# Bombardier Service Bulletin 8-76-02

Copy: No revision named ("U.S. DOT/FAA - Service Information - 1"), 14 pages: PDF https://openairdocs.org/files/sha256/6b/51/6b51f6518b29d08b1738f91fccaf0ba5f8e03e387fce9bb1a0cddc6ca554cd59; text https://openairdocs.org/service-documents/bombardier/sb-8-76-02/file/6b51f6518b29.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2012-0190; AD 2012-05-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 8-76-02
- Page: https://openairdocs.org/service-documents/bombardier/sb-8-76-02

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2012-05-07](https://openairdocs.org/ad/2012-05-07.md), effective Apr 4, 2012: No revision named

## Text (14 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2012-0190; AD 2012-05-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

DHC-8 (DASH 8)
SERVICE BULLETIN 8-76-02
Engine Controls - Power Levers - Installation of New Friction Brake
Nut on the Power Lever Damper Adjusting Screw - Modification No.
8/0443
This page transmits Revision 'A' of Service Bulletin 8-76-02, pages 1 thru
12 dated 25 Jan 2012.
This service bulletin is re-issued in its entirety for the reasons that follow:
- the Compliance recommendation of this service bulletin has changed. A
Transport Canada Airworthiness Directive is pending. No rework is introduced
into this revision. Operators that have accomplished the initial issue of this
service bulletin are unaffected
- the format of this service bulletin is updated to the latest Bombardier standard.
Revision bars are not applied to any format or editorial changes. Revision bars
are applied only beside subject matter to identify technical changes or new
information
- the SUBJECT block is revised as follows: was "Installation of New Stop", now
"Installation of New Friction Brake Nut"
- removed aircraft serial number 1 and 2 from the In-Service part of the
Effectivity section
- the Reason part of the PLANNING INFORMATION section is revised to clarify
the information
- the Description and Approval sections are revised to include additional
information / new information
- the Manpower section is revised to show a breakdown of the man-hours
required to do the job
- the Material - Price and Availability section is revised to include a table
containing the Kit Number and Description of the required kit. Also included
is the latest Bombardier Aerospace Sales Administrators contact information
- the References section is revised to convey the latest revision of this service
bulletin and related engineering documentation
Revision 'A' dated 25 Jan 2012

### Page 2 (OCR)

- the Existing Parts Accountability section is revised to include a table that
determines disposition of the main parts removed
- the Job Set-Up part of the ACCOMPLISHMENT INSTRUCTIONS section is
revised to include additional set-up steps
- the Procedure part of the ACCOMPLISHMENT INSTRUCTIONS section is
revised to include edit changes that clarify some of the steps, to include
references to new Figures 1, 2, 3 and 4, to include new Figures 1, 2, 3 and 4
and new steps (7), (8), (10) (a), (b) and (c) and (12) (a) thru (e).
Remove the initial issue of Service Bulletin 8-76-02 and replace with
attached.
Previous issue(s) of Service Bulletin 8-76-02:
Initial issue - Pages 1 and 2 dated 24 Jan 1986

### Page 3 (OCR)

de HAVILLAND
BOMBARDIER  DASH8
SERVICE BULLETIN
Customer_
Support
ATA SYSTEM: 7600  NUMBER: 8-76-02
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARLY SIGNIFICANT AND
URGES OPERATORS TO PROMPTLY EVALUATE THE CONTENTS
SUBJECT: Engine Controls - Power Levers - Installation of New Friction Brake
Nut on the Power Lever Damper Adjusting Screw - Modification No.
8/0443
1.  PLANNING INFORMATION
A. Effectivity
Aircraft Affected:
In-Service:  DHC-8 Aircraft Models 102, 103, 106 Serial Numbers 3 thru
39.
NOTE: The instructions in this Service Bulletin are only applicable to the systems
and parts installed at the time of delivery on the aircraft or as changed by
Bombardier Aerospace Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this bulletin
can be completed.
Spares Affected:
None
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 1 of 12
LS

### Page 4 (OCR)

SERVICE BULLETIN 8-76-02
B. Reason
Problem: With the adjusting knob of the power lever friction brake fully loosened
a leaf spring may contact the flight idle gate (refer to Figure 2) due to
short friction brake nut shoulder. This condition would allow the gate to
be raised without the pilot lifting the triggers.
Solution: The existing friction brake nut is removed and replaced with a new
wider friction brake nut (refer to Figure 4). The new friction brake nut
provides a positive stop for the friction adjuster.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that
tollow:
- two center console covers are removed
- the power lever friction knob is removed
- the existing friction brake nut is removed and replaced with a new friction brake
nut
- the power lever friction knob is reinstalled and adjusted as necessary
- an operational test of the power lever friction brake is done
- close out.
D. Compliance
Bombardier Inc. highly recommend that Modification 8/0443 be incorporated at the
earliest opportunity unless otherwise directed by the operator's airworthiness
authority.
A Transport Canada Airworthiness Directive Pending
E. Approval
The technical content of this service bulletin has been approved under the
authority of the Transport Canada Civil Aviation (TCCA) Design Approval
Organization No: DAO #93-Q-02.
This Service Bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 2 of 12
LS

### Page 5 (OCR)

SERVICE BULLETIN 8-76-02
F. Manpower
It will take an estimated 2.5 man-hours to complete this service bulletin. The
breakdown of the man-hours is shown in the table that follows:
TASK  MAN-HOURS
Job Set-Up  0.25
Procedure  2.00
Close-Out  0.25
For any on-site labor assistance, please speak with a Fleet Services
representative for a quote. The Fleet Services group can be contacted via the
Q Series Technical Help Desk by telephone at 416-375-4000 or
email at : thd.qseries@aero.bombardier.com
G.  Material - Price and Availability
The ModKit listed below is available through the Customer Accounts Service Team
at Bombardier Aerospace Regional Aircraft division. Operators should submit a
purchase order specifying aircraft serial number (s) to:
Bombardier Aerospace
Customer Accounts Services Team (Mail Stop N11-32)
123 Garratt Blvd.
Toronto
Ontario
Canada M3K- 1Y5
Facsimile: (416) 375-3060
Telephone : (416) 375-3920
Kit Number  Description
8MK0443-001  Friction Brake Nut - Center Console
- Rework
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 3 of 12
LS

### Page 6 (OCR)

SERVICE BULLETIN 8-76-02
H. Tooling - Price and Availability
None
I. Weight and Balance
None
J. Electrical Load Data
Not affected
K. Publications Affected
Dash 8 Illustrated Parts Catalogue  ............ PSM 1-8-4
Modifications Manual  ............ PSM 1-813-12
References
Revision 'A' of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING  SHEET  REV
8MK0443  1
8Z1850
Modification 8/0443 Issue 2
PCA 7056 Revision 0 (for internal reference only)
A Transport Canada Airworthiness Directive Pending
All Operator Message No. 984
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 4 of 12
ILS

### Page 7 (OCR)

SERVICE BULLETIN 8-76-02
2. MATERIAL INFORMATION
A. Parts Required Per Aircraft
(1) Modification Kit 8MK0443-001
(2) Detailed Kit Content
Quantity Per Kit  Part Number  Description  Remarks
-001
2  AN960D516L  Washer
MS24665-153  Cotter Pin
1  87610336-101  Friction Brake Nut
A/R  MS20995C32  Lockwire
1  821850  Rework Drawing
8MK0443  Kit Drawing
B. Parts Required to Modify Spares
None
C. Special Tools and Equipment Required
None
D.  Existing Parts Accountability
The following parts may be affected by this service bulletin. Indented parts are
components of the next higher assembly. The quantity (Qty.) column lists the
quantity that may be affected per aircraft for non-indented parts and the quantity
per next higher assembly for indented parts.
Existing  New Part
Part Number  Description  Qty.  | IC  DC  Number  PNC
87610073-101  Friction Brake  1  C  DIS  87610336-101  S
Nut
IC  Interchangeability Code
A  Not interchangeable.
B  Removed Part. No direct replacement.
C  Conditionally Interchangeable. Installation of superseded part negates the
intent of this service bulletin.
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 5 of 12
LS

### Page 8 (OCR)

SERVICE BULLETIN 8-76-02
DC Disposition
Discard Part.
MU Multiple Usage Item: Return to stock if serviceable.
RWK Rework existing part in accordance with this service bulletin.
RWI Rework existing part per .....
Salvage. Return to operator's stores for salvage consideration.
PNC Part Number Code
N  No equivalent Bombardier Inc. part number for reworked part. Indicate
on part that this service bulletin has been accomplished.
R Part number after rework.
S  Superseding part number.
Reworked part and superseding part are functionally and physically
equivalent but not identical.
3. ACCOMPLISHMENT INSTRUCTIONS
A. Job Set-Up
(1)  Make sure aircraft electrical power is OFF and observe safety precautions (refer
to Maintenance Manual PSM 1-8-2, Chapter 24).
(2)  Make sure that lock pins are installed thru each main gear and main gear door
mechanism.
(3)  Make sure the nose gear ground lock is engaged.
(4)  Gain access to the power lever friction knob (aft end of center console) refer to
Figure 3.
B. Procedure
(1) Remove and retain eight bolts NAS5002-2 and eight washers AN960D8L
securing cover assembly 87610180-001 to centre console pedestal. Retain
cover (refer to Figure 1 detail A).
(2)  Remove and retain eight bolts NAS5002-2 and eight washers AN960D8L
securing aft cover assembly 87610097-001 (or - 103) refer to Figure 1 detail B.
(3)  Permit cover assembly 87610097-001 (or -103) to hang loosely on friction
brake shaft.
(4)  Remove existing cotter pin MS24665-153, pin MS20392-2C27 and related
washer AN960D10L securing existing friction brake nut 87610073-001 to power
control link 87610034-101.  Retain pin MS20392-2C27 and washer
AN960D10L (refer to Figure 3).
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 6 of 12
LS

### Page 9 (OCR)

SERVICE BULLETIN 8-76-02
(5)  Unscrew friction knob carefully to remove existing friction brake nut
87610073-101. Discard nut 87610073-101 and retain washers AN960D516L
(refer to Figure 3).
(6)  Install new friction brake nut 87610336-101 to screw 87610084-101 such that
pin MS20392-2C27 can be installed. Do not install cotter pin at this time (refer
to Figure 3).
(7)  Measure the gap between friction nut and friction block at location shown (refer
to Figure 3).
(8)  If required, with friction pad just touching friction block (refer to Figure 2) install
washers AN960D516L to achieve a 0.060/0.075 inch gap between washer and
nut (refer to Figure 3).
(9)  Install pin MS20392-2C27, washer AN960D10L and cotter pin MS24665-153
securing power screw to power control link (refer to Figure 3).
(10) After completion of rework do an operational check of the power lever friction
brake as follows:
(a) Slowly rotate the friction brake knob (for power lever) clockwise to lock the
power levers in position. Make sure lever restraint increases proportionally
with application of increased friction.
(D)  Slowly rotate the friction brake knob in a counterclockwise direction to release
the power levers. Make sure lever restraint decreases proportionally with
decreased friction.
(c)  With the friction brake fully released move each power lever through full range
of travel, make sure that the levers move smoothly without any binding.
(11) Install previously removed cover assemblies using retained hardware.
(12) Do the Functional Check of the Power Levers as follows:
(a) With the power lever friction knob set to the lowest friction setting, move the
power levers to approximately 28 deg. forward of the flight idle setting.
(b) Without raising the trigger, move the No. 1 power lever aft with a sharp pull of
approximately 30 pounds. Make sure the lever cannot pass the flight idle
gate.
(c) Without raising the the trigger, move the No. 2 power lever aft with a sharp pull
of approximately 30 pounds. Make sure the lever cannot pass the flight idle
gate.
(d) Repeat steps (a) thru (c) four times.
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 7 of 12
LS

### Page 10 (OCR)

SERVICE BULLETIN 8-76-02
(e)  Without raising the trigger, move the No. 1 and No. 2 power levers with a
sharp pull of approximately 30 pounds. Make sure both levers cannot
pass through the flight idle gate.
C. Close Out
(1) Remove all tools and equipment from the work area.
(2)  On incorporation of this modification, make an entry that conforms to local
regulatory requirements in the applicable logbooks). Enter component serial
numbers if applicable. Enter this modification number (8/0443) only after
complete and functional incorporation of all work defined in this service bulletin.
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 8 of 12
LS

### Page 11 (OCR)

SERVICE BULLETIN 8-76-02
POWER LEVER COVER
87610180-001
BOLT
NAS5002-2
WASHER
AN960D8L
AFT COVER ASSEMBLY
87610097
BOLT
NAS5002-2
WASHER
AN960D8L
Center Console Components - Removal/Installation
Figure 1
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 9 of 12
LS

### Page 12 (OCR)

SERVICE BULLETIN 8-76-02
FLT IDLE GATE
FRICTION PAD (REF) -
→ X143.00
Z126.75
FRICTION BLOCK (REF) -
View Looking on Left Side of Center Console
Figure 2
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 10 of 12
LS

### Page 13 (OCR)

SERVICE BULLETIN 8-76-02
SCREW
/ p/n 87610084-101
NUT
was p/n 87610073-101
now p/n 87610336-101
PIN  p/n MS20392-2C27  WASN 60D516L
(Ret.)
LOCKWIRE
p/n MS20995C32
ROLL PIN (Ref)
(SEE FIGURE 4)
POWER LEVER
FRICTION KNOB
COTTER PIN  p/n MS24665-153  - 0.060 / 0.075 INCH GAP  (REF)
WASHER  POWER CONTROL LINK
AN960D10L  p/n 87610034-101
NOTE:
WITH FRICTION PAD JUST TOUCHING FRICTION BLOCK (REF FIGURE 2) INSTALL
WASHERS AS REQUIRED TO ACHIEVE 0.060 / 0.075 INCH GAP
Section View A-A
Figure 3
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 11 of 12
LS

### Page 14 (OCR)

SERVICE BULLETIN 8-76-02
.500  .560  NUT p/n 87610073-101 (REF)
Pre Mod 8/0443
0.50
NUT p/n 87610336-101 (REF)  Mod 8/0443
Friction Brake Nut Pre / Post Mod 8/0443
Figure 4
24 Jan 1986  S.B. 8-76-02
Revision 'A' 25 Jan 2012  Page 12 of 12
LS

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
