# CFM International Service Bulletin LEAP-1A-72-00-0485-01A-930A-D: No revision named

- Rights: © CFM International. Filed by the FAA in regulations.gov docket FAA-2025-3434; AD 2025-21-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [CFM International Service Bulletin LEAP-1A-72-00-0485-01A-930A-D](https://openairdocs.org/service-documents/cfm/leap1a-72-00-0485-01a930a-d.md)
- Title as filed: CFM Service Bulletin LEAP-1A-72-00-0485-01A-930A-D Issue 003-00
- Pages: 18
- PDF: https://openairdocs.org/files/sha256/3e/b1/3eb17bfacfa42e0f01477b2a00f06393c9005d2142eb3db8d996edd64faec52f
- Page: https://openairdocs.org/service-documents/cfm/leap1a-72-00-0485-01a930a-d/file/3eb17bfacfa4

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
ENGINE
–
HPT
ROT
OR
ASSEMBL
Y
(72
-
52
-
00)
–
IMPROVED
HPT
ROT
OR
ST
AGE
1
BLADE
BSI
INTER
V
ALS
FOR
INDIA
REGION
SERVICE
BULLETIN
T
able
of
contents
1.
REVISION
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
A.
Revision
reason
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
B.
Revision
history
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
2.
SUMMAR
Y
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
A.
Reason
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
3.
PLANNING
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
A.
Applicability
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
B.
Concurrent
requirements
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
C.
Reason
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
D.
Description
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
E.
Compliance
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
F
.
Approval
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
G.
Manpower
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
H.
W
eight
and
balance
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
I.
Electrical
load
data
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
J.
Software
accomplishment
summary
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
K.
Referenced
documentation
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
L.
Documentation
af
fected
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
M.
Industry
support
information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
N.
Interchangeability
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
4.
MA
TERIAL
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
5.
ACCOMPLISHMENT
INSTRUCTIONS
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
A.Engine
Cooldown
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
B.Safety
Precautions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
C.Get
Access
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
D.Deactivation
of
the
Thrust
Reverser
System
for
Maintenance
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
E.HPT
BSI
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
F
.Return
Aircraft
to
Service
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
9
6.
ADDITIONAL
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
18
A.
Additional
information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
18
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
1/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 2

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
List
of
tables
T
able:
Reasons
for
update
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2
T
able:
Support
equipment
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
T
able
1:
CFM
Contact
Information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
18
List
of
figures
Figure
1:
Location
of
HPT
Rotor
Stage
1
Blades
Assemblies
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
10
Figure
2:
Example
V
iews
With
a
4.0
mm
Borescope
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1
1
Figure
3:
Example
V
iews
With
a
6.0
mm
Borescope
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12
Figure
4:
HPT
Rotor
Stage
1
Blade
Cracks
Example
(Uninstalled)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
13
Figure
5:
HPT
Rotor
Stage
1
Blade
Cracks
Example
(Installed)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
14
Figure
6
(Sheet
1/2):
HPT
Rotor
Stage
1
Blade
BSI
Example
V
iews
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
15
Figure
6
(Sheet
2/2):
HPT
Rotor
Stage
1
Blade
BSI
Example
V
iews
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
16
Figure
7:
HPT
BSI
Guidelines
for
Engines
Paired
on
Same
Aircraft
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
17
CFM
PROPRIET
AR
Y
INFORMA
TION
The
information
contained
in
this
document
is
CFM
proprietary
information
and
is
disclosed
in
confidence.
It
is
the
property
of
CFM
and
shall
not
be
used,
disclosed
to
others
or
reproduced
without
the
express
written
consent
of
CFM,
including,
but
without
limitation,
it
is
not
to
be
used
in
the
creation,
manufacture,
development,
or
derivation
of
any
repairs,
modifications,
spare
parts,
design,
or
configuration
changes
or
to
obtain
F
AA
or
any
other
government
or
reg-
ulatory
approval
to
do
so.
If
consent
is
given
for
reproduction
in
whole
or
in
part,
this
notice
and
the
notice
set
forth
on
each
page
of
this
document
shall
appear
in
any
such
reproduction
in
whole
or
in
part.
The
information
contained
in
this
document
may
also
be
controlled
by
U.S.
export
control
laws.
Unauthorized
export
or
re
-
export
is
prohibited.
Reasons
for
update
T
able:
Reasons
for
update
[TECHNICAL]
T
o
update
paragraph
3.,
PLANNING
INFORMA
TION.
References
No
References
Management
information
Manufacturer
recommendation:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Recommended
T
ask
type:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Inspection
Original
issue
date:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2022
-
09
-
27
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
2/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 3

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
1.
REVISION
INFORMA
TION
A.
Revision
reason
Issue
Number
Revision
Reason
001
Baseline.
002
T
o
update
paragraph
5.,
ACCOMPLISHMENT
INSTRUCTIONS.
003
T
o
update
paragraph
3.,
PLANNING
INFORMA
TION.
B.
Revision
history
Issue
Number
Issue
Date
001
2022
-
09
-
27
002
2025
-
04
-
16
2.
SUMMAR
Y
A.
Reason
T
o
improve
reliability
of
the
high
pressure
turbine
(HPT)
module
airfoils
on
LEAP
-
1A
engines
operating
in
the
India
region
and
reduce
significant
events.
3.
PLANNING
INFORMA
TION
A.
Applicability
This
Service
Bulletin
is
applicable
to:
•
Engine
type:
LEAP
-
1A
•
Engine
model(s):
LEAP
-
1A23,LEAP
-
1A24,LEAP
-
1A24E1,LEAP
-
1A26,LEAP
-
1A26CJ,LEAP
-
1A26E1,LEAP
-
1A29,LEAP
-
1A29CJ,LEAP
-
1A30,LEAP
-
1A32,LEAP
-
1A33,LEAP
-
1A33B2,LEAP
-
1A35A
This
Service
Bulletin
is
applicable
to
all
LEAP
-
1A
engines.
Engine
models
are
defined
as
follows:
Group
1:
LEAP
-
1A29,
LEAP
-
1A29CJ,
LEAP
-
1A30,
LEAP
-
1A32,
LEAP
-
1A33,
LEAP
-
1A33B2,
and
LEAP
-
1A35A.
Group
2:
LEAP
-
1A23,
LEAP
-
1A24,
LEAP
-
1A24E1,
LEAP
-
1A26,
LEAP
-
1A26CJ,
and
LEAP
-
1A26E1.
The
HPT
rotor
stage
1
blades
P/N
2747M92P01,
P/N
2553M91G03,
P/N
2553M91G05,
P/N
2553M91G06,
P/N
2553M91G07,
and
P/N
2553M91G08
are
af
fected
by
this
Service
Bulletin.
B.
Concurrent
requirements
None.
C.
Reason
(1)
Objective:
T
o
improve
reliability
of
the
HPT
module
airfoils
on
LEAP
-
1A
engines
operating
in
the
India
region
and
reduce
significant
events.
(2)
Condition:
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
3/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 4

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
The
LEAP
-
1A
engines
operating
in
the
India
region
have
exhibited
HPT
module
airfoil
distress
at
earlier
cycle
times.
(3)
Cause:
Operating
environment
can
make
the
HPT
module
airfoils
more
susceptible
to
cracking
in
the
field.
(4)
Inspection:
Shortened
borescope
inspection
(BSI)
interval
of
the
HPT
rotor
stage
1
blades
to
examine
distress
on
the
airfoils.
(5)
Substantiation:
Substantiation
is
by
fleet
experience.
Recommended
inspection
of
the
engines
is
more
frequent
than
that
published
in
the
Maintenance
Planning
Document
(MPD)
(1,600
cycles).
D.
Description
This
Service
Bulletin
introduces
reduced,
targeted
BSI
intervals
of
the
HPT
rotor
stage
1
blades
for
LEAP
-
1A
engines
operating
in
the
India
region.
The
India
region
includes:
Bangladesh,
Bhutan,
India,
Maldives,
Nepal,
and
Sri
Lanka.
E.
Compliance
Category
2
CFM
recommends
for
HPT
rotor
stage
1
blades
that
have
accumulated
over
1,100
departures
in
the
India
region
to
do
the
following:
•
For
Group
1
thrust
ratings:
-
For
HPT
rotor
stage
1
blades
with
more
than
2,400
flight
cycles
since
new
,
do
the
initial
inspection
as
specified
in
paragraph
5.E.
within
100
flight
cycles.
-
For
all
other
HPT
rotor
stage
1
blades,
do
the
initial
inspection
as
specified
in
paragraph
5.E.
before
the
HPT
rotor
stage
1
blades
accumulate
2,500
flight
cycles
since
new
.
-
Repeat
the
inspection
specified
in
paragraph
5.E.
at
an
interval
that
does
not
exceed
150
cycles.
•
For
Group
2
thrust
ratings:
-
For
HPT
rotor
stage
1
blades
with
more
than
5,000
flight
cycles
since
new
,
do
the
initial
inspection
as
specified
in
paragraph
5.E.
within
100
flight
cycles.
-
For
all
other
HPT
rotor
stage
1
blades,
do
the
initial
inspection
as
specified
in
paragraph
5.E.
before
the
HPT
rotor
stage
1
blades
accumulate
5,100
flight
cycles
since
new
.
-
Repeat
the
inspection
specified
in
paragraph
5.E.
at
an
interval
that
does
not
exceed
300
cycles.
NOTE:
If
the
HPT
rotor
stage
1
blade
departures
are
unknown,
then
perform
this
Service
Bulletin
on
engines
that
have
accumulated
over
1,100
departures
in
the
India
region.
NOTE:
If
the
engine
rating
changes
between
Group
1
and
Group
2,
then
follow
the
instruction
for
Group
1
thrust
rating.
NOTE:
Inspections
completed
ahead
of
Service
Bulletin
issuance
will
be
credited,
provided
the
inspection
was
performed
in
accordance
with
the
instructions
contained
within
this
Service
Bulletin.
Impact
B
This
recommendation
is
to
address
a
condition
that
may
result
in
an
Increased
Rate
of
In
-
Flight
Shutdowns
(IFSD),
T
ake
-
Of
f
Aborts
(T
OA),
Air
T
urn
Backs
(A
TB)
or
Diversions
(DIV).
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
4/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 5

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
NOTE:
This
Service
Bulletin
can
be
done
on
wing.
NOTE:
The
Service
Bulletin
recommended
targeted
HPT
rotor
stage
1
blades
inspections
are
in
addition
to
the
regularly
scheduled
MPD
tasks.
This
Service
Bulletin
is
of
fered
to
improve
the
reliability
or
performance
of
your
CFM
product,
or
to
help
prevent
the
occurrence
of
the
event
or
condition
described
in
this
Service
Bulletin.
If
the
operator
elects
not
to
participate
in
the
bulletin,
that
decision
will
be
taken
into
consideration
by
CFM
in
evaluating
future
product
performance
issues
that
may
arise
in
the
operator
’
s
fleet.
F
.
Approval
The
technical
content
of
this
Service
Bulletin
is
approved
by
the
F
AA
and
under
the
Authority
of
DOA
No.
EASA.21J.086.
G.
Manpower
After
you
get
access
to
the
engine,
you
will
need
approximately
4
man
-
hours
to
do
the
inspection
portion
of
this
Service
Bulletin.
H.
W
eight
and
balance
W
eight
and
balance
are
not
changed.
I.
Electrical
load
data
Not
Applicable.
J.
Software
accomplishment
summary
Not
Applicable.
K.
Referenced
documentation
Airbus
A318/A319/A320/A321
Aircraft
Maintenance
Manual
(AMM)
L.
Documentation
affected
None.
M.
Industry
support
information
None.
N.
Interchangeability
Not
Applicable.
4.
MA
TERIAL
INFORMA
TION
List
of
material
sets
Not
Applicable.
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
5/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 6

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
List
of
support
equipment
Support
equipment
Name
T
ool
Number
Reference
(Qty)
MFR
Unit
$
Price
(Pkg
Qty)
L/T
Standard
T
ools
AR
TICULA
TING
BORESCOPE
(4
mm
or
6
mm
diameter)
-
Not
Applicable
(1)
-
-
(
-)
-
NOTE:
Replenishment
Lead
T
ime
(L/T)
in
days.
NOTE:
Prices
are
provided
for
planning
purposes
and
are
subject
to
change.
List
of
supplies
Not
Applicable.
List
of
spares
Not
Applicable.
List
of
removed
spares
Not
Applicable.
5.
ACCOMPLISHMENT
INSTRUCTIONS
A.
Engine
Cooldown
W
ARNING:
BE
CAREFUL
WHEN
YOU
DO
WORK
ON
THE
ENGINE
P
AR
TS
AFTER
THE
ENGINE
SHUTDOWN.
USE
APPLICABLE
THERMAL
GLOVES.
THE
ENGINE
P
AR
TS
CAN
ST
A
Y
HOT
FOR
ONE
HOUR
AFTER
SHUTDOWN
AND
CAN
BURN
YOU.
W
ARNING:
REFER
T
O
THE
PRODUCT
LABEL
AND
THE
MANUF
ACTURER’S
(MA
TERIAL)
SAFETY
DA
T
A
SHEET
(SDS)
FOR
INSTRUCTIONS
ON
THE
HAZARDS,
ST
ORAGE,
SAFE
HANDLING
AND
PROPER
USE
OF
THIS
PRODUCT
.
(1)
If
a
faster
cooldown
is
necessary
,
do
a
dry
motoring
for
more
than
five
minutes
as
soon
as
possible
when
the
aircraft
is
grounded.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
71
-
00
-
00,
ADJUSTMENT/TEST
,
T
ASK
71
-
00
-
00
-
700
-
805
-
A.
NOTE:
The
dry
motoring
will
help
to
cool
down
the
engine.
B.
Safety
Precautions
(1)
On
the
center
pedestal,
on
the
ENG
panel
1
15VU,
do
as
follows:
(a)
Make
sure
that
the
ENG/MODE
selector
switch
is
in
the
NORM
position.
(b)
Make
sure
that
the
ENG/MASTER
1(2)
control
switch
was
in
the
OFF
position
for
a
minimum
of
five
minutes
before
you
do
this
procedure.
(c)
Put
W
ARNING
NOTICE(S)
in
position
to
tell
persons
not
to
operate
in
the
locations
that
follow:
1
ENG/MODE
selector
switch.
2
ENG/MASTER
1(2)
control
switch.
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
6/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 7

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
(2)
On
the
ENG
section
of
maintenance
panel
50VU,
do
as
follows:
(a)
Make
sure
that
the
ON
legend
of
the
F
ADEC
GND
PWR/1(2)
push
-
button
switch
is
of
f.
(b)
Put
W
ARNING
NOTICE(S)
in
position
to
tell
persons
not
to
energize
the
F
ADEC
1(2).
C.
Get
Access
(1)
Open
the
fan
cowl
doors.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
71
-
13
-
00,
MAINTENANCE
PRACTICES,
T
ASK
71
-
13
-
00
-
010
-
803
-
A,
and
do
as
follows:
(a)
For
4020KM1
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
1)
437AL,
438AR.
(b)
For
4020KM2
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
2)
447AL,
448AR.
D.
Deactivation
of
the
Thrust
Reverser
System
for
Maintenance
W
ARNING:
YOU
MUST
DEACTIV
A
TE
THE
THRUST
REVERSER
BEFORE
YOU
DO
WORK
ON
OR
AROUND
IT
.
IF
YOU
DO
NOT
,
THE
THRUST
REVERSER
CAN
OPERA
TE
ACCIDENT
ALL
Y
AND
CAUSE
AN
INJUR
Y
AND/OR
DAMAGE.
(1)
Do
the
deactivation
of
the
thrust
reverser
system
for
ground
maintenance.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
78
-
30
-
00,
DEACTIV
A
TION/REACTIV
A
TION,
T
ASK
78
-
30
-
00
-
040
-
809
-
A.
(2)
Open
the
thrust
reverser
cowl
doors.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
78
-
36
-
00,
MAIN-
TENANCE
PRACTICES,
T
ASK
78
-
36
-
00
-
010
-
806
-
A,
and
do
as
follows:
(a)
For
4020KM1
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
1)
451AL,
452AR.
(b)
For
4020KM2
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
2)
461AL,
462AR.
E.
HPT
BSI
(1)
Do
the
BSI
of
the
HPT
rotor
stage
1
blades
(1,
Figure
1
)
(SIN:
159A0).
Use
Option
A
or
Option
B
specified
in
steps
5.E.(1)(a)
and
5.E.(1)(b),
and
do
as
follows:
(a)
Option
A.
Do
the
BSI
with
a
4.0
mm
borescope.
For
this
BSI
it
is
recommended
to:
•
Use
approximately
a
4.0
mm
diameter
articulating
borescope.
•
Use
a
0
degree
(forward
looking)
objective
tip.
•
Access
the
HPT
rotor
stage
1
blades
(1,
Figure
1
)
(SIN:
159A0)
through
the
applicable
BSI
port.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
72
-
52
-
00,
INSPECTION/CHECK,
T
ASK
72
-
52
-
00
-
290
-
803
-
A,
paragraphs
4.A.
through
4.D.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
72
-
52
-
00,
INSPECTION/CHECK,
T
ASK
72
-
52
-
00
-
290
-
803
-
A,
paragraphs
4.A.
through
4.D.
•
Insert
the
4.0
mm
borescope
and
look
in
the
aft
direction.
Refer
to
step
5.E.(1)(a)1.
•
T
urn
the
HPT
rotor
assembly
(SIN:
15000)
into
position
for
each
of
the
60
HPT
rotor
stage
1
blades
(1)
(SIN:
159A0).
Refer
to
step
5.E.(1)(a)2.
•
Stop
and
do
an
inspection
of
the
full
blade
span
of
the
aft
concave
surface.
Refer
to
step
5.E.(1)(a)3.
1
It
is
not
recommended
to
advance
the
4.0
mm
borescope
circumferentially
between
the
leading
edge
of
the
HPT
rotor
stage
1
blade
(1)
(SIN:
159A0)
and
the
trailing
edge
of
the
HPT
stator
stage
1
nozzle
(SIN:
172A0).
If
the
4.0
mm
borescope
is
directed
circumferentially
between
these
components,
be
careful
to
not
get
the
4.0
mm
borescope
caught
in
the
platform
clearance
between
the
HPT
rotor
stage
1
blade
(1)
(SIN:
159A0)
and
the
HPT
stator
stage
1
nozzle
(SIN:
172A0).
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
7/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 8

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
2
T
urn
the
HPT
rotor
assembly
(SIN:
15000)
via
the
accessory
gearbox
(AGB)
manual
drive
pad.
It
is
recommended
to
turn
in
the
opposite
direction
of
normal
rotation
to
avoid
a
pinched
or
a
bound
4.0
mm
borescope.
3
Move
the
4.0
mm
borescope
between
the
HPT
rotor
stage
1
blades
(1)
(SIN:
159A0)
to
get
the
per-
pendicular
views
of
the
concave
surface
aft
zone.
Scan
4.0
mm
borescope
to
view
each
HPT
rotor
stage
1
blade
(1)
(SIN:
159A0)
from
the
top
-
span
(tip),
to
the
mid
-
span,
and
lower
-
span
(platform).
Refer
to
Figure
2
.
(b)
Option
B.
Alternative
procedure.
Do
the
BSI
with
a
6.0
mm
borescope.
For
this
BSI
it
is
recommended
to:
•
Use
approximately
a
6.0
mm
diameter
articulating
borescope.
•
Use
a
90
degrees
(side
looking)
objective
tip.
•
Access
the
HPT
rotor
stage
1
blades
(1,
Figure
1
)
(SIN:
159A0)
through
the
applicable
BSI
port.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
72
-
52
-
00,
INSPECTION/CHECK,
T
ASK
72
-
52
-
00
-
290
-
803
-
A,
paragraphs
4.A.
through
4.D.
•
Insert
the
6.0
mm
borescope
and
look
in
the
aft
direction.
•
T
urn
the
HPT
rotor
assembly
(SIN:
15000)
into
position
for
each
of
the
60
HPT
rotor
stage
1
blades
(1)
(SIN:
159A0).
Refer
to
step
5.E.(1)(b)1.
•
Stop
and
do
an
inspection
of
the
full
blade
span
of
the
aft
concave
surface.
Refer
to
step
5.E.(1)(b)2.
1
T
urn
the
HPT
rotor
assembly
(SIN:
15000)
via
the
AGB
manual
drive
pad.
It
is
recommended
to
turn
in
the
opposite
direction
of
normal
rotation
to
avoid
a
pinched
or
a
bound
6.0
mm
borescope.
2
Move
the
6.0
mm
borescope
forward
of
the
HPT
rotor
stage
1
blade
(1)
(SIN:
159A0)
looking
aft
to
get
the
three
views
of
the
concave
surface
aft
zone.
V
iew
each
HPT
rotor
stage
1
blade
(1)
(SIN:
159A0)
at
the
top
-
span
(tip),
the
mid
-
span,
and
the
lower
-
span
(platform).
Refer
to
Figure
3
.
It
can
be
beneficial
to
turn
the
HPT
rotor
assembly
(SIN:
15000)
two
to
three
times
to
get
the
top,
mid,
and
lower
views.
(c)
Do
a
BSI
of
the
HPT
rotor
stage
1
blades
(1,
Figure
1
)
(SIN:
159A0),
use
the
technique
specified
in
paragraph
5.E.(1)(a)
or
5.E.(1)(b).
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
72
-
52
-
00,
INSPEC-
TION/CHECK,
T
ASK
72
-
52
-
00
-
290
-
803
-
A,
paragraph
4.E.(4)
and
do
as
follows:
1
Pay
close
attention
to
the
HPT
rotor
stage
1
blade
(1,
Figure
1
)
(SIN:
159A0)
concave
airfoil,
radially
along
cooling
hole
row
12
for
any
cracking.
Refer
to
Figure
4
and
Figure
5
.
(d)
Record
and
save
the
BSI
videos
and
still
images.
Refer
to
Figure
6
for
example
views
of
the
HPT
rotor
stage
1
blade
(1)
(SIN:
159A0).
(e)
Obey
the
serviceability
criteria
specified
in
the
Airbus
A318/A319/A320/A321
AMM,
72
-
52
-
00,
INSPEC-
TION/CHECK,
T
ASK
72
-
52
-
00
-
290
-
803
-
A,
paragraph
4.E.(4)
and
do
as
follows:
1
Report
any
HPT
rotor
stage
1
blade
unserviceable
findings
to
your
local
CFM
international
field
service
representative.
Refer
to
Paragraph
6,
Additional
Information
for
CFM
contact
information.
(f)
If
the
BSI
shows
an
HPT
rotor
stage
1
blade
condition
that
needs
removal
or
re
-
inspection
within
50
cycles
as
specified
in
the
Airbus
A318/A319/A320/A321
AMM,
refer
to
Figure
7
for
instructions
for
sister
engine
inspections
and
engine
removals
as
necessary
,
and
do
as
follows:
NOTE:
The
second
engine
on
the
same
aircraft
is
referred
to
as
the
"sister"
engine
in
this
Service
Bul-
letin.
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
8/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 9

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
1
If
one
engine
shows
HPT
rotor
stage
1
blade
conditions
that
would
need
removal
or
re
-
inspection
within
50
cycles
as
specified
in
the
Airbus
A318/A319/A320/A321
AMM
inspections
referenced
above
in
paragraph
5.E.(1)(c),
the
operator
must
do
the
HPT
stage
1
blade
(1)
(SIN:
159A0)
inspection
of
the
sister
engine
in
accordance
with
this
Service
Bulletin,
no
later
than
5
cycles
after
the
first
engine
serial
number
(ESN)
inspection,
unless
the
sister
engine
was
inspected
as
recommended
by
this
Service
Bulletin
within
the
past
50
cycles
for
Group
1
or
within
the
past
100
cycles
for
Group
2
engines.
2
If
the
sister
engine
has
HPT
rotor
stage
1
blade
conditions
that
would
need
removal
or
re
-
inspection
within
50
cycles
as
specified
in
the
Airbus
A318/A319/A320/A321
AMM
inspections
referenced
above
in
paragraph
5.E.(1)(c),
remove
one
engine
before
the
next
flight.
F
.
Return
Aircraft
to
Service
(1)
Close
-
up
as
follows:
(a)
Make
sure
that
the
work
area
is
clean
and
clear
of
tools
and
other
items.
(b)
Close
the
thrust
reverser
cowl
doors.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
78
-
36
-
00,
MAIN-
TENANCE
PRACTICES,
T
ASK
78
-
36
-
00
-
410
-
806
-
A,
and
do
as
follows:
1
For
4020KM1
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
1)
451AL,
452AR.
2
For
4020KM2
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
2)
461AL,
462AR.
3
Do
the
reactivation
of
the
thrust
reverser
system
after
nacelle
maintenance.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
78
-
30
-
00,
DEACTIV
A
TION/REACTIV
A
TION,
T
ASK
78
-
30
-
00
-
440
-
809
-
A.
(c)
Close
access
as
follows:
1
Close
the
fan
cowl
doors.
Refer
to
the
Airbus
A318/A319/A320/A321
AMM,
71
-
13
-
00,
CLOSING
OF
THE
F
AN
COWL
DOORS,
T
ASK
71
-
13
-
00
-
410
-
803
-
A,
and
do
as
follows:
a
For
4020KM1
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
1)
437AL,
438AR.
b
For
4020KM2
(POWER
PLANT
-
DEMOUNT
ABLE,
ENGINE
2)
447AL,
448AR.
2
Remove
the
W
ARNING
NOTICE(S).
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
9/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 10

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
1
LEGEND:
1. HPT ROTOR STAGE 1 BLADE (QTY-60)
    (SIN: 159A0)
CDN ASSEMBLY
(SIN: 00107)
HPT STAGE 1 
NOZZLE ASSEMBLY
(SIN: 17200)
HPT ROTOR 
ASSEMBLY
(SIN: 15000)
ICN-LEAP-1A-72000485-B-07482-00001-A-001-01
Location
of
HPT
Rotor
Stage
1
Blades
Assemblies
Figure
1
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
10/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 11

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
HPT ROTOR 
STAGE 1 BLADE
(QTY-60)
(SIN: 159A0)
UPPER-SPAN MID-SPAN
LOWER-SPAN
UPPER
MID
LOWER
ICN-LEAP-1A-72000485-B-07482-00002-A-001-01
Example
V
iews
W
ith
a
4.0
mm
Borescope
Figure
2
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
1
1/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 12

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
HPT ROTOR 
STAGE 1 BLADE
(QTY-60)
(SIN: 159A0)
UPPER-SPAN MID-SPAN
LOWER-SPAN
UPPER
MID
LOWER
ICN-LEAP-1A-72000485-B-07482-00003-A-001-01
Example
V
iews
W
ith
a
6.0
mm
Borescope
Figure
3
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
12/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 13

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
HPT ROTOR 
STAGE 1 BLADE
(QTY-60)
(SIN: 159A0)
ROW 12
CRACKS
ICN-LEAP-1A-72000485-B-07482-00004-A-001-01
HPT
Rotor
Stage
1
Blade
Cracks
Example
(Uninstalled)
Figure
4
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
13/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 14

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
HPT ROTOR
STAGE 1 BLADE
(QTY-60)
(SIN: 159A0)
ROW 9
ROW 12
CRACK
NOTES:
DISTINGUISHING THERMAL BARRIER COATING CRACKS
FROM BLADE PARENT MATERIAL CRACKS MAY REQUIRE
CLOSER EXAMINATION. FROM FIELD EXPERIENCE, A 4MM
BORESCOPE IS RECOMMENDED TO ACHIEVE A CLOSER
INSPECTION OF THE CONCAVE AIRFOIL.
ICN-LEAP-1A-72000485-B-07482-00005-A-001-01
HPT
Rotor
Stage
1
Blade
Cracks
Example
(Installed)
Figure
5
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
14/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 15

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
HPT ROTOR 
STAGE 1 BLADE
LEADING EDGE
ICN-LEAP-1A-72000485-B-07482-00006-A-001-01
HPT
Rotor
Stage
1
Blade
BSI
Example
V
iews
Figure
6
(Sheet
1
of
2)
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
15/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 16

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
HPT ROTOR STAGE 1 
BLADE CONCAVE 
PANEL
HPT ROTOR STAGE 1 
BLADE CONCAVE
PANEL
HPT ROTOR 
STAGE 1 BLADE 
TRAILING EDGE
ICN-LEAP-1A-72000485-B-07482-00007-A-001-01
HPT
Rotor
Stage
1
Blade
BSI
Example
V
iews
Figure
6
(Sheet
2
of
2)
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
16/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 17

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
DOES ENGINE 
INSPECTION 
CONTAIN AN HPT 
CONDITION THAT 
REQUIRES 
REMOVAL 
OR REINSPECTION 
WITHIN 50 CYCLES 
AS SPECIFIED IN 
THE AIRBUS 
A318/A319/A320/A321 
AMM ?
PERFORM THE HPT 
INSPECTION OF THE 
SISTER ENGINE NO 
LATER THAN FIVE 
CYCLES AFTER THE 
FIRST ESN INSPECTION, 
UNLESS THE SISTER 
ENGINE WAS 
INSPECTED AS 
RECOMMENDED BY 
THIS SERVICE BULLETIN 
WITHIN THE PAST 50 
CYCLES FOR GROUP 1 
OR 100 CYCLES FOR 
GROUP 2 ENGINES
PERFORM THE HPT 
INSPECTION OF THE 
SISTER ENGINE 
WITHIN CYCLE 
INTERVAL 
RECOMMENDED 
BY THIS SERVICE 
BULLETIN
DOES THE SISTER 
ENGINE HAVE HPT 
ROTOR STAGE 1 
BLADE 
CONDITIONS THAT 
WOULD REQUIRE 
REMOVAL OR 
REINSPECTION 
WITHIN 50 CYCLES 
AS SPECIFIED IN 
THE AIRBUS 
A318/A319/A320
/A321 AMM?
YES
NO
NO
NOTES: 
1. THE SECOND ENGINE ON THE SAME AIRCRAFT IS REFERRED 
    TO AS THE "SISTER" ENGINE IN THIS SERVICE BULLETIN.
2. *REMOVAL FROM AIRCRAFT AND ROUTE FOR OVERHAUL.
* REMOVE ONE 
  ENGINE PRIOR 
  TO THE 
  NEXT FLIGHT
YES
FOLLOW INSPECTION 
INTERVALS 
RECOMMENDED BY 
THIS SERVICE 
BULLETIN AND AIRBUS 
A318/A319/A320/A321 
AMM SERVICEABILITY 
LIMITS 
ICN-LEAP-1A-72000485-B-07482-00008-A-001-01
HPT
BSI
Guidelines
for
Engines
Paired
on
Same
Aircraft
Figure
7
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
Page
17/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 18

LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
6.
ADDITIONAL
INFORMA
TION
A.
Additional
information
T
able
1:
CFM
Contact
Information
CFM
SA
ZONE
CFM
Inc.
Zone
Customer
Support
Center:
http://mycfmportal.com
Widget
AskCFM
GE
A
viation
Fleet
Support:
http://www
.geaviation.com/support
OR
OR
E
-
mail:
cfm.csc@safrangroup.com
E
-
mail
(USA):
aviation.fleetsupport@ge.com
E
-
mail
(China
and
Asia):
aviation.fleetsupport.cn@ge.com
OR
OR
PSE
CFM
SAFRAN
Aircraft
Engines
Site
de
MELUN
MONTEREAU
BP
1936
-
77019
Melun
Cedex
FRANCE
GE
A
viation
M/D
Rm.
285
One
Neumann
W
ay
OH
45215
USA
OR
OR
Phone:
+33
1
64
14
88
66
Fax:
+33
1
64
14
87
65
USA
Phone:
877
-
432
-
3272
International
Phone:
(513)
552
-
3272
China
and
Asia
Phone:
+
86
21
38777666
LEAP
-
1A
-
72
-
00
-
0485
-
01A
-
930A
-
D
End
of
data
module
Page
18/
18
Issue
003
-
00
-
2025
-
07
-
30
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
