# Bombardier Service Bulletin TR51-027: No revision named

- Rights: © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-2012, the docket of AD 2025-02-03. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bombardier Service Bulletin TR51-027](https://openairdocs.org/service-documents/bombardier/tr51-027.md)
- Title as filed: TR51-027
- Pages: 11
- PDF: https://openairdocs.org/files/sha256/ea/a5/eaa5282d4fb4d6bd3f33285f92a0efc6b1f227456b699945526bf731f878b6f1
- Page: https://openairdocs.org/service-documents/bombardier/tr51-027/file/eaa5282d4fb4

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

NONDESTRUCTIVE TESTING MANUAL
Part 4 -  Ultrasonic
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Page 1
51- 53- 61- 870
EFFECTIVITY: SEE PARAGRAPH 2
FILING INSTRUCTIONS: Insert this Temporary Revision facing TASK Part 4, 51- 53- 61- 870.
Record the incorporation of this Temporary Revision on the yellow
RECORD OF TEMPORARY REVISIONS sheet at the front of this
volume.
Keep this Temporary Revision until Revision 45 incorporates this
information into the Nondestructive Testing Manual.
DESCRIPTION:
This Temporary Revision revises TASK Part 4, 51- 53- 61- 870
INSPECTION OF THE UPPER AND LOWER WEBS AND DOUBLERS,
AND AFT WEB OF THE REPAIR ENGINE SUPPORT BEAM AT
FS640.00 to introduce a new calibration reference standard (CRS)
and make other miscellaneous changes.
Part 4
TEMPORARY REVISION 51- 027
TR 51- 027
of 11
Sep 15/23

### Page 2

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
INSPECTION OF THE UPPER AND LOWER WEBS AND DOUBLERS, AND AFT WEB OF THE
REPAIR ENGINE SUPPORT BEAM AT FS640.001. 
General
A. Function
(1) This inspection procedure is used to detect subsurface cracks propagating in the
forward−to−aft direction at the following locations:
− First outer aft row of fastener holes in the upper and lower webs of the engine
support beam covered by the inner ribs, along WL119.12 and WL111.09 at 
BL18.00, and BL0.00 at FS640.00
− First outer forward and aft (along FS640.00) row of fastener holes in the upper
and lower doubler angle horizontal flange of the engine support beam covered by
the external longitudinal stiffeners, along WL119.12 and WL111.09 at BL31.41 
(upper doubler angle only), BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, 
and BL0.00 at FS640.00
− Lower row of fastener holes in the aft web at the upper doubler angle vertical
flange of the engine support beam covered by the inner ribs at BL18.00 and 
BL0.00 at FS640.00
− Upper row of fastener holes in the aft web at the lower doubler vertical flange of
the engine support beam covered by the inner rib at BL18.00 and BL0.00 at 
FS640.00
− Upper and lower row of fastener holes in the upper and lower doubler vertical 
flange of the engine support beam covered by the external vertical stiffeners at
BL27.50 and BL9.50 at FS640.00.
NOTE: The inspection applies to both sides of the aircraft.
B. Reference Information
(1) For additional data that is necessary to do this inspection, refer to the manuals that
follow:
− Nondestructive Testing Manual (NDTM), Part 1−General Information 
− Structural Repair Manual (SRM)
− Aircraft Maintenance Manual (AMM).
            (2)      This inspection must be done by a Level II or Level III ultrasonic qualified individual
certified to an NDT Standard approved by the National Airworthiness Authority .
C. Location
(1) The engine support beam is located in Zone 310 (Refer to NDTM Part 1, 51−01−03).
D. Access
(1) Access to the inspection area is through the aft−equipment compartment door
311BB (Refer to NDTM Part 1, 51−01−04).
(2) It is recommended that the removal of the auxiliary power unit (APU) and the
complete APU enclosure be removed to gain access to the engine support beam.
E. Parts Examined in This Procedure
Refer to Table 1.
        
TR 51- 027
Page 2 of 11
Sep 15/23

### Page 3

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
Table 1 − Part Identification Data  
ITEM
NO. [1] DESCRIPTION DRAWING OR PARTNUMBER [2] MATERIAL SPECIFICATION
1 Upper web 601−35006−3 7075−T62 Al QQ−A−250/132 Lower web 601−35006−5 7075−T62 Al QQ−A−250/13
3 Aft web 601−35006−9
4 Upper doubler angle 601R−53−61−870−1 2024−T42 Al QQ−A−250/5
5 Lower doubler angle 601R−53−61−870−6
NOTE [1]: Parts that do not include an item number are not identified in Figure 2.
NOTE [2]: Numbers that do not include a dashed suffix are drawing numbers.
2. Effectivity
A. All aircraft incorporating REO 601R−53−61−870.
NOTE: NDTM Part 6, 51−53−61−870 must be accomplished in order to complete the
full inspection.3. 
Tools and Equipment
A. Use the items identified as follows, or their equivalent (Refer to NDTM Part 1, 51−20−04):
NOTE: Equivalent ultrasonic equipment may be used provided that it satisfies the 
requirements of this procedure and is capable of resolving the reference notch in
the calibration standard at the required level of resolution. 
− Ultrasonic Flaw Detector
Sonatest Model: UFDS
− Miniature angle beam transducer, 5.0 MHz frequency, 45 degrees refractive angle in
aluminum, contact surface 0.250 in (6.35 mm) by 0.375 in (9.52 mm) 
VM Products Model: VM 7−121
− Coaxial cable (BNC to microdot)
− Inspectech LTD Gorptech Industrial Ultrasonic Couplant Gel
− MHI RJ Aviation calibration reference standard No. EXCM601R30039, similar in material
and cross section as the inspection area and contains electrical discharge machined 
(EDM) notches
− High intensity light source.
4. Preparation and Cleaning
A. Prepare the inspection area as follows:
(1) Identify the location to be inspected.
(2) Open the aft−equipment compartment door 311BB to get access to the engine
support beam (Refer to the AMM, Chapter 6).
(3) Remove the APU and the complete APU enclosure (Refer to the AMM,
49−11−01−000−801).
        
TR 51- 027
Page 3 of 11
Sep 15/23

### Page 4

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
WARNING: MAKE SURE THAT THERE IS A GOOD FLOW OF CLEAN AIR AND
SUFFICIENT FIRE PROTECTION.  USE APPROVED BODY PROTECTION
WHEN YOU USE SOLVENTS.  ALL SOLVENTS ARE POISONOUS AND
SOME ARE FLAMMABLE.
(4) Clean the inspection surfaces (Refer to the SRM, 51−26−00).
NOTE: It is not necessary to remove the finish from the parts unless it shows
deterioration or local damage.
(5) If the finish in the area to be inspected is damaged or deteriorated, remove the finish
(Refer to the SRM, chapter 51).
5. Inspection for Subsurface Cracks Initiating From the First Forward Row of Fasteners in the
0.032−in (0.81−mm) Thick Section of the Upper and Lower Webs Along WL119.12 and
WL111.09 at BL0.00, FS640.00
A. Equipment Calibration
Refer to Figure 1.
(1) Calibrate the ultrasonic equipment as follows:
(a) Connect the transducer (VM 7−121) with the coaxial cable to the ultrasonic
instrument.
(b) Turn the power ON and set the instrument to pulse−echo test mode and 5 MHz
test frequency.
(c) Apply an even layer of couplant gel on the 0.032−in (0.813−mm) thick section
of the −3 web adjacent to the −4 and −5 angles (0.62−in (15.75−mm) edge 
distance side) of reference standard EXCM601R30039.
(d) Do the instrument calibration on the reference standard as follows:
1 Place the front of the transducer against the −4 angle so that the sound
beam is directed at EDM notch A (Notch Echo A (NEA)) (Refer to 
Transducer Placement 1 in Figure 1).  Manipulate the transducer by 
swiveling the transducer toward and away from the NEA to obtain a 
maximized reflection signal.
2 Adjust the GAIN to obtain a 100% full screen height (FSH) signal from NEA. 
3 Use the DELAY and RANGE controls to set the leading edge of the
reflection signal from NEA at 20% of the horizontal limit on the baseline.
        
TR 51- 027
Page 4 of 11
Sep 15/23

### Page 5

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
rnd5361870_001.dg, lr/yf, 25/02/05
0.62 in.
(15.75 mm)
0.62 in.
(15.75 mm)
TRANSDUCER
PLACEMENT 1
A
B
TRANSDUCER
PLACEMENT 2
−3 WEB
CALIBRATION REFERENCE STANDARD EXCM601R30039
AND TRANSDUCER PLACEMENT
CHEM MILL
LINE
(REF)
0.050 in.
(1.27 mm)
0.25 in.
(6.35 mm)
−4 ANGLE
−5 ANGLE
−3 WEB
EDM NOTCH
NEA
CRT DISPLAY
IP
EFH
IP
NEB
TRANSDUCER PLACEMENT 2
50 1000
TRANSDUCER PLACEMENT 1
50 1000
NOTES
50
100
SIGNAL AMPLITUDE
50
100
SIGNAL AMPLITUDE
IP = Initial pulse.
NEA = Notch echo from
EDM notch A.
CRT DISPLAY
0.032 in.
(0.81 mm)
(4 PLACES)
NEB = Notch echo from
EDM notch B.
Calibration Reference Standard EXCM601R30039 and Transducer Placement, and CRT Dis-
plays of Calibration Notch Signals
Figure 1
        
TR 51- 027
Page 5 of 11
EFH = Echo from
            Fastener Hole.
Sep 15/23

### Page 6

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
B. Inspection Procedure 
Refer to Figure 2.
(1) Do the inspection as follows:
NOTE: This inspection is performed internally via the cutout holes in the aft web.
A nonrelevant indication from the fastener hole may or may not appear 
when the sound beam is in line with the center of the fastener, but the 
indication will always appear closer to the initial pulse or left side of the 
CRT screen than a discontinuity indication.
(a) After calibration as outlined in paragraph 5.A., apply an even layer of couplant
gel on the 0.032−in (0.81−mm) thick section of the upper and lower webs 
adjacent to the edge of the upper and lower rib flanges of the first forward outer 
row of fasteners at BL0.00, approximately at FS633.00.  There are a total of two 
fastener locations (identified with the symbol ), one at the lower web and one 
at the upper web, that require inspection (Refer to Figure 2, Sheet 1 and Sheet 
2).
(b) Couple the transducer to the upper web with the front of the transducer against 
the edge of the rib flange at BL0.00.  Scan both sides of the forward outer
fastener with a slight swivel movement toward and away from the fasteners. 
Use the edge of the rib flange as a transducer guide.
(c) Repeat step 5.B.(b) for the fastener on the lower web.
(d) Note all relevant indications 50% FSH or greater and its location on the part.
Ensure the indication is not from the fastener hole. 
C. Acceptance or Rejection Criteria
(1) Any distinct indication with an amplitude signal of 50% FSH or greater is classified as
a crack and cause for rejection.
(2) Record and report results in accordance with company guidelines and policies.
(3) For indications that exceed the allowable limits, it is recommended that you contact
MHIRJ Customer Support (refer to SRM 51−13−01).
6. Inspection for Subsurface Cracks Initiating From Fasteners of the Upper and Lower Webs (at 
BL18.00 only) and Doubler Angles and Aft Web (at BL0.00 and BL18.00) Along WL119.12 and
WL111.09 at BL31.41, BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00, at 
FS640.00
A. Equipment Calibration
Refer to Figure 1.
(1) Calibrate the ultrasonic equipment as follows:
(a) Apply an even layer of couplant gel on the 0.050−in (1.27−mm) thick section 
of the −3 web adjacent to the −4 and −5 angles (0.620−in (15.75−mm) edge
distance side) of reference standard EXCM601R30039.
(b) Do the instrument calibration on the reference standard as follows:
1 Place the front of the transducer against the −4 angle so that the sound
beam is directed at EDM notch B (Notch Echo B (NEB)) (Refer to 
Transducer Placement 2 in Figure 1).  Manipulate the transducer by 
swiveling the transducer toward and away from NEB to obtain a maximized 
reflection signal.
        
TR 51- 027
Page 6 of 11
Sep 15/23

### Page 7

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
rnd5361870_002.dg, yf, 24/02/05
VIEW LOOKING DOWN
ON TOP SURFACE
LBL36.20 LBL9.50
BL0.00
LBL4.28LBL31.41
LBL27.50
LBL22.30
LBL18.00
LBL13.30
FS
625.30
FS
640.00
0.063 in. (1.60 mm)
THICKNESS
SECTION OF WEB
CHEM MILL
LINE
(REF)
0.050 in. (1.27 mm)
THICKNESS
SECTION OF WEB
0.032 in. (0.81 mm)
THICKNESS
SECTION OF WEB CHEM MILLLINE
(REF)
4
INSPECTSYMBOL
− Inspect upper web via cutout in the aft
  web on both sides of these fasteners.
− Inspect upper doubler angle (horizontal flange)
  externally on both sides around these fasteners.
TYPICAL TRANSDUCER PLACEMENT
AND MOVEMENT. BOTH SIDES OF
FASTENER TO BE INSPECTED.
TRANSDUCER
OF ENGINE SUPPORT BEAM
LEGEND
1. Upper web.
4. Upper doubler angle.
1
Inspection Locations of the Engine Support Beam
Figure 2, Sheet 1
        
TR 51- 027
Page 7 of 11
Sep 15/23

### Page 8

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
rnd5361870_003.dg, yf, 24/02/05
VIEW LOOKING UP
ON LOWER SURFACE
INSPECTSYMBOL
− Inspect lower web via cutout in the aft
  web on both sides of these fasteners.
− Inspect lower doubler angle (horizontal flange)
  externally on both sides around these fasteners.
LBL18.00 LBL9.50LBL13.30 LBL4.28
FS
625.30
FS
640.00
LBL27.50 LBL22.30
0.032 in. (0.81 mm)
THICKNESS
SECTION OF WEB
0.050 in. (1.27 mm)
THICKNESS
SECTION OF WEB
0.063 in. (1.60 mm)
THICKNESS
SECTION OF WEB
OF ENGINE SUPPORT BEAM
TYPICAL TRANSDUCER PLACEMENT
AND MOVEMENT. BOTH SIDES OF
FASTENER TO BE INSPECTED.
TRANSDUCER
LEGEND
2. Lower web.
5. Lower doubler angle.
5
2
BL0.00
Inspection Locations of the Engine Support Beam
Figure 2, Sheet 2
        
TR 51- 027
Page 8 of 11
Sep 15/23

### Page 9

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
rnd5361870_004.dg, yf, 25/02/05
VIEW LOOKING FORWARD AT FS640.00
ON AFT WEB OF ENGINE SUPPORT BEAM
INSPECTSYMBOL
− Inspect aft web (Covered by inner ribs) via cutout
in the aft web on both sides of these fasteners.
− Inspect lower doubler angle (Vertical flange)
externally on both sides of these fasteners.
− Inspect upper doubler angle (Vertical flange)
externally on both sides of these fasteners.
WL
119.12
WL
111.09
LBL36.20
LBL31.41
LBL27.50 LBL18.00
LBL13.30
LBL9.50
LBL4.28
BL0.00
LBL22.30
TYPICAL TRANSDUCER PLACEMENT
AND MOVEMENT. BOTH SIDES OF
FASTENER TO BE INSPECTED.
TRANSDUCER
LBL9.50
4
3 5
LEGEND
3. Aft web.
4. Upper doubler angle.
5. Lower doubler angle.
Inspection Locations of the Engine Support Beam
Figure 2, Sheet 3
        
TR 51- 027
Page 9 of 11
Sep 15/23

### Page 10

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 22 
Adjust the GAIN to obtain a 100% FSH signal from NEB.
3 Use the DELAY and RANGE controls to set the leading edge of the
reflection signal from NEB at 20% of the horizontal limit on the baseline.
B. Inspection Procedure
(1) Inspect the 0.050−in (1.27−mm) thick sections of the upper web and aft web
fastener locations as follows:
NOTE: Access to the upper web surface at BL18.00 and aft web surface at BL0.00
and BL18.00 is through the cutout holes in the aft web.  The fastener 
locations that require inspection are identified with the symbol .
(a) After calibration as outlined in paragraph 6.A., apply an even layer of couplant
gel on the 0.050−in (1.27−mm) thick section of the upper and lower webs 
adjacent to the edge of the rib flanges for the fasteners to be inspected at 
BL18.00 and for the aft web at BL18.00 and BL0.00.
(b) Couple the transducer to the upper web with the front of the transducer against
the edge of the rib horizontal flange at BL18.00.  Scan both sides of the 
fasteners with a slight swivel movement toward and away from the fastener. 
Use the edge of the rib as a transducer guide (Refer to Figure 2, Sheet 1).
(c) Couple the transducer to the lower web with the front of the transducer against
the edge of the rib horizontal flange at BL18.00.  Scan both sides of the 
fasteners with a slight swivel movement toward and away from the fastener. 
Use the edge of the rib as a transducer guide (Refer to Figure 2, Sheet 2).
(d) Couple the transducer to the aft web, upper corner, lower fastener with the front
of the transducer against the edge of the rib vertical flange at BL0.00, with the 
sound beam directed toward the lower fastener to be inspected.  Scan both 
sides of the fastener with a slight swivel movement toward and away from the 
fastener.  Use the edge of the rib flange as a transducer guide (Refer to
Figure 2, Sheet 3).
(e) Repeat step 6.B. (1) (d) for the aft web lower corner at BL0.00, upper fastener. 
(f) Repeat step 6.B. (1) (d) for the aft web upper corner at BL18.00, lower fastener.
(g) Repeat step 6.B. (1) (d) for the aft web lower corner at BL18.00, upper fastener. 
(h) Note all relevant indications 50% FSH or greater and its location on the part.
Ensure the indication is not from the fastener hole. 
(2) Inspect the upper and lower doublers as follows:
NOTE: Access to the inspection area of the upper and lower doublers is from the
exterior of the engine support beam.
The fastener locations that require inspection are identified with these 
symbols: , , , unless otherwise noted.
(a) After calibration as outlined in paragraph 6.A., apply an even layer of couplant
gel as follows:
− On the upper doubler horizontal flange adjacent to the edge of the upper
longitudinal stiffeners at the aft and forward row of fasteners to be inspected 
at BL31.41, BL27.50, BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and 
BL0.00
        
TR 51- 027
Refer to Figure 2.
Page 10 of 11
Sep 15/23

### Page 11

NONDESTRUCTIVE TESTING MANUAL
Part 4 − Ultrasonic
Part 4
51−53−61−870
EFFECTIVITY: SEE PARAGRAPH 2
− On the upper doubler vertical flange adjacent to the vertical stiffener flange
fasteners at BL27.50 and BL9.50
− On the lower doubler horizontal flange adjacent to the edge of the lower
longitudinal stiffeners at the outer aft and forward row of fasteners to be 
inspected at BL27.50, BL22.30, B.18.00, BL13.30, BL9.50, BL4.28, and 
BL0.00
− On the lower doubler vertical flange adjacent to the vertical stiffener flange
fasteners at BL27.50 and BL9.50.
(b) Couple the transducer to the upper doubler horizontal flange with the front of
the transducer against the edge of the longitudinal stiffener at BL31.41.  Scan 
both sides of the fastener with a slight swivel movement toward and away from 
the fastener.  Use the edge of the stiffener as a transducer guide.
(c) Repeat step 6.B(2)(b) on the upper doubler horizontal flange at BL27.50,
BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00.
(d) Repeat step 6.B(2)(b) on the lower doubler horizontal flange at BL27.50,
BL22.30, BL18.00, BL13.30, BL9.50, BL4.28, and BL0.00.
(e) Repeat step 6.B(2)(b) for the upper doubler vertical flange, upper fastener at
BL27.50 and BL9.50.
(f) Repeat step 6.B(2)(b) for the lower doubler vertical flange, lower fastener at
BL27.50 and BL9.50.
(g) Note all relevant indications 50% FSH or greater and its location on the part.
Ensure the indication is not from the fastener hole.
C. Acceptance or Rejection Criteria
(1) Any distinct indication with an amplitude signal of 50% FSH or greater is classified as
a crack and cause for rejection.
(2) Record and report results in accordance with company guidelines and policies.
(3) For indications that exceed the allowable limits, it is recommended that you contact
MHIRJ Customer Support (refer to SRM 51−13−01).
7. Close Out
A. Remove ultrasonic couplant gel from the inspection surfaces.
B. Make sure that NDTM Part 6, 51−53−61−870 has been completed.
C. If the finish in the inspection area was removed, replace the finish (refer to the SRM,
Chapter 51).
D. Install the APU and the complete APU enclosure (Refer to the AMM,
49−11−01−400−801).
E. Remove all tools, equipment, and unwanted materials from the work area.
        
TR 51- 027
Page 11 of 11
Sep 15/23

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.