# Bombardier Service Bulletin 700-34-7523

Copy: Revision 01 ("700-34-7523 Rev 1"), 77 pages: PDF https://openairdocs.org/files/sha256/30/36/30366ca7ac31f9bce72fdf9248e0bf6c7b4b097c26e4cfda436fadbf3c417d1e; text https://openairdocs.org/service-documents/bombardier/sb-700-34-7523/file/30366ca7ac31.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 700-34-7523
- Latest revision known: 700-34-7523, Revision 01, dated December 8, 2021 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-700-34-7523

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-27-02](https://openairdocs.org/ad/2022-27-02.md), effective Mar 17, 2023: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-700-34-7523/proposed.md).

## Text (77 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Discard the Basic Issue of this Service Bulletin dated April 30/2021, and replace in its
entirety with Revision 01.
Service Bulletin No. 700−34−7523
Date of Basic Issue Apr 01/2021
Revision No. 01 Dated Dec 08/2021
For action applicable to aircraft on which the Basic Issue of this Service Bulletin was
done, refer to the retroactive action box on Page 1 of this Service Bulletin.
This revision is a complete reissue, therefore revision bars were intentionally omitted.
This revision is issued to:
1. Revise, in the Pilots Information Sheet, the AFM revision and the recording statement.
2. Revise, in the Service Bulletin Summary Sheet, the compliance time. Add a NOTE
regarding the Airworthiness Directive (AD).
3. Add a retroactive action in Page 1.
4. Update, in Paragraph 1, to clarify Notes 8 and 10 statements. Add NOTE regarding the
Airworthiness Directive (AD).
5. Add, in Paragraph 1, a NOTE 12 to review a training video.
6. Revise Paragraph 1.B. to clarify the root cause #3.
7. Revise Paragraph 1.C. to change the sequence of steps.
8. Revise, in Paragraph 1.D., the compliance date. Add NOTE regarding the Airworthiness
Directive (AD).
9. Add, in Paragraph 1.H., NOTES 4 and 8.
SERVICE BULLETIN
MODEL BD−700−2A12 (BD−700)
700−34−7523
Page 1 of 2
REVISION TRANSMITTAL SHEET

### Page 2

10.Update, in Paragraph 1.K., 2.B.(1), and 2.B.(5), the Report Number RAE−BA700−229 to
Rev. D, and Rockwell Collins, document 946−9118−001, to Rev. E.
11.Update, in Paragraph 1.L., the AFM revision.
12.Add, in Paragraphs 2.B.(1)(a) and 2.B.(1)(c), the Z values for the golden rivets location.
13.Correct, in Paragraph 2.B.(1)(c), External Target Board table, the tolerance values in
centimeter.
14.Change the sequence of steps in Paragraph 2.B. − Modification, to avoid the installation
of the AMAT tool on the older hard mounting points, according to Report Number
RAE−BA700−229, Rev. D, and Rockwell Collins, document 946−9118−001, Rev.E.
15.Updated illustrations to reflect the new External Target Board Assembly design and
revised per document 946−9118−001 Rev. E.
16.Add Paragraph 2.C.(3), to inform the evidences shall be reviewed.
17.Add, in Paragraph 2.D, new steps 1 and 2.
18.Revise, in Paragraph 2.D.(3), to clarify the step.
19.Update, in Paragraph 3.D., the AFM revision.
20.Make miscellaneous minor changes, as necessary, with no change of context.
MODEL BD−700−2A12 (BD−700)
700−34−7523
Page 2 of 2

### Page 3

MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –
SECOND HUD CALIBRATION PROCEDURES
A. Objective
It has been reported the Heads Up Display (HUD) may not be sufficiently aligned for
Enhanced Flight Vision System (EFVS) or Steep Approach operations. Installation of the
HUD requires an angular accuracy to within 5.0 mrad (0.286°). It has been discovered on
several aircraft, that the installation had a misalignment greater than 5.0 mrad (0.286°).
The Steep Approach or EFVS operations are not permitted until the accuracy of the HUD
has been verified and corrected if necessary.
This Service Bulletin is issued to correct the HUD installation and alignment.
B. Systems Impacted
Enhanced Flight Vision System (EFVS) or Steep Approach operations.
C. Flight Compartment Procedure Impacted
Not applicable.
D. Passenger Compartment Procedure Impacted
Not applicable.
E. Pilot Training
Not applicable.
F. AFM References
− Airplane Flight Manual (AFM), CSP 700−7000−1, Revision 14 dated Oct 21/2021.
G. Additional Information
Not applicable.
MODEL BD−700−2A12 (BD−700)
ATA 34−32
NAVIGATION
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 1 of 2
PILOTS INFORMATION SHEET

### Page 4

H. Flight Planning Information
Not applicable.
J. Recording
After Service Bulletin 700−34−7523 is incorporated, make sure to update the aircraft logbook
to show that Service Bulletin 700−34−7523 (Revision 01) as incorporated and if applicable
provide a copy of the Pilot Information Sheet to the flight crew and revise
AFM 01−00−General to include this Service Bulletin.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 2 of 2

### Page 5

MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –
SECOND HUD CALIBRATION PROCEDURES
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Recommended before February/2024
EFFECTIVITY: A/C Serial No. 70036, 70044, 70055 and 70062
MANPOWER: 69 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN YES NO
AIRWORTHINESS LIMITATIONS (AWL) NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION: See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO
PREREQUISITE SERVICE BULLETINS: N/A
NOTES: 1. Bombardier recommends that the Service Bulletin 700−34−7521 be done at
the same time as Service Bulletin 700−34−7523.
2. This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD
CF−2021−36.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL BD−700−2A12 (BD−700)
ATA 34−32
NAVIGATION
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 1 of 1
This Service Bulletin is available at:

### Page 6

MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –
SECOND HUD CALIBRATION PROCEDURES
RETROACTIVE ACTION
THE ACTION THAT FOLLOWS IS RECOMMENDED FOR AIRCRAFT ON WHICH
THE BASIC ISSUE OF THIS  SERVICE BULLETIN WAS DONE:
A typographical error on the metric values on the External Target Board table has been
corrected for Service Bulletin 700−34−7523 Basic Issue. If the operator has used the
imperial values, then no action is required.
If the operator has used the metric values, then review the collected Evidence #1, the
Laser Tracker Report, to verify if the target was aligned in accordance to the values
listed on Service Bulletin 700−34−7523 Revision 01, step 2.B.(1)(c). If the Evidence #1,
the Laser Tracker Report shows the target board alignment outside the tolerances from
the Service Bulletin 700−34−7523 Revision 01, step 2.B.(1)(c), then perform the Service
Bulletin 700−34−7523 Revision 01 to ensure correct HUD alignment.
1. PLANNING INFORMATION
NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin can
be completed.
2. For any technical issues, contact CSE, Technical Support, Global Express
by e−mail at SRPSA@aero.bombardier.com.
3. Due to complexity, this Service Bulletin needs to be performed at specific
Bombardier Aviation Service Centers due to limited specialized tooling.
Contact the In−Service Implementation Team (ISIT) prior to scheduling
your aircraft to confirm availability during your down time.
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL BD−700−2A12 (BD−700)
ATA 34−32
NAVIGATION
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2021 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 1 of 65
This Service Bulletin is available at:

### Page 7

4. Bombardier Aviation Service Centers may contract a third party entity to
Set−Up the Target Board in front of the aircraft using laser tracking device
or a theodolite. The third party entity will use their own laser equipment or
theodolite and will supply the laser tracker report of the aircraft leveling
and Target Board placement.
5. This Service Bulletin is covered by a dedicated schedule. Dedicated
schedules are used to reserve and manage inventory due to limited
availability of rotable stock, parts and/or kits. Parts are limited, therefore,
advance part scheduling with our In−Service Implementation Team (ISIT)
is recommended prior to a maintenance visit. Please contact your
Regional Manager (RM), Field Service Representative (FSR) or Customer
Service Representative (CSR) to schedule your aircraft as there is a
limited availability. The parts will be allocated on a first come first serve
basis.
For more information on dedicated schedules, refer to SB 700−00−7502.
6. The removal and installation of the RHS windshield is required to perform
this Service Bulletin.
It is recommended to incorporate the following In−Service Modifications
while reinstalling the windshield:
− IS700−53−7001 part A (sealing plates).
− IS700−53−7002 (additional sealant).
7. Bombardier recommends that the Service Bulletin 700−34−7521 be done
at the same time as Service Bulletin 700−34−7523.
8. Make sure there is enough space in front of the aircraft to place the Target
Board. The distance from the nose landing gear wheel center to target:
431 in (10.95 m). The target board area must be clear of any condition that
could cause movement. A barrier tape can be installed around it to avoid
accidental impact to of the target board.
9. Note that the HUD alignment is verified with and without the windshield
installed. If the windshield fails this test, it must be replaced.
10.After the Target Board has been aligned in front of the aircraft with laser
tracker, the access to AFT of the aircraft, behind FS727 (inside the cabin
or outside the aircraft) should be avoided. No moving of flaps either. This
is to ensure that the alignment of the Target Board in reference to the
aircraft remains undisturbed until the collection of the all evidences
(Tables 2 and 3).
11.Since the windshield installation has to be performed with the aircraft on
jacks, make sure that access to the windshield is possible. Some of the
stands usually used for windshield removal installation may not be suitable
for usage when the aircraft is elevated on jacks.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 2 of 65

### Page 8

12.All the steps to collect Evidences #5 and #6, including the proper Collins’s
technique for PUSH, PULL and RELEASE of the Combiner, are
documented in the attached video (Appendix 1) titled "How to record HUD
Combiner image (evidences #5 and #6) per Strategia TT−237.mp4".
Review this training video before starting the procedure.
13.This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA,
AD CF−2021−36.
A. Effectivity
BD−700−2A12 aircraft, Serial No. 70036, 70044, 70055 and 70062.
NOTE: The instructions given in this Service Bulletin are only applicable to the
systems and parts installed at the time of delivery of the aircraft or as
changed by Bombardier Aviation Service Bulletin(s).
B. Reason
1. Condition:
It has been reported the Heads Up Display (HUD) may not be sufficiently aligned
for Enhanced Flight Vision System (EFVS) or Steep Approach operations.
Installation of the HUD requires an angular accuracy to within 5.0 mrad (0.286°). It
has been discovered on several  aircraft, that the installation had a misalignment
greater than 5.0 mrad (0.286°).
The Steep Approach or EFVS operations are not permitted until the accuracy of the
HUD has been verified and corrected if necessary.
2. Evidence:
The root causes of HUD misalignment have been identified as follows:
Source #1 − AMAT mishandling and workmanship issues.
Performing HUD alignment using an out of calibration AMAT causes HUD image
misalignment.
Note that an AMAT metrology report or a HUD Combiner picture (taken properly
using the ERP tool) can show that this kind of misalignment has been introduced.
The current procedure has been updated with additional AMAT instructions to help
prevent AMAT mishandling and workmanship issues causing the tool to become
out of calibration.
Source #2 − epoxy curing time too short.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 3 of 65

### Page 9

It has been demonstrated that a HUD Combiner installation performed when the
epoxy has not cured for long enough, will cause the Combiner hard mounting point
to become misaligned. Therefore, it is now requested 48 hours curing time before
installation of the Combiner (i.e. before torqueing of the Combiner Channel
fasteners). The current procedure has been updated to account for the new epoxy
curing time. Furthermore, it has also been demonstrated that an AMAT telescope
picture cannot capture to its full extent deviations of the Combiner hard mounting
point caused by this epoxy/torqueing issue. This is an AMAT limitation that was
previously unknown. Only a HUD Combiner picture taken properly using the ERP
tool can show that this kind of misalignment has been introduced.
The current procedure has been updated to collect the HUD Combiner picture and
use it as additional PASS/FAIL criteria.
Source #3 − optical issues with the windshield.
For the HUD Model 6600 to meet the required angular accuracy, the total HUD
system display boresight accuracy error budget must be less than or equal to 5.0
mrad. To achieve the goal of staying within that budget, track must be kept of the
contributing error of each component in the HUD system and its installation. This is
done along both the horizontal and the vertical axis.
HUD installation is one component of that error budget, where the AMAT telescope
is pointing to the external Target Board looking through the windshield. The Global
7500 windshield is also a source of error. The magnitude of the windshield
refraction offsets had never been measured until November 2020. The results of
the windshield sampling measured were more scattered than anticipated for the
windshields manufactured initially. It was known that some windshields did not
meet the error limit allocated to the windshield. Consequently, a new HUD
alignment method had to be developed and the windshield manufacturing control
process had to be looked at. The new method continues to enable the HUD system
to meet the requirement on boresight accuracy.
To increase the tolerance for windshield error:
− Perform the HUD alignment without the windshield installed.
− Perform the HUD alignment closer to the center of the Target Circle.
3. Objective/Benefit:
This Service Bulletin is issued to correct the HUD installation and alignment.
C. Description
This Service Bulletin gives instructions to:
− Remove the RHS windshield
− Set−up the External Target Board,
− Remove Overhead Unit (OHU) and Combiner,
− Align the HUD mounting hard points,
− Install the RHS windshield,
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 4 of 65

### Page 10

− Do the “windshield verification target” procedure, and replace the RHS
windshield if required,
− Remove the AMAT, install OHU and combiner,
− Do the “HUD System error verification” procedure,
− Collect all eight evidences (listed in Tables 2 and 3) and store them, along with
page 5 of the Appendix 1, in the location specified in Appendix 1, and
− Realign the EVS with the new HUD alignment position.
D. Compliance
Specified Time Compliance
NOTES: 1. Bombardier Aviation recommends that this Service Bulletin be done
before February/2024.
2. If it is not possible to complete all the instructions in this Service
Bulletin because of the aircraft configuration, submit an SRPSA for
analysis and to get an approved disposition to complete this Service
Bulletin.
3. This Service Bulletin is in reference to Advisory Wire
AW700−34−0797.
4. This Service Bulletin is mandated by Airworthiness Directive (AD)
TCCA, AD CF−2021−36.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU Bilateral Aviation Safety Agreement.
F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to
SB 700−00−7502.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 5 of 65

### Page 11

2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at
the next scheduled maintenance task or inspection. Therefore no
man−hours are allotted to prepare the aircraft for maintenance or to
prepare for this Service Bulletin.
69 man−hours are necessary to do this modification.
The labor required to do this Service Bulletin is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS), and
− this Service Bulletin is scheduled before April/2022.
G. Material − Cost and Availability
No kit is necessary to do this modification.
The parts in Paragraph 3.B. are necessary to do this modification.
The parts are available at no cost if:
− ordered during new aircraft warranty period, and
− a no−charge purchase order is sent to Bombardier Aviation before April/2022.
This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are
used to reserve and manage inventory due to limited availability of rotable stock,
parts and/or kits. Parts are limited, therefore, advance part scheduling with our
In−Service Implementation Team (ISIT) is recommended prior to a maintenance
visit. Please contact your Regional Manager (RM), Field Service Representative
(FSR) or Customer Service Representative (CSR) to schedule your aircraft as there
is a limited availability. The parts will be allocated on a first come first serve basis.
For more information on dedicated schedules, refer to SB 700−00−7502.
For all parts transactions, Bombardier Aviation’s current Spare Parts and
Component Repair Price Catalogue General Terms and Conditions apply. These
terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com
Smart Parts does not pay for this recommended Service Bulletin at any time.
H. Tooling
The equipment and tools listed below are necessary to do this modification:
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 6 of 65

### Page 12

GSE REFERENCE NO. PART NO. DESCRIPTION
20X−10−01 S4933959−501 Tag, Circuit Breaker
34X78K−33−01 4500−5247−001 Target Board AlignmentFrame
34X78K−33−03 4500−6195−001 Eye Ref Point Locator,Right HUD
34X78K−33−05 232−0 Brunson Stand
34X78K−33−06 235−20 Brunson Adapter Plate
34X78K−33−08
4500−6771−001
or
4500−4826−001
(alternate)
RHS Aircraft Mounting
and Alignment Tool
(AMAT)
34X78K−33−10 G05318500−001−SFIX01
External Target Board
Assembly for HUD
(without windshield) and
EVS
(See Note 8)
Commercially Available −
HD Camera
(minimum 4032 x 3024
pixels)
Commercially Available − Tripod for Camera
Commercially Available −
Laser tracking device or
Theodolite
(See Note 7)
NOTES: 1. Refer to the Global 7500 Illustrated Tool and Equipment Publication
(ITEP) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEP for the G7500 for
acceptable GSE equivalents.
3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the AMP, WM, Chapter 20,
then the tools called in the AMP, WM prevail. Other approved
alternative tools are acceptable and can also be used.
4. Alternate Target Board Alignment Frames and stands may be used so
long as the Target Board is located in a stable manner to the
coordinates provided in the current procedure.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 7 of 65

### Page 13

5. The RHS Aircraft Mounting and Alignment Tool (AMAT) (Part No.
4500−6771−001 or alternate 4500−4826−001) includes several
separable assemblies or parts that are used  throughout the
boresighting process. They are listed as follows:
− 4500−3605−003 − Forward Scope Assembly
− 4500−4919−001 − Level Assembly
− 4500−4732−001 − Gap Gauge
− 4500−4893−001 − Alignment Pin Assembly
− 4500−4830−001 − Drill Guide Assembly, RHS
6. The AMAT may contain in the kit box a Rear Scope Assembly (P/N
4500−6691−002 or 4500−4758−002) that is not required to be used
by this Service Bulletin.
7. Bombardier Aviation Service Centers may contract a third party entity
to Set−Up the Target Board in front of the aircraft using a laser
tracking device or a theodolite. The third party entity will use their own
laser equipment or theodolite and will supply the laser tracker report
of the aircraft leveling and Target Board placement.
8. If SB700−34−7521 is done at the same time with SB700−34−7523, a
modified target board can be used to for both service bulletins to
avoid the alignment of two target boards. In this case, submit an
SRPSA to get instructions on how to modify the
G05318500−001−SFIX02 target board to be able to be used with both
SB700−34−7521 and SB700−34−7523.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− Bombardier Aviation, Top Modification Summary, 700T7094866.
− Bombardier Aviation, Top Modification Summary, 700T7900054.
− Bombardier Aviation, Option Collector P3430005, Rev. B.
− Bombardier Aviation, Advisory Wire AW100−34−0797.
− Bombardier Aviation, In−Service Modification IS700−53−7001, Rev. B−1.
− Bombardier Aviation, In−Service Modification IS700−53−7002, Rev. A.
− Bombardier Aviation, Restriction and/or Special Instruction C−70573, Rev.−−.
− Bombardier Aviation, Restriction and/or Special Instruction C−70574, Rev.−−.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 8 of 65

### Page 14

− Global 7500 Aircraft Maintenance Publication (AMP), Chapters 08, 24, 25, 32
and 34.
− Global 7500 Aircraft Structure Repair Publication (ASRP), Chapter 51.
− Bombardier Aviation, Service Bulletin 700−34−7521, “Modification − Head Up
Display (HUD) System − HUD Calibration Procedures”.
− Bombardier Aviation, Service Bulletin 700−34−7523, Appendix 1 (attached).
− Bombardier Aviation, Report Number RAE−BA700−229, Rev. D (attached).
− Rockwell Collins, document 946−9118−001, Rev. E (attached).
− Bombardier Aviation, Learning Platform Strategia, TT−237 Training.
L. Other Publications Affected
− Airplane Flight Manual (AFM), CSP 700−7000−1, Revision 14 dated
Oct 21/2021.
M. Equivalent Service Bulletins
None.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the Global 7500
BD−700−2A12, Aircraft Maintenance Publication (AMP) unless otherwise
specified.
2. All references made to zones, access panels and/or doors, are from the
Global 7500 BD−700−2A12 Aircraft Maintenance Publication (AMP),
Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to
BD700−A−J24−00−00−00AAA−012A−A.
(2) Obey all electrostatic discharge safety precautions. Refer to
BD700−A−J24−00−00−01AAA−012A−A.
CAUTION: OBEY ALL ELECTROSTATIC DISCHARGE-SENSITIVE (ESDS)
PRECAUTIONS.   STATIC VOLTAGES CAN CAUSE DAMAGE TO
ESDS COMPONENTS.
(3) In the flight compartment, on the eCB Page, set the circuit breaker that follows
to LOCK. Refer to BD700−A−J24−00−00−00AAA−561A−A:
NAME CB NUMBER/LOCATION
R HUD SPDA1−2−3
(4) Do the procedure to remove the headliner trim panel (222 ARC). Refer to
BD700−A−J25−12−01−00AAA−520A−A.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 9 of 65

### Page 15

(5) Remove the head−up−display combiner unit (Copilot). Refer to
BD700−A−J34−32−03−00ABA−520A−A.
(6) Remove the head−up−display overhead unit (Copilot). Refer to
BD700−A−J34−32−01−00ABA−520A−A.
(7) Remove the RHS windshield. Refer to
BD700−A−J56−11−01−00AAA−520A−A.
(8) Set the aircraft to Weight−On−Wheels (WOW) condition. Refer to
BD700−A−J32−61−00−03AAA−398A−A.
(9) Do the procedure to lift the complete aircraft with jacks. Refer to
BD700−A−J07−10−01−00AAA−172A−A.
(10) Make sure the aircraft is leveled within +/− 0.1 degree pitch and yaw. Refer to
BD700−A−J08−20−01−00AAA−913A−A.
B. Modification
NOTES: 1. If it is not possible to complete all the instructions in this Service
Bulletin because of the configuration of the aircraft, submit an SRPSA
for analysis and get an approved disposition to complete this Service
Bulletin.
External Target Board set−up
(1) Install the External Target Board assembly as shown in Figures 1 and 2.
For a reference, see Collins document 946−9118−001, Rev. E, Paragraph
5.3.1, and BD700−A−J34−33−01−00AAA−272A−A (dated 2019−08−20) steps
1 to 4 and 9 to 21.
NOTES:1 . The HUD alignment PASS/FAIL criteria requires six photos
or videos evidences to be collected and properly uploaded
on a dedicated database. One of those important evidences
is collected at the step below. Refer to Appendix 1 (attached)
to learn the photo/video recording process.
2. Take the Target Board placement report from the Laser Tracker
team (evidence #1 RHS) and upload it to the HUD alignment
database (refer to Appendix 1 (attached) for the network location
of that database).
3. Keep the external Target Board in position until the EVS
alignment is completed.
(a) Remove the following bolts (golden rivets) from the nut plate. Install the
laser target holder at the golden rivets locations.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 10 of 65

### Page 16

LHS
FORWARD
GOLDEN
RIVET
LHS REAR
GOLDEN
RIVET
RHS
FORWARD
GOLDEN
RIVET
RHS REAR
GOLDEN
RIVET
FS: 379.000
+20.000,
Z = 327.000
FS: 816.000,
Z = 852.000
FS: 379.000
+20.000,
Z = 327.000
FS: 816.000,
Z = 852.000
BL: −53.061 BL: −53.061 BL: 53.061 BL: 53.061
WL: 97.000 WL: 97.000 WL: 97.000 WL: 97.000
(b) Align both the LHS and RHS Markers with the Laser Tracker.
(c) Use the following values for the External Target Board Setup.
External Target Board Setup Value
Z axis distance from LHS/RHS
Forward Golden Rivet to Target
589 ± 6 in
(14.96 ± 0.15 m)
Distance from Nose Landing Gear
Wheel Center to Target
431 ±6 in
(10.95 ± 0.15 m)
LHS Marker Location WL +121.968 ± .02 in
(+309.80 ± 0.051 cm)
BL −19.203 ± .02 in
(−48.78 ± 0.051 cm)
RHS Marker
Location
WL +121.968 ± .02 in
(+309.80 ± 0.051 cm)
BL +19.203 ± .02 in
(+48.78 ± 0.051 cm)
Roll
(see note)
0.019 in
(0.4826 mm)
NOTE: Adjust the roll of the External Target Board so that the LHS and
RHS Marker Locations are no more than 0.019 in vertical
displacement from each other. Note that this accomplishes a 0.5
mrad roll on the Target Board.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 11 of 65

### Page 17

4500−5247−001
(TARGET BOARD ALIGNMENT FRAME)
235−20
(BRUNSON ADAPTER PLATE)
232−0
(BRUNSON STAND)
SB700−34−7521_057
TARGET BOARD ALIGNMENT FRAME (4500−5247−001),
EXTERNAL TARGET BOARD (232−20) ADAPTER PLATE AND (232−0) STAND
MODEL BD−700−2A12 (BD−700)
Figure 1
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 12 of 65

### Page 18

SB700−34−7523_027
EXTERNAL TARGET BOARD ASSEMBLY FOR HUD
(WITH OR WITHOUT WINDSHIELD) AND EVS P/N G05318500−001−SFIX01
MODEL BD−700−2A12 (BD−700)
Figure 2
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 13 of 65

### Page 19

WINDSHIELD VERIFICATION TARGET
WITHOUT WINDSHIELD
SCOPE TARGET
HUD SYSTEM
VERIFICATION TARGET (4.12 mrad)
EXTERNAL TARGET BOARD ASSEMBLY FOR HUD (WITHOUT WINDSHIELD)
AND EVS P/N G05318500−001−SFIX01
FORWARD SCOPE CROSSHAIRS
SB700−34−7523_013
RHS MARKER LOCATION
(FOR TARGET BOARD PLACEMENT)
WL 121.50
Figure 3
RHS Mounting Hard Points Removal
(2) Remove and discard the following parts with the associated hardware:
− Sockets (P/N: 5000−8197−001, 5000−8197−003, 5000−8163−001)
− Fixed or free retaining cups (P/N: 5000−8148−001 and 5000−8149−001)
− Retainers (P/N: 5000−8147−001)
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 14 of 65

### Page 20

− Combiner mounting channel (P/N: 5000−8165−002)
− Combiner pad (P/N 5000−8164−002)
NOTE: Sockets and combiner pad are potted with structural adhesive that will
break off. Carefully remove structural adhesive mechanically.
(a) Clean any residuals using plastic tools and, if required, lightly abrade per
BD700−A−J51−25−00−04AAA−252A−A.
(b) Inspect the HUD mounting brackets and sill beams to make sure that all
mating surfaces and injection holes are clean, smooth and clear of
contamination such as drill shavings and adhesive. Inspect to make sure
that no physical damage has occurred.
NOTES: 1. If damages are found, replace the affected bracket(s).
2. Submit an SRPSA to get support for the bracket(s)
replacement.
3. Refer to Repair Engineering Order (REO) 700−56−11−7001
for repair of Combiner Pad sill beams.
RHS Combiner Pad installation
(3) Install the new RHS Combiner Pad (P/N 5000−8164−002) onto the sill beam
with the screws provided in the installation kit. Tighten all four #10−32 screws
(P/N NAS1351−3−12P) to a torque of 30 ± 5 in−lbs (3.4 ± 0.6 N m). Refer to
Figure 4.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 15 of 65

### Page 21

SB700−34−7523_001
COMBINER PAD INSTALLATION RHS
AS VIEWED FROM COCKPIT
5000−8164−002
(RHS COMBINER PAD)
NAS1351−3−12P
(#10−32 PLATED SCREW)
Figure 4
RHS AMAT preparation
(4) Do the RHS AMAT preparation as follows:
CAUTION: THE AMAT AND ITS SCOPE ARE CALIBRATED TOGETHER
AND ARE NOT INTERCHANGEABLE. BEFORE EVERY INSTALLATION,
VERIFY THAT THE SERIAL NUMBER ON THE AMAT BODY MATCHES THE
SERIAL NUMBER ON THE SCOPE ASSEMBLY.
(a) The Table 1 below lists important AMAT handling and AMAT workmanship
instructions that must be followed.
# INSTRUCTION
1 Always refer to Proper Installation instructions whenever
handling AMATs for a specific Installation. Each AMAT, scope
and Target Board set up are designed for a specific aircraft, so
they do vary because of many factors, depending on the
aircraft.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 16 of 65

### Page 22

# INSTRUCTION
2 When using the AMAT take extra care not to damage it. The
AMAT is precision piece of equipment (costing more than
$200K) used for aligning HGS boresight within a couple
milliradians. Keep that in mind when handling the AMAT. If the
AMAT is dropped or damaged, send it back to the
manufacturer for calibration.
3 Always store the AMAT in its case when not in use, as it is
designed to protect it. The AMAT is used for HGS boresight
alignment and should be removed from the case in order to
install the hard points only. On removing the AMAT from its
case, examine the tooling surfaces. If the tooling surfaces are
dented, damaged of have potting material, tape or debris on it,
return it to the manufacturer to remove the irregularity unless
the debris can be safely removed without damaging the AMAT.
Any surface that is not within tolerance can affect the
installation of the hard points and boresight alignment. On
removing the telescope mounted part of the AMAT from its
case, avoid pulling by the telescope itself. Rather pull the
red/green aluminum section.
4 When installing the AMAT in the aircraft always use two
people, one to hold it in place while the other person tightens
the fasteners to retain it. Be careful when installing to go
vertically up without binding. Tighten fasteners according to
installation instructions. Be sure to mask off areas where
potting may fall with drop cloth or tape for ease of clean up.
Using a thin coat of mold release to ensure potting does not
stick to the mating surfaces. DO NOT put tape on mating
surfaces.
5 Once the potting has cured the appropriate amount of time,
referring to the installation instructions and epoxy
manufacturers specs, it is time to remove the AMAT. Be sure
to loosen the combiner channel bolts as well as the OHU
fasteners before removal. Do not completely remove all the
fasteners, so the AMAT does not free fall when it is removed.
Using two mechanics, gently remove the AMAT without
excessive force pulling slightly, straight down without binding at
an angle. If the AMAT is still tight, try tapping with a hand
before pulling straight down. DO NOT use pry bars or screw
drivers as they can damage the AMAT.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 17 of 65

### Page 23

# INSTRUCTION
6 Once the AMAT is down and off the aircraft examine the
tooling surfaces and condition of the AMAT on an adjacent
table with padding underneath. Using a soft cloth and solvent
to remove any potting material, tape or debris, being careful
not to damage the AMAT. DO NOT use sandpaper or any
abrasive materials as it will damage the surface of the AMAT. If
the mating surfaces have any dents or scuffs, send it back to
the manufacturer to get re−calibrated before using again.
7 After the AMAT is clean and surfaces are free of debris, store
AMAT back inside the case where it came from until next use
to ensure it does not get damaged. Also store the case where it
will not get bumped or tipped over to ensure the AMAT is in
good condition for the next use.
8 The AMAT should not be disassembled in any way except as
specifically noted in the procedure.
9 DO NOT install the AMAT on hard points previously installed
using a different AMAT.
Table 1 − AMAT instructions
(b) Make sure that the AMAT assembly is within the valid calibration period
(check dates on the calibration label on AMAT). Refer to Figures 5 and 6.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 18 of 65

### Page 24

SERIAL NUMBER POSITION ON AMAT
SERIAL NUMBER
LOCATION
SB700−34−7521_041
Figure 5
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 19 of 65

### Page 25

SERIAL NUMBER LOCATION
ON REAR SCOPE
SERIAL NUMBER LOCATION
ON FORWARD SCOPE
SERIAL NUMBER POSITION ON SCOPE
SB700−34−7521_042
MODEL BD−700−2A12 (BD−700)
Figure 6
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 20 of 65

### Page 26

(c) Assemble the RHS AMAT Part No. 4500−6771−001 (or alternate
4500−4826−001) configuration with the fwd scope (Part No.
4500−3605−002) as shown in the Figure 7.
5000−8165−002
(RHS COMBINER
MOUNTING CHANNEL)
5000−8197−003
(ASSEMBLY, SOCKET ALIGNMENT)
5000−8197−001
(ASSEMBLY, SOCKET ALIGNMENT)
LEVEL ASSEMBLY
4500−3605−003
(FWD SCOPE ASSEMBLY)
STABILIZATION
BRACKET
AFT YAW
ADJUSTMENT
BRACKET
5000−8163−001
(OHU AFT INSTALLATION SOCKET)
SB700−34−7523_011RIGHT HAND SIDE AMAT (P/N 4500−4826−001) WITH FORWARD SCOPE
Figure 7
(d) Inspect the AMAT to make sure that all mating surfaces are clean,
smooth, and clear of contamination such as drill shavings and epoxy, and
that no physical damage has occurred which might affect the boresight
alignment.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 21 of 65

### Page 27

(e) Install the aft yaw adjust bracket and two forward stabilization brackets.
Loosen the yaw adjust bracket and slide it down to the bottom of the post.
Back out, but do not remove, the three 1/4−20 stabilization screws in the
aft yaw adjust bracket and two stabilization brackets (Figure 8).
STABILIZATION SCREW
STABILIZATION SCREWS ON AMAT
SB700−34−7521_044
Figure 8
(f) Apply a thin even coat of mold release or equivalent on the tooling face
where the sockets and Combiner channel are mounted, and any adjacent
tooling faces to prevent the epoxy from sticking to the tooling.
(g) Prior to installing the Combiner Channel, back out the Combiner Channel
jacking screw on the AMAT body (Figure 9) so that it does not interfere
with the channel during attachment.
Insert the 10−32 barbed hose fittings into the threaded holes on the
underside of the channel (Figure 10).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 22 of 65

### Page 28

JACKING SCREW
(LOOKING FROM UNDERSIDE OF AMAT)
JACKING SCREW FOR COMBINER CHANNEL
SB700−34−7523_017
NOTE
Do not touch the black hex−head bolts. The black hex−head bolts are for calibration purposes.1
BLACK HEX−HEAD BOLTS1
Figure 9
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 23 of 65

### Page 29

SB700−34−7523_018
NOTE
Do not touch the black hex−head bolts. The black hex−head bolts are for calibration purposes.1
BARBED FITTING LOCATIONS
VIEWED FROM UNDERSIDE OF AMAT
BARBED FITTINGS FASTENED
TO COMBINER CHANNEL
BLACK HEX−HEAD BOLTS1
Figure 10
(h) Seal the Combiner Channel holes with masking tape, cellophane, or foil
tape, making sure that the holes are completely covered. This will prevent
epoxy from entering those features (see Figure 11).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 24 of 65

### Page 30

TAPE
TAPE SEALS ON COMBINER CHANNEL
5000−8165−002
(COMBINER CHANNEL)
SB700−34−7523_015
Figure 11
(i) Install the OHU sockets (Part No. 5000−8197−003, 5000−8163−001, and
5000−8197−001) (Figure 7) on the OHU mounting hard point attachment
points (Figure 16).
CAUTION: Use extensive care during socket installation to avoid
damaging the socket treads. Fully inspect the hardware before installation.
The threads on the hardware are very delicate for fine adjustment and can
easily be damaged.
Install the Combiner channel (Part No. 5000−8165−002) on the Combiner
mounting hard point attachment points.
Refer to Figures 17, 18 and 19 for the specific location of the sockets.
Tighten the six 1/4−28 hex head bolts in the AMAT to a torque of 84 ± 4
in−lbs (9.4 ± 0.5 N m).
NOTE: Make sure that the 0.125 inch diameter (3.175 mm) holes in the
alignment sockets (Figure 7, items 5000−8197−003 and
5000−8197−001) fit over the pins on the AMAT OHU mounting
hard point attachment posts (see Figure 12).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 25 of 65

### Page 31

(j) Clean all surfaces to be epoxied with cleaning solvent before installing the
AMAT into position in the aircraft, including the retaining cups and rings.
Install the hose fittings into the threaded holes on the aft and forward
outboard OHU mounting brackets.
Install a short piece (6−8 in.) of vinyl tubing on each of the hose fittings
that are attached to the Combiner channel.
Make sure the holes are open in OHU mounting brackets so that structural
adhesive can be injected.
Install the pin (P/N 4500−4893−001) into the potting hole on the forward
inboard OHU mounting bracket. This pin, shown in Figure 13, locates the
fixed cup Part No. 5000−8148−001 (Figure 19 when installed in the
bracket.
SOCKET HOLE TO AMAT PIN ALIGNMENT (INBOARD)
AMAT PINSSOCKET HOLES
SB700−34−7521_048
Figure 12
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 26 of 65

### Page 32

4500−4893−001
AMAT ALIGNMENT PIN
SB700−34−7521_049
Figure 13
Mounting Hard Point Installation
(5) Do the alignment of the RHS HUD Mounting Hard Points as follows:
For a reference, see Collins document 946−9118−001, Rev. E.
CAUTION: The current section must be executed prior installation of the
windshield.
CAUTION: Refer to Table 1 for important AMAT handling and workmanship
instructions that must be followed.
(a) Elevate the RHS AMAT and align it to the OHU mounting brackets and
Combiner pad, oriented as shown in Figure 14. When the OHU sockets
are close to alignment in the brackets, slide the fixed or free retaining cup
over the socket to rest on the top of the bracket, concave surface facing
upward.
(i) Make sure that the fixed cup is pressed down into the inboard bracket
opening and that one of the slots aligns with the alignment pin (P/N
4500−4893−001) inserted into the bracket (see Figure 15).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 27 of 65

### Page 33

(ii) Center the alignment pin by manually clocking the cup in one direction
until contact is made.
(iii) Rotate in the opposite direction and make contact with the other side
of the hard point slot.
(iv) Finally, find the approximate midpoint orientation by rotating
approximately half the angle between the two contact point angles.
NOTE: Refer to Figures 17, 18, and 19 for the specific location of
the fixed and free retaining cups.
RHS AMAT POSITIONED IN THE FLIGHT STRUCTURE
SB700−34−7523_002Rear scope not used for this Service Bulletin.
NOTE
1
FORWARD SCOPE
REAR SCOPE
1
Figure 14
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 28 of 65

### Page 34

SB700−34−7521_012
CUP ORIENTATION WITH ALIGNMENT FEATURE
4500−4893−001
(ALIGNMENT PIN)
Figure 15
(b) Install the retaining rings (Figure 16) by threading them over the top of the
sockets, spherical surface down. This will allow the AMAT to be fully
supported by the aircraft brackets. See Figure 17, Figure 18, and Figure
19 for the installation hardware Stack−Up.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 29 of 65

### Page 35

A
RIGHT HAND SIDE OVERHEAD MOUNTING HARD POINTS 
VIEW LOOKING FORWARD
SB700−34−7523_003
G05319033−101
(AFT A/C OHU
MOUNTING BRACKET)
G05319031−101
(FWD OUTBD A/C OHU
MOUNTING BRACKET)
G05319032−101
(FWD INBD A/C OHU
MOUNTING BRACKET)
A
MODEL BD−700−2A12 (BD−700)
Figure 16
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 30 of 65

### Page 36

SB700−34−7523_004
RHS INSTALLATION HARDWARE STACK−UP
(AFT OHU MOUNTING BRACKET)
5000−8149−001
(FREE RETAINING CUP)
G05319033−101
(AFT OHU MOUNTING BRACKET) POTTING PORT
5000−8147−001
(RETAINING RING)
5000−8163−001
(AFT ALIGN SOCKET)
Figure 17
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 31 of 65

### Page 37

SB700−34−7523_005
(FWD OUTBD OHU MOUNTING BRACKET)
RHS INSTALLATION HARDWARE STACK−UP
5000−8147−001
(RETAINING RING)
5000−8149−001
(FREE RETAINING CUP)
G05319031−101
(FWD OUTBD OHU MOUNTING BRACKET)
5000−8197−003
(SLOTTED ALIGN SOCKET)
POTTING PORT
Figure 18
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 32 of 65

### Page 38

SB700−34−7523_006
(FWD INBD OHU MOUNTING BRACKET)
RHS INSTALLATION HARDWARE STACK−UP
G05319032−101
(FWD INBD OHU MOUNTING BRACKET)
5000−8197−001
(TIGHT ALIGN SOCKET)
5000−8148−001
(FIXED RETAINING CUP)
5000−8147−001
(RETAINING RING)
POTTING PORT
Figure 19
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 33 of 65

### Page 39

5000−8147−001
(RING, RETAINING)
5000−8197−001 (OR)
5000−8197−003 (OR)
5000−8163−001
(SOCKET)
5000−8149−001 − SHOWN (OR)
5000−8148−001
(RETAINING CUP)
CROSS−SECTION OF OHU FREE MOUNTING HARD POINT INTERFACE
SB700−34−7521_060
Figure 20
(c) Looking through the telescope, ensure that both crosshairs (on the
telescope and on the external Target Board) are visible. When moving the
eye around the outer limits of the telescope eyepiece, verify that there is
no perceivable motion between the two crosshairs.
If there is motion, adjust the telescope using the eyepiece and the front
focus adjustment on the scope using the following two steps:
(i) Block the telescope with white paper and adjust the eyepiece so that
the crosshairs appear clear and focused to the eye.
(ii) Remove the paper and adjust the front focus adjustment looking at
the crosshairs on the Target Board until they are clear. Make sure that
both the scope and the Target Board crosshairs do not move relative
to each other as the eye moves around the outer limits of the
telescope eyepiece.
(d) Using the AMAT gap gauge provided, (P/N 4500−4732−001) set the
nominal socket to bracket gap by placing the gauge between the top of the
socket flange and the bottom of the OHU bracket. Thread the retaining
ring clockwise until the gauge is snug in the gap.
Remove the gauge and repeat on the other two posts.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 34 of 65

### Page 40

(e) Slide the aft yaw adjust bracket up the aft post until the swivel head
screws mate with the aft bracket. Tighten the handle to clamp against the
post. Using the swivel head screws, get a rough yaw alignment by placing
the center of the forward scope crosshairs on the vertical Target Board
line. Back the swivel head screws out a half turn. See Figure 21.
AFT YAW STABILIZATION BRACKET
AFT YAW BRACKETSTABILIZATION SCREW
SB700−34−7523_016
Figure 21
(f) Using the aft retaining ring, adjust the pitch of the AMAT so that the center
of the forward scope crosshairs is aligned with the horizontal Target Board
line.
(g) Remove the calibrated precision level (Figure 22) from the level assembly
and place on top of the forward scope yoke (Figure 7). Accurately adjust
the retaining rings so that the bubble lines up between the two larger
center lines on the level.
(i) Monitor the level and maintain a horizontal condition while adjusting
the pitch and yaw to center the telescope cross hairs on the Target
Board. This method requires the aircraft to first be placed on jacks
and leveled to within ±0.1°.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 35 of 65

### Page 41

(ii) If the bubble is no longer in between the larger center marks, adjust
the retaining rings on the forward inboard and outboard mounting
hard points to align the roll axis. Proper roll alignment is achieved by
re−leveling out the precision level assembly on the forward scope
yoke by these retaining ring adjustments.
CALIBRATED LEVEL FOR ALIGNMENT USING EXTERNAL TARGET BOARD
SB700−34−7521_061
Figure 22
(h) Repeat steps (e) through (g) until the forward scope crosshairs are aligned
on the target center (Figure 23) and the bubble is centered on the level.
NOTE: To minimize alignment error, adjust the AMAT so the telescope
crosshairs are aligned to the target crosshairs (as close as
possible to the target center). Throughout the alignment process,
ensure the sockets, Combiner channel, and the AMAT do not
bind or interfere with the installed brackets or aircraft structure.
CAUTION: AFTER EACH ADJUSTMENT IS MADE, VERIFY THAT
THERE IS A POSITIVE GAP, OR NO CONTACT, BETWEEN THE
THREE OHU SOCKETS AND THE AIRCRAFT BRACKETS, AS WELL
AS THE COMBINER CHANNEL AND THE AIRCRAFT STRUCTURE.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 36 of 65

### Page 42

WINDSHIELD VERIFICATION TARGET
WITHOUT WINDSHIELD
SCOPE TARGET
HUD SYSTEM
VERIFICATION TARGET (4.12 mrad)
EXTERNAL TARGET BOARD ASSEMBLY FOR HUD (WITHOUT WINDSHIELD)
AND EVS P/N G05318500−001−SFIX01
FORWARD SCOPE CROSSHAIRS
SB700−34−7523_013
RHS MARKER LOCATION
(FOR TARGET BOARD PLACEMENT)
WL 121.50
Figure 23
(i) To stabilize the AMAT during potting, position the two stabilization
brackets so that the ¼ − 20 stabilization screws are directly under a flat
portion of the A/C brackets. Thread the three screws up until they are
finger tight against the underside of the A/C brackets. Tighten the two aft
yaw adjustment swivel head screws so that each screw is tightened up to
the side of the aft A/C bracket finger tight.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 37 of 65

### Page 43

CAUTION: DO NOT USE A TOOL OF ANY KIND TO TIGHTEN THE
STABILIZATION SCREWS OR THE ALIGNMENT RINGS AND SWIVEL
SCREWS AS THIS COULD CAUSE DISTORTION OF THE A/C
BRACKETS, AFFECTING HUD ALIGNMENT.
(j) Look through the scope and verify that the alignment crosshairs are still
aligned on the target center and the bubble is centered on the level. If the
crosshairs are not aligned, repeat steps (e) to (i).
NOTE: The AMAT roll adjustment should be done per the level bubble
indication. Any roll mismatch with the telescope crosshairs could
be an issue with the AMAT Calibration that needs to be
investigated.
(k) Install a piece of aluminum foil tape to seal the top of the three sockets.
(l) Make dams with clear tape (Aluminium foil tape could also be used)
around the OHU sockets on the top and bottom sides of the OHU
brackets. Leave an inspection/vent opening at the upper opposite side of
the injection port of each enclosure. Seal around the edges with caulking
cord or alternative means.
(m) Make dams between the Combiner channel and the pre−installed pad
using clear tape. Dam both ends and lower opening, making a hole at
each of the top corners (four places) as a vent/inspection opening.
(n) Check to ensure that the AMAT telescope crosshair remains aligned on
the target center and the bubble is centered on the level. Adjust the AMAT
as necessary (steps (e) to (i)).
(o) For the inboard OHU bracket, carefully remove the mounting hard point
alignment pin, making sure that there exists a clear potting path through
the bracket into the hard point. Minimize any movement that may cause
shifting of the hard point with respect to each OHU bracket. Carefully fit
the bracket with the hose fitting. All brackets are now ready for the potting
process.
(p) Check the telescope to make sure that the AMAT is still aligned on the
target center and the bubble is centered on the level.
Potting (injection/cure) procedure
(6) Do the potting as follows:
CAUTION: MAKE SURE THAT VENT AND INSPECTION OPENINGS ARE
PROVIDED IN ALL POTTING DAMS TO ALLOW PROPER FILLING.
CAUTION: INJECT THE EPOXY SLOWLY TO PREVENT VOIDS AND TO
ENSURE AN EVEN DISTRIBUTION OF THE EPOXY WITHIN THE CAVITY.
(a) Install a short piece (6−8 in.) of vinyl tube on each bracket hose fitting for
potting. Inject structural adhesive through the tube and fitting on the
forward inboard bracket into the cavity created by the dams made in
Paragraph 2.B.(5) step (l).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 38 of 65

### Page 44

To inject, put the nozzle of the potting gun into the end of the tube. Hold
the nozzle into the tube and operate the potting gun to force the adhesive
into the cavity. When adhesive appears at the inspection/vent hole, the
cavity is full. Use an inspection mirror and light to see the vent hole.
Release the gun trigger and remove the nozzle from the tube. Plug the
inspection/vent hole with masking tape and fold the end of the tube with
masking tape to prevent any adhesive from escaping out. Masking tape or
caulk may be used to seal the adhesive off.
Go to the next fitting and repeat until all three OHU sockets are potted.
(b) Fill the cavity between the Combiner channel and the pad via the threaded
10−32 entrance ports (four each). Start injecting at one end and watch it
fill the cavity through the clear tape. As adhesive fills past the injection
port, move the gun to the next tube and keep injecting until the whole
channel is filled. The adhesive may come out of the corner inspection/vent
ports. Remove excess adhesive if necessary. Plug vents and fold tubes
with tape or caulk to prevent any adhesive spillover.
CAUTION: AFTER POTTING THE MOUNTING HARD POINTS, THE
INSTALLATION TOOLING MUST STAY UNDISTURBED FOR 4 HOURS.
IT IS VERY IMPORTANT TO KEEP THE AIRCRAFT STABLE AND THE
TOOLING UNDISTURBED WHILE THE STRUCTURAL ADHESIVE
CURES.
NOTE: The HUD alignment PASS/FAIL criteria requires six photos
or videos evidences to be collected and properly uploaded
on a dedicated database. Two of those important evidences
are collected at step (c) and (e) below.
Refer to Appendix 1 (attached) to learn the photo/video recording
process.
(c) Check the telescope to make sure that the AMAT is still aligned on the
target center and the bubble is centered on the level. Adjust the AMAT if
required by repeating steps of Paragraph 2.B.(5), from (e) to (i).
NOTE: Make sure to take a picture looking through the AMAT scope for
photo evidence #2. See Table 2.
Upload the photo to the HUD alignment database (refer to
Appendix 1 (attached) for the network location of that database).
CAUTION: The crosshairs need to be within the target circle and as much
aligned to the center as possible. This is critical for HUD Alignment
method WITHOUT windshield as is provides additional buffer to the
"Windshield Verification Target" in Paragraph 2.B.(8).
(d) Allow at least 4 hours minimum curing time depending on the adhesive
type used. During the cure time the tooling is to remain undisturbed and
the temperature kept constant (not less than 65°F/18°C or more than
180°F/82°C).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 39 of 65

### Page 45

It is very important to keep the aircraft stable and the tooling undisturbed
while the structural adhesive cures.
The Combiner and OHU mounting hard points are now potted.
(e) After 48 hours minimum. Looking through the scope, verify that the scope
crosshairs are still within the target circle and the bubble is centered on
the level.
NOTES: 1. Make sure to take an AMAT telescope picture (photo
evidence #3, see Table 2) and indicate on the picture the
elapse time since epoxy injection (48 hours minimum).
2. Upload the photo to the HUD alignment database (refer to
Appendix 1 (attached) for the network location of that
database).
(7) Install the RHS windshield. Refer to BD700−A−J56−11−01−00AAA−720A−A.
CAUTION: This section must NOT be performed until a minimum of 48 hours
after potting (Paragraph 2.B.(6)) to allow time for the epoxy to fully cure.
NOTES: 1. Since the windshield installation has to be performed with the
aircraft on jacks, make sure that access for the windshield
removal is done without disturbing the aircraft leveling or the
Target Board Alignment. Otherwise, the Target Board needs to
be realigned before “Windshield Verification Target” procedure.
2. It is recommended to incorporate the following In−Service
Modifications while reinstalling the windshield:
− IS700−53−7001 part A (sealing plates).
− IS700−53−7002 (additional sealant).
3. The side windows and LHS windshield are not removed as part
of this Service Bulletin, only the RHS windshield. For the purpose
of this Service Bulletin it is recommended to perform the
in−service modifications only for the RHS windshield.
Windshield Verification Target (RHS)
(8) Do the Windshield Verification Target (RHS) as follows:
CAUTION: This section must be executed AFTER the windshield has been
fully installed.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 40 of 65

### Page 46

CAUTION: Refer to Table 1 for important AMAT handling and workmanship
instructions that must be followed.
(a) Look through the AMAT Scope, verify that the scope crosshair is within the
Windshield Verification Target (see Figure 3).
NOTES: 1. Refer to photo evidence #3 (refer to section Paragraph
2.B.(6), step (e)) and if the telescope crosshair was within
the Windshield Verification Target.
2. If the telescope crosshair IS within the Windshield
Verification Target, the windshield passes the error tolerance
criteria. Proceed to step (c).
(b) If the crosshair is outside of the Windshield Verification Target limits, the
(RHS) windshield fails the error tolerance criteria and must be rejected. Do
the steps (b)(i) to (b)(iii).
NOTE: The HUD system cannot meet the alignment regulation for EFVS
and Steep Approach with the current windshield error as it
exceeds the windshield error budgeted limits.
(i) Remove and discard the RHS windshield. Refer to
BD700−A−J56−11−01−00AAA−520A−A.
(ii) Install a new RHS windshield. Refer to
BD700−A−J56−11−01−00AAA−720A−A.
NOTE: It is recommended to incorporate the following in−service
modifications while installing the windshield:
− IS700−53−7001 part A (sealing plates).
− IS700−53−7002 (additional sealant).
(iii) Do the “Windshield Verification Target (RHS)” procedure, Paragraph
2.B.(8), steps (a) to (d).
(c) If the crosshair is within the Windshield Verification Target (see Figure 3),
take an AMAT telescope picture (photo evidence #4). Upload the photo to
the HUD alignment database (refer to Appendix 1 (attached) for the
network location of that database).
NOTE: The HUD alignment PASS/FAIL criteria requires six photos
or videos evidences to be collected and properly uploaded
on a dedicated database. One of those important evidences
is collected at step (c) above.
Refer to Appendix 1 (attached) to learn the photo/video recording
process.
(d) The Windshield Verification Target (RHS) procedure is now complete.
AMAT Removal
(9) Remove the AMAT as follow:
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 41 of 65

### Page 47

CAUTION: Refer to Table 1 for important AMAT handling and workmanship
instructions that must be followed.
(a) Loosen the stabilization bracket bolts if necessary. Loosen the three bolts
in the Combiner channel until they hang freely in the AMAT body. While
supporting the AMAT from underneath, remove the three bolts in the OHU
sockets. Remove the AMAT and place it on the storage container.
NOTE: If the AMAT does not drop down freely, do not pry or pound on
the AMAT body. Thread the three OHU bolts back into the
sockets then back out two turns. Use the jacking screw in the
middle of the Combiner channel to separate the AMAT from the
adhesive.
CAUTION: Be careful not to loosen the three black hex−heads bolts (see
Figure 10) as the AMAT would become out of calibration. If any of those
bolts are loosen by mistake, contact the Bombardier Customer Response
Center (CRC) for assistance in correcting the problem.
(b) Inspect that the structural adhesive fills the cavities. Backfill any voids with
structural adhesive. Remove the caulking cord and any excess adhesive
from the interface surfaces. Remove the barbed fittings from the OHU
brackets and Combiner by unscrewing with the hose attached and discard.
Clean all contact interface surfaces on the Overhead sockets and the
Combiner channel with cleaning solvent. These interface surfaces must be
perfectly clean and flat. Clean all tools and return them to their
shipping/storage boxes.
RHS Combiner Pad drilling
(10) Drill the RHS Combiner Pad as follows:
CAUTION: This section must NOT be performed until a minimum of 48 hours
after potting (Paragraph 2.B.(6)) to allow time for the epoxy to fully cure.
Torqueing the fasteners (step (d)) has been demonstrated to introduce a Hard
Point misalignment when the epoxy did not get enough time to cure fully
(minimum of 48 hours).
CAUTION: Drilled holes must not go into the aircraft structure (sill beam).
(a) To ensure an added secure mechanical lock between the Combiner
Channel and Pad, use P/N 4500−4830−001 right hand side drill guide
(Figure 24) and a #21 (0.159 in) bit, and drill through the pre−drilled holes
in the Combiner channel into the pad attached to the window sill beam
(three holes). Carefully control the depth of drilling to avoid complete
penetration of the pad.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 42 of 65

### Page 48

The hole depth in the Combiner mounting pad must be adequate to
provide full thread engagement of the mounting screws. The use of a drill
stop and careful measurement is recommended.
NOTE: Right hand side drill guide (P/N 4500−4830−001) is attached to
the Combiner channel using the three ¼−28 captive bolts.
Torque these bolts securely.
(b) Remove the right hand side drill guide (P/N 4500−4830−001) from the
Combiner channel, then use a 10−32 tap to tap the holes drilled in step (a)
above to the maximum drilling depth using the predrilled holes in the
Combiner Channel as guide.
Change the tap to a bottom tap and clean up the tapped hole to get
maximum threads in the pad for the #10−32 flathead mounting screws
(P/N 015−0D19−460 or 015−0D19−470).
(c) Clean the guide and place it in the AMAT shipping/storage box.
(d) Measure the length of the screw required and install the correct length
screws after applying the thread locker, and tighten to 30 ± 5 in−lbs (3.4 ±
0.6 N m).
NOTE: Screws heads must be flush or below the Combiner channel
mounting surface. Channel mounting surface must be clean and
flat.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 43 of 65

### Page 49

1/4 − 28 MOUNTING BOLT GUIDE HOLE FOR
#21 DRILL BIT
1/4 − 28 MOUNTING BOLT
ALIGN WITH PIN
IN CHANNEL
SB700−34−7523_012
4500−4830−001
RHS DRILL GUIDE
Figure 24
(11) Install the existing HUD overhead unit (Copilot) and HUD combiner unit
(Copilot). Refer to BD700−A−J34−32−01−00ABA−720A−A and
BD700−A−J34−32−03−00ABA−720A−A.
(12) In the flight compartment, on the eCB Page, set the circuit breaker that follows
to IN. Refer to BD700−A−J24−00−00−00AAA−761A−A:
NAME CB NUMBER/LOCATION
R HUD SPDA1−2−3
(13) Do the operation test for the head−up−display overhead unit. Refer to
BD700−A−J34−32−01−00AAA−320A−A.
(14) Do the operation test of the head−up−display combiner unit. Refer to
BD700−A−J34−32−03−00AAA−320A−A.
HUD System error verification (RHS) procedure
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 44 of 65

### Page 50

(15) Do the HUD System error verification (RHS) procedure as follow.
(a) Make sure the RHS HUD is powered up and symbology is displayed on
the Combiner.
(b) Stow the HUD combiner and then deploy it to its operating detent position.
Ensure that the “Align HUD” message is not displayed.
(c) Ensure that the “Align HUD” message is not displayed in the Combiner
after installation of the ERP Locator tool.
HUD COMBINER AND ERP LOCATOR TOOL (RHS SHOWN)
SB700−34−7523_007
ERP LOCATOR TOOL
(RHS SHOWN)
HUD COMBINER
(RHS SHOWN)
Figure 25
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 45 of 65

### Page 51

HUD COMBINER AND ERP LOCATOR TOOL SIDE VIEW (RHS SHOWN)
SB700−34−7523_008
FWD
Figure 26
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 46 of 65

### Page 52

HOLDING FINGERS
HUD COMBINER AND ERP LOCATOR TOOL TOP FINGER POSITION (RHS SHOWN)
SB700−34−7523_009
Figure 27
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 47 of 65

### Page 53

SB700−34−7523_010HUD COMBINER AND ERP LOCATOR TOOL MOUNTING (RHS SHOWN)
COMBINER
SUPPORT
ADJUST FINGER
UP AGAINST SUPPORT
Figure 28
Recording the Video Evidences #5 and #6
(16) Do the procedure as follow to record the video evidences #5 and #6.
NOTE: The HUD alignment PASS/FAIL criteria requires six photos or
videos evidences to be collected and properly uploaded on a
dedicated database. Two of those important evidences are
collected below.
Refer to Appendix 1 (attached) to learn the photo/video recording
process.
NOTE: This section provides the steps to video document the HUD Combiner
image offset. The evidences #5 and #6 will be presented to the
authorities to demonstrate that the HUD System is meeting the
alignment requirement, and that this aircraft can be used for EFVS−A,
EFVS−L and Steep Approach Landing without any issues related to
safety.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 48 of 65

### Page 54

CAUTION: HUD images are very sensitive to improper Combiner deployment.
The requirement for HUD alignment at boresight is < 0.286 deg (5 mrad) for a
PASS. An improper deployment of the Combiner can add an extra ±0.300 deg
on top of the current HUD offset. This is due to a limitation of the Combiner
mechanical design. Therefore, ensure the correct “Collins’s technique” per the
Strategia training TT−237 is used for Combiner deployment.
All the steps from the section, including the proper Collins’s technique for
PUSH, PULL and RELEASE of the combiner, are documented in the attached
video (Appendix 1) titled "How to record HUD Combiner image (evidences #5
and #6) per Strategia TT−237.mp4". Review this training video before
recording evidence #5 and #6.
CAUTION: The technician and both Quality inspectors must have reviewed
and understood the HUD combiner deployment video training (Strategia
Training TT−237). The Quality inspectors must be present to make sure each
Combiner RELEASE, each Combiner PUSH and each Combiner PULL is
performed per the training.
CAUTION: Only a HUD Combiner video taken properly using the ERP Locator
tool can catch that an AMAT out−of−calibration was used or catch an epoxy
curing issue. Failing to catch those issues is a flight HAZARD.
(a) Install the ERP Locator tool  (P/N 4500−6195−001) to the RHS Combiner.
(i) The ERP Locator tool shall be placed on the Combiner, so the eye
locator opening extends toward the operator when sitting in the
copilot’s seat (See Figure 26).
(ii) Position the ERP Locator tool’s three top holding fingers over the top
portion of the Combiner glass and metal frame as shown in Figure 27.
(iii) When viewed from the left side, adjust / slide the ERP Locator tool to
the right so the top left holding finger fits up against the Combiner
support as shown in Figure 28.
(iv) Verify that the lower support arm of the ERP Locator tool fits properly
up against the bottom middle edge of the Combiner glass. If there is a
little bit of play when moving the eye locator opening left right, make
sure to center it as much as possible.
(b) Setup the Camera/Tripod in front of the ERP Locator tool. See Figure 30.
(i) Setup the camera resolution setting to its maximum value (no less
that 1920 x 1080 pixels). Fix it firmly to the tripod.
(ii) Place the Camera/Tripod in the copilot seating area such that the lens
of camera is one inch aft of ERP viewing circle. Setup the tripod to
have two legs aft and one leg forward. Having two legs of the tripod
on the copilot seat is acceptable if the seat cushion has been
removed as shown on Figure 30. Alternatively, the RHS crew seat
can be removed if this is more convenient. Refer to
BD700−A−J25−11−01−00AAA−520A−A.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 49 of 65

### Page 55

(iii) Pull the IRS circuit breakers to get the boresight symbol displayed on
the HUD. This symbol is required for the alignment verification. Adjust
the tripod and orient the camera so that when the camera is fully
zoomed out, the boresight symbol appears right at the center of the
ERP circle (both vertically and horizontally). The left and right side of
the ERP circle must be captured when fully zoomed out as well. Refer
to Figure 31 for a visual example of the default zoomed out setup.
(iv) Make sure that the boresight symbol remains at the center of the
camera screen shot when the camera is fully zoomed in (see Figure
32). It this is not the case, readjust the orientation and repeat step
(b)(iii) above.
(v) To prevent movement of the camera and get the sharpest image
possible, make sure to check that all the tripod screws and bolts are
not too loose.
(vi) Rotate the “HUD CVS” knob on the RHS Glareshield Panel to adjust
the HUD image brightness and make sure the boresight symbol
edges appears clearly on the video (not too faint, not too
bright/blurry).
(c) Collect the Combiner video PUSH and PULL video evidence #5.
CAUTION: If the tripod get bumped at any point during step (c), stop the
recording and repeat steps (b)(iii) to (b)(v) . Once the setup of the
camera/tripod have been re−validated, restart from step (c)(i).
(i) Make sure the camera is fully zoomed out (see Figure 31). Start the
video recording.
(ii) Fully zoom in the camera (Figure 32). Push the Combiner into the
breakaway position and proceed to remove the ERP tool. Stow and
redeploy the Combiner.
(iii) With the thumb, press gently against the bottom edge of the
Combiner glass to push it forward. Release the pressure and make
sure to move your hand away from the Combiner without bumping the
tripod.
(iv) With the index, pull gently the bottom edge of the Combiner glass to
pull it towards you. Release the pressure and make sure to move your
hand away from the Combiner without bumping the tripod.
CAUTION: The pressure required to PUSH or PULL the Combiner
glass to the forward and aft ends of the Combiner mechanical play is
much less than what it required to get to the breakaway positions.
Redeploy the Combiner if it gets there inadvertently.
(v) Repeat steps (c)(iii) and (c)(iv) above until you have recorded at least
four push and four pull. At this point you can stop the recording of
evidence #5, or continue with the recording of evidence #6 by going
straight to step (d)(iv).
(d) Collect the Combiner RELEASE video evidence #6.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 50 of 65

### Page 56

CAUTION: If the tripod get bumped at any point during step (d), stop the
recording and repeat steps (b)(iii) to (b)(v). Once the setup of the
camera/tripod have been re−validated, restart from step (d)(i).
(i) Push the Combiner into the breakaway position and proceed to
reinstall the ERP tool per the instructions from step (a). Put the
Combiner back to its deployed position. With the camera fully zoomed
out (Figure 31) make sure the boresight symbol still appears right at
the center of the ERP circle (both vertically and horizontally) and that
the left and right side of the ERP circle are still captured as well. If this
is not the case repeat steps (b)(iii) to (b)(v).
(ii) Make sure the camera is fully zoomed out (see Figure 31). Start the
video recording.
(iii) Fully zoom in the camera (see Figure 32). Push the Combiner into the
breakaway position and proceed to remove the ERP tool.
(iv) Stow and release the Combiner to its deployed position per the
Collins’s technique" for Proper Combiner Deployment (i.e., per
Strategia Training TT−237).
(v) Repeat steps (d)(iv) above until you have recorded at least four
releases where the boresight symbol lands at the exact same position
vis−a−vis the Target Board.
CAUTION: Variation up and down between the boresight symbol
position after each RELEASE would be indicative that the Combiner
was not released properly per the "Collins’s technique" (not enough
momentum or hand still touching the Combiner when its snaps at the
deployed position) or that there is interference between the Combiner
arm and the headliner. Make sure there is no mechanical interference
between the HUD Combiner arm and the headliner. A minimum space
of a paper sheet thickness should exist between the released HUD
combiner arm and the headliner. If this is not the case, the headliner
leather must be reworked before continuation recording evidence #5
and #6.
CAUTION: The average PUSH and PULL positions are expected to
be 0.6 deg apart (i.e. 2 times the height of the boresight symbol “V”).
See Figure 33. The average RELEASE positions should be midway
between the PUSH and PULL positions. Any deviation from that could
be indicative of a possible Combiner unit issue. Replacement of the
Combiner unit by a new one would be required before repeating steps
(c) and (d) again.
(e) Analysis of the PASS/FAIL criteria of the HUD Combiner image.
(i) When reviewing evidence #6, the boresight symbol should be the
same after each RELEASES without noticeable vertical deviations. If
this is not the case, refer to the CAUTION from section (d) to fix this
issue as evidence #6 would be a FAIL.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 51 of 65

### Page 57

(ii) Take a screen shot of the video after a proper release of the
Combiner. Locate the center of the boresight symbol by drawing a
vertical line and a horizontal line (see Figure 34). If the center is
located within the “HUD System Verification Target”, the HUD System
alignment is a PASS. Otherwise, it is a FAIL and it needs an
investigation to identify if this HUD misalignment was caused by an
AMAT out−of−calibration, an epoxy curing issue or a defective
Combiner unit. Contact the Bombardier Customer Response Center
(CRC) for additional support.
(f) Upload of the video evidences #5 and #6 to the HUD alignment database.
(i) All the PUSH, PULL and RELEASE videos collected throughout this
section should be uploaded to the HUD alignment database.
(g) The HUD System Error Verification (RHS) procedure is now complete.
THE LENS OF THE CAMERA IS ABOUT ONE INCH FROM THE ERP CIRCLE
SB700−34−7523_021
CAMERA
PUSH
PUSH
PH−157G
Figure 29
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 52 of 65

### Page 58

SB700−34−7523_022
CAMERA/TRIPOD SETUP IN PILOT SEATING AREA
CAMERA
TRIPOD
Figure 30
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 53 of 65

### Page 59

SB700−34−7523_023
VIEW FROM THE CAMERA WHEN FULLY ZOOMED OUT
(DEFAULT VIEW FOR PUSH, PULL AND RELEASE)
FPV
ATT
BORESIGHT SYMBOL AT THE
CENTER OF THE ERP CIRCLE
RIGHT SIDE OF THE
ERP CIRCLE
LEFT SIDE OF THE
ERP CIRCLE
Figure 31
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 54 of 65

### Page 60

SB700−34−7523_024
VIEW FROM THE CAMERA WHEN FULLY ZOOMED IN
(REQUIRED FOR RELEASE PASS/FAIL CHECK)
BL 18.25
WL 121.50
Figure 32
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 01/2021
Revision 01: Dec 08/2021
700−34−7523
Page 55 of 65

The text continues at https://openairdocs.org/service-documents/bombardier/sb-700-34-7523/file/30366ca7ac31.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.