# Bombardier Service Bulletin 700-46-6005

Copy: Revision 02 ("FAA-2015-8431_SB 700-46-6005 R2"), 20 pages: PDF https://openairdocs.org/files/sha256/4e/11/4e11b65a8db8b4c35a16c56000acc0a1595a8074af4280124901abdd51286f91; text https://openairdocs.org/service-documents/bombardier/sb-700-46-6005/file/4e11b65a8db8.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2015-8431; AD 2016-10-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 700-46-6005
- Latest revision known: 700-46-6005, Revision 02, dated June 18, 2015 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-700-46-6005

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-10-06](https://openairdocs.org/ad/2016-10-06.md), effective Jun 23, 2016: Revisions 01 and 02

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-700-46-6005/proposed.md).

## Text (20 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2015-8431; AD 2016-10-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

700-46-6005Page 1 of 1
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
MODEL BD-700-1A10 (BD-700)
Discard the Revision 01 of this Service Bulletin dated Mar 20/2015, and replace in its
entirety with this Revision 02.
Service Bulletin No. 700-46-6005
Date of Basic Issue Feb 23/2015
Revision No. 01 Dated Mar 20/2015
Revision No. 02 Dated Jun 18/2015
This revision has no effect for aircraft on which the Basic Issue or Rev. 01 of this
Service Bulletin was done thus no other action is necessary.  Do not sign the
log book if you have not done this revision.  Keep the previous log book entry.
You may make an entry as “Not Applicable” for this revision.
This revision is issued to:
1. Revise, in the Service Bulletin Summary Sheet, the Effectivity row, and Paragraph
1.A., Effectivity to delete aircraft, Serial No. 9313.
2. Add, in Paragraph 1, Planning Information, NOTE 4, a new paragraph.
3. Add, in Paragraph 2.C.(19), NOTE, a reference to a TASK number.
4. Add, in Paragraph 2.D., TESTING, a CAUTION.
5. Add, in Paragraph 2.D.(1)(a), a NOTE.
6. Revise Paragraph 2.D.(4), for clarity.
7. Replace Figure 7, figure replaced with figure displayed when using PMAT 5.
8. Make miscellaneous minor changes, as necessary, with no change of context.

### Page 2

Basic Issue: Feb 23/2015 700-46-6005Revision 01: Feb 25/2015 Page 1 of 1
PILOTS INFORMATION SHEET
MODEL BD-700-1A10 (BD-700)
ATA 46-31
INFORMATION SYSTEMS
ICA – MODIFICATION – INFORMATION MANAGEMENT SYSTEM –
DEACTIVATION OF CES ETHERNET INTERFACE TO CABIN PRINTER
Bombardier has been advised by Rockwell Collins that on aircraft with Service Bulletins
700-34-6017 and/or 700-23-6012 installed; the implementation of the network interface
between the Information Management System (IMS-6000) unit and the CES cabin
network may affect the Avionics Control Domain (ACD).
The IMS-6000 unit is connected by a Local Area Network (LAN) cable to the CES
server providing flight crew with cabin printing capabilities.
Bombardier and Rockwell Collins are working on a solution.  Until the final solution is
available, the connection between the IMS and the CES has been deactivated by cap
and stowing wires at the IMS.

### Page 3

Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 1 of 1
SERVICE BULLETIN SUMMARYThis Service Bulletin is available at:
www.cic.bombardier.com
MODEL BD-700-1A10 (BD-700)
ATA 46-31
INFORMATION SYSTEMS
ICA – MODIFICATION – INFORMATION MANAGEMENT SYSTEM –
DEACTIVATION OF CES ETHERNET INTERFACE TO CABIN PRINTER
The information below is provided for your reference.  For full details, please
see corresponding paragraph contained within this bulletin.
RECOMMENDEDSPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Within 15 Months from Service Bulletin
Release (Basic Issue)
EFFECTIVITY: A/C Serial No. 9381, 9432 to 9708, 9711 to 9718 and 9720 to 9730
MANPOWER: Part A – 1 man-hour
Part B – 3 man-hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN
YES NO
TLMC, CH 5 AFFECTED YES NO
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION:  See important
information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO
PREREQUISITE SERVICE BULLETINS: N/A.
NOTE: This SB includes Instructions for Continued Airworthiness (ICA).  Refer to
            Paragraph 1, (Planning Information) and Paragraph 1.D. (Compliance) for details.
To place an order for parts or kits, please call Bombardier Aerospace Parts Services at:
514-855-2999 or 1-866-538-1247

### Page 4

Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
© 2015 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 1 of 14
SERVICE BULLETINThis Service Bulletin is available at:
www.cic.bombardier.com
MODEL BD-700-1A10 (BD-700)
ATA 46-31
INFORMATION SYSTEMS
ICA – MODIFICATION – INFORMATION MANAGEMENT SYSTEM –
DEACTIVATION OF CES ETHERNET INTERFACE TO CABIN PRINTER
1. PLANNING INFORMATION
NOTES: 1. For any technical issues, contact CSE, Technical Support, Global
Express by e-mail at SRPSA@aero.bombardier.com.
2. For aircraft In Service, because of the lead-time necessary to get the
new files for the Aircraft Personality Module (APM) we recommend that
you send, four weeks in advance, a SRPSA and pages 1, 2 and 3 of
Appendix 1 to Customer Support Engineering (CSE), Technical Support,
Global Express by e-mail at SRPSA@aero.bombardier.com  before you
schedule the incorporation of this Service Bulletin.
3. After incorporation of this Service Bulletin the IMS/CES interface is
disconnected and functionality affected is as follows:
(i) Printing from the cockpit to the cabin printer is not available, if the
option was installed, and
(ii) Physical link from the cabin network to the OMS is removed.
4. The APM Option file number configuration is
APMOPTION_6XXXXXXXXXXXXX.  The 8th character from right to left
(shown in bold) indicates the status of installed printers.
The possible codes are: 0 for no printers installed, 1 for cockpit printer
installed, C for cabin printer installed and B for both cockpit and cabin
printers installed.
If the current APM Option file shows B, then a new APM Option file
indicating a 1 must be requested by SRPSA.
If the current APM Option file shows C, then a new APM Option file
indicating a 0 must be requested by SRPSA.
When the SRPSA is submitted, include the current APM Option file
number on the request.

### Page 5

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 2 of 14
A. Effectivity
BD-700-1A10 aircraft, Serial No. 9381, 9432 to 9708, 9711 to 9718 and
9720 to 9730.
NOTES: 1. All other BD700-1A10 aircraft are scheduled for modification in
production.  Refer to Modification Summary Z700T901412.
2. The instructions given in this Service Bulletin are only applicable to
the systems and parts installed at the time of delivery of the aircraft
or as changed by Bombardier Aerospace Service Bulletin(s).
 Before you do this bulletin, examine all STC, STA or equivalent
action changes to make sure that this bulletin can be completed.
B. Reason
Condition:
Bombardier has been advised by Rockwell Collins that on aircraft with Service
Bulletin 700-34-6017 and/or 700-23-6012 installed; the implementation of the
network interface between the Information Management System (IMS-6000) unit
and the CES cabin network may affect the Aircraft Control Domain (ACD).  This
scenario has been determined by analysis and was not reported from the
in-service aircraft.
Evidence:
The IMS-6000 unit is connected by a Local Area Network (LAN) cable to the CES
server providing flight crew with Cabin printing capabilities.  Since the IMS-6000
becomes a client of the CES server, it can potentially compromise the operational
integrity of the avionics system.
Objective/Benefits:
Bombardier and Rockwell Collins are working on a solution.  Until the final solution
is available, print function from the cockpit to the cabin printer must be disabled.
C. Description
This Service Bulletin gives instructions in:
PART A:
– Verify printer status in the APM Option file,
– Remove the IMS,
– Inspect connector A459P1, and
– Verify pins are present.
PART B:
– Cap and stow wires,
– Install the IMS,
– Install updated APM Option file, if required, and
– Do the necessary tests to make sure that the system operates correctly.

### Page 6

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 3 of 14
D. Compliance
Recommended within 15 months from this Service Bulletin release date
(Basic Issue).
NOTE: The issuance of an Airworthiness Directive (AD) to incorporate this
Service Bulletin is expected to be released by Transport Canada.
E. Approval
The technical content of this Service Bulletin has been approved under
the authority of Transport Canada Civil Aviation (TCCA) Design Approval
Organization (DAO) No. DAO #93-Q-02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the
FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA
in accordance with established procedures.
F. Manpower
NOTES: 1. The man-hours given are estimates to help you schedule the tasks
given in this bulletin.  The estimates are for direct labor performed by
an experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower estimates, refer to
SB 700-00-6002.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3).  The accumulated curing
time is not included in the labor estimates and should be considered
for planning purposes before you schedule this Service Bulletin.
1 man-hour is necessary to do PART A.
3 man-hours are necessary to do PART B.
4 man-hours are necessary to do PART A and PART B.
The labor required to do this Service Bulletin is at no cost if:
(i) the work is done at Bombardier Business Aviation Services (BBAS)
or Authorized Service Facilities (ASF), and
(ii) this Service Bulletin is scheduled in less than 15 months from its
release date (Basic Issue).

### Page 7

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 4 of 14
G. Material - Cost and Availability
No kit is necessary to do this modification.  For parts, refer to Paragraph 3.B.
The parts are available at no cost if a no-charge purchase order is sent to
Bombardier Aerospace in less than 15 months from this Service Bulletin release
date (Basic Issue).
During or after the above free period, Smart Parts does not pay for the parts.
H. Tooling
The tool listed below is necessary to do this modification:
GSE REFERENCE NO. PART NO. DESCRIPTION
- M81969/14-01 Insertion/Extraction
Tool
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
– TCCA Airworthiness Directive, (pending).
– FAA Airworthiness Directive,(pending).
– Bombardier Aerospace, Modification Summary, R700T400577, Rev. C1.
– Global 6000 BD-700 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 25,
46 and 52.
– Bombardier Aerospace, Standard Practices Manual (SPM), Chapter 20, Wiring
and 51 Structures.
– Bombardier Aerospace, Supplemental Wiring Diagram Manual (SMM), Chapter 44.
– Appendix 1 – Information Feedback Sheet (attached).
L. Other Publications Affected
– BD-700-1A10 Flight Crew Operating Manual, GL 6000 FCOM, Revision 14
dated May 11/2015 or later revisions as applicable.
M. Equivalent Service Bulletin
– For the Global 5000 BD-700-1A11 (BD-700) Featuring Global Vision Flight
Deck aircraft, use SB 700-46-5005.

### Page 8

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 5 of 14
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from Global 6000
BD-700-1A10, Aircraft Maintenance Manual (AMM) unless otherwise
specified.
2. All references made to zones, access panels and/or doors, are from
the Global 6000 BD-700-1A10, Aircraft Maintenance Manual (AMM),
Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions.  Refer to
TASK 24-00-00-910-801.
(2) Obey all electrostatic discharge safety precautions.
Refer to TASK 24-00-00-910-802.
(3) Set the circuit breaker that follows to OUT (refer to TASK 24-00-00-863-801):
SYSTEM NAME CIRCUIT BREAKER NAME BUS NAME
IMS IMS DC 1
(4) On the cabin systems panel, set the cabin power switch to OFF.
B. PART A – Verify Connector Pins are Present
(1) Remove the IMS-6000 unit.  Refer to TASK 46-31-01-000-801.
(2) Get access to the A459P1 connector.
(3) Inspect the connector to determine if pins are present at positions 25, 27,
48 and 50.
(4) If pins are present do Paragraph 2.C. PART B Modification.
(5) If pins are not present do the following:
(a) Install the IMS unit.  Refer to TASK 46-31-01-400-801.
(b) Proceed to Paragraph 2.F., Recording.

### Page 9

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 6 of 14
C. PART B – Modification
(1) Remove the pilot’s seat.  Refer to TASK 25-11-00-000-801.
(2) Remove pilot’s side panel to get improved access to the IMS connector.
Refer to TASK 25-12-05-000-801.
(3) Get access to the A459P1 connector and remove the backshell.
NOTES: 1. Slide the locking ring to the left to show the red indicator line.
Backshell is unlocked.  Refer to Figure 1.
2. Unscrew the backshell by the composite barrel.  Do not use the
locking ring or the strain relief.
Figure 1: Connector Components
(4) Identify and locate wire CAM2181-24.
(5) Using the extraction tool, remove wires located on pins 25, 27, 48 and 50.
Backshell
MST CapMST Rook
Locking Ring

### Page 10

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 7 of 14
(6) Cap and stow the wires.  Refer to SPM TASK, Wiring 20-12-05-02, Stowage
of Electrical Wiring and Figure 2.
NOTE: Do not remove pin terminations from the wires.  Wires will be
reconnected at a later date.
Figure 2: Wire Cap and Stow Position
(7) Install sealing plugs in connector where pins 25, 27 48 and 50 were located.
(8) Straighten other shields along wire bundle.
(9) Slide the MST Rook (see Figure 1) over the shields until the serrated edge on
the MST Rook and connector mate.
(10) Holding the MST Rook and connector in the mated position, fold the remaining
shields through the slots of the MST Rook and along the outside of the MST
Rook.
Pins capped
& stowed
Shield capped
and stowed
Tie with
lacing

### Page 11

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 8 of 14
(11) Mate the MST Cap to the MST Rook holding the shields in place.
(12) Install backshell on connector plug A459P1 and make sure not to over tighten.
(13) Slide the locking ring (see Figure 1) to the right, hiding the red indicator line
and showing the blue indicator line.  Backshell is in locked position.
(14) Install the IMS unit.  Refer to TASK 46-31-01-400-801.
(15) Do an electrical bonding test on the IMS unit.  Refer to SPM TASK, Structures
51-80-00-760-801, Electrical Bonding Test.
NOTE: Make sure that the resistance value is not more than 0.010 ohm.
Measure from the connector shell to the aircraft structure with all mating
connectors disconnected.  All connectors of the unit must be tested.
(16) Connect and energize the external ac power if it is not connected.  Refer to
TASK 24-41-00-861-801.
NOTE: Wait five minutes after power is applied to let the IMS and the MCE in
the cabin system become fully functional.
(17) Set the circuit breaker that follows to IN (refer to TASK 24-00-00-863-802):
SYSTEM NAME CIRCUIT BREAKER NAME BUS NAME
IMS IMS DC 1
(18) On the cabin systems panel, set the cabin power switch to ON.
(19) If required, load the new APM Option file as determined by Appendix 1.
Refer to TASK 46-31-00-970-803.
NOTE: Updates to the APM option file must consider other options being
installed at the same time to make sure all required options are
enabled prior to loading a new APM option file.
Refer to TASK 31-42-09-970-802.

### Page 12

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 9 of 14
D. Testing
CAUTION: MAKE SURE THE WIRELESS SWITCH ON THE PMAT IS TURNED
OFF.  REFER TO AW700-45-0490.
(1) Do the connectivity test on the OMS AFT port as follows:
(a) Connect PMAT using RJ45 LAN cable to OMS AFT port receptacle
(J2002).
NOTE: GCC will use their PMAT equivalent.
Figure 3: OMS Aft Port (J2002)
(b) Power on PMAT and select ON-BOARD MAINT.SYS. tab.
(c) Click IP UTILITY button.
(d) From pop up window, check AFT and SUBMIT.
(e) Click on OMS AFT button.
(f) Observe the OMS main page displays on the PMAT.
(g) If PMAT displays the OMS main page, as shown on Figure 4, the test
passes.  Refer to Figure 4.
(h) Test completed - Disconnect PMAT from the OMS Aft port.

### Page 13 (OCR)

BOMBARDIER
GLOBAL 6000
MODEL BD-700-1A10 (BD-700)
IOMBARDIE
CUSTOMER  @ http://172.24.10.1:10001/RM/ D - B C  @ 172.24.10.1
Edit View Favorites Tools Help
Maintenance Main Menu
FAVORITES
View Flight Deck Effects (47 Active)
ON-BOARD MAINT  View Fault Messages (39 Active)
View Service Messages (2 Active)
View System Exceedances (0 Stored)
IP UTILITY  View System Trends
1P config tool
View Aircraft Life Cycle Data
View System Parameters
Perform IRU/System Operations
View System Configuration Data
Interal Lighting System  Goodrich  Write Maintenance Reports
Set IP UTILITY to "AUTO IF
Figure 4: OMS Main Page
(2) Do the connectivity test on the Wardrobe OMS port as follows:
(a) Connect PMAT, using RJ45 LAN cable, to Wardrobe OMS port receptacle.
(NuE
Figure 5: IMS Wardrobe Connections
(b) Power on PMAT and select ON-BOARD MAINT.SYS. tab.
(c) Click IP UTILITY button.
Basic Issue: Feb 23/2015  700-46-6005
Revision 02: Jun 18/2015  Page 10 of 14

### Page 14

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 11 of 14
(d) From pop up window, check Wardrobe and SUBMIT.
(e) Click on OMS Wardrobe button.
(f) Observe OMS main page display on the PMAT.
(g) If PMAT displays the OMS main page, as shown in Figure 4, the test passes.
(h) Test completed - Disconnect PMAT from the Wardrobe OMS port.
(3) Do the connectivity test on the AFDX NETWORK A and AFDX NETWORK B
port.  Refer to Figure 5.  Refer to TASK 46-31-000-970-807.
(4) Test for OMS access via cabin network to verify successful disconnection as
follows:
(a) Connect LAN cable to CES-MCE RJ45 port at the rear of copilot seat.
(b) On PMAT, select ON-BOARD MAINT.SYS. tab .
(c) Click the IP Utility button.
(d) From the pop up window, select AFT and SUBMIT.
Figure 6: IP Selection tool
(e) Click on the OMS AFT button.

### Page 15

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 12 of 14
(f) Observe network problem report; “Your not connected to a network” on
Internet Explorer.  See Figure 7.
NOTE: PMAT, Part No. G700-454501-5, displays message shown in
Figure 7.  If you use a different PMAT version, the message may
be different.
Figure 7: Disconnection Confirmation
(5) Do the operational test for the IMS.  Refer to TASK 46-31-00-710-801.
E. Close-out
(1) Install pilot’s side panel.  Refer to TASK 25-12-05-400-801.
(2) Install the pilot’s seat.  Refer to TASK 25-11-00-400-801.
(3) Remove external ac power.  Refer to TASK 24-41-00-861-802.
(4) Remove all tools, equipment and unwanted materials from the aircraft.
F. Recording
When this Service Bulletin is completed, make an entry in the aircraft log to
indicate whether only Part A was carried out or Part A and Part B were carried
out.  Send the attached Incorporation Notice to Bombardier Business Aircraft
Customer Services (BBACS).
In an effort to improve the quality of our technical communications, we are
requesting your feedback.  Please take a moment to fill out our easy on-line
Service Bulletin survey:
http://csefeedback.aero.bombardier.com

### Page 16

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 13 of 14
3. MATERIAL INFORMATION
A. Kit
No kits required.
B. Parts
The parts that follow are necessary to do this Service Bulletin and are available
from Bombardier Aerospace Parts Services, Montreal:
NEW
PART NO.
QTY ITEM USED
PART NO.
INSTRUCTIONS -
DISPOSITION
APMOPTION_6XX
XXXXXXXXXXX
1 APM Option file
(See NOTE 2)
- -
M23053/5-106-9 2 in Shrink Tube - -
MS27488−22 4 Sealing Plug - -
N344-8005 10 in Shrink Tube - -
NOTES: 1. The part number for the items listed above are subject to change
without revision to this Service Bulletin.  In case of discrepancy
between this list and any other list, the Illustrated Parts Catalog
prevails and shall be used to determine the latest part number.
2. Refer to Paragraph 1, Planning Information, Note 4.

### Page 17

MODEL BD-700-1A10 (BD-700)
Basic Issue: Feb 23/2015 700-46-6005Revision 02: Jun 18/2015 Page 14 of 14
C. Material
The materials that follow are necessary to do this Service Bulletin.  These can be
purchased from a local supplier.  Bombardier Aerospace does not pay for these
consumables.
DESCRIPTION PART
No./NAME
SPECIFICATION QUANTITY SUPPLIER
(See Note)
Tape, Lacing A-A-52081 - As
Necessary
Code: A
Ty Rap, Plastic B0816019 - As
Necessary
Code: A
NOTES: 1. Refer to the table that follows for each supplier’s address listed by
codes.
2. The Curing Time (CT), if applicable, for each consumable material is
indicated with the description of each product.
3. At time of release of this Service Bulletin, the information on the
supplier was valid and accurate.  In the event that this information
has changed, the operator is encouraged to use the World Wide Web
to find a local supplier.
SUPPLIERS ADDRESSES BY CODES
Code: A
Commercially Available
D. Publications
The publication that follows is required after this Service Bulletin has been
incorporated.
– BD-700-1A10 Flight Crew Operating Manual, GL 6000 FCOM, Revision 14
dated May 11/2015 or later revisions as applicable.

### Page 18

SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: 700-46-6005 ISSUE: Rev. 02 DATED: Jun 18/2015
TITLE: Modification – Information Management System – Deactivation of CES Ethernet
Interface to Cabin Printer
In an effort to improve the quality of our technical communications, we are replacing
the standard Service Bulletin Evaluation Form with an on-line Service Bulletin
Survey and we are requesting your feedback.  Please take a moment to fill out our
easy on-line Service Bulletin survey:
http://csefeedback.aero.bombardier.com

### Page 19

SERVICE BULLETIN INCORPORATION SHEET – “700-46-6005”
BOMBARDIER
SUBMISSION Upon completion of the Service Bulletin, please fill-in, fax to
(514) 855-8798 or e-mail to Fracas at fracas.montreal@aero.bombardier.com
If your aircraft is registered on CAMP and you are reporting to them,
please do not send the incorporation sheet to Bombardier. If your aircraft
is on another tracking system, please contact Bombardier to make
arrangements for automated data submission.
     COMPLIED WITH
Service Bulletin
Number
Rev. * Parts
Completed
YES NO N/A Remarks/Reason
700-46-6005 02 PART A
“ “ PART B
- - -
Actual hours to accomplish Service Bulletin:
* NOTES: 1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A, B,
C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be reported
unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should be
reported.
Aircraft Serial No.  Aircraft Reg. No.
Airframe Hours:  Airframe Landings
S.B. Incorporation date  Service Order No.
(dd/mm/yy)
Facility Incorporating S.B.
Name Signature Date
                          (dd/mm/yy)Signature not required if sent by E-Mail

### Page 20

-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
Bombardier Business Aircraft Customer Services (BBACS)
P.O. Box 6087, Station Centre-ville
Montreal, Québec, Canada H3C 3G9
Attention: Customer Support Department, Maintenance Engineering
-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
