# Bombardier Service Bulletin 84-28-20

Copy: Revision D ("84-28-20D Rleased Copy"), 36 pages: PDF https://openairdocs.org/files/sha256/20/74/2074513904d255cf374902fcf9426a3df49218e9c353095973fe2ad72dd01184; text https://openairdocs.org/service-documents/bombardier/sb-84-28-20/file/2074513904d2.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0726; AD 2020-04-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-28-20
- Latest revision known: 84-28-20, Revision D, dated November 23, 2018 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-28-20

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-23-01](https://openairdocs.org/ad/2022-23-01.md), effective Dec 13, 2022: Revisions A, B, C and D
- [AD 2020-04-20](https://openairdocs.org/ad/2020-04-20.md), effective May 4, 2020: Revisions A, B, C and D

Also cited in [3 proposed ADs](https://openairdocs.org/service-documents/bombardier/sb-84-28-20/proposed.md).

## Text (36 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0726; AD 2020-04-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘D’ 23 Nov 2018
D H C --- 8 ( D A S H 8 )
S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
Fuel - - - Wing Inspection & Rectification to Address Corrosion, Damage
and Wear of Hydraflow Couplings, Tube and Component Ferrules - - -
Modsum 4- - - 113921
This page transmits Revision ‘D’ of Service Bulletin 84- - -28- - -20, pages 1 thru
32, dated 23 Nov 2018.
This service bulletin is re- - -issued in its entirety for the reasons that follow:
--- t h eEffectivity section is revised to change effectivity from 4001, 4003 thru
4999 to 4001, 4003 thru 4575 and to add related Modsums
--- t h eCompliance section is revised to convey the latest revision of the
Airworthiness Directive
--- t h eReferences section is revised to convey the latest revision of the service
bulletin, engineering documentation and Airworthiness Directive
The Compliance in the previous issue(s) of this service bulletin is not
affected by this revision. No additional rework to the aircraft is introduced by
this revision.
Remove previous issue of Service Bulletin 84- - -28- - -20 and replace with
attached.
Previous issue(s) of Service Bulletin 84- - -28- - -20:
Initial issue - - - Pages 1 thru 32 dated 30 Sep 2016
Revision ‘A’ - - - Pages 1 thru 32 dated 14 Dec 2016
Revision ‘B’ - - - Pages 1 thru 32 dated 13 Feb 2017
Revision ‘C’ - - - Pages 1 thru 32 dated 28 Apr 2017

### Page 2

(No text on this page.)

### Page 3

D
S . B . 8 4 --- 2 8 --- 2 0
Page 1 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 2800 NUMBER: 84- - -28- - -20
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
URGE OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
SUBJECT : Fuel - - - Wing Inspection & Rectification to Address Corrosion, Damage
and Wear of Hydraflow Couplings, Tube and Component Ferrules - - -
Modsum 4- - - 113921
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4001,
4003 thru 4575.
Related ModSum Title
4- - -113969 Fuel System - - - Wing - - - Introduction of High Resist-
ance Isolators, Flexible Anodized and Threaded
Rigid Couplings and Bracket Supports for Fuel
P i p e st oA d d r e s sW e a ra n dC o r r o s i o n

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 2 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
Related ModSum Title
4- - -113970 F u e l S y s t e m --- W i n g --- ( R e t r o f i t O n l y ) I n t r o d u c t i o n
of High Resistance Isolators, Flexible Anodized and
Threaded Rigid Couplings and Bracket Supports
for Fuel Pipes to Address Wear and Corrosion
Verification: ModSum 4- - -113921 has been installed on DHC- - -8 Aircraft
Model 402 Serial Number 4164 using Verification SB
84- - -28- - -20.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery on the aircraft or as
changed by Bombardier Aerospace Service Bulletin(s). Before you do
this bulletin, examine all STC or equivalent action changes to make
sure this bulletin can be completed.
Spares Affected:
None
B. Reason
Problem: Some operators have found corrosion and wear on the Hydraflow
couplings and sleeve assemblies as well as wear on the fuel tube end
ferrules and fuel component port ferrules. Corrosion and wear can
adversely impact the ability of the fuel system transport elements to carry
lightning currents which in turn may lead to lightning strike induced fuel
tank ignition.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that follow:
- - - aircraft electrical power is removed
- - - the nose landing gear lock is engaged
- - - the main landing gear lock pins are installed thru each main gear and main gear door
mechanism
- - - fuel tank is prepared for access
- - - access panels are opened

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 3 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
- - - all hydraflow couplings and sleeves will be inspected within the fuel tank, except for
the collector tank
- - - coupling and sleeves inside the dry bay are not inspected/replaced
- - - removed couplings and sleeves are returned to Bombardier
- - - replace all O- - -rings within the fuel tank, except for the collector tank
- - - inspect fuel tube ferrules and fuel component ferrules for wear
- - - ferrule wear within the defined wear limits is acceptable, blending may be required
- - - ferrule wear beyond the defined wear limits requires the fuel tube or fuel component
to be replaced
- - - tube or component removal for inspection may be required
- - - some tubes may need to be cut to allow their removal
- - - pressure testing of the fuel lines is done
- - - electrical bonding checks of the fuel lines and components is done
- - - inspection findings are reported back to Bombardier
- - - close out.
D. Compliance
Bombardier Inc. highly recommend that ModSum 4- - -113921 be incorporated at the
earliest opportunity unless otherwise directed by the operator’s airworthiness
authority.
Transport Canada Airworthiness Directive AD CF- - -2017- - -04R2.
E. Approval
The technical content of this service bulletin has been approved under the authority of
the Transport Canada Civil Aviation (TCCA) Design Approval Organization No: DAO
# 9 3 --- Q --- 0 2 .
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance Inspections (DTIs).

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 4 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
F. M a n p o w e r
It will take an estimated 354 man- - -hours to complete the Accomplishment
Instructions in this service bulletin. The breakdown of man - - - hours is shown in the
table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 32.0
Procedure (Inspection) 180.0
Procedure (Rectification) 90.0
T e s t/R T S 20.0
Close- - -Out 32.0
G. Material - - - Price and Availability
The parts and material required are listed in Paragraph 2.A. The parts required may
be either furnished or fabricated from the operator’s existing stock, purchased as
single items from Bombardier Aerospace Regional Aircraft or purchased directly from
industry sources. DK parts are to be manufactured and approved locally (refer to
disclaimer in the related text or illustra tion). In some cases, an equivalent to the DK
part may be available from Bombardier under the production part number shown as
reference in Parts Required Per Aircraft.
H. T ooling - - - Price and Availability
Description Remarks
Bright Light Source Approved for use in fuel tank
Inspection Mirror Commercially available
Soft Jaw Pliers Commercially available
I. Weight and Balance
Not affected
J. Electrical Load Data
Not affected

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 5 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
K. Publications Affected
Aircraft Maintenance Manual PSM 1- - -84- - -2.........................
Aircraft Illustrated Parts Catalog PSM 1- - -84- - -4......................
Maintenance Requirement Manual PSM 1- - -84- - -7....................
ModSums Manual PSM 1- - -84- - -12..................................
L. References
Revision ‘D’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8DK4311 1 R
8DK4311 1.1 --- ---
8DK4311 2 D
8DK4311 3 F
8DK4311 4 D
8DK4311 5 E
8DK4311 6 F
ModSum 4Q113921 Rev. ‘U’
ModSum 4- - -113921 Rev. ‘U’
PCA 44307 Revision 0 (for internal reference only)
Transport Canada Airworthiness Directive AD CF- - -2017- - -04R2.
The related 8DK drawings listed in the T able above can be requested by writing to the
e- - -mail address that follows:
qseriesdwgrequest@aero.bombardier.com
Follow the instructions per All Operator Messages (AOM) 914 (Q100/200/300) or 389
(Q400).

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 6 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Detailed Parts List:
Quantity
Per Aircraft
Part Number Description Remarks
2 B0301010D20 Union, Ext, Swaged see Note 3
16 B0301010D16 Union, Ext, Swaged see Note 3
10 B0301010D12 Union, Ext, Swaged see Note 3
3 B0301005- - -28 Union see Note 1
2 B0301005- - -20 Union see Note 1
16 B0301005- - -16 Union see Note 1
10 B0301005- - -12 Union see Note 1
2 DSC530- - -1 Grommet see Note 1
4 MS35489- - -123 Grommet see Note 1
2 MS35489- - -23 Grommet see Note 1
2 MS35489- - -135 Grommet see Note 1
14 MS29513- - -224 O --- R i n g
26 MS29513- - -218 O --- R i n g
2 MS29513- - -215 O --- R i n g
42 MS29513- - -214 O --- R i n g
40 MS29513- - -117 O --- R i n g
7 B0305080A28 Coupling 14J26- - -28A
see Note 1 & 2
12 B0305080A20 Coupling 14J26- - -20A
see Note 1 & 2
2 B0305080A16C Coupling 14C26- - -16A
see Note 1 & 2
22 B0305080A16 Coupling 14J26- - -16A
see Note 1 & 2
20 B0305080A12 Coupling 14J26- - -12A
see Note 1 & 2

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 7 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
NOTE 1: The requirement (and quantities required) for these parts will be
determined based on the inspection results.
NOTE 2: Hydraflow coupling assembly (P/N 14J26- - -XXA) includes the clamshell
coupling (14C26- - -XXA) and sleeve (14R02- - -XXA).
NOTE 3: If required, install axial swage fittings B0301005- - -12/- - -16/- - -20/- - -28 per
AMM T ask 20- - -20- - -24- - -400- - -801. As an alternate it is acceptable to
use radial (external) swage per AMM T ask 20- - -20- - -22- - -400- - -801.
Using unions B0301010D12, B0301010D16, B0301010D20 in lieu of
B0301005- - -12/- - -16/- - -20. Union size (- - -28) is only available for axial
swaging. Measure electrical bonding across the swaged fitting as
specified in the AMM T ask.
(2) In addition to the above part(s), the following material(s) are required for the
completion of this service bulletin and may be procured as single items from
Bombardier Aerospace Regional Aircraft or purchased directly from industry
sources.
Each consumable product listed in the table below is given its own unique
Product ID Number. The number is used to identify a particular recommended
product, the specifications and the trade names any of which can be used
unless specified otherwise (refer to PSM 1- - -84- - -18 Consumable Products
Manual).
Consumable
Product ID
Number
Quantity
Per Aircraft
Description Remarks
06- - -01 A/R Sealant
DHMS S3.01 T ype 1
T emperature Resistant, In-
tegral Fuel T anks, High Ad-
hesion
07- - -29A A/R C10 Alodine Bonderite M- - -CR1132 Pen
OR
Bonderite M- - -CR871 Pen

### Page 10

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 8 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
B. Parts Required to Modify Spares
None
C. Special T ools and Equipment Required
NOTE: Suggested measurement and support equipment include but not
limited to:
Reference Designation Remarks
Biddle DLRO
#247001, or BCD
MI bonding meter,
or equivalent
Digital Low Resistance
Ohmmeter
Commercially Available
BAE Systems P/N
906- - -10247- - -ALL
Loop Resistance T ester
(LRT)
Commercially Available
BAE Systems P/N
906- - -10271- - -3
Accessory Assembly LRT
(Battery Charger for Loop
Resistance T ester)
Commercially Available
GSB1216012 Kit, Nitrogen Charging and
Gauging
Low Pressure, 0 to 500
psi (0 to 3447 kPa)
N/A Axial Swage Fitting T ool see Note 6 of drawing8DK4311 sheet 1
N/A Digital Calipers Commercially Available
N/A Digital Vernier Micrometer Commercially Available
N/A Optical Micrometer Commercially Available
N/A Depth Gauge Commercially Available
N/A
Borescope with measuring
capabilities
Commercially Available
N/A Magnifying Glass 10XCommercially Available
D. Existing Parts Accountability
None

### Page 11

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 9 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
3. ACCOMPLISHMENT INSTRUCTIONS
If it is not possible to complete all the instructions of this service bulletin because of the
configuration of the aircraft, speak with a representative of Bombardier in the CRC at
1- - -844- - -272- - -2720 (1- - -844- - -CRC- - -CRCO) or email at thd.qseries@aero.bombardier.comfor
analysis and to get an approved disposition to complete this service bulletin.
A . J o b S e t --- U p
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALL Y
RETRACT . THIS CAN CAUSE INJURIES TO PERSONS AND
DAMAGE TO THE EQUIPMENT .
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS
CAN ACCIDENTALL Y CLOSE THE LANDING GEAR DOORS. THIS
CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO THE
EQUIPMENT .
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE LANDING
GEAR DOORS. MAKE SURE YOU DISCONNECT THE LANDING
GEAR DOORS. IF YOU DO NOT DO THIS THE LANDING GEAR
DOORS WILL CLOSE WHEN YOU APPL Y THE HYDRAULIC
PRESSURE. THIS CAN CAUSE INJURIES TO PERSONS AND
DAMAGE TO THE EQUIPMENT .
NOTE: Make sure to put a protective cover on any disconnected electrical
connector or any tube, hose, duct and/or line.
(1) Placard and select all aircraft electrical power to OFF . Obey all relevant
W A R N I N G S a n d C A U T I O N S ( r e f e r t o A M M T A S K ’ S 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 a n d
24- - -00- - -00- - -910- - -801).

### Page 12

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 10 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
(2) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
(3) Make sure the nose gear ground lock is engaged.
(4) Set wheel chocks in front and behind the landing gear tires.
(5) Set up the work platforms or ladders around and/or under the left (and/or right)
wing as required to gain access to the fuel tanks. Make sure the work platforms
or ladders are electrically grounded.
(6) Prepare fuel tanks for access. Refer to AMM T ask 28- - -10- - -00- - -840- - -801.
(7) Remove outer wing fuel access panels. Refer to AMM TASK
57- - -21- - -01- - -000- - -801.
WARNING: FUEL PLUMBING SYSTEMS ARE DESIGNED WITH ELECTRICAL
BONDING FEATURES INCLUDING BONDING JUMPERS. SELF
BONDING COUPLINGS, CONDUCTIVE FITTINGS AND COMPONENTS
WITH CONDUCTIVE INTERFACES. THESE DESIGN FEATURES ARE
CLASSIFIED AS CRITICAL DESIGN CONFIGURATION CONTROL
LIMITATION (CDCCL) ITEMS. THE INTEGRITY OF THESE CRITICAL
DESIGN FEATURES MUST BE MAINTAINED TO ENSURE THAT
UNSAFE CONDITIONS DO NOT DEVELOP THROUGH MAINTENANCE.
NOTE: Inspection and rectification tasks are carried out on each fuel tank
system identified in T able 1 on drawing 8DK4311 sheet 1.1 and
flagnote 10 on drawing 8DK4311 sheet 1.
NOTE: Refer to general notes 1 to 12 on drawing 8DK4311 sheet 1.
NOTE: As outlined in flagnote 9, the tubes shown in T able 1 of drawing
8DK4311 sheet 1.1 reflect the latest aircraft configuration in production
only. Refer to the aircraft Illustrated parts catalogue for older
configurations.
NOTE: As outlined in flagnote 12, if a tube is required to be removed to
facilitate inspection, part mark the fuel tube orientation to ensure
proper re- - -installation.

### Page 13

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 11 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
B. Procedure
NOTE: If it is not possible to complete all the instructions of this service
bulletin because of the configuration of the aircraft, speak with a
representative of Bombardier in the CRC at 1- - -844- - -272- - -2720
( 1 --- 8 4 4 --- C R C --- C R C 0 ) o r e m a i l a t t h d . q s e r i e s @ a e r o . b o m b a r d i e r. c o m
for analysis and to get an approved disposition to complete this service
bulletin.
NOTE: Per flagnote 11 of drawing 8DK4311 sheet 1, record ferrule wear and
damage information along with pipe and fuel component replacement on
T ables 1 to 5 of this service bulletin. Please package couplings/sleeves by
fuel system (eg. engine feed or fuel vent). Return all removed couplings
and sleeves to Bombardier Aerospace. Report the findings to the
Bombardier T echnical Help Desk.
CAUTION: CARE SHOULD BE TAKEN WHEN WORKING IN SIDE THE FUEL
TANK TO PREVENT UNNECESSARY DAMAGE TO THE TUBE
ASSEMBL Y AND SURROUNDING STRUCTURE.
Wing Engine Fuel Feed System and Nacelle Fuel Feed System
(1) Do an inspection and rectification on the Wing Engine Fuel Feed System and
Nacelle Engine Fuel Feed System in accordance with drawing 8DK4311 sheet 1
and 2 as follows:
(a) Per flagnote 15 on drawing 8DK4311 sheet 1, inspect clamshell couplings and
sleeves at 12 locations shown on drawing 8DK4311 sheet 2 as follows:
NOTE: At inspection points 1 and 12 the sleeve is integral to the spar fitting
feed, only the clamshell is to be removed to gain access. Refer to
drawing 8DK4311 sheet 2 DETAILS A and B.
1 D ot h ei n s p e c t i o no nt h ebody of the clamshell coupling in accordance
with the inspection criteria on flagnote 15 of drawing 8DK4311 sheet 1.
2 Do the inspection of the clamshell coupling bonding wires in
accordance with the inspection criteria on flagnote 15 of drawing 8DK4311
sheet 1.

### Page 14

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 12 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
3 Do the inspection of the sleeve in accordance with the inspection criteria
on flagnote 15 of drawing 8DK4311 sheet 1. Refer to Figure 1 of this service
bulletin for an example of wear on the coupling sleeve.
4 Replace all O- - -rings at each coupling location.
(b) Return all removed couplings and sleeves to Bombardier as noted in flagnote
11 on drawing 8DK4311 sheet 1.
NOTE: Identify the location and from what system the coupling assemblies
were removed from when returning the couplings to Bombardier
Aerospace.
(c) Per flagnote 16 on drawing 8DK4311 sheet 1, inspect the surface of the tube
end ferrules for damage and wear at coupling locations shown on drawing
8DK4311 sheet 2 (refer to sections T- - -T and U- - -U on sheet 1.1).
1 If the depth of wear on the tube end ferrule is greater than the 0.007 inches
wear limit on flag notes 16A and 16B, the tube must be repaired
(cut/swage) or replaced per retrofit instructions on 8DK4311 sheet 2.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the tube end ferrule is less than or equal to the 0.007
inches wear limit on flag notes 16A and 16B, repair or blend per
instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(d) Per flag note 16C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel tube) for damage and wear at each end of every tube as follows:

### Page 15

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 13 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
1 If damage is greater than or equal to 0.012 inches (radial) limits as shown
in figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1, the tubes must
be repaired (cut/re- - -swage) or replaced per instructions on sheets 2 to 6.
2 If o- - -ring flange damage is less than 0.012 inches radial (see figure 4 and
section L- - -L on sheet 1.1), the ferrule is acceptable unless flag notes 16A
and 16B are not satisfied.
3 Re- - -install tubes as required per sheets 2 to 6.
(e) Per flag note 17 on drawing 8DK4311 sheet 1, inspect the surface of the fuel
component end ferrules for damage and wear at coupling locations shown on
drawing 8DK4311 sheet 2 (engine feed SOV qty. 2 - - - refer to sections T- - -T and
U- - -U on sheet 1.1).
1 If the depth of wear on the fuel component end ferrule is greater than the
0.007 inches wear limit on flag notes 17A and 17B, replace the affected
fuel component per retrofit instructions on 8DK4311 sheet 2.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the fuel component end ferrule is less than or equal
to the 0.007 inches wear limit on flag notes 17A and 17B, repair or blend
per instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(f) Per flag note 17C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel component) for damage and wear at each ferrule of fuel
components as follows:

### Page 16

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 14 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
1 If damage is greater than or equal to 0.012 inches radial (limits as shown in
figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1), replace fuel
components per appropriate AMM T ask instructions. Refer to T able 2 on
sheet 1.1 for list of AMM T asks.
2 If o- - -ring flange damage is less than 0.012 inches radial, the ferrule is
acceptable unless flag notes 17A and 17B are not satisfied.
3 Re- - -install fuel components as required per appropriate AMM T asks.
NOTE: Make sure electrical bonding of the engine shut off valves in
accordance with the flag notes on sheet 2 of drawing 8DK4311.
(g) Per the inspection criteria of flag note 15 on drawing 8DK4311 sheet 1, install
new clamshell couplings and new sleeves (as required). Install new O- - -rings at
12 locations shown on drawing 8DK4311 sheet 2.

### Page 17

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 15 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
TABLE 1
OR REPAIRED (BY CUTTING AND SWAGING) DUE TO BEING BEYOND LIMITS.

### Page 18

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 16 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
Center Wing Refuel/Defuel System
(2) Do an inspection and rectification on the Center Wing Refuel/Defuel System in
accordance with drawing 8DK4311 sheet 1 and 3 as follows:
(a) Remove the Fuel T ank Partition Assembly. Refer to AMM TASK
57- - -14- - -00- - -000- - -801.
(b) Per flagnote 15 on drawing 8DK4311 sheet 1, inspect clamshell couplings and
sleeves at 21 locations shown on drawing 8DK4311 sheet 3 as follows:
1 D ot h ei n s p e c t i o no nt h ebody of the clamshell coupling in accordance
with the inspection criteria on flagnote 15 of drawing 8DK4311 sheet 1.
2 Do the inspection of the clamshell coupling bonding wires in
accordance with the inspection criteria on flagnote 15 of drawing 8DK4311
sheet 1.
3 Do the inspection of the sleeve in accordance with the inspection criteria
on flagnote 15 of drawing 8DK4311 sheet 1. Refer to Figure 1 of this service
bulletin for an example of wear on the coupling sleeve.
4 Replace all O- - -rings at each coupling location.
(c) Return all removed couplings and sleeves to Bombardier as noted in flagnote
11 on drawing 8DK4311 sheet 1.
NOTE: Identify the location and from what system the coupling assemblies
were removed from when returning the couplings to Bombardier
Aerospace.
(d) Per flag note 16 on drawing 8DK4311 sheet 1, inspect the surface of the tube
end ferrules for damage and wear at coupling locations shown on drawing
8DK4311 sheet 3 (refer to sections T- - -T and U- - -U on sheet 1.1).
1 If the depth of wear on the tube end ferrule is greater than the 0.007 inches
wear limit on flag notes 16A and 16B, the tube must be repaired
(cut/swage) or replaced per retrofit instructions on 8DK4311 sheet 3.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH

### Page 19

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 17 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
2 If the depth of wear on the tube end ferrule is less than or equal to the 0.007
inches wear limit on flag notes 16A and 16B, repair or blend per
instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(e) Per flag note 16C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel tube) for damage and wear at each end of every tube as follows:
1 If damage is greater than or equal to 0.012 inches (radial) limits as shown
in figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1, the tubes must
be repaired (cut/re- - -swage) or replaced per instructions on sheets 2 to 6.
2 If o- - -ring flange damage is less than 0.012 inches radial (see figure 4 and
section L- - -L on sheet 1.1), the ferrule is acceptable unless flag notes 16A
and 16B are not satisfied.
3 Re- - -install tubes as required per sheets 2 to 6.
NOTE: As per the instructions on drawing 8DK4311 sheet 3, replace any
bonding jumpers that may have been removed.
(f) Per flag note 17 on drawing 8DK4311 sheet 1, inspect the surface of fuel
component end ferrules for damage and wear at coupling locations shown on
drawing 8DK4311 sheet 3 (Refuel/Defuel Transfer SOV , Level Control Valve,
Refuel/Defuel SOV T ee Adaptor, Refuel/Defuel SOV) (refer to sections T- - -T and
U- - -U on sheet 1.1).
1 If the depth of wear on the fuel component end ferrule is greater than the
0.007 inches wear limit on flag notes 17A and 17B, replace the affected
fuel component per retrofit instructions on drawing 8DK4311 sheet 3.

### Page 20

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 18 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the fuel component end ferrule is less than or equal
to the 0.007 inches wear limit on flag notes 17A and 17B, repair or blend
per instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(g) Per flag note 17C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel component) for damage and wear at each ferrule of fuel
components as follows:
1 If damage is greater than or equal to 0.012 inches radial (limits as shown in
figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1), replace fuel
components per appropriate AMM T ask instructions. Refer to T able 2 on
sheet 1.1 for list of AMM T asks.
2 If o- - -ring flange damage is less than 0.012 inches radial, the ferrule is
acceptable unless flag notes 17A and 17B are not satisfied.
3 Re- - -install fuel components as required per appropriate AMM T asks.
NOTE: Make sure electrical bonding of the Refuel/Defuel Transfer SOV , Level
Control Valve, Refuel/Defuel SOV T ee Adaptor, Refuel/Defuel SOV in
accordance with the flag notes on sheet 3 of drawing 8DK4311.
NOTE: As per the instructions on drawing 8DK4311 sheet 3, replace any
bonding jumpers that may have been removed.
(h) Per the inspection criteria of flag note 15 on drawing 8DK4311 sheet 1, install
new clamshell couplings and new sleeves (as required). Install new O- - -rings at
21 locations shown on drawing 8DK4311 sheet 3.

### Page 21

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 19 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
TABLE 2
OR REPAIRED (BY CUTTING AND SWAGING) DUE TO BEING BEYOND LIMITS.

### Page 22

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 20 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
Wing Scavenge and Motive Flow System
(3) Do an inspection and rectification on the Wing Scavenge and Motive Flow
System in accordance with drawing 8DK4311 sheet 1 and 4 as follows:
(a) Per flagnote 15 on drawing 8DK4311 sheet 1, inspect clamshell couplings and
sleeves at 10 locations shown on drawing 8DK4311 sheet 4 as follows:
1 D ot h ei n s p e c t i o no nt h ebody of the clamshell coupling in accordance
with the inspection criteria on flagnote 15 of drawing 8DK4311 sheet 1.
2 Do the inspection of the clamshell coupling bonding wires in
accordance with the inspection criteria on flagnote 15 of drawing 8DK4311
sheet 1.
3 Do the inspection of the sleeve in accordance with the inspection criteria
on flagnote 15 of drawing 8DK4311 sheet 1. Refer to Figure 1 of this service
bulletin for an example of wear on the coupling sleeve.
4 Replace all O- - -rings at each coupling location.
(b) Return all removed couplings and sleeves to Bombardier as noted in flagnote
11 on drawing 8DK4311 sheet 1.
NOTE: Identify the location and from what system the coupling assemblies
were removed from when returning the couplings to Bombardier
Aerospace.
(c) Per flag note 16 on drawing 8DK4311 sheet 1, inspect the surface of the tube
end ferrules for damage and wear at coupling locations shown on drawing
8DK4311 sheet 4 (refer to sections T- - -T and U- - -U on sheet 1.1).
1 If the depth of wear on the tube end ferrule is greater than the 0.007 inches
wear limit on flag notes 16A and 16B, the tube must be repaired
(cut/swage) or replaced per retrofit instructions on 8DK4311 sheet 4.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the tube end ferrule is less than or equal to the 0.007
inches wear limit on flag notes 16A and 16B, repair or blend per
instructions on flag note 18 of drawing 8DK4311 sheet 1.

### Page 23

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 21 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(d) Per flag note 16C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel tube) for damage and wear at each end of every tube as follows:
1 If damage is greater than or equal to 0.012 inches (radial) limits as shown
in figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1, the tubes must
be repaired (cut/re- - -swage) or replaced per instructions on sheets 2 to 6.
2 If o- - -ring flange damage is less than 0.012 inches radial (see figure 4 and
section L- - -L on sheet 1.1), the ferrule is acceptable unless flag notes 16A
and 16B are not satisfied.
3 Re- - -install tubes as required per sheets 2 to 6.
(e) Per flag note 17 on drawing 8DK4311 sheet 1, inspect the surface of fuel
component end ferrules for damage and wear at coupling locations shown on
drawing 8DK4311 sheet 4 (Scavenge Ejectors) (refer to sections T- - -T and U- - -U
on sheet 1.1).
1 If the depth of wear on the fuel component end ferrule is greater than the
0.007 inches wear limit on flag notes 17A and 17B, replace the affected
fuel component per retrofit instructions on drawing 8DK4311 sheet 4.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the fuel component end ferrule is less than or equal
to the 0.007 inches wear limit on flag notes 17A and 17B, repair or blend
per instructions on flag note 18 of drawing 8DK4311 sheet 1.

### Page 24

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 22 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(f) Per flag note 17C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel component) for damage and wear at each ferrule of fuel
components as follows:
1 If damage is greater than or equal to 0.012 inches radial (limits as shown in
figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1), replace fuel
components per appropriate AMM T ask instructions. Refer to T able 2 on
sheet 1.1 for list of AMM T asks.
2 If o- - -ring flange damage is less than 0.012 inches radial, the ferrule is
acceptable unless flag notes 17A and 17B are not satisfied.
3 Re- - -install fuel components as required per appropriate AMM T asks.
NOTE: Make sure electrical bonding of the Scavenge Ejectors in accordance
with the flagnotes on sheet 4 of drawing 8DK4311.
(g) Per the inspection criteria of flag note 15 on drawing 8DK4311 sheet 1, install
new clamshell couplings and new sleeves (as required). Install new O- - -rings at
10 locations shown on drawing 8DK4311 sheet 4.

### Page 25

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 23 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
TABLE 3
OR REPAIRED (BY CUTTING AND SWAGING) DUE TO BEING BEYOND LIMITS.

### Page 26

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 24 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
Fuel Vent Line System
WARNING: DO NOT REMOVE OR DAMAGE THE PROTECTIVE SLEEVE (HOSE).
THE PROTECTIVE SLEEVE (HOSE) IS NECESSARY TO PROVIDE
ELECTRICAL ISOLATION BETWEEN THE FUEL TANK VENT LINES
AND THE ADJACENT STRUCTURE. REMOVAL OR DAMAGE TO THE
PROTECTIVE SLEEVE CAN POSSIBL Y CAUSE AN IGNITION
SOURCE INSIDE THE FUEL TANK DURING A LIGHTNING STRIKE.
NOTE: If required, teflon sleeve can be installed per SB A84- - -28- - -02 or AMM
T ask 28- - -12- - -01- - -400- - -801.
(4) Do an inspection and rectification on the Fuel Vent Line System in accordance
with drawing 8DK4311 sheet 1 and 5 as follows:
(a) Per flagnote 15 on drawing 8DK4311 sheet 1, inspect clamshell couplings and
sleeves at 8 locations shown on drawing 8DK4311 sheet 5 as follows:
1 D ot h ei n s p e c t i o no nt h ebody of the clamshell coupling in accordance
with the inspection criteria on flagnote 15 of drawing 8DK4311 sheet 1.
2 Do the inspection of the clamshell coupling bonding wires in
accordance with the inspection criteria on flagnote 15 of drawing 8DK4311
sheet 1.
3 Do the inspection of the sleeve in accordance with the inspection criteria
on flagnote 15 of drawing 8DK4311 sheet 1. Refer to Figure 1 of this service
bulletin for an example of wear on the coupling sleeve.
4 Replace all O- - -rings at each coupling location.
(b) Return all removed couplings and sleeves to Bombardier as noted in flagnote
11 on drawing 8DK4311 sheet 1.
NOTE: Identify the location and from what system the coupling assemblies
were removed from when returning the couplings to Bombardier
Aerospace.
(c) Per flagnote 16 on drawing 8DK4311 sheet 1, inspect the surface of the tube
end ferrules for damage and wear at coupling locations shown on drawing
8DK4311 sheet 5 (refer to sections T- - -T and U- - -U on sheet 1.1).

### Page 27

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 25 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
1 If the depth of wear on the tube end ferrule is greater than the 0.007 inches
wear limit on flag notes 16A and 16B, the tube must be repaired
(cut/swage) or replaced per retrofit instructions on 8DK4311 sheet 5.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the tube end ferrule is less than or equal to the 0.007
inches wear limit on flag notes 16A and 16B, repair or blend per
instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(d) Per flag note 16C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel tube) for damage and wear at each end of every tube as follows:
1 If damage is greater than or equal to 0.012 inches (radial) limits as shown
in figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1, the tubes must
be repaired (cut/re- - -swage) or replaced per instructions on sheets 2 to 6.
2 If o- - -ring flange damage is less than 0.012 inches radial (see figure 4 and
section L- - -L on sheet 1.1), the ferrule is acceptable unless flag notes 16A
and 16B are not satisfied.
3 Re- - -install tubes as required per sheets 2 to 6.
NOTE: As per the instructions on drawing 8DK4311 sheet 5, replace any
bonding jumpers that may have been removed.
(e) Per the inspection criteria of flag note 15 on drawing 8DK4311 sheet 1, install
new clamshell couplings and new sleeves (as required). Install new O- - -rings at
8 locations shown on drawing 8DK4311 sheet 5.

### Page 28

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 26 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
TABLE 4
82822103- - -002
OR REPAIRED (BY CUTTING AND SWAGING) DUE TO BEING BEYOND LIMITS.

### Page 29

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 27 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
Outer Wing Fuel System
WARNING: DO NOT REMOVE OR DAMAGE THE PROTECTIVE SLEEVE (HOSE).
THE PROTECTIVE SLEEVE (HOSE) IS NECESSARY TO PROVIDE
ELECTRICAL ISOLATION BETWEEN THE FUEL TANK VENT LINES
AND THE ADJACENT STRUCTURE. REMOVAL OR DAMAGE TO THE
PROTECTIVE SLEEVE CAN POSSIBL Y CAUSE AN IGNITION
SOURCE INSIDE THE FUEL TANK DURING A LIGHTNING STRIKE.
NOTE: If required, teflon sleeve can be installed per SB A84- - -28- - -02 or AMM
T ask 28- - -12- - -06- - -400- - -801.
(5) Do an inspection and rectification on the Outer Wing Fuel System in accordance
with drawing 8DK4311 sheet 1 and 6 as follows:
(a) Per flagnote 15 on drawing 8DK4311 sheet 1, inspect clamshell couplings and
sleeves at 14 locations shown on drawing 8DK4311 sheet 6 as follows:
1 D ot h ei n s p e c t i o no nt h ebody of the clamshell coupling in accordance
with the inspection criteria on flagnote 15 of drawing 8DK4311 sheet 1.
2 Do the inspection of the clamshell coupling bonding wires in
accordance with the inspection criteria on flagnote 15 of drawing 8DK4311
sheet 1.
3 Do the inspection of the sleeve in accordance with the inspection criteria
on flagnote 15 of drawing 8DK4311 sheet 1. Refer to Figure 1 of this service
bulletin for an example of wear on the coupling sleeve.
4 Replace all O- - -rings at each coupling location.
(b) Return all removed couplings and sleeves to Bombardier as noted in flagnote
11 on drawing 8DK4311 sheet 1.
NOTE: Identify the location and from what system the coupling assemblies
were removed from when returning the couplings to Bombardier
Aerospace.
(c) Per flag note 16 on drawing 8DK4311 sheet 1, inspect the surface of the tube
end ferrules for damage and wear at coupling locations shown on drawing
8DK4311 sheet 6 (refer to sections T- - -T and U- - -U on sheet 1.1).

### Page 30

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 28 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
1 If the depth of wear on the tube end ferrule is greater than the 0.007 inches
wear limit on flag notes 16A and 16B, the tube must be repaired
(cut/swage) or replaced per retrofit instructions on 8DK4311 sheet 6.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the tube end ferrule is less than or equal to the 0.007
inches wear limit on flag notes 16A and 16B, repair or blend per
instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(d) Per flag note 16C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel tube) for damage and wear at each end of every tube as follows:
1 If damage is greater than or equal to 0.012 inches (radial) limits as shown
in figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1, the tubes must
be repaired (cut/re- - -swage) or replaced per instructions on sheets 2 to 6.
2 If o- - -ring flange damage is less than 0.012 inches radial (see figure 4 and
section L- - -L on sheet 1.1), the ferrule is acceptable unless flag notes 16A
and 16B are not satisfied.
3 Re- - -install tubes as required per sheets 2 to 6.
(e) Per flag note 17 on drawing 8DK4311 sheet 1, inspect the surface of fuel
component end ferrules for damage and wear at coupling locations shown on
drawing 8DK4311 sheet 6 (Scavenge Ejectors and Fuel Elbow) (refer to
sections T- - -T and U- - -U on sheet 1.1).

### Page 31

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 29 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
1 If the depth of wear on the fuel component end ferrule is greater than the
0.007 inches wear limit on flag notes 17A and 17B, replace the affected
fuel component per retrofit instructions on drawing 8DK4311 sheet 6.
CAUTION: IN CASES WHERE BLENDING OF THE TUBE END FERRULE AND
FUEL COMPONENT END IS REQUIRED (PER FLAG NOTE 16 AND
17), MAKE SURE THE BLENDING OPERATION MINIMIZES ANY
INCREASE IN THE MEASURED DEPTH
2 If the depth of wear on the fuel component end ferrule is less than or equal
to the 0.007 inches wear limit on flag notes 17A and 17B, repair or blend
per instructions on flag note 18 of drawing 8DK4311 sheet 1.
NOTE: In cases where the scuffing damage on the ferrule (reference
section T - - - T) is less than 0.004 inches and the scuffed area is
smooth with no sharp edges or nicks, blending is not required.
Clean the scuffed area and apply the C10 (alodine) to the scuffed
area using the Bonderite M- - - CR1132 Pen or Bonderite M- - - CR871
Pen in accordance with the applications instructions on drawing
8DK4311 sheet 1. Make sure there is cleanliness throughout the
C10 (Alodine) process.
(f) Per flag note 17C on drawing 8DK4311 sheet 1, inspect the ferrule O - - - ring
flanges (fuel component) for damage and wear at each ferrule of fuel
components as follows:
1 If damage is greater than or equal to 0.012 inches radial (limits as shown in
figure 4 and section L- - -L on drawing 8DK4311 sheet 1.1), replace fuel
components per appropriate AMM T ask instructions. Refer to T able 2 on
sheet 1.1 for list of AMM T asks.
2 If o- - -ring flange damage is less than 0.012 inches radial, the ferrule is
acceptable unless flag notes 17A and 17B are not satisfied.
3 Re- - -install fuel components as required per appropriate AMM T asks.
NOTE: Make sure electrical bonding of the Scavenge Ejectors and Fuel
Elbow in accordance with the flagnotes on sheet 6 of drawing
8DK4311.
(g) Per the inspection criteria of flag note 15 on drawing 8DK4311 sheet 1, install
new clamshell couplings and new sleeves (as required). Install new O- - -rings at
14 locations shown on drawing 8DK4311 sheet 6.

### Page 32

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 30 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
TABLE 5
OR REPAIRED (BY CUTTING AND SWAGING) DUE TO BEING BEYOND LIMITS.

### Page 33

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 31 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
C. Close Out
NOTE: After rework completion, make sure that fuel lines located within the
fuel tank are installed with a minimum clearance to wing structure of
1/8 inch (0.125 inches). Fuel lines designed with a protective teflon
sleeve installed around the pipe (adjacent to the wing structure) are not
required to meet the minimum clearance requirement at the location of
the teflon sleeve. Refer to the AMM T asks for each fuel system shown
on sheets 2 to 6 of drawing 8DK4311.
(1) Upon completion of the inspection and r ectification tasks, carry out a pressure
leak test of each fuel system as specified in the retrofit instructions on sheets 2 to
6 of drawing 8DK4311.
(2) Following completion of the pressure leak testing carry out electrical bonding tests
of each fuel system in accordance with note 19 on drawing 8DK4311 sheet 1.
(3) Install the Fuel T ank Partition Assembly. Refer to AMM TASK
57- - -14- - -00- - -400- - -801.
(4) Install the applicable access fuel panels that were removed (Refer to AMM TASK
57- - -11- - -01- - -400- - -801 and/or AMM TASK 57- - -21- - -01- - -400- - -801).
(5) Remove all tools and equipment from the work area.
(6) Return all removed couplings and sleeves to Bombardier Aerospace as noted in
flagnote 11 of drawing 8DK4311 sheet 1.
(7) Submit T ables 1 to 5 of this service bulletin to:
Q- - -Series Action Center
email: thd.qseries@aero.bombardier.com;
T el. 1- - -514- - -855- - -8500; 1- - -844- - -CRC- - -CRC0 (1- - -844- - -272- - -2720)
(8) On incorporation of this ModSum, make an entry that conforms to local
regulatory requirements in the applicable logbook(s). Enter component serial
numbers if applicable. Enter this ModSum number only after complete and
functional incorporation of all work defined in this service bulletin.

### Page 34

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 0
S . B . 8 4 --- 2 8 --- 2 0
Page 32 of 32
30 Sep 2016
Revision ‘D’ 23 Nov 2018 JR
THE DESIGN OF THE PART IN THIS DRAWING HAS BEEN APPROVED BY DE HAVILLAND INC. FOR MANUFACTURE BY OR ON BE-
HALF OF THE RECIPIENT . THE RECIPIENT IS RESPONSIBLE FOR (A) PROPER MANUFACTURE OF THE PART USING THE SPECI-
FIED MATERIALS AND FOR INCORPORATION OF THE MODIFICATION, ALL IN ACCORDANCE WITH THE DRAWING AND RELATED
INSTRUCTIONS, AND (B) APPROVAL OF THE FINAL INSTALLATI ON BY THE RELEVANT AIRWORTHINESS AUTHORITY . DE HAVIL-
LAND INC. AND BOMBARDIER INC. (BOMBARDIER AEROSPACE REGIONAL AIRCRAFT) DISCLAIM ANY RESPONSIBILITY FOR IN-
CIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION LOSS OR USE, LOSS OF REVENUE OR LOSS OF
PROFIT , ARISING FROM SUCH MANUFACTURE, INCORPORATION AND INSTALLATION.
Figure 1
Coupling Sleeve Wear
Example of wear
1

### Page 35

May2018
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 36

May 2018
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.