# Bombardier Service Bulletin 84-28-04

Copy: Revision B ("U.S. DOT/FAA - Service Bulletin - 84-28-04B"), 36 pages: PDF https://openairdocs.org/files/sha256/b2/35/b2354052852993f995c4d18186367cb2e7ccd4a96e832240dcdf0b0f4317d0a9; text https://openairdocs.org/service-documents/bombardier/sb-84-28-04/file/b23540528529.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-0036; AD 2011-13-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-28-04
- Latest revision known: 84-28-04, Revision B, dated October 21, 2009 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-28-04

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2011-13-06](https://openairdocs.org/ad/2011-13-06.md), effective Aug 1, 2011: Revisions A and B

## Text (36 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-0036; AD 2011-13-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘B’ 21 Oct 2009
D H C --- 8 ( D A S H 8 )
S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
Fuel - - - Fuel T ank System and Fuel Indication - - - Wiring Identification,
Segregation and Installation (High Level Sensor and Fuel Quantity
Indication) - - - Retrofit - - - ModSum 4- - - 126366
This page transmits Revision ‘B’ of Service Bulletin 84- - -28- - -04, pages 1 thru
32 dated 21 Oct 2009.
This service bulletin is re- - -issued to introduce new ModKits 8MK4331- - -003
and 8MK4331- - -051.
It has been reported that in some instances, installation of a solder sleeve
used to terminate the shields of cable assembly 8Z6619- - -011 could be
“challenging”. An in- - -house review to determine the root cause was
negative and the event could not be duplicated. The affected solder sleeve
was successfully install during a factory test.
Going forward operators should install new ModKit 8MK4331- - -003. The
- - -003 kit replaces the - - -001 kit and includes a slightly larger solder sleeve
and cable assembly 8Z6619- - -021 in lieu of cable assembly 8Z6619- - -011.
All other related parts are unchanged.
If an operator has already procured ModKit 8MK4331- - -001 and has not
installed the kit, it may be necessary to procure new ModKit 8MK4331- - -051
for successful installation. The new kit (a delta kit) replaces the existing
8Z6619- - -011 cable assembly (p/o the - - -001 kit) with cable assemble
8Z6619- - -021 and supplies a slightly larger solder sleeve.
No action is required for operators who have successfully installed ModKit
8MK4332- - -001.
This service bulletin is revised as follows:
--- t h eDescription, the Material - - - Price and Availabilityand the MATERIAL
INFORMATION sections are revised accordingly to convey the above
information
--- t h eReferences section is revised to convey the latest issue of the service
bulletin and related engineering documentation

### Page 2

--- t h eACCOMPLISHMENT INSTRUCTIONS are revised to add cable
assembly 8Z6619- - -021 as required throughout the procedure.
The Compliance recommendation in the previous issue of this service
bulletin is not affected by this revision. No additional rework to the aircraft is
introduced by this revision.
Remove Service Bulletin 84- - -28- - -04 revision ‘A’ dated 15 Nov 2006 and
replace with attached.
Previous issues of Service Bulletin 84- - -28- - -04:
Initial issue - - - Pages 1 thru 28 dated 29 Jun 2006
Revision ‘A’ - - - Pages 1 thru 28 dated 15 Nov 2006

### Page 3

D
S . B . 8 4 --- 2 8 --- 0 4
Page 1 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 2840 NUMBER: 84- - -28- - -04
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
URGES OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
SUBJECT : Fuel - - - Fuel T ank System and Fuel Indication - - - Wiring Identification,
Segregation and Installation (High Level Sensor and Fuel Quantity
Indication) - - - Retrofit - - - ModSum 4- - - 126366
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4003,
4004, 4006 and 4008 thru 4118.
Verification: ModSum 4- - -126366 has been installed on DHC- - -8 Aircraft
Model 402 Serial Number 4006.
Production: Equivalent production ModSum 4- - -126333 will be installed
before delivery on applicable DHC- - -8 Aircraft at Serial
Number 4119 and subsequent.

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 2 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
NOTE: The instructions in this Service Bulletin are only applicable to the systems
and parts installed at the time of delivery on the aircraft or as changed by
Bombardier Aerospace Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this bulletin
can be completed.
Spares Affected:
None
B. Reason
Problem: This service bulletin (ModSum 4- - -126366) is issued as a result of FAA
certification requirements conveyed by Special Federal Aviation
Regulation 88 (SFAR 88). The regulations are set to enhance fuel tank
system safety.
A fuel system safety review of the existing high level sensor wiring
installation along the rear spar and inside the fuselage, the FQI wiring
inside the fuselage and wiring connected to the vent valve position switch
has determined that it may not comply with SFAR 88 certification
requirements.
Solution: This service bulletin conveys ModSum 4- - -126366.
The ModSum adds new wiring with protective sleeving, reworks existing
wiring, labels and segregates the FQI wiring and hi level sensor wiring from
other wiring, enhances the EMI shielding of the wiring connected to the
vent valve position switch and installs additional provision for wiring
clipping in the center fuselage to improve the mechanical protection of
some existing wiring.
ModSum 4- - -126366 is designed to enhance fuel tank system safety and
meet FAA SFAR 88 certification requirements.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that
follow:
- - - lock pins are installed thru each main gear and main gear door mechanism
- - - the nose gear ground lock is engaged
- - - flaps are lowered to the 35 degrees position
- - - all aircraft electrical power is selected to the OFF position

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 3 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
- - - electrically grounded work platforms or ladders are set- - -up around and/or under
the left (and/or right) wing
- - - center fuselage overwing access panels are opened
- - - left and right side rear spar access panels are opened
- - - right side nacelle cowls and fairings are opened
- - - the refuel/defuel control panel is removed
- - - right side aft engine exhaust pipe is removed
- - - sidewall panels, dado panels, overhe ad baggage bins, seats and floor boards
between stations X321.00 and X509.50 are removed (as required)
- - - new bulkhead brackets B0816026- - -001 are installed to frame at station X469.50
and X509.50
- - - wiring identified as ‘EMC2, EMC4 and EMC5’ in the center fuselage is rerouted and
clipped to redundant tie mounts as required
- - - some fuel system wires are removed or taped and stowed (at both ends) or
reterminated (one end only)
- - - five new cable assemblies (c/a’s) are installed and are covered with ident sleeving
ModKit 8MK4331- - -001 installs c/a’s p/n 8Z6619- - -011, 8Z6619- - -013,
8Z6619- - -015, 8Z6619- - -017 and 8Z6619- - -019
or
ModKit 8MK4331- - -003 installs c/a’s p/n 8Z6619- - -021, 8Z6619- - -013,
8Z6619- - -015, 8Z6619- - -017 and 8Z6619- - -019
- - - affected wiring is tested for continuity using an Ohmmeter
- - - the refuel/defuel control panel is re- - -installed
- - - return to service checks are done
- - - center fuselage overwing access panels, rear spar access panels, aft nacelle cowls,
the engine exhaust (RHS), dado panels, side wall panels, overhead bins,
passenger seats, carpets and floor boards are re- - -installed
D. Compliance
Bombardier Inc. highly recommends that ModSum 4- - -126366 be incorporated at
the earliest opportunity unless otherwise directed by the operator’s airworthiness
authority.
An Airworthiness Directive from Transport Canada is pending.

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 4 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
E. Approval
The technical content of this Service Bulletin has been approved under the
authority of the Transport Canada Civil Aviation (TCCA) Design Approval
O r g a n i z a t i o n N o : D A O # 9 3 --- Q --- 0 2 .
F. M a n p o w e r
All costs to incorporate this modification are the responsibility of the Operator
It will take an estimated 263 man- - -hours to complete of this Service Bulletin. The
breakdown of man - - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 44.00
Procedure 170.00
T e s t/R T S 5.00
Close- - -Out 44.00
Many man- - -hours would be saved if this ModSum 4- - -126366 is accomplished
concurrently with service bulletin 84- - -57- - -09 (ModSum 4- - -126330).
G. Material - - - Price and Availability
ModKits 8MK4331- - -001 and 8MK4331- - -051 or 8MK4331- - -003 are available
through the Customer Accounts Service T eam at Bombardier Aerospace Regional
Aircraft division. Operators should submi t a purchase order specifying aircraft
serial number(s) to:
Bombardier Aerospace
Customer Accounts Services T eam (Mail Stop N11- - -32)
123 Garratt Blvd.
To r o n t o
Ontario
Canada M3K- - -1Y5
Facsimile: (416) 375- - -3060
T elephone : (416) 375- - -3920

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 5 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Kit Number Description
8MK4331- - -001 R e t r o f i t K i t --- F u e l S y s t e m --- S F A R 8 8
--- W i r i n g S e g r e g a t i o n
8MK4331- - -051 Delta Kit for 8MK4331- - -001(see
NOTE 1 below)
8MK4331- - -003 R e t r o f i t K i t --- F u e l S y s t e m --- S F A R 8 8
--- W i r i n g S e g r e g a t i o n
NOTE 1: MAY BE HAVE
H. T ooling - - - Price and Availability
None
I. Weight and Balance
A/C T ype and
Model
Weight (Lb) Arm (Inches)
Moment
(Inches x Lb)
x 0.001
D H C --- 8 M o d e l 4 0 1 +11.46 408.95 +4.69
D H C --- 8 M o d e l 4 0 2 +11.46 408.95 +4.69

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 6 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
J. Electrical Load Data
Not affected
K. Publications Affected
Maintenance Manual PSM 1- - -84- - -2................................
Wiring Diagrams Manual PSM 1- - -84- - -2W............................
Dash 8 Illustrated Parts Catalogue PSM 1- - -84- - -4....................
ModSums Manual PSM 1- - -84- - -12..................................
Weight and Balance Manual (Imperial) PSM 1- - -84- - -8................
Weight and Balance Manual (Metric) PSM 1- - -84- - -8M..................

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 7 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
L. References
Revision ‘B’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8MK4331 1 B
8Z6624 1 ---
8Z6624 2 ---
8Z6624 3 ---
8Z6619 1 F
8Z6619 2 E
8Z6619 3 B
8Z6619 4 B
8Z6619 5 B
8Z6619 6 B
8Z6619 7 B
8Z6619 8 A
8Z6619 9 B
8Z6619 10 B
ModSum 4Q126366 Rev. ‘H’
ModSum 4- - -126366 Rev. ‘H’
ModSum 4Q126452 Rev. ‘A’
ModSum 4- - -126452 Rev. ‘A’
PCA 40933 Revision 1 (for internal reference only)

### Page 10

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 8 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Modification Kit 8MK4331- - -001 and 8MK4331- - -051 or 8MK4331- - -003
(a) Detailed kit content for 8MK4331- - -001:
Quantity per Kit
--- 0 0 1
Part Number Description Remarks
4 MS35207- - -261 Screws Pan Head
4 M85052/2- - -4 Cushioned Clamp
6 MS21919WDG4 Cushioned Clamp
1 8Z6624 Provisions Fuel Systems DWG
1 8Z6619 Fuel System Wiring DWG
6 B0205016AD4- - -7S Rivet
25 B0205016AD4- - -6S Rivet
30 B0816026- - -001 Bulkhead Bracket
1 8Z6619- - -019 C / AR e a rS p a rO / BR i g h t
Side
1 8Z6619- - -017 C / AR e a rS p a rO / BL e f t
Side
1 8Z6619- - -015 C / AR e a rS p a rI / BL e f t
Side
1 8Z6619- - -013 C/A Refuel/Defuel
1 8Z6619- - -011 C/A Center Fuse
1 CSP255- - -2800- - -GS26 Label
1 CSP255- - -2800- - -GS25 Label
2 NAS43DD3- - -52FC Spacer
2 NAS43DD3- - -16FC Spacer
1 NAS1801- - -3- - -22 Screw
2 NAS1801- - -3- - -21 Screw
2 NAS1801- - -3- - -20 Screw
2 NAS1801- - -3- - -10 Screw
1 NAS1801- - -3- - -8 Screw
3 NAS1149F0316P Plain Washer

### Page 11

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 9 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Quantity per Kit
--- 0 0 1
RemarksDescriptionPart Number
3 NAS1149D0363J Plain Washer
8 NAS1149D0316J Plain Washer
3 MS35650- - -302 Plain Nut
3 MS35338- - -43 Lock Washer
4 MS21919WDG3 Cushion Clamp
8 MS21042L3 Self Locking Nut
20 CSCS- - -M Cross Spacer
50 CR4H Connector Ring
150 B0816019- - -003 Strap Tie Down
(b) Detailed kit content for 8MK4331- - -051:
(The - - -051 kit that follows is a delta kit for 8MK4431- - -001. Ref to NOTE 1
in the Material - - - Price and Availabilitysection for explanation).
Quantity per Kit
--- 0 5 1
Part Number Description Remarks
1 8Z6619- - -021 C/A Center Fuse
1 8Z6619 Fuel System Wiring DWG
(c) Detailed kit content for 8MK4331- - -003:
Quantity per Kit
--- 0 0 3
Part Number Description Remarks
4 MS35207- - -261 Screws Pan Head
4 M85052/2- - -4 Cushioned Clamp
6 MS21919WDG4 Cushioned Clamp
1 8Z6624 Provisions Fuel Systems DWG
1 8Z6619 Fuel System Wiring DWG
6 B0205016AD4- - -7S Rivet
25 B0205016AD4- - -6S Rivet
30 B0816026- - -001 Bulkhead Bracket

### Page 12

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 10 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Quantity per Kit
--- 0 0 3
RemarksDescriptionPart Number
1 8Z6619- - -019 C / AR e a rS p a rO / BR i g h t
Side
1 8Z6619- - -017 C / AR e a rS p a rO / BL e f t
Side
1 8Z6619- - -015 C / AR e a rS p a rI / BL e f t
Side
1 8Z6619- - -013 C/A Refuel/Defuel
1 8Z6619- - -021 C/A Center Fuse
1 CSP255- - -2800- - -GS26 Label
1 CSP255- - -2800- - -GS25 Label
2 NAS43DD3- - -52FC Spacer
2 NAS43DD3- - -16FC Spacer
1 NAS1801- - -3- - -22 Screw
2 NAS1801- - -3- - -21 Screw
2 NAS1801- - -3- - -20 Screw
2 NAS1801- - -3- - -10 Screw
1 NAS1801- - -3- - -8 Screw
3 NAS1149F0316P Plain Washer
3 NAS1149D0363J Plain Washer
8 NAS1149D0316J Plain Washer
3 MS35650- - -302 Plain Nut
3 MS35338- - -43 Lock Washer
4 MS21919WDG3 Cushion Clamp
8 MS21042L3 Self Locking Nut
20 CSCS- - -M Cross Spacer
50 CR4H Connector Ring
150 B0816019- - -003 Strap Tie Down
(2) In addition to the above part(s), the following material(s) are required for the
completion of this service bulletin and may be procured as single items from
Bombardier Aerospace Regional Aircraft or purchased directly from industry
sources.
Addresses of manufacturers and suppliers not shown below are listed in
either Maintenance Manual Chapter 20 or in Structural Repair Manual Chapter
51 or, for 400 Series Aircraft, in Consumable Products Manual PSM
1 --- 8 4 --- 1 8 .

### Page 13

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 11 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Part Number Qty. Per Aircraft Description Remarks
CS7707 As Required 0 7 --- 5 8 --- C o a t i n g ,
Nylon Epoxy
B0207017C4- - -3 6 Rivet Alternate p/n
CCR244CS- - -4- - -3
B. Parts Required to Modify Spares
None
C. Special T ools and Equipment Required
None
D. Existing Parts Accountability
None

### Page 14

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 12 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
3. ACCOMPLISHMENT INSTRUCTIONS
A . J o b S e t --- U p
(1) Make sure that lock pins are installed thru each main gear and main gear door
mechanism.
(2) Make sure the nose gear ground lock is engaged.
(3) Lower the wing flaps to the 35 degrees position as follows:
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE
MOVEMENT OF FLIGHT CONTROL SURFACES. MOVEMENT OF THE
FLIGHT CONTROL SURFACES CAN CAUSE INJURIES TO PERSONS
AND DAMAGE TO THE EQUIPMENT .
(a) Pressurize the No. 1 hydraulic system (Refer to PSM 1- - -84- - -2 TASK
29- - -00- - -00- - -863- - -801).
(b) Have a person give you visual clearance to extend the flaps.
(c) Set the flap selector to 35 degrees to lower the wing flaps.
(d) Remove the pressure from the No. 1 hydraulic system (Refer to AMM
29- - -00- - -00- - -863- - -802).
(4) Placard and select all aircraft electrical power to OFF . Obey all relevant
WARNINGS and CAUTIONS detailed in Maintenance Manual PSM 1- - -84- - -2.
(5) Set up the work platforms and/or ladders to permit access to the rear spar (left
and right side). Make sure that the work platforms or ladders are electrically
grounded.
(6) Gain access to the wiring located along the left and right wing rear spar, the
overcenter fuselage and right side nacelle as follows:
(a) Remove the center fuselage overwing access panels that follow (refer to PSM
1- - -84- - -2 TASK 06- - -41- - -00- - -992- - -803):
ACCESS DESIGNATION
262AT Access Panel Center Wing
262BT Access Panel Center Wing
262HT Access Panel Center Wing
262JT Access Panel Center Wing
262CT Access Panel Center Wing
262KT Access Panel Center Wing

### Page 15

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 13 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(b) Remove the L/H and R/H rear spar access panels that follow. Refer to PSM
1 --- 8 4 --- 2 T A S K ’ s 0 6 --- 4 1 --- 0 0 --- 9 9 2 --- 8 0 8 a n d 0 6 --- 4 1 --- 0 0 --- 9 9 2 --- 8 0 9 f o r
c o m p o n e n t l o c a t i o n . R e f e r t o T A S K ’ s 5 7 --- 5 1 --- 0 1 --- 0 0 0 --- 8 0 1 a n d
57- - -51- - -06- - -000- - -801 for removal instructions.
ACCESS DESIGNATION
531AB Closure Panel
631AB Closure Panel
532AB Closure Panel
532BB Closure Panel
532DB Closure Panel
532FB Closure Panel
632AB Closure Panel
632BB Closure Panel
632DB Closure Panel
632FB Closure Panel
(c) Remove the cowls and fairing from the R/H nacelle that follow (refer to
PSM 1- - -84- - -2 TASK 54- - -32- - -00- - -992- - -801):
ACCESS DESIGNATION
424AL, 424AR Aft Upper Cowl
424BB Boat- - -tail Fairing
424AT Upper Mid Aft- - -Cowl
(d) Remove the refuel/defuel control panel (refer to PSM 1- - -84- - -2 TASK
28- - -24- - -01- - -000- - -801).
(e) Remove R/H aft engine exhaust (refer to PSM 1- - -84- - -2 TASK
78- - -10- - -01- - -000- - -801).
(7) Gain access to the center fuselage rework areas as follows:
(a) Remove overhead bins (both sides) located between stations X361.50 and
X529.50 (refer to applicable instructions in PSM 1- - -84- - -2 TASK
25- - -23- - -01- - -000- - -801).
(b) Remove passenger seats (both sides), carpets and floor boards located
between stations X321.00 and X509.50 (refer to the applicable instructions in
PSM 1- - -84- - -2 TASK 53- - -33- - -01- - -000- - -801).

### Page 16

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 14 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(c) Remove L/H and R/H side wall panels between stations X321.00 and X509.50
(refer to the applicable instructions in PSM 1- - -84- - -2 TASK
25- - -26- - -01- - -000- - -801).
(d) Remove L/H and R/H dado panels between stations X321.00 and X509.50
(refer to the applicable instructions in PSM 1- - -84- - -2 TASK
25- - -26- - -06- - -000- - -801).
B. Procedure
(1) Install new bulkhead brackets B0816026- - -001 to frame at station X469.50 and
X509.50 as follows:
NOTE: Installation of bulkhead bracke ts B0816026- - -001 will provide clipping
provisions for a new SFAR 88 harness in the center fuselage.
NOTE: The steps that follow give the instructions to install a typical bulkhead
bracket B0816026- - -001 to the related frame.
(a) Refer to locator view on drawing 8Z6624 sheet 1 and detail views on sheets 2
and 3 to determine the position of each new bulkhead bracket on affected
frame at station X469.50 and X509.50.
(b) In the center fuselage remove or detach insulation as required to gain access
to affected frame at station X469.50 and X509.50.
(c) T emporally hold new bulkhead bracket in position against the frame. Using
the pilot hole in the bracket as a guide make a match mark onto the frame.
(d) Remove bulkhead bracket then make a hole thru the match mark on frame to
final size using a #30 drill (0.128 inch).
(e) Deburr the new holes thru frames.
(f) Treat bared metal using alodine 1200, 1200S or 1201 and prime using epoxy
chromate primer.
NOTE: If additional access is required loosen or remove adjacent sidewall rail
and/or dado panel rail as required to install any bulkhead bracket to
stringer.
(g) Attach each new bulkhead bracket to affected frame using rivets
B0205016AD- - -6S or B0205016AD- - -7S (as required per installation) to agree
with all of the notes and detail views given on drawing 8Z6624 sheets 1, 2 and
3.
(h) Clean up all unwanted materials from the rework area.

### Page 17

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 15 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(i) Install or reattach the insulation, sidewall and/or dado panel rail that were
removed to do the above procedure.
(2) Refer to drawing 8Z6619 sheet 3 and identify the location/routing of the wiring
bundles (wiring) identified as ‘EMC2, EMC4 and EMC5’.
(3) In the center fuselage reroute the wiring identified as ‘EMC2, EMC4 and EMC5’
as follows:
(a) In the left side wiring trough locate existing EMC5 wiring.
(b) Open any clips (keep all hardware) and/or cut away tie wraps that are used to
secure EMC5 wiring.
(c) Reroute EMC5 wiring in the wiring trough to accommodate the new W22 (c/a
- - -011 or - - -021) run to agree with the detail views and notes given on drawing
8Z6619 sheet 3 and Section views H- - -H and L- - -L.
(d) Starting at the forward left wing root electrical disconnect, reroute existing
EMC2 wiring with EMC4 wiring to agree with the detail views and notes given
on drawing 8Z6619 sheet 3. Open any clips (keep all hardware) and/or cut
away tie wraps as required. Use redundant tie mounts as required.
(e) Starting at the forward right wing root electrical disconnect, reroute existing
EMC4 wiring with EMC2 wiring to agree with the detail views and notes given
on drawing 8Z6619 sheet 3. Open any clips (keep all hardware) and/or cut
away tie wraps as required. Use redundant tie mounts as required.
(f) Secure EMC2, EMC4 and EMC5 wiring using tie wraps as required.
(4) Remove and discard the wires that follow (refer to T able 1 and the views and
notes given on drawing 8Z6619 sheets 2, 3, 4, 5, 6 7, and Figures 1 and 4). If
required it is also acceptable to tape and stow both ends of the affected wires.

### Page 18

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 16 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Ta b l e 1

### Page 19

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 17 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
T able 1 Continued
(5) T ape and stow the wires that follow (one end only) - - - Post ModSum 4 - - - 126285
(refer to T able 2 and the views and notes given on drawing 8Z6619 sheet 2, 3, 5,
6, 7 and Figures 1 and 3).
Ta b l e 2

### Page 20

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 18 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(6) T ape and stow the wires that follow (one end only) - - - Pre ModSum 4 - - - 126285
(refer to T able 3 and the views and notes given on drawing 8Z6619 sheet 2 and
Figures 1 and 3).
Ta b l e 3

### Page 21

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 19 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(7) Reterminate the wires that follow (one end only) (refer to T able 4 and the views
and notes given on drawing 8Z6619 sheet 2 and Figure 2 and Figures 1 and 3).
Ta b l e 4

### Page 22

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 20 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(8) Install cable assembly 8Z6619- - -011 (if installing - - -001 kit) or 8Z6619- - -021 (if
installing - - -003 kit) using the instruction that follow:
(a) Add the new wires that follow, refer to T able 5 and the views and notes given on
drawing 8Z6619 sheets 2 thru 7 and Figures 1 and 4 (refer to PSM 1- - -84- - -2W
TASK 20- - -15- - -10- - -401).
NOTE 1: MAY BE HAVE
(b) Wrap fuel indent sleeving over cable assembly on all waycode W22 and W23
wires, (refer to views and notes given on drawing 8Z6619 sheet 2 and Figures
1 and 4).
(c) Secure each end of the fuel indent sleeving under the backshell clamps.

### Page 23

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 21 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Ta b l e 5

### Page 24

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 22 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
T able 5 Continued

### Page 25

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 23 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(9) Install cable assembly 8Z6619- - -013 using the instructions that follow:
(a) In the forward section of the refuel defuel panel locate electrical connector
2811- - -J1 and related mounting bracket (refer to 8Z6619 sheet 10 VIEW ON
ARROW T).
(b) Detach the electrical connector from the mounting bracket. If the electrical
connector is difficult to detach or additional work space is required remove the
six rivets that secure the mounting bracket to structure and remove the
connector and bracket as an assembly.
(c) Add the new wires that follow, refer to T able 6 and the views and notes given on
drawing 8Z6619 sheets 2, 9, 10 and Figures 1 and 2 (refer to PSM 1- - -84- - -2W
TASK 20- - -15- - -10- - -401).
(d) Install fuel indent sleeving on all waycode W22 and W23 wires, refer to views
and notes given on drawing 8Z6619 sheet 2 and Figures 1 and 2.
(e) Make sure that fuel indent sleeving extends under the connector backshell
clamps.
(f) Reinstall mounting bracket and attached connector 2811- - -J1 to original
position using six rivets B0207017C4- - -3 (alternate p/n CCR244CS- - -4- - -3).
Ta b l e 6
(10) Install cable assembly 8Z6619- - -015 using the instructions that follow:
(a) Add the new wires that follow, refer to T able 7 and the views and notes given on
drawing 8Z6619 sheets 2, 8, 10 and Figures 1 and 2 (Refer to PSM 1- - -84- - -2W
TASK 20- - -15- - -10- - -401).
(b) Install fuel indent sleeving on all waycode W22 and W23 wires, refer to views
and notes given on drawing 8Z6619 sheet 2 and Figures 1 and 2.
(c) Secure each end of the fuel indent sleeving under the backshell clamps.

### Page 26

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 24 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Ta b l e 7
(11) Install cable assembly 8Z6619- - -017 using the instructions that follow:
(a) Add the new wires that follow, refer to T able 8 and the views and notes given on
drawing 8Z6619 sheets 2, 10 and Figures 1 and 2 (refer to PSM 1- - -84- - -2W
TASK 20- - -15- - -10- - -401).
(b) Install fuel indent sleeving on all waycode W22 and W23 wires , refer to views
and notes given on drawing 8Z6619 sheet 2 and Figures 1 and 2.
(c) Secure each end the fuel indent sleeving under the backshell clamps.
(d) Install label CSP255- - -2800- - -GS25 adjacent ground stud, refer to 8Z6619
sheet 10 SECTION V- - -V .
NOTE: Make sure cable assembly is grounded to GS25.
Ta b l e 8
(12) Install cable assembly 8Z6619- - -019 using the instructions that follow:
(a) Add the new wires that follow, refer to T able 9 and the views and notes given on
drawing 8Z6619 sheets 2, 10 and Figures 1 and 2 (Refer to PSM 1- - -84- - -2W
TASK 20- - -15- - -10- - -401).
(b) Install fuel indent sleeving on all waycode W22 and W23 wires, refer to views
and notes given on drawing 8Z6619 sheet 2 and Figures 1 and 2.
(c) Secure each end of the fuel indent sleeving under the backshell clamps.
(d) Install label CSP255- - -2800- - -GS26 adjacent ground stud Refer to 8Z6619
sheet 10 SECTION V- - -V .

### Page 27

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 25 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
NOTE: Make sure cable assembly is grounded to GS26.
Ta b l e 9
(13) Do a continuity check with a Ohmmeter to verify compliance with the wiring
diagram shown on T ables 1 thru 9.
(14) Install the refuel/defuel control panel (refer to PSM 1- - -84- - -2 TASK
28- - -24- - -01- - -400- - -801).
(15) Do the return to service checks that follow (refer to PSM 1- - -84- - -2):
(a) Operational test of the AC variable frequency generation system (refer to PSM
1- - -84- - -2 TASK 24- - -21- - -00- - -710- - -801).
(b) Operational test of the external AC power system (refer to PSM 1- - -84- - -2 TASK
24- - -41- - -00- - -710- - -801).
C. Close Out
(1) Install the center fuselage overwing access panels that follow (refer to PSM
1- - -84- - -2 TASK 06- - -41- - -00- - -992- - -803):
ACCESS DESIGNATION
262AT Access Panel Center Wing
262BT Access Panel Center Wing
262HT Access Panel Center Wing
262JT Access Panel Center Wing
262CT Access Panel Center Wing
262KT Access Panel Center Wing

### Page 28

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 26 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(2) Install the L/H and R/H rear spar access panels that follow (refer to PSM
1- - -84- - -2 TASK’s 06- - -41- - -00- - -992- - -808 and 06- - -41- - -00- - -992- - -809):
ACCESS DESIGNATION
531AB Closure Panel
532AB Closure Panel
532BB Closure Panel
532DB Closure Panel
532FB Closure Panel
631AB Closure Panel
632AB Closure Panel
632BB Closure Panel
632DB Closure Panel
632FB Closure Panel
(3) Install the R/H aft nacelle cowl that follows (refer to PSM 1- - -84- - -2 TASK
06- - -41- - -00- - -992- - -807):
ACCESS DESIGNATION
424AL, 424AR Aft Upper Cowl
424BB Boat- - -tail Fairing
424AT Upper Mid Aft- - -Cowl
(4) Install R/H aft engine exhaust (refer to PSM 1- - -84- - -2 TASK
78- - -10- - -01- - -400- - -801).
(5) Install L/H and R/H dado panels between stations X321.00 and X509.50 (refer to
PSM 1- - -84- - -2 TASK 25- - -26- - -00- - -400- - -801).
(6) Install L/H and R/H side wall panels between stations X321.00 and X529.50
(refer to PSM 1- - -84- - -2 TASK 25- - -26- - -01- - -400- - -801).
(7) Install overhead bins (both sides) located between stations X361.50 and
X509.50 (refer to applicable instructions in PSM 1- - -84- - -2 TASK
25- - -23- - -01- - -400- - -801).
(8) Install passenger seats (both sides), carpets and floor boards located between
stations X321.0 and X509.50 (refer to the applicable instructions in PSM
1- - -84- - -2 TASK 53- - -23- - -01- - -400- - -801).
(9) Remove all tools and equipment from the work area.

### Page 29

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 27 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
(10) On incorporation of this ModSum/Modification, add the weight and balance data
shown in Section I of this service bulletin to the Weight and Balance Manual
PSM 1- - -84- - -8. Under ‘Description of Change’ enter “ModSum 4- - -126366
incorporated.”
(11) On incorporation of this ModSum make an entry that conforms to local
regulatory requirements in the applic able logbook(s). If only part of this
ModSum is completed, use only this service bulletin number as reference and
detail exact limit of work completed. Enter component serial numbers if
applicable. Enter this ModSum number only after complete and functional
incorporation of all work defined in this service bulletin.

### Page 30

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 28 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
1. UNLESS OTHERWISE SPECIFIED ALL WIRE CODES AND REF
DESIGNATIONS ARE PREFIXED 2800- - -.
2. UNLESS OTHERWISE SPECIFIED ALL WAYCODES ARE W7.
3. CONNECTOR PIN IDENTS SUFFIXED BY (- - -) DENOTE LOWER CASE
LETTERS.
4. SHIELD TERMINATION TO BE WITHIN 2.0 INCHES E7/E8.
5 LENGTH 3 INCHES MAXIMUM.
6. TAPE AND STOW EXISTING WIRES. INSTALL NEW WIRES IN SEPARATED
RUNS WRAPPED IN FUEL IDENT SLEEVING (S8021).
7. WRAP EXISTING WIRES WITH FUEL IDENT SLEEVING (S8021).
8. FOR AIRCRAFT PRE- - -MODSUM 4Q109534, RE- - -IDENTIFY SPLICES
E3 / E4 AS E7 / E8 ACCORDINGL Y .
17. DISENGAGE AND DE- - -PIN CONNECTOR 2800- - -P/J715. REMOVE
BACKSHELL 3CSR0AB4014S AND REPLACE WITH 3CGA00AB4014S.
RE- - -PIN CONNECTOR BACK TO ORIGINAL STATE AND RECONNECT ‘P’
A N D ‘ J ’ S I D E S . T E R M I N A T E S H I E L D P E R P S M 1 --- 8 4 --- 2 W T A S K
20- - -15- - -10- - -401.
18. FOR INSTALLATION EASEMENT WHEN ADDING FUEL IDENT SLEEVING
(P/N S8021) ON EXISTING WIRES, START AT EITHER END OF CABLE
ASSEMBL Y . FIND WIRE CODES TO BE SLEEVED PER WIRING
DIAGRAM IN FIGURES 2 AND 3.
ADD SLEEVE TOWARDS THE OTHER END OF CABLE ASSEMBL Y
REFER TO NOTE 6 FOR OTHER INSTRUCTIONS.
NOTE THAT ‘W’ CODE IS PART OF THE WIRE IDENT .
Figure 1

### Page 31

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 29 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Figure 2
NOTE: T erminate shields to backshell
r e f e r t o P S M 1 --- 8 1 4 --- 2 W
TASK 20- - -15- - -10- - -401.
8
8
OR

### Page 32

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 30 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
Figure 3
NOTE: T erminate shields to backshell
r e f e r t o P S M 1 --- 8 1 4 --- 2 W
TASK 20- - -15- - -10- - -401.

### Page 33

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 31 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
NOTE: T erminate shields to backshell
r e f e r t o P S M 1 --- 8 1 4 --- 2 W
TASK 20- - -15- - -10- - -401.
Figure 4
OR

### Page 34

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 0 4
S . B . 8 4 --- 2 8 --- 0 4
Page 32 of 32
29 Jun 2006
L.S
Revision ‘B’ 21 Oct 2009
This Page Intentionally Blank
1

### Page 35

Jan 2009
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : Partner Data Co- - -Ordinator (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 3534 Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 36

Feb 2009
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.