# Bombardier Service Bulletin 84-26-15

Copy: Revision A ("U.S. DOT/FAA - SB 84-26-15 Rev A"), 22 pages: PDF https://openairdocs.org/files/sha256/97/26/97269883eee36583481e09d36eb371372f485d60d9d26a6b29a9aac1445dab6b; text https://openairdocs.org/service-documents/bombardier/sb-84-26-15/file/97269883eee3.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2014-0524; AD 2015-13-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-26-15
- Latest revision known: 84-26-15, Revision A, dated January 15, 2014 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-26-15

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2015-13-02](https://openairdocs.org/ad/2015-13-02.md), effective Jul 31, 2015: Revision A

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-84-26-15/proposed.md).

## Text (22 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2014-0524; AD 2015-13-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘A’ 15 Jan 2014
DHC-8 (DASH 8)
SERVICE BULLETIN 84-26-15
Fire Protection - Extinguishing System - Forward Baggage
Compartment - Center Fuse - ModSum 4-190360
This page transmits Revision ‘A’ of Service Bulletin 84-26-15, pages 1 thru
18 dated 15 Jan 2014.
This service bulletin is re-issued in its entirety for the reasons that follow:
-t h e Description section is revised to add a new paragraphs
-t h e References section is revised to update the status of the engineering
documentation and service bulletin
-t h e ACCOMPLISHMENT INSTRUCTIONS section is revised to add
additional steps in Part A and to delete step 20 in Part B (no electrical
bonding check required)
The Compliance recommendation in the previous issue of this service
bulletin is not affected by this revision. No additional rework to the aircraft is
introduced by this revision.
Remove the previous issue of Service Bulletin 84-26-15 and replace with
attached.
Previous issues of Service Bulletin 84-26-15:
Initial issue - Pages 1 thru 16 dated 07 Jun 2013

### Page 2

(No text on this page.)

### Page 3

D
S.B. 84-26-15
Page 1 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 2622 NUMBER: 84-26-15
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARLY SIGNIFICANT AND
URGES OPERATORS TO PROMPTLY EVALUATE THE CONTENTS
SUBJECT: Fire Protection - Extinguishing System - Forward Baggage
Compartment - Center Fuse - ModSum 4-190360
1. PLANNING INFORMATION
NOTE: This service bulletin supercedes Service Bulletin 84-26-13.
A. Effectivity
Aircraft Affected:
In-Service: DHC-8 Aircraft Models 401 and 402 Serial Numbers 4001,
4003 thru 4424.
Production: ModSum 4Y123816 will be installed before delivery on
applicable DHC-8 Aircraft at Serial Number 4425 thru 4449.
Production: ModSum 4Y123869 will be installed before delivery on
applicable DHC-8 Aircraft at Serial Number 4450 thru 4799.
Production: ModSum 4-113741 will be installed before delivery on
applicable DHC-8 Aircraft at Serial Number 4800 and
subsequent.

### Page 4

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 2 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
NOTE: The instructions in this service bulletin are only applicable to the systems
and parts installed at the time of delivery on the aircraft or as changed by
Bombardier Aerospace Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this bulletin
can be completed.
Spares Affected:
None
B. Reason
Problem: There have been reports of severe corrosion on the firex distribution lines
to the forward baggage compartment which has resulted in perforations
of some of the tubes. This could result in insufficient extinguishing agent
reaching the forward baggage compartment in the event of a fire situation.
Solution: This service bulletin provides instructions to inspect the tubes for leaks and
instructions to replace the alumunum tubes with stainless steel tubes.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that
follow:
- aircraft is put into standard configuration for maintenance
- aircraft electrical power is removed
- the nose landing gear lock is engaged
- the main landing gear lock pins are installed thru each main gear and main gear
door mechanism
- the discharge head tube in the forward baggage compartment is plugged with a
plug
- dry nitrogen is connected to the aft pressure bulkhead connection
- the tubing is pressurized to check for leaks
- if no leaks are found, system is put back to normal and the leak test is repeated after
a specific period until all tubes are replaced with stainless steel
- If leak test fails, all aluminum tubing is replaced before next flight
- or the forward baggage compartment is placarded to inhibit use of forward
baggage compartment until the aluminum tubing is replaced with stainless steel
tubing within 10 days
- a leak check is done on the new tubes
- close out.

### Page 5

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 3 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
D. Compliance
Bombardier Inc. recommends incorporation of ModSum 4-190360 as follows,
unless otherwise directed by the operator’s airworthiness authority:
For aircraft more than 12,000 FH or 6 years:
- Inspection: initially within 2,000 FH or 1 year and subsequently at intervals
not to exceed 2,000 FH or 1 year
- Replace tubes within 6,000 FH or 3 years with CRES tubing
For aircraft less than 12,000 FH or 6 years:
- Inspection: initially prior to reaching 12,000 FH or 6 years and
subsequently at intervals not to exceed 2,000 FH or 1 year
- Replace: prior to accumulating 18,000 FH or 9 years with CRES tubing
Transport Canada Airworthiness Directive Pending
E. Approval
The technical content of this service bulletin has been approved under the
authority of the Transport Canada Civil Aviation (TCCA) Design Approval
Organization No: DAO #93-Q-02.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
F. Manpower
PART A - Integrity Check of Firex Distribution Lines
It will take an estimated 1.00 man-hours to complete PART A of the
ACCOMPLISHMENT instructions in this s ervice bulletin. The breakdown of man
-hours is shown in the table that follows:
TASK MAN-HOURS
Job Set-Up 0.25
Procedure in Part A 0.25
Test / RTS 0.25
Close-Out 0.25

### Page 6

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 4 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
PART B - Tube Replacement
It will take an estimated 41.00 man-hours to complete PART B of the
ACCOMPLISHMENT instructions in this s ervice bulletin. The breakdown of man
-hours is shown in the table that follows:
TASK MAN-HOURS
Job Set-Up 0.25
Procedure in Part
B
40.00
Test / RTS 0.50
Close-Out 0.25
For any on-site labor assistance, please speak with a Fleet Services representative
for a quote. The Fleet Services group can be contacted via the Q Series Technical
Help Desk by telephone at 416-375-4000 or email at:
thd.qseries@aero.bombardier.com
G. Material - Price and Availability
The ModKit(s) required to do this service bulletin are listed in the table below:
Operators should submit a purchase orde r through the Customer Accounts Service
Team (CAST) at Bombardier Aerospace Regional Aircraft division specifying aircraft
serial number(s) to:
Bombardier Aerospace
Customer Accounts Services Team (Mail Stop N11-32)
123 Garratt Blvd.
Toronto
Ontario
Canada M3K-1Y5
Facsimile: (416) 375-3060
Telephone: (416) 375-3920
Facsimile:
International: (416) 375-3334
European: (416) 373-5966
Americas East: (416) 373-5964
Americas West: (416) 373-5965

### Page 7

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 5 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
Telephone:
International: (416) 375-3706
European: (416) 373-3704
Americas East: (416) 375-3700
Americas West: (416) 373-5888
E-mail addresses:
International: cast.international@aero.bombardier.com
European: cast.europe@aero.bombardier.com
Americas East: cast.americaseast@aero.bombardier.com
Americas West: cast.americaswest@aero.bombardier.com
Kit Number Description
8MK4652-001/-003/-051 Kit -Tube Installation Fire Protection
System Forward Baggage C/Fuse
NOTE: Kit 8MK4652-051 required only if Kit 8MK4598 was ordered from previous
S.B. 84-26-13.
H. Tooling - Price and Availability
None
I. Weight and Balance
A/C Type and
Model
Weight (Lb) Arm (Inches)
Moment
(Inches x Lb)
x 0.001
DHC-8 Model 401 +9.5 418.2 4.0
DHC-8 Model 402 +9.5 418.2 4.0
J. Electrical Load Data
Not affected

### Page 8

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 6 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
K. Publications Affected
Dash 8 Illustrated Parts Catalogue PSM 1-84-4....................
ModSums Manual PSM 1-84-12..................................
Weight and Balance Manual (Imperial) PSM 1-84-8................
Weight and Balance Manual (Metric) PSM 1-84-8M..................
L. References
Revision ‘A’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8MK4652 1 --
8Z9546 1 A
8Z9546 2 --
8Z9546 3 --
8Z9546 4 --
8Z9546 5 --
ModSum 4Q190360 Rev. ‘A’
ModSum 4-190360 Rev. ‘A’
PCA 43731 Revision 2 (for internal reference only)
Transport Canada Airworthiness Directive Pending
ADR SGUT-13-22137760, ABOE-13-21740728, MFU-13-28731247
(for internal reference only)
2. MATERIAL INFORMATION
A. Parts Required Per Aircraft
(1) Modification Kit 8MK4652-001 for aircraft serial numbers 4001, 4003 thru
4016.

### Page 9

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 7 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
(2) Modification Kit 8MK4652-003 for aircraft serial numbers 4017 thru 4424.
(3) Detailed Kit Content:
Quantity Per Kit
-003 -001
Part Number Description Remarks
40 40 NAS1149C0316R WASHER
11 11 NAS1149C0363R WASHER
11 AN924-8J NUT
11 AN901-8C GASKET
11 B0313006J8 ELBOW
21 21 NAS1802-3-10 SCREW
99 MS35338-138 SPRING, WASHER
10 10 MS25083-2BB6 JUMPER
11 11 MS21043-3 NUT
18 18 B0313001J8 UNION
11 11 AN735C8 CLAMP
11 82620158-003 TUBE ASSEMBLY
11 82620157-007 TUBE ASSEMBLY
11 82620156-003 TUBE ASSEMBLY
11 82620155-007 TUBE ASSEMBLY
11 82620154-005 TUBE ASSEMBLY
11 82620149-003 TUBE ASSEMBLY
11 82620148-005 TUBE ASSEMBLY
11 82620147-003 TUBE ASSEMBLY
11 82620146-007 TUBE ASSEMBLY
11 82620145-009 TUBE ASSEMBLY
11 82620144-007 TUBE ASSEMBLY
11 82620143-007 TUBE ASSEMBLY
11 82620142-005 TUBE ASSEMBLY
11 82620141-005 TUBE ASSEMBLY
11 82620140-003 TUBE ASSEMBLY
11 82620139-005 TUBE ASSEMBLY
11 82620138-005 TUBE ASSEMBLY
11 82620137-003 TUBE ASSEMBLY
1 82620136-009 TUBE ASSEMBLY

### Page 10

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 8 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
Quantity Per Kit
-003 -001
RemarksDescriptionPart Number
1 82620136-007 TUBE ASSEMBLY
(4) Modification Kit 8MK4652-051 for operators who have kit 8MK4598-001
and/or -003 from S.B. 84-26-13.
(5) Detailed Kit Content:
Quantity Per Kit
-051
Part Number Description Remarks
1 82620145-009 Tube Assembly see NOTE below
NOTE: Operators that have kit 8MK4598-001 and/or 8MK4598-003 in stock only
need to order delta kit 8MK4652-051.
Tube assembly 82620145-009 is two way interchangeable with tube
assembly 82620145-007 (part of 8MK4598-001/-003). Operators can use
either tube assembly pending ease of installation.
B. Parts Required to Modify Spares
None
C. Special Tools and Equipment Required
Reference Designation Remarks
AN806-D8 Plug
Regulated Nitrogen Supply 300 PSI capability
D. Existing Parts Accountability
The following parts may be affected by this service bulletin. Indented parts are
components of the next higher assembly. The quantity (Qty.) column lists the
quantity that may be affected per aircraft for non-indented parts and the quantity
p e rn e x th i g h e ra s s e m b l yf o ri n d e n t e dp a r t s .

### Page 11

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 9 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
Existing
Part Number Description Qty. IC DC
New Part
Number PNC
82620136
82620137
82620138
82620139
82620140
82620141
82620142
82620143
82620144
82620145
82620146
82620147
82620148
82620149
82620154
82620155
82620156
82620157
82620158
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
Tube Assembly
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
DIS
82620136-007 or -009
82620137-003
82620138-005
82620139-005
82620140-003
82620141-005
82620142-005
82620143-007
82620144-007
82620145-007 or -009
82620146-007
82620147-003
82620148-005
82620149-003
82620154-005
82620155-007
82620156-003
82620157-007
82620158-003
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
IC Interchangeability Code
A Not interchangeable.
B Removed Part. No direct replacement.
C Conditionally Interchangeable. Inst allation of superseded part negates the
intent of this service bulletin.
DC Disposition
DIS Discard Part.
MUI Multiple Usage Item: Return to stock if serviceable.
RWK Rework existing part in accordance with this service bulletin.
RWI Rework existing part per .....
SAL Salvage. Return to operator’s stores for salvage consideration.

### Page 12

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 10 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
PNC Part Number Code
N No equivalent Bombardier Inc. part number for reworked part. Indicate on
part that this service bulletin has been accomplished.
R Part number after rework.
S Superseding or equivalent part number.
X Reworked part and superseding part are functionally and physically
equivalent but not identical.
3. ACCOMPLISHMENT INSTRUCTIONS
Part A - INSPECTION (Integrity Check of Firex Distribution Lines)
A. Job Set-Up
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALLY
RETRACT. THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE
TO THE EQUIPMENT.
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS
CAN ACCIDENTALLY CLOSE THE LANDING GEAR DOORS. THIS CAN
CAUSE INJURIES TO PERSONS AND DAMAGE TO THE EQUIPMENT.
(1) Placard and select all aircraft electrical power to OFF. Obey all relevant
WARNINGS and CAUTIONS (refer to AMM TASK’S 24-00-00-861-802 and
24-00-00-910-801).
(2) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
(3) Make sure the nose gear ground lock is engaged.

### Page 13

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 11 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
B. Procedure
(1) Perform blockage test of distribution tubes per AMM Task 26-22-21-790-801
Section 4.A. steps (1) through (5), but substitute the high pressure nitrogen
supply rig. Connect the rig at location shown in Figure 1.
(2) On the forward baggage compartment, disconnect tube 82620149 from
discharge nozzle and plug end of tube using plug AN806-D8. See Figure 2.
(3) Pressure test the whole suppression line system to 300 psig, turn off the
nitrogen supply and hold for 5 minutes.
(4) If within 5 minutes the pressure is less than 270 psi (10% or 30 psi) do as
follows:
(a) Reduce the pressure to 0 psi, remove nitrogen supply rig, connect tube
back to the discharge head, remove plug AN806-D8 and connect tube
82620149 to discharge nozzle.
(b) replace all aluminum tubing with stainless steel tubing before next flight,
per PART B - RECTIFICATION ,o r
(c) Inhibit use of forward baggage compartment by placarding forward
baggage compartment and flight compartment.
(d) Replace the aluminum firex tubes with (CRES) stainless steel tubes within
10 days per Part B - Rectification.
(e) Make appropriate entry in the aircraft journey log.
(5) If the pressure is greater than 270 psi during the 5 minutes, do as follows:
(a) Reduce the pressure to 0 psi, remove nitrogen supply rig, connect tube
back to the discharge head, remove plug AN806-D8 and connect tube
82620149 to discharge nozzle.
(b) Repeat the integrity check as per the Compliance section of this service
bulletin.
C. Close Out
(1) Remove all tools and equipment from the work area.

### Page 14

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 12 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
(2) On completion of this service bulletin, make the following entry in the
appropriate logbook(s): “Service Bulletin 84-26-15 - Fire Protection -
Extinguishing System - Forward Baggage Compartment - Center Fuse - Part A -
INSPECTION incorporated’’.
Part B - RECTIFICATION (Tube Replacement)
A. Job Set-Up
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALLY
RETRACT. THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE
TO THE EQUIPMENT.
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS
CAN ACCIDENTALLY CLOSE THE LANDING GEAR DOORS. THIS CAN
CAUSE INJURIES TO PERSONS AND DAMAGE TO THE EQUIPMENT.
(1) Placard and select all aircraft electrical power to OFF. Obey all relevant
WARNINGS and CAUTIONS (refer to AMM TASK’S 24-00-00-861-802 and
24-00-00-910-801).
(2) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
(3) Make sure the nose gear ground lock is engaged.
B. Procedure
(1) Remove the squibs (cartridges) from the bottles. Refer to AMM Tasks
26-22-06-000-801, 26-22-08-000-801 and 26-22-16-000-801.
(2) Remove HRD bottle. Refer to AMM Task 26-22-03-000-801.
(3) Remove the base panel of the halon box in the forward baggage compartment.
Refer to AMM Task 25-51-15-000-801.
(4) Remove ceiling panels 235AZ, 235BZ and 235CZ. Refer to AMM Task
25-27-01-000-801 (25-27-01-000-802 Next Generation).
(5) Remove overhead bin 234AZ. Refer to AMM Task 25-23-01-000-801
(25-23-01-000-802 Next Generation).

### Page 15

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 13 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
(6) Remove sidewall panels 232CZ and 232DZ. Refer to AMM Task
25-26-01-000-801 (25-26-01-000-802 Next Generation).
(7) Remove the following floor panels: Refer to AMM Tasks 53-23-01-000-801,
53-33-01-000-801 and 53-41-01-000-801.
132DZ, 132EZ, 132FZ, 132GZ, 132HZ, 142AZ, 142BZ, 142CZ, 142DZ, 142EZ,
142FZ, 144CZ, 144EZ, 145AZ, 145BZ and 145CZ.
(8) Remove the aft baggage compartment ceiling liner. Refer to AMM Task
25-52-19-000-801.
(9) Remove aft baggage compartment sidewall panel 251QZ.
(10) Remove the canted bulkhead. Refer to AMM Task 25-52-01-000-801.
(11) Remove and discard the following tubes and all aluminum bonding hardware,
from X1.0 to X136.0. Retain all other hardware. Refer to AMM Task
26-22-21-000-803.
Tube assembly 82620149
Tube assembly 82620148
Tube assembly 82620147
Tube assembly 82620146
Tube assembly 82620145
(12) Remove the following tubes and all aluminum bonding hardware, from X136.0 to
X728.1. Retain all other hardware. Refer to AMM Task 26-22-21-000-802.
Tube assembly 82620157
Tube assembly 82620156
Tube assembly 82620144
Tube assembly 82620143
Tube assembly 82620142
Tube assembly 82620155
Tube assembly 82620154
Tube assembly 82620141
Tube assembly 82620140
Tube assembly 82620139
(13) Remove the following tubes and all aluminum bonding hardware, from X728.1 to
X882.7. Retain all other hardware. Refer to AMM Task 26-22-21-000-801.
Tube assembly 82620138
Tube assembly 82620137
Tube assembly 82620158
Tube assembly 82620136

### Page 16

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 14 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
(14) Install the following new tube assemblies using kept and new electrical bonding
hardware, from X1.0 to X136.0. Refer to AMM Task 26-22-21-400-803.
Tube assembly 82620149-003
Tube assembly 82620148-005
Tube assembly 82620147-003
Tube assembly 82620146-007
Tube assembly 82620145-009 or -007
(15) Install the following new tube assemblies using kept and new electrical bonding
hardware, from X136.0 to X728.1. Refer to AMM Task 26-22-21-400-802.
Tube assembly 82620157-007
Tube assembly 82620156-003
Tube assembly 82620144-007
Tube assembly 82620143-007
Tube assembly 82620142-005
Tube assembly 82620155-007
Tube assembly 82620154-005
Tube assembly 82620141-005
Tube assembly 82620140-003
Tube assembly 82620139-005
(16) Install the following new tube assemblies using kept and new electrical bonding
hardware, from X728.1 to X882.7. Refer to AMM Task 26-22-21-400-801.
Tube assembly 82620138-005
Tube assembly 82620137-003
Tube assembly 82620158-003
Tube assembly 82620136-007 (for aircraft s/n 4001, 4003 thru 4016 only)
or
Tube assembly 82620136-009 (for aircraft s/n 4017 thru 4424 only)
(17) Check the newly installed tubes for leaks per AMM Task 26-22-21-790-801 using
a pressure of 75 psi +- 5 psi.
(18) Rectify any noted leaks and recheck as necessary.
(19) Install HRD bottle. Refer to AMM Task 26-22-03-400-801.
(20) DELETED
(21) Install the squibs (cartridges) to the bottles. Refer to AMM Tasks
26-22-06-400-801, 26-22-08-400-801 and 26-22-16-400-801.

### Page 17

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 15 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
C. Close Out
(1) Remove all tools and equipment from the work area.
(2) Install the canted bulkhead. Refer to AMM Task 25-52-01-400-801.
(3) Install aft baggage compartment sidewall panel 251QZ.
(4) Install the aft baggage compartment ceiling liner. Refer to AMM Task
25-52-19-400-801.
(5) Install the following floor panels: Refer to AMM Tasks 53-23-01-400-801,
53-33-01-400-801 and 53-41-01-400-801.
132DZ, 132EZ, 132FZ, 132GZ, 132HZ, 142AZ, 142BZ, 142CZ, 142DZ, 142EZ,
142FZ, 144CZ, 144EZ, 145AZ, 145BZ and 145CZ.
(6) Install sidewall panels 232CZ and 232DZ. Refer to AMM Task 25-26-01-400-801
(25-26-01-400-802 Next Generation).
(7) Install overhead bin 234AZ. Refer to AMM Task 25-23-01-400-801
(25-23-01-400-802 Next Generation).
(8) Install ceiling panels 235AZ, 235BZ and 235CZ. Refer to AMM Task
25-27-01-400-801 (25-27-01-400-802 Next Generation).
(9) Install the base panel of the halon box in the forward baggage compartment.
Refer to AMM Task 25-51-15-400-801.
(10) On completion of this service bulletin, make the following entry in the
appropriate logbook(s): “Service Bulletin 84-26-15 - Fire Protection -
Extinguishing System - Forward Baggage Compartment - Center Fuse - Part B -
RECTIFICATION incorporated’’.

### Page 18 (OCR)

SERVICE BULLETIN 84-26-15
0000000
1000000000000
AFT HIGH-RATE
BOTTLE
(REF)
DISCONNECT HERE AND CONNECT NITROGEN LINE
LEGEND
1. Aft low-rate bottle.
2. Forward baggage-compartment
distribution tube.
3. Fitting.
5. Forward baggage-compartment
discharge head
Location of LRD bottle
Figure 1
07 Jun 2013  S.B. 84-26-15
Revision 'A' 15 Jan 2014  Page 16 of 18
JR

### Page 19

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 17 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
Forward Baggage Compartment
Figure 2
DISCONNECT FROM DISCHARGE NOZZLE AND PLUG
1

### Page 20

SERVICE BULLETIN 84-26-15
S.B. 84-26-15
Page 18 of 18
07 Jun 2013
Revision ‘A’ 15 Jan 2014 JR
This Page Intentionally Blank
1

### Page 21

Jan 2009
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 22

Feb 2009
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
