# Bombardier Service Bulletin 84-32-108

Copy: Revision A ("U.S. DOT/FAA - 84-32-108 R0, RA"), 26 pages: PDF https://openairdocs.org/files/sha256/d8/9c/d89c0d0a0d33e321b4419eeafb2f58156225ed61eb1b6cb1e8cae29595419058; text https://openairdocs.org/service-documents/bombardier/sb-84-32-108/file/d89c0d0a0d33.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2013-0689; AD 2014-05-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-32-108
- Latest revision known: 84-32-108, Revision A, dated October 1, 2012 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-32-108

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2014-05-18](https://openairdocs.org/ad/2014-05-18.md), effective Apr 22, 2014: Revision A

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-84-32-108/proposed.md).

## Text (26 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2013-0689; AD 2014-05-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

T x L t r S B 8 4 --- 3 2 --- 1 0 8
Page 1 of 2
Revision ‘A’ 01 Oct 2012
D H C --- 8 ( D A S H 8 )
S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
Landing Gear - - - MLG Door Actuator - - - Incorrect Scraper Installation - - - Special
Inspection and Rectification
This page transmits Bombardier PDF Merged Document SB 84- - -32- - -108 Revision
‘A’ dated: 01 Oct 2012 & Goodrich VSB 46830- - -32- - -106 Revision 1 dated: Sep
12/12
This service bulletin is re- - -issued in its entirety for the reasons that follow:
--- t h eEffectivity section is revised to include MLG door actuator affected serial
numbers
--- t h eDescription, Material - - - Price and Availability, Existing Parts Accountability
and ACCOMPLISHMENT INSTRUCTIONS sections have been revised to show
latest issue of Goodrich service bulletin
--- t h eReferences section is revised to convey the latest revision of the service
bulletin and engineering documentation
- - - Goodrich VSB 46830- - -32- - -106 has been revised
The Compliance in the previous issue of this service bulletin is not affected by this
revision. No additional rework to the aircraft is introduced by this revision.
Remove Bombardier PDF Merged Document SB 84- - -32- - -108_06 Sep 2012 &
Goodrich VSB 46830- - -32- - -106_Aug 24/12 and replace with attached.
Previous issues of Bombardier PDF Merged Document SB 84- - -32- - -108 &
Goodrich VSB 46830- - -32- - -106:
Initial issue - - - Pages 1 thru 20 dated 06 Sep 2012 & Aug 24/12 respectively.
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
1 of 24

### Page 2

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
T x L t r S B 8 4 --- 3 2 --- 1 0 8
Page 2 of 2
Revision ‘A’ 01 Oct 2012
This Page Intentionally Blank
1
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
2 of 24

### Page 3

D
S.B. 84- - -32- - -108
Page 1 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 3212 NUMBER: 84- - -32- - -108
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
URGES OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
SUBJECT : Landing Gear - - - MLG Door Actuator - - - Incorrect Scraper Installation
- - - Special Inspection and Rectification
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4001
thru 4415 with Main Landing Gear Door Actuator Assembly
P/N 46830- - -7 containing the following serial numbers:
MAL- - -NMC0001 to MAL- - -NMC0006, MAL- - -NMC0008 to MAL- - -NMC0010,
MAL- - -NMC0012 to MAL- - -NMC0019, MAL- - -NMC0021, MAL- - -NMC0031,
MAL- - -NMC0033, MAL- - -NMC0039, MAL- - -NMC0040, MAL- - -NMC0042,
MAL- - -NMC0045 to MAL- - -NMC0052, MAL- - -NMC0054, MAL- - -NMC0056 to
MAL- - -NMC0074, MAL- - -NMC0076 to MAL- - -NMC0078, MAL- - -NMC0080,
MAL- - -NMC0082, MAL- - -NMC0086 to MAL- - -NMC0089, MAL- - -NMC0094 to
MAL- - -NMC0100, MAL- - -NMC0102, MAL- - -NMC0103, MAL- - -NMC0105,
MAL- - -NMC0107 to MAL- - -NMC0109, MAL- - -NMC0112, MAL- - -NMC0127,
MAL- - -NMC0150.
NOTE: The instructions in this service bulletin are only applicable to the systems
and parts installed at the time of delivery on the aircraft or as changed by
Bombardier Aerospace Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this bulletin
can be completed.
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
3 of 24

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 2 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
Spares Affected:
The following is a list of spares affected by this change. Review spares and
procurement systems to determine the existence of any listed parts.
Part Number Description
46830- - -7 MLG Door Actuator
B. Reason
Problem: The main landing gear door actuator P/N 46830- - -7 may have had the
scraper installed backwards. If the scraper is installed backwards, the
function of the actuator may be adversely affected.
Solution: This service bulletin provides instructions for an inspection and
rectification for aircraft that have a suspect unit.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that
follow:
- - - aircraft is put into standard configuration for maintenance
- - - aircraft electrical power is removed
- - - the nose landing gear lock is engaged
- - - the main landing gear lock pins are installed thru each main gear and main gear
door mechanism
- - - the MLG door actuator in each nacelle is inspected to determine if it carries a
specific serial number as per the effectivity section of Goodrich Service Bulletin
46830- - -32- - -106 R1
- - - if aircraft does not have a matching serial number the aircraft can be returned to
service
- - - affected aircraft will require repeat inspections until affected unit is replaced
- - - if aircraft has an affected unit, it must be replaced
- - - close out.
D. Compliance
Bombardier Inc. recommends incorporation of this service bulletin at the earliest
opportunity unless otherwise directed by the operator’s airworthiness authority.
Transport Canada Airworthiness Directive Pending
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
4 of 24

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 3 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
E. Approval
The technical content of this service bulletin has been approved under the
authority of the Transport Canada Civil Aviation (TCCA) Design Approval
O r g a n i z a t i o n N o : D A O # 9 3 --- Q --- 0 2 .
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance Inspections (DTIs).
F. M a n p o w e r
PART A - - - INSPECTION
It will take an estimated .75 man- - -hours to complete PART A of the
ACCOMPLISHMENT instructions in this s ervice bulletin. The breakdown of man
- - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 0.25
Procedure in Part A 0.25
T e s t/R T S 0.00
Close- - -Out 0.25
PART B - - - ACTUATOR REPLACEMENT
It will take an estimated 16.5 man- - -hours to complete PART B of the
ACCOMPLISHMENT instructions in this s ervice bulletin. The breakdown of man
- - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 0.25
Procedure in Part B 15.00*
T e s t/R T S 1.00
Close- - -Out 0.25
* LH side 9 hours, RH side 6 hours.
For any on- - -site labor assistance, please speak with a Fleet Services representative for
a quote. The Fleet Services group can be contacted via the Q Series T echnical Help
Desk by telephone at 416- - -375- - -4000 or email at: thd.qseries@aero.bombardier.com
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
5 of 24

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 4 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
G. Material - - - Price and Availability
Refer to Goodrich Landing Gear Division service bulletin 46830- - -32- - -106 R1
H. T ooling - - - Price and Availability
None
I. Weight and Balance
None
J. Electrical Load Data
Not affected
K. Publications Affected
None
L. References
Revision ‘A’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
PCA 44332 Revision 0 (for internal reference only)
Goodrich Landing Gear Division service bulletin 46830- - -32- - -106 R1 dated: Sep
12/12
Transport Canada Airworthiness Directive Pending
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Detailed Parts List:
Quantity
Per Aircraft
Part Number Description Remarks
2 NAS1611- - -123
or
Seal
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
6 of 24

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 5 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
Quantity
Per Aircraft
RemarksDescriptionPart Number
2- - -123E515- - -80
2 7115FS- - -954- - -P4 Seal
2 R2301- - -017S041 Seal, MSE
B. Parts Required to Modify Spares
Quantity
Per Aircraft
Part Number Description Remarks
2 NAS1611- - -123
or
Seal
2- - -123E515- - -80
2 7115FS- - -954- - -P4 Seal
2 R2301- - -017S041 Seal, MSE
C. Special T ools and Equipment Required
TOOL NO. NOMENCLATURE MANUFACTURER USE
AT 31846 Assembly T ool Goodrich Installation/removal of
gland nut
TF 31847 Te s t F i x t u r e Goodrich Landing
Gear
Secure actuator
assembly during
testing
Force Gauge Commercially
Available
D. Existing Parts Accountability
Refer to Goodrich Landing Gear Division service bulletin 46830- - -32- - -106 R1
3. ACCOMPLISHMENT INSTRUCTIONS
A . J o b S e t --- U p
(1) Placard and select all aircraft electrical power to OFF . Obey all relevant
W A R N I N G S a n d C A U T I O N S ( r e f e r t o A M M T A S K ’ S 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 a n d
24- - -00- - -00- - -910- - -801).
(2) Make sure the nose gear ground lock is engaged.
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
7 of 24

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 6 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
(3) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
(4) Set up work platforms or ladders as required to gain access to MLG door
actuator in each nacelle. Make sure work platforms or ladders are electrically
grounded.
(5) Check aircraft logbooks or the MLG door actuator in each nacelle to determine if
it carries any of the serial numbers stated in the effectivity section of Goodrich
Service Bulletin 46830- - -32- - -106 R1.
(6) If actuators do not match any of the serial numbers, go to Close Out section of
this service bulletin and return aircraft to service.
(7) If any actuator serial number matches the effectivity on Goodrich Service Bulletin
46830- - -32- - -106 R1, go to PART A - - - INSPECTION of this service bulletin.
B. Procedure
P A R T A ---INSPECTION
(1) Remove lockpins from the main landing gear doors and close the doors.
(2) Open the MLG bypass door in the flight compartment ceiling, with a force gauge
attached pull the alternate release handle to open the MLG doors, the
approximate pull force to release the MLG aft doors is 52 lbf.
(3) If the doors do not release easily and the force exceeds 67 lbf, the MLG aft door
actuator will need to be replaced, go to PART B of this service bulletin.
P A R T B --- A C T U A T O RREPLACEMENT
(1) Make sure that lock pins are installed through each main gear and main gear
door mechanism.
NOTE: Actuator is to be replaced with a unit supplied by Goodrich or reworked in
accordance with the enclosed procedure.
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU DO
NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALL Y RETRACT .
THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO THE
EQUIPMENT .
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS
CAN ACCIDENTALL Y CLOSE THE LANDING GEAR DOORS. THIS CAN
CAUSE INJURIES TO PERSONS AND DAMAGE TO THE EQUIPMENT .
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
8 of 24

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 7 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
(2) Remove the MLG Doors Actuator. Refer to Appendix A at the back of this service
bulletin.
NOTE: It may be necessary to remove the SPU to gain additional access for the
removal and installation of the MLG door actuator on the left hand
nacelle. Ref AMM tasks 29- - -11- - -36- - -000- - -801 & 29- - -11- - -36- - -400- - -801.
(3) Rework MLG Doors Actuator as follows: (Refer to Figure 1)
(a) Cut lock wire and remove two flat fillister head screws (20) and lock tab
(30).
(b) Cut lock wire and loosen jam nut (50). Remove rod end assembly from
piston (140) and remove jam nut (50) and lock key (40).
(c) Using tool AT 31846, remove gland nut (100).
NOTE: Do not remove piston 46835- - -1 (140) from actuator cylinder assembly.
(d) Remove seals M83461/1- - -123 (110), 7115FS- - -954- - -P4 (120) and
R2301- - -017S041 (130) from gland nut.
(e) Install new seals NAS1611- - -123 (110) or 2- - -123E515- - -80 (110) and
7115FS- - -954- - -P4 (120) to gland nut 46833- - -1 (100).
(f) Install new seal R2301- - -017S041 (130) to gland nut 46833- - -1 (100). Refer
to Figure 2 for correct seal orientation.
(g) Install gland nut (100) over the piston (140). Using tool AT 31846, thread
and torque gland nut (100), 200 - - - 250 in. lbs.
(h) Assemble jam nut (50) onto rod end assembly. Thread rod end assembly
onto piston rod (140).
(i) Install actuator assembly into test fixture TF- - -31847. Push piston (140)
down and make sure it is bottomed. Measure the fully retracted length and
adjust rod end assembly as required (7.802 - - - 7.822 inches) retracted
length.
(j) If necessary, adjust rod end assembly one quarter turn at a time. Make
sure the actuator meets retract and extend length requirements.
NOTE: Make sure locking features in the rod end assembly and the piston are
aligned. Do not fully tighten the jam nut.
(k) Pull the piston (140) and measure the fully extended length (11.33 - - - 11.37
inches).
NOTE: The difference between the two measurements shall be the actual stroke.
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
9 of 24

### Page 10

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 8 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
(l) Install rod end lock key (40) and torque jam nut (50), 160 - - - 190 in. lbs.
(m) Disconnect and remove actuator assembly from test fixture.
(n) Install lock tab (30) and secure with two flat fillister head screws (20).
T orque screws (20).
(o) Vibropeen SB 32- - -106 and date accomplished in the MOD STATUS field of
nameplate (10).
CAUTION: DO NOT LETTER STAMP NAMEPLATE ON ASSEMBL Y . THIS CAN
DAMAGE ASSEMBL Y .
(4) Install the MLG Doors Actuator. Refer to Appendix B at the back of this service
bulletin.
(5) Bleed the No. 2 Hydraulic System. Refer to AMM T ask 29- - -10- - -00- - -870- - -802.
(6) Remove the lockpins from the door mechanism of the MLG.
(7) Do an operational check of the Main Landing Gear aft door actuator as follows:
(a) Pressurize hydraulic system #2. Refer to AMM T ask 29- - -00- - -00- - -863- - -801.
(b) Make sure the amber LDG door light on the LDG gear selector panel
extinguishes and the MLG doors are closed.
(c) In the flight compartment ceiling, set the landing- - -gear inhibit switch to the
INHIBIT position.
(d) Make sure that the amber lights on the LDG selector panel illuminate and
the MLG doors open.
(e) Set the landing- - -gear inhibit switch to the NORMAL position make sure the
amber LDG door lights extinguish and the MLG doors close.
(f) Repeat the above check 3 times to help bleed the hydraulic system.
(g) Check for leaks.
C. Close Out
(1) Remove all tools and equipment from the work area.
(2) On completion of this service bulletin, make the following entry in the
appropriate logbooks: “Service Bulletin 84- - -32- - -108 Landing Gear - - - MLG
Door Actuator - - - Incorrect Scraper Installation - - - Special Inspection and
Rectification accomplished.”
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
10 of 24

### Page 11 (OCR)

Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12  11 of 24
SERVICE BULLETIN 84-32-108
• 220
250
270
180
160
150
200
230
190
130
100
80
4683201B
Door Actuator Assembly
Figure 1
06 Sep 2012  S.B. 84-32-108
Revision 'A' 01 Oct 2012  Page 9 of 16
JR

### Page 12

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 10 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
Scraper Installation
Figure 2
GLAND NUT (100)
SEAL (SCRAPER) R2301- - -017S041 (130)
PISTON (140)
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
12 of 24

### Page 13 (OCR)

Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12  13 of 24
SERVICE BULLETIN 84-32-108
NOTE
Frame assembly
not shown.
0000a.aca00
16
LEGEND
1. Hydraulic hose.
2. Hydraulic hose.
3. MLG door actuator.
4. Union.
5. Union.
12. Frame assembly.
13. Cotter pin.
14. Nut.
15. Washer
16. Bolt.  19 18 18 19
17. Sleeve.
18. Flanged bush.
19. Plain bush.
MLG Doors Actuator - Removal/Installation
Figure 402 (Sheet 1 of 2)
06 Sep 2012  S.B. 84-32-108
Revision 'A' 01 Oct 2012  Page 11 of 16
JR

### Page 14 (OCR)

Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12  14 of 24
SERVICE BULLETIN 84-32-108
NOTE
Frame assembly
not shown.
LEGEND
3. MLG doors actuator.
6. Lock link assembly.
7. Cotter pin.
8. Nut.
9. Washer.
10. Bushing.
11. Bolt.
10
9
MLG Doors Actuator - Removal/Installation
Figure 402 (Sheet 2 of 2)
06 Sep 2012  S.B. 84-32-108
Revision 'A' 01 Oct 2012  Page 12 of 16
JR

### Page 15

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 13 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
Appendix A
Removal of the MLG Doors Actuator
1. General
A.
The maintenance procedure that follows is for the removal of the actuator for the aft
doors of the main landing gear (written as the ”MLG” in these procedures). The
MLG doors actuator is installed in the engine nacelle and is connected to the MLG
aft doors mechanism. The procedures for the MLG doors actuator of the left and
the right nacelle are the same. The procedure for the MLG doors actuator of the left
nacelle is given.
2 . J o b S e t --- U p I n f o r m a t i o n
A. T ools & Equipment
(1) Commercially Available
Container, Minimum 1 Imperial gallon (1.2 US gallon, 4.5 liter) capacity
B. Reference Information
AMM TASK 29- - -00- - -00- - -910- - -801 Hydraulic Safety Precautions
A M M T A S K 3 2 --- 0 0 --- 0 0 --- 8 4 0 --- 8 0 1 O p e n a n d L o c k t h e L a n d i n g G e a r D o o r s
3 . J o b S e t --- U p
A. Obey all the hydraulic safety precautions (Refer to AMM TASK
29- - -00- - -00- - -910- - -801.
WARNING:
BE SURE THAT THE HYDRAULIC PRESSURE IS OFF , AND THAT THERE IS NO
PRESSURE IN THE HYDRAULIC SYSTEM. IF YOU DO NOT DO THIS YOU CAN
CAUSE INJURIES TO PERSONS AND DAMAGE TO THE EQUIPMENT .
B. Make sure that all the hydraulic power is off.
WARNING:
YOU MUST INSTALL THE LOCKPINS IN THE DOOR MECHANISMS OF THE MLG
AND NLG. THE DOOR MECHANISMS CAN ACCIDENTALL Y CLOSE THE
LANDINGGEAR DOORS. THIS CAN CAUSE INJURIES TO PERSONS AND
DAMAGE TO THE EQUIPMENT .
C. Open and lock the landing gear doors (Refer to AMM TASK 32- - -00- - -00- - -840- - -801).
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
15 of 24

### Page 16

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 14 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
4. Procedure
Refer to Figure 402.
A. Remove the MLG doors actuator as follows:
(1) Disconnect the hydraulic hoses (1) and (2) from the MLG doors actuator (3) as
follows:
WARNING:
BE SURE THAT THE HYDRAULIC PRESSURE IS OFF , AND THAT THERE IS NO
PRESSURE IN THE HYDRAULIC SYSTEM. IF YOU DO NOT DO THIS YOU CAN
CAUSE INJURIES TO PERSONS AND DAMAGE TO THE EQUIPMENT .
(a) Put the container below the MLG doors actuator (3) to collect the hydraulic
fluid.
(b) Disconnect the hydraulic hoses (1) and (2) from the unions (4) and (5).
(c) Seal the hydraulic hoses (1) and (2) and the unions (4) and (5) with caps.
(2) Disconnect the MLG doors actuator (3) from the lock link assembly (6)
as follows:
(a) Remove the cotter pin (7) from the nut (8). Discard the cotter pin (7).
(b) Remove the nut (8), the washer (9), and the bushing (10) from the bolt (11).
(c) Remove the bolt (11) from the lock link assembly (6).
(3) Disconnect the MLG doors actuator (3) from the frame assembly (12) as
follows:
(a) Remove the cotter pin (13), the nut (14), and the washer (15) from the bolt (16).
Discard the cotter pin (13).
NOTE: In order to remove the actuator, it may be necessary to pull the door
mechanism spring out of the way, use a strap to pull the spring enough to remove
the actuator. It is difficult to re- - -install the spring if removed.
(b) Hold the MLG doors actuator (3) in position. Remove the bolt (16) and the
sleeve bushing (17) from the frame assembly (12) and the MLG doors actuator (3).
(c) Remove the MLG doors actuator (3) from the frame assembly (12).
(4) Remove the MLG doors actuator (3) from the nacelle.
(5) Rework or replace with serviceable unit.
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
16 of 24

### Page 17

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 15 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
Appendix B
Installation of the MLG Doors Actuator
General
A.
The maintenance procedure that follows is for the installation of the actuator for the
aft doors of the main landing gear (written as the ”MLG” in these procedures). The
MLG doors actuator is installed in the engine nacelle and is connected to the MLG
aft doors mechanism. The procedures for the MLG doors actuator of the left and
the right nacelle are the same. The procedure for the MLG doors actuator of the left
nacelle is given.
2 . J o b S e t --- U p I n f o r m a t i o n
A. T ools & Equipment
(1) Commercially Available
Wrench, T orque 10 to 200 lbf in (1.13 to 11.3 Nm)
(2) Commercially Available
Wrench, T orque 200 to 500 lbf in (22.6 to 56.49 Nm)
(3) Commercially Available
Grease Gun
B. Consumable Materials
(1) 04- - -03 Synthetic grease
(2) 05- - -15 Adhesive
(3) 07- - -01A F13 Coating- - -compound, corrosion preventive
( 4 ) 1 0 --- 0 9 Ta m p e r --- p r o o f s e a l a n t
3 . J o b S e t --- U p
A. Make sure that the aircraft is in the same configuration as in the removal task.
4. Procedure
Refer to Figure 402.
A. Apply finger pressure to the flanged bushes (18), and the plain bushes (19) in
the frame assembly (12) to make sure that there is no movement. If there is
movement, do as follows:
(1) Remove the bush from the frame assembly (12), (Refer to AMM TASK
20- - -10- - -40- - -400- - -801).
(2) Apply adhesive to the bush and replace in the frame assembly (12), (Refer to
AMM TASK 20- - -10- - -40- - -400- - -801).
B. Install the MLG doors actuator as follows:
NOTE: Make sure that the surfaces are clean with no corrosion, paint, or
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
17 of 24

### Page 18

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 0 8
S.B. 84- - -32- - -108
Page 16 of 16
06 Sep 2012
Revision ‘A’ 01 Oct 2012 JR
preservation fluids.
(1) Connect the MLG doors actuator (3) to the frame assembly (12) as follows:
(a) Compress the piston of the MLG doors actuator (3) and put it in the frame
assembly (12).
(b) Hold the MLG doors actuator (3) in position in the frame assembly (12). Install
the sleeve bushing (17) through the frame assembly (12) and the MLG doors
actuator (3).
(c) Apply corrosion preventive compound to the shank of the bolt (16) (Refer to
A M M T A S K 5 1 --- 2 5 --- 0 1 --- 3 9 0 --- 8 0 1 ) .
(d) Install the bolt (16) through the frame assembly (12), and the MLG doors
actuator (3).
(e) Install the washer (15) and the nut (14) on the bolt (16). Safety the nut (14)
with a new cotter pin (13).
(f) Apply a 1/8 in. (3.17 mm) wide stripe of torque seal across the nut (14) and on
the frame assembly (12).
(2) Connect the MLG doors actuator (3) to the lock link assembly (6) as follows:
(a) Apply grease to the shank of the bolt (11).
(b) Align the rod end of the MLG doors actuator (3) with the lock link assembly (6).
(c) Put the bolt (11) through the lock link assembly (6) and the rod end of the MLG
doors actuator (3).
(d) Install the bushing (10), the washer (9), and the nut (8) on the bolt (11).
(e) T orque the nut (8) from 40 to 60 lbf in (4.52 to 6.78 Nm). Safety the nut (8) with
a new cotter pin (13).
(f) Apply a 1/8 in. (3.17 mm) wide stripe of torque seal across the nut (8) and on
the lock link assembly (6).
(3) Connect the hydraulic hoses (1) and (2) to the MLG doors actuator (3) as
follows:
(a) Remove the caps from the hydraulic hoses (1) and (2) and the unions (4) and
(5).
(b) Connect the hydraulic hoses (1) and (2) to the unions (4) and (5).
(c) T orque the hydraulic hose (1) from 270 to 300 lbf in (30.51 to 33.90 Nm).
(d) T orque the hydraulic hose (2) from 170 to 200 lbf in (19.21 to 22.60 Nm).
(e) Apply a 1/8 in. (3.17 mm) wide stripe of torque seal across the hydraulic hoses
(1), (2) and on the unions (4), (5).
(4) Lubricate the grease fittings on the MLG actuator (3) with a grease gun.
(5)If the SPU was removed, reinstall IAW AMM 29- - -11- - -36- - -400- - -801, if not
proceed to close- - -out .
1
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
18 of 24

### Page 19

46830-32-106 R1 
 
SERVICE BULLETIN 
                           HIGHLIGHTS 
Sep 12/12 
              Page 1 of 1  
THESE COMMODITIES, SOFTWARE OR TECHNOLOGY WERE EXPORTED/RE-EXPORTED IN ACCORDANCE WITH U.S. EXPORT 
ADMINISTRATION REGULATION.  DIVERSION CONTRARY TO U.S. LAW IS PROHIBITED. 
 
DASH 8 Q400 
MLG DOOR ACTUATOR – INCORRECT SCRAPER INSTALLATION 
 
 
REVISION NO.1 – September 12, 2012 
 
 
Service Bulletin 46830-32-106 R1 supersedes Service Bulletin 46830-32-106 dated Aug 24/12 and 
is re-issued in its entirety to reflect the changes listed below. 
 
The compliance in the previous issue of this Service Bulletin is not affected by this revision.   
No additional rework is introduced by this revision. 
 
Please destroy all copies of SB 46830-32-106 dated Aug 24/12. 
 
 
 
Page/Para     Change 
 
 
Page 1, Para1.A. Effectivity revised. 
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
19 of 24

### Page 20

Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
20 of 24

### Page 21

46830-32-106 R1 
 
SERVICE BULLETIN 
 Sep 12/12 
Page 1 of 4 
THESE COMMODITIES, SOFTW ARE OR TECHNOLOGY W ERE EXPORTED/RE -EXPORTED IN ACCORDANCE W ITH U.S. EXPORT 
ADMINISTRATION REGULATION. DIVERSION CONTRARY TO U.S. LAW  IS PROHIBITED.  
Reference Goodrich CMM for proprietary information 
DASH 8 Q400 
MLG DOOR ACTUATOR – INCORRECT SCRAPER INSTALLATION 
-------------------------------------------------------------------------------------------------------------------------------------- 
1. PLANNING INFORMATION 
A. Effectivity 
Main Landing Gear Door Actuator Assembly PN 46830-7, Serial Numbers: 
MAL-NMC0001 to MAL-NMC0006, MAL-NMC0008 to MAL-NMC0010, MAL-NMC0012 to 
MAL-NMC0019, MAL-NMC0021, MAL-NMC0031, MAL-NMC0033, MAL-NMC0039,  
MAL-NMC0040, MAL-NMC0042, MAL-NMC0045 to MAL-NMC0052, MAL-NMC0054,  
MAL-NMC0056 to MAL-NMC0074, MAL-NMC00 76 to MAL-NMC0078, MAL-NMC0080, 
MAL-NMC0082, MAL-NMC00 86 to MAL-NMC0089, MAL- NMC0094 to MAL-NMC0100 , 
MAL-NMC0102, MAL-NMC0103, MAL-NMC0105, MAL-NMC0107 to MAL-NMC0109,  
MAL-NMC0112, MAL-NMC0127, MAL-NMC0150. 
B. Concurrent Requirements 
None. 
C. Reason 
There is a possibility that the scraper was installed backwards.  If the scraper is installed 
backwards, the function of the actuator may be adversely affected. 
D. Description 
The door actuator assembly is removed from the aircraft, returned to Goodrich for rework or 
reworked per Accomplishment Instructions, Paragraph 3.C. 
E. Compliance 
Goodrich Landing Gear, in concurrence with the aircraft manufacturer, recommends 
incorporation of this bulletin at operator’s earliest convenience. 
F. Approval 
The technical content of this Service Bulletin has been reviewed and accepted by 
Bombardier Aerospace. 
G. Manpower 
Approximately 2.0 manhours are required to accomplish this Service Bulletin. 
H. Weight and Balance 
No effect. 
I. Electrical Load Data 
No change. 
J. Software Accomplishment Summary 
Does not apply. 
K. References 
Goodrich Landing Gear Component Maintenance Manual 32-31-08 
Bombardier Aerospace Service Bulletin 84-32-108 
L. Other Publications Affected 
None. 
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
21 of 24

### Page 22

46830-32-106 R1 
Goodrich Landing Gear Division 
Goodrich Aerospace Canada Ltd. 
 Sep 12/12 
Page 2 of 4 
Reference Goodrich CMM for proprietary information 
M. Interchangeability or Intermixability of Parts 
Not applicable. 
-------------------------------------------------------------------------------------------------------------------------------------- 
2. MATERIAL INFORMATION 
A. Material Cost and Availability 
(1) Actuator Exchange 
A rotable pool of actuators has been provisioned; affected actuators will be exchanged 
at no charge to the operator by: 
Goodrich Corporation  
Customer Services  
4115 Corporate Center Drive  
Monroe, NC 28110-1313 USA 
ATT: Customer Services Administrator  
Phone: 1-704-282-2622 
Fax:  1-704-290-5959 
(2) Actuator Rework 
Seals required for bulletin incorporation are available on a FOC basis from: 
Goodrich Landing Gear 
1400 South Service Rd West 
Oakville, Ontario  
Canada L6L 5Y7 
ATT: Warranty Administrator 
Phone: 1-905-827-7777 
Fax: 1-905-825-1583 
(3) Goodrich will offer credit of $320.00 (USD 2012) for each actuator removed from the 
aircraft in compliance with this Service Bulletin.  Warranty claim may be submitted to 
Goodrich Landing Gear in accordance with Service Information Letter (SIL) 02121-32-
035. Spare/shelf units do not apply. 
B. Material Required for each Component 
Actuator Exchange 
Actuator Rework 
  
New Part No Qty Per 
Unit 
Keyword Old Part No. Instructions / 
Disposition 
46830-7 1 Actuator 46830-7 Exchange 
New Part No Qty Per 
Unit 
Keyword Old Part No. Instructions / 
Disposition 
NAS1611-123 
OR 
2-123E515-80 
 
1 
 
Seal 
NAS1611-123 
OR 
2-123E515-80 
 
Discard 
7115FS-954-P4 1 Seal 7115FS-954-P4 Discard 
R2301-017S041 1 Seal, MSE R2301-017S041 Discard 
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
22 of 24

### Page 23

46830-32-106 R1 
Goodrich Landing Gear Division 
Goodrich Aerospace Canada Ltd. 
 Sep 12/12 
Page 3 of 4 
Reference Goodrich CMM for proprietary information 
--------------------------------------------------------------------------------------------------------------------------------- 
3. ACCOMPLISHMENT INSTRUCTIONS 
NOTE: Numbers in parenthesis refer to CMM 32-31-08, IPL Figure-Item number. 
A. General 
(1) Refer to Bombardier Aerospace Service Bulletin 84-32-108 for removal and installation 
of MLG door actuator. 
(2) Bombardier Aerospace Service Bulletin 84-32-108 also provides instructions for 
optional actuator rework procedure and alternate on-wing pressure test. 
B. Actuator Exchange  
 (1) Goodrich Customer Services will contact operators directly to coordinate exchange 
actuator availability, and incorporation scheduling. 
(2) Upon being contacted by Goodrich Customer Services, issue a No Charge Exchange 
Purchase Order to: 
Goodrich Corporation  
Customer Services  
4115 Corporate Center Drive  
Monroe, NC 28110-1313 USA 
ATT: Customer Services Administrator  
(3) Upon receipt of exchange actuators, replace existing MLG door actuators. 
(4) Ship removed MLG door actuators, along with a copy of the Exchange Purchase Order 
to address above. 
C. Actuator Rework (Ref Figure 1) 
(1) Disassemble actuator to remove gland nut (1-100) and seals (1-110), (1-120), 
and (1-130) (Ref CMM 32-31-08 DISASSEMBLY). 
NOTE: Do not remove piston (1-140) from actuator cylinder assembly (1-210). 
(2) Install seals (1-110A) or (1-110B), (1-120) and (1-130) into gland nut (1-100) 
(Ref CMM 32-31-08 ASSEMBLY). 
(3) Reassemble actuator (Ref CMM 32-31-08 ASSEMBLY). 
(4) Test actuator (Ref CMM 32-31-08 TESTING AND FAULT ISOLATION). 
D. Re-identification 
CAUTION: DO NOT LETTER STAMP NAMEPLATE ON ASSEMBLY. THIS CAN DAMAGE 
ASSEMBLY. 
(1) Vibropeen SB 32-106 and date accomplished in the MOD STATUS field of 
nameplate (1-10). 
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
23 of 24

### Page 24

46830-32-106 R1 
Goodrich Landing Gear Division 
Goodrich Aerospace Canada Ltd. 
 Sep 12/12 
Page 4 of 4 
Reference Goodrich CMM for proprietary information 
 
MLG Door Actuator – Scraper Installation Details 
Figure 1 
Bombardier PDF Merged Document SB 84-32-108A_01 Oct 2012 & Goodrich VSB 46830-32-106 R1_Sep 12/12
24 of 24

### Page 25

Jan 2009
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 26

Feb 2009
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
