# Bombardier Service Bulletin 84-28-21

Copy: Revision C ("84-28-21C - Released Copy"), 114 pages: PDF https://openairdocs.org/files/sha256/e3/37/e337ed6194af759a2fd86a84f3308444b467abba84d371148e794775a6c250b9; text https://openairdocs.org/service-documents/bombardier/sb-84-28-21/file/e337ed6194af.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0726; AD 2020-04-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-28-21
- Latest revision known: 84-28-21, Revision C, dated July 13, 2018 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-28-21

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-23-01](https://openairdocs.org/ad/2022-23-01.md), effective Dec 13, 2022: Revisions A, B and C
- [AD 2020-04-20](https://openairdocs.org/ad/2020-04-20.md), effective May 4, 2020: Revisions A, B and C

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/bombardier/sb-84-28-21/proposed.md).

## Text (114 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0726; AD 2020-04-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘C’ 13 Jul 2018
D H C --- 8 ( D A S H 8 )
S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
Fuel - - - Fuel System - - - Wing - - - Introduction of High Resistance
Isolators, Flexible Anodized and Threaded Rigid Couplings and Bracket
Supports for Fuel Pipes to Address Wear and Corrosion - - - ModSum
4 - - - 113970
This page transmits Revision ‘C’ of Service Bulletin 84- - -28- - -21,
pages 1 thru 110 dated 13 Jul 2018.
This service bulletin is re- - -issued in its entirety for the reasons that follow:
--- t h eReferences section revised to convey the latest revision of the service
bulletin and engineering documentation
--- Figure 29 and Figure 30 were revised to update electrical bonding
measurement instructions with correct table numbers and test point
locations in section R1, R10 and R11 per 8Z10149 sheet 1.1 revision R.
The Compliance i n R e v i s i o n B o f S B 8 4 --- 2 8 --- 2 1 i s n o t a f f e c t e d b y t h i s
revision. However, the Compliance in Revision A of SB 84- - -28- - -21 is
affected by this revision if Revision B of SB 84- - -28- - -21, IS4Q2800032
Revision A, or one of the qualifying Airworthiness Change Requests (ACRs)
has not been incorporated yet. Qualifying ACRs will be listed in the
Airworthiness Directive (Pending).
SB 84- - -28- - -21 Revision B included electrical bonding measurements of the
rigid couplings installation on the vent line (reference drawing 8Z10149
Sheet 1.1 Section R) Flagnote R4) Subnote B)). Aircraft which have
incorporated SB 84- - -28- - -21 Revision A that have also incorporated
IS4Q2800032 Revision A have completed the electrical bonding
measurements of the rigid coupling installation on the vent line and
therefore do not require additional rework. Operators incorporating Revision
A of SB 84- - -28- - -21 and also required to complete FSL 284000- - -417,
required an Airworthiness Change Request (ACR) to identify the electrical
bonding test points in FSL 284000- - -417 applicable to post mod 4- - -113970
(SB 84- - -28- - -21) configuration. The ACR also incorporated the electrical
bonding measurements for the rigid couplings installed on the vent line.
Electrical bonding of the rigid coupling installation was completed on
verification aircraft S/N 4490. No additional rework to MSN 4490 is
introduced by this revision.

### Page 2

The following clarification is provided for the electrical bonding test points in
sections R1, R10 and R11 that were updated per 8Z10149 sheet 1.1 revision
R in SB 84- - -28- - -21 Revision C. The test points revised in R1, R10 and R11
have the same test locations and resistance values as the test points
specified in SB 84- - -28- - -21 Revision A and Revision B. These test points
were re- - -identified in SB 84- - -28- - -21 Revision C to reflect the release of T ask
Card 000- - -28- - -520- - -713 (Config A02) and T ask Card 000- - -28- - -620- - -713
(Config A02). The test points listed in SB 84- - -28- - -21 Revision A and
Revision B are based on T ask Card 000- - -28- - -520- - -713 (Config A01) and
T ask Card 000- - -28- - -620- - -713 (Config A01) and are equivalent to the
re- - -identified test points in SB 84- - -28- - -21 Revision C. The resistance
measurements of the revised and original R1, R10 and R11 test points
carried out in accordance with T ask Card (Config A02) and T ask Card
(Config A01), respectively, both satisfy the intent of the return to service
electrical bonding measurements.
The initial issue of this Service Bulletin was issued to one customer for
aircraft ”release to service” of verification aircraft S/N 4490 only.
Remove the previous revision of Service Bulletin 84- - -28- - -21 and replace
with attached.
Previous issue of Service Bulletin 84- - -28- - -21:
Initial issue - - - Pages 1 thru 100 dated 31 Aug 2017
Revision ’A’ - - - Pages 1 thru 110 dated 29 Sep 2017
Revision ’B’ - - - Pages 1 thru 110 dated 08 Jun 2018

### Page 3

D
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 1 of 110
SERVICE BULLETIN
ATA SYSTEM: 2800 NUMBER: 84- - -28- - -21
BOMBARDIER AEROSPACE CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
URGE OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
SUBJECT : Fuel - - - Fuel System - - - Wing - - - Introduction of High Resistance
Isolators, Flexible Anodized and Threaded Rigid Couplings and
Bracket Supports for Fuel Pipes to Address Wear and Corrosion - - -
ModSum 4- - - 113970
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4001,
4003 thru 4575.
Verification: ModSum 4- - -113970 has been incorporated on DHC- - -8 Aircraft
Model 402 Serial Number 4490 per Post Verification Service
B u l l e t i n 8 4 --- 2 8 --- 2 1 V.
Production: ModSum 4- - -113969 will be installed before delivery on
applicable DHC- - -8 Aircraft at Serial Number 4576 and
subsequent.

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 2 of 110
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery on the aircraft or as
changed by Bombardier Aerospace Service Bulletin(s). Before you do
this bulletin, examine all STC or equivalent action changes to make
sure this bulletin can be completed.
Spares Affected:
None
INTRODUCTION FOR SERVICE BULLETIN 8 4 --- 2 8 --- 2 1
Service Bulletin 84- - - 28- - - 20 was released to the Q400 fleet as an Interim
Corrective Action mandated by TCCA AD CF - - - 2017- - - 04R1 to address the fuel
tank concerns listed below:
- - - Corrosion of the B0305080 fuel clamshell couplings (interim action: to replace with
new B0305080 coupling assembly based on inspection criteria)
- - - Wear of the fuel tube end ferrules and fuel component end ferrules (interim action to
blend end ferrules or replace fuel tubes a nd fuel components based on wear limits
determined by lightning tests).
Service Bulletin 84- - - 28- - - 21 is released to the Q400 fleet as the Final Corrective
Action to TCCA AD CF - - - 2017- - - 04R1:
- - - The majority of B0305080 clamshell coupling are replaced with B0305144 clamshell
coupling to alleviate corrosion of the boron nickel plating
- - - A number of B0305080 couplings are replaced on attrition
- - - Addition of structural support brackets at selected locations to mitigate wear of the
fuel tube and fuel component end ferrules
- - - Introduction of high resistance isolators and removal of bonding jumpers on selected
fuel subsystems. The isolators and jumper removal are a product improvement
designed to mitigate lightning current flow which in turn allows a relaxation of the end
ferrule wear limits as well as a relaxation of the electrical bonding requirements across
the couplings.

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 3 of 110
B. Reason
Problem: Several operators have report ed the following observations associated
with the Hydraflow (P/N 14J26) clamshell coupling installation:
Greenish black corrosion deposits on the external plating of the coupling
(P/N 14J26).
Wear of the bonding spring and fuel pipe/ fuel component end ferrule.
Wear of the coupling sleeves.
Contact of the coupling body with the fuel pipe/fuel component end
ferrule.
The corrosion can adversely impact the electrical conductivity of the
coupling assembly. The wear issues ca n result in inadvertent, intermittent
contact between coupling components not designed to carry the lightning
current. The corrosion and wear issues can result in potential ignition
sources inside the fuel tank in the event of the lightning strike.
Excessive movement of the fuel tubes can result in unintentional and
intermittent contact between coupling body and end ferrule as well as
scoring of the sleeve.
Cause: The highest degree of corrosion was found primarily on couplings located
in the upper portion of the fuel tank such as the fuel vent and outboard fuel
scavenge lines due to the fact that they are more exposed to fuel vapor and
air.
The wear/fretting of the bonding spring and end ferrule is due to the relative
motion between coupling and ferrule caused by the fuel tubes not being
properly restrained for specific locations within the fuel tank.
Solution: This service bulletin introduces ModSum 4- - -113970 which gives actions
as follows:
Addition of high resistance isolators in the engine fuel feed and fuel vent
system at selected locations to limit lightning currents to less than 125
milliamperes.
Replacement of B0305080A (Hydraflow P/N 14J26) couplings with
B0305144A (Hydraflow P/N 14J18) couplings at selected locations for
in- - -service aircraft.

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 4 of 110
Addition of the rigid coupling - - - Hydraflow P/N 15J18 (BA P/N B0305119
and B0305118) at main vent line selected locations to support Isolator
8SC5055 installation.
Addition of tube support structure (brackets, intercostal, and clamps) to
address wear of coupling assembly as well as tube/component ferrule
wear.
Removal of bonding jumpers at selected locations to provide isolation and
limit lightning currents to less than 125 milliamperes.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that follow:
- - - aircraft electrical power is removed
- - - the nose landing gear lock is engaged
- - - the main landing gear lock pins are installed thru each main gear and main gear door
mechanism
- - - fuel tank is prepared for access
- - - access panels are opened
- - - sequence given in the retrofit summary (RS) is followed per drawing 8Z10149 sheet
1 and retrofit installation is initiated
Part A - - - Inspection of Fuel T ube End Ferrules and Fuel Component End Ferrules
(Drawing 8Z10174 Sheet 1 to 6)
- - - selected B0305080 couplings are inspected for wear and electrical bonding
- - - all fuel tube ferrules and component ferrules are inspected for wear and repaired per
drawing 8Z10174
Part B - - - Part B1 - - - Structural Retrofit (Drawing 8Z10150 Sheet 1 to 3)
Part B2 - - - Systems Retrofit of Fuel Couplings, Isolators
(Drawing 8Z10149 Sheet 1 to 7)
The following is the retrofit summary (RS) for Part B:
Note: T o avoid pre- - -loading fuel lines at installation, it is recommended to
follow the following steps given in RS 3 (refer to 8Z10149 sheet 1).
- - - fuel lines and isolators are installed per 8Z10149

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 5 of 110
- - - saddle clamps and/or p- - -clamps are installed onto fuel lines
- - - brackets or intercostals are attached to saddle clamps and/or p- - -clamps
- - - the brackets are fitted onto the ribs and/or stringers
- - - pilot holes are transferred from brackets to structures (ribs & stringers)
- - - fuel lines are removed
- - - brackets are drilled and installed as required per 8Z10150
- - - fuel lines and isolators are re- - -installed as per 8Z10149
--- For inboard vent line - - - 82822016
- - - two isolators (8SC5055- - -001) are installed
- - - existing couplings p/n B0305080 are removed and discarded
- - - existing sleeves are replaced
- - - six anodized couplings p/n B0305144A are installed
- - - four tubes (with B0305118 body) are installed using four nut/retainers p/n
B0305119
- - - sheet metal brackets and P- - -clamps are installed per drawing instructions
(RIB Y42)
- - - bonding jumpers are removed as specified
--- For outboard vent line - - - 82822250
- - - existing couplings p/n B0305080 are removed and discarded
- - - existing sleeves are replaced
- - - four anodized coupling p/n B0305144A are installed
- - - bonding jumpers are removed, as specified
--- For outboard scavenge line - - - 82822250
- - - existing couplings p/n B0305080 are removed and discarded
- - - existing sleeves are replaced
- - - ten anodized couplings p/n B0305144A are installed
- - - bonding jumpers are removed, as specified
--- For inboard scavenge line - - - 82822012
- - - existing sleeves are replaced with new sleeves p/n 14R02- - -12A (FN 62)
- - - existing coupling clamshells B0305080AXXC are inspected for wear and
electrical bonding. B0305080AXXC coupling clamshells that are damaged or
fail bonding check are replaced with B0305144AXXC clamshells.
B0305080AXXC coupling clamshells that pass the wear inspection and
electrical bonding check are re- - -installed
- - - bonding jumpers are removed, as specified

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 6 of 110
--- For engine feed line - - - 82822002
- - - four isolators (8SC5055- - -001) are installed
- - - existing coupling clamshells B0305080AXXC are inspected for wear and
electrical bonding. B0305080AXXC coupling clamshells that are damaged or
fail bonding check are replaced with B0305144AXXC clamshells.
B0305080AXXC coupling clamshells that pass the wear inspection and
electrical bonding check are re- - -installed
- - - four tubes are installed
- - - sheet metal brackets and saddle clamps are installed as required
- - - existing sleeves are replaced with new sleeves p/n 14R02- - -16A (FN 63)
- - - bonding jumpers are removed, as specified
--- For fuel / defuel line - - - 82822008
- - - existing coupling p/n B0305080 are removed and discarded
- - - existing sleeves are replaced
- - - twenty- - -eight anodized couplings p/n B0305144A are installed
- - - sheet metal brackets and saddle clamps are installed as required
- - - pressure testing of each fuel system is done as specified
- - - electrical bonding test procedure is performed as specified
- - - close out.
D. Compliance
Bombardier Inc. highly recommend incorporation of ModSum 4- - -113970 at the
earliest opportunity unless otherwise directed by the operator’s airworthiness
authority.
Transport Canada Airworthiness Directive Pending.
E. Approval
The technical content of this service bulletin has been approved under the authority of
the Transport Canada Civil Aviation (TCCA) Design Approval Organization No: DAO
# 9 3 --- Q --- 0 2 .
This Service Bulletin affects Airworthiness Limitations (AWLs) and/or Damage
T olerance Inspections (DTIs). Reference applicable Post/Pre ModSum 4- - -113970 and
Service Bulletin 84- - -28- - -21 in the Maintenance Requirements Manual.

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 7 of 110
F. M a n p o w e r
It will take an estimated 525.00 man- - -hour s to complete this service bulletin. The
breakdown of the man- - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 40.0
Inspection (Part A)
Procedure in Part A
(Inspection)
125.0
Rectification (Part B1 and B2)
Procedure in Part B1
(Structural Re- - -work)
100.0
Procedure in Part B2
( S y s t e m R e --- w o r k )
200.0
T e s t/R T S 20.0
Close- - -Out 40.0
NOTE: For verification A/C (S/N 4490), additional 75 man- - -hours for inspection
and 100 man- - -hours system and structural rework were required.
This estimate is for direct labour done by an experienced crew and it does not
include, planning, familiarization, cure tim e, part fabrication, tool acquisition or lost
time.
G. Material - - - Price and Availability
The ModKit(s) required to do this service bulletin is/are listed in the table below:
Kit Number Description
8MK4812- - -001 Retrofit Kit- - -Couplings and Isolators
Fuel System, Wing (A/C S/N 4490 Only)
8MK4812- - -003 Retrofit Kit- - -Couplings and Isolators
Fuel System, Wing (A/C S/N 4001,
4003 thru 4489, 4491 thru 4575)

### Page 10

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 8 of 110
Kit Number Description
8MK4812- - -501 Retrofit Kit
NOTE: This kit contains additional parts
that required to be used with
8MK4812 - - -003 kit for A/C
configuration prior to ModSum
4Q113523 (Ref A/C 4001, 4003 thru
4159)
Operators should submit a purchase orde r through the Customer Response Center
(CRC) to the Customer Accounts Service T eam (CAST) at Bombardier Aerospace
Commercial Aircraft division specifying aircraft serial number(s) to:
Bombardier Aerospace
Customer Accounts Services T eam (Mail Stop N11- - -32)
123 Garratt Blvd.
To r o n t o
Ontario
Canada M3K- - -1Y5
E- - -mail addresses:
International: cast.international@aero.bombardier.com
European: ps_emea@aero.bombardier.com
Americas East: cast.americaseast@aero.bombardier.com
Americas West: cast.americaswest@aero.bombardier.com
T elephone:
North America:T oll Free +1- - -844- - -CRC- - -CRC0 (+1- - -844- - -272- - -2720) or direct
+1- - -514- - -855- - -8500
Facsimile:
International: (416) 373- - -5966
Americas East: (416) 373- - -5964
Americas West: (416) 375- - -5965

### Page 11

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 9 of 110
H. T ooling - - - Price and Availability
Description Remarks
Bright Light Source Approved for use in fuel tank
Inspection Mirror Commercially available
Soft Jaw Pliers Commercially available
I. Weight and Balance
A/C T ype and Model Weight (Lb) Arm (Inches)
Moment
(Inches x Lb)
x 0.001
D H C --- 8 --- Q 4 0 0
MODEL 402
KIT - - - 8MK4812- - -001 (A/C
4490 Only)
+7.89 402.96 3.18
D H C --- 8 --- Q 4 0 0
MODELS 401 & 402
KIT - - - 8MK4812- - -003 (A/C
4001, 4003 thru 4118)
+7.89 402.96 3.18
D H C --- 8 --- Q 4 0 0
MODELS 401 & 402
KIT - - - 8MK4812- - -003
POST 4Y122242
(A/C 4119 thru 4159)
+7.78 403.11 3.14
D H C --- 8 --- Q 4 0 0
MODELS 401 & 402
KIT - - - 8MK4812- - -003 (AC
4160 thru 4575)
+7.89 402.96 3.18
D H C --- 8 --- Q 4 0 0
MODELS 401 & 402
KIT·8MK4812- - -501
PRE 4Q113523
(A/C 4001, 4003 thru 4159)
+0.10 389.54 0.04
J. Electrical Load Data
Not affected

### Page 12

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 10 of 110
K. Publications Affected
Aircraft Maintenance Manual PSM 1- - -84- - -2.........................
Aircraft Illustrated Parts Catalog PSM 1- - -84- - -4......................
ModSums Manual PSM 1- - -84- - -12..................................
Weight and Balance Manual (Imperial) PSM 1- - -84- - -8................
Weight and Balance Manual (Metric) PSM 1- - -84- - -8M..................
L. References
Revision ‘C’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8MK4812 1 N
8Z10149 1 T
8Z10149 1.1 R
8Z10149 2 D
8Z10149 3 G
8Z10149 4 F
8Z10149 5 D
8Z10149 6 C
8Z10149 7 A
8Z10150 1 J
8Z10150 2 E
8Z10150 3 C
8Z10174 1 G
8Z10174 1.1 E
8Z10174 2 C
8Z10174 3 C
8Z10174 4 B
8Z10174 5 B
8Z10174 6 D

### Page 13

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 11 of 110
DRAWING REV SHEET
8SC5055 1 C
82822061 1 C
82822061 2 A
82822324 1 C
82822324 2 A
ModSum 4Q113970 Rev. ‘AD’
ModSum 4Q113970 Rev. ‘P’
NOTE: THIS REVISION ‘P’ OF MODSUM TO SUPPORT SERVICE BULLETIN
VERIFICATION ON A/C 4490. PIPE 82822061- - -007 WAS INTRODUCED
TO ADDRESS INTERFERENCE ISSUE THAT OCCURRED DURING
VERIFICATION AND TO SUPPORT A/C 4490 TO RETURN TO
SERVICE.
ModSum 4D113970 Rev. ‘L’
ModSum 4D113970 Rev. ‘F’
NOTE: THIS REVISION ‘F’ OF MODSUM WAS ISSUED TO SUPPORT
SERVICE BULLETIN VERIFICATION ON A/C 4490. BRACKETS P/N
85713736- - -001, 85713735- - -003 AND 85714513- - -103 WERE
REWORKED PER RD 8/4- - -57- - -3807 & RD 8/4- - -57- - -3812 TO
SUPPORT SERVICE BULLETIN VERIFICATION ON A/C 4490.
ModSum 4- - -113970 Rev. ‘AH’
Related ModSum 4- - -113969 Rev. ‘U’
Related ModSum 4Q113969 Rev. ‘G’
Related ModSum 4D113969 Rev. ‘M’
Related ModSum IS4Q2800032 Rev. ‘A’

### Page 14

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 12 of 110
PCA 46423 Revision 10 (for internal reference only)
Transport Canada Airworthiness Directive CF- - -2017- - -04R1
All Operator Message 389
RD 8/4- - -57- - -3807 (applicable on aircraft s/n 4490 only).
RD 8/4- - -57- - -3812 (applicable on aircraft s/n 4490 only).
RD 8/4- - -57- - -3967
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Modification Kit 8MK4812- - -001
NOTE: Kit 8MK4812- - -001 and 8Z10149- - -001 retrofit are applicable for SB
verification aircraft serial number 4490 only. Future A/C should use Kit
8MK4812- - -003 and 8Z10149- - -003 retrofit.
(2) Modification Kit 8MK4812- - -501
NOTE: Additionally, Kit 8MK4812- - -501 is required for aircraft with pre ModSum
4Q113523
configuration (ref A/C 4001 thru 4159).
(3) Modification Kit 8MK4812- - -003
NOTE: Kit 8MK4812- - -003 is applicable for aircraft serial numbers 4001, 4003
thru 4575, except for SB verification A/C serial number 4490.

### Page 15

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 13 of 110
(4) Detailed Kit Content:
Quantity Per Kit
--- 0 0 3 --- 5 0 1 --- 0 0 1
Part Number Description Remarks
2 82822324- - -005 T ube Assy S e eN o t e3
& 5 below
2 82822324- - -003 T ube Assy S e eN o t e3
& 5 below
2 8Z10149- - -107 T ube Assy S e eN o t e3
& 5 below
22 B0205016AD5- - -7S Rivet, Solid Univ
10 10 B0205016AD5- - -5S Rivet, Solid Univ
44 B0205016AD6- - -8S Rivet, Solid Univ
44 B0205016AD5- - -10S Rivet, Solid Univ
77 B0205016DN5- - -8S Rivet, Solid Univ
34 34 B0205016AD5- - -6S Rivet, Solid Univ
44 B0206016CY6 Collar
44 B0206001AG6- - -8 H i --- L i t e
22 85714524- - -001 Bracket Assy
11 85714522- - -002 Bracket Assy
11 85714522- - -001 Bracket Assy
22 85714518- - -003 Bracket Assy
11 85714517- - -002 Bracket Assy
11 85714517- - -001 Bracket Assy
22 85714516- - -003 Intercostal Assy
22 85714515- - -001 Bracket Assy
22 85714514- - -003 Intercostal Assy
22 85714513- - -103 Bracket S e eN o t e4
below
22 85714512- - -001 Bracket Assy
1 85714509- - -004 Bracket Assy
1 85714509- - -003 Bracket Assy
11 85713736- - -001 Bracket Assy S e eN o t e4
below
11 85713735- - -003 Bracket Assy S e eN o t e4
below
11 85713734- - -001 Bracket Assy

### Page 16

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 14 of 110
Quantity Per Kit
--- 0 0 3 --- 5 0 1 --- 0 0 1
RemarksDescriptionPart Number
22 85713733- - -001 Bracket Assy
10 14R02- - -16A Sleeve
10 14R02- - -12A Sleeve
22 B0301005- - -16 Union, Axial
Swage
22 DSC411- - -16- - -0040 T eflon Hose
22 600- - -052- - -1 Clamping Band
2 B0305030- - -16N Clamp
44 NAS1401- - -3D3 Washer, Radius
44 NAS1149F0332P Washer
46 46 NAS1149D0332J Washer
40 2 40 NAS1149D0316J Washer
2 82822326- - -001 T ube Assy
66 NAS1801- - -3- - -11 Screw
44 NAS1801- - -3- - -10 Screw
46 2 46 NAS1801- - -3- - -9 Screw
40 40 NAS1801- - -3- - -8 Screw
15 15 B0305113- - -D03NB16 Clamp, Saddle
88 B0305113- - -D03NB20 Clamp, Saddle
40 40 MS29513- - -117 P a c k i n g , O --- R i n g
22 MS29513- - -215 P a c k i n g , O --- R i n g
56 56 MS29513- - -214 P a c k i n g , O --- R i n g
34 34 MS29513- - -218 P a c k i n g , O --- R i n g
14 14 MS29513- - -224 P a c k i n g , O --- R i n g
10 10 B0305144A12 Coupling Assy
18 18 B0305144A16 Coupling Assy
17 17 B0305144A20 Coupling Assy
77 B0305144A28 Coupling Assy
44 B0305119- - -16A Nut/Retainer
66 8SC5055- - -001 Isolator Assy
11 82822061- - -007 T ube Assy
22 82822312- - -001 T ube Assy
22 82822311- - -001 T ube Assy
11 82822325- - -001 T ube Assy

### Page 17

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 15 of 110
Quantity Per Kit
--- 0 0 3 --- 5 0 1 --- 0 0 1
RemarksDescriptionPart Number
2 82822324- - -001 T ube Assy S e eN o t e3
& 5 Below
11 82822323- - -001 T ube Assy
Ref Ref 8Z10150 R e t r o f i t --- S t r u c t u r eDWG only
Ref Ref 8Z10149 Retrofit Fuel Syst DWG only
Ref Ref 8Z10174 Retrofit Fuel Syst DWG only
NOTE 1: This kit does not contain any article subject to I.A.T .A dangerous
goods regulations. Modification kits may contain substitute hardware
and/or material authorized by Bombardier Inc. Materials Department.
NOTE 2: No drawings will be supplied with this kit. Drawings will be distributed
concurrently with the Service bulletin.
NOTE 3: These parts are applicable for SB verification A/C serial number 4490
only. Parts are shipped separately.
NOTE 4: Brackets P/N 85713736- - -001, 85713735- - -003 and 85714513- - -103
were reworked per RD 8/4- - -57- - -3807 & RD 8/4- - -57- - -3812 to support
service bulletin verification on A/C 4490.
NOTE 5: Part number 82822324- - -001/- - -003/- - -005 were never installed on any
aircraft and were substituted by Part Number 8Z10149- - -107 for A/C
4490.
Listed drawings that are required to complete the kits above can be requested by
writing to the following e- - -mail address:
qseriesdwgrequest@aero.bombardier.com
(5) In addition to the above part(s), the following material(s) are required for the
completion of this service bulletin and may be procured as single items from
Bombardier Aerospace Commercial Aircraft or purchased directly from industry
sources. These parts are not included in the kit and must be supplied by the
operator.

### Page 18

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 16 of 110
Qty. Per Aircraft Part Number Description Remarks
2 AS3209- - -220 Packing
2 MS29513- - -132 P a c k i n g , O --- R i n g
(6) Each consumable product listed in the table below is given its own unique
Product ID Number. The number is used to identify a particular recommended
product, the specifications and the trade names any of which can be used
unless specified otherwise (refer to PSM 1- - -84- - -18 Consumable Products
Manual).
Consumable
Product ID
Number
Quantity
Per Aircraft
Description Remarks
06- - -01A A/R Sealant DHMS S3.01/B2
06- - -02 A/R Sealant DHMS S3.06
C --- 8 0
07- - -29A A/R C10 Alodine B o n d e r i t e M ---
CR1132 Pen
OR
B o n d e r i t e M ---
CR871 Pen
B. Parts Required to Modify Spares
None
C. Special T ools and Equipment Required
Reference Designation Remarks
8Z10150- - -001- - -34 Drill Guide For Installation at Y102D - - -79.7
see Note below
8Z10150- - -003- - -34 Drill Guide For Installation at Y102D - - -117.5
see Note below
8Z10150- - -005- - -34 Drill Guide For Installation at Y102D - - -60.9
see Note below

### Page 19

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 17 of 110
Reference Remarks Designation
8Z10150- - -007- - -34 Drill Guide For Installation at Y102D - - -42.0
see Note below
Biddle DLRO
#247001, or BCD
MI bonding meter,
or equivalent
Digital Low Resistance
Ohmmeter
Commercially Available
BAE Systems P/N
906- - -10247- - -ALL
Loop Resistance T ester
(LRT)
Commercially Available
BAE Systems P/N
906- - -10271- - -3
Accessory Assembly LRT
(Battery Charger for Loop
Resistance T ester)
Commercially Available
Aeroquip P- - -142
or equivalent
Hydraulic Pump, Capable of supplying a
swage pressure of 10,000 ±250
psi
(68947.60 ±1723.69 kPa)
DLT- - -Series
GSB2910013 or
equivalent
Radial Swage Repair Kit Refer to AMM TASK
2 0 --- 2 0 --- 2 2 --- 4 0 0 --- 8 0 1 f o r d e t a i l s
GSB1216012 Kit, Nitrogen Charging and
Gauging
Low Pressure, 0 to 500 psi (0 to
3447 kPa)
DAT06AETA1016 Axial Swage T ool (1 inch) Refer to AMM TASK2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r d e t a i l s
N/A
Manual or Hydraulic Pump,
Maximum Pressure 10000
psi
Commercially Available
or Available from Bombardier
DAT06AEMG1016 Marking T emplate Refer to AMM TASK2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r d e t a i l s
DAT06AEIG1016 Flat Inspection Gauge Refer to AMM TASK2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r d e t a i l s
D9849- - -13- - -16 Stem Assembly Refer to AMM TASK2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r d e t a i l s
D9849- - -15 Deburring T ool Refer to AMM TASK2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r d e t a i l s
D12632- - -001 T ube Cutter Refer to AMM TASK2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r d e t a i l s

### Page 20

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 18 of 110
Reference Remarks Designation
N/A
Fuel Lines Pressure T ester Commercially Available
(to Apply Air Pressure of
Maximum 10 psi)
DAT06AEMG1016
Marking T emplate Refer to AMM TASK
2 0 --- 2 0 --- 2 4 --- 4 0 0 --- 8 0 1 f o r D e t a i l s
GSB2840002
Digital Fuel Quantity T est
Set
Refer to AMM TASK
2 8 --- 4 0 --- 3 1 --- 7 2 0 --- 8 0 1 f o r d e t a i l s
GSB2840008A
Adapter Cable Set for
D8- - -400 Fuel Quantity T est
Refer to AMM TASK
2 8 --- 4 0 --- 3 1 --- 7 2 0 --- 8 0 1 f o r d e t a i l s
TS.790.10.50 MK12 Adapter Fitting orEquivalent Commercially Available fromBombardier
TS.790.10.50 MK16 Adapter Fitting orEquivalent Commercially Available fromBombardier
TS.790.10.50 MK20 Adapter Fitting orEquivalent Commercially Available fromBombardier
TS.790.10.40 MK12 Plug Fitting or Equivalent Commercially Available fromBombardier
TS.790.10.40 MK16 Plug Fitting or Equivalent Commercially Available fromBombardier
TS.790.10.40 MK20 Plug Fitting or Equivalent Commercially Available fromBombardier
N/A Digital Calipers Commercially Available
N/A Digital Vernier Micrometer Commercially Available
N/A Optical Micrometer Commercially Available
N/A Depth Gauge Commercially Available
N/A Borescope with measuring capabilitiesCommercially Available
N/A Magnifying Glass 10X Commercially Available
NOTE: Drill blocks are to be ordered by contacting the Q- - -Series Action
Center. Drill blocks are reusable.

### Page 21

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 19 of 110
D. Existing Parts Accountability
Refer to T able 3, 4, 5, 6 and 7 (drawing 8Z10174).
Refer to T able 1 (drawing 8Z10150 sheet 1).
Refer to T able 1, 2, 3, 4 and 5 (drawing 8Z10149).
3. ACCOMPLISHMENT INSTRUCTIONS
If it is not possible to complete all the instructions of this service bulletin because of the
configuration of the aircraft, speak with a representative of Bombardier in the CRC at
1- - -844- - -272- - -2720 (1- - -844- - -CRC- - -CRC0) or email at thd.qseries@aero.bombardier.comfor
analysis and to get an approved disposition to complete this service bulletin.
A . J o b S e t --- U p
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALL Y
RETRACT . THIS CAN CAUSE INJURIES TO PERSONS AND
DAMAGE TO THE EQUIPMENT .
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS
CAN ACCIDENTALL Y CLOSE THE LANDING GEAR DOORS. THIS
CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO THE
EQUIPMENT .
WARNING: OBEY ALL THE FUEL SAFETY PRECAUTIONS WHEN YOU DO
WORK ON THE FUEL SYSTEM AND/OR A FUEL SYSTEM
COMPONENT . IF YOU DO NOT YOU CAN CAUSE INJURIES TO
PERSONS AND/OR DAMAGE TO EQUIPMENT .
NOTE 1: Make sure highest standard of fit, form and function is maintained.

### Page 22

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 20 of 110
NOTE 2: When doing structural rework make sure to deburr affected rivet holes
then apply a layer of alodine and touch up with epoxy chromate primer
as required.
NOTE 3: Make sure to put a protective cover on any disconnected electrical
connector or any tube, hose, duct and/or line.
(1) Placard and select all aircraft electrical power to OFF . Obey all relevant
W A R N I N G S a n d C A U T I O N S ( r e f e r t o A M M T A S K 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 a n d
24- - -00- - -00- - -910- - -801).
(2) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
(3) Make sure the nose gear ground lock is engaged.
(4) Set wheel chocks in front and behind the landing gear tires.
(5) Defuel the aircraft (refer to AMM TASK 12- - -10- - -28- - -650- - -802).
( 6 ) M a k es u r et od e - - - e n e r g i z et h ea i r c r a f te l e c t r i c a ls y s t e m( r e f e rt oA M MT A S K
24- - -00- - -00- - -861- - -802).
(7) Set up work platforms or ladders around and/or under the left (and/or right) wing
to permit access to the fuel tanks. Make sure that the work platforms or ladders
are electrically grounded.
(8) Make sure to obey the fuel system safety precautions (refer to AMM TASK
28- - -00- - -00- - -910- - -801).
(9) Obey the electrical/electronic safety precautions (refer to AMM TASK
24- - -00- - -00- - -910- - -801).
(10) Obey the electrostatic discharge safety precautions (refer to AMM TASK
24- - -00- - -00- - -910- - -802).
(11) Remove the left and/or right wing panels that follow:
CAUTION: DRAIN THE FUEL TANK BEFORE YOU REMOVE THE ACCESS
PANELS. IF YOU DO NOT DO THIS, YOU CAN CAUSE DAMAGE TO

### Page 23

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 21 of 110
THE WING STRUCTURE.
(12) Prepare the left and right wing fuel tanks for access (refer to AMM TASK
28- - -10- - -00- - -840- - -801).
(13) Use only cotton cloth or a natural sponge to soak up the remaining fuel.
ACCESS DESIGNATION
521AT Dry Bay Fuel Access Panels
521BT (and/or 621BT right wing) Dry Bay Fuel Access Panels
522AT (and/or 622AT right wing) Wet Bay Fuel Access Panels
522BT (and/or 622BT right wing) Wet Bay Fuel Access Panels
522CT (and/or 622CT right wing) Wet Bay Fuel Access Panels
523AT (and/or 623AT right wing) Wet Bay Fuel Access Panels
524AT (and/or 624AT right wing) Outer Wing Fuel Access Panels
525AT (and/or 625AT right wing) Outer Wing Fuel Access Panels
524BT (and/or 624BT right wing) Outer Wing Fuel Access Panels
524CT (and/or 624CT right wing) Outer Wing Fuel Access Panels
524DT (and/or 624DT right wing) Outer Wing Fuel Access Panels
524ET (and/or 624ET right wing) Outer Wing Fuel Access Panels
524FT (and/or 624FT right wing) Outer Wing Fuel Access Panels
(a) For removal of the dry bay fuel access panel 521AT , 521BT (and/or 621BT right
wing) (refer to AMM TASK 57- - -11- - -06- - -000- - -802).
(b) For removal of the wet bay fuel access panel (refer to AMM TASK
57- - -11- - -01- - -000- - -801).
(c) For removal of the outer wing fuel access panels (refer to AMM TASK
57- - -21- - -01- - -000- - -801).
(14) Remove the fuel fumes (refer to AMM TASK 28- - -10- - -00- - -840- - -802).

### Page 24

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 22 of 110
WARNING: FUEL PLUMBING SYSTEMS ARE DESIGNED WITH ELECTRICAL
BONDING FEATURES INCLUDING BONDING JUMPERS. SELF
BONDING COUPLINGS, CONDUCTIVE FITTINGS AND COMPONENTS
WITH CONDUCTIVE INTERFACES. THESE DESIGN FEATURES ARE
CLASSIFIED AS CRITICAL DESIGN CONFIGURATION CONTROL
LIMITATION (CDCCL) ITEMS. THE INTEGRITY OF THESE CRITICAL
DESIGN FEATURES MUST BE MAINTAINED TO ENSURE THAT
UNSAFE CONDITIONS DO NOT DEVELOP THROUGH MAINTENANCE.
B. Procedure
CAUTION: CARE SHOULD BE TAKEN WHEN WORKING INSIDE THE FUEL
TANK TO PREVENT UNNECESSARY DAMAGE TO THE TUBE
ASSEMBL Y AND SURROUNDING STRUCTURE.
PART A - - - INSPECTION OF FUEL TUBE END FERRULES AND FUEL COMPONENT
END FERRULES FOR WEAR (DRAWING 8Z10174 SHEET 1 TO 6)
Instructions for Inspection of Fuel T ube End Ferrules and Fuel Component End
Ferrules for Wear
Wear is generated by wing bending and vibration which can cause the bonding wires
of the coupling to move relative to the tube and fuel component end ferrule. Wear
may occur at multiple locations on the ferrule corresponding to the contact points of
bonding wire with the ferrule (refer to Figure 1 and section R- - -R on drawing 8Z10174
sheet 1.1).
There are typically two types of ferrule wear due to contact with the coupling bonding
wires:
1. Scuffing 2. Grooves
--- Scuffing is a more uniform wear distributed over a larger area, typically less than 0.004
inches (radial) in depth, similar to that shown in section T- - -T on drawing 8Z10174
sheet 1.1. There may be some cases where the scuffing wear exceeds 0.004” (radial)
in depth.

### Page 25

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 23 of 110
--- Grooves are very localized areas of wear which may vary in depth, similar to that
shown in section U- - -U on drawing 8Z10174 sheet 1.1.
O --- r i n g f l a n g e : W e a r c a n a l s o o c c u r t o t h e f e r r u l e O --- r i n g f l a n g e ( r e f e r s e c t i o n L --- L
on drawing 8Z10174 sheet 1.1 for damage criteria).

### Page 26

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 24 of 110
Refer to Drawing 8Z10174 Sheet 1.1

### Page 27

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 25 of 110
Refer to Drawing 8Z10174 Sheet 1.1
Inspection of Refuel/Defuel System: Installation - - - 82822008 (A1)
(Refer to T able 4 and drawing 8Z10174 sheet 3)
(1) Inspect the fuel tube end ferrules and component end ferrules at each coupling
location (refer to T able 4) for scuffing, groove wear and O --- r i n g f l a n g ewear
(refer to drawing 8Z10174 sheet 1 step A1 and applicable views and notes on the
drawing 8Z10174 sheet 3) as follows:

### Page 28

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 26 of 110
Scuffing Wear
(a) If possible, perform the following steps with tubes and components in situ.
Otherwise remove the tube and component from the tank.
(b) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
(c) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).
(d) Inside the collector tank and dry bay area, if the depth of the scuff wear is greater
than 0.012 inches (radial) at any location of the tube ferrule (see section T- - -T on
the drawing 8Z10174 sheet 1.1), repair tube (cut/re- - -swage) or replace tube per
instructions on the drawing 8Z10174 sheet 3.
(e) In other inspection locations, if the depth of the scuff wear is greater than 0.007
inches (radial) at any location of the tube ferrule (see section T- - -T on the
drawing 8Z10174 sheet 1.1), repair tube (cut/re- - -swage) or replace tube per
instructions on the drawing 8Z10174 sheet 3.
(f) Inside the collector tank and dry bay area, if the depth of the scuff wear is greater
than 0.012 inches (radial) at any location of the fuel component ferrule (see
section T- - -T on the drawing 8Z10174 sheet 1.1), replace the fuel component
per AMM TASK (refer to T able 2 on the drawing 8Z10174 sheet 1.1 for the list of
AMM tasks).
(g) In other inspection locations, if the depth of the scuff wear is greater than 0.007
inches (radial) at any location of the fuel component ferrule (see section T- - -T on
the drawing 8Z10174 sheet 1.1), replace the fuel component per AMM TASK
(refer to T able 2 on the drawing 8Z10174 sheet 1.1 for the list of AMM tasks).

### Page 29

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 27 of 110
(h) Inside the collector tank and dry bay area, if the depth of the scuff wear is less
than or equal to 0.012 inches (radial) at any location on the ferrule, do the blend
repair at each wear location on the ferrule per blending instructions (refer to
AMM TASK 28- - -00- - -00- - -220- - -802).
(i) In other inspection locations, if the depth of the scuff wear is less than or equal to
0.007 inches (radial) at any location on the ferrule, do the blend repair at each
wear location on the ferrule per blending instructions (refer to Note B1 on the
drawing 8Z10174 sheet 1.1).
Groove Wear
(a) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
NOTE: Wear in the shape of a groove usually requires blending which may
require the tube and fuel component to be removed from fuel tank
(refer to tube removal/repair instructions on drawing 8Z10174 sheet 3
and T able 2 on sheet 1.1).
(b) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).
(c) Inside the collector tank and dry bay area, if the depth of the groove wear is
greater than 0.012 inches (radial) at any location on the tube ferrule (see section
U- - -U on the drawing 8Z10174 sheet 1.1), repair tube (cut/re- - -swage) or replace
tube per instructions on the drawing 8Z10174 sheet 3.
(d) In other inspection locations, if the depth of the groove wear is greater than
0.007 inches (radial) at any location on the tube ferrule (see section U- - -U on the
drawing 8Z10174 sheet 1.1), repair tube (cut/re- - -swage) or replace tube per
instructions on the drawing 8Z10174 sheet 3.

### Page 30

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 28 of 110
(e) Inside the collector tank and dry bay area, if the depth of the groove wear is
greater than 0.012 inches (radial) at any location of the fuel component ferrule
(see section U- - -U on the drawing 8Z10174 sheet 1.1), replace the fuel
component per AMM TASK (refer to T able 2 on the drawing 8Z10174 sheet 1.1
for the list of AMM tasks).
(f) In other inspection locations, if the depth of the groove wear is greater than
0.007 inches (radial) at any location of the fuel component ferrule (see section
U- - -U on the drawing 8Z10174 sheet 1.1), replace the fuel component per AMM
TASK (refer to T able 2 on the drawing 8Z10174 sheet 1.1 for the list AMM tasks).
(g) Inside the collector tank and dry bay area, if the depth of the groove wear is less
than or equal to 0.012 inches (radial), do the blend repair at each wear location
of the ferrule per blending instructions (refer to AMM TASK
28- - -00- - -00- - -220- - -802).
(h) In other inspection locations, if the depth of the groove wear is less than or equal
to 0.007 inches (radial), do the blend repair at each wear location of the ferrule
per blending instructions (refer to Note B1 on the drawing 8Z10174 sheet 1.1).
Ferrule O - - -ring Flange Wear
(a) Inspect O- - -ring flanges on each tube ferrule. If damage is greater than or equal
to 0.012 inches (radial) limits, shown in figure 4 and section L- - -L on the drawing
8Z10174 sheet 1.1 Repair (cut/re- - -swage) the tube or replace per instructions
on drawing 8Z10174 sheet 3.
(b) Inspect O- - -ring flanges for each fuel component ferrule. If the depth of the wear
is greater than or equal to 0.012 inches (radial) at any location of the fuel
component ferrule flange (see section L- - -L on the drawing 8Z10174 sheet 1.1),
replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM tasks).
(c) If ferrule O- - -ring flange wear is less than 0.012 inches (radial), see section L- - -L
and Figure 4 on the drawing 8Z10174 sheet 1.1. The ferrule is acceptable unless
groove and scuff wear criteria (above) is not satisfied.
(d) Re- - -install tubes and fuel components as required (refer to drawing 8Z10174
sheet 3 for instructions and T able 2 on sheet 1.1).

### Page 31

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 29 of 110
T able 4 - - - Drawing 8Z10174 Sheet 3

### Page 32

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 30 of 110
(Refer to Drawing 8Z10174 Sheet 3)

### Page 33

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 31 of 110
Inspection of Engine Fuel Feed System: Installation - - - 82822002 (A2)
(Refer to T able 3 and drawing 8Z10174 sheet 2)
CAUTION: Prior to inspection of fuel tube end ferrules and fuel components
end ferrules, complete B0305080 coupling inspection at location 1
to 6 (LHS) and 7 to 12 (RHS) on 8Z10174 sheet 2, as per the
instruction Note D on 8Z10174 sheet 1.1.
(1) Inspect the fuel tube end ferrules and component end ferrules at each coupling
location for scuff and groove wear and O --- r i n g f l a n g ewear (refer to drawing
8Z10174 sheet 1 step A2 and drawing 8Z10174 sheet 2) as follows:
Scuffing Wear
(a) If possible, perform the following steps with tubes and components in situ.
Otherwise remove the tube and component from the tank.
(b) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
(c) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).
(d) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the tube ferrule (see section T- - -T on the drawing 8Z10174 sheet 1.1), repair
tube (cut/re- - -swage) or replace tube per instructions on the drawing 8Z10174
sheet 2.
(e) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the fuel component ferrule (see section T- - -T on the drawing 8Z10174 sheet
1.1), replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM
tasks).

### Page 34

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 32 of 110
T able 2 (List of AMM T asks) - - - Drawing 8Z10174 Sheet 1.1
(f) If the depth of the scuff wear is less than or equal to 0.012 inches (radial) at any
location on the ferrule, do the blend repair at each wear location on the ferrule
per blending instructions (refer to Note B2 on the drawing 8Z10174 sheet 1.1 for
additional instructions).
Groove Wear
(a) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
NOTE: Wear in the shape of a groove usually requires blending which may
require the tube and fuel component to be removed from fuel tank
(refer to tube removal/repair instructions on drawing 8Z10174 sheet 2
and T able 2 on sheet 1.1).
(b) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).

### Page 35

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 33 of 110
(c) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location on the tube ferrule (see section U- - -U on the drawing 8Z10174 sheet
1.1), repair tube (cut/re- - -swage) or replace tube per instructions on the drawing
8Z10174 sheet 2.
(d) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location of the fuel component ferrule (see section U- - -U on the drawing
8Z10174 sheet 1.1), replace the fuel component per AMM TASK (refer to T able 2
on the drawing 8Z10174 sheet 1.1).
(e) If the depth of the groove wear is less than or equal to 0.012 inches (radial), do
the blend repair at each wear location per blending instructions (refer to Note
B2 on the drawing 8Z10174 sheet 1.1).
Ferrule O - - -ring Flange Wear
(a) Inspect O- - -ring flanges on each tube ferrule. If damage is greater than or equal
to 0.012 inches (radial) limits shown in figure 4 and section L- - -L on the drawing
8Z10174 sheet 1.1, repair (cut/re- - -swage) the tube or replace per instructions
on drawing 8Z10174 sheet 2.
(b) Inspect the O- - -ring flanges for each fuel component ferrule. If the depth of the
wear is greater than or equal to 0.012 inches (radial) at any location of the fuel
component ferrule flange (see section L- - -L on the drawing 8Z10174 sheet 1.1),
replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM tasks).
(c) If O- - -ring flange wear is less than 0.012 inches (radial), see section L- - -L and
figure 4 on the drawing 8Z10174 sheet 1.1. The ferrule is acceptable unless
groove and scuff wear criteria (above) is not satisfied.
(d) Re- - -install tubes and fuel components as required (refer to drawing 8Z10174
sheet 2 and T able 2 sheet 1.1).

### Page 36

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 34 of 110
T able 3 - - - Drawing 8Z10174 Sheet 2

### Page 37

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 35 of 110
(Refer to Drawing 8Z10174 Sheet 2)

### Page 38

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 36 of 110
Inspection of Outer Wing Vent and Scavenge system: Installation - - - 82822250
(A3)
(Refer to T able 7 and drawing 8Z10174 sheet 6)
(1) Inspect the fuel tube end ferrules and fuel component end ferrules at each
coupling location for scuffing, groove wear and O --- r i n g f l a n g ewear (refer to
drawing 8Z10174 sheet 1 step A3 and drawing 8Z10174 sheet 6) as follows:
Scuffing Wear
(a) If possible, perform the following steps with tubes and components in situ.
Otherwise remove the tube and component from the tank.
(b) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
(c) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).
(d) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the tube ferrule (see section T- - -T on the drawing 8Z10174 sheet 1.1), repair
tube (cut/re- - -swage) or replace tube per instructions on the drawing 8Z10174
sheet 6.
(e) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the fuel component ferrule (see section T- - -T on the drawing 8Z10174 sheet
1.1), replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM
tasks).

### Page 39

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 37 of 110
T able 2 (List of AMM T asks) - - - Drawing 8Z10174 Sheet 1.1
(f) If the depth of the scuff wear is less than or equal to 0.012 inches (radial) at any
location on the ferrule, do the blend repair at each wear location on the ferrule
per blending instructions (refer to Note B2 on the drawing 8Z10174 sheet 1.1 for
additional instructions).
Groove Wear
(a) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
NOTE: Wear in the shape of a groove usually requires blending which may
require the tube and fuel component to be removed from fuel tank
(refer to tube removal/repair instructions on drawing 8Z10174 sheet 6
and table 2 on sheet 1.1).
(b) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).

### Page 40

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 38 of 110
(c) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location on the tube ferrule (see section U- - -U on the drawing 8Z10174 sheet
1.1), repair tube (cut/re- - -swage) or replace tube per instructions on the drawing
8Z10174 sheet 6.
(d) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location of the fuel component ferrule (see section U- - -U on the drawing
8Z10174 sheet 1.1), replace the fuel component per AMM TASK (refer to T able 2
on the drawing 8Z10174 sheet 1.1 for the list of AMM tasks).
(e) If the depth of the groove wear is less than or equal to 0.012 inches (radial), do
the blend repair at each wear location on the ferrule per blending instructions
(refer to Note B2 on the drawing 8Z10174 sheet 1.1).
Ferrule O - - -ring Flange Wear
(a) Inspect O- - -ring flanges on each tube ferrule. If damage is greater than or equal
to 0.012 inches (radial) limits shown in figure 4 and section L- - -L on the drawing
8Z10174 sheet 1.1, repair (cut/re- - -swage) the tube or replace per instructions
on drawing 8Z10174 sheet 6.
(b) Inspect o- - -ring flange for each fuel c omponent ferrule. If the depth of the wear is
greater than or equal to 0.012 inches (radial) at any location of the fuel
component ferrule flange (see section L- - -L on the drawing 8Z10174 sheet 1.1),
replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM tasks).
(c) If O- - -ring flange wear is less than 0.012 inches (radial), see section L- - -L and
figure 4 on the drawing 8Z10174 sheet 1.1. The ferrule is acceptable unless
groove and scuff wear criteria (above) is not satisfied.
(d) Re- - -install tubes and fuel components as required (refer to drawing 8Z10174
sheet 6 and T able 2 sheet 1.1).

### Page 41

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 39 of 110
T able 7 - - - Drawing 8Z10174 Sheet 6

### Page 42

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 40 of 110
Refer to Drawing 8Z10174 Sheet 6

### Page 43

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 41 of 110
Inspection of Inboard Vent Line: Installation - - - 82822016 (A4)
(Refer to T able 6 and drawing 8Z10174 Sheet 5)
(1) Inspect the fuel tube end ferrules and fuel component end ferrules at each
coupling location for scuffing, groove wear and O --- r i n g f l a n g ewear (refer to
drawing 8Z10174 sheet 1.1 step A4 and drawing 8Z10174 sheet 5) as follows:
Scuffing Wear
(a) If possible, perform the following steps with tubes and components in situ.
Otherwise remove the tube and component from the tank.
(b) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
(c) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).
(d) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the tube ferrule (see section T- - -T on the drawing 8Z10174 sheet 1.1), repair
tube (cut/re- - -swage) or replace tube per instructions on the drawing 8Z10174
sheet 5 and T able 2 on sheet 1.1.
(e) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the fuel component ferrule (see section T- - -T on the drawing 8Z10174 sheet
1.1), replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM
tasks).

### Page 44

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 42 of 110
T able 2 (List of AMM T asks) - - - Drawing 8Z10174 Sheet 1.1
(f) If the depth of the scuff wear is less than or equal to 0.012 inches (radial) at any
location on the ferrule, do the blend repair at each wear location on the ferrule
per blending instructions (refer to Note B2 on the drawing 8Z10174 sheet 1.1 for
additional instructions).
Groove Wear
(a) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
NOTE: Wear in the shape of a groove usually requires blending which may
require the tube and fuel component to be removed from fuel tank
(refer to tube removal/repair instructions on drawing 8Z10174 sheet 5).
(b) Using appropriate tooling, measure and record ( for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).

### Page 45

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 43 of 110
(c) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location on the tube ferrule (see section U- - -U on the drawing 8Z10174 sheet
1.1), repair tube (cut/re- - -swage) or replace tube per instructions on the drawing
8Z10174 sheet 5.
(d) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location of the fuel component ferrule (see section U- - -U on the drawing
8Z10174 sheet 1.1), replace the fuel component per AMM TASK (refer to T able 2
on the drawing 8Z10174 sheet 1.1 for the list of AMM tasks).
(e) If the depth of the groove wear is less than or equal to 0.012 inches (radial), do
the blend repair at each wear location per blending instructions (refer to Note
B2 on the drawing 8Z10174 sheet 1.1).
Ferrule O - - -ring Flange Wear
(a) Inspect O- - -ring flanges on each tube ferrule. If damage is greater than or equal
to 0.012 inches (radial) limits shown in figure 4 and section L- - -L on the drawing
8Z10174 sheet 1.1, repair (cut/re- - -swage) the tube or replace per instructions
on drawing 8Z10174 sheet 5.
(b) Inspect O- - -ring flanges for each fuel component ferrule. If the depth of the wear
is greater than or equal to 0.012 inches (radial) at any location of the fuel
component ferrule flange (see section L- - -L on the drawing 8Z10174 sheet 1.1),
replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM tasks).
(c) If O- - -ring flange wear is less than 0.012 inches (radial), see section L- - -L and
figure 4 on the drawing 8Z10174 sheet 1.1. The ferrule is acceptable unless
groove and scuff wear criteria (above) is not satisfied.
(d) Re- - -install tubes and fuel components as required (refer to drawing 8Z10174
sheet 5 and T able 2 on sheet 1.1).

### Page 46

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 44 of 110
T able 6 - - - Drawing 8Z10174 Sheet 5
(Refer to Drawing 8Z10174 Sheet 5)

### Page 47

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 45 of 110
Inspection of Inboard Scavenge and Motive Flow System - - - 82822012 (A5)
(Refer to T able 5 and drawing 8Z10174 sheet 4)
CAUTION: Prior to inspection of fuel tube end ferrules and fuel component end
ferrules, complete B0305080 coupling inspection as per the
instruction Note D on drawing 8Z10174 sheet 1.1.
(1) Inspect the fuel tube end ferrules and fuel component end ferrules at each
coupling location for scuffing and groove wear and O --- r i n g f l a n g ewear (refer
to drawing 8Z10174 sheet 1.1 step A5 and drawing 8Z10174 sheet 4) as follows:
Scuffing Wear
(a) If possible, perform the following steps with tubes and components in situ.
Otherwise remove the tube and component from the tank.
(b) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
(c) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).
(d) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the tube ferrule (see section T- - -T on the drawing 8Z10174 sheet 1.1), repair
tube (cut/re- - -swage) or replace tube per instructions on the drawing 8Z10174
sheet 4.
(e) If the depth of the scuff wear is greater than 0.012 inches (radial) at any location
of the fuel component ferrule (see section T- - -T on the drawing 8Z10174 sheet
1.1), replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM
tasks).

### Page 48

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 46 of 110
T able 2 (List of AMM T asks) - - - Drawing 8Z10174 Sheet 1.1
(f) If the depth of the scuff wear is less than or equal to 0.012 inches (radial) at any
location on the ferrule, do the blend repair at each wear location on the ferrule
per blending instructions (refer to Note B2 on the drawing 8Z10174 sheet 1.1 for
additional instructions).
Groove Wear
(a) Clean external surface of end ferrules (refer to AMM TASK
20- - -20- - -06- - -110- - -804 and AMM TASK 51- - -27- - -01- - -110- - -801).
NOTE: Wear in the shape of a groove usually requires blending which may
require the tube and fuel component to be removed from fuel tank
(refer to tube removal/repair instructions on drawing 8Z10174 sheet 4).
(b) Using appropriate tooling, measure and record (for A/C record only) the depth
of the wear on the surface of the ferrule.
NOTE: Suggested measurement and support equipment include but is not
limited to digital calipers, digital vernier micrometer, optical micrometer,
depth gauge boroscope with measuring capabilities, magnifying glass
(10X).

### Page 49

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 47 of 110
(c) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location on the tube ferrule (see section U- - -U on the drawing 8Z10174 sheet
1.1), repair tube (cut/re- - -swage) or replace tube per instructions on the drawing
8Z10174 sheet 4.
(d) If the depth of the groove wear is greater than 0.012 inches (radial) at any
location of the fuel component ferrule (see section U- - -U on the drawing
8Z10174 sheet 1.1), replace the fuel component per AMM TASK (refer to T able 2
on the drawing 8Z10174 sheet 1.1 for the list of AMM tasks).
(e) If the depth of the groove wear is less than or equal to 0.012 inches (radial), do
the blend repair at each wear location per blending instructions (refer to Note
B2 on the drawing 8Z10174 sheet 1.1).
Ferrule O - - -ring Flange Wear
(a) Inspect O- - -ring flanges on each tube ferrule. If damage is greater than or equal
to 0.012 inches (radial) limits shown in figure 4 and section L- - -L on the drawing
8Z10174 sheet 1.1, repair (cut/re- - -swage) the tube or replace per instructions
on drawing 8Z10174 sheet 4.
(b) Inspect O- - -ring flanges for each fuel component ferrule flange. If the depth of
the wear is greater than or equal to 0.012 inches (radial) at any location of the
fuel component ferrule flange (see section L- - -L on the drawing 8Z10174 sheet
1.1), replace the fuel component per AMM TASK (refer to T able 2 on the drawing
8Z10174 sheet 1.1 for the list of AMM tasks).
(c) If O- - -ring flange wear is less than 0.012 inches (radial), see section L- - -L and
figure 4 on the drawing 8Z10174 sheet 1.1. The ferrule is acceptable unless
groove and scuff wear criteria (above) is not satisfied.
(d) Re- - -install tubes and fuel components as required (refer to drawing 8Z10174
sheet 4 and T able 2 on sheet1.1).

### Page 50

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 48 of 110
T able 5 - - - Drawing 8Z10174 Sheet 4

### Page 51

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 49 of 110
(Refer to Drawing 8Z10174 Sheet 4)

### Page 52

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 50 of 110
Note B1 (From the drawing 8Z10174 sheet 1.1)

### Page 53

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 51 of 110
Note B2 (From the drawing 8Z10174 sheet 1.1)

### Page 54

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 52 of 110
Application of C10 Alodine (Refer 8Z10174 Sheet 1.1)
Note C (From the drawing 8Z10174 sheet 1.1 )

### Page 55

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 53 of 110
PART B - - - RETROFIT OF FUEL COUPLINGS, ISOLATORS AND STRUCTURAL
PROVISIONS (SYSTEM DRAWING 8Z10149 SHEET 1 TO 7 AND STRUCTURAL
DRAWINGS DRAWINGS 8Z10150 SHEET 1 TO 3)
PART B is divided into PART B1and PART B2 as outlined below:
Part B1 - - - Structural Rework (Drawing 8Z10150 Sheet 1- - - 3)
Part B2 - - - System Rework (Drawing 8Z10149 Sheet 1- - - 7)
This retrofit reworks the following fuel system installations.
- - - 82822002 - - - Engine Fuel Feed, Wing (refer to drawing 8Z10149 sheet 2)
- - - 82822008 - - - Refuel / Defuel, Center Wing (refer to drawing 8Z10149 sheet 3)
- - - 82822016 - - - Fuel Vent Line (refer to drawing 8Z10149 sheet 4)
- - - 82822250 - - -Fuel System, Outer Wing Vent and Scavenge (refer to drawing 8Z10149
sheet 5)
- - - 82822012 - - - Fuel System, Inboard Scavenge and Motive Flow (refer to drawing
8Z10149 sheet 7)
NOTE: Structural retrofit per drawing 8Z10150 (ModSum 4D113970) is a
co- - -requisite to this retrofit.
NOTE: T orque fasteners (refer to AMM TASK 20- - -10- - -01- - -430- - -801).
NOTE: Installation of fluid lines and fittings (refer to AMM TASK
20- - -20- - -11- - -400- - -801).
NOTE: If required, repair fuel lines per AMM TASK 20- - -20- - -24- - -400- - -801, or
AMM TASK20- - -20- - -22- - -400- - -801.

### Page 56

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 54 of 110
Part B1 - - - Structural Rework (Drawing 8Z10150 Sheet 1- - - 3)
Structural Rework for Engine Feed System and Refuel/Defuel System
CAUTION NOTE: Be extra careful when you do structural rework, to avoid
damage to the adjacent structure inside the tanks.
(1) Do the structural rework (refer to the applicable notes and the views in drawing
8Z10150 sheet 1, 2 and 3 and the applicable instructions that follow:
NOTE: Refer to the T able 1 (below) and the drawing 8Z10150 sheet 1 for
structural parts disposition.
(2) Refer to drill guide instructions at the end of this section to assist with the
structural re- - -work at Y102D - - -60.9, Y102D - - -79.7, Y102D - - -117.5 and Y102D
- - -42.0.
NOTE: Prior to structural rework installation of Intercostal Assy - - - FN 13, carry
out electrical bonding check per Flag note N (drawing 8Z10150
sheet 1).
NOTE: Following structural rework and prio r to installation of tube assemblies
per 8Z10149, carry out electrical bonding checks per Note 18 (drawing
8Z10150 sheet 1) and Figure 28 (close- - -out).

### Page 57

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 55 of 110
TABLE 1 - - - Drawing 8Z10150 Sheet 1
ALL FLAGNOTES AND PART NUMBERS (REFER TO 8Z10150 SHEET 1 AND TABLE 1)

### Page 58

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 56 of 110
Structural Rework Instructio ns (Refer to 8Z10150 Sheet 1, 2 and 3)
General Notes - - - Drawing 8Z10150 Sheet 1

### Page 59

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 57 of 110
Structural Rework Instructio ns (Refer to 8Z10150 Sheet 1, 2 and 3)
ELECTRICAL BONDING TEST POINT
INTERCOSTAL ASSEMBL Y
85714514- - - 003
(REFER TO DRAWING 8Z10150 SHEET 2)

### Page 60

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1
S . B . 8 4 --- 2 8 --- 2 131 Aug 2017
Revision ‘C’ 13 Jul 2018 PMPage 58 of 110
Structural Rework Instructio ns (Refer to 8Z10150 Sheet 1, 2 and 3)
- - - Drawing 8Z10150 Sheet 1
Note: Follow the drilling instructions given in the next three pages to drill the
holes at applicable locations, before plugging the holes.
(REFER TO FIGURE 28 IN CLOSE OUT SECTION)

The text continues at https://openairdocs.org/service-documents/bombardier/sb-84-28-21/file/e337ed6194af.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
