# CFM International Service Bulletin LEAP-1B-72-00-0394-01A-930A-D: No revision named

- Rights: © CFM International. Filed by the FAA in regulations.gov docket FAA-2024-1898; AD 2024-25-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [CFM International Service Bulletin LEAP-1B-72-00-0394-01A-930A-D](https://openairdocs.org/service-documents/cfm/leap1b-72-00-0394-01a930a-d.md)
- Title as filed: CFM International Service Bulletin LEAP-1B-72-00-0394-01A-930A-D Issue 002
- Pages: 41
- PDF: https://openairdocs.org/files/sha256/82/26/8226fac92cfdd757989a78265c78c14ab0522092ab60cd2c6c3163d7840355cb
- Page: https://openairdocs.org/service-documents/cfm/leap1b-72-00-0394-01a930a-d/file/8226fac92cfd

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
ENGINE
-
FOR
W
ARD
COMPRESSOR
ST
A
T
OR
ASSEMBL
Y
(72
-
32
-
00)
-
ST
AGE
2
COMPRESSOR
ST
A
T
OR
SEAL
AND
ROT
OR
SEAL
TEETH
INSPECTION
SERVICE
BULLETIN
T
able
of
contents
1.
REVISION
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
A.
Revision
reason
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
B.
Revision
history
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
2.
SUMMAR
Y
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
A.
Reason
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
3.
PLANNING
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
A.
Applicability
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
B.
Concurrent
requirements
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
C.
Reason
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
D.
Description
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
E.
Compliance
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
F
.
Approval
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
G.
Manpower
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
H.
W
eight
and
balance
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
I.
Electrical
load
data
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
J.
Software
accomplishment
summary
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
K.
Referenced
documentation
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
L.
Documentation
af
fected
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
M.
Industry
support
information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
N.
Interchangeability
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
4.
MA
TERIAL
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
5.
ACCOMPLISHMENT
INSTRUCTIONS
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
A.General
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
B.In
-
Shop
Corrective
Action
W
ork
-
Scope
Instructions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
10
6.
ADDITIONAL
INFORMA
TION
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
19
A.
Additional
information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
19
B.
Additional
information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
19
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
1/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 2

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
List
of
tables
T
able:
Reasons
for
update
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
T
able:
References
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
T
able
1:
List
of
Suspect
Parts
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
T
able:
Support
equipment
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
T
able:
Spares
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
T
able
2:
Serviceability
Criteria
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
9
T
able
3:
CFM
Contact
Information
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
19
T
able
4:
List
of
Instruments
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
20
T
able
5:
List
of
Items
in
Kit
GE
-
FQAP
-
802
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
26
List
of
figures
Figure
1
(Sheet
1/2):
Stage
2
HPC
Hardware
and
Borescope
Plug
Locations
with
Flexible
Borescope
Path
12
Figure
1
(Sheet
2/2):
Stage
2
HPC
Hardware
and
Borescope
Plug
Locations
with
Flexible
Borescope
Path
13
Figure
2:
Stage
2
Seals
Markings
V
iew
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
14
Figure
3:
Optimal
V
iew
to
Honeycomb
Groove
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
15
Figure
4:
3:00
and
9:00
O’Clock
Area
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
16
Figure
5:
Channel
-
Like
Cavity
and
Seal
T
eeth
Rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
17
Figure
6:
Rub
Depth
Calculation
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
18
Figure
7:
Seal
T
eeth
Inspection
Areas
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
31
Figure
8:
Probe
P/N
US
-
3313
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
32
Figure
9:
Probe
Fixture
P/N
JO57138
-
R1
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
33
Figure
10:
Calibration
Standard
and
Holder
,
Probe
and
Probe
Fixture
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
34
Figure
1
1:
Calibration
Standard
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
35
Figure
12:
Assembly
of
Probe
Holder
Handle
P/N
JO58579
-
R1
and
ECI
Probe
Holder
P/N
JO57138
-
R1
.
36
Figure
13:
Calibration
Standard
Holder
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
37
Figure
14:
Calibration
Display
-
Probe
P/N:
US
-
3313
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
38
Figure
15:
Form
2562
-
1
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
39
Figure
16:
Stage
3
-
4
Blisk
Inspection
T
echnique
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
40
Figure
17:
EC
Reject
Threshold
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
41
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
2/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 3

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
CFM
PROPRIET
AR
Y
INFORMA
TION
The
information
contained
in
this
document
is
CFM
proprietary
information
and
is
disclosed
in
confidence.
It
is
the
property
of
CFM
and
shall
not
be
used,
disclosed
to
others
or
reproduced
without
the
express
written
consent
of
CFM,
including,
but
without
limitation,
it
is
not
to
be
used
in
the
creation,
manufacture,
development,
or
derivation
of
any
repairs,
modifications,
spare
parts,
design,
or
configuration
changes
or
to
obtain
F
AA
or
any
other
government
or
reg-
ulatory
approval
to
do
so.
If
consent
is
given
for
reproduction
in
whole
or
in
part,
this
notice
and
the
notice
set
forth
on
each
page
of
this
document
shall
appear
in
any
such
reproduction
in
whole
or
in
part.
The
information
contained
in
this
document
may
also
be
controlled
by
U.S.
export
control
laws.
Unauthorized
export
or
re
-
export
is
prohibited.
Reasons
for
update
T
able:
Reasons
for
update
[TECHNICAL]
T
o
update
paragraphs
3.,
PLANNING
INFORMA
TION,
4.,
MA
TERIAL
INFORMA
TION,
5.,
ACCOMPLISHMENT
INSTRUCTIONS,
and
6.,
ADDITIONAL
INFORMA
TION.
References
T
able:
References
T
echnical
Publication
LEAP
-
1B
-
72
-
30
-
00
-
05A
-
53AA
-
C
LEAP
-
1B
-
72
-
00
-
00
-
01A
-
31AA
-
C
LEAP
-
1B
-
72
-
32
-
00
-
05A
-
53BA
-
C
LEAP
-
1B
-
72
-
00
-
31
-
01A
-
310A
-
C
LEAP
-
1B
-
72
-
31
-
00
-
01A
-
530A
-
C
LEAP
-
1B
-
72
-
30
-
00
-
01A
-
710A
-
C
LEAP
-
1B
-
72
-
31
-
00
-
01A
-
710A
-
C
LEAP
-
1B
-
72
-
32
-
00
-
05A
-
71BA
-
C
Management
information
Manufacturer
recommendation:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Recommended
T
ask
type:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Inspection
Original
issue
date:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2023
-
07
-
20
1.
REVISION
INFORMA
TION
A.
Revision
reason
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
3/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 4

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Issue
Number
Revision
Reason
001
Baseline.
002
T
o
update
paragraphs
3.,
PLANNING
INFORMA
TION,
4.,
MA
TERIAL
INFORMA
TION,
5.,
ACCOMPLISHMENT
INSTRUCTIONS,
and
6.,
ADDITIONAL
INFORMA
TION.
B.
Revision
history
Issue
Number
Issue
Date
001
2023
-
07
-
20
2.
SUMMAR
Y
A.
Reason
T
o
improve
reliability
.
3.
PLANNING
INFORMA
TION
A.
Applicability
This
Service
Bulletin
is
applicable
to:
•
Engine
type:
LEAP
-
1B
•
Engine
model(s):
LEAP
-
1B21,LEAP
-
1B23,LEAP
-
1B25,LEAP
-
1B27,LEAP
-
1B28,LEAP
-
1B28B1,LEAP
-
1B28B2,LEAP
-
1B28B2C,LEAP
-
1B28B3,LEAP
-
1B28BBJ1,LEAP
-
1B28BBJ2
This
Service
Bulletin
is
applicable
to
these
LEAP
-
1B
engines:
•
LEAP
-
1B
engines,
serial
numbers
60A635,
60A639,
60A641
through
60A663,
60A665,
60A669,
60A670,
60A671,
60A673,
60A676
through
60A679,
60A681,
60A682,
60A686
through
60A693,
60A696,
and
60A702.
These
serial
numbers
are
the
best
available
data.
The
parts
listed
in
T
able
1
below
are
af
fected
by
this
Service
Bulletin.
T
able
1:
List
of
Suspect
Parts
Part
Nomenclature
Part
Number
Manufacturer
CAGE
Codes
Production
Date
Codes
Stage
2
compressor
stator
seal
(stage
2
seal)
(SIN:
076N2)
2639M52G01
21023
BS,
CS,
DS,
ES
Stage
2
compressor
stator
seal
(stage
2
seal)
(SIN:
076N3)
2639M52G02
21023
BS,
CS,
DS,
ES
NOTE:
Parts
of
manufacturer
CAGE
code
different
than
"21023"
are
not
suspect
parts.
Also,
these
will
not
be
accompanied
by
production
date
codes.
B.
Concurrent
requirements
None.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
4/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 5

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
C.
Reason
(1)
Objective:
T
o
improve
reliability
.
(2)
Condition:
The
suspected
rotating
and
static
parts
could
be
subject
to
increased
rub
depth
with
possible
stage
3
-
4
compressor
rotor
blisk
(stage
3
-
4
blisk)
seal
teeth
coating
damage.
(3)
Cause:
The
suspected
stage
2
seals
may
have
been
manufactured
without
detailed
finish
machining
and
installed
into
the
forward
stator
assembly
.
Suspect
stage
2
seals
may
introduce
a
stock
-
on
condition,
which
could
create
deeper
rubs
and
mechanical
damage
to
the
mating
rotors
coating
system
during
initial
operations.
Concurrent
presence
of
these
conditions
could
introduce
local
material
damage
to
rotating
seal
teeth
from
increased
rub
severity
.
(4)
Inspection:
One
-
time
360
-
degree
borescope
inspection
(BSI)
to
identify
suspect
parts
and
evaluate
the
condition
of
static
and
rotating
seal
interface.
(5)
Substantiation:
Substantiation
is
by
analysis.
D.
Description
This
Service
Bulletin
provides
a
recommendation
to
do
a
one
-
time
BSI
of
the
honeycomb
structure
of
the
suspected
stage
2
seals
and
rotating
seal
teeth
coating
condition.
This
Service
Bulletin
provides
instructions
to
find
the
serviceability
of
the
suspected
components
that
failed
BSI.
E.
Compliance
Category
2
NOTE:
Some
steps
in
paragraphs
3.E.,
Compliance
and
5.,
ACCOMPLISHMENT
INSTRUCTIONS
are
identi-
fied
as
Required
for
Compliance
(RC).
If
this
Service
Bulletin
is
mandated
by
an
Airworthiness
Directive
(AD),
the
steps
identified
as
RC
must
be
done
to
comply
with
the
AD.
Steps
not
identified
with
RC
are
recommended
and
may
be
deviated
from;
done
as
a
part
of
other
actions;
or
done
with
accepted
methods
different
from
those
given
in
this
Service
Bulletin
if
the
RC
steps
can
be
done
and
the
airplane
returned
to
a
serviceable
condition.
RC
-
CFM
recommends
that
you
do
this
Service
Bulletin
as
soon
as
possible
without
ef
fect
on
revenue
service
but
before
1,600
cycles
since
new
(CSN)
or
within
60
days
of
the
Service
Bulletin
issue
date,
whichever
occurs
later
.
Impact
A
This
recommendation
is
to
address
a
condition
that
may
af
fect
Flight
Safety
.
NOTE:
This
Service
Bulletin
can
be
done
on
wing
or
in
shop.
This
Service
Bulletin
is
of
fered
to
improve
the
reliability
or
performance
of
your
CFM
product,
or
to
help
prevent
the
occurrence
of
the
event
or
condition
described
in
this
Service
Bulletin.
If
the
operator
elects
not
to
participate
in
the
bulletin,
that
decision
will
be
taken
into
consideration
by
CFM
in
evaluating
future
product
performance
issues
that
may
arise
in
the
operator
’
s
fleet.
F
.
Approval
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
5/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 6

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
The
technical
content
of
this
Service
Bulletin
is
approved
by
the
F
AA
and
under
the
Authority
of
DOA
No.
EASA.21J.086.
G.
Manpower
After
you
get
access
to
the
high
pressure
compressor
(HPC)
stage
3
BSI
port
(port
F),
you
will
need
approximately
4
man
-
hours
to
do
the
inspection
portion
of
this
Service
Bulletin.
H.
W
eight
and
balance
W
eight
and
balance
are
not
changed.
I.
Electrical
load
data
Not
Applicable.
J.
Software
accomplishment
summary
Not
Applicable.
K.
Referenced
documentation
American
Society
of
Non
-
Destructive
T
esting
(ASNT
-
TC
-
1A)
Air
T
ransport
Association
Specification
No.
105
(A
T
A
105)
Guidelines
For
T
raining
and
Qualifying
Personnel
in
Nondestructive
T
est
Methods
Boeing
737
-
7/8/8200/9
Aircraft
Maintenance
Manual
(AMM)
CFM
LEAP
-
1B
Engine
Illustrated
Parts
Catalog
(EIPC),
CFM
-
TP
-
620
EIPC.21
CFM
LEAP
-
1B
Engine
Shop
Manual
(ESM),
CFM
-
TP
-
620
SM.21
COSAC
(Comité
Sectoriel
Aérospatial
de
Certification)
NAS410
-
NAS
Certification
&
Qualification
of
Nondestructive
T
est
Personnel
L.
Documentation
affected
None.
M.
Industry
support
information
Please
submit
a
commercial
inquiry
on
the
customer
portal
with
D
-
2348
referenced.
N.
Interchangeability
Not
Applicable.
4.
MA
TERIAL
INFORMA
TION
List
of
material
sets
Not
Applicable.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
6/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 7

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
List
of
support
equipment
Support
equipment
Name
T
ool
Number
Reference
(Qty)
MFR
Unit
$
Price
(Pkg
Qty)
L/T
Standard
T
ools
FLEXIBLE
BORESCOPE
(2.8
mm
max.
diameter
,
2.0
m
min.
cord
length)
-
Not
Applicable
(1)
-
-
(
-)
-
NOTE:
Replenishment
Lead
T
ime
(L/T)
in
days.
NOTE:
Prices
are
provided
for
planning
purposes
and
are
subject
to
change.
List
of
supplies
Not
Applicable.
List
of
spares
Spares
New
PN
/
SIN
/
MFR
(New
Qty)
Unit
$
Price
(Pkg
Qty)
L/T
New
Part
Name
(CSN)
2552M03G03
/
056A2
/
07482
(1)
518,500
.00
(1)
60
BLISK,
ST
AGE
3
-
4
COMPRESSOR
ROT
OR
(01
-
100
00A,
72
-
31
-
00)
2639M52G01
/
076N2
/
07482
(2)
6,941.00
(1)
5
SEAL,
ST
AGE
2
COMPRESSOR
ST
A
T
OR
(01
-
320
00A,
72
-
32
-
00)
2639M52G02
/
076N3
/
07482
(2)
6,941.00
(1)
5
SEAL,
ST
AGE
2
COMPRESSOR
ST
A
T
OR
(01
-
330
00A,
72
-
32
-
00)
NOTE:
Replenishment
Lead
T
ime
(L/T)
in
days.
NOTE:
Prices
are
provided
for
planning
purposes
and
are
subject
to
change.
List
of
removed
spares
Not
Applicable.
5.
ACCOMPLISHMENT
INSTRUCTIONS
A.
General
NOTE:
These
accomplishment
instructions
refer
to
methods,
techniques,
and
practices
specified
in
other
documents.
When
the
words
"refer
to"
are
used
and
there
are
other
acceptable
methods,
techniques,
and
practices
(in-
cluding
tools,
equipment,
and
test
equipment)
those
acceptable
methods,
techniques,
practices
(including
tools,
equipment,
and
test
equipment)
may
be
used
to
complete
the
work.
When
the
words
"in
accordance
with"
are
included
in
the
instruction,
the
methods,
techniques,
and
practices
specified
(including
tools,
equip-
ment,
and
test
equipment)
in
the
specified
document
must
be
used.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
7/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 8

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
(1)
Get
access
and
remove
compressor
stator
borescope
plug
(borescope
plug)
(SIN:
073S1,
Figure
1
)
in
stage
3
BSI
port
(port
F).
Refer
to
the
Boeing
737
-
7/8/8200/9/10
AMM,
72
-
00
-
00,
INSPECTION/CHECK,
T
ASK
72
-
00
-
00
-
290
-
804
-
G00,
Subtask
72
-
00
-
00
-
020
-
006
-
G00.
(2)
Do
an
inspection
of
the
removed
borescope
plug
(SIN:
073S1,
Figure
1
)
in
stage
3
BSI
port
(port
F).
Refer
to
the
Boeing
737
-
7/8/8200/9/10
AMM,
72
-
00
-
00,
PREP
ARA
TION
FOR
BORESCOPE
INSPECTION,
T
ASK
72
-
00
-
00
-
290
-
801
-
G00,
Subtask
72
-
00
-
00
-
290
-
003
-
G00.
(3)
RC
-
Do
a
360
-
degree
BSI
of
the
trail
edge
(TE)
area
of
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3,
Figure
1
)
to
verify
identification
markings
as
follows:
(a)
Insert
the
flexible
borescope
through
the
stage
3
BSI
port
(port
F)
and
guide
it
between
the
stage
2
compressor
stator
shrouds
(stage
2
shrouds)
(SIN:
071C0,
SIN:
071C1,
SIN:
071C2,
and
SIN:
071C3)
TE
and
stage
3
-
4
compressor
rotor
blisk
(stage
3
-
4
blisk)
(SIN:
056A2)
lead
edge
(LE)
to
see
the
aft
J
-
hook
of
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3).
NOTE:
It
is
necessary
to
insert
a
minimum
2.0
m
long
flexible
borescope
into
the
lower
cavity
between
the
HPC
rotor
and
stator
.
It
is
recommended
that
the
borescope
probe
is
2.8
mm
in
diameter
(maximum).
(b)
Feed
the
flexible
borescope
360
degrees
along
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
TE.
(c)
Get
a
view
of
the
aft
J
-
hook
of
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
to
see
the
identification
markings,
such
as
part
number
,
manufacturer
CAGE
code,
and
production
date
code.
Refer
to
Figure
2
.
(d)
Start
the
video
recording
on
the
BSI
equipment.
(e)
Pull
the
flexible
borescope
to
do
an
inspection
of
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
TE
markings.
Focus
on
manufacturer
CAGE
code
and
production
date
code.
Each
code
must
be
clearly
visible.
Refer
to
Figure
2
.
NOTE:
There
are
four
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
segments.
There
is
one
manufacturer
CAGE
code
and
one
production
date
code
per
seal
segment.
Manufacturer
CAGE
code
marking
is
dot
-
peened
and
is
easily
readable.
Production
date
code
is
ink
-
marked
or
handwritten
and
could
be
unclear
or
not
visible.
Refer
to
Figure
2
.
(4)
RC
-
Evaluate
the
BSI
results
from
paragraph
5.A.(3)
and
do
as
follows:
(a)
If
all
four
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
segments
manufacturer
CAGE
code
and
production
date
code
are
confirmed
to
be
outside
of
the
suspect
population
listed
in
T
able
1
,
BSI
is
complete
and
engine
is
serviceable.
NOTE:
Findings
can
be
reported
to
CFM.
Contact
details
are
specified
in
paragraph
6.,
ADDITIONAL
INFORMA
TION.
(b)
If
one
or
more
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
segments
has
manufacturer
CAGE
code
and
production
date
code
markings
as
listed
in
T
able
1
or
date
codes
markings
are
illegible,
do
as
follows:
1
Reset
the
flexible
borescope
position
for
another
360
-
degree
BSI.
2
Get
a
view
of
the
honeycomb
structure
and
seal
tooth
of
the
stage
3
-
4
blisk
(SIN:
056A2).
Rub
track
in
the
honeycomb
must
be
visible.
Optimal
view
shown
in
Figure
3
.
3
Start
video
recording
and
complete
a
360
-
degree
BSI
of
the
rotating
seal
tooth
and
honeycomb
struc-
ture
interface,
pay
special
attention
to
the
split
lines
between
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
segments,
located
at
the
3:00,
6:00,
9:00,
and
12:00
o'clock
areas.
Refer
to
Figure
4
.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
8/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 9

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
NOTE:
During
this
BSI,
the
flexible
borescope
will
be
put
in
a
cavity
created
by
rotor
seal
tooth,
honeycomb
seal
surface,
and
rotor
arm
of
the
stage
3
-
4
blisk
(SIN:
056A2),
which
will
help
in
flexible
borescope
navigation.
Refer
to
Figure
5
.
(5)
RC
-
Use
a
frame
(photo)
from
BSI
video
to
estimate
the
rub
depth
on
the
suspected
honeycomb
seal
segments,
where
the
manufacturer
CAGE
and
production
date
codes
match
the
codes
listed
in
T
able
1
,
or
date
code
markings
are
illegible.
Post
process
the
selected
image
as
follows:
NOTE:
CFM
can
provide
technical
assistance
in
rub
depth
calculation
in
paragraph
5.A.(5)(a)
through
5.A.(h).
If
necessary
,
submit
the
request
to
CFM,
refer
to
paragraph
6.,
ADDITIONAL
INFOR-
MA
TION
for
contact
details.
NOTE:
The
engine
can
be
operated
until
the
evaluation
of
the
BSI
data
is
completed
as
specified
in
step
5.A.(5)
and
this
Service
Bulletin
is
done
in
accordance
with
paragraph
3.E.,
Compliance.
(a)
Use
a
software
for
visual
presentation
aligning
BSI
photo
as
shown
in
example
picture.
Refer
to
Figure
6
(Detail
A).
(b)
T
race
converging
perspective
lines
on
the
BSI
image.
Refer
to
Figure
6
(Detail
A).
(c)
T
race
contours
of
hexagonal
honeycomb
seal
cells
(one
row)
and
reconstruct
missing
edges
with
per-
spective
lines
as
an
aid.
Refer
to
Figure
6
(Detail
B).
(d)
Measure
perceived
cell
width
(wp),
perceived
cell
height
(hp)
and
perceived
rub
depth
(dp)
as
shown
in
Figure
6
(Detail
C).
(e)
Calculate
scaling
factor
(SF)
using
measured
honeycomb
wp
and
type
design
cell
data
(w).
Refer
to
Figure
6
(Detail
D
and
Detail
E).
(f)
Calculate
scaled
honeycomb
height
(hp_scaled).
Refer
to
Figure
6
(Detail
D).
(g)
Calculate
angle
of
view
α
(alpha)
with
the
formula
shown
in
Figure
6
(Detail
D).
(h)
Calculate
scaled
honeycomb
rub
depth
(dp_scaled).
Refer
to
Figure
6
(Detail
D).
(i)
Calculate
true
rub
depth
(d)
with
the
formula
shown
in
Figure
6
(Detail
D).
(j)
Compare
true
rub
depth
(d)
against
T
able
2
.
Manage
the
engine
accordingly
.
T
able
2:
Serviceability
Criteria
Assessed
rub
depth
CFM
recommendation
Within
0.030
inch
(0.76
mm)
Engine
is
serviceable
and
can
return
to
service.
BSI
is
complete.
Greater
than
0.030
inch
(0.76
mm)
Remove
the
engine
before
2,900
CSN
to
further
evaluate
serviceability
as
specified
in
paragraph
5.B.,
In
-
Shop
Corrective
Action
W
ork
-
Scope
Instructions.
(6)
Install
again
the
previously
removed
borescope
plug
(SIN:
073S1,
Figure
1
)
in
stage
3
BSI
port
(port
F).
Refer
to
the
Boeing
737
-
7/8/8200/9/10
AMM,
72
-
00
-
00,
INSPECTION/CHECK,
T
ASK
72
-
00
-
00
-
290
-
804
-
G00,
Subtask
72
-
00
-
00
-
010
-
01
1
-
G00.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
9/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 10

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
B.
In
-
Shop
Corrective
Action
W
ork
-
Scope
Instructions
(1)
This
section
applies
only
if
the
BSI
evaluation
in
step
5.A.(5)(j)
identified
rub
depths
beyond
the
service-
ability
criteria
specified
in
T
able
2
.
(2)
Remove
the
forward
compressor
stator
assembly
[HPC
forward
stator
assembly
(SIN:
07000)]
to
enable
360
-
degree
inspection
access
to
the
stage
3
-
4
blisk
(SIN:
056A2)
forward
seal
teeth
and
mating
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
listed
in
T
able
1
.
Refer
to
the
LEAP
-
1B
ESM,
72
-
30
-
00,
DISASSEM-
BLE
ENGINE
MODULAR
SECTION
(
Refer
to:
LEAP
-
1B
-
72
-
30
-
00
-
05A
-
53AA
-
C
),
and
do
as
follows:
(a)
Do
an
inspection
of
the
parts
and
modules
removed
for
access
to
the
stage
3
-
4
blisk
(SIN:
056A2)
forward
seal
teeth.
Refer
to
the
LEAP
-
1B
ESM,
72
-
00
-
00,
CHECK
INSPECTION
(
Refer
to:
LEAP
-
1B
-
72
-
00
-
00
-
01A
-
31AA
-
C
).
(3)
RC
-
Do
an
inspection
of
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
honeycomb
listed
in
T
able
1
as
follows:
(a)
Maximum
groove
depth
must
be
less
than
0.040
in
(1.02
mm)
in
depth.
A
verage
axial
distance
between
adjacent
grooves
or
edge
must
be
more
than
0.093
in
(2.36
mm).
(b)
Damaged
cells
length
at
ends
must
be
less
than
0.125
in
(3.18
mm).
All
other
areas,
0.125
sq
in.
(80.65
sq
mm)
total
damage
for
each
stage
(all
segments),
if
the
damage
does
not
go
axially
across
the
seal.
(c)
Remove
the
unserviceable
stage
2
seals
(SIN:
076N2
and
SIN:
076N3).
Refer
to
the
LEAP
-
1B
ESM,
72
-
32
-
00,
DISASSEMBLE
ENGINE
SUBASSEMBLIES
(
Refer
to:
LEAP
-
1B
-
72
-
32
-
00
-
05A
-
53BA
-
C
).
(4)
RC
-
Do
an
inspection
of
the
forward
arm
seal
teeth
of
the
stage
3
-
4
blisk
(SIN:
056A2,
Figure
5
)
for
missing
coating.
Refer
to
the
LEAP
-
1B
ESM,
72
-
00
-
31,
VISUAL
EXAMINA
TION
(
Refer
to:
LEAP
-
1B
-
72
-
00
-
31
-
01A
-
310A
-
C
).
(5)
RC
-
Do
an
eddy
current
inspection
(ECI)
of
the
forward
arm
seal
teeth
of
the
stage
3
-
4
blisk
(SIN:
056A2,
Figure
5
).
Refer
to
paragraph
6.B.,
Additional
information.
(6)
RC
-
If
the
condition
of
the
stage
3
-
4
blisk
(SIN:
056A2,
Figure
5
)
seal
teeth
on
the
forward
rack
is
rejected
as
specified
in
the
ECI
inspection
results
from
step
5.B.(5)
or
missing
coating
evaluation
from
step
5.B.(4)
of
the
stage
3
-
4
blisk
(SIN:
056A2),
the
stage
3
-
4
blisk
(SIN:
056A2)
is
unserviceable
and
you
must
do
as
follows:
(a)
Remove
the
stage
3
-
4
blisk
(SIN:
056A2)
from
the
HPC
rotor
assembly
(SIN:
05000).
Refer
to
the
LEAP
-
1B
ESM,
72
-
31
-
00,
DISASSEMBLE
PROCEDURE
(
Refer
to:
LEAP
-
1B
-
72
-
31
-
00
-
01A
-
530A
-
C
).
(b)
Remove
all
the
stage
2
seals
(SIN:
076N2
and
SIN:
076N3).
Refer
to
the
LEAP
-
1B
ESM,
72
-
32
-
00,
DISASSEMBLE
ENGINE
SUBASSEMBLIES
(
Refer
to:
LEAP
-
1B
-
72
-
32
-
00
-
05A
-
53BA
-
C
)
and
T
able
1
.
NOTE:
The
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
removal
is
recommended
to
avoid
damage
on
replaced
stage
3
-
4
blisk
(SIN:
056A2).
(7)
Assemble
the
HPC
module
assembly
(SIN:
08000),
HPC
forward
stator
assembly
(SIN:
07000),
and
HPC
rotor
assembly
(SIN:
05000)
again
as
necessary
.
Refer
to
the
LEAP
-
1B
ESM,
72
-
30
-
00,
ASSEMBLE
PRO-
CEDURE
(
Refer
to:
LEAP
-
1B
-
72
-
30
-
00
-
01A
-
710A
-
C
)
and
do
as
follows:
(a)
RC
-
If
previously
removed
as
unserviceable,
install
a
new
or
serviceable
stage
3
-
4
blisk
(SIN:
056A2).
Refer
to
the
LEAP
-
1B
ESM,
72
-
31
-
00,
ASSEMBLE
PROCEDURE
(
Refer
to:
LEAP
-
1B
-
72
-
31
-
00
-
01A
-
710A
-
C
).
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
10/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 11

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
(b)
RC
-
If
previously
removed
as
unserviceable,
install
a
new
or
serviceable
stage
2
seals
(SIN:
076N2
and
SIN:
076N3).
Refer
to
the
LEAP
-
1B
ESM,
72
-
32
-
00,
ASSEMBLE
ENGINE
SUBASSEMBLIES
(
Refer
to:
LEAP
-
1B
-
72
-
32
-
00
-
05A
-
71BA
-
C
).
CAUTION:
IF
YOU
REPLACE
ONE
OR
MORE
ST
AGE
2
SEALS
(SIN:
076N2
AND
SIN:
076N3),
DO
A
PRE
-
GROOVING
OF
THE
NEW
HONEYCOMB
SEAL
AND/OR
A
RECOA
TING
OF
THE
INTERST
AGE
SEAL
TEETH
ON
THE
ASSOCIA
TED
ST
AGE
3
-
4
BLISK
(SIN:
056A2).
DO
NOT
ENGAGE
THE
UNCOA
TED
INTERST
AGE
SEAL
TEETH
WITH
A
NEW
HONEYCOMB
SEAL.
DAMAGE
T
O
THE
ENGINE
CAN
OCCUR
(8)
Return
unserviceable
stage
3
-
4
blisk
(SIN:
056A2)
and
stage
2
seals
(SIN:
076N2
and
SIN:
076N3)
to
CFM.
Refer
to
paragraph
6.A.,
Additional
information.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
1
1/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 12 (OCR)

cim
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
FLEXIBLE
BORESCOPE
ROUTING  BORESCOPE PLUG
(SIN: 073S1) (PORT F)
STAGE 2
VANE
(SIN: 072C0)
(SIN: 072C1)
STAGE 2  BLISK  - A
(SIN: 056A1)  -STAGE 3-4
BLISK
(SIN: 056A2)
FWD
ICN-LEAP-1B-72000394-B-07482-00001-A-001-01
Stage 2 HPC Hardware and Borescope Plug Locations with Flexible Borescope Path
Figure  1 (Sheet 1 of 2)
LEAP-1B-72-00-0394-01A-930A-D
Page 12/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 13 (OCR)

cfm|)
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
DETAIL A
FLEXIBLE
BORESCOPE
ROUTING
STAGE 2
SHROUD
(SIN: 071CO)
(SIN: 071C1)
(SIN: 071C2)
(SIN: 071C3)
• STAGE 3-4
BLISK
(SIN: 056A2)
STAGE 2 SEAL
(SIN: 076N2)  INSPECTED AFT
FWD  (SIN: 076N3)  J-HOOK TRAILING  EDGE SURFACE
ICN-LEAP-1B-72000394-B-07482-00002-A-001-01
Stage 2 HPC Hardware and Borescope Plug Locations with Flexible Borescope Path
Figure 1 (Sheet 2 of 2)
LEAP-1B-72-00-0394-01A-930A-D
Page 13/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 14 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
SECTION AA
AFT LOOKING FORWARD
12:00 O'CLOCK
POSITION
9:00 O'CLOCK  3:00 O'CLOCK
POSITION  POSITION
STAGE 2 SHROUD
(SIN: 071CO)  STAGE 2 SEAL
(SIN: 071C1)  (SIN: 076N2)
(SIN: 071C2)  (SIN: 076N3)
(SIN: 071C3)  6:00 O'CLOCK
POSITION
PRODUCTION DATE  MANUFACTURER
CODE - INK MARKED  CAGE CODE
ICN-LEAP-1B-72000394-B-07482-00003-A-001-01
Stage 2 Seals Markings View
Figure 2
LEAP-1B-72-00-0394-01A-930A-D
Page 14/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 15 (OCR)

[cfm|)
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
RUB TRACK
ROTATING  (GROOVE)  SPLIT LINE
SEAL  SEAL A  BETWEEN SEAL
TOOTH  SEGMENTS
(GROOVE)  RUB TRACK  HONEYCOMB  STRUCTURE
SEAL B
ICN-LEAP-1B-72000394-B-07482-00004-A-001-01
Optimal View to Honeycomb Groove
Figure 3
LEAP-1B-72-00-0394-01A-930A-D
Page 15/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 16 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
SECTION AA
AFT LOOKING FORWARD
12:00 O'CLOCK
POSITION
9:00 O'CLOCK  3:00 O'CLOCK
POSITION  POSITION
STAGE 2
SHROUD  STAGE 2 SEAL
(SIN: 071CO)  (SIN: 076N2)
(SIN: 071C1)  6:00 O'CLOCK  (SIN: 076N3)
(SIN: 071C2)  POSITION
(SIN: 071C3)
NOTE:
HIGHEST PRIORITY: VIEWS OF HONEYCOMB
GROOVE OF ALL FOUR STAGE 2 SEAL SEGMENTS
AT 9:00 AND 3:00 O'CLOCK.  ICN-LEAP-1B-72000394-B-07482-00005-A-001-01
3:00 and 9:00 O'Clock Area
Figure 4
LEAP-1B-72-00-0394-01A-930A-D
Page 16/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 17 (OCR)

cfm )
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
RUB TRACK  FLEXIBLE
(GROOVE)  BORESCOPE
STAGE 3-4 BLISK
(SIN: 056A2)
STAGE 2 SEAL
(SIN: 076N2)
(SIN: 076N3)  CAVITY CREATED
BY ROTATING SEAL
FWD  TOOTH, HONEYCOMB SEAL
SURFACE, AND ROTOR ARM
STAGE 3-4 BLISK
SEAL TEETH RACK
ICN-LEAP-1B-72000394-B-07482-00006-A-001-01
Channel-Like Cavity and Seal Teeth Rack
Figure 5
LEAP-1B-72-00-0394-01A-930A-D
Page 17/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 18 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
PHOTO PROCESSING SEQUENCE FOR RUB DEPTH CALCULATION
DETAIL A
DETAIL B  DETAIL C
hp
dp
wp
DETAIL D
SCALING FACTOR SF = W/Wp
hp_scaled = hp*SF
dp_scaled = dp*SF
ANGLE OF VIEW alpha = sin (hp_scaled/h
TRUE RUB DEPTH d = dp_scaled/cos(alpha)
DETAIL E  GEOMETRICAL RELATION
W=0.063 (1.60)  TRUE VALUE OF RUB DEPTH  OF MEASURED AND
h=0.072
(1.83)  hp scaled
1/16 INCH  dp scaled  h
HONEYCOMB CELL SIZE  a
NOTE:
DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.  ICN-LEAP-1B-72000394-B-07482-00007-A-001-01
Rub Depth Calculation
Figure 6
LEAP-1B-72-00-0394-01A-930A-D
Page 18/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media

### Page 19

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
6.
ADDITIONAL
INFORMA
TION
A.
Additional
information
T
able
3:
CFM
Contact
Information
CFM
SA
ZONE
CFM
Inc.
Zone
Customer
Support
Center:
http://mycfmportal.com
Widget
AskCFM
GE
A
viation
Fleet
Support:
http://www
.geaviation.com/support
OR
OR
E
-
mail:
cfm.csc@safrangroup.com
E
-
mail
(USA):
aviation.fleetsupport@ge.com
E
-
mail
(China
and
Asia):
aviation.fleetsupport.cn@ge.com
OR
OR
PSE
CFM
SAFRAN
Aircraft
Engines
Site
de
MELUN
MONTEREAU
BP
1936
-
77019
Melun
Cedex
FRANCE
GE
A
viation
M/D
Rm.
285
One
Neumann
W
ay
OH
45215
USA
OR
OR
Phone:
+33
1
64
14
88
66
Fax:
+33
1
64
14
87
65
USA
Phone:
877
-
432
-
3272
International
Phone:
(513)
552
-
3272
China
and
Asia
Phone:
+
86
21
38777666
B.
Additional
information
(1)
ECI
Inspection
Details
(a)
Stage
3
-
4
Blisk
(SIN:
056A2)
ECI
of
Coated
Seal
T
eeth
1
Do
an
ECI
of
the
stage
3
-
4
blisk
(SIN:
056A2)
forward
arm
seal
teeth
as
follows:
a
Scope
1)
This
Service
Bulletin
describes
the
equipment,
technique,
and
procedure
required
for
conducting
an
ECI
of
the
stepped
forward
rack
coated
seal
teeth
on
the
stage
3
-
4
blisk
(SIN:
056A2).
The
purpose
of
this
inspection
is
to
detect
cracking
at
the
tip
of
the
seal
teeth.
2)
This
inspection
is
to
be
accomplished
at
top
case
engine,
module,
or
piece
part
level
on
the
coated
seal
teeth.
3)
This
Service
Bulletin
describes
the
general
procedure
and
equipment
approved
to
accomplish
this
inspection.
For
specific
cases
where
the
procedure/equipment
described
herein
cannot
be
applied
in
their
total
content,
specific
exceptions
should
be
obtained
in
writing
from
GE
A
viation.
b
Applicable
Documents
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
19/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 20

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
1)
Appropriate
instrument
instruction
manuals.
c
Personnel
Requirements
1)
Personnel
performing
this
inspection
shall
be
certified
in
accordance
with
one
of
the
following:
•
NAS410
-
NAS
Certification
&
Qualification
of
Nondestructive
T
est
Personnel
•
American
Society
of
Non
-
Destructive
T
esting
(ASNT
-
TC
-
1A)
•
Air
T
ransport
Association
Specification
No.
105
(A
T
A
105)
•
COSAC
(Comité
Sectoriel
Aérospatial
de
Certification)
•
Locally
approved
certification
program
2)
Personnel
performing
this
inspection
shall
receive
practical
training
in
the
use
of
this
procedure
and
must
demonstrate
proficiency
in
calibration
of
the
inspection
equipment,
inspection
of
hardware,
and
evaluation
of
indications
before
the
authority
to
accept
and
reject
hardware
is
delegated.
3)
T
raining
which
may
be
provided
regarding
the
performance
of
this
inspection
does
not
imply
that
the
requirements
of
step
6.B.(1)(a)1c1)
above
have
been
met.
d
Equipment
Requirements
1)
The
instruments
listed
in
T
able
4
are
approved
for
use
with
this
procedure,
but
are
not
supplied
with
the
inspection
kit.
Contact
GE
A
viation
for
information
regarding
approval
of
additional
instruments
by
sending
an
email
to
ndttooling@ge.com
T
able
4:
List
of
Instruments
ST
A
VELEY
-
NOR
TEC
2000
Series
CONTROL
DESCRIPTION
INITIAL
SETTING
MAIN
FREQUENCY
500
KHZ
ANGLE
170
H
-
DB
50.0
DB
V
-
DB
50.0
DB
PROBE
DRIVE
HIGH
CONT
NULL
OFF
DISPLA
Y
SWEEP
OFF
V
-
POS
50%
H
-
POS
50%
SCREEN
PERSIST
OFF
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
20/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 21

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
DISP
ERASE
AS
NEEDED
FIL
TER
LPF
100
HZ
HPF
0
HPF
POLE
2
-
POLE
NOR
TEC
500
&
600
Series
ADAPT
OR
P/N:9230392
/
SPO
-
6701
CONTROL
DESCRIPTION
INITIAL
SETTING
FREQ
1
SETUP
FREQ
500
KHz
ANGLE
170
GAIN
-
H
50
GAIN
-
V
50
FIL
TER
SETUP
HiP
ASS
OFF
LowP
ASS
100
CONT
NULL
OFF
PRE
AMP
OFF
BALANCE
OFF
DISPLA
Y
SCREEN
SETUP
H
POS
50%
V
POS
50%
DOT/BOX
DOT
ERASE
SETUP
PERSIST
OFF
DISP
ERS
AS
NEEDED
SWP
ERS
OFF
GRA
TICUL
ON
MAIN
DSP
F1
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
21/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 22

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
SCAN
SWP
MODE
OFF
SETUP
INST
.
SETUP
PROBE
DRIVE
HIGH
ANGSTEP
1
FRQ
MODE
SINGLE
HMIX
GN
0
dB
VMIX
GN
0
dB
INST
.
PREFS
LOCK
OFF
LANG
AS
NEEDED
SOFTKEY
RIGHT
AUT
O
ERASE
ON
UNIWEST
Pro,
Premium
&
454
Series
CONTROL
DESCRIPTION
INITIAL
SETTING
FREQ
1
500
KHz
F1
Gain
27
F1
Rot
290
FREQ
2
Of
f
DRIVE
High
LP
FL
T
100
Hz
HP
FL
T
Of
f
X
Sens
0.5
v/Div
Y
Sens
=X
X
-
Null
Point
0.0
Div
Y
-
Null
Point
0.0
Div
AUT
O
CLEAR
AS
NEEDED
ROHMANN
ELOTEST
B1
V3
Series
Adapter
P/N
B1
-
NOB
8H
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
22/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 23

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
CONTROL
DESCRIPTION
INITIAL
SETTING
FREQ
500
KHZ
BWL
ON
BW
HF
BW
AUT
O
GAIN
24
DB
PREAMP
6
DB
Y
AXIS
SPREAD
0
DB
X
AXIS
SPREAD
0
DB
PHASE
290
DISP
Y/X
FIL
TER
HIGHP
ASS
ST
A
TIC
LOWP
ASS
100
HZ
DOT
POSITION
X
&
Y
0
ROHMANN
ELOTEST
B1
V4
Series
Adapter
P/N
B1
-
NOB
8H
CONTROL
DESCRIPTION
INITIAL
SETTING
FREQ
500
KHZ
BWL
ON
GAIN
28/28
DB
PREAMP
10
DB
Y
AXIS
SPREAD
0
DB
X
AXIS
SPREAD
0
DB
PHASE
240
DISP:
Y/X
FIL
TER
HIGHP
ASS
ST
A
TIC
LOWP
ASS
100
HZ
DOT
POSITION
X
&
Y
0
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
23/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 24

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
ROHMANN
ELOTEST
B300
Series
Adapter
P/N
B1
-
NOB
8H
CONTROL
DESCRIPTION
INITIAL
SETTING
P
ARAMETER
SETUP
FREQUENCY
500
KHZ
AMPLITUDE
50%
PREAMPLIFIER
10.0
DB
MAIN
AMPLIFIER
16.0
DB
SPREAD
Y
0.0
DB
T
OT
AL
GAIN
Y/X
26.0
DB
PHASE
40
FIL
TER
LOP
ASS
100
HZ
HIP
ASS
ST
A
TIC
DOT
POSITION
Y
0.00%
DOT
POSITION
X
0.00%
PERSIST
ANCE
AS
NEEDED
PRB/CHAN
SETUP
F2
CHA
1
INPUT
A
PROBE
TYPE
NOT
USED
A
TTENUA
T
OR
OFF
HOCKING
-
PHASEC
2200
Probe
Adapter
P/N:
640
-
015
-
007
CONTROL
DESCRIPTION
INITIAL
SETTING
MODE
DIFF
1CH
DISPLA
Y
XY
VIEW
CH
1
PERSIST
AS
NEEDED
CH
1
FREQ
500
KHZ
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
24/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 25

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
CH
1
PHASE
226
CH
1
GAIN
30.0
DB
CH
1
X:Y
0.0DB
HI
-
P
ASS
DC
LO
-
P
ASS
100
HZ
INP
.
GAIN
+20DB
X
&
Y
POS
0
SUBMENU
GRA
TICULE
RECT
.
PROBE
ST
ANDARD
DRIVE
0
DB
2.0
V
HOCKING
PHASEC
2s
Probe
Adapter
P/N:
640
-
015
-
007
CONTROL
DESCRIPTION
INITIAL
SETTING
GAIN
DB
28.0/28.0
X
DB
28
Y
DB
28
PHASE
70
FREQUENCY
500
KHZ
HIP
ASS
HZ
DC
LOP
ASS
HZ
100
BAND
LOCK
OFF
PROBE
BRIDGE
LOAD
mH
22
INPUT
GAIN
LOW
SWEEP
N/A
PERSITST
AS
NEEDED
GRA
TICULE
GRID
2
SPOT
X
50%
SPOT
Y
50%
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
25/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 26

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
HOCKING
PHASEC
2d
Probe
Adapter
P/N:
640
-
015
-
007
CONTROL
DESCRIPTION
INITIAL
SETTING
GAIN
XY1
28.0/28.0
PHASE1
260
FREQ1
500
KHZ
FIL
TER1
BP/RA
TIO
HP/LP1
DC/100
PROBE
BRIDGE
DISPLA
Y
SPOT
GRA
TICULE
GRID
2
SPOT
XY
90/0
SPOT
INFO
NONE
PERSIST
AS
NEEDED
SWEEP
NA
LOAD
mH
22
2)
The
following
items
listed
in
T
able
5
are
supplied
with
inspection
kit
GE
-
FQAP
-
802.
T
able
5:
List
of
Items
in
Kit
GE
-
FQAP
-
802
Item
Qty
Part
Number
Description
1
1
SGP
-
171
Calibration
Standard
2
1
SGP
-
1
13
Calibration
Standard
Holder
3
2
US
-
3313
Eddy
Current
Probe
4
2
JO57138
-
R1
Eddy
Current
Probe
Holder
(Spring
Included)
5
2
JO58579
-
R1
Eddy
Current
Probe
Holder
Handle
(4
attachment
bolts
included)
6
2
94161
Probe
Cable
7
2
5490
T
eflon
T
ape
to
be
continued
...
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
26/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 27

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Item
Qty
Part
Number
Description
8
1
Q404
Black
Action
Marker
(size
33
fine)
9
1
iM2100
Storm
Case
10
1
N/A
Label
3)
Replacement
for
items
1,
2,
3,
4,
and
5
must
be
obtained
through
GE
A
viation.
Refer
to
paragraph
6.B.(1)(a)1d4).
4)
T
o
obtain
a
kit,
additional
items,
or
replacement
items,
contact
the
NDT
T
ooling
Group
via
this
email
ndttooling@ge.com
e
Pre
-
Part
Inspection
Preparation
W
ARNING:
USE
PROTECTIVE
GLOVES
T
O
PREVENT
INJUR
Y
FROM
SHARP
EDGES
AND
ROUGH
SURF
ACES.
CAUTION:
BE
VER
Y
CAREFUL
WITH
BLADES
TIPS.
THE
BLADES
TIPS
CAN
BE
DAMAGED.
1)
If
visible,
verify
the
engine
serial
number
or
the
serial/part
number
of
the
stage
3
-
4
blisk
(SIN:
056A2).
2)
Mark
a
reference
mark
on
the
forward
side
of
the
stage
3
-
4
blisk
(SIN:
056A2),
close
to
the
seal
teeth
that
is
radially
in
line
with
the
“/”
in
the
serial
number
identification
of
the
stage
3
-
4
blisk
(SIN:
056A2).
This
will
be
the
start
and
stop
location
for
each
seal
tooth
scan.
If
the
serial
number
is
not
visible
place
an
arbitrary
mark
to
identify
the
start/stop
location
with
an
approved
marker
.
Refer
to
Figure
7
.
3)
Do
a
visual
inspection
of
the
seal
teeth
and
mark
on
the
part
the
location
of
any
nicks,
dents,
or
other
anomalies,
which
may
cause
an
indication
during
inspection.
f
Initial
Equipment
Setup
1)
T
urn
the
eddy
current
instrument
on
and
allow
it
to
warm
up
per
manufacturer
’
s
recommendations
or
at
least
10
minutes
prior
to
any
inspection.
2)
Adjust
the
instrument
to
the
initial
settings
listed
in
T
able
4
.
3)
Insert
probe
P/N
US
-
3313
into
probe
holder
P/N
JO57138
-
R1
as
follows:
a)
Make
sure
that
the
spring
is
placed
over
the
cable
connection
side
of
the
probe
and
it
is
resting
on
the
large
diameter
of
the
probe
body
.
Refer
to
Figure
8
.
b)
Grasp
the
clamp
on
the
probe
holder
by
the
two
notched
areas
and
slide
it
back
(open),
until
it
stops.
Refer
to
Figure
9
.
c)
Insert
the
probe,
coil
end
first
into
the
probe
holder
.
Refer
to
Figure
10
.
d)
Make
sure
that
the
flat
sides
of
the
probe
body
are
parallel
with
the
clamp
slot
and
the
spring
is
completely
to
the
bottom
of
the
probe
holder
counter
bored
hole.
The
clamp
should
glide
easily
over
the
top
of
the
spring
when
closing
to
keep
the
probe
locked
into
the
holder
.
e)
Attach
the
probe
holder
handle
P/N
JO58579
-
R1
to
the
probe
holder
P/N
JO57138
-
R1.
f)
Connect
the
inspection
probe
to
the
eddy
current
instrument
with
the
probe
cable.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
27/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 28

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
g
System
Calibration
1)
Do
the
calibration
of
the
system
as
follows:
a)
Apply
T
eflon
tape
to
the
probe
as
follows:
(1)
Make
sure
the
tape
is
attached
to
the
bottom
of
the
groove
in
the
probe
tip.
Refer
to
Figure
10
.
(2)
An
acceptable
method
to
attach
the
tape
into
the
groove
is
with
the
use
of
the
calibration
standard
(
Figure
1
1
)
to
push
the
tape
into
the
bottom
of
the
probe
tip
groove
and
swiping
the
probe
along
the
standard.
(3)
Make
sure
that
the
tape
does
not
inhibit
movement
of
the
probe
inside
the
probe
holder
.
b)
The
probe
holder
handle
does
not
have
to
be
attached
during
the
calibration
routine.
Refer
to
Figure
12
.
CAUTION:
IT
IS
CRITICAL
THA
T
TENSION
IS
NOT
PUT
ON
THE
PROBE
CABLE.
TENSION
WILL
CAUSE
THE
PROBE
T
O
PULL
A
W
A
Y
FROM
THE
ST
ANDARD
SURF
ACE
CAUSING
A
LIFT
OFF
EFFECT
AND
CHANGE
IN
CALIBRA
TION
SENSITIVITY
.
NOTE:
Due
to
the
narrow
width
of
the
probe
holder
,
only
one
side
will
rest
on
the
calibration
standard
holder
while
scanning.
c)
Place
the
eddy
current
probe
and
probe
holder
on
the
calibration
standard
so
the
inspection
coil
is
away
from
the
electro
discharge
machining
(EDM)
notch.
Make
sure
the
probe
holder
is
seated
flat
on
the
calibration
standard
holder
(
Figure
13
)
and
that
the
probe
spring
compresses
up
when
set
on
the
standard.
Refer
to
Figure
10
.
d)
Null
the
eddy
current
instrument.
e)
Slowly
scan
the
probe
across
the
EDM
notch
until
the
notch
is
detected
and
observe
the
response.
Scan
speed
shall
be
kept
relatively
slow
,
approximately
3
inches
per
second
(76.2
mm
per
second)
or
less.
NOTE:
While
scanning
across
the
EDM
notch
in
different
directions,
a
slight
difference
in
notch
response
may
be
observed.
The
highest
amplitude
response
(regardless
of
scan
direction)
shall
be
used
to
set
the
calibration
sensitivity
.
f)
While
scanning
back
and
forth
across
the
EDM
notch,
adjust
the
instrument
phase
and
gain
control
until
the
EDM
notch
response
is
vertical
and
6
major
divisions
peak
to
peak.
Refer
to
Figure
14
.
g)
Re
-
null
the
eddy
current
instrument
after
any
instrument
adjustments
are
made.
Make
sure
the
probe
coil
is
away
from
the
EDM
notch.
h)
Re
-
scan
the
EDM
notch
to
assure
the
notch
response
is
still
vertical
and
at
6
major
divisions
peak
to
peak.
i)
Record
all
instrument
settings
and
requested
information
on
the
appropriate
inspection
data
sheet,
Form
2562
-
1.
Refer
to
Figure
15
.
h
Hardware
Inspection
1)
Calibrate
the
equipment
in
accordance
with
the
calibration
section
of
this
document.
NOTE:
Assure
that
the
seal
teeth
are
in
the
coated
condition
prior
to
ECI.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
28/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 29

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
CAUTION:
DO
NOT
PUT
TENSION
ON
THE
PROBE
CABLE.
TENSION
WILL
CAUSE
THE
PROBE
T
O
PULL
A
W
A
Y
FROM
THE
SEAL
T
OOTH
SURF
ACE
CAUSING
A
LIFT
OFF
EFFECT
AND
CHANGE
IN
INSPECTION
SENSITIVITY
.
2)
Beginning
at
the
previously
marked
reference
point,
serial
number
,
or
arbitrary
mark
and
place
the
eddy
current
probe
over
the
number
1
seal
tooth.
Refer
to
Figure
7
.
3)
When
placing
the
coil
over
the
seal
tooth,
make
sure
the
spring
applies
pressure
to
the
probe
and
the
seal
tooth
is
riding
in
the
groove
of
both
the
probe
and
the
probe
holder
wheels.
Refer
to
Figure
16
.
4)
Maintain
the
probe
as
normal
as
possible
to
the
seal
teeth.
When
inspecting
the
seal
teeth,
the
bubble
level
may
be
used
if
visible
to
aid
the
operator
in
keeping
the
probe
normal
to
the
tooth
by
balancing
the
bubble
as
close
as
possible
between
the
two
center
lines.
When
inspecting
seal
teeth
that
are
at
an
angle,
the
bubble
level
is
not
used
and
the
operator
should
try
and
maintain
the
probe
at
a
similar
angle
as
the
seal
tooth
keeping
the
probe
as
normal
to
the
seal
tooth
as
possible.
5)
With
the
probe
seated
over
the
seal
tooth,
null
the
eddy
current
instrument.
6)
By
rotating
the
engine
core
and
holding
the
probe
stationary
,
scan
the
circumference
of
the
part
overlapping
the
start
and
stop
position
to
assure
360
degree
coverage
of
the
entire
seal
tooth.
If
the
part
will
not
rotate,
the
operator
will
have
to
scan
the
probe
around
the
part.
Scan
speed
shall
be
kept
relatively
slow
,
approximately
3
inches
per
second
or
less.
NOTE:
The
scans
do
not
have
to
be
continuous
for
360
degrees.
The
seal
tooth
can
be
divided
into
sections
and
each
section
inspected.
If
this
is
done,
care
should
be
taken
to
ensure
that
all
scans
overlap.
7)
Monitor
the
instrument
display
for
any
indication
equal
to
or
exceeding
2
major
divisions,
regardless
of
scan
direction.
Refer
to
Figure
17
.
8)
For
any
indication
equal
to
or
exceeding
2
major
divisions,
do
an
evaluation
as
described
in
the
evaluation
step
6.B.(1)(a)j.
Record
the
indication
amplitude
on
the
inspection
data
sheet
(Form
2562
-
1).
Refer
to
Figure
15
.
9)
It
is
recommended
that
the
tape
be
replaced
after
every
tooth
inspected
or
as
needed.
A
calibration
check
must
be
performed
after
every
tape
change
to
assure
the
calibration
sensitivity
has
not
changed.
10)
Repeat
steps
6.B.(1)(a)h3)
through
6.B.(1)(a)h10)
for
the
remaining
seal
tooth
2
and
seal
tooth
3
on
forward
arm
of
the
stage
3
-
4
blisk
(SIN:
056A2).
Refer
to
Figure
7
(Detail
A).
i
Post
Calibration
1)
A
calibration
check
shall
be
performed
upon
the
completion
of
each
inspection,
whenever
any
system
component
or
operator
is
changed,
after
any
tape
change,
at
least
once
every
hour
,
or
any
time
the
operator
suspects
a
change
may
have
occurred
in
the
system.
NOTE:
Due
to
the
narrow
width
of
the
probe
holder
,
only
one
side
will
rest
on
the
calibration
standard
holder
while
scanning.
2)
Place
the
eddy
current
probe
and
probe
holder
on
the
calibration
standard
so
that
the
inspection
coil
is
away
from
the
EDM
notch.
Make
sure
that
the
probe
holder
is
setting
flat
on
the
calibration
standard
holder
and
that
the
probe
spring
is
compressed
when
set
on
the
standard.
Null
the
eddy
current
instrument.
3)
Slowly
scan
the
probe
across
the
EDM
notch
of
the
calibration
standard
and
observe
the
response.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
29/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 30

LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
NOTE:
While
scanning
across
the
EDM
notch
in
different
directions
a
slight
difference
in
notch
response
may
be
observed.
The
highest
amplitude
response
(regardless
of
scan
direction)
shall
be
used
to
check
the
calibration
sensitivity
.
4)
If
the
calibration
repeats
to
within
1/2
division
full
screen
height
(5.5
to
6.5)
of
the
initial
calibration,
the
test
was
acceptable.
5)
If
the
notch
response
is
less
than
5.5
divisions,
the
system
must
be
re
-
calibrated,
and
all
hardware
inspected
since
the
last
acceptable
calibration
must
be
re
-
inspected.
6)
If
the
notch
response
is
greater
than
6.5
divisions,
the
system
must
be
re
-
calibrated
prior
to
inspection
of
additional
hardware
and
any
rejected
hardware
must
be
re
-
inspected.
j
Indication
Evaluation
1)
Regardless
of
scan
direction,
all
indications
equal
to
or
greater
than
2
major
divisions
shall
be
evaluated
by
applying
the
following
steps:
a)
Assure
the
calibration
notch
response
is
still
at
6
major
divisions
in
amplitude.
b)
V
isually
inspect
the
seal
tooth
for
any
nicks,
dents,
or
other
anomalies.
Refer
to
Figure
15
and
record
any
findings
on
Form
2562
-
1,
INDICA
TION
LOG
table,
COMMENTS
SECTION.
c)
Reposition
the
eddy
current
probe
over
the
suspect
area
of
the
seal
tooth
and
rescan
several
times
to
assure
that
the
previously
observed
indication
can
be
repeated.
If
the
calibration
is
correct
and
the
indication
is
repeatable,
the
indication
shall
be
considered
valid.
Record
seal
tooth
number
,
clocking
location
(forward
looking
aft,
clockwise),
and
signal
amplitude
associated
with
previously
noted
findings.
Refer
to
Figure
15
and
note
on
Form
2562
-
1,
INDICA
TION
LOG
table.
NOTE:
Suspect
areas
are
all
ECI
indications
equal
to,
or
greater
than
2
major
divisions
and/or
nicks,
dents,
and
other
anomalies
detected
by
visual
inspection.
d)
If
the
indication
is
not
repeatable
or
less
than
(2
major
divisions),
the
indication
is
not
valid
and
shall
be
considered
acceptable.
k
Disposition
Criteria
1)
Any
seal
tooth
indication(s)
that
equals
or
exceeds
2
major
divisions,
shall
be
considered
reject
by
this
procedure.
Refer
to
Figure
15
,
Form
2562
-
1,
INSPECTION
RESUL
TS
table.
l
Records
1)
As
a
minimum,
record
all
requested
information
on
the
inspection
data
sheet
and
forward
it
to
CFM.
Refer
to
T
able
3
and
Figure
15
.
LEAP
-
1B
-
72
-
00
-
0394
-
01A
-
930A
-
D
Page
30/
41
Issue
002
-
00
-
2024
-
01
-
23
©
CFM
PROPRIET
AR
Y
INFORMA
TION:
Subject
to
the
restrictions
on
the
media.

### Page 31 (OCR)

lefm
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
STAGE 3-4
BLISK
(SIN: 056A2)
STAGE 3
ECI STEPPED
SEAL TEETH
(QTY-3)
D
STAGE 2
STAGE 2
STAGE 2  BLISK
VANE  (SIN: 056A1)
(SIN: 072CO)
(SIN: 072C1)
DETAIL A
2  SEAL TOOTH
SERIAL NUMBER  IDENTIFICATION
REFERENCE MARK
LOCATION
ICN-LEAP-1B-72000394-B-074  482-00008-A-001-01
Seal Teeth Inspection Areas
Figure 7
LEAP-1B-72-00-0394-01A-930A-D
Page 31/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 32 (OCR)

cim
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
CABLE
CONNECTION
US 3313
S/N XXX
UNIWEST  CORRECT
SPRING
LOCATION
INSPECTION
COIL
ICN-LEAP-1B-72000394-B-07482-00009-A-001-01
Probe P/N US-3313
Figure 8
LEAP-1B-72-00-0394-01A-930A-D
Page 32/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 33 (OCR)

(cfm |
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
NOTCHED AREA TO GRIP
AND SLIDE CLAMP
CLAMP IN
CLOSED
POSITION
JO57138-R1
ICN-LEAP-1B-72000394-B-07482-00010-A-002-01
Probe Fixture P/N JO57138-R1
Figure 9
LEAP-1B-72-00-0394-01A-930A-D
Page 33/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 34 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
DETAIL A
Probe
Probe
Clamp
APPLY TAPE AS SHOWN AFTER
PROBE HAS BEEN INSTALLED
INTO PROBE HOLDER
ICN-LEAP-1B-72000394-B-07482-00011-A-002-01
Calibration Standard and Holder, Probe and Probe Fixture
Figure 10
LEAP-1B-72-00-0394-01A-930A-D
Page 34/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 35 (OCR)

cfm )
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
0.030"
L  DEEP EDM
NOTCH LOCATION
CALIBRATION STANDARD P/N:
SGP-171
MATERIAL:
TITANIUM
PLATE THICKNESS:
0.055" (0.030" ON NOTCHED SIDE)
EDM NOTCH:
0.030" DEEP X 0.003" WIDE, THROUGH
ICN-LEAP-1B-72000394-B-07482-00016-A-001-01
Calibration Standard
Figure 11
LEAP-1B-72-00-0394-01A-930A-D
Page 35/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 36 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
JO58579-R1
JO57138-R1
ICN-LEAP-1B-72000394-B-07482-00012-A-002-01
Assembly of Probe Holder Handle P/N JO58579-R1 and ECI Probe Holder P/N JO57138-R1
Figure 12
LEAP-1B-72-00-0394-01A-930A-D
Page 36/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 37 (OCR)

(cfm |
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
CALIBRATION
STANDARD
STANDARD
HOLDER
ICN-LEAP-1B-72000394-B-07482-00017-A-001-01
Calibration Standard Holder
Figure 13
LEAP-1B-72-00-0394-01A-930A-D
Page 37/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 38 (OCR)

cfm
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
6 MAJOR
DIVISIONS
ICN-LEAP-1B-72000394-B-07482-00013-A-001-01
Calibration Display - Probe P/N: US-3313
Figure 14
LEAP-1B-72-00-0394-01A-930A-D
Page 38/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 39 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
FORM 2562-1 - INSPECTION DATA SHEET FOR LEAP 1B HPCR STAGE 3-4 BLISK
ECI OF COATED SEAL TEETH ON THE FWD STEPPED RACK
DATE:  INSTRUMENT MODEL
INSPECTOR  INSTRUMENT S/N
PROBE P/N  PROBE S/N
CAL. STD. P/N  CAL. STD. S/N
FREQUENCY  LOW PASS FILTER
GAIN  HIGH PASS FILTER
PHASE  LOCATION
PART NAME
P/N  S/N
ESN:
CALIBRATION
AMPLITUDE  DIVISIONS VERTICAL
INDICATION LOG
PART (HPCR)  SEAL  LOCATION AMPLITUDE
STAGE 3-4  TOOTH IND NO  CLOCK POS  MAJOR  COMMENTS
BLISK  NO.  (FLA, CW)  DIVISION
INSPECTION RESULTS
HPCR STAGE 3-4 BLISK  ACCEPT/REJECT
SEAL TOOTH NO.
1
2
POST CALIBRATION  DIVISIONS VERTICAL
HARDWARE DISPOSITION  _ ACCEPT  REJECT
COMMENTS:
INSPECTOR SIGNATURE  DATE:
ICN-LEAP-1B-72000394-B-07482-00018-A-001-01
-orm 2562-
- Iqure 1¿
LEAP-1B-72-00-0394-01A-930A-D
Page 39/41
Issue 002-00 - 2024-01-23
© CEM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 40 (OCR)

cfm
The Power of Flight  LEAP-1B-72-00-0394-01A-930A-D
HOLD PROBE
NORMAL TO SEAL
TEETH AS SHOWN
JO58579-R1
ICN-LEAP-1B-72000394-B-07482-00015-A-002-01
Stage 3-4 Blisk Inspection Technique
Figure 16
LEAP-1B-72-00-0394-01A-930A-D
Page 40/41
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

### Page 41 (OCR)

cfm )
The Power of Flight
LEAP-1B-72-00-0394-01A-930A-D
2 MAJOR
DIVISIONS
ICN-LEAP-1B-72000394-B-07482-00014-A-001-01
EC Reject Ihreshol
LEAP-1B-72-00-0394-01A-930A-D
Page 41/41
End of data module
Issue 002-00 - 2024-01-23
© CFM PROPRIETARY INFORMATION: Subject to the restrictions on the media.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
