# Bombardier Temporary Revision 5-268: No revision named

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2025-0616; AD 2025-17-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Temporary Revision 5-268](https://openairdocs.org/service-documents/bombardier/tr-5-268.md)
- Title as filed: TR 5-268 dated 23-Dec-2022
- Pages: 2
- PDF: https://openairdocs.org/files/sha256/4d/fb/4dfb472b5abd63a2eb9e303ff8c4d7519c686e154d1c1f3a75610c4051333d11
- Page: https://openairdocs.org/service-documents/bombardier/tr-5-268/file/4dfb472b5abd

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

REASON FOR ISSUE: To introduce a task for the Forward Pressure Bulkhead Cap Angle − Aft Side.
ACTION: Add the task that follows to the list of Chapter 53 Checks:
TIME LIMITS/MAINTENANCE CHECKS
PSP 601−5
TEMPORARY REVISION NO. TR 5−268
INSERT IN SECTION 5−10−30
FACING PAGE 24
EFFECTIVITY:   ALL TR 5−268
5−10−30 Page 1 of 2Dec 23/2022
NOTE: Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS and the LIST OF
EFFECTIVE TEMPORARY REVISIONS sheets at the front of this publication.

### Page 2

MAINTENANCE CHAPTER 53 CHECKS CHECK ZONE ACCESS
MANUAL − CH. 5 DESCRIPTION INTERVAL
REFERENCE
53−10−01−103 * Forward Pressure Bulkhead Cap Angle − Aft Side
• Visual Check
(Ref. PSP 612, Part 9, VC−53−10−91)
A/C 3001 to 3042
PHASE−IN: For aircraft with 6921 Landings or less, this check
must be accomplished at or before 7521
Landings. For aircraft with more than 6921
Landings, this check must be accomplished within
600 Landings.
T 7521  L
R 4311  L
A/C 3043 to 3066
PHASE−IN: For aircraft with 11661 Landings or less, this
check must be accomplished at or before 12261
Landings. For aircraft with more than 11661
Landings but not more than 16272 Landings, this
check must be accomplished within 600 Landings
but no later than 16572 Landings, whichever
comes first. For aircraft with more than 16272
Landings, this check must be accomplished within
300 Landings.
T 12261  L
R 4311  L
114
115
221
223
TIME LIMITS/MAINTENANCE CHECKS
PSP 601−5
EFFECTIVITY:   ALL TR 5−268
5−10−30 Page 2 of 2Dec 23/2022

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
