threads of the screws,
Part No. MS24693−C27.
3. Torque the screw, Part No. MS24693−C27 to 15 lbf in
(1.69 Nm). Refer to SPM−MM 20−21−00−910−801.
(12) Insert the wire harness in the conduit.
(13) Connect the wires (MPE1KD) of the APU canister connector harness assy at
terminal block TB442 at FS409 and wire to ground stud N412. Refer to WM
49−61−00.
(14) Connect the wires (MPE1QA) of the LH Engine canister connector harness
assy at connector P421 and wire to ground stud N403 and N423. Refer to WM
28−21−00.
(15) Connect the wires (MPE2QA) of the RH Engine canister connector harness
assy at connector P420 and wire to ground stud N404 and N424. Refer to WM
28−21−00.
CAUTION: CONTAMINATION ON THE COVER PART NO. 246045 CAN CAUSE
INCORRECT SEATING OF THE CONDUIT B-NUT ON THE COVER
PART NO. 246045. THIS CAN CAUSE FUEL TO LEAK.
(16) Make sure the threads of the cover and conduit B−nut are clean and free of
any sealant or other contaminants. Refer to SPM−MM 51−23−00−100−801.
(17) Install the connector harness assy conduit B−nuts, fuel hoses and pressure
sensing lines on the engine and APU fuel boost−pump canisters per AMM
28−11−01−400−801.
(18) If canister is identified as −951 by ink−stamping, strike out that identification by
ink stamp. Refer to SPM 20−90−00 (Identification of Aircraft Parts and
Assemblies) or by using best shop practices.
(19) Reidentify the canister. Use the amendment plate and add the character “B”
with vibro peen. Apply alodine solution on the amendment plate new
identification vibro peened surfaces per finish code A045, SRM 51−01−04.
Refer to Figure 3, Detail C.
(20) Install the LH/RH engine fuel boost−pump canister mounted on its access
panel assembly into the fuel tank. Refer to AMM 28−11−01−400−801 and
Figure 3, Detail A.
(21) Install the APU fuel boost−pump canister mounted on its access panel
assembly into the fuel tank. Refer to AMM 28−11−01−400−801 and Figure 3,
Detail B.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 11 of 25

### Page 13

(22) Do the electrical bonding test between the re−installed access panels and the
aircraft primary structure. The electrical bonding value must not be more than
the maximum resistance value of 2.5 mΩ.  Refer to SPM−MM
51−80−00−760−801.
D. PART C – Modification of the Electric Fuel Boost Pump Cartridge Part No.
601R62181−5 (Vendor Part No. 226114−3) and Part No. 601R62181−7 (Vendor
Part No. P99C25−603)
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and get an approved disposition to complete this Service Bulletin.
(1) Get access to the wing lower surface access panel 510BB (610BB) for LH
and/or RH engine fuel boost−pump cartridge or 640BB for APU boost pump
cartridge.
(2) Remove the fuel boost−pump cartridge, Part No. 601R62181−5 and/or Part
No. 601R62181−7. Refer to AMM 28−23−02−000−801 or
AMM 28−24−02−000−801 and Figure 1 and/or Figure 2.
(3) Remove and discard the three O−rings on each boost pump cartridge Part No.
601R62181−5 and 601R62181−7. Refer to Detail A in Figures 1 and 2.
(4) Lubricate and install new O−rings on the boost pump cartridge. Refer to
AMM 28−23−02−400−801 or AMM 28−24−02−400−801 and Detail A in
Figures 1 and 2.
NOTE: Refer to kit, Part No. KP99−1546 for the list of O−rings in Para 3. B.
(Material Information).
(5) Reidentify the cartridge from Part No. 601R62181−5 (226114−3) to Part No.
601R62181−11 (226114−5) and/or from Part No. 601R62181−7 (P99C25−603)
to Part No. 601R62181−13 (P99C25−614) as follows:
(a) Strike out the original dash number and add the new dash number with
vibro peen. Apply alodine solution on new vibro peened identification
surfaces per finish code A045, SRM 51−01−04. Refer to Detail C in
Figure 1 or Figure 2.
(b) Do not reinstall the cartridges in their respective canisters at this time.
NOTE: To perform the static leakage test of the canister modifications,
the cartridges must not be installed in the canisters.
E. Testing
(1) Do the static leak test of the canister before installation of the cartridge as
follows:
(a) Refuel the applicable fuel tank (Auxiliary tank, RH and LH wing tank) with
a minimum of 3200 lbs of fuel in each tank. Refer to AMM
12−11−28−650−801.
(b) Wait four hours and verify there is no leak inside the connector cavity of
the canister and at the outlet of the conduits carrying the connector
harness assy:
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 12 of 25

### Page 14

(i) If the belly fairing on the applicable side has not been removed,
remove one belly fairing screw located at FS412.00, BL0.0
(approximately). Keep the screw to re−install later. Refer to Figure 6.
(ii) For LH boost pump: conduit MPE1QA at front spar (if Left forward
wing−to−fuselage fairing (191BB) was removed). Otherwise, proceed
with a leakage inspection at location shown in Figure 6.
(iii) For RH boost pump: conduit MPE2QA at front spar (if Right forward
wing−to−fuselage fairing (192BB) was removed). Otherwise, proceed
with a leakage inspection at location shown in Figure 6.
(iv) For Aircraft S/N: 6050 to 6124. For APU boost pump: Conduit
MPE1KD at the front spar (RH landing light compartment).
(v) For Aircraft S/N: 6125 to 6163. For APU boost pump: conduit
MPE1KD at front spar located just inboard of the right landing light
compartment (if Right forward wing−to−fuselage fairing (192BB) was
removed). Otherwise, proceed with a leakage inspection at location
shown in Figure 6.
(c) No leaks are allowed.
(2) Do the fuel boost pump assy dynamic leak test after installation of the
cartridges as follows:
(a) Install all 3 cartridges into canisters. Refer to AMM 28−23−02−400−801 or
AMM 28−24−02−400−801, and Detail A in Figures 1 and/or 2.
NOTES: 1. Make sure that the O−rings are lubricated.
2. Make sure that the mark on the boost pump cartridge is
aligned with the mark on the boost pump canister.
(b) For the left engine fuel boost pump, remove the tags and close the circuit
breakers that follow:
LOCATION CB NO. NAME ZONE
CBP−1 M9 FUEL L PUMPCONT 221
CBP−1 M10 FUEL L PUMP 221
(c) For the right engine fuel boost pump, remove the tags and close the circuit
breakers that follow:
LOCATION CB NO. NAME ZONE
CBP−2 G7 R FUEL PUMPCONT 222
CBP−2 G8 R FUEL PUMP 221
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 13 of 25

### Page 15

(d) For the APU fuel boost pump, remove the tags and close the circuit
breakers that follow:
LOCATION CB NO. NAME ZONE
CBP−2 P4 APU FUELPUMP 222
CBP−1 L1 APU CONTROL 222
(e) Do the operational test of the reinstalled LH and RH engine fuel boost
pumps. Refer to AMM 28−23−01−710−801.
(f) Do the operational test of the reinstalled APU fuel boost pump. Refer to
AMM 28−24−01−710−801.
(g) Operate each pump for 15 minutes.
(h) Do the general visual inspection of the area that follows for leakage:
(i) For LH boost pump: conduit MPE1QA at front spar (if Left forward
wing−to−fuselage fairing (191BB) was removed). Otherwise, proceed
with a leakage inspection at location shown in Figure 6.
(ii) For RH boost pump: conduit MPE2QA at front spar (if Right forward
wing−to−fuselage fairing (192BB) was removed). Otherwise, proceed
with a leakage inspection at location shown in Figure 6.
(iii) For Aircraft S/N: 6050 to 6124. For APU boost pump: Conduit
MPE1KD at the front spar (RH landing light compartment).
(iv) For Aircraft S/N: 6125 to 6163. For APU boost pump: conduit
MPE1KD at front spar located just inboard of the right landing light
compartment (if Right forward wing−to−fuselage fairing (192BB) was
removed). Otherwise, proceed with a leakage inspection at location
shown in Figure 6.
(i) No leaks are allowed.
F. Close−out
NOTE: The steps in the Close−out section of this Service Bulletin, except for the
return−to−service tests, are recommended steps. The steps give a
recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to
return to service. Alternative steps can be used at the operator’s
discretion.
(1) Remove all tools, equipment and unwanted materials from the aircraft.
(2) Install the Left and Right forward wing−to−fuselage fairings (191BB/192BB) if
removed. Refer to AMM 53−62−01−400−802.
(3) If the belly fairing on the applicable side has not been removed, reinstall the
belly fairing screw removed previously at location FS412.00, BL0.0
(approximately). Refer to Figure 6.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 14 of 25

### Page 16

(4) Reinstall the boost pump cartridge access covers Part No. 601R62182−9 or
Part No. 604−62182−1 for LH, RH engine boost pumps. Refer to
AMM 28−23−02−400−801 and Figure 1.
(5) Reinstall the boost pump cartridge access cover Part No. 601R62182−9 or
Part No. 604−62182−1 for APU boost pump. Refer to
AMM 28−24−02−400−801 and Figure 2.
G. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Business Aircraft Customer
Services (BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin
Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kits
No kits required.
B. Parts
The parts that follow are necessary to do this Service Bulletin and are available
from Bombardier Aviation Parts Services, Montreal:
The parts that follow are necessary to do PART A of this Service Bulletin:
NEW PART
NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
MS29513−027 3 O−Ring − −
The parts that follow are necessary to do PART B of this Service Bulletin:
NEW PART
NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
C93−648
(Alternate:
C93−607)
3
Harness
Assy Kit
(See NOTE
5 for list of
parts.)
−
See NOTE 2
Qty of harness
assy kit to be used
as needed, from 0
to 3.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 15 of 25

### Page 17

NEW PART
NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
M39029/1−103 2
Pin
For APU
Harness
MPE1KD
−
Qty 2 if APU
harness is
replaced.
M39029/58−365 2
Pin
For LH/RH
Pump
Harness
MPE1QA
and
MPE2QA
−
Qty 1 for LH & 1
for RH harness, if
harness is
replaced.
MS25036−112 5
Lug
(Per qty: 3
Harness
Assy kit)
−
Qty 2 for LH, 2 for
RH and 1 for APU
harness, If
harness is
replaced.
6301
or
AR80−16
A/R SpringWasher − Necessary only ifdamaged.
MS24693−C27
or
AV60−25
A/R Screw − Necessary only ifdamaged.
The parts that follow are necessary to do PART C of this Service Bulletin:
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 16 of 25

### Page 18

NEW PART
NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION
KP99−1546 3
O−Ring Kit
(See NOTE
3)
− −
NOTES: 1. The part number(s) for the item(s) listed above are/is subject to
change without revision to this Service Bulletin. In case of
discrepancy between this list and any other list, the Illustrated Parts
Catalog prevails and shall be used to determine the latest part
number.
2. The harness assy kit is necessary if harness is found damaged during
inspection or when protective sleeve removal procedure is not
successful.
3. Each O−Ring kit contains one each of P/N: CJ0074, M25988−3−034
(alternate to Part No. AJ60−140) and M25988−3−142 (alternate to
Part No. AJ63−176) for use in cartridge. There is no alternate to
CJ0074.
4. If cover Part No. 246045 cannot be cleaned or is damaged during this
Service Bulletin procedures, submit an SRPSA for analysis of
damage to possibly reuse the cover. Before ordering a cover the
SRPSA must approve the order of the new part.
5. The Harness Assy Kit (Safran P/N: C93−648) contains the following
parts: harness assy (Safran P/N: C93−649), washer (Safran P/N:
AR80−16 or alternate P/N:6301), screws (Safran P/N: AV60−25 or
alternate P/N: MS24693−C27), and O−ring (Safran P/N: H134373 or
alternate P/N: MS29513−027).
C. Material
The materials that follow, or alternate, are necessary to do this Service Bulletin.
These can be purchased from a local supplier. Bombardier Aviation does not pay
for these consumables.
DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY SUPPLIER(SEENOTE)
Thread Locker
CT: 10 minutes Loctite 242 − AsNecessary Code: A
Coating Chemical
Conversion
Alodine
1200S
MIL−DTL−81706
Class 1A
As
Necessary Code: B
Lockwire, CRES MS20995C32 − 3 Code: C
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 17 of 25

### Page 19

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY SUPPLIER(SEENOTE)
Petrolatum − VV−P−236 AsNecessary Code: C
NOTES: 1. Refer to the table that follows for each suppliers address listed by
codes.
2. The Curing Time (CT), if applicable, for each consumable material is
indicated with the description of each product.
3. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate. In the event that this information has
changed, the operator is encouraged to use the World Wide Web to
find a local supplier.
SUPPLIERS ADDRESSES BY CODES
Code: A
Henkel Loctite Corp.
1001 Trout Brook Crossing,
Rocky Hill, CT, 06067−3910
U.S.A.
Tel.: 1−860−571−5100
Fax: 1−860−571−5465
www.loctite.us
Code: B
Chemsol, Inc.
8423 Boettner Road,
Bridgewater, MI 48115
U.S.A.
Tel.: 1−800−663−4057
Fax: 1−734−944−3781
www.chemsol.com
Code: C
Commercially Available
D. Publications
The publications that follow are required after this Service Bulletin has been
incorporated.
− CL−650 Aircraft Illustrated Parts Catalog (AIPC), latest approved revisions as
applicable.
MODEL CL−600−2B16
Basic Issue: Jun 16/2020 650−28−002
Page 18 of 25

### Page 20

ENGINE FUEL
BOOST PUMP
MS29513−118
(O−RING)
MS29513−034
(O−RING)
226114−3
(CARTRIDGE)
MS29513−142
(O−RING)
CJ0074
(O−RING)
M25988−3−034
(O−RING)
M25988−3−142
(O−RING)
PRE MOD
POST MOD
SB650−28−002_001
NAS620C10L
(WASHER)
NAS623−3−7
(SCREW)
601R62182−9
(COVER)
MS20995C32
(LOCKWIRE)
226114−5
(CARTRIDGE)NAS1189E3P14L
(SCREW)
(REF)
(REF)
(REF)
(REF)
(REF)
5
11
SYMBOL WORK
GREASE GUN
PART DISCARDED IN
REMOVAL TASK
MODEL CL−600−2B16
Modification of the Engine Electric Boost Pump Cartridge (Part No. 601R62181−5)
Figure 1
Basic Issue: Jun 16/2020 650−28−002
Page 19 of 25

### Page 21

APU FUEL
BOOST PUMP
M25988−3−118
(O−RING)
M25988−3−034
(O−RING)
M25988−3−142
(O−RING)
PRE MOD
POST MOD
SB650−28−002_011
P99C25−614
(CARTRIDGE)
P99C25−603
(CARTRIDGE)
NAS620C10L
(WASHER)
NAS623−3−7
(SCREW)
601R62182−9
(COVER)
(SCREW)
NAS1189E3P14L
MS20995C32
(LOCKWIRE)
(REF)
(REF)
(REF)
(REF)
(REF)
CJ0074
(O−RING)
M25988−3−034
(O−RING)
M25988−3−142
(O−RING)
SYMBOL WORK
GREASE GUN
PART DISCARDED IN
REMOVAL TASK
MODEL CL−600−2B16
Modification of the APU Electric Boost Pump Cartridge (Part No. 601R62181−7)
Figure 2
Basic Issue: Jun 16/2020 650−28−002
Page 20 of 25

### Page 22

WS45.04
WS45.04
SB650−28−002_021
PROTECTIVE
SLEEVE
CONNECTOR
(PART OF HARNESS ASSY, C93−649)
MS29513−027
(O−RING)
B−NUT
FS511.25
FS411.00
ENGINE FUEL BOOST PUMP
DOOR ASSEMBLY
(REF)
226115−2
(CANISTER)
SYMBOL WORK
AE713510−1
(HOSE ASSEMBLY)
246045
(COVER)
6301 OR
AR80−16
(SPRING WASHER)
MS24693−C27 OR
AV60−25
(SCREW)
C93−649
(HARNESS ASSY)
GREASE GUN
PART DISCARDED IN
REMOVAL TASK
MODEL CL−600−2B16
Modification of Fuel Boost Pump Canister (Part No. 601R62181−1)
Figure 3 (Sheet 1 of 2)
Basic Issue: Jun 16/2020 650−28−002
Page 21 of 25

### Page 23

SB650−28−002_022
A A B
PRE MOD POST MOD
APU FUEL BOOST PUMP
A A
226115−2
(CANISTER)
B−NUT
AE1014208K0132
(HOSE)
CONNECTOR
(PART OF HARNESS ASSY, C93−649)
MS29513−027
(O−RING)
MS24398D16−12
(ADAPTOR)
(REF)
246045
(COVER)MS24693−C27 OR
AV60−25
(SCREW)
6301 OR
AR80−16
(SPRING WASHER)
C93−649
(HARNESS ASSY)
SYMBOL WORK
GREASE GUN
PART DISCARDED IN
REMOVAL TASK
PROTECTIVE
SLEEVE
MODEL CL−600−2B16
Modification of Fuel Boost Pump Canister (Part No. 601R62181−1)
Figure 3 (Sheet 2 of 2)
Basic Issue: Jun 16/2020 650−28−002
Page 22 of 25

### Page 24

SB650−28−002_031
PICTURE SHOWING SUPPORT DEVICE MAINTAINING THE CANISTER/PANEL ASSEMBLY
AT HEIGHT OUTSIDE THE WING ACCESS HOLE
HARNESS CONDUIT B−NUT UNSCREWED TO ALLOW ACCESS
TO PROTECTIVE SLEEVE AREA 
BOOST PUMP
PANEL ASSY
SUPPORT DEVICE
HARNESS CONDUIT B−NUT
SLEEVE AREA
FUEL HOSE B−NUT
MODEL CL−600−2B16
Inspection of Fuel Canister Harness
Figure 4
Basic Issue: Jun 16/2020 650−28−002
Page 23 of 25

### Page 25

SB650−28−002_032
PICK TOOL USED TO OPEN UP THE SLEEVE BY CUTTING A SLIT
SLEEVE REMOVAL USING TWO PAIRS OF LONG NOSE PLIERS
PICK TOOL
SLEEVE
MODEL CL−600−2B16
Protective Sleeve Extraction
Figure 5
Basic Issue: Jun 16/2020 650−28−002
Page 24 of 25

### Page 26 (OCR)

CHALLENGER 650
MODEL CL-600-2B16
SCREW TO
BE REMOVED
VIEW A  SB604_2822_001
Location of Belly Fairing Drain Hole, FS412.00, BLO.0
Figure 6
Basic Issue: Jun 16/2020  650-28-002
Page 25 of 25

### Page 27

650−28−002 Basic Jun 16/2020
MODIFICATION – FUEL SYSTEM –
ENGINE AND APU FUEL BOOST PUMP SEALING IMPROVEMENT
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 28

SERVICE BULLETIN INCORPORATION SHEET − "650−28−002"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
650−28−002 Basic
COMPLIED WITH
YES    NO    N/A
PART A
PART B
PART C
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
