# Bombardier Service Bulletin 84-57-24

Copy: Revision A ("U.S. DOT/FAA - Service Information"), 18 pages: PDF https://openairdocs.org/files/sha256/23/3b/233b56487bc148eced09d8db937ccabf5af0349e4221b5969f4a6fd6e260b562; text https://openairdocs.org/service-documents/bombardier/sb-84-57-24/file/233b56487bc1.md. Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2012-0588; AD 2012-20-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Bombardier](https://openairdocs.org/service-documents/bombardier.md)
- Type: Service bulletin (Service Bulletin)
- Number: 84-57-24
- Latest revision known: 84-57-24, Revision A, dated August 6, 2012 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/bombardier/sb-84-57-24

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2012-20-04](https://openairdocs.org/ad/2012-20-04.md), effective Nov 14, 2012: Revision A

## Text (18 pages)

Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2012-0588; AD 2012-20-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Revision ‘A’ 06 Aug 2012
DHC-8 (DASH 8)
SERVICE BULLETIN 84-57-24
Wings - Center Section -Special Inspection - Heat Shield & D Nose -
Relocation of Anchor Nut on Outboard Heat Shield to Avoid Harness
Fouling on Leading Edge Rib - ModSum 4-110440
This page transmits Revision ‘A’ of Service Bulletin 84-57-24, pages 1 thru
14 dated 06 Aug 2012.
This service bulletin is re-issued in its entirety for the reasons that follow:
- the format of this service bulletin is updated to the latest standard. Revision
bars are not applied to any format changes. Revision bars are applied only
beside subject matter to identify technical changes or new information
- added EMPHASIS statement before SUBJECT
-t h e Compliance section is revised with new statement. Added AD number
-t h e References section is revised to convey the latest revision of the service
bulletin and engineering documentation
- revised part of step 3.B.(1) the ACCOMPLISHMENT INSTRUCTIONS
section from ‘visually inspect’ to ‘do a detailed inspection of’
- revised part of step 3.B.(8) the ACCOMPLISHMENT INSTRUCTIONS
section from ‘and Figure 3 or Figure 4 ’t o‘ and Figure 4 or Figure 5 ’.
The Compliance in the previous issues of this service bulletin is not affected
by this revision. No additional rework to the aircraft is introduced by this
revision.
Remove Service Bulletin 84-57-24 Initial Issue and replace with attached.
Previous issues of Service Bulletin 84-57-24:
Initial issue - Pages 1 thru 14 dated 30 Sep 2011

### Page 2 (OCR)

Revision 'A' 06 Aug 2012

### Page 3

D
S.B. 84-57-24
Page 1 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
SERVICE BULLETIN
Customer
Support
ATA SYSTEM: 5700 NUMBER: 84-57-24
BOMBARDIER AEROSPACE REGIONAL AIRCRAFT CONSIDER THIS
SERVICE BULLETIN TO BE PARTICULARLY SIGNIFICANT AND
URGES OPERATORS TO PROMPTLY EVALUATE THE CONTENTS
SUBJECT Wings - Center Section -Special Inspection - Heat Shield & D Nose -
Relocation of Anchor Nut on Outboard Heat Shield to Avoid Harness
Fouling on Leading Edge Rib - ModSum 4-110440
1. PLANNING INFORMATION
A. Effectivity
Aircraft Affected:
In-Service: DHC-8 Aircraft Models 401 and 402 Serial Numbers 4001,
4003 thru 4382.
Verification: ModSum 4-110440 has been incorporated on DHC-8 Aircraft
Model 402 Serial Number 4249 per Post Verification Service
Bulletin 84-57-24.
NOTE: The instructions in this service bulletin are only applicable to the systems
and parts installed at the time of delivery on the aircraft or as changed by
Bombardier Aerospace Service Bulletin(s). Before you do this bulletin,
examine all STC or equivalent action changes to make sure this bulletin
can be completed.
Spares Affected:
None
B. Reason
Problem: Operator’s have reported wire chafing damage at the inboard end rib of the
landing light assembly on both left hand and right hand sides.

### Page 4

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 2 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Cause: A potential fouling condition exists between a wire harness and the inboard
end rib of the landing light assembly on both the left hand and right hand
sides. This harness includes wires for the flare and approach lights, the
position lights and the dual distributing valves.
Solution: Do an inspection of the affected wire harness and repair the harness if
chafing exists. In addition, relocate and install a new anchor nut to
eliminate the fouling condition between the wiring harness and the leading
edge rib.
NOTE: Relocation and installation of new anchor nut to be completed on both
the left and right hand sides, even if there are no signs of chafing.
C. Description
The procedures in this service bulletin give the instructions to do the tasks that
follow:
- aircraft is put into standard configuration for maintenance
- aircraft electrical power is removed
- the nose landing gear lock is engaged
- the main landing gear lock pins are installed thru each main gear and main gear
door mechanism
- the left and right hand nacelle forward f airing assemblies and landing light
leading edge assemblies are removed
- the wiring harness on the left or right hand side is visually inspected for chafing.
The harness is repaired if damage is found
- abrasion protection is installed to the harness
- if installed, the existing plastic grommet is removed and discarded
- the anchor nut is removed and replaced with a new one relocated down by one
fastener pitch on the leading edge rib
- the wiring harness is installed to the anchor nut with the existing clamps, washer
and a new screw and spacer
- a new grommet is installed to the hole
- the rework is done on the opposite side
- the nacelle forward fairing assemblies and the landing light leading edge
assemblies are installed

### Page 5

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 3 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
- an operational test of the landing lights is done
- close out.
D. Compliance
Bombardier Inc. highly recommend that ModSum 4-110440 be incorporated at the
earliest opportunity unless otherwise directed by the operator’s airworthiness
authority.
Transport Canada Airworthiness Directive CF-2012-05.
E. Approval
The technical content of this service bulletin has been approved under the
authority of the Transport Canada Civil Aviation (TCCA) Design Approval
Organization No: DAO #93-Q-02.
This Service Bulletin does not affect Airworthiness Limitations (AWLs) or Damage
Tolerance Inspections (DTIs).
F. Manpower
It will take an estimated 8.50 man-hours to complete this service bulletin. The
breakdown of the man-hours is shown in the table that follows:
TASK MAN-HOURS
Job Set-Up 3.00
Inspection/Procedure 2.00
Test / RTS 0.50
Close-Out 3.00
For any on-site labor assistance, please speak with a Fleet Services representative
for a quote. The Fleet Services group can be contacted via the Q Series Technical
Help Desk by telephone at 416-375-4000 or email at:
thd.qseries@aero.bombardier.com
G. Material - Price and Availability
The part(s) and material(s) detailed in Paragraph(s) 2.A. and 2.B. may be either
furnished or fabricated from the operator’s existing stock, purchased as single
items from Bombardier Aerospace Regional Aircraft or purchased directly from
industry sources.
H. Tooling - Price and Availability
None

### Page 6

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 4 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
I. Weight and Balance
None
J. Electrical Load Data
Not affected
K. Publications Affected
Dash 8 Illustrated Parts Catalogue PSM 1-84-4....................
ModSums Manual PSM 1-84-12..................................
L. References
Revision ‘A’ of this service bulletin was prepared to the engineering drawings and
related data that follows:
DRAWING SHEET REV
8DK4179 1 A
8Z9340 1 A
ModSum 4Q110440 Rev. ‘B’
ModSum 4-110440 Rev. ‘B’
PCA 43644 Revision 3 (for internal reference only)
Transport Canada Airworthiness Directive CF-2012-05.
2. MATERIAL INFORMATION
A. Parts Required Per Aircraft
(1) Detailed Parts List:
Quantity
Per Aircraft
Part Number Description Remarks
2 NAS1801-3-24 Screw (full thread)
2 NAS43DD3-64FC Spacer

### Page 7

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 5 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Quantity
Per Aircraft
RemarksDescriptionPart Number
6 B0205016AD4-4S Rivet see NOTE: 1
2 B0204033-3-4 Anchor Nut see NOTE: 2
2 MS21266-1N Grommet
NOTE 1: B0205016AD4-4S is equivalent to MS20470AD4-4S.
NOTE 2 : B0204033-3-4 is equivalent to T8059S1032B-1CPC (Textron Cherry) or
52LHA71-4-02 (SPS Technologies) or T8059S1032B-1CPC (Republic
Fasteners).
(2) In addition to the above parts, the following materials are required for the
completion of this service bulletin and may be procured as single items from
Bombardier Aerospace Regional Aircraft or purchased directly from industry
sources.
Addresses of manufacturers and suppliers not shown below are listed in
either Maintenance Manual Chapter 20 or in Structural Repair Manual Chapter
51 or, for 400 Series Aircraft, in Consumable Products Manual PSM 1-84-18.
Part Number Qty. Per Aircraft Description
DHMS C4.01 as required Epoxy Primer, Type 2 F19
MIL-C-5541 as required Chemical Conversion Coating, C1
DHMS A6.09 Epoxy Adhesive
9o z or
- Adhesive, Fastweld #10
B. Parts Required to Modify Spares
None
C. Special Tools and Equipment Required
None

### Page 8

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 6 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
D. Existing Parts Accountability
None
3. ACCOMPLISHMENT INSTRUCTIONS
A. Job Set-Up
(1) Placard and select all aircraft electrical power to OFF. Refer to AMM TASK
24-00-00-861-802, TASK 24-00-00-910-801 and obey all relevant WARNINGS
and CAUTIONS.
(2) Make sure that lock pins are installed thru each main gear and main gear door
mechanism.
(3) Make sure the nose gear ground lock is engaged.
(4) Refer to Figure 1 and set up work platforms or ladders as required to gain
access to the wing leading edges at the nacelles. Make sure the work platforms
or ladders are electrically grounded.
(5) Refer to Figure 2 and the applicable steps in AMM TASK 57-23-01-000-801 and
remove and keep left and right hand side landing light leading edge assemblies
85720301 (512AL-left hand side and 612AR-right hand side).
(6) Refer to Figure 3 and AMM TASK 54-12-01-000-801 and remove and keep
nacelle forward fairing assembli es 87144008 (412CT-left hand side and
422CT-right hand side).
B. Procedure
(1) Refer to Figure 6 and do a detailed inspection of the wire harness at left or right
hand anchor nut location for chafing damage. If damaged, repair the wiring
harness per Wiring Diagram Manual Chapter 20-16-10 and Chapter 20-16-20.
(2) Add abrasion protection to the harness if required in accordance with Wiring
Diagram Manual 20-12-10-201-Wiring Maintenance Practices-Section 10,
Installation of Edging Grommet and Spiral Wrap.
(3) If installed, remove and discard existing plastic grommet.
(4) Refer to Figure 4 (left hand side) or Figure 5 (right hand side) and remove and
keep existing clamps DSC184-9 and MS21919WDG6. Discard spacer and
screw, keep washer.
(5) Remove and discard existing anchor nut.
(6) Refer to SRM TASK 51-42-05-00-01, Figure 4 or Figure 5 and plug top rivet hole
using one rivet B0205016AD4-4S.

### Page 9

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 7 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
(7) Refer to SRM TASK 51-42-05-00-01, Figure 4 or Figure 5 and install new anchor
nut B0204033-3-4 at location shown using two rivets B0205016AD4-4S.
(8) Refer to SRM TASK 51-22-45-02-01 or TASK 51-22-35-02-01, AMM TASK
20-00-33-400-801 and Figure 4 or Figure 5 and install new grommet
MS21266-1N as shown with DHMS A6.09 epoxy adhesive or Fastweld #10
adhesive.
(9) Install wiring harness with removed clamps DSC184-9 and MS21919WDG6 to
new anchor nut using kept washer NAS1149D0316H, new spacer
NAS43DD3-64FC and new screw NAS1801-3-24. Torque screw to 20 - 25 inch
pounds.
(10) Re-finish any scuffed surface on the leading edge rib with C1 alodine & F19
epoxy primer.
(11) Temporarily install landing light leading edge assembly 85720301 with four
screws. Do a visual inspection of the relocated harness support area for any
fouling condition.
(12) Remove landing light leading edge assembly 85720301.
(13) Repeat steps B.(1) thru B.(12) for the opposite side.
C. Close Out
(1) Refer to AMM TASK 54-12-01-400-801 and install nacelle forward fairing
assemblies 87144008 (412CT-left hand side and 422CT-right hand side).
(2) Refer to applicable steps in AMM TASK 57-23-01-400-801 and install landing
light leading edge assemblies 85720301 ( 512AL-left hand side and 612AR-right
hand side).
(3) Refer to the steps in section 5. A., B., C., D. of AMM TASK 33-41-01-400-801 and
do an operational test of the landing lights.
(4) Remove all tools and equipment from the work area.
(5) On incorporation of this ModSum, make an entry that conforms to local
regulatory requirements in the applicable logbook(s). Enter component serial
numbers if applicable. Enter this ModSum number only after complete and
functional incorporation of all work defined in this service bulletin.

### Page 10

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 8 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Location of Rework
Figure 1

### Page 11

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 9 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Removal / Installation of Landing Light Leading Edge
Figure 2
LEGEND
1. BOLT
2. SILICONE SEAL
3. LEADING EDGE
1
2
3
1
512AL-LEFT HAND SIDE
612AR-RIGHT HAND SIDE

### Page 12 (OCR)

SERVICE BULLETIN 84-57-24
412CT-LEFT HAND SIDE
422CT-RIGHT HAND SIDE
NOTE
Unidentified holes on fairing item 12
are attached by bolt item 1.
Removal / Installation of Leading Edge Fairing - Forward Nacelle
Figure 3
30 Sep 2011  S.B. 84-57-24
Revision 'A' 06 Aug 2012  Page 10 of 14
MG

### Page 13

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 11 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Looking Inboard on Leading Edge Rib - LH Side
Figure 4
SCREW
NAS1801-3-24
SPACER
NAS43DD3-64FC
RIVET
B0205016AD4-4S
PLASTIC GROMMET
MS21266-1N
ADHESIVE
FASTWELD #10
OR
EPOXY DHMS A6.09
ANCHOR NUT
B0204033-3-4
RIVET
B0205016AD4-4S
CLAMP
(DSC184-9
OR DSC184-10)
MAKE SURE CLAMP
DOES NOT CONTACT
PLASTIC GROMMET
CLAMP
(MS21919WDG6)
RIVET EDGE DISTANCE
FROM CUT OUT EDGEMIN.

### Page 14

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 12 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Looking Inboard on Leading Edge Rib - RH Side
Figure 5
SCREW
NAS1801-3-24
SPACER
NAS43DD3-64FCRIVETB0205016AD4-4S
ANCHOR NUT
B0204033-3-4
RIVET
B0205016AD4-4S
PLASTIC GROMMET
MS21266-1N
ADHESIVE
FASTWELD #10
OR
EPOXY DHMS A6.09
CLAMP
(MS21919WDG6)
RIVET EDGE DISTANCE
FROM CUT OUT EDGE
MIN.
CLAMP
(DSC184-9
OR DSC184-10)
MAKE SURE CLAMP
DOES NOT CONTACT
PLASTIC GROMMET

### Page 15

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 13 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
Fouling Condition On Leading Edge Rib - Pre Mod Illustration
Figure 6
INBOARD

### Page 16

SERVICE BULLETIN 84-57-24
S.B. 84-57-24
Page 14 of 14
30 Sep 2011
MG
Revision ‘A’ 06 Aug 2012
This Page Intentionally Blank
2

### Page 17

Jan 2009
SERVICE BULLETIN (SB) - - - RECORD OF INCORPORATION
- - - Q SERIES DASH 8 AIRCRAFT
To : CMDB Focal
Facsimile: (1) 416 375 4538
E- -mai l: cmdb.requests@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
The data that you provide below will help us record the incorporation of this ModSum
and the aircraft effectivity in the maintenance manual.
Operator: Service Bulletin: __________________ Revision: _________
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Aircraft Serial Number: Model Number: Date Bulletin Completed:
Fax this sheet to (1) 416 375 4538 or Email PDF to:
cmdb.requests@aero.bombardier.com

### Page 18

Feb 2009
SERVICE BULLETIN (SB) - - - COMMENT SHEET - - - Q SERIES DASH 8 AIRCRAFT
To : SB Focal (T oronto), Bombardier Aerospace Commercial Aircraft
Phone: (1) 416 375 4078 Facsimile: (1) 416 375 4538
E- -mai l: syed.rizvi@aero.bombardier .com
From:
Company:
Phone: Extn:
Facsimile: Date:
E- -mai l:
Select appropriate box(es) and add comments or suggestions you would like us to know
that may enhance the quality of our service bulletins.
Service Bulletin: Revision: ModSum:
1. PLANNING INFORMATION
V Effectivity V Reason V Description V Compliance
V Approval V Manpower V Material V Weight and Balance
V Electrical Load V T ooling V References V Publications Affected
2. MATERIAL INFORMATION
V Kit Content V Special T ools/Equipment V Parts to Modify Spares
V Consumables V Disposition of Existing Parts V Other
3. ACCOMPLISHMENT INSTRUCTIONS
V J o b S e t --- U p V Procedure V Close- - -Out V Te s t
V Illustration(s) V Other
4. COMMENTS, REMARKS, SUGGESTIONS
Fax this sheet to (1) 416 375 4538 or Email PDF to:
syed.rizvi@aero.bombardier.com

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
