# Bombardier Service Bulletin 700-78-7501

Copy: Revision 01 ("700-78-7501 Rev01"), 10 pages: PDF https://openairdocs.org/files/sha256/da/5e/da5e3b66b6cbccfad09e58f68a45c3dd7587e16f0bbff0b6c3bb43caae448f1c; text https://openairdocs.org/service-documents/bombardier/sb-700-78-7501/file/da5e3b66b6cb.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-1468; AD 2024-18-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 700-78-7501
- Latest revision known: 700-78-7501, Revision 01, dated July 13, 2023 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-700-78-7501

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2024-18-06](https://openairdocs.org/ad/2024-18-06.md), effective Jan 23, 2025: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-700-78-7501/proposed.md).

## Text (10 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-1468; AD 2024-18-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Discard the Basic of this Service Bulletin dated Apr 12/2023, and replace in its entirety
with this Revision 01.
Service Bulletin No. 700−78−7501
Date of Basic Issue Apr 12/2023
Revision No. 01 Dated Jul 13/2023
This revision has no effect for aircraft on which the Basic Issue of this Service
Bulletin was done thus no other action is necessary. Do not sign the log book if you
have not done this revision. Keep the previous log book entry. You may make an
entry as "Not Applicable" for this revision.
This revision is issued to:
1. Revise Paragraph 1.A. effectivity to add more aircraft.
2. Revise Paragraph 1.D. Compliance, completed the compliance statement.
3. Revise in Paragraph 1.K. Issue 000 to Issue 002
4. Make miscellaneous minor changes, as necessary, with no change of context.
SERVICE BULLETIN
MODEL BD−700−2A12 (BD−700)
700−78−7501
Page 1 of 1
REVISION TRANSMITTAL SHEET

### Page 2

SPECIAL CHECK/REWORK – THRUST REVERSER –
INSPECTION OF THE THRUST REVERSER PIVOTING DOOR PRESSURE SEALS
The information below is provided for your reference. For full details, including labor and part
coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME
Refer to Paragraph 1.D.
EFFECTIVITY: Refer to Paragraph 1.A.
MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN YES NO
AIRWORTHINESS LIMITATIONS (AWL) NOYES
KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES
PREREQUISITE SERVICE BULLETINS: NA
This Service Bulletin may be subject to an Airworthiness Directive which makes it
necessary to implement this Service Bulletin.
SERVICE BULLETIN SUMMARY
my.businessaircraft.bombardier.com
MODEL BD−700−2A12 (BD−700)
ATA 78−30
EXHAUST
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 1 of 1
This Service Bulletin is available at:

### Page 3

SPECIAL CHECK/REWORK – THRUST REVERSER –
INSPECTION OF THE THRUST REVERSER PIVOTING DOOR PRESSURE SEALS
1. NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or
equivalent action changes to make sure that this Service Bulletin
can be completed.
2. For any technical issues, contact CSE, Technical Support, Global
Express by e−mail at SRPSA@aero.bombardier.com.
A. Effectivity
BD−700−2A12 aircraft, Serial No. 70007 , 70008, 70010, 70012 to 70047,
70049, 70051 to 70053, 70055 to 70077, 70079 to 70081, 70083 to 70133,
70135 to 70138, 70142 to 70148, 70150, 70152 and 70158
NOTE: The instructions given in this Service Bulletin are only applicable to
the systems and parts installed at the time of delivery of the aircraft or
as changed by Bombardier Aviation Service Bulletin(s).
B. Reason
1. Condition:
Improper preparation of the seal bonding surface (surface preparation and
sealant application) and variations in the assembly process.
2. Evidence:
Pressure seals were found detached or missing from the retainers on the
thrust reverser fixed structure.
SERVICE BULLETIN
my.businessaircraft.bombardier.com
MODEL BD−700−2A12 (BD−700)
ATA 78−30
EXHAUST
Refer to applicable governmental agency regulations and requirements and make sure that the work described in this
Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or
by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
 2023 Bombardier Inc.  All rights reserved
Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 1 of 6
This Service Bulletin is available at:

### Page 4

3. Objective/Benefit:
To reduce the potential for seal disbond or liberation by inspecting and
reworking the pivoting door seals on the thrust reverser fixed structure.
C. Description
This Service Bulletin gives instructions to:
− Get access to the pivot door seal,
− Inspect the seal,
− Repair or replace the seals as required, and
− Do the necessary tests to make sure that the system operates correctly.
D. Compliance
Specified Time Compliance
Recommended completed in 750 flight hours or 18 months whichever comes first
from the Basic Issue release date of the Service Bulletin.
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the aircraft configuration, submit an SRPSA for analysis and to
get an approved disposition to complete this Service Bulletin.
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization
(DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA
under the Canada/USA bilateral Aviation Safety Agreement.
2. .The technical content of this Service Bulletin is accepted by EASA
under the Canada/EU bilateral Aviation Safety Agreement.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 2 of 6

### Page 5

F. Manpower
NOTES: 1. The man−hours given are to help you schedule the tasks given in this
Service Bulletin. The man−hours are for direct labor performed by an
experienced crew and do not include the time for familiarization,
planning, aircraft preparation in hangar such as towing and
positioning of scaffolds, removal of interior furnishings, repainting,
supervision and inspection.
For more information related to the manpower, refer to SB
700−00−7502.
2. This Service Bulletin may require consumable materials that have
specific curing times (refer to Paragraph 3). The accumulated curing
time is not included in the man−hours and should be considered for
planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at
the next scheduled maintenance task or inspection. Therefore no
man−hours are allotted to prepare the aircraft for maintenance or to
prepare for this Service Bulletin.
2.5 man−hours are necessary to inspect the seals on each engine, and
2.5 man−hours are necessary to repair each seal on each engine, or
3.0 man−hours are necessary to replace each seal on each engine.
The labor required to do this Service Bulletin is at no cost if:
NOTE: Labour costs are to be submitted to GE as per the VSB.
− the work is done at Bombardier Business Aviation Services (BBAS) or
Authorized Service Facilities (ASF), and
− this Service Bulletin is completed in less than 18 months or 750 flight hours
whichever comes first from its release date (Basic Issue).
G. Material − Cost and Availability
The parts in Paragraph 3.B. may be necessary to do this special check/rework.
Smart Parts does not pay for this recommended Service Bulletin at any time.
These parts are available from GE at no cost if:
− ordered during new aircraft warranty period, and
− this Service Bulletin is completed in less than 18 months or 750 flight hours
whichever comes first from this Service Bulletin release date Basic Issue.
H. Tooling
The equipment and tools listed below are necessary to do this special
check/rework:
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 3 of 6

### Page 6

GSE REFERENCE NO. PART NO. DESCRIPTION
SGSE 78X78K−30−02 BGV4014−01−0 Thrust Reverser Actuator
Safety Sleeve
SGSE 78X78K−30−04 BGV4005−00−0 S−Hook Key
SGSE 78X78K−30−03 BGV4004−00−0 S−Hook Pin
Commercially Available − Hand−held Manometer
Commercially Available − Locally Manufactured
Manometer Cylinder Tip
Commercially Available − Mastic gun
Commercially Available Non−metalic Scraper
Commercially Available − Rigid stick, spatula, or
equivalent
Commercially Available − Torque Wrench
NOTES: 1. Refer to the Global 7500 Illustrated Tool and Equipment Publication
(ITEP) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEP for the G7500 for
acceptable GSE equivalents.
3. This list is provided for quick reference. In case of discrepancy
between this list and the tools called in the AMP, WM, Chapter 20,
then the tools called in the AMP, WM prevail. Other approved
alternative tools are acceptable and can also be used.
I. Weight and Balance
No change.
J. Electrical Load Data
No change.
K. References
− TCCA Airworthiness Directive, (pending).
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−70726,
Rev. A.
− GE Service Bulletin PASSPORT20−A−78−00−0005−00A−930A−D, Issue 002,
dated 31 May 2023. (Attached)
− Global 7500, Aircraft Maintenance Publication (AMP), Chapters 06 and 78.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 4 of 6

### Page 7

L. Other Publications Affected
None.
M. Equivalent Service Bulletins
None.
2. ACCOMPLISHMENT INSTRUCTIONS
NOTES: 1. All TASKs given in the procedures that follow are from the Global 7500
BD−700−2A12, Aircraft Maintenance Publication (AMP) unless otherwise
specified.
2. All references made to zones, access panels and/or doors, are from the
Global 7500 BD−700−2A12 Aircraft Maintenance Publication (AMP),
Chapter 6.
A. Aircraft Setup
For aircraft setup refer to VSB PASSPORT20−A−78−00−0005−00A−930A−D.
B. Modification
NOTE: If it is not possible to complete all the instructions in this Service Bulletin
because of the configuration of the aircraft, submit an SRPSA for analysis
and get an approved disposition to complete this Service Bulletin.
Standard SRPSA fees may apply. Refer to the Services section of the
Bombardier Customer Portal for the latest prices, rates and fees.
(1) Do the special check/rework as required. Refer to VSB
PASSPORT20−A−78−00−0005−00A−930A−D.
C. Testing
Do the operations test for the thrust reverser. Refer to
BD700−A−J78−30−01−00AAA−320A−A.
D. Close−out
(1) For close−out refer to VSB PASSPORT20−A−78−00−0005−00A−930A−D.
(2) Remove all tools, equipment and unwanted materials from the aircraft.
E. Recording
When this Service Bulletin is completed, make an entry in the aircraft log and send
the attached Incorporation Notice to Bombardier Aviation Customer Services
(BACS).
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 5 of 6

### Page 8

For information, corrections, comments and/or feedback regarding Service Bulletins
released on the Customer Portal, please contact the Service Bulletin Group at the
following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION
A. Kit
No kits required.
B. Parts
The parts that follow are necessary to do this Service Bulletin and are available
from GE:
NEW PART NO. QTY ITEM USED PART
NO.
INSTRUCTIONS
- DISPOSITION
BGL4405−04−0
See NOTE 1
2 Seal − −
BGL4455−04−0
See NOTE 1
2 Seal − −
NOTES: 1. Only order the seals if the damage to the seals requires replacement.
2. The part numbers for the items listed above are subject to change
without revision to this Service Bulletin. In case of discrepancy
between this list and any other list, the Illustrated Parts Data
Publication prevails and shall be used to determine the latest part
number.
C. Material
For materials refer to VSB PASSPORT20−A−78−00−0005−00A−930A−D.
D. Publications
No publications required.
MODEL BD−700−2A12 (BD−700)
Basic Issue: Apr 12/2023
Revision 01: Jul 13/2023
700−78−7501
Page 6 of 6

### Page 9

700−78−7501 Rev. 01 Jul 13/2023
SPECIAL CHECK/REWORK – THRUST REVERSER –
INSPECTION OF THE THRUST REVERSER PIVOTING DOOR
PRESSURE SEALS
bbad_SBgroup@aero.bombardier.com
NOTE: Please use Salesforce only for troubleshooting issues or when Engineering
deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM
(Your ideas will help us provide better bulletins)
SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service
Bulletins released on the Customer Portal, please contact the Service Bulletin Group
at the following email address:

### Page 10

SERVICE BULLETIN INCORPORATION SHEET − "700−78−7501"
Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com
If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending
this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is
on another tracking system, please contact Bombardier to make arrangements
for automated data submission.
700−78−7501 01
COMPLIED WITH
YES    NO    N/A
Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings
S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION
Service Bulletin
Number
Rev. * Parts
Completed
Remarks/Reason
(Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A,
B, C, D, etc.) which can be carried out separately, indicate only those parts
completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be
reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should
be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part
not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy)
Signature not required if sent by E−Mail (dd/mm/yy)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
