# Daher Service Bulletin 10-081: Revision 3

- Rights: © Socata. Filed by the FAA in regulations.gov docket FAA-2018-0326; AD 2018-21-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Daher Service Bulletin 10-081](https://openairdocs.org/service-documents/daher/sb-10-081.md)
- Title as filed: SB10-081 Rev. 3
- Pages: 9
- PDF: https://openairdocs.org/files/sha256/58/78/5878fbb07da5f334c01350df9077bf629a41c93ec519fdeb90b0c6618aa0ff62
- Page: https://openairdocs.org/service-documents/daher/sb-10-081/file/5878fbb07da5

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Page 1 / 9OCT 94
Rev. 3 --- DEC 17
SUBJECT : WING FRONT ATTACHMENTS
REFERENCE : REPAIR SHEET No. 20---084
EFFECTIVITY : TB 9, TB 10 and TB 200 aircraft
PURPOSE : To ensure integrity of the wing front attachments on wing and fuselage sides by a crack
detection inspection.
PURPOSE OF THE REVISION 1 :
Consideration of customers who, before the issue of this Service Bulletin, had already
applied kit OPT10908100 concerning side fuselage reinforcement.
PURPOSE OF THE REVISION 2 :
--- Modification of Effectivity.
--- Modification of Application.
--- Integration of the new repair solution of front attachment on wing side.
--- Removal of Figure 1 “Wing front attachment (wing side) --- Inspection / check”.
--- Addition of Figure 2 “Front spar --- Crack permissible criteria”.
--- Removal of SB Supplement pages.
PURPOSE OF THE REVISION 3 :
--- ToreplaceKitOPT10911001withKitOPT10911002(concerningwingfrontattachment).
--- To authorize Eddy current testing as a variant of dye penetrant inspection.
--- To modify application after Kit OPT109110XX installation (see Figure 2).
DESCRIPTION: Pickling,crackdetectionbydyepenetrantinspectionorEddycurrenttesting,possiblerepair
and painting of the wing front attachments on fuselage and wing sides.
SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
SOCATA
D
irection des Services TELEPHONE : 33 (0)5 62.41.73.00
65921 TARBES CEDEX 9 TELEFAX : 33 (0)5 62.41.76.54
FRANCE

### Page 2

SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
Page 2 / 9O CT 94
Rev. 3 --- DEC 17
APPLICATION: Every 3000 landings or 2000 flight hours (whichever occurs first).
A. FRONT ATTACHMENT ON WING SIDE (Perform the operations in accordance with
flowcharts hereunder)
before KITOPT109110XXinstallation --- see Figure 1
after KITOPT109110XXinstallation --- see Figure 2
Figure 1 --- Before Kit OPT109110XX installation
INSTALL KIT OPT10911002
YESNO
IS AIRCRAFT MORE
THAN 12000
LANDINGS OR 8000
FLIGHT HOURS (*)
?
YESNO
(*)WHICHEVER OCCURS FIRST
(**)PENETRANT INSPECTION OR EDDY CURRENT TESTING
IS ANY CRACK
DETECTED
?
CRACK DETECTION (**)EVERY
3000 LANDINGS OR 2000
FLIGHT HOURS (*)

### Page 3

SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
Page 3 / 9O CT 94
Rev. 3 --- DEC 17
Figure 2 --- After Kit OPT109110XX installation
(*)WHICHEVER OCCURS FIRST
(
**)PENETRANT INSPECTION OR EDDY CURRENT TESTING
KIT OPT109110XX INSTALLED
SCHEDULED
INSPECTION
SOLUTION
?
YES
KIT REPLACEMENT AT 6000
LANDINGS OR 4000 FLIGHT
HOURS (*)BY OPT10911002
1stCRACK DETECTION AT
6000 LANDINGS OR 4000
FLIGHT HOURS (*)
NO
CRACK
DETECTED
?
YES NOREPLACE KITBY KIT
OPT10911002
INSPECT (**)EVERY
3000 LANDINGS OR
2000 FLIGHT HOURS (*)
CRACK
DETECTED
?
YES NO

### Page 4

SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
Page 4 / 9O CT 94
Rev. 3 --- DEC 17
B. FRONT ATTACHMENT ON FUSELAGE SIDE
NOTE:
OnlyTB9S/N1to9999andTB10S/N1to803,805,806,809to815,820to822aircraft
areconcernedbyfrontattachmentonfuselagesidecrackdetection.
1) Perform a crack detection on fuselage side front attachment by dye penetrant
inspection --- refer to 20---00---14 of the Maintenance Manual --- or Eddy current
testing.
2) Aircraft S/N 1 to 399, 413, SL 10-14/1 notapplied, kit OPT908100 notapplied
(Attachments in 25CD4S)
a) When there is no crack :
--- Installation of kit OPT10919800 in accordance with Technical Instruction
OPT10---9198---53 Revision 2 or any later at the latest at 6000 landings
or 4000 flight hours (whichever occurs first).
--- NewinstallationofkitOPT10919800inaccordancewithTechnicalInstruction
OPT10---9198---53 Revision 2 or any later at the latest at 12000 landings
or 8000flighthoursafterthelastapplicationofthekit(whicheveroccursfirst).
b) When cracks have been detected during the inspection :
--- Installation of kit OPT10919800 in accordance with Technical Instruction
OPT10---9198---53 Revision 2 or any later.
--- NewinstallationofkitOPT10919800inaccordancewithTechnicalInstruction
OPT10---9198---53 Revision 2 or any later at the latest at 12000 landings
or 8000flighthoursafterthelastapplicationofthekit(whicheveroccursfirst).
3) Aircraft S/N 1 to 399, 413, SL 10-14/1 applied, kit OPT10908100 installed
(Attachments in 15CDV6)
a) When there is no crack :
--- Installation of kit OPT10919800 in accordance with Technical Instruction
OPT10---9198---53 Revision 2 or any later at the latest at 12000 landings
or 8000flighthoursafterthelastapplicationofthekit(whicheveroccursfirst).
b) When cracks have been detected during the inspection :
--- Installation of kit OPT10919800 in accordance with Technical Instruction
OPT10---9198---53 Revision 2 or any later.
--- NewinstallationofkitOPT10919800inaccordancewithTechnicalInstruction
OPT10---9198---53 Revision 2 or any later at the latest at 12000 landings
or 8000flighthoursafterthelastapplicationofthekit(whicheveroccursfirst).
4) TB 9 aircraft S/N 400 to 412, 414 to 9999 (Attachments in 15CDV6)
TB 10 aircraft S/N 400 to 412, 414 to 803, 805, 806, 809 to 815, 820 to 822
(Attachments in 15CDV6)
a) When there is no crack :
--- Installation of kit OPT10908100 in accordance with Technical Instruction
OPT10---9081---53 Revision 3 or any later at the latest at 12000 landings
or 8000 flight hours (whichever occurs first).

### Page 5

SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
Page 5 / 9O CT 94
Rev. 3 --- DEC 17
--- New installation of the kit OPT10908100 in accordance with Technical
Instruction OPT10---9081---53 Revision 3 or any later at the latest
at 12000 landings or 8000 flight hours after the last application of the kit
(whichever occurs first).
b) When cracks have been detected during the inspection :
--- Installation of kit OPT10908100 in accordance with Technical Instruction
OPT10---9081---53 Revision 3 or any later.
--- New installation of the kit OPT10908100 in accordance with Technical
Instruction OPT10---9081---53 Revision 3 or any later at the latest
at 12000 landings or 8000 flight hours after the last application of the kit
(whichever occurs first).
PROCURABLE MATERIAL:
--- Parts to be ordered to your TB spare parts distributor,
Item Part number Description Qty/aircraft
2 5402453300 Locknut 12
/ 5401458300 Locknut 12
/ 5402454490 Locknut 2
and if necessary :
A. Aircraft S/N 1 to 9999
Kit OPT10911002 for the front attachment on wing side
B. Aircraft S/N 1 to 399, 413
Kit OPT10919800 for front attachment on fuselage side
C. TB 9 aircraft S/N 400 to 412, 414 to 9999
TB 10 aircraft S/N 400 to 412, 414 to 803, 805, 806, 809 to 815, 820 to 822
Kit OPT10908100 for front attachment on fuselage side
CONSUMABLE MATERIAL or OTHER PRODUCTS(Local purchase) :
--- Paint remover
--- Crack detector product (dye penetrant, developer)
--- Primer
--- Final painting (according to the aircraft range)
--- Red paint
--- Methyl---Ethyl---Ketone (MEK)
TOOLS :
--- Standard aeronautical maintenance station tools
--- Wing support
--- Fuselage support

### Page 6

SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
Page 6 / 9O CT 94
Rev. 3 --- DEC 17
MANPOWER :
--- 1 mechanic, skilled in crack dye penetrant detection method
--- 3 manhours (inspection only) per aircraft
--- Application of kit OPT10911002 : 8.50 manhours per aircraft
--- Application of kit OPT10908100 : 16 manhours per aircraft
--- Application of kit OPT10919800 : 16 manhours per aircraft
--- 1 assistant (if application of one of the kits)
DESCRIPTION OF ACCOMPLISHMENT INSTRUCTIONS:
NOTE:
The inspectionand thepossible installationofkit(s)OPT10911002 and/orOPT10908100
and/orOPT10919800mustbeaccomplishedinacertifiedaeronauticalmaintenancestation
accordingtotheproceduredescribedhereafter.
A. PREPARATION
1) Remove the cowling under hull Nr 218.
2) Remove the L.H. junction fairing Nr 217L and the R.H. junction fairing Nr 217R.
3) Install supports under the R.H. and the L.H. wings and under the fuselage.
4) Remove the front seats --- refer to Chapter 25---11---00 of the Maintenance Manual.
5) Remove the side upholsterings at the frame Nr 1.
6) Remove the circuit---breaker panel.
B. PROCEDURE --- see Figures 3 and 4
NOTE:
TheproceduredescribedhereafteristhesameforL.H.andR.H.wingfrontattachments.
NOTE:
OnlyTB9S/N1to9999andTB10S/N1to803,805,806,809to815,820to822aircraft
areconcernedbyfrontattachmentonfuselagesidecrackdetection.
1) Remove wing front attachment --- refer to Chapter 57---20---03 of the Maintenance
Manual.
2) Remove and retain screw (5) and washer (1). Discard the locknut (2).
3) Cleanandnakethewingfrontattachmentfittingsonwingandfuselagesides,aswell
as small spar below front attachement on wing side. Degrease them.
4) Perform a crack detection by a dye penetrant inspection --- refer to
Chapter 20---00---04 of the Maintenance Manual or Eddy current testing.
5) If one crack is detected :
a) On the small spar (Figure 4), apply the proposal for rework described in the
Technical Instruction delivered with kit OPT10911002.
b) On the front attachment on fuselage side, apply the proposal for rework
described in the Technical Instruction delivered with kit OPT10908100 or
kit OPT10919800.

### Page 7

SERVICE BULLETIN
TB AIRCRAFT
MANDATORY
The technical content of this document is approved
u
nder the authority of DOA No. EASA.21J.013
is the subject of an AD
SB 10--081
REVISION 3
57
ATA No.
Page 7 / 9O CT 94
Rev. 3 --- DEC 17
c) InaccordancewithMaintenanceManual,onthefrontattachment,onwingside,
replace the front attachment.
NOTE:
Ifseveralcracksaredetected,flightisnotauthorized,contactDAHER.
6) If no crack has been detected, proceed to the painting of the fittings --- refer to
Chapter 20---00---03 of the Maintenance Manual.
7) Install screw (5), washer (1) and new locknut (2). Torque to 39 lbf.in (4.5 N.m).
8) Install wing front attachment --- refer to Chapter 57---20---03 of the Maintenance
Manual.
9) Mark screw (5) and locknut (2) with a red paint line.
C. RECONDITIONING
1) Install the circuit---breaker panel.
2) Install the L.H. and R.H. upholsterings.
3) Install the front seats --- refer to Chapter 25---11---00 of the Maintenance Manual.
4) Install the L.H. junction fairing Nr 217L and the R.H. junction fairing Nr 217R.
5) Install the cowling under hull Nr 218.
6) Remove the wing and fuselage supports.
UPDATING OF THE AIRCRAFT DOCUMENTATION:
Record accomplishment of Service Bulletin Nr SB10---081---57 Revision 3 ”WING FRONT
ATTACHMENTS”andthepossibleapplicationofkitsOPT10911002”Reinforcementofwing
frontattachment”and/orOPT10908100and/orOPT10919800”Frame1reinforcement,wing
attachmentarea”intheaircraftlogbook,Chapter”Aircraftmodificationsembodied”page X
or XI.
CAUTION
IF THE APPLICATION OF KIT OPT10911002 AND/OR KIT OPT10908100 AND/OR
KIT OPT10919800 ONLY AFFECT(S) ONE SIDE OF THE WING, SPECIFY IT ON THE
AIRCRAFT LOG BOOK.
WARNING : DAHER considers that it is MANDATORY for operators to comply with the instructions of
this SB.
OperatorswhoarbitrarilyignorethecompliancestatementindicatedinthisSBdosoattheir
own risk.

### Page 8 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-081  REVISION 3  57  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
1 - Washer
2 - Locknut
3 - Front seat strut
4 - Cabin floor
5 - Screw
6 - Wing front attachment
7 - Shim
0000
5
Revêtement extérieur
Outside skin
4570001AAAKYZ4600  Figure 3 - Wing front attachment (fuselage side) - Inspection / check
OCT 94  Page 8 / 9
Rev. 3 - DEC 17

### Page 9 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-081  REVISION 3  57  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
20 mm
0.79 in
14570001AAA I·724600  VOIR NOTA
SEE NOTE
10 mm MINI
0.39 in MIN
NOTA : LONGUEUR MAXIMALE DE CRIQUE ADMISSIBLE : 20 mm
NOTE: MAXIMUM CRACK LENGTH 0.79 in
Figure 4 - Front spar - Crack permissible criteria
OCT 94  Page 9 / 9
Rev. 3 - DEC 17

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
