# De Havilland Canada Service Bulletin 84-55-09

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision A ("SB84-55-09 Rev B"), 38 pages: PDF https://openairdocs.org/files/sha256/90/70/9070ec9b2d185f0fb859b89a86fd112b0fdcc2b99ff66a52989ca73a30cd37cb; text https://openairdocs.org/service-documents/bombardier/sb-84-55-09/file/9070ec9b2d18.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2025-0482, the docket of AD 2025-19-05. Not covered by OpenAirDocs’ CC0 dedication.
- SB 84-55-09 ("SB 84-55-09"), 34 pages: PDF https://openairdocs.org/files/sha256/f7/a2/f7a23baeb445ff00f10748117c937510b03f03f43fc8052ad436403c475fdcce; text https://openairdocs.org/service-documents/bombardier/sb-84-55-09/file/f7a23baeb445.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0322; AD 2019-16-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md) (issued as De Havilland Canada)
- Type: Service bulletin (Service Bulletin)
- Number: 84-55-09
- Latest revision known: 84-55-09, Revision A, dated January 10, 2020 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-55-09

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2025-19-05](https://openairdocs.org/ad/2025-19-05.md), effective Oct 31, 2025: Revision A
- [AD 2019-16-09](https://openairdocs.org/ad/2019-16-09.md), effective Oct 9, 2019: No revision named

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/bombardier/sb-84-55-09/proposed.md).

## Text (38 pages)

Revision A, the newest copy. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2025-0482, the docket of AD 2025-19-05. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

TxLtrSB84-55-09Revision‘B’17Feb2023 
AS
Page1of2
DHC-8 (DASH 8) 
SERVICE BULLETIN 84-55-09 
Empennage – Horizontal Stabilizer – Rear Spar Elevator Powe r Control Unit 
(PCU) Brackets (Fittings) Replacement and Inspection of the E levator Front 
Spar Web – ModSum 4-113983 
This page transmits Revision ‘B’ of Service Bulletin 84-55-09, pages 1 thru 34,
dated17Feb2023.
Thisservicebulletinis re-issuedinitsentiretyforthe re asonsthatfollow: 
– The Description Part – B (Rectification) sectionisrevisedtoaddthesteps 
relatedtotheremovalandinstallationofelevatortorquet ubesandhydrauliclines 
– The References sectionisrevisedtoconveythelatestrevisionoftheservi ce 
bulletinandengineeringdocumentation 
– The Procedure Part B – Rectification sectionisrevisedtoaddthe stepsrelatedto 
theremoval andinstallationofelevatortorque tubes andhy drauliclines 
– Updatedthephonenumbersandtheaddress.
The Compliance in the previous issues of this service bulletin is not affected by 
thisrevision.Noadditionalreworktothe aircraftisintro ducedbythisrevision.
Remove the previous revision of Service Bulletin 84-55-09 a nd replace with 
attached.
PreviousissuesofServiceBulletin84-55-09: 
Initialissue–Pages1thru32dated07Jun2018 
Revision‘A’–Pages1thru32dated10Jan2020

### Page 2

SERVICE BULLETIN 84-55-09
TxLtrSB84-55-09Revision‘B’17Feb2023 
AS
Page2of2
This Page Intentionally Blank

### Page 3

S.B. 84-55-09
Page 1 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
SERVICEBULLETIN
ATASYSTEM: 5510 NUMBER: 84-55-09 
DE HAVILLAND AIRCRAFTOFCANADALIMITED(DHC)CONSIDERS 
URGESOPERATORSTOPROMPTLYEVALUATETHECONTENTS 
THISSERVICEBULLETINTOBEPARTICULARLYSIGNIFICANTAND 
SUBJECT: Empennage–HorizontalStabilizer–RearSparElev atorPowerControl
Unit (PCU) Brackets (Fittings) Replacement and Inspection ofthe 
ElevatorFrontSparWeb–ModSum 4-113983 
1. PLANNING INFORMA TION 
A. Effectivity 
Aircraft Affected: 
In-Service: DHC-8 Aircraft Models 401 and 402 Serial Number s 4001, 4003 
thru 4580. 
Production: ModSum 4-180055 will be installed before deliv ery on 
applicable DHC-8 Aircraft at Serial Number 4581 and 
subsequent. 
NOTE: The instructions in this service bulletin are only applicab le to the 
systems and parts installed at the time of delivery on the aircraft or as 
changed by DHC Service Bulletin(s). Before you do this bulle tin, 
examine all STC or equivalent action changes to make sure thi s 
bulletin can be completed.

### Page 4

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 2 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Spares Affected: 
The following is a list of spares affected by this change. Review spares and 
procurement systems to determine the existence of any listed parts. See 
Paragraph 2.D., Existing Parts Accountability,fordisposition. 
PartNumber Description 
85517347-001 PCU FTG Assy, LH 
85517347-002 PCU FTG Assy, RH 
B. Reason 
Problem: In five separate events, an operator has reported cracked elevator PCU 
brackets(fittings).Inonecasethecrackgrowthresultedi ndetachmentof
the PCU fitting during pushback. 
AdetachedPCUfittingcanimpedeelevatormovement.Multip ledetached 
PCUfittingsintheaircraftcancauselossofelevatorcontr ol.Therearesix 
fittings per aircraft supporting six elevator PCUs, four ofwhich are active 
and twoare standby.
There have also been tworeports of Elevator Front Spar cracking. 
Cause: Current PCU fittings do not account for force-fightl oads from mis-rigged 
elevator PCUs. Force-fight loads from mis-rigged elevatorPCUs, when 
superimposed with fitting flange installation preload maybe sufficient to 
cause the fatigue cracking. 
Solution: ThisservicebulletinintroducesModSum4-11398 3.TheModSuminspects 
and replaces any existing PCU fittings with redesigned PCU fittings, if
found cracked. 
Redesignedfittingshaveimprovedfatiguelifewhensubjec ttohigherthan 
anticipated force fightand installation pre-loads. 
This SB also conducts inspection of the elevator leading edge front spar 
and H-stab rear spar in the areas adjacent to PCU fittings andcollects 
sampling data.

### Page 5

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 3 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
C. Description 
The procedures in this service bulletin give the instructions todothe tasks that follow: 
- The nose landinggear lock is engaged 
- Themainlandinggearlockpinsareinstalledthrougheachm aingearandmaingear 
doormechanism 
- Pressure from the hydraulic systems is removed 
- Aircraft electrical power is removed 
- Wheel chocks are setin front and behind the landing gear tires 
- Work scissor lift(s) or platforms are set as required to gain access to horizontal
stabilizer 
- Access panels are removed to gain access to the elevatorPCUfittings 
- Elevator leading edge panels removed as necessary 
- If necessary, elevators are removed. 
Part–A(Inspection –ForCracks) 
- PCU’s are disconnected, if necessary 
- Elevator PCU fittings are inspected forcracks ordamages 
- Horizontal stabilizer rear spar and elevator front spar around the PCU fittings are 
visually inspectedforcracking 
- Ifcracksordamagearefoundonthehorizontalstabilizerr earsparortheelevatorfront 
spar around the PCU fittings, contact the Q Series TechnicalHelp Desk by telephone
at 1-855-310-1013 or 1-647-277-5820, email at: thd@dehavilland.com for approved
disposition/action/repair
- Ifnocracksordamagearefound,allsixPCUsareriggedand closeout iscompleted 
- ResultsandfindingsarereportedtoDHCperTableattheend oftheservicebulletin.

### Page 6

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 4 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Part–B(Rectification) 
- If cracks ordamage are found only on PCU fittings, elevators are removed 
- Elevator PCU’s are removed, if required 
- Elevator torque tubes are removed, if required 
- Hydrauliclines are removed, if required 
- Cracked PCU fittings are replaced with redesigned fittings 
- The hydraulic lines are installed, if removed 
- The elevatortorque tubes are installed, if removed 
- Removed PCU’s are installed 
- Elevators are installed 
- Systems functional tests are completed 
- Close-out 
- ResultsandfindingsarereportedtoDHCperTableattheend oftheservicebulletin. 
D. Compliance 
De Havilland Aircraft of Canada Limited highly recommends that ModSum 4-113983 
be incorporated at the earliest opportunity unless otherwise directed by the operator’s 
airworthiness authority.
Transport Canada Airworthiness Directive CF-2018-34 has been issued. 
E. Approval
The technical content of this service bulletin has been approved under the authority of
the Transport Canada Civil Aviation (TCCA) Design ApprovalOrganization No: DAO 
#93-Q-02. 
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage 
Tolerance Inspections (DTIs).

### Page 7

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 5 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
F. Manpower 
PartA– Inspection 
It will take an estimated 13.00 man-hours to complete Part A – Inspection given in 
the ACCOMPLISHMENT instructions in this service bulletin. The breakdown of man-
hours is shown in the table that follows: 
TASK MAN-HOURS 
Job Set-Up 2.00 
Procedure in PartA 4.00 
Test / RTS 5.00 
Close-Out 2.00 
NOTE: Man hours in Procedure – Part B are inclusive to PCU bracket 
replacements and additional man-hours for repair/replace ment of
elevator/H-stab due to structural cracks are not included.
PartB– Rectification 
It will take an estimated 18.00 man-hours to complete PART B – Rectification given 
in the ACCOMPLISHMENT instructions in this service bulletin. The breakdown of
man -hours is shown in the table that follows: 
TASK MAN-HOURS 
Job Set-Up 1.00 
Procedure in PartB 10.00 
Test / RTS 5.00 
Close-Out 2.00 
G. Material–PriceandAvailability 
The full Modification Kit required to do this service bulletin is listed in the table below 
for reference only:

### Page 8

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 6 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
KitNumber Description 
8MK4837-001 Kit – PCU Fitting Replacement, HSTAB 
NOTE: Whole 8MK4837-001 kit is not procurable. It is intended thatoperators 
order fittings and shims as required after they find crackedfittings. 
NOTE: Please note that the full Modification kit required to do this service 
bulletin is listed in the above table for reference only. Refer to section 
2.A. and order part quantities sufficient to replace fittings which have 
cracked. 
Operators should submit a purchase order through the Customer Response Center 
(CRC) to the Customer Accounts Service Team (CAST) at DHC specifying aircraft 
serial number(s). Submit the purchase orderto: 
De Havilland Aircraftof Canada Limited 
Material Services 
5800 Explorer Drive 
Mississauga 
Ontario 
Canada L4W-5K9 
DHCPhone Numbers :
North America:Toll Free: 1-855-310-1013 or 
Direct: 1-647-277-5820 
DHC Emails: 
Parts: Europe, Middle East, Africa, and Russia: emear.parts@dehavilland.com 
Americas and Rest of World: parts@dehavilland.com

### Page 9

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 7 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
H. Tooling–Price andAvailability 
For tool rentals, contact the Customer Response Center (CRC ) Kits Team at
1-855-310-1013 or1-647-277-5820 or email: kits@dehavilland.com.
I. WeightandBalance 
NOTE: Weight and Balance changes are only required if replacing any fitting. 
A/CType and 
Model
Weight(Lb) Arm(Inches) 
Moment 
(InchesxLb) 
x0.001 
DHC-8 Model401,402 
Kit -8MK4837-001 
8Z10178-001 
PCU #1(Y- 90.50)
+0.13 1049.72 0.14 
DHC-8 Model401,402 
Kit -8MK4837-001 
8Z10178-001 
PCU #2(Y- 82.50)
+0.13 1049.72 0.14 
DHC-8 Model401,402 
Kit -8MK4837-001 
8Z10178-001 
PCU #3(Y- 70.50)
+0.13 1049.72 0.14 
DHC-8 Model401,402 
Kit -8MK4837-001 
8Z10178-002 
PCU #1(Y+90.50) 
+0.13 1049.72 0.14 
DHC-8 Model401,402 
Kit -8MK4837-001 
8Z10178-002 
PCU #2(Y+82.50) 
+0.13 1049.72 0.14 
DHC-8 Model401,402 
Kit -8MK4837-001 
8Z10178-002 
PCU #3(Y+70.50) 
+0.13 1049.72 0.14 
J. ElectricalLoadData 
Not affected

### Page 10

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 8 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
K. PublicationsAffected 
AircraftMaintenance Manual PSM 1-84-2........................
AircraftIllustrated Parts Catalog PSM 1-84-4.....................
ModSums Manual PSM 1-84-12 .................................
L. References 
Revision ‘B’ of this service bulletin was prepared to the engineering drawings and 
relateddatathat follows: 
DRAWING SHEET REV 
8MK4837 1 --
8Z10178 1 -H
8Z10178 2 -C
Tool Drawing8Z10178-001-58 
ModSum 4Q113983 Rev.‘M’
ModSum 4-113983 Rev. ‘N’
Related ModSum 4-180055 Rev. ‘D’
PCA 46717 Revision 04 (for internal reference only) 
Transport Canada Airworthiness Directive CF-2018-34 effective 2018-12-31. 
2. MATERIAL INFORMA TION 
A. PartsRequiredPerAircraft 
(1) Modification Kit 8MK4837-001 for reference only (See Note below).

### Page 11

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 9 of34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
(2) Detailed Kit Content: 
Quantity PerKit 
-001 
PartNumber Description Remarks 
Ref 8Z10178 Retrofit Drawing only 
6 CSP469A-115-340 Shim 
6 85517244-101 Shim 
3 85517347-004 PCU FTG 
Assy, RH 
3 85517347-003 PCU FTG 
Assy, LH 
NOTE: Kit 8MK4837-001 is not procurable. Quantity is shown for replacement 
of all PCU fittings.Replace only fittings which have cracked. 
Listed drawings that are required to complete the kits abovecan be requested by 
writing tothe following email address: 
dwg.request@dehavilland.com 
(3) In addition to the above part(s), the following material(s) are required for the 
completion of this service bulletin and may be procured as single items from 
DeHavilland orpurchaseddirectlyfrom industry sources. 
Each consumable product listed in the table below is given its own unique 
Product ID Number. The number is used to identify a particular recommended 
product, the specifications and the trade names any of whichcan be used 
unless specified otherwise (refer to PSM 1-84-18, Consumab le Products 
Manual).

### Page 12

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 10 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Consumable 
ProductID 
Number 
Qty.PerAircraft Description Remarks 
06-02 A/R Sealant, Corrosion 
Inhibiting 
DHMS S3.06 C-80 
Alternative Proseal
P/S 870 C-12 
Sealant to 
MIL-PRF-81733 
05-01 A/R Adhesive,Room 
Temperature 
Curing, 
Polychloroprene 
Rubber-Based 
DHMS A6.11Type 1
Class 1
07-02 A/R Primer, Fluid-Resis-
tant,Chromate 
Epoxy(F19) 
DHMS C4.01 Type 2
(4) The following parts are required for the completion of this service bulletin and 
may be procured as single items from DeHavilland or purchased directly 
from industry sources. 
Qty.
PerAircraft 
PartNumber Description Remarks 
(AlternateParts) 
24 B0206017TP8 Collar HST1488TP-8
12 B0206016CY8 Collar HST1479CY-8
72 B0206016CY5 Collar HST1479CY-5
12 B0206003AG8-9 Pin HST12AG8-9
12 B0206003AG8-6 Pin HST12AG8-6
12 B0206002AG8-4 Pin HST11AG8-4
72 B0206001AG5-6 Pin HST10AG5-6
NOTE: Alternate part numbers are provided per EO 7336 in the Table and not 
shown in the kitdrawing.

### Page 13

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 11 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
B. PartsRequiredtoModifySpares 
None 
C. SpecialToolsandEquipmentRequired 
Reference Designation Remarks 
8Z10178-001-58 Locating Tool See Figure 6 thru 11 
D. ExistingPartsAccountability 
The following parts may be affected by this service bulletin. Indented parts are 
components of the next higher assembly. The quantity (Qty.)column lists the quantity 
that may be affected per aircraft for non-indented parts andthe quantity per next 
higher assembly forindented parts. 
NOTE: Discard cracked fittings which have been removed from the aircraft. 
Existing parts in spares stock remain serviceable. Refer to Parts 
Disposition List in page 20. 
Existing 
PartNumber Description Qty. IC DC 
NewPart 
Number PNC 
85517347-001 PCU FTG Assy, LH 3 C DIS 85517347-003 S
85517347-002 PCU FTG Assy, RH 3 C DIS 85517347-004 S
IC InterchangeabilityCode 
A Notinterchangeable. 
B Removed Part. No directreplacement. 
C Conditionally Interchangeable. Installation of superse ded part negates the 
intent of this service bulletin.

### Page 14

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 12 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
DC Disposition 
DIS Discard Part. 
MUI Multiple Usage Item: Return tostock if serviceable. 
RWK Rework existing part in accordance with this service bulletin. 
RWI Rework existing part per ..... 
SAL Salvage. Return tooperator’sstores forsalvage consideration. 
PNCPartNumberCode 
N No equivalent DeHavilland part number for reworked part. I ndicate on 
part that this service bulletin has been accomplished. 
R Part numberafterrework. 
S Superseding orequivalent part number.
X Reworked part and superseding part are functionally and ph ysically 
equivalent butnotidentical. 
3. ACCOMPLISHMENT INSTRUCTIONS 
If it is not possible to complete all the instructions of thisservice bulletin because of the 
configuration of the aircraft, speak with a representativeof DHC in the CRC at 1-855-310-1013
or 1-647-277-5820 or email at thd@dehavilland.com for analysis and to get an approved 
disposition tocomplete this service bulletin. 
A. JobSet-Up 
WARNING: PUT SAFETY DEVICES, WARNING SIGNS, AND WARNING 
PLACARDS IN POSITION BEFORE YOU START A PROCEDURE ON 
OR NEAR FLIGHT CONTROLS, FLIGHT CONTROL SURFACES OR 
COMPONENTS THAT MOVE. MAKE SURE THAT THERE ARE NO 
PERSONS OR EQUIPMENT ON OR NEAR THE FLIGHT CONTROL 
SURFACES. ACCIDENTAL MOVEMENT OF THE FLIGHT 
CONTROLS CAN CAUSE INJURIES TO PERSONS AND/OR 
DAMAGETO EQUIPMENT.

### Page 15

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 13 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
WARNING: MAKE SURE SURE THAT THE HYDRAULIC PRESSURE IS OFF, AND 
THAT THERE IS NO PRESSURE IN THE HYDRAULIC SYSTEM. IF 
YOU DO NOT DO THIS YOU CAN CAUSE INJURIES TO PERSONS 
ANDDAMAGETO THEEQUIPMENT.
WARNING: OBEY ALL THE HYDRAULIC SAFETY PRECAUTIONS WHEN YOU 
DO WORK ON THE HYDRAULIC SYSTEM OR A HYDRAULIC 
SYSTEM COMPONENT. IF YOU DO NOT DO THIS, YOU CAN CAUSE 
INJURIESTOPERSONSANDDAMAGETOEQUIPMENT.
WARNING: MAKESUREYOU INSTALL THELOCKPINS ON THE MAIN LANDING 
GEAR. MAKE SURE YOU ENGAGE THE NOSE GEAR LOCK. IF YOU 
DO NOT DO THIS, THE LANDING GEAR CAN ACCIDENTALLY
RETRACT. THIS CAN CAUSE INJURIES TO PERSONS AND 
DAMAGETO THEEQUIPMENT.
WARNING: MAKE SURE YOU INSTALL THE LOCKPINS IN THE DOOR 
MECHANISMS OF THE MLG AND NLG. THE DOOR MECHANISMS 
CAN ACCIDENTALLY CLOSE THE LANDING GEAR DOORS. THIS 
CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO THE 
EQUIPMENT.
(1) Make sure that lock pins are installed through each main gear and main gear 
doormechanism. 
(2) Make sure the nose gear ground lock is engaged. 
(3) Obey all the hydraulic safety precautions (refer to AMMTASK 29-00-00-910-801). 
(4) Remove pressure from the hydraulic systems (refer to AMM TASK 
29-00-00-863-802 and AMM TASK 29-00-00-804). 
(5) Placard and select all aircraft electrical power to OFF. Obey all relevant 
WARNINGS and CAUTIONS (refer to AMM TASK’S 24-00-00-861-80 2 and 
24-00-00-910-801).

### Page 16

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 14 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
(6) Set wheel chocks in frontand behind the landing geartires. 
(7) Set up work scissor lift(s) or platforms to gain access tothe horizontal stabilizer.
Make sure that the scissorlift(s) orwork platforms are electrically grounded. 
(8) Remove the access panels that follow (refer to AMM TASK 55-11-00-992-801, 
AMMTASK 55-21-00-992-801 and Figure 12 forlocations). 
(9) Remove leading edge skins (refer to AMM TASK 55-23-00-000-801 and Figure 
12). 
NOTE: If necessary, remove elevators to access foraccess tothe elevatorfront 
spar web (refertoAMM TASK 27-34-01-000-801). 
AccessPanel Designation 
332AT* Access Panel (LeftInboard PCU) 
332BT* Access Panel (LeftMiddle PCU) 
332CT* Access Panel (LeftOutboard PCU) 
332DB Access Panel (LeftInboard PCU) 
332EB Access Panel (LeftOutboard and Middle PCU) 
333BB Access Panel (LeftInboard and Middle PCU) 
333CB Access Panel (LeftOutboard PCU) 
342AT* Access Panel (Right Inboard PCU) 
342BT* Access Panel (Right Middle PCU) 
342CT* Access Panel (Right Outboard PCU) 
342DB Access Panel (Right Inboard PCU) 
342EB Access Panel (Right Outboard and Middle PCU) 
343BB Access Panel (Right Inboard and Middle PCU) 
343CB Access Panel (Right Outboard PCU) 
* Removal is notrequired for Part A –Inspection

### Page 17

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 15 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
B. Procedure 
PartA– Inspection –ForCracks 
(1) Do a detailed visual inspection of the rear spar web on thehorizontal stabilizer 
rear spar assembly 85517044 and the front spar web 85527122,front spar lower 
angle 85527169 and upper skin panel 85527102 on the elevator assembly 
85527021 around the PCU fittings for cracking (refer to applicable views and 
instructions in drawing 8Z10178, Flag note 15, Figure 4 and Figure 5). 
(a) If cracks or damage are found around the horizontal stabilizer rear spar 
assembly 85517044 and/or elevator assembly 85527021 around the PCU 
fittings during the inspection, contact the Q Series Technical Help Desk by
telephoneat1-855-310-1013or1-647-277-5820oremailat: thd@dehavilland.com
forapproved disposition/action/repair.
(2) Doa detailed visual inspection of each PCU fitting for any cracks ordamage. 
(3) If necessary for access, detach each elevator PCU from it s fitting on the 
horizontal stabilizer rear spar or elevator front spar and support the PCU and 
hold as necessary. (refertoAMM TASK 27-31-36-000-801). 
(4) Remove primer from the area to be fluorescent penetrant inspected. (refer to 
PSM 1-84-3, SRM 51-26-10-02-01 and to Figure 3 and DETAIL B onthe drawing 
8Z10178). 
(5) Clean the area to be fluorescent penetrant inspected (refer to PSM 1-84-3, SRM 
51-26-00-02-01 or SRM 51-26-00-02-02). 
(6) Do the fluorescent penetrant inspection per NDT Manual 1-84-7A, Part 1, Task 
51-00-08-910-801 on the area shown in Figures 2 and 3. For inspection use Type 
1 Method C Sensitivity Level 3 or 4, developer form D. Penetrant dwell time 
minimum 60 min and maximum 120 min. 
(7) If cracks or damage on PCU fittings are found during the inspection and no 
cracks or damages around the horizontal stabilizer rear spar assembly 85517044 
and elevator structure assembly 85527021 around the PCU fittings, do the Part B
–Rectification.

### Page 18

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 16 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
(8) If no cracks or damage are found on PCU fittings during theinspection, touch-up 
all unpainted surfaces with fluid-resistant (F19) chromate epoxy primer to agree 
with applicable instructions in SRM chapter 51-25-10. 
(9) If no cracks or damage are found during the inspection, attach each elevator 
PCU to its fitting on the rear spar or elevator front spar if disconnected in step (3). 
(referto AMMTASK 27-31-36-400-801). 
(10) Dothe rigging of all six PCUs (refer to AMMTASK 27-31-36-830-801). 
(11) Dothe Close-out .
PartB– Rectification 
(1) Remove the elevators (referto AMMTASK 27-34-01-000-801). 
(2) Remove the elevator power control units (PCU) as required (refer to AMM TASK 
27-31-36-000-801). 
NOTE: If a crack is detected, replacement of a single fitting will require all
three PCUs on one side to be completely removed, to fit the locating 
tool 8Z10178-001-58. 
(3) If required, remove the elevator torque tubes (refer to A MM TASK 
27-31-46-000-801). 
(4) If required,remove the hydraulic lines (refer to AMMTASK 29-00-00-000-802). 
(5) Remove and discard the cracked PCU fitting(s), shims andassociated hardware 
(refer to Figure 2 and applicable notes and views/details in the drawing 
8Z10178). 
(a) If a fitting is removed, dothe eddy current inspection perNDT Manual,PSM 
1-84-7A,PART6,TASK51-00-05-250-801onallmatingholesi nthesparwebof
the horizontal stabilizer rear spar assembly 85517044 and the lower skin 
common to the fitting (refer to applicable views and instructions in drawing 
8Z10178 Flag note 4b and Figure 3 and Figure 6). 
NOTE: Only one fitting may be replaced at a time. 
NOTE: Quantity is shown in the drawing for replacement of all PCU fittings. 
Replace only fittings which have cracked.

### Page 19

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 17 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
(6) Locate and secure replacement PCU fitting with tool 8Z10178-001-58 (refer to 
applicable views and instructions in Figure 7 thru 11). 
(a) After fittings are located per Flag note 12, transferhole pattern from sparweb 
and open holes in PCU fitting to full size (refer to applicable views and 
instructions in drawing 8Z10178 Flag note 14 and Figure 5 and6). 
(7) Touch-up all edges and unpainted surfaces with fluid-resistant (F19) chromate 
epoxy primer toagree with applicable instructions in SRMchapter51-25-10. 
(8) Bond shims CSP469A-115-340 to rear spar doubler using DHMS A6.11 TY-1 C-1
(CPM 05-01) adhesive (refertoAMM TASK 51-21-11-340-801).
(9) Install new fitting(s) 85517347-003 (LH) and/or 85517347-004 (RH) (refer to all the 
notes, views and details in the drawing 8Z10178 and Figure 5 and 6). 
NOTE: Do not reuse existing fasteners. If required, replace with first oversize 
Hi-Lite fasteners. Install Hi-Lites perSRMTASK 51-40-15-02-01. 
(10) Fay seal all mating surfaces with DHMS S3.06 type 1 classC-80 seal or Proseal
P/S 870 C-12 sealant to MIL-PRF-81733 (CPM 06-02) (refer to A MM TASK 
51-23-00-390-801). 
(11) Remove the locating tool 8Z10178-001-58. 
(12) If removed, install the hydraulic lines (refertoAMM TASK 29-00-00-400-802). 
(13) If removed, install the elevator torque tubes (refer to AMM TASK 
27-31-46-400-801). 
(14) Install the elevator power control units (PCU) which have been removed (refer to 
AMMTASK 27-31-36-400-801). 
(15) Install the elevators (refer to AMMTASK 27-34-01-400-801). 
C. CloseOut 
(1) Remove all tools and equipment from the work area.

### Page 20

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 18 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
(2) Install the access panels that follow (refer to AMM TASK 55-11-00-992-801, AMM 
TASK 55-21-00-992-801 and Figure 12 forlocations): 
AccessPanel Designation 
332AT* Access Panel (LeftInboard PCU) 
332BT* Access Panel (LeftMiddle PCU) 
332CT* Access Panel (LeftOutboard PCU) 
332DB Access Panel (LeftInboard PCU) 
332EB Access Panel (LeftOutboard and Middle PCU) 
333BB Access Panel (LeftInboard and Middle PCU) 
333CB Access Panel (LeftOutboard PCU) 
342AT* Access Panel (Right Inboard PCU) 
342BT* Access Panel (Right Middle PCU) 
342CT* Access Panel (Right Outboard PCU) 
342DB Access Panel (Right Inboard PCU) 
342EB Access Panel (Right Outboard and Middle PCU) 
343BB Access Panel (Right Inboard and Middle PCU) 
343CB Access Panel (Right Outboard PCU) 
* Removal is notrequired for Part A –Inspection 
(3) Install leading edge skins (refertoAMM TASK 55-23-00-400-801 and Figure 12). 
(4) If fittings are replaced, on incorporation of this ModSum, add the weight and 
balance data shown in Section I of this service bulletin to the Weight and Balance 
Manual PSM 1-84-8. Under ‘Description of Change’ enter “ModSum 4-113983 
incorporated.” 
(5) On incorporation of this ModSum, make an entry that confo rms to local
regulatory requirements in the applicable logbook(s). Enter component serial
numbers if applicable. Enter this ModSum number only after complete and 
functional incorporation of all work defined in this service bulletin.

### Page 21

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 19 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
(6) Use the form on page 33 and submit the results and findingsof this inspection, 
aftercompletion of this service bulletin to 
Q-Series Action Center 
email: thd@dehavilland.com;
Tel. 1-855-310-1013 or1-647-277-5820.

### Page 22

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 20 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ALL FLAGNOTES ANDPART NUMBERS (REFER TO 8Z10178 SHEET 1) 
PartDispositionList

### Page 23

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 21 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
RetrofitLocation 
Figure 1

### Page 24

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 22 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Pre Mod 
Figure 2
RIB8 
RIB11
AUX 
SPAR 
REAR 
SPAR 
RIB10 
RIB9 12 
A
A

### Page 25 (OCR)

SERVICE BULLETIN 84-55-09
4c 42  (0.10)  4a\
BOTH SIDES
DETAIL B
3 PLACES
ALL DIMENSIONS ARE IN INCHES
NOTE
_ REMOVE PRIMER FROM THE AREA TO BE FLUORESCENT PENETRANT
INSPECTED PER PSM 1-84-3, SRM 51-26-10-02-01 AND CLEAN THE
AREA PER PSM 1-84-3, SRM 51-26-00-02-01 OR SRM 51-26-00-02-02.
FLUORESCENT PENETRANT INSPECT AREA SHOWN PER NDT MANUAL
PSM 1-84-7A, PART 1, TASK 51-00-08-910-801. FOR INSPECTION USE
TYPE 1 METHOD C SENSITIVITY LEVEL 3 OR 4, DEVELOPER FORM D.
PENETRANT DWELL TIME MINIMUM 60 MIN AND MAXIMUM 120 MIN. IF FOUND
b) IF FITTING REMOVED EDDY CURRENT INSPECT ALL THE MATING HOLES  TO BE CRACKED, REMOVE FITTING, SHIM AND ATTACHMENT HARDWARE.  cg5827a01.dg, kb/nn, dec16/2019
ON THE SPAR WEB AND LOWER SKIN PER NDT MANUAL, PSM 1-84-7A,
PART 6, TASK 51-00-05-250-801.
c) TOUCH UP ALL UNPAINTED SURFACES WITH FLUID RESISTANT
(F19) CHROMATE EPOXY PRIMER PER SRM TASK 51-25-10.
Inspection Area
Figure 3
07 Jun 2018  S.B. 84-55-09
Revision 'B' 17 Feb 2023  Page 23 of 34
AS

### Page 26 (OCR)

SERVICE BULLETIN 84-55-09
cg5644a01.dg, kb/nn, dec16/2019  DATUM  RIB 11  -65.00  Y 602D  REAR SPAR
85527122
(VIEW LOOKING NORMAL ON ELEVATOR FRONT SPAR)  DATUM  RIB 12  15  -70.500  Y 602D  ‚RIB14  RIB13  RIB12  RIB11
RIB15  15
DATUM  RIB 13  -76.500  Y 602D  FRONT SPAR  10  RIB16  THE DE HAVILLAND TECHNICAL HELP DESK.  FOR CRACKING. IF CRACKING IS FOUND, THE OPERATOR HAS TO CONTACT  85527102 ON ELEVATOR ASSEMBLY 85527021 AROUND THE PCU FITTINGS  85527122, FRONT SPAR LOWER ANGLE 85527169 AND UPPER SKIN PANEL  STABILIZER REAR SPAR ASSEMBLY 85517044 AND THE FRONT SPAR WEB  DETAILED VISUAL INSPECTION OF THE REAR SPAR WEB ON THE HORIZONTAL  NOTE
RH OPPOSITE  LH SHOWN
DATUM  RIB 14  -82.500  Y 602D
85527169  85527102
DATUM  RIB 15  +  -90.500
-96.500  Y602D
Inspection Area - Elevator Front Spar
Figure 4
07 Jun 2018  S.B. 84-55-09
Revision 'B' 17 Feb 2023  Page 24 of 34
AS

### Page 27

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 25 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
PostMod 
Figure5
RIB8 
RIB11
AUX 
SPAR 
REAR 
SPAR 
RIB10 
RIB9 12 
ALL FLAGNOTES,FINDNUMBERSANDPART NUMBERS(REFER TO 8Z10178SHEET 1) 
REFER TOFIGURE 6

### Page 28

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 26 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Section A- A
Figure6
ALL DIMENSIONS AREININCHES 
ALL FLAGNOTES AND PART NUMBERS (REFER TO 8Z10178 SHEET 1)

### Page 29

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 27 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ToolInstallationInstructions–PCU #1Replacement 
Figure7
(FIGURE 11) 
(FIGURE 11) 
(FIGURE 11)

### Page 30

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 28 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ToolInstallationInstructions–PCU #2Replacement 
Figure8
(FIGURE 11) 
(FIGURE 11) 
(FIGURE 11)

### Page 31

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 29 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ToolInstallation– PCU#3Replacement 
Figure9
(FIGURE 11) 
(FIGURE 11) 
(FIGURE 11)

### Page 32

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 30 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ToolInstallationInstructions 
Figure 10 
ALL DIMENSIONS ARE IN INCHES

### Page 33

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 31 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ToolInstallationInstructions 
Figure 11 
ALL DIMENSIONS ARE IN INCHES 
LEGEND

### Page 34

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 32 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Elevator(LHshown)AccessPanels 
Figure 12 
B
BOLT
A
333CB 
(343CB) 
333BB 
(343BB) 
C
B
C
A
NAS8602- 2
BOLT
NAS8602- 2
BOLT
NAS8602- 1
BOLT
NAS8602- 2
BOLT
NAS8602- 1
LEADING EDGE SKIN

### Page 35

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 33 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
Empennage– HorizontalStabilizer– RearSparElevatorPowe rControlUnit (PCU) 
Brackets(Fittings)ReplacementandInspectionoftheEleva torFrontSparWeb 
ModSum4-113983 
(ServiceBulletin84-55-09) 
OperatorName :
ContactInformation: 
Name: 
Phone: 
FaxNo.
e- mail:
Air-
craft 
Serial
No.
Hours Cycles 
PCUFITTINGS(LH) 
Cracks Found 
Yes/No 
PCU#1 PCU#2 PCU#3 
PCU FITTINGS(RH) 
CracksFound 
Yes/No 
PCU#1 PCU#2 PCU#3 
ELEVATOR FRONT 
SPARWEB 
Cracks Found 
Yes/No 
(LH) (RH) 
H/STABILIZERREAR 
SPAR WEB 
CracksFound 
Yes/No 
(LH) (RH)

### Page 36

SERVICEBULLETIN 84-55-09
S.B. 84-55-09
Page 34 of 34
07 Jun 2018 
AS
Revision ‘B’17 Feb 2023
ThisPageIntentionallyBlank 
1

### Page 37

Oct 2019
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
DASH 8 AIRCRAFT
To : CMDB Focal
Email: cmdb.request@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
The data that you provide below will help us record the incorporation of this Service
Bulletin and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Email PDF to:
cmdb.request@dehavilland.com

### Page 38

Oct 2019
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - DASH 8 AIRCRAFT
To: SB Focal, DE HAVILLAND AIRCRAFT OF CANADA LIMITED   
Phone: 1-844-359-3428
Email: george.moffatt@dehavilland.com
From:
Company:
Phone: Extn:
Facsimile: Date:
Email:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Email PDF to:
george.moffatt@dehavilland.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.