# De Havilland Canada Service Bulletin 84-26-20

Copy: Revision A ("84-26-20A"), 18 pages: PDF https://openairdocs.org/files/sha256/b3/df/b3dff35ca0a824fdd65739081fc30a20f0718405a04cd7d05b1f8cd4ddc3d657; text https://openairdocs.org/service-documents/bombardier/sb-84-26-20/file/b3dff35ca0a8.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0656; AD 2021-23-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md) (issued as De Havilland Canada)
- Type: Service bulletin (Service Bulletin)
- Number: 84-26-20
- Latest revision known: 84-26-20, Revision A, dated March 9, 2021 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-26-20

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2021-23-02](https://openairdocs.org/ad/2021-23-02.md), effective Jan 5, 2022: Revision A

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-84-26-20/proposed.md).

## Text (18 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0656; AD 2021-23-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

T x L t r S B 8 4 --- 2 6 --- 2 0
Page 1 of 2
Revision ‘A’ 09 Mar 2021
PM
D H C --- 8 ( D A S H 8 )
S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
Fire Protection - - - Fire Detection System - - - Nacelle Fire Detection System - - -
Main Landing Gear (MLG) Primary Zone - - - Advanced Pneumatic Detectors
(APD) - - - Special Inspection and Rectification - - - ModSum 4- - - 114036
This page transmits Revision ‘A’ of Service Bulletin 84- - -26- - -20, pages 1 thru 14,
dated 09 Mar 2021.
This service bulletin is re- - -issued in its entirety for the reasons that follow:
--- T h eReason section is revised to add details for tube installation at LH nacelle
location
--- T h eDescription section is revised to add details for tube installation at LH nacelle
location
--- T h eReference section is revised to convey the latest revision of the service
bulletin and engineering documentation
--- T h eParts Required Per Aircraft section is revised to update part list for tube
installation at LH nacelle location and update existing Notes and add new Note 5, 6
and 7.
--- T h eProcedure s e c t i o n ---APD Sensing Line (Element) - - - Inspection and Repair
is revised to update a note
--- T h eProcedure s e c t i o n ---Hydraulic Tube - - - Inspection and Repairis revised to
update step (1) and (4) with instructions for tube inspection at LH nacelle location
and add an additional note
--- Figure 3 is revised and Figure 4 is added for tube installation at LH nacelle location
and additional notes.
The Compliance in the previous issue(s) of this service bulletin is not affected by
this revision. No additional rework to the aircraft is introduced by this revision.
Remove the previous issue of Service Bulletin 84- - -26- - -20 and replace with
attached.
Previous issue(s) of Service Bulletin 84- - -26- - -20:
Initial issue - - - Pages 1 thru 12 dated 21 Oct 2020

### Page 2

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
T x L t r S B 8 4 --- 2 6 --- 2 0
Page 2 of 2
Revision ‘A’ 09 Mar 2021
PM
This Page Intentionally Blank
1

### Page 3

S . B . 8 4 --- 2 6 --- 2 0
Page 1 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
SERVICE BULLETIN
ATA SYSTEM: 2610 NUMBER: 84- - -26- - -20
DE HAVILLAND AIRCRAFT OF CANADA LIMITED (DHC) CONSIDERS
URGES OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
THIS SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
SUBJECT : Fire Protection - - - Fire Detection System - - - Nacelle Fire Detection
System - - - Main Landing Gear (MLG) Primary Zone - - - Advanced
Pneumatic Detectors (APD) - - - Special Inspection and Rectification - - -
ModSum 4- - - 114036
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4001,
4003 thru 4614.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery on the aircraft or as
changed by DHC Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this
bulletin can be completed.
Spares Affected:
None

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 2 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
B. Reason
Problem: A hydraulic leak was reported by flight crew during flight. Additionally, the
crew received an annunciation of the Check Fire Detect light caused the
aircraft to return to base. An inspection of the area of the leak revealed a
leak from the T ube Assembly, Cross to Restrictor, Nacelle
(P/N:82974424- - -001) resulting from chafing with the RH MLG primary
zone Advanced Pneumatic Detector (APD) sensing line.
There have been a total of six similar reported occurrences, Three of which
involving the chafing between APD Sensing Line (Element) and the
surrounding structure, and the other three involving Hydraulic tube
damage incurred due to APD Sensing Line (Element) fouling with the
Hydraulic tube.
Cause: Installation of the APD pressu re sensing lines in close proximity to
hydraulic system lines in the MLG primary zone.
Solution: This service bulletin provides the instructions to inspect the APD Sensing
Line (Element), tube assembly 82974424- - -001 (RHS Nacelle), tube
assembly 82974234- - -( ) (LHS Nacelle) and the surrounding structure for
chafing damage and clearances between sensing line and the tube
assembly 82974424- - -001 (RHS Nacelle) and the tube assembly
82974234- - -( ) (LHS Nacelle) and to replace sensing line and the tube
assemblies, if necessary.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that follow:
- - - Aircraft electrical power is removed
- - - The nose landing gear lock is engaged
- - - The main landing gear lock pins are installed through each main gear and main gear
door mechanism
- - - Access panels on the left and right nacelles are opened
- - - Main landing gear doors are opened and locked
- - - MLG Primary Zone APD Sensing Line (Element) is inspected for chafing damage and
repaired
- - - Hydraulic tube assembly 82974424- - -001 (RHS Nacelle) and tube assembly

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 3 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
82974234- - -( ) (LHS Nacelle) is inspected for chafing damage and repaired
- - - The applicable operational tests are done
- - - Close out.
D. Compliance
De Havilland Aircraft of Canada Limited recommends incorporation of this Service
Bulletin at the earliest opportunity unless otherwise directed by the operator’s
airworthiness authority.
A Transport Canada Airworthiness Directive Pending.
E. Approval
The technical content of this service bulletin has been approved under the authority of
the Transport Canada Civil Aviation (TCCA) Design Approval Organization No: DAO
# 1 9 --- Q --- 0 1 .
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance Inspections (DTIs).
F. M a n p o w e r
It will take an estimated 9.00* man- - -hour s to complete this service bulletin. The
breakdown of the man- - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 2.00
Procedure 3.00*
T e s t/R T S 2.00
Close- - -Out 2.00
This estimate is for direct labour done by an experienced crew and it does not
include, planning, familiarization, cure tim e, part fabrication, tool acquisition or lost
time.
NOTE: * Estimated time may vary, if it is required to replace APD Sensing Line
(Element) and the tube assembly.

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 4 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
G. Material - - - Price and Availability
T h eM o d K i tr e q u i r e dt od ot h i ss e r v i c eb u l l e t i ni sl i s t e di nt h et a b l eb e l o w .
Kit Number Description
8MK4916- - -001 Kit - - - Inspection and Repair MLG
Primary Zone APD
Operators should submit a purchase orde r through the Customer Response Center
(CRC) to the Customer Accounts Service T eam (CAST) at DHC specifying aircraft
serial number(s). Submit the purchase order to:
De Havilland Aircraft of Canada Limited
Material Services
123 Garratt Blvd.
To r o n t o
Ontario
Canada M3K- - -1Y5
DHC Phone Numbers :
North America:T oll Free: 1 (844)- - -CRC- - -CRC0 (1 (844) 272- - -2720) or
Direct: 1 (514) 855- - -8500
DHC Emails:
Parts: Europe, Middle East, Africa, and Russia: emear.parts@dehavilland.com
Americas and Rest of World: parts@dehavilland.com
H. T ooling - - - Price and Availability
None
I. Weight and Balance
Not affected
J. Electrical Load Data
Not affected
K. Publications Affected
ModSums Manual PSM 1- - -84- - -12..................................

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 5 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
L. References
Revision ‘A’ of service bulletin was prepar ed to the engineering drawings and related
data that follows:
DRAWING SHEET REV
8MK4916 1 --- B ---
ModSum 4- - -114036 Rev. ‘D’
ModSum 4Q114036 Rev. ‘D’
Related ModSum 4D170112 Rev. ‘A’
PCA 48032 Revision 00 (for internal reference only)
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Modification Kit 8MK4916- - -001
(2) Detailed Kit Content:
Quantity Per Kit
--- 0 0 1
Part Number Description Remarks
2 B0301010- - -08 Union, Straight S e eN o t e3
4, 5 & 7
below
2 B0301015- - -08080604 Cross. Reducer S e eN o t e3
4&5b e l o w
2 82974237- - -001 T ube Assy S e eN o t e3
4&5b e l o w
2 82974236- - -001 T ube Assy S e eN o t e3
4&5b e l o w

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 6 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
Quantity Per Kit
--- 0 0 1
RemarksDescriptionPart Number
1 82974352- - -003 T ube Assy S e eN o t e3
4, 5 & 6
below
1 82974232- - -005 T ube Assy S e eN o t e3
4, 5 & 6
below
1 82974234- - -005 T ube Assy S e eN o t e5
2 B0302126- - -04 Elbow, Swivel, 90_ S e eN o t e5
1 82974424- - -001 T ube Assy S e eN o t e5
2 10- - -1097- - -02 Detector S e eN o t e5
NOTE 1: This kit does not contain any article subject to I.A.T .A dangerous
goods regulations. Modification kits may contain substitute hardware
and/or material authorized by De Havilland Aircraft of Canada Limited
Materials Department.
NOTE 2: No drawings will be supplied with this kit. Drawings will be distributed
concurrently with the Service bulletin.
NOTE 3: If T ube Assembly 82974424- - -001 replacement is required, T ube
Assembly 82974352- - -003, 82974236- - -001, 82974237- - -001 and Cross.
Reducer B0301015- - -08080604 may be required to complete the
installation of the new tube.
NOTE 4: If T ube Assembly 82974234- - -( ) replacement is required, T ube
Assembly 82974232- - -005, 82974236- - -001, 82974237- - -001 and Cross.
Reducer B0301015- - -08080604 may be required to complete the
installation of the new tube.
NOTE 5: T h e s ep a r t sa r en o ti n c l u d e di nt h ek i ta n dm u s tb ep r o v i d e db yt h e
operator or obtained from De Havilland Aircraft of Canada Limited
Spares. Part numbers and quantities as listed in the bill of materials
should be obtained as required to repair any damage that may be
present.
NOTE 6: T ube Assembly 82974232- - -005 & 82974352- - -003 are part of the latest
production configuration shown. However, this inspection/repair
applies to all tube part numbers (previous dash numbers, NIEO part
numbers) installed in place of P/N 82974232- - -005 and 82974352- - -003.

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 7 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
NOTE 7: Use Union B0301010- - -08 to repair T ube Assembly 82974352- - -( ) and
82974232- - -( ). Install union per AMM TASK 20- - -20- - -22- - -400- - -801.
NOTE: Permaswage fitting B0301010- - - 08 may be required for repair. It is
not included in the kit and must be provided or obtained from De
Havilland Aircraft of Canada Spares.
Listed drawings that are required to complete the kits above can be requested by
writing to the following e- - -mail address:
dwg.request@dehavilland.com
B. Parts Required to Modify Spares
None
C. Special T ools and Equipment Required
None
D. Existing Parts Accountability
None
3. ACCOMPLISHMENT INSTRUCTIONS
If it is not possible to complete all the instructions of this service bulletin because of the
configuration of the aircraft, speak with a representative of DHC in the CRC at 1 (844)
272- - -2720 (1 (844) CRC- - -CRC0) or email at thd@dehavilland.comfor analysis and to get an
approved disposition to complete this service bulletin.
A . J o b S e t --- U p
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALL Y
RETRACT . THIS CAN CAUSE INJURIES TO PERSONS AND
DAMAGE TO THE EQUIPMENT .

### Page 10

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 8 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS
CAN ACCIDENTALL Y CLOSE THE LANDING GEAR DOORS. THIS
CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO THE
EQUIPMENT .
(1) Placard and select all aircraft electrical power to OFF . Obey all relevant
W A R N I N G S a n d C A U T I O N S ( r e f e r t o A M M T A S K 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 a n d
AMM TASK 24- - -00- - -00- - -910- - -801).
(2) Make sure the aircraft is in standard configuration for maintenance (refer to AMM
TASK 12- - -00- - -01- - -860- - -801).
(3) Make sure that lock pins are installed through each main gear.
(4) Open and lock the main landing gear doors to gain access to the
inspection/repair area (refer to AMM TASK 32- - -00- - -00- - -840- - -801).
(5) Make sure the nose gear ground lock is engaged.
(6) Set wheel chocks in front and behind the landing gear tires.
(7) Set up work platforms or ladders around the No.1 and No.2 nacelles. Make sure
that the work platforms or ladders are electrically grounded.
B. PROCEDURE
APD Sensing Line (Element) - - - Inspection and Repair
(1) Chemical clean the advanced pneumatic detector. Refer to AMM TASK
26- - -10- - -00- - -110- - -801. No external damage is allowed. Some surface
discolorations is allowed.
(2) Inspect clearance between MLG primary zone APD Sensing Line (Element) and
surrounding structure as well as clearance between other system components
installed in vicinity of the MLG primary zone APD Sensing Line (Element) in the
main landing gear bay area, in the LHS and RHS nacelles.

### Page 11

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 9 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
(3) Refer to AMM TASK 26- - -11- - -06- - -400- - -801 for minimum clearance requirements
between the APD Sensing Line (Element) and surrounding structure as well as
other system components installed in vicinity of the MLG primary zone APD and
sensing line.
NOTE: T o adjust APD Sensing Line (Element) clearance, move APD Sensing
Line (Element) away from surrounding structure or other system
c o m p o n e n t s m a i n t a i n i n g A M M T A S K 2 6 --- 1 0 --- 0 0 --- 1 1 0 --- 8 0 1 A P D
installation requirements.
NOTE: If APD Sensing Line (Element) is damaged, it is required to remove
A P D p e r A M M T A S K 2 6 --- 1 1 --- 0 6 --- 0 0 0 --- 8 0 1 a n d r e --- i n s t a l l p e r A M M
TASK 26- - -11- - -06- - -400- - -801.
Hydraulic Tube - - - Inspection and Repair
(1) Inspect tube assembly 82974424- - -001 (RHS Nacelle) and tube assembly
82974234- - -( ) (LHS Nacelle) for chafing damage per AMM TASK
20- - -20- - -00- - -220- - -801.
NOTE: Approximate inspection area is located at RHS Nacelle X201D 187.53
(refer to Figure 3). Approximate inspection area is located at LHS
Nacelle X201D 187.53 (refer to Figure 4).
(2) If tube damage is discovered, determine if the damage is within acceptable limits
as per AMM TASK 20- - -20- - -00- - -220- - -801. Repair allowable chafing damage as
instructed per the same task.
(3) Refer to following AMM tasks and AIPC sections for additional information on
hydraulic line repair and installation:
1 A I P C 3 2 --- 3 1 --- 0 0 --- 2 0 a n d 3 2 --- 3 1 --- 0 0 --- 2 5 ( M L G H y d r a u l i c P i p i n g
Installation)
2 TASK 20- - -20- - -22- - -400- - -801 (Installation of Permaswage Radial Fittings
on Rigid Fluid Lines)
3 TASK 20- - -20- - -21- - -350- - -801 (Repair of Hydraulic Lines using
Permaswage Fittings).

### Page 12

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 10 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
NOTE: Permaswage fitting B0301010- - -08 may be required for repair. It is not
included in the kit and must be provided or obtained from De Havilland
Aircraft of Canada Spares.
(4) If the tube damage is more than the allowance limits, remove the tube assembly
per AMM TASK 29- - -00- - -00- - -000- - -802 and install new tube assembly
82974424- - -001 (RHS Nacelle) or tube assembly 82974234- - -( ) (LHS Nacelle) and
elbow B0302126- - -04 per AMM TASK 29- - -00- - -00- - -400- - -802.
NOTE: If T ube Assembly 82974236- - -001 is re- - -installed , install Bonding Strap
B0312009BB6 and Bonding Clamp AN735C6 as shown in the Figure 3
and Figure 4 (refer AMM TASK 51- - -80- - -00- - -400- - -801).
C. Close Out
(5) Remove all tools and equipment from the work area.
(6) Close all the panels and doors that were opened and removed.
(7) On completion of this service bulletin, make the following entry in the appropriate
logbooks: “Service Bulletin 84- - -26- - -20 {Fire Protection - - - Fire Detection System
--- N a c e l l e F i r e D e t e c t i o n S y s t e m --- M a i n L a n d i n g G e a r ( M L G ) P r i m a r y Z o n e ---
Advanced Pneumatic Detectors (APD) - - - Special Inspection and Rectification - - -
ModSum 4- - -114036} accomplished.”

### Page 13

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 11 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
MLG Primary Zone APD Sensing Line (Element) - - - Location
Figure 1
B
C
B
A
C
(TYPICAL 38 PLACES)
GROMMET (TYP .)
SENSING ELEMENT (TYP .)
HINGED CLAMP
APD
ELECTRICAL
CONNECTOR

### Page 14

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 12 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
MLG Primary Zone APD Sensing Line (Element) - - - Location
Figure 2
B

### Page 15

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 13 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
Hydraulic Tube - - - Location (RH Nacelle)
Figure 31

### Page 16

S E R V I C E B U L L E T I N 8 4 --- 2 6 --- 2 0
S . B . 8 4 --- 2 6 --- 2 0
Page 14 of 14
21 Oct 2020
PM
Revision ‘A’ 09 Mar 2021Revision ‘
Hydraulic Tube - - - Location (LH Nacelle)
Figure 41
1

### Page 17

Oct 2019
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
DASH 8 AIRCRAFT
To : CMDB Focal
Email: cmdb.request@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
The data that you provide below will help us record the incorporation of this Service
Bulletin and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Email PDF to:
cmdb.request@dehavilland.com

### Page 18

Oct 2019
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - DASH 8 AIRCRAFT
To : SB Focal, DE HAVILLAND AIRCRAFT OF CANADA LIMITED
Phone: 1 (416) 373 - - -5098
Email: george.moffatt@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Email PDF to:
george.moffatt@dehavilland.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
