# De Havilland Canada Service Bulletin 84-32-159

Copy: No revision named ("SB 84-32-159"), 15 pages: PDF https://openairdocs.org/files/sha256/c9/26/c926f42c0c17795c077d937836de6a9362e90f36e841fbe8b4a87d1eb8152d06; text https://openairdocs.org/service-documents/bombardier/sb-84-32-159/file/c926f42c0c17.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1047; AD 2023-16-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md) (issued as De Havilland Canada)
- Type: Service bulletin (Service Bulletin)
- Number: 84-32-159
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-32-159

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2023-16-05](https://openairdocs.org/ad/2023-16-05.md), effective Sep 25, 2023: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/bombardier/sb-84-32-159/proposed.md).

## Text (15 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-1047; AD 2023-16-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

S.B. 84- - -32- - -159
Page 1 of 1228 Jun 2019
AC/JV
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 3234 NUMBER: 84- - -32- - -159
DE HAVILLAND AIRCRAFT OF CANADA LIMITED (DHC) CONSIDERS
URGES OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS
THIS SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND
SUBJECT : Landing Gear - - - Inspection / Rec tification- - - MLG Alternate Extension
System
1. PLANNING INFORMA TION
A. Effectivity
Aircraft Affected:
In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4001,
4003 thru 4999 with cam assembly part number 48510- - -5
installed.
NOTE: The instructions in this service bulletin are only applicable to the
systems and parts installed at the time of delivery on the aircraft or as
changed by DHC Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this
bulletin can be completed.

### Page 2

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 2 of 1228 Jun 2019
AC/JV
Spares Affected:
None
B. Reason
Problem: There are reports from operators that they were unable to open the MLG
doors in one of nacelle using the MLG alternate extension system. Upon
troubleshooting they found the cam assembly lever fractured. In some of
these cases, associated spring box plunger (PN 48507- - -1) (Refer to Fig
ure 1, sheet 3) was also found broken or uplock release cable (PN
48503- - -3) have also been found broken.
Solution: This service bulletin provides the necessary instructions to perform the
operational check of the cam assembly (PN 48510- - -5), uplock cable (PN
48503- - -3) and one time inspection of the associated spring box assembly
(PN 48504- - -1) in both nacelles.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that follow:
- - - aircraft electrical power is removed
- - - the nose landing gear lock is engaged
- - - the main landing gear lock pins are installed through each main gear
- - - the MLG doors are closed by hydraulic power
- - - the MLG aft doors are released by operating the MLG alternate extension system from
the cockpit
- - - operation of the cam assembly in both nacelles is verified upon successful MLG aft
door opening
- - - a one time in- - -situ visual inspection of the spring box assembly (PN 48504- - -1) in both
nacelles is done to check for bent plunger
- - - Visual inspection of cam assembly (PN 48510- - -5) and uplock release cable (PN
48503- - -3) are done in both nacelles
- - - if any discrepancy is found, the cam assembly (PN 48510- - -5) and/or the spring box
assembly (PN 48504- - -1) and/or uplock release cable (PN 48503- - -3) is replaced per
instructions in the SB

### Page 3

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 3 of 1228 Jun 2019
AC/JV
- - - no action is required, if the cam assembly operates normally and visual inspections
do not reveal deficiencies
- - - Repeat inspection:
1. Functional check of cam assembly thru MLG aft door opening using
alternate extension system
2. Visual inspection of uplock release cable and cam assembly in both
nacelles.
- - - close out.
D. Compliance
This special inspection and rectification may be done at the operator’s discretion.
A Transport Canada Airworthiness Directive Pending.
E. Approval
The technical content of this service bulletin has been approved under the authority of
the Transport Canada Civil Aviation (TCCA) Design Approval Organization No: DAO
# 9 3 --- Q --- 0 2 .
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage
T olerance Inspections (DTIs).
F. M a n p o w e r
P a r t A --- I n s p e c t i o n
It will take an estimated 1.00 man- - -hours to complete Part A - - - Inspection given in
the accomplishment instructions in this service bulletin. The breakdown of
man- - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 0.25
Procedure in Part A 0.50
T e s t/R T S 0.00
Close- - -Out 0.25

### Page 4

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 4 of 1228 Jun 2019
AC/JV
Part B - - - Rectification
It will take an estimated 4.50 man- - -hours to complete PART B - - - Rectification given
in the accomplishment instructions in this service bulletin. The breakdown of
man- - -hours is shown in the table that follows:
TASK M A N --- H O U R S
J o b S e t --- U p 0.25
Procedure in Part B 3.00
T e s t/R T S 1.00
Close- - -Out 0.25
This estimate is for direct labour done by an experienced crew and it does not
include, planning, familiarization, cure tim e, part fabrication, tool acquisition or lost
time.
G. Material - - - Price and Availability
The parts and materials required are listed in Paragraph 2.A. The parts required may
be either purchased as single items from DHC or purchased directly from industry
sources.
H. T ooling - - - Price and Availability
None
I. Weight and Balance
Not affected
J. Electrical Load Data
Not affected
K. Publications Affected
None

### Page 5

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 5 of 1228 Jun 2019
AC/JV
L. References
The initial issue of this service bulletin was prepared to the related data that follows:
PCA 47446 Revision 0 (for internal reference only).
S B 8 4 --- 3 2 --- 1 0 0 --- L a n d i n g G e a r --- M L G --- E m e r g e n c y E x t e n s i o n S y s t e m ---
Installation of new Cam Mechanism Assembly 48510- - -5 - - - ModSum 4- - -113765.
Transport Canada Airworthiness Directive Pending.
2. MATERIAL INFORMA TION
A. Parts Required Per Aircraft
(1) Detailed Parts List
Quantity Per
Aircraft
Part Number Description Remarks
2
2
2
48510- - -5
48504- - -1
48503- - -3
Cam Assembly
Spring Box Assembly
Cable Assembly
If required to
be replaced
NOTE: This Service bulletin is self- - -contained. No drawings will be supplied.
B. Parts Required to Modify Spares
None
C. Special T ools and Equipment Required
None
D. Existing Parts Accountability
None

### Page 6

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 6 of 1228 Jun 2019
AC/JV
3. ACCOMPLISHMENT INSTRUCTIONS
A . J o b S e t --- U p
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS ON THE MAIN LANDING
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALL Y
RETRACT . THIS CAN CAUSE INJURIES TO PERSONS AND
DAMAGE TO THE EQUIPMENT .
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR
MECHANISMS OF THE NLG AND THE MLG AFT DOORS ARE
CLOSED. THE DOOR MECHANISMS CAN ACCIDENTALL Y CLOSE
THE LANDING GEAR DOORS. THIS CAN CAUSE INJURIES TO
PERSONS AND DAMAGE TO THE EQUIPMENT .
(1) Placard and select all aircraft electrical power to OFF . Obey all relevant
W A R N I N G S a n d C A U T I O N S ( r e f e r t o A M M T A S K 2 4 --- 0 0 --- 0 0 --- 8 6 1 --- 8 0 2 a n d
TASK 24- - -00- - -00- - -910- - -801).
(2) Make sure that lock pins are installed through each main gear and main gear aft
doors are closed.
(3) Make sure the nose gear ground lock is engaged.
(4) Set wheel chocks in front and behind the landing gear tires.
(5) Set up the work platforms or ladders as required to gain access to cam assembly
in both nacelles. Make sure the work platforms or ladders are electrically
grounded.
B. Procedure
Part A - - - Inspection
(1) Following instructions apply to both nacelles, verify MLG doors are closed and
do an operational check of the cam assembly by actuating alternate extension
from the cockpit. Do an operational check of the uplock release cable, also if
applicable do a one time in- - -situ spring box inspection for any bend as follows:
NOTE: Repeat inspection interval to be set by the Airworthiness Directive.

### Page 7

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 7 of 1228 Jun 2019
AC/JV
(a) Open the MLG aft doors by actuating alternate extension from the cockpit
(refer to AMM TASK 32- - -00- - -00- - -840- - -801).
(b) If the MLG aft doors open, the cam assembly operation is successfully
verified.
(c) Install door pins and gain access to Alternate Extension System
components in the nacelle (Refer to Figure 1).
(d) Examine the cam assembly (PN 48510- - -5) to verify return to its original
rested position shown in Figure 1. On the cam assembly visually check the
gap between the roller and the cam guide shown in Figure 1 (sheet 2).
Look for visible signs of increased gap between the roller and the cam
guide path exceeding approximately 0.040 in. (1.016 mm).
(e) Inspect the uplock release cable (PN 48503- - -3) to make sure the cable is
not broken. Evidence of this is that the cable stays on pulleys and is not
slacken (Refer to Figure 1, sheet 4).
(f) Examine the associated spring box assembly (PN 48504- - -1) for any bend
plunger and refer to the bend spring box picture (Refer to Figure 1, sheet
3).
NOTE: Use a mirror or flashlight as required to visually inspect the spring box
assembly for any bend or damage to the plunger.
(g) If the cam assembly (PN 48510- - -5) return to its original rested position and
there is no visible signs of increased gap between the roller and the cam
guide, then no further action concerning cam assembly is required.
(h) If uplock cable (PN 48503- - -3) is found not broken, no action concerning
the uplock cable is required.
(i) If no bend is found to the plunger of the spring box assembly (PN
48504- - -1), then no further action concerning the spring box assembly is
required.
(j) If any discrepancy is found, in the cam assembly, uplock release cable or
spring box assembly proceed to procedure part B Rectification.

### Page 8

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 8 of 1228 Jun 2019
AC/JV
Part B - - - Rectification
(1) If the MLG aft doors fail to open in any nacelle during alternate extension release,
the associated cam assembly is inoperative. Doors have to be open by hydraulic
power by setting LDG inhibit switch (Re fer to AMM TASK 32- - -34- - -00- - -710- - -801)
in the cockpit to INHIBIT position, install door pins and examine cam assembly,
uplock cable and spring box in both the nacelles (refer to Part A - - - Inspection,
steps (1) (d) to (1) (i)).
(2) If there is any bend observed on the plunger (PN 48507- - -1), replace spring box
(PN 48504- - -1) per AMM T ask 32- - -34- - -26- - -000- - -801 as follows:
(a) Remove the locking clip (9) from the turnbuckle (10).
(b) Loosen the turnbuckle (10) to remove the tension from cable (8).
(c) Remove and discard the cotter pin (11). Remove the washer (12) and the
pin (13).
(d) Remove spring box.
(3) Install new spring box 48504- - -1 per AMM T ask 32- - -34- - -26- - -400- - -801 as follows:
(a) Connect turnbuckle (10) to cable (8) and sprig box P/N 48504- - -1.
(b) Install the locking clip (9).
(c) Align the clevises of cables (8) and (5) on the cam assembly (1), install the
pin (13) and the washer (12).
(d) Safety the pin (13) with a new cotter pin (11).
(4) If the cam assembly is found broken, deformed or not resetting to its normal
rested position, replace the cam assembly as follows:
(a) Remove the cam assembly (PN 48510- - -5) (Refer to AMM TASK
32- - -34- - -26- - -000- - -801).
(b) Install the cam assembly (PN 48510- - -5) (Refer to AMM TASK
32- - -34- - -26- - -400- - -801).
(5) If the uplock release cable is found broken replace the cable (Refer to AMM
TASK 32- - -34- - -16- - -400- - -804).

### Page 9

S E R V I C E B U L L E T I N 8 4 --- 3 2 --- 1 5 9
S.B. 84- - -32- - -159
Page 9 of 1228 Jun 2019
AC/JV
(6) Do the rigging of the alternate extension MLG cables (Refer to the AMM TASK
32- - -34- - -16- - -830- - -802).
C. Close Out
(1) Remove all tools and equipment from the work area.
(2) On completion of this service bulletin, make the following entry in the appropriate
logbooks: “Service Bulletin 84- - -32- - -159 {Landing Gear - - - Inspection /
Rectification - - - MLG Alternate Extension System} accomplished,”

### Page 10 (OCR)

SERVICE BULLETIN 84-32-159
TO FLIGHT COMPARTMENT
PIN
WASHER
SPRING BOX
ASSEMBLY  - COTTER PIN
UPLOCK CABLE
TO
UPLOCK  CAM MECHANISM
ASSEMBLY  ASSEMBLY
CAM ASSEMBLY IN THE NORMAL
RESTING POSITION
cg5543a01.dg. ss/kb. jun03/2019
MLG CAM ASSEMBLY
Figure 1 (Sheet 1 of 4)
S.B. 84-32-159
28 Jun 2019
Page 10 of 12
AC/JV

### Page 11 (OCR)

SERVICE BULLETIN 84-32-159
TO FLIGHT COMPARTMENT
PIN
SPRING BOX
ASSEMBLY
-WASHER
COTTER PIN
UPLOCK CABLE
TO
UPLOCK
ASSEMBLY
CAM MECHANISM
ASSEMBLY
CAM ASSEMBLY IN THE FULLY DEPLOYED
POSITION AFTER THE INPUT LEVER
HAS BEEN ROTATED FORWARD
48514-5
NOTE  cg5543a02.cgm, nn/kb, jun03/2019
1 Zone to check for any visible signs of increased
gap between the roller and the cam guide path.  EXCESSIVE ROLLER/CAM GUIDE GAP
MLG CAM ASSEMBLY
Figure 1 (Sheet 2 of 4)
S.B. 84-32-159
28 Jun 2019
Page 11 of 12
AC/JV

### Page 12 (OCR)

SERVICE BULLETIN 84-32-159
SPRING BOX PLUNGER
PIN 48507-1
BENT SPRING BOX ASSEMBLY P/N 48504-1
GET 45600,0, kt, (UNSE 9)
Migue (Sno 3)
S.B. 84-32-159
28 Jun 2019
Page 12 of 12
AC/JV

### Page 13 (OCR)

SERVICE BULLETIN 84-32-159
CABLE BALL END
(REF)
GUARD PIN
BRACKET
PULLEY  UPLOCK
RELEASE
HANDLE
CABLE
CABLE
LOCKING  CLIP  cg5543a04.dg. kb. mav02/2019
TURNBUCKLE
MLG CAM ASSEMBLY
Figure 1 (Sheet 4 of 4)
S.B. 84-32-159
28 Jun 2019
Page 13 of 12
AC/JV

### Page 14

Jul 2019
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Email: cmdb.request@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Email PDF to:
cmdb.request@dehavilland.com

### Page 15

Jun 2019
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal, DE HAVILLAND AIRCRAFT OF CANADA LIMITED
Phone: 1 (416) 373 - - -5098
Email: george.moffatt@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Email PDF to:
george.moffatt@dehavilland.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.