# CFM International Service Bulletin CFM56-5B 72-0850: No revision named

- Rights: © CFM International. Filed by the FAA in regulations.gov docket FAA-2015-2983; AD 2016-02-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [CFM International Service Bulletin CFM56-5B 72-0850](https://openairdocs.org/service-documents/cfm/cfm56-5b-72-0850.md)
- Title as filed: CFM56-5B SB 72-0850
- Pages: 25
- PDF: https://openairdocs.org/files/sha256/d3/6f/d36f6d8a5a5083c7e814664da4246b855bb52be806d717b9edd02c896c30b2f0
- Page: https://openairdocs.org/service-documents/cfm/cfm56-5b-72-0850/file/d36f6d8a5a50

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
CFM PROPRIETARY INFORMATION
The information contained in this document is CFM proprieta ry information and is disclosed in
conﬁdence. It is the property of CFM and shall not be used, disclos ed to others or reproduced
without the express written consent of CFM, including, but without limitation, it is not to be used in
the creation, manufacture, development, or derivation of a ny repairs, modiﬁcations, spare parts,
design, or conﬁguration changes or to obtain FAA or any other government or regulatory approval
to do so. If consent is given for reproduction in whole or in pa rt, this notice and the notice set
forth on each page of this document shall appear in any such re production in whole or in part.
The information contained in this document may also be contr olled by U.S. export control laws.
Unauthorized export or re-export is prohibited.
All technical documentation and information contained her ein, with respect to assembly and
disassembly, cleaning, inspection methods and limits, rep air methods and limits, operational
limits, life limits and the like, have been developed and app roved for use with engines and parts
that have been manufactured and/or approved by CFM and that h ave been maintained in
accordance with CFM technical documentation and recommend ations. CFM has no contractual
or legal obligation for, nor knowledge of, non-CFM-approve d parts and repairs. Accordingly, this
document is not intended to apply to non-CFM-approved parts and repairs.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 1 of 25

### Page 2

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
1. PLANNING INFORMATION
A. Effectivity
CFM56-5B1, -5B2, -5B4, -5B5, -5B6, -5B7
CFM56-5B1/P, -5B2/P, -5B3/P , -5B4/P, -5B5/P, -5B6/P, -5B7/P, -5B8/P , -5B9/P
CFM56-5B3/P1, -5B4/P1
(1) This Service Bulletin affects all Turbine Rear Frames (TRF) P/N 338-102-907-0 and
338-102-908-0 installed on CFM56-5B engine model.
B. Description
This Service Bulletin gives instructions for on wing or in sh op inspection of the TRF struts
in order to increase the life of the TRF. The three mount strut s of the TRF have to be
inspected. Refer to Figure 1.
C. Compliance
Category 7
Do at customer convenience but before the TRF reaches 32,000 cycles since new for
commercial engine models and 25,000 cycles for corporate jet engine models (CFM56-5B6,
-5B7, -5B6/P, -5B7/P).
For TRF disposition/re-inspection intervals, refer to par agraphs 3.D.(2) and 3.E.(2).
NOTE: The Service Bulletin can be accomplished in shop or on wing.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
To do an inspection.
To increase the life of the TRF. Refer to Engine Shop Manual ATA 05-12-04 for life
limits and to Engine Shop Manual ATA 05-21-03 for inspections.
(2) Condition:
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 2

### Page 3

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
TRF may exhibit cracks, initiating at leading and trailing e dge of the mount struts, in
the transition radius between the struts and in the outer rin g ﬁllet radius.
(3) Cause:
High thermal gradient between the struts and the outer ring.
(4) Improvement:
This Service Bulletin provides the procedure and equipment to inspect the TRF
mount struts.
(5) Substantiation:
Substantiation is by analysis.
F. Approval
The technical content of this document is approved by the FAA and under the authority of
DOA n°EASA.21J.086.
G. Manpower
You will need approximately 3 man-hours for each engine to do this Service Bulletin. This
estimation does not include the time needed to get access to t he inspection areas.
H. Weight and Balance
Weight and Balance are not changed.
I. References
CFM56-5B Engine Shop Manual , CFMI-TP.SM.9
A318/A319/A320/A321 Aircraft Maintenance Manual
CFM56 Consumable Products Manual , CFMI-TP.CP.3
CFM56 Standard Practice Manual , CFMI-TP.SP .2
J. Publications Affected
CFM56-5B Engine Shop Manual , CFMI-TP.SM.9 ATA 05-12-04, 05-21-03 and 72-56-01.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 3

### Page 4

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
K. Interchangeability
The physical and the functional interchangeabilities are n ot affected.
L. Software Accomplishment Summary
None.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
None.
(3) Consumables:
Code Number Description
CP1040 Methyl Ethyl Ketone
CP2189 Durite G422
CP2191 Durite G421
B. Industry Support Information
None.
C. Conﬁguration Chart
None.
D. Disposition of Parts
None
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 4

### Page 5

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
E. Tooling - Price and Availability
Description Supplier
Nortec Model NDT 19, 19e, 19e2, 24,
1000, 1200 or -3000.
OLYMPUS NDT
421 North Quay Street
WA 99336
KENEWICK
USA
or
ANAFAB
3 avenue Marcel Dassault
78310 Coigneres
FRANCE
Rohman Elotest family Rohmann GmbH
Rudolf-Diesel-Str.13
D-67227 Frankenthal
DEUTCHLAND
or
Intercontrole IC ESCOFFIER
Parc d'activités de la route des lacs
BP 612
27106 VAL DE REUIL
FRANCE
NOTE 1: Any equivalent equipment approved by Snecma/CFM can be use d instead of
listed above.
Tool No. Description
856A2692G01 Eddy current inspection kit of rear frame
NOTE 2: The inspection kit containing all required tooling can be o btained from CFM
by contacting the following address:
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 5

### Page 6

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
North and South America and Asia Customers
CFM Inc. Customers
Europe, Middle East and Africa Customers
CFM SA Customers
CFM international
Quality Technology Center
One Neumann Way, MD:
QB Cincinnati, OH 45215 USA
Attention: Brenda Tenley
Phone: (513)552 4701
Fax: (513)552 4892
e-mail: brenda.tenley@ge.com
CFM international
Snecma
Manager CFM56 Tooling Programms
Site de Melun-Montereau
BP 1936
77019 Melun Cedex
FRANCE
Phone: 33 1 64 14 80 89
Fax: 33 1 64 14 87 65
e-mail: snecma.tooling@snecma.fr
3. ACCOMPLISHMENT INSTRUCTIONS
A. General
WARNING: METHYL ETHYL KETONE IS TOXIC. USE PERSONAL PROTECTION
EQUIPMENT. USE IN A WELL-VENTILATED AREA.
(1) Get access to the TRF for on wing inspection.
(a) Remove the primary nozzle assy. Refer to Aircraft Maintenan ce Manual
(AMM), ATA 78-11-01, TASK 78-11-01-000-801.
(b) Remove the primary plug assy. Refer to AMM, ATA 78-11-02, TAS K
78-11-02-000-801.
(2) Get access to the TRF for on wing or in shop inspection.
(a) Remove the ﬂame arrestor and the rear cover. Refer to AMM, TASK
72-56-00-000-802 or Engine Shop Manual (ESM) ATA 72-00-03 R EMOVAL
001
(3) Do a visual inspection of the areas to be inspected. Mark on th e part at the location
of all blends, nicks, or other anomalies which may cause an in dication during the
inspection. If needed use Methyl Ethyl Ketone (CP1040) , Dur ite G422 (CP2189) or
Durite G421 (CP2191) to clean the part.
B. Eddy current calibration and inspection:
The four speciﬁc areas to be inspected on the three mounts struts position 1, 3 and 14 are
detailed on Figure 1. The calibration block is described on F igure 2.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 6

### Page 7

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
(1) Calibrate the eddy current instrument to the initial settin gs as follows:
(a) Permit the eddy current instrument to warm up. Refer to the in structions
of the manufacturer.
(b) Set the eddy current instrument to the initial settings as below with the example
of Rohmann Elotest B300 instrument.
Instrument type Frequency Range Gain Filters
Elotest B300 1 to 2 MHz Preampli ﬁer: auto LP: 100
HP: STATIC
(c) Eddy Current probe(s) from the kit, : 9970-958-574, 9970-95 8-575,
9970-958-576.
(d) Calibration block from the kit, : 9970-958-579. Refer to Fig ure 2.
(e) Apply teﬂon from the kit, to the probe.
(f) Put the probe of the inspection kit on the calibration standa rd away from the
EDM notches and null the probe.
(2) Scan across the EDM notch at a speed equal to the one that will b e used during
the inspection and adjust the instrument gain, phase and dot position so that the
peak response from the EDM notch dimension 0.020 inch (0,5 mm ) x 0.004 inch
(0,1 mm) has an amplitude equal to 1.5 or 2 Volts depending on t he probe. Refer
to Figure 3 to Figure 5.
NOTE 1: Repeat the steps 3.B.(1)(e), 3.B.(1)(f) and 3.B.(2) for ea ch probe
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 7

### Page 8

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
NOTE 2: Personnel performing these inspections must be certi ﬁed to one of
the following: NAS 410 / EN4179 level 2 minimum or any equival ent
standard as recognized by the airworthiness authority of the personnel.
Personnel performing this inspections should receive prac tical training
in the use of this procedure and must demonstrate pro ﬁciency in the
calibration, inspection and evaluation routines before ac cept/reject
authority is delegated.
Training, which can be provided regarding the performance o f this
inspection, does not imply that personnel who receive that t raining have
met the requirements of inspector certiﬁcation in accordance with note 2
above.
Contact your customer team if you think you need such a traini ng.
(3) Inspection.
(a) See locations and dimensions of the areas to be inspected:
– Location A, refer to Figure 6,
– Location B1, refer to Figure 7,
– Location B2, refer to Figure 8.
(b) Inspect 3 areas as follows:
1 Using the appropriate probe, scan in two directions of all th e areas as it is
shown on each ﬁgure. Pay special attention near the variation of shapes.
– Probe 9970-958-576, Figure 6 location A.
– Probe 9970-958-574, Figure 7 location B1.
– Probe 9970-958-575, Figure 8 location B2.
(c) In case of indication over the limits of the screen (for examp le due to cracks
which pass through the thickness of the ﬂange) reduce the amplitude by steps
of 6 db as much time as it is necessary to reach an interpretabl e signal.
NOTE: As we perform a manual inspection, the way to inspect has to b e the
closest to the theoretic scanning shown on the ﬁgures (not strictly).
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 8

### Page 9

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
1 Evaluate the horizontal and vertical indications that are e qual to or more
than half of calibration level for each probe.
9970-958-574 and 9970-958-576 : 750 millivolts or 1.5 divis ions.
9970-958-575: 1,000 millivolts or 2 divisions,
2 Clean and re-inspect the area in different scanning directi ons to check
the indication.
3 After completion of the indication evaluation procedure, i f the indication is
still equal to or more than 1,000 millivolts or 750 millivolt s (depending on
the probe used), note the place of the indication on the part.
4 Scan perpendicularly to the defect to determine its length. Refer to Figure
9.
(4) Calibration check.
Do a calibration/check after each area inspection (and or ea ch probe) as follows:
NOTE: The calibration check must be done with initial calibratio n settings.
(a) Do a calibration check after each inspection, when a system c omponent or
inspector is changed, or when the inspector suspects a chang e may have
occurred in the inspection.
(b) If the peak notch response is within 10% more or less, the cali bration is
acceptable.
(c) If the amplitude of the response from the EDM notch has decrea sed by more
than 10%, re-calibrate and re-inspect all areas inspected s ince the previous
calibration.
(d) If the amplitude of the response from the EDM notch has increa sed by more
than 10%, re-calibrate and re-inspect any areas which were p reviously found
to be rejected since the previous calibration.
C. Alternative Procedure. Fluorescent Penetrant Inspection (FPI) at piece part level.
CAUTION: PARTS MUST BE THOROUGHLY CLEANED BEFORE BEING SUBJECTED
TO THE FLUORESCENT PENETRANT INSPECTION TO ACCOMPLISH
A PROPER INSPECTION AND TO PREVENT CONTAMINATION OF THE
INSPECTION MATERIALS.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 9

### Page 10

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
CAUTION: PAY PARTICULAR ATTENTION TO THE AREAS TO BE INSPECTED. IF
THERE IS ANY DOUBT, PERFORM THE EDDY CURRENT INSPECTION.
(1) Perform a FPI according to Standard Practice Manual (SPM) 70 -32-14 on the
areas to be inspected:
– Location A, refer to Figure 6
– Location B1, refer to Figure 7
– Location B2, refer to Figure 8.
D. Inspection intervals for CFM56-5B commercial engine appli cations:
Mandatory inspection interval for TRF P/N 338-102-907/-90 8-0
(1) If no crack is found on any of the three mount struts, the TRF is serviceable and
must be re-inspected at 2,500 cycles repetitive intervals.
(2) If cracks are found on the mount struts, the TRF must be re-ins pected according to
the following repetitive intervals:
Total cumulated crack length at each location Re-inspection interval within
L < 0.20 (5)
0.20 (5) ≤ L < 0.25 (6,5)
L ≥ 0.25 (6,5)
2,500 cycles
370 cycles
Immediately remove the turbine frame
Repetitive inspection interval of every location is driven by the minimum reduced
interval.
NOTE 1: Dimensions are in inches with millimeters in parentheses.
NOTE 2: For each mount strut:
– If one single crack, measure crack length.
– If multiple cracks, cumulate crack length.
NOTE 3: After TRF removal, cracks may be repairable using the limit s provided
in Engine Shop Manual ATA 72-56-01 Inspection 001. Even afte r
the cracks are repaired, the TRF must still be re-inspected u sing the
intervals above.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 10

### Page 11

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
NOTE 4: Three inspection locations on mounts struts (1, 3 and 14):
– Location A: leading edge top end strut, pressure side and suc tion
side.
– Location B1: the outer casing ﬁllet radius close to rear ﬂange at
mount area (ﬂow path side).
– Location B2: the outer casing ﬁllet radius close to rear ﬂange at
mount area (opposite to the ﬂow path).
E. Inspection intervals for CFM56-5B Corporate Jet applicati ons:
Mandatory inspection interval for TRF P/N 338-102-907/908 -0
(1) If no crack is found on any of the three mount struts, the TRF is serviceable and
must be re-inspected at next 1,670 cycles repetitive interv als.
(2) If cracks are found on the mount struts, the TRF must be re-ins pected according to
the following repetitive intervals:
Total cumulated crack length at each location Re-inspection interval within
L < 0.20 (5)
0.20 (5) ≤ L < 0.25 (6,5)
L ≥ 0.25 (6,5)
1,670 cycles
280 cycles
Immediately remove the turbine frame
Repetitive inspection interval of every location is driven by the minimum reduced
interval
NOTE 1: Dimensions are in inches with millimeters in parentheses.
NOTE 2: For each mount strut:
– If one single crack, measure crack length.
– If multiple cracks, cumulate crack length.
NOTE 3: After TRF removal, cracks may be repairable using the limit s provided
in Engine Shop Manual ATA 72-56-01 Inspection 001. Even afte r
the cracks are repaired, the TRF must still be re-inspected u sing the
intervals above.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 11

### Page 12

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
NOTE 4: Three inspection locations on mounts struts (1, 3 and 14):
– Location A: leading edge top end strut, pressure side and suc tion
side.
– Location B1: the outer casing ﬁllet radius close to rear ﬂange at
mount area (ﬂow path side).
– Location B2: the outer casing ﬁllet radius close to rear ﬂange at
mount area (opposite to the ﬂow path).
F. Installation after the inspection, if the TRF is serviceabl e:
(1) Installation on wing or in shop:
(a) Install the rear cover and the ﬂame arrestor. Refer to AMM, TASK
72-56-00-400-001 or Engine Shop Manual ATA 72-00-03 INSTALLATION 001.
(2) Installation on wing only:
(a) Install the primary plug assy. Refer to AMM, ATA 78-11-12, TA SK
78-11-12-400-041.
(b) Install the primary nozzle assy. Refer to AMM, ATA 78-11-11, TASK
78-11-01-400-041.
G. Quality assurance.
(1) For Eddy Current inspection process:
(a) Record inspection results on the provided inspection sheet report and return
it to CFM ﬁeld representative. Refer to Figure 10.
(b) All probes, block calibration and materials used for this in spection must be
supplied or validated by CFM.
(c) Keep all inspection records with the permanent record of the Turbine Rear
Frame.
(2) For Fluorescent Penetrant inspection process:
(a) Record inspection results on the provided inspection sheet report and return
it to CFM ﬁeld representative. Refer to Figure 11.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 12

### Page 13

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
(b) Keep all inspection records with the permanent record of the Turbine Rear
Frame.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 13

### Page 14 (OCR)

(ctm  SERVICE
BULLETIN
THE POWER  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
VIEW A
D  MOUNTS
STRUTS
MOUNT
STRUT
DETAIL D  LOCATION B2  LOCATION B1  OUTER CASING FILLET
OUTER CASING FILLET  RADIUS CLOSE TO
RADIUS CLOSE TO REAR  REAR FLANGE AT
FLANGE AT MOUNT AREA  MOUNT AREA
(OPPOSITE TO THE  (FLOW PATH SIDE)
FLOW PATH)
LOCATION A
LEADING EDGE TOP
END STRUT
S-M56-SB-04684-00-B
Turbine Rear Frame - Areas to be Inspected
Figure 1
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 14

### Page 15 (OCR)

(cfm/  SERVICE
BULLETIN
Trict CFM56-5B
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
EDM NOTCH  EDM NOTCH
0.012 x 0.004  0.020 × 0.004
(0,3 × 0,1)  (0,5 × 0,1)
0.177-0.217
(4,5-5,5)
RECTO  2 EDM
NOTCH
(G'Ot-S'6E)
2.343-2.382
559,5-60,5)
VERSO
CFM56
9970-958-579
NOTE:
DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES
S-M56-SB-04685-00-B
Calibration Block
Figure 2
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 15

### Page 16 (OCR)

(ctm  SERVICE
BULLETIN
TECHT CFM56-53
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
CALIBRATION PROBE 9970-958-574
FREQUENCY RANGE :
1 TO 2 MHZ
PREAMPLIFIER : 12 db
MAIN AMPLI: 16 db
ANGLE : HORIZONTAL
ROTATE THE ANGLE TO 90°
THE EDM NOTCH INDICATION
SHOWS 30% FULL SCREEN
VERTICAL (1,5 V)
S-M56-SB-04686-00-B
Probe 9970-958-574
Figure 3
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 16

### Page 17 (OCR)

(cfm)  SERVICE
BULLETIN
TrICHT CFM56-5B
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
CALIBRATION PROBE 9970-958-575
FREQUENCY RANGE :
1 TO 2 MHZ
PREAMPLIFIER: 16 db
MAIN AMPLI: 14 db
ANGLE: HORIZONTAL
DOT POSITION: 75%
ROTATE THE ANGLE TO 90°
THE EDM NOTCH INDICATION
SHOWS 40% FULL SCREEN
VERTICAL (2 V)
S-M56-SB-04687-00-B
Probe 9970-958-575
Figure 4
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 17

### Page 18 (OCR)

(ctm  SERVICE
BULLETIN
TECHT CFM56-53
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
CALIBRATION PROBE 9970-958-576
FREQUENCY RANGE :
1 TO 2 MHZ
PREAMPLIFIER : 14 db
MAIN AMPLI: 6 db
ANGLE : HORIZONTAL
ROTATE THE ANGLE TO 90°
THE EDM NOTCH INDICATION
SHOWS 30% FULL SCREEN
VERTICAL (1,5 V)
S-M56-SB-04688-00-B
Probe 9970-958-576
Figure 5
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 18

### Page 19 (OCR)

(cfm)  SERVICE
BULLETIN
THE POWE  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
VIEW H
WELD
BEAD
LOCATION A
LEADING EDGE
TOP END STRUT.
BOTH SIDES OF
MOUNT STRUT
(SUCTION AND
PRESSURE SIDES)  1.18 (30)
MUST BE INSPECTED  (19) 298
SCANNING IN BOTH DIRECTIONS
AS MUCH AS POSSIBLE.
~0.08(2)
AREA TO BE INSPECTED: 1.18 x 2.52 (30 x 64)
LOCATION: LEADING EDGE, SUCTION AND PRESSURE SIDES
OF THE MOUNT STRUT / OUTER CASING FILLET RADIUS.
NOTE:
DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.
S-M56-SB-04690-00-B
Location A
Figure 6
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 19

### Page 20 (OCR)

(ctm  SERVICE
BULLETIN
THE POWER  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
LOCATION B1  VIEW F
OUTER CASING FILLET
RADIUS CLOSE TO  1.18(30) -
REAR FLANGE AT
MOUNT AREA  $ 0.27 (1
(FLOW PATH SIDE)  0.59 (15)
0.90 (23)
CENTER OF THE
REAR FLANGE
SCALLOP
SCANNING IN BOTH DIRECTIONS
AS MUCH AS POSSIBLE.  SPECIAL ATTENTION IN THIS DIRECTION:
SCANNING PERPENDICULAR
TO THE DEFECT.
~0.08 (2)
NOTE:
DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.
AREA TO BE INSPECTED: 0.90 × 1.18 (23 × 30).
LOCATION: EACH SIDE OF THE TRAILING EDGE,
INSIDE OF THE OUTER RING, * 0.27 (7) FROM
THE AFT SIDE OF THE FLANGE.
S-M56-SB-04691-00-B
Location B1
Figure 7
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 20

### Page 21 (OCR)

(cfm  SERVICE
BULLETIN
THE POWE  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
VIEW G
0.90 (23)
- * 0.27 (7)
0.59 (15)
CENTER OF
.THE REAR
FLANGE
LOCATION B2  SCALLOP
OUTER CASING FILLET
RADIUS CLOSE TO  1.18 (30)
REAR FLANGE AT
MOUNT AREA
(OPPOSITE TO THE FLOW PATH)
SCANNING IN BOTH DIRECTIONS
AS MUCH AS POSSIBLE.  SPECIAL ATTENTION IN THIS DIRECTION:  SCANNING PERPENDICULAR
TO THE DEFECT.
~0.08 (2)
AREA TO BE INSPECTED: 0.90 x 1.18 (23 x 30).
NOTE:  THE AFT SIDE OF THE FLANGE.
DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.  S-M56-SB-04692-00-B
Location B2
Figure 8
December 19, 2012

### Page 22 (OCR)

(ctm  SERVICE
BULLETIN
THE POWER  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
1/ TO DETERMINE THE LENGTH OF THE DEFECT,
SCAN PERPENDICULARLY TO ITS PROPAGATION DIRECTION
2/ MARK THE BEGINNING OF THE
INDICATION ON THE PART
3/ NOTE THE MAXIMUM AMPLITUDE ON THE
CALIBRATION AND INSPECTION RECORD
FORM FIGURE 10
4/ MARK THE END OF THE INDICATION
ON THE PART
5/ MEASURE THE DISTANCE BETWEEN THE FIRST AND THE SECOND MARK
6/ NOTE THE LENGTH ON THE CALIBRATION AND INSPECTION RECORD FORM FIGURE 10
NOTE: THE REPRESENTATION ON THE 3 SCREENS SHOWS AN EXEMPLE OF A SPECTRE THAT
CAN BE OBTAINED. IT MIGHT BE DIFFERENT BUT THE WAY TO DETERMINE THE LENGTH OF
A DEFECT STAYS THE SAME.
S-M56-SB-04693-00-B
Defects Length
Figure 9
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 22

### Page 23 (OCR)

cim  SERVICE
BULLETIN
THE POWER  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
CALIBRATION AND INSPECTION RECORD FORM
INSPECTOR :  AIRLINE/SHOP :  ..DATE :
TRE P/N :  -S/N
EDDY CURRENT INSTRUMENT TYPE / MODEL  ..S/N
CALIBRATION STANDARD P/N:  ...S/N.
PROBE (P/N, S/N)
TRF TSN/CSN :
MOUNT  NUMBER OF  DEFECT AMPLITUDE  CUMULATED  LENGTH
LOCATION  PROBE*  (DIVISIONS
STRUT  INDICATIONS  (INCHES
AND/OR VOLTS)
AND/OR MM)
1  B1
B2
3  B1
B2
14  B1
B2
* POSSIBILITY OF MORE THAN ONE REFERENCE.
COMMENTS.
S-M56-SB-04694-00-B
Calibration and Inspection Record Form
Figure 10
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 23

### Page 24 (OCR)

Ictm  SERVICE
BULLETIN
THE POWER  CFM56-5B
OF FLIGHT
ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
FLUORESCENT PENETRANT INSPECTION RECORD FORM
INSPECTOR :  ..AIRLINE/SHOP :  .......DATE : ..
TRF P/N :  .S/N .
TSN/CSN :
SPM FPI REFERENCE
CUMULATED
MOUNT  NUMBER OF  LENGTH
STRUT  LOCATION  INDICATIONS  (INCHES
AND/OR MM)
1  B1
B2
B1
B2
14  B1
B2
COMMENTS ..
S-M56-SB-04700-00-B
Fluorescent Penetrant Inspection Record Form
Figure 11
CFM56-5B S/B 72-0850
December 19, 2012  PAGE 24

### Page 25

ENGINE - LPT Frame Assembly (72-56-00) - Inspection of Turbine Rear Frame on CFM56-5B Engines
4. A - PARTS PROGRESSION CHART
None.
CFM56-5B S/B 72-0850
December 19, 2012 PAGE 25

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
