# Bombardier Service Bulletin 84-25-169

Copy: Revision B ("SB 84-25-169_Rev B"), 20 pages: PDF https://openairdocs.org/files/sha256/3d/f9/3df901637d1981a25ba6a769601ab66c4e88e19cbe74994ac691b9b5ac3a8e94; text https://openairdocs.org/service-documents/bombardier/sb-84-25-169/file/3df901637d19.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0125; AD 2017-14-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-25-169
- Latest revision known: 84-25-169, Revision B, dated February 17, 2017 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-25-169

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-14-02](https://openairdocs.org/ad/2017-14-02.md), effective Aug 10, 2017: Revisions A and B

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-84-25-169/proposed.md).

## Text (20 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0125; AD 2017-14-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘B’ 17 Feb 2017
D H C --- 8 ( D A S H 8 )
S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
Equipment and Furnishings - - - Flight Compartment - - - Instrument Panel
- - - Pilot and Copilot Side - - - Wiring Shrouds Inspection and Rectification
- - - ModSum 4- - - 113902
This page transmits Revision ‘B’ of Service Bulletin 84- - -25- - -169, pages 1
thru 16, dated 17 Feb 2017.
This service bulletin is re- - -issued in its entirety for the reasons that follow:
--- t h eCompliance section is revised to convey the Transport Canada AD
number (CF- - -2016- - -27)
--- t h eReferences section is revised to convey the latest revision of the service
bulletin and the Transport Canada AD number (CF- - -2016- - -27)
--- t h eParts Required Per Aircraft section is revised to change the
Consumable Product ID Number 07- - -29 to 07- - -29A in Step (3) consumable
table
--- t h eProcedure section is revised to replace all occurrences of “ Alodine C1
(07- - -29)” to “ Alodine C1 (07- - -29A)”.
The Compliance in the previous issue(s) of this service bulletin is not
affected by this revision. No additional rework to the aircraft is introduced by
this revision.
Remove the previous issue of Service Bulletin 84- - -25- - -169 and replace with
attached.
Previous issue(s) of Service Bulletin 84- - -25- - -169:
Initial issue - - - Pages 1 thru 16 dated 17 Dec 2015
Revision ‘A’ - - - Pages 1 thru 16 dated 25 Apr 2016

### Page 2

(No text on this page.)

### Page 3

D
S.B. 84- - -25- - -169
Page 1 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 2500 NUMBER: 84- - -25- - -169
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
URGE OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
SUBJECT : Equipment and Furnishings - - - Flight Compartment - - - Instrument Panel
- - - Pilot and Copilot Side - - - Wiring Shrouds Inspection and Rectification
- - - ModSum 4- - - 113902
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4003 and
subsequent.
Spares Affected:
None
B. Reason
Problem: Operators have experienced wires falling below the cockpit instrument
panel. Subsequent inadvertent contact with the wires could cause
instruments to misfunction. ModSum IS4Q2500035 has been issued to
install a shroud that will prevent the wires from falling. However, an
operator who incorporated the ModSum IS4Q2500035 has subsequently
reported an obstruction of the pilot’s or co- - -pilot’s feet. Obstruction of the
pilot’s or co- - -pilot’s foot at a critical phase of flight or ground operations
can cause loss of of control of the aircraft.

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 2 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Solution: This service bulletin provides the instructions to inspect the aircraft to verify
if the wiring shrouds are installed and, if installed, to rework the shrouds
to remove the obstruction.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that follow:
- - - the nose landing gear lock is engaged
- - - the main landing gear lock pins are installed thru each main gear and main gear door
mechanism
- - - the aircraft electrical power is removed
- - - the pilot and co- - -pilot seats are removed
- - - the applicable pilot and co- - -pilot display units are removed for access as necessary
- - - the wiring shrouds are removed
- - - the stiffeners are removed from the wiring shrouds
- - - the wirings under the instrument panels are inspected for conditions and installation
- - - the wiring shrouds are re- - -installed
- - - an operational check of affected systems are done
- - - close out.
D. Compliance
Bombardier Inc. highly recommend that this inspection and rectification service
bulletin be accomplished at the earliest opportunity unless otherwise directed by the
operator’s airworthiness authority.
Transport Canada Airworthiness Directive CF- - -2016- - -27 has been issued.
E. Approval
The technical content of this service bulletin has been approved under the authority of
the Transport Canada Civil Aviation (TCCA) Design Approval Organization No: DAO
# 9 3 --- Q --- 0 2 .
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance Inspections (DTIs).

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 3 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
F. M a n p o w e r
It will take an estimated 0.50 man- - -hrs to complete PART A of this service bulletin. It
will take an estimated 6.50 man- - -hours to complete PART B of this service bulletin.
The breakdown of the man- - -hours to complete PART B is shown in the table that
follows:
TASK M A N --- H O U R S
J o b S e t --- U p 1.00
Procedure 3.00
T e s t/R T S 1.50
Close- - -Out 1.00
This estimate is for direct labour done by an experienced crew and it does not
include, planning, familiarization, cure tim e, part fabrication, tool acquisition or lost
time.
G. Material - - - Price and Availability
Kit Number Description
8DK4296- - -001 Kit Installation LHS - - - Wiring Shroud - - -
Instrument Panel
8DK4296- - -002 Kit Installation RHS - - - Wiring Shroud - - -
Instrument Panel
Drawing Kit(s) (DKs) listed in the table above are drawings only. No parts will be
supplied.
The part(s) and material(s) required are listed in Paragraph 2.A. The parts required
may be either furnished or fabricated from the operator’s existing stock, purchased as
single items from Bombardier Aerospace Regional Aircraft or purchased directly from
industry sources. DK parts are to be manufactured and approved locally (refer to
disclaimer in the related text or illustra tion). In some cases, an equivalent to the DK
part may be available from Bombardier under the production part number shown as
reference in Parts Required Per Aircraft.

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 4 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
If required the related 8DK drawings listed in the T able above can be requested by
writing to the e- - -mail address that follows:
qseriesdwgrequest@aero.bombardier.com
Follow the instructions per All Operator Messages (AOM) 389.
H. T ooling - - - Price and Availability
None
I. Weight and Balance
Not affected
J. Electrical Load Data
Not affected
K. Publications Affected
ModSums Manual PSM 1- - -84- - -12..................................
L. References
Revision ‘B’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8DK4296 1 --- ---
8Z8446 1 --- ---
8Z8446 2 --- ---
ModSum 4Q113902 Rev. ‘A’
ModSum 4- - -113902 Rev. ‘B’
ModSum IS4Q2500035 Rev. ‘C’
A l lO p e r a t o rM e s s a g e s( A O M )3 8 9
PCA 45650 Revision 0 (for internal reference only)
Transport Canada Airworthiness Directive CF- - -2016- - -27.
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Drawing Kits 8DK4296- - -001 and - - -002

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 5 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
(2) Detailed Kit Content:
Quantity Per Kit
--- 0 0 2 --- 0 0 1
Part Number Description Remarks
1 --- NAS9304E- - -5- - -02 Blind Rivet Acceptable alternative
M7885/6- - -5- - -02 or
CR3243- - -5- - -02
1 --- NAS9304E- - -4- - -02 Blind Rivet Acceptable alternative
M7885/6- - -4- - -02 or
CR3243- - -4- - -02
20 20 NAS1149D0332J Washer Acceptable alternatives
AN960JD10L,
AN960KD10L
10 10 MS21042- - -3 Nut
10 10 NAS1801- - -3- - -7 Screw
1 --- 8Z8446- - -102 Wiring Shroud Make from
IS4Q2500035- - -1
--- 1 8Z8446- - -101 Wiring Shroud Make from
IS4Q2500035- - -2
REF REF 8Z8446 8Z Rework Drawing only
REF REF 8DK4296 Drawing Kit Drawing only
NOTE: This service bulletin is self- - -contained (illustrated). No drawings will be
supplied.
(3) In addition to the above part(s), the following material(s) are required for the
completion of this service bulletin and may be procured as single items from
Bombardier Aerospace Regional Aircraft or purchased directly from industry
sources.
Each consumable product listed in the table below is given its own unique
Product ID Number. The number is used to identify a particular recommended
product, the specifications and the trade names any of which can be used
unless specified otherwise (refer to PSM 1- - -84- - -18 Consumable Products
Manual).

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 6 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Consumable
Product ID
Number
Qty. Per Aircraft Description Remarks
07- - -02A as required Primer, Fluid
Resistant Epoxy
(F19 T ype 2)
DHMS C4.01
MIL- - -PRF- - -23377
07- - -29A as required Coating, Chemical
Conversion
(Alodine C1)
MIL- - -C- - -5541
08- - -12 as required Solvent, Degreaser MIL- - -T- - -81533 or
equivalent
B. Special T ools and Equipment Required
None
C. Existing Parts Accountability
Existing
Part Number Description Qty. IC DC
New Part
Number PNC
IS4Q2500035- - -1 Wiring Shroud
LHS
1 C RWK 8Z8446- - -101 R
IS4Q2500035- - -2 Wiring Shroud
RHS
1 C RWK 8Z8446- - -102 R
IC Interchangeability Code
A Not interchangeable.
B Removed Part. No direct replacement.
C Conditionally Interchangeable. Inst allation of superseded part negates the
intent of this service bulletin.

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 7 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
DC Disposition
DIS Discard Part.
MUI Multiple Usage Item: Return to stock if serviceable.
RWK Rework existing part in accordance with this service bulletin.
RWI Rework existing part per .....
SAL Salvage. Return to operator’s stores for salvage consideration.
PNC Part Number Code
N No equivalent Bombardier Inc. part number for reworked part. Indicate
on part that this service bulletin has been accomplished.
R Part number after rework.
S Superseding or equivalent part number.
X Reworked part and superseding part are functionally and physically
equivalent but not identical.
3. ACCOMPLISHMENT INSTRUCTIONS
A . J o b S e t --- U p
(1) Make sure the nose gear ground lock is engaged.
(2) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
(3) Set wheel chocks in front and behind the landing gear tires.
(4) Placard and select all aircraft electrical power to OFF . Obey all relevant
W A R N I N G S a n d C A U T I O N S ( r e f e r t o A M M T A S K ’ S 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 a n d
24- - -00- - -00- - -910- - -801).
B. Procedure
Part A - - - Inspection
(1) Verify if the wiring shrouds are installed.
(2) If the wiring shrouds are not installed, go to Close Out.

### Page 10

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 8 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
(3) If the wiring shrouds are installed go to PART - - - B - - - Rectificationbelow.
Part B - - - Rectification - - - Rework of Existing Wiring Shrouds
(1) Remove the pilot and co- - -pilot seat (refer to applicable instructions in AMM TASK
25- - -11- - -01- - -000- - -801).
(2) Remove the pilot and co- - -pilot display units as necessary (refer to applicable
instructions in AMM TASK 31- - -61- - -01- - -000- - -801).
NOTE: If the wiring shroud is attached to the bottom of the instrument panel
frame assembly using screws, washers and anchor nuts, it may not be
necessary to remove the display units. If the wiring shroud is attached
using screws, washers and hex nuts, the display units have to be
removed.
(3) Disconnect the ground wires at 3428- - -GS1 and 3428- - -GS3 from the bottom of
the co- - -pilot instrument panel (refer to Figure 5 View on Arrow E- - -E).
(4) Remove the existing wiring shrouds IS4Q2500035- - -1 and .IS4Q2500035- - -2 from
under the instrument panel frame assembly (refer to Figure 3).
NOTE: It is acceptable to retain serviceabl e hardware for re- - -installation.
(5) Rework each wiring shroud as follows:
CAUTION: MAKE SURE NOT TO DAMAGE THE SHROUD WHEN DRILLING
OFF THE RIVETS AS SHROUD IS TO BE USED AGAIN.
(a) Remove the four stiffeners from the shroud (refer to Figure 6 Details G and H).
(b) Leave the csk rivet holes open. Make sure there are no sharp edges.
(c) Clean the wiring shrouds with solvent (08- - -12). (refer to applicable instructions
i n S R M T A S K 5 1 --- 2 6 --- 0 0 --- 0 2 --- 0 1 ) .
(d) Refinish csk’s and damaged surface with Alodine C1 (07- - -29A) and F19 Epoxy
Primer (07- - -02A) (refer to the applicable instructions in SRM TASKs
5 1 --- 2 1 --- 1 0 --- 0 2 --- 0 1 a n d 5 1 --- 2 5 --- 1 0 --- 0 2 --- 0 1 ) .
(e) Use an indelible ink marker to part mark wiring shroud IS4Q2500035- - -1 as
8Z8446- - -101 and wiring shroud IS4Q2500035- - -2 as 8Z8446- - -102.

### Page 11

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 9 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
(6) Prepare the shroud and instrument panel frame assembly for electrical bonding
through direct contact (refer to the applicable instructions in AMM Chapter
51- - -80- - -00). Make sure shroud and instrument panel contact correspond and
refinish areas with Alodine C1 (07- - -29A).
(a) The contact areas are defined by X- - -hatched diameter shown in Fig 3 and
Figure 6 Details G and H.
(b) Make sure the shroud and instrument panel contact correspond.
(c) Refinish areas with Alodine C1 (07- - -29A) refer to the applicable instructions in
S R M T A S K 5 1 --- 2 1 --- 1 0 --- 0 2 --- 0 1 ) .
(7) On the pilot side, if the tie mount exists as shown in Figure 4 View on Arrow D- - -D
and Figure 5 Detail J, remove the tie mount and replace the fastener as noted in
Figure 5 Detail J (refer to the applicable instructions in SRM TASK
5 1 --- 4 2 --- 1 5 --- 0 2 --- 0 1 ) .
(8) Install the wiring shrouds 8Z8446- - -101 (Pilot Side) and 8Z8446- - -102 (Co- - -pilot
Side) on the bottom of the instrument panel frame assembly as follows (refer to
Figure 6 View on Arrow F- - -F):
(a) Inspect the conditions of the wirings.
(b) If hex nuts are used instead of anchor nuts:
1 Make sure wirings are not pinched before tightening the screws.
2 Install washers under both the screw heads and nuts.
3 Tighten the screws with a suitable wrench until the screw head and base of
the nut rest against the parts being tightened and resistance increases
sharply (refer to applicable instructions in SRM TASKs
51- - -41- - -00- - -00- - -01 and 51- - -41- - -05- - -00- - -01). Tighten a further 1/4 turn.
(c) If anchor nuts are used instead of hex nuts:
1 Install washers under the screw heads.
2 Tighten the screws with a suitable wrench until the screw head and base of
the nut rest against the parts being tightened and resistance increases
sharply (refer to applicable instructions in SRM TASKs
51- - -41- - -00- - -00- - -01 and 51- - -41- - -05- - -00- - -01). Tighten a further 1/4 turn.

### Page 12

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 10 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
(9) After the wiring shrouds have been installed, do an inspection of the wirings as
follows:
( a ) M a k es u r en ow i r e sa r ep i n c h e do rd a m a g e d .
(b) Make sure no wires are touching the shrouds. If necessary, install click bond
fasteners for dressing the wires (refer to applicable instructions in AMM TASK
20- - -10- - -08- - -400- - -802).
(10) Re- - -connect the ground wires at 3428- - -GS1 and 3428- - -GS3 on the bottom
co- - -pilot instrument panel (refer to Figure 5 View on Arrow E- - -E).
(11) Re- - -install the display units (refer to the applicable instructions in AMM TASK
31- - -61- - -01- - -400- - -801).
(12) Check for wire clearances on area LRUs and structure. If necessary, reposition
(add tie wraps) and protect (refer to WDM 20- - -12- - -10- - -201 - - - Wiring
Maintenance Practices and to Figure 4 View on Arrow D- - -D).
(13) Install the pilot and co- - -pilot seats (refer to the applicable instructions in AMM
TASK 25- - -11- - -01- - -400- - -801).
(14) Do the Operational T est of the Rudder Control System (refer to AMM TASK
27- - -20- - -00- - -710- - -802).
C. Close Out
(1) Remove all tools and equipment from the work area.
(2) On incorporation of ModSum 4- - -113902, make an entry that conforms to local
regulatory requirements in the applicable logbook(s). Enter component serial
numbers if applicable. Enter this ModSum number only after complete and
functional incorporation of all work defined in this service bulletin.
THE DESIGN OF THE PART IN THIS DRAWING HAS BEEN APPROVED BY DE HAVILLAND INC. FOR MANUFACTURE BY OR ON BE-
HALF OF THE RECIPIENT . THE RECIPIENT IS RESPONSIBLE FOR (A) PROPER MANUFACTURE OF THE PART USING THE SPECI-
FIED MATERIALS AND FOR INCORPORATION OF THE MODIFICATION, ALL IN ACCORDANCE WITH THE DRAWING AND RELATED
INSTRUCTIONS, AND (B) APPROVAL OF THE FINAL INSTALLATI ON BY THE RELEVANT AIRWORTHINESS AUTHORITY . DE HAVIL-
LAND INC. AND BOMBARDIER INC. (BOMBARDIER AEROSPACE REGIONAL AIRCRAFT) DISCLAIM ANY RESPONSIBILITY FOR IN-
CIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION LOSS OR USE, LOSS OF REVENUE OR LOSS OF
PROFIT , ARISING FROM SUCH MANUFACTURE, INCORPORATION AND INSTALLATION.

### Page 13

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 11 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Area of Rework
Figure 1

### Page 14

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 12 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Pilot and Co - - - Pilot Wiring Shrouds
Figure 2

### Page 15

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 13 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Pilot and Co - - - Pilot Wiring Shrouds
Figure 3
WIRING SHROUD LHS
8Z8446- - -101
WIRING SHROUD RHS
8Z8446- - -102

### Page 16

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 14 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Pilot and Co - - - Pilot Wiring Shrouds
Figure 4

### Page 17

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 15 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Pilot and Co - - - Pilot Wiring Shrouds
Figure 5

### Page 18

S E R V I C E B U L L E T I N 8 4 --- 2 5 --- 1 6 9
S.B. 84- - -25- - -169
Page 16 of 16
17 Dec 2015
NB
Revision ‘B’ 17 Feb 2017
Pilot and Co - - - Pilot Wiring Shrouds
Figure 6
WASHER (10X)
NAS1149D0332J
SCREW (10X)
NAS1801- - -3- - -7
WASHER (20X)
NAS1149D0332J
SCREW (10X)
NAS1801- - -3- - -7
NUT (10X)
MS21042- - -3
WIRING SHROUD LHS
8Z8446- - -101
WIRING SHROUD RHS
8Z8446- - -102

### Page 19

Jan 2009
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 20

Feb 2009
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.