# Bombardier Service Bulletin 84-28-16

Copy: Revision B ("U.S. DOT/FAA - Service Bulletin  84-28-16 Revision B Released"), 20 pages: PDF https://openairdocs.org/files/sha256/52/0d/520dc6540a8570666e883d232a02c0ac15036b3a46e195acf11e7b1864bb7945; text https://openairdocs.org/service-documents/bombardier/sb-84-28-16/file/520dc6540a85.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2014-0191; AD 2014-23-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-28-16
- Latest revision known: 84-28-16, Revision B, dated June 17, 2013 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-28-16

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2014-23-14](https://openairdocs.org/ad/2014-23-14.md), effective Dec 31, 2014: Revisions A and B

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-84-28-16/proposed.md).

## Text (20 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2014-0191; AD 2014-23-14 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘B’ 17 Jun 2013
DHC-8 (DASH 8)
SERVICE BULLETIN 84-28-16
Fuel System - Center Wing - Engine Fuel Feed Installation - Introduction
of Restrictor - ModSum 4-113736
This page transmits Revision ‘B’ of Service Bulletin 84-28-16, pages 1 thru
16 dated 17 Jun 2013.
This service bulletin is re-issued in its entirety for the reasons that follow:
-- t h eI n - S e r v i c ep a r to ft h eEffectivity section is revised to add the text “with
installed engine fuel feed ejector pump P/N 2960008-102”
-- the Cause part of the Reason section is revised to add the P/N of engine fuel
feed ejector pump (P/N 2960008-102)
-- the References section is revised to convey the latest revision of the service
bulletin
-- the Procedures section is revised to add the P/N of the ejector fuel pump
(2960008-102) in Figure 1 Sheets 1 and 2.
The Compliance recommendation in the previous issue of this service
bulletin is not affected by this revision. No additional rework to the aircraft is
introduced by this revision.
Remove the previous issue of this Service Bulletin and replace with
attached.
Previous issue of Service Bulletin 84-28-16:
Initial issue - Pages 1 thru 16 dated 16 Jul 2012
Revision ‘A’ - Pages 1 thru 16 dated 23 May 2013

### Page 2

(No text on this page.)

### Page 3

D
S.B. 84-28-16
Page 1 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 2800 NUMBER: 84-28-16
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARLY SIGNIFICANT AND
URGES OPERATORS TO PROMPTLY EVALUATE THE CONTENTS
SUBJECT: Fuel System - Center Wing - Engine Fuel Feed Installation -
Introduction of Restrictor - ModSum 4-113736
1. PLANNING INFORMATION
A. Effectivity
Aircraft Affected:
In-Service: DHC-8 Aircraft Models 401 and 402 Serial Numbers 4001 and
4003 thru 4417 with installed engine fuel feed ejector pump
P/N 2960008-102.
NOTE: The instructions in this service bulletin are only applicable to the systems
and parts installed at the time of delivery on the aircraft or as changed by
Bombardier Aerospace Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this bulletin
can be completed.

### Page 4

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 2 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
Spares Affected:
None
B. Reason
Problem: Several operators of a Q400 aircraft have advised BA of the low fuel
pressure caution light indication in fl ight regarding power lever position.
The caution light was extinguished after the AUX fuel pump was selected
to ON.
Cause: Investigation has determined that the low fuel pressure caution light was
caused by a partially blocked fuel feed line. The ejector swing arm (flapper
valve) part of the engine fuel feed ejector pump P/N 2960008-102 became
detached and partially blocked engine fuel feed flow.
Solution: This Service Bulletin introduces ModSum 4-113736. The ModSum installs
a containment device (restrictor) into the fuel feed line that is designed to
catch a detached ejector swing arm assembly (flapper valve) preventing
it from traveling downstream and blocking AUX fuel pump flow to the
engine.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that
follow:
- No. 1 and No. 2 fuel tanks are defueled
- main landing gear lock pins are installed thru each main gear and main gear door
mechanism
- nose landing gear lock is engaged
- aircraft electrical power is de-energized
- electrically grounded work stands are set in position around and/or under the left
and right wing
- wet bay fuel access panels are removed
- fuel tube assemblies inside the No. 1 and No. 2 fuel tanks are disconnected
- sealants are applied to the inside surface of the fuel tube assemblies
- restrictors are inserted into fuel tube assemblies and fuel tube assemblies are
re-identified

### Page 5

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 3 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
- electrical bonding check between the front face of the restrictor and outer
surface of the ferrule is done
- fuel tube assemblies inside the No. 1 and No. 2 fuel tanks are connected
- an operational check of the engine fuel feed pressure is done
- wet bay fuel access panels are installed
- close out.
D. Compliance
Bombardier Inc. highly recommend that ModSum 4-113736 be incorporated at the
earliest opportunity unless otherwise directed by the operator’s airworthiness
authority.
A Transport Canada Airworthiness Directive is pending.
E. Approval
The technical content of this service bulletin has been approved under the
authority of the Transport Canada Civil Aviation (TCCA) Design Approval
Organization No: DAO #93-Q-02.
This Service Bulletin affects Airworthiness Limitations (AWLs) and/or Damage
Tolerance Inspections (DTIs). Reference applicable Post/Pre ModSum 4-113736
and Service Bulletin 84-28-16 in the Maintenance Requirements Manual.
F. Manpower
It will take an estimated 12 man-hours to complete both PART A and PART B of this
service bulletin. The breakdown of the man-hours is shown in the table that follows:
TASK MAN-HOURS
Job Set-Up 3.0*
Procedure 2.00**
Test / RTS 4.00
Close-Out 3.0

### Page 6

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 4 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
*Does not include time to drain the fuel tanks.
**Does not include curing time of sealants.
For any on-site labor assistance, please speak with a Fleet Services representative
for a quote. The Fleet Services group can be contacted via the Q Series Technical
Help Desk by telephone at 416-375-4000 or email at:
thd.qseries@aero.bombardier.com.
G. Material - Price and Availability
The Modkit listed below is available through the Customer Accounts Service Team
at Bombardier Aerospace Regional Aircraft division. Operators should submit a
purchase order specifying aircraft serial number(s) to:
Bombardier Aerospace
Customer Accounts Services Team (Mail Stop N11-32)
123 Garratt Blvd.
Toronto
Ontario
Canada M3K-1Y5
Facsimile: (416) 375-3060
Telephone: (416) 375-3920
Kit Number Description Price (US$) Delivery
8MK4487-001 Retrofit Kit - Engine Fuel
Feed Line
Quoted at
time of order
Will be given
at time of
order
H. Tooling - Price and Availability
None

### Page 7

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 5 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
I. Weight and Balance
None
J. Electrical Load Data
Not affected
K. Publications Affected
Maintenance Manual PSM 1-84-2................................
Dash 8 Illustrated Parts Catalogue PSM 1-84-4....................
ModSums Manual PSM 1-84-12..................................
L. References
Revision ‘B’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8MK4487 1 -
8Z9462 1 A
ModSum 4Q113736 Rev. ‘D’
ModSum 4-113736 Rev. ‘D’
PCA 43732 Revision 1 (for internal reference only)
Transport Canada Airworthiness Directive Pending.
2. MATERIAL INFORMATION
A. Parts Required Per Aircraft
(1) Modification Kit 8MK4487-001

### Page 8

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 6 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
(2) Detailed Kit Content:
Quantity Per Kit
-001
Part Number Description Remarks
8 MS29513-214 Packing, O-ring
2 82820159-101 Restrictor
1 8Z9462 Retrofit - Dwg Drawing only
1 8MK4487 Retrofit - Kit Drawing only
(3) In addition to the above parts, the following material is required for the
completion of this service bulletin and may be procured as single items from
Bombardier Aerospace Regional Aircraft or purchased directly from industry
sources.
Addresses of manufacturers and suppliers not shown below are listed in
either Maintenance Manual Chapter 20 or in Structural Repair Manual Chapter
51 or, for 400 Series Aircraft, in Consumable Products Manual PSM 1-84-18.
Part Number Qty. Per Aircraft Description Remarks
DHMS S3.01 A/R Type II Class B
Sealant
PR 1776 B2 or
Equivalent
B. Parts Required to Modify Spares
None
C. Special Tools and Equipment Required
None

### Page 9

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 7 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
D. Existing Parts Accountability
The following parts may be affected by this service bulletin. Indented parts are
components of the next higher assembly. The quantity (Qty.) column lists the
quantity that may be affected per aircraft for non-indented parts and the quantity
p e rn e x th i g h e ra s s e m b l yf o ri n d e n t e dp a r t s .
Existing
Part Number Description Qty. IC DC
New Part
Number PNC
82822018-003 Tube Assembly 1 A RWK 8Z9462-001 R
82822145-001 Tube Assembly 1 A RWK 8Z9462-003 R
IC Interchangeability Code
A Not interchangeable.
B Removed Part. No direct replacement.
C Conditionally Interchangeable. Inst allation of superseded part negates the
intent of this service bulletin.
DC Disposition
DIS Discard Part.
MUI Multiple Usage Item: Return to stock if serviceable.
RWK Rework existing part in accordance with this service bulletin.
RWI Rework existing part per .....
SAL Salvage. Return to operator’s stores for salvage consideration.
PNC Part Number Code
N No equivalent Bombardier Inc. part number for reworked part. Indicate on
part that this service bulletin has been accomplished.
R Part number after rework.
S Superseding or equivalent part number.
X Reworked part and superseding part are functionally and physically
equivalent but not identical.

### Page 10

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 8 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
3. ACCOMPLISHMENT INSTRUCTIONS
A. Job Set-Up
WARNING: OBEY ALL THE FUEL SAFETY PRECAUTIONS WHEN YOU DO WORK
ON THE FUEL SYSTEM AND/OR A FUEL SYSTEM COMPONENT. IF
YOU DO NOT YOU CAN CAUSE INJURIES TO PERSONS AND/OR
DAMAGE TO EQUIPMENT.
(1) Pressure defuel the No. 1 and No. 2 fuel tanks (refer to applicable instructions in
AMM TASK 12-10-28-650-802).
(2) Make sure that lock pins are installed thru each main gear and main gear door
mechanism.
(3) Make sure the nose gear ground lock is engaged.
(4) Make sure to de-energize the aircraft electrical system (refer to AMM TASK
24-00-00-861-802).
(5) Set up the work platforms or ladders as required to gain access to wing access
panels 522AT and 622AT (refer to AMM PSM 1-84-2, TASKs 06-41-00-992-808
and 06-41-00-992-809 for location). Make sure the work platforms or ladders are
electrically grounded.
(6) Make sure to obey the fuel system safety precautions (refer to AMM TASK
28-00-00-910-801).
(7) Make sure to obey the electrical/electronic safety precautions (refer to AMM
TASK 24-00-00-910-801).
(8) Obey the electrostatic discharge safety precautions (refer to AMM TASK
24-00-00-910-802).
CAUTION: MAKE SURE THAT THE FUEL TANKS ARE DRAINED BEFORE YOU
REMOVE THE ACCESS PANELS. IF YOU DO NOT DO THIS, YOU CAN
CAUSE DAMAGE TO THE WING STRUCTURE.
(9) Remove and retain the wet bay fuel access panels 522AT and 622AT (refer to
applicable instructions in AMM TASK 57-11-01-000-801).

### Page 11

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 9 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
(10) Make sure no fuel or fuel vapors are present before working on aircraft or in the
fuel tanks (refer to applicable instructions in AMM TASK 28-10-00-840-801).
B. Procedure
PART A - Left Wing Fuel Tank Engine Fuel Feed Line Restrictor
82820159-101 - Installation
(1) Remove and retain the screws NAS1801-3-8, washers NAS1149F0332P and
clamps MS21919WDF16 from the left wing fuel feed line tubes located at
Y=-60.900 (refer to Figure 1 Sheet 1).
(2) Disconnect left wing fuel tube assembly 82822019-001 from tee assembly
located at Y=-70.285 (refer to Figure 1 Sheet 1 and applicable instructions in
AMM TASK 28-21-06-000-801). Keep coupling B0305080A16 for re-installation
and discard O-ring.
(3) Disconnect left wing fuel tube assembly 82822018-003 from ejector fuel pump
located at Y=-48.000 (refer to Figure 1 Sheet 1 and applicable instructions in
AMM TASK 28-21-06-000-801). Keep coupling B0305080A16 for re-installation
and discard O-ring.
NOTE: Do not remove swaged union connecting left wing fuel tube assembly
82822018-003 with tube assembly 82822019-001.
(4) Apply sealant DHMS S3.01 to the inside surface of the left wing fuel tube
assembly P/N 82822018-003, approximately 1.00 inch (2.54 cm) from the end of
the tube (refer to Figure 1 Sheet 3 SECTION C-C and flagnote 1 ).
(5) Insert the restrictor 82820159-101 into the left wing fuel tube assembly
82822018-003 (refer to Figure 1 Sheet 3 DETAIL A and SECTION C-C).
Re-identify tube assembly as 8Z9462-001 (refer to applicable instructions in
AMM TASK 20-00-01-910-801).

### Page 12

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 10 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
(6) Make sure no sealant is applied in the interface between the tube assembly
ferrule and restrictor 82820159-101 and there is no sealant visible in the
restrictor opening (refer to Figure 1 Sheet 3 SECTION C-C flagnote 2 ).
(7) Secure the restrictor 82820159-101 to the tube with tape to provide direct
contact between the restrictor and front of ferrule until sealant is cured.
(8) Do an electrical bonding check between the front face of the restrictor
82820159-101 and the outer surface of the ferrule (refer to Figure 1 Sheet 3
SECTION C-C and applicable instructions in AMM TASK 51-80-00-760-801).
Make sure the measured bonding resistance is 750 milliohms or less.
(9) Connect left wing fuel tube assembly 8Z9462-001 using coupling B0305080A16
and new O-ring MS29513-214 to the left fuel tank ejector fuel pump located at
Y=-48.000.
(10) Connect left wing fuel tube assembly 82822019-001 using coupling
B0305080A16 and new O-ring MS29513-214 to the left fuel tank tee assembly
located at Y=-70.285 (refer to Figure 1 Sheet 1 and applicable instructions in
AMM TASK 28-21-06-400-801).
(11) Secure the left wing fuel feed line tube assemblies with clamps
MS21919WDF16, screws NAS1801-3-8 and washers NAS1149F0332P at
location Y=-60.900 (refer to Figure 1 Sheet 1). Tighten clamp fastener (refer to
applicable instructions in AMM TASK 20-10-01-430-801).
PART B - Right Wing Fuel Tank Engine Fuel Feed Line Restrictor
82820159-101 - Installation
(1) Remove and retain the screws NAS1801-3-8, washers NAS1149F0332P and
clamps MS21919WDF16 from the right wing fuel feed line tubes located
Y=60.900 (refer to Figure 1 Sheet 2).
(2) Disconnect right wing fuel tube assembly 82822019-001 from tee assembly
located at Y=70.285 (refer to Figure 1 Sheet 2 and applicable instructions in
AMM TASK 28-21-06-000-801). Keep coupling B0305080A16 for re-installation
and discard O-ring.

### Page 13

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 11 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
(3) Disconnect right wing fuel tube assembly 82822145-001 from ejector fuel pump
located at Y=48.000 (refer to Figure 1 Sheet 2 and applicable instructions in
AMM TASK 28-21-06-000-801). Keep coupling B0305080A16 for re-installation
and discard O-ring.
NOTE: Do not remove swaged union connecting right wing fuel tube assembly
82822145-001 with tube assembly 82822019-001.
(4) Apply sealant DHMS S3.01 to the inside surface of the right wing fuel tube
assembly 82822145-001, approximately 1.00 inch (2.54 cm) from the end of the
tube (refer to Figure 1 Sheet 3 SECTION C-C and flagnote 1 ).
(5) Insert the restrictor 82820159-101 into right wing fuel tube assembly
82822145-001 (refer to Figure 1 Sheet 3 DETAIL B and SECTION C-C).
Re-identify tube assembly as 8Z9462-003 (refer to applicable instructions in
AMM TASK 20-00-01-910-801).
(6) Make sure no sealant is applied in the interface between the tube assembly
ferrule and restrictor 82820159-101 and there is no sealant visible in the
restrictor opening (refer to Figure 1 Sheet 3 SECTION C-C flagnote 2 ).
(7) Secure the restrictor 82820159-101 to the tube with tape to provide direct
contact between the restrictor and front of ferrule until sealant is cured.
(8) Do an electrical bonding check between the front face of the restrictor
82820159-101 and the outer surface of the ferrule (refer to Figure 1 Sheet 3
SECTION C-C and applicable instructions in AMM TASK 51-80-00-760-801).
Make sure the measured bonding resistance is 750 milliohms or less.
(9) Connect right wing fuel tube assembly 8Z9462-003 using couplings
B0305080A16 and new O-rings MS29513-214 to the right fuel tank ejector fuel
pump located at Y=48.000.
(10) Connect right wing fuel tube assembly 82822019-001 using coupling
B0305080A16 and new O-ring MS29513-214 to the right fuel tank tee assembly
located at Y=70.285 (refer to Figure 1 Sheet 2 and applicable instructions in
AMM TASK 28-21-06-400-801).

### Page 14

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 12 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
(11) Secure the right wing fuel feed line tube assemblies with clamps
MS21919WDF16, screws NAS1801-3-8 and washers NAS1149F0332P at
location Y=60.900 (refer to Figure 1 Sheet 2). Tighten clamp fastener (refer to
applicable instructions in AMM TASK 20-10-01-430-801).
C. Close Out
(1) Do the Engine Fuel Feed Line Pressure Test (refer to applicable instructions in
AMM TASK 28-21-00-780-801).
(2) Install the wet bay fuel access panels 522AT and 622AT (refer to applicable
instructions in AMM TASK 57-11-01-400-801).
(3) Remove all tools, equipment and unwanted materials from the work area.

### Page 15

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 13 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
TUBE ASSEMBLY
82822019- -001
TUBE ASSEMBLY
82822018- -003
WASHER NAS1149F0332P
SCREW NAS1801- -3- -8
CLAMP MS21919WDF16
TEE ASSEMBLY
VIEW LOOKING DOWN ON LEFT WING REAR SPAR
AIRCRAFT
ENGINE FUEL FEED LINE RESTRICTOR - INSTALLATION
Figure 1 (Sheet 1)
X 102D
374.405
F/SPAR
Y 102D
- -60.900
Y 102D
- -42.000
Y 102D
0.000
Y 102D
- -79.700
EJECTORTEE ASSEMBLY FUEL PUMP
COUPLING B0305080A16
O- -RING MS29513- -214
C/L
8Z9462-001 (p/n after rework)
2960008- -102

### Page 16

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 14 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
VIEW LOOKING DOWN ON RIGHT WING REAR SPAR
TEE ASSEMBLY
WASHER NAS1149F0332P
SCREW NAS1801- -3- -8
CLAMP MS21919WDF16
EJECTOR
TUBE ASSEMBLY
82822145- -001
TUBE ASSEMBLY
82822019- -001
TEE ASSEMBLY
X 102D
374.405
F/SPAR
AIRCRAFT
Y 102D
60.900
Y 102D
42.000Y 102D0.000 Y 102D79.700
ENGINE FUEL FEED LINE RESTRICTOR - INSTALLATION
Figure 1 (Sheet 2)
FUEL PUMP
C/L
8Z9462- -003
(p/n after rework)
COUPLING B0305080A16
O- -RING MS29513- -214
2960008- -102

### Page 17

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 15 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
RESTRICTOR
TUBE ASSEMBLY
ENGINE FUEL FEED LINE RESTRICTOR - INSTALLATION
Figure 1 (Sheet 3)
0.50 INCH (1.27 CM)
1.00 INCH (2.54 CM)
FERRULE 1
2
1
2
82820159-101
82822018-003 (LEFT SIDE)
82822145-001 (RIGHT SIDE)
(COUPLING AND O-RING
REMOVED FOR CLARITY)
(LEFT SIDE)
(RIGHT SIDE) - APPLY SEALANT DHMS S3.01 TOINSIDE SURFACE OF TUBE,
APPROXIMATELY 1.00 IN. (2.54 CM)
FROM END OF TUBE, OVER THE
DISTANCE SHOWN IN SECTION C-C.
-M A K ES U R EN OS E A L A N TI S
APPLIED IN THE INTERFACE BET-
WEEN FERRULE AND RESTRICTOR
AND THERE IS NO SEALANT VISIBLE
IN THE RESTRICTOR OPENING.
RESTRICTOR
82820159-101
NOTES:

### Page 18

SERVICE BULLETIN 84-28-16
S.B. 84-28-16
Page 16 of 16
16 Jul 2012
NB
Revision ‘B’ 17 Jun 2013
This Page Intentionally Blank
1

### Page 19

Jan 2009
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 20

Feb 2009
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
