# CFM International Service Bulletin CFM56-7B 72-1042: Revision 01

- Rights: © CFM International. Filed by the FAA in regulations.gov docket FAA-2019-0212, the docket of AD 2019-12-05. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [CFM International Service Bulletin CFM56-7B 72-1042](https://openairdocs.org/service-documents/cfm/cfm56-7b-72-1042.md)
- Title as filed: CFM56-7B SB 72-1042 R01
- Pages: 7
- PDF: https://openairdocs.org/files/sha256/b9/96/b99665b0e6eecff69a50c09099b2d3620c8b38e38c623c3db277c957b03db3b6
- Page: https://openairdocs.org/service-documents/cfm/cfm56-7b-72-1042/file/b99665b0e6ee

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
CFM PROPRIETARY INFORMATION
The information contained in this document is CFM proprietary information and is disclosed in con ﬁ-
dence. It is the property of CFM and shall not be used, disclosed to others or reproduced without the
express written consent of CFM, including, but wit hout limitation, it is not to be used in the creation,
manufacture, development, or derivation of any repairs, modi ﬁcations, spare parts, design, or con ﬁg-
uration changes or to obtain FAA or any other government or regulatory approval to do so. If consent
is given for reproduction in whole or in part, this notice and the notice set forth on each page of this
document shall appear in any such reproduction in w hole or in part. The information contained in
this document may also be controlled by U.S. export control laws. Unauthorized export or re-export
is prohibited.
All technical documentation and information contained herein, with respect to assembly and disas-
sembly, cleaning, inspection methods and limits, r epair methods and limits, operational limits, life
limits and the like, have been developed and approved for use with engines and parts that have been
manufactured and/or approved by CFM and that have been maintained in accordance with CFM
technical documentation and recommendations. CFM has no contractual or legal obligation for, nor
knowledge of, non-CFM-approved parts and repairs . Accordingly, this document is not intended to
apply to non-CFM-approved parts and repairs.
July 27, 2018 CFM56-7B S/B 72-1042
Revision 01, January 02, 2019 PAGE 1 of 7

### Page 2

ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
TRANSMITTAL INFORMATION
REVISION 1 TO SERVICE BULLETIN 72-1042
Revision 1 is issued to update paragraphs 1., P LANNING INFORMATION and 3.,
ACCOMPLISHMENT INSTRUCTIONS.
The original was issued July 27, 2018. Revision bars in the left margin identify changes.
1. PLANNING INFORMATION
A. Effectivity
CFM56-7B20, -7B22, -7B24, -7B26, -7B27
CFM56-7B22/B1, -7B24/B1, -7B26/B1, -7B26/B2, -7B27/B1, -7B27/B3
CFM56-7B20/2, -7B22/2, -7B24/2, -7B26/2, -7B27/2
CFM56-7B27A
The rotating air high pressure turbine (HPT) front seals (seal) P/N 1795M36P02 with
the following serial numbers: GWNDN949 through GWNSE969, and GWN000CE
through GWN0990L (except serial numbers GWN08ND7, GWN0923A, GWN0971E,
GWN098A1, GWN098W6, GWN098W8, GWN098WA, and GWN0990G), which
have been removed from their original HPT disk in the ﬁeld and re-assembled to a
second HPT disk with a different serial number, are affected by this Service Bulletin.
B. Description
This Service Bulletin provides removal timing for the seal P/N 1795M36P02 with the
serial numbers listed in paragraph 1.A, E ffectivity. Refer to Figure 1.
C. Compliance
Category 2
CFM recommends that you do this Service Bulletin before 6,500 cycles since
assembly to a second HPT disk, if the seal was re-assembled to a second HPT disk
with a different serial number.
If the condition has exceeded the 6,500 cycles since assembly to a second HPT
disk, then replace the seal before 500 cycles or within three months from the original
issue date of this Service Bulletin, whichever comes sooner.
NOTE 1: For seals that have exceeded the 6,500-cycle threshold, the removal should
be prioritized based on the cycles since the installation to the second HPT
disk.
Impact A
This recommendation is to address a condition that may affect Flight Safety.
July 27, 2018 CFM56-7B S/B 72-1042
Revision 01, January 02, 2019 PAGE 2
CFM Des ignated: - CONFIDENTIAL Subject to the restrictions on the media

### Page 3

ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
NOTE 2: This Service Bulletin can be accomplished in shop.
This Service Bulletin is offered to improve the reliability or performance of your CFM
product, or to help prevent the occurrence of the event or condition described in this
Service Bulletin. If the operator elects not to participate in the bulletin, that decision
will be taken into consideration by CFM in evaluating future product performance
issues that may arise in the operator’s ﬂeet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
Replacement of the seal.
(2) Condition:
The seal may have a condition, generated during manufacturing, that could
affect the life of the seal if re-installed to a second HPT disk within the
operating life of the seal.
(3) Cause:
The affected seals have geometry variations on the air slot breakedges, which
can make the seal more sensitive to loading variations when assembled to a
second disk.
(4) Improvement:
None.
(5) Substantiation:
Substantiation is by analysis and ﬂeet experience.
F. Approval
The technical content of this Service Bulletin is approved by the FAA and under the
Authority of DOA No. EASA.21J.086.
G. Manpower
No additional man-hours are required to comply with this Service Bulletin.
H. Weight and Balance
Weight and balance are not changed.
July 27, 2018 CFM56-7B S/B 72-1042
Revision 01, January 02, 2019 PAGE 3
CFM Des ignated: - CONFIDENTIAL Subject to the restrictions on the media

### Page 4

ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
I. References (Use the latest version of these documents)
CFM56 Standard Practices Manual (SPM), CFMI-TP-SP .2
CFM56-7B Engine Shop Manual (ESM), CFMI-TP .SM.10
CFM56-7B Illustrated Parts Catalog (IPC), CFMI-TP .PC.14
J. Publications Affected
None.
K. Interchangeability
The physical and functional interchangeabilities are not affected.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
Part Number
Qty/
Eng Part Name
Unit ($)
Price
Pkg
Qty
Lead
Time
Days
1795M36P02 (1) Seal, Rotating
Air HPT Front
344,600.00 (1) 5
NOTE: Prices are provided for planning purposes and are subject to change.
(2) Other Spare Parts:
None.
(3) Consumables:
None.
B. Industry Support Information
Contact your Customer Support Manager (CSM).
C. Conﬁguration Chart
None.
July 27, 2018 CFM56-7B S/B 72-1042
Revision 01, January 02, 2019 PAGE 4
CFM Des ignated: - CONFIDENTIAL Subject to the restrictions on the media

### Page 5

ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
D. Parts Disposition
Return old parts to:
The seal P/N 1795M36P02, removed to accomplish this Service Bulletin, must be
sent to the following address v ia the Service Request system:
GE Aviation
Crescent Park Distribution Centers Inc
Attn: FOS Field Program Return
5443 Duff Drive
West Chester, Ohio, USA 45246
Report the seal and engine information to CFM Customer Support Center or Fleet
Support:
CFM SA ZONE CFM Inc. Zone
Customer Support Center:
http://mycfmportal.com
Widget AskCFM
OR
E-mail: cfm.csc@safrangroup.com
OR
PSE CFM
SAFRAN Aircraft Engines
Site de MELUN MONTEREAU
BP 1936 - 77019 Melun Cedex
FRANCE
OR
Phone: +33 1 64 14 88 66
F a x : + 3 316 41 48 76 5
GE Aviation Fleet Support:
http://www.geaviation.com/support
OR
E-mail (USA): aviation. ﬂeetsupport@ge.com
E-mail (China and Asia): aviation. ﬂeet-
support.cn@ge.com
OR
GE Aviation
M/D Rm. 285
One Neumann Way
OH 45215
USA
OR
USA Phone: 877-432-3272
International Phone: (513) 552-3272
China and Asia Phone: +86 21 38777666
E. Tooling - Price and Availability
None.
3. ACCOMPLISHMENT INSTRUCTIONS
A. General
(1) Remove the suspect seal (Figure 1). Removal instructions have not changed.
Refer to the CFM56-7B ESM, 72-52-00, DISASSEMBLY .
July 27, 2018 CFM56-7B S/B 72-1042
Revision 01, January 02, 2019 PAGE 5
CFM Des ignated: - CONFIDENTIAL Subject to the restrictions on the media

### Page 6

ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
(2) Write the word SCRAP close to the P/N and S/N markings. You can use any
method of permanent marking speci ﬁed in the CFM56 SPM, 70-10-00. Return
the removed seal (Figure 1) to CFM to the address speci ﬁed in paragraph
2.D., P arts Disposition and do as follows:
(a) Do a visual inspection of the seal (Figure 1) for cracks before you return
it to CFM. If there are cracks, notify CFM and also return the associated
HPT disk to CFM.
(3) Install the replacement seal (Figure 1). Installation instructions have not
changed. Refer to the CFM56-7B ESM, 72-52-00, ASSEMBLY 001.
July 27, 2018 CFM56-7B S/B 72-1042
Revision 01, January 02, 2019 PAGE 6
CFM Des ignated: - CONFIDENTIAL Subject to the restrictions on the media

### Page 7 (OCR)

cim  SERVICE
BULLETIN
THE POWER  CFM56-7B
OF FLIGHT
ENGINE - HPT Rotor Assembly (72-52-00) - Replacement of Rotating Air HPT Front Seal
P/N 1795M36P02
VIEW A
SEAL
DISK
REAR
_SHAFT
FRONT SHAFT
DAMPER SLEEVE  208868888
FORWARD
VIEW B
SEAL
FORWARD
5057439-01
Seal Location
Figure 1
July 27, 2018  CFM56-7B S/B 72-1042
Revision 01, January 02, 2019  PAGE 7
CFM Designated: - CONFIDENTIAL Subject to the restrictions on the media

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.